ENS 48786: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/26/2013 16:30 PST
| event date = 02/26/2013 16:30 PST
| last update date = 02/26/2013
| last update date = 02/26/2013
| title = Loss Of Assessment Capability Due To Vital Inverter Maintenance
| title = Loss of Assessment Capability Due to Vital Inverter Maintenance
| event text = At approximately 1630 PST on February 26, 2013, Pacific Gas & Electric (PG&E) will be performing repairs on a vital inverter.  The clearance will remove power from various inputs to the Safety Parameter Display System (SPDS), Emergency Response Data System (ERDS), and Emergency Response Data and Recall Recorder Subsystem (ERFDS).
| event text = At approximately 1630 PST on February 26, 2013, Pacific Gas & Electric (PG&E) will be performing repairs on a vital inverter.  The clearance will remove power from various inputs to the Safety Parameter Display System (SPDS), Emergency Response Data System (ERDS), and Emergency Response Data and Recall Recorder Subsystem (ERFDS).
PG&E expects to have the equipment repaired and returned to service within 12 hours.  During this time, a dedicated licensed operator will be available to provide plant data to the NRC's Emergency Operations Center.
PG&E expects to have the equipment repaired and returned to service within 12 hours.  During this time, a dedicated licensed operator will be available to provide plant data to the NRC's Emergency Operations Center.

Latest revision as of 21:01, 1 March 2018

ENS 48786 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-5.17 h-0.215 days <br />-0.0308 weeks <br />-0.00708 months <br />)
Opened: Dan Stermer
19:20 Feb 26, 2013
NRC Officer: Vince Klco
Last Updated: Feb 26, 2013
48786 - NRC Website
Loading map...