TXX-4532, Interim Deficiency Rept SDAR-187 Re Deviation from FSAR Criteria in Steam Generator Design.Initially Reported on 850719.Evaluation Continuing & Completion Anticipated by 851122: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
{{#Wiki_filter:-
{{#Wiki_filter:-
l TEXAS UTILITIES GENERATING COMPANY
l TEXAS UTILITIES GENERATING COMPANY
                              . W KT WAY Te tWER
. W KT WAY Te tWER
* 100 NOHTil E DLIVE hil.EET L.fl. MS
* 100 NOHTil E DLIVE hil.EET L.fl. MS
* 13 ALLAH. TEXAM T3201 wim u.o.cousm August      9,  1985 TXX-4532 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office o' Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000                                                     Docket No.       50-445 l         Arlington, TX 76012 l
* 13 ALLAH. TEXAM T3201 August 9,
l                                       COMANCHE PEAK STEAM ELECTRIC STATION l                                     UPPER LATERAL RESTRAINT EMBEDMENT DESIGN QA FILE: CP-85-26, SDAR-187 FILE N0.: 10110
1985 wim u.o.cousm TXX-4532 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office o' Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket No.
50-445 l
Arlington, TX 76012 l
l COMANCHE PEAK STEAM ELECTRIC STATION l
UPPER LATERAL RESTRAINT EMBEDMENT DESIGN QA FILE: CP-85-26, SDAR-187 FILE N0.:
10110


==Dear Mr. Hunter:==
==Dear Mr. Hunter:==
 
}
}          On July 19, 1985 we verbally notified your D. Powell of a deficiency regarding the deviation from FSAR criteria in the design of the Unit 1 Steam Generator upper restraint embedment.
On July 19, 1985 we verbally notified your D. Powell of a deficiency regarding the deviation from FSAR criteria in the design of the Unit 1 Steam Generator upper restraint embedment.
We are continuing our evaluation and anticipate completion by November 22, 1985.
We are continuing our evaluation and anticipate completion by November 22, 1985.
Very truly yours, 4/f8 W.G. Counsil WGC:tig cc: NRC Region IV - (0 + 1 copy) gg   g Director, Inspection & Enforcement (15 copies)                                                         i U.S. Nuclear Regulatory Commission                                                   !
Very truly yours, 4/f8 W.G. Counsil WGC:tig cc: NRC Region IV - (0 + 1 copy) gg g
Washington, DC 20555
Director, Inspection & Enforcement (15 copies) i U.S. Nuclear Regulatory Commission
                                                                                                            .- MI2 m (R1   Ig 85002%k 6
.- MI2 m (R1 Washington, DC 20555 Ig 85002%k $h"45 A ').o 6
                                                              $h"45 '
%9 IE-3G
      %9 A ').o                                                                                                           IE-3G
..,,,,,,,,,,., r
                                            .. ,,, , , , ,, ,, . , r   . v T , ,. , , . - c , , , c v. m ..-}}
. v T,,.,,. - c,,, c v. m..-}}

Latest revision as of 04:46, 12 December 2024

Interim Deficiency Rept SDAR-187 Re Deviation from FSAR Criteria in Steam Generator Design.Initially Reported on 850719.Evaluation Continuing & Completion Anticipated by 851122
ML20134F223
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/09/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-187, TXX-4532, NUDOCS 8508210026
Download: ML20134F223 (1)


Text

-

l TEXAS UTILITIES GENERATING COMPANY

. W KT WAY Te tWER

  • 100 NOHTil E DLIVE hil.EET L.fl. MS
  • 13 ALLAH. TEXAM T3201 August 9,

1985 wim u.o.cousm TXX-4532 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office o' Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket No.

50-445 l

Arlington, TX 76012 l

l COMANCHE PEAK STEAM ELECTRIC STATION l

UPPER LATERAL RESTRAINT EMBEDMENT DESIGN QA FILE: CP-85-26, SDAR-187 FILE N0.:

10110

Dear Mr. Hunter:

}

On July 19, 1985 we verbally notified your D. Powell of a deficiency regarding the deviation from FSAR criteria in the design of the Unit 1 Steam Generator upper restraint embedment.

We are continuing our evaluation and anticipate completion by November 22, 1985.

Very truly yours, 4/f8 W.G. Counsil WGC:tig cc: NRC Region IV - (0 + 1 copy) gg g

Director, Inspection & Enforcement (15 copies) i U.S. Nuclear Regulatory Commission

.- MI2 m (R1 Washington, DC 20555 Ig 85002%k $h"45 A ').o 6

%9 IE-3G

..,,,,,,,,,,., r

. v T,,.,,. - c,,, c v. m..-