ML20134M237: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:__ . _ _                   _       ._       _       _ . _ _ _ _ _ _ . . _ _                     ._ _ . . _ . _
{{#Wiki_filter:,
_ . _ _ _ _ _ _ . . _ _
._ _ . . _ . _
__ . _ _
_
._
_
l
i
.
,
,
                                                                                                                            l
n,
i                                                                                                                          !
-
.
                                                                                                                            l
      ,
  n,
      -
s
s
v
v
                                                        November 15, 1996
November 15, 1996
:
:
i
i
;
;
i                 Mr. H. G. Stanley
i
Mr. H. G. Stanley
Site Vice President
+
+
                  Site Vice President
Braidwood Nuclear Power Station
                  Braidwood Nuclear Power Station
;
;                 Commonwealth Edison Company
Commonwealth Edison Company
R. R. #1, Box 84
.
.
                  R. R. #1, Box 84
Braceville, IL 60407
-
-
                  Braceville, IL 60407
:
:
i                 SUBJECT:       'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .
i
                                  456/96015(DRS); 50-457/96015(DRS)
SUBJECT:
}                 Dear Mr. Stanley:
'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .
456/96015(DRS); 50-457/96015(DRS)
}
Dear Mr. Stanley:
,
,
l;-              This refers to the inspection completed.on October 18,1996 at your Braidwood facility.
l
                  The enclosed report presents the results of that inspection.
This refers to the inspection completed.on October 18,1996 at your Braidwood facility.
;               -This insp'ection included an announced review of the licensee's radiation monitoring
;-
                  system, the control room and auxiliary building filtered Heating, Ventilation, and Air-
The enclosed report presents the results of that inspection.
;l               Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms.                   l
;
                  Special emphasis was placed on operability, and material condition of these systems. . In                 i
-This insp'ection included an announced review of the licensee's radiation monitoring
system, the control room and auxiliary building filtered Heating, Ventilation, and Air-
;l
Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms.
Special emphasis was placed on operability, and material condition of these systems. . In
i
addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.
-
-
                  addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.
ll
ll                This inspection noted that the material condition of the radioactive waste tank rooms was .
This inspection noted that the material condition of the radioactive waste tank rooms was .
j                 good as evidenced by adequate housekeeping in the areas, minimal contaminated area,                       i
j
                  and the low number of outstanding work request items for the equipment in these rooms.
good as evidenced by adequate housekeeping in the areas, minimal contaminated area,
                  Likewise the HVAC systems inspected were free of debris and found in good working
i
!                 order.
and the low number of outstanding work request items for the equipment in these rooms.
                  The radiation monitors inspected were in good working order and appropriate corrective
Likewise the HVAC systems inspected were free of debris and found in good working
!
order.
The radiation monitors inspected were in good working order and appropriate corrective
actions were being implemented for the' four monitors which exhibit recurring operability
t
t
                  actions were being implemented for the' four monitors which exhibit recurring operability
;
;                problems. However, the inspection identified that the basis document for the alarm set
problems. However, the inspection identified that the basis document for the alarm set
i                 point calculations for these monitors was informally controlled.
i
point calculations for these monitors was informally controlled.
*
*
                                                .
.
                                                                                                                            !
This inspection also noted that good radiological controls were being provided by the
                  This inspection also noted that good radiological controls were being provided by the
radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-
,,
,,
'
'
                  radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-
cycle outage. However, a review of the work control process noted a communication
                  cycle outage. However, a review of the work control process noted a communication
deficiency which contributes to issues not being evaluated or discussed until the final
                  deficiency which contributes to issues not being evaluated or discussed until the final
stages of the planning process, especially for short lead time activities.
                  stages of the planning process, especially for short lead time activities.
l
l
!'               No violations of NRC requirements were identifie'd during this inspection.
!'
No violations of NRC requirements were identifie'd during this inspection.
;.
;.
-
-
1                                                                                                                         I
1
I
i-
9611220285 961115
'
'
  i-              9611220285 961115
PDR
                  PDR    ADOCK 05000456
ADOCK 05000456
G
_PDR
-
-
                  G                    _PDR
:
:
7
7
1
1


                                                                                                                                                __
_.
                    _.           .                                   _ . . _ . _ .                   _   _
.
    4
_ . . _ . _ .
  I
_
i   .
_
      H. Stanley                                                                     -2                       November 15, 1996
__
4
I
i
H. Stanley
-2
November 15, 1996
.
.
.
.
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
.
      and the enclosures will be placed in the NRC Public Document Room (PDR).
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
,
,
                                                                      Sincerely,
Original Signed by Brent Clayton (for)
                                                                Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
                                                                      Geoffrey E. Grant, Director
Division of Reactor Safety
                                                                      Division of Reactor Safety                                                 i
i
      Docket Nos. 50-456; 50-457
Docket Nos. 50-456; 50-457
      Licenses No. NPF-72; NPF-77
Licenses No. NPF-72; NPF-77
      Enclosure:           Inspection Reports No.
Enclosure:
Inspection Reports No.
50-456/96015(DRS);
-
-
                              50-456/96015(DRS);
50-457/96015(DRS)
                              50-457/96015(DRS)
'
'
      cc w/ encl:           D. A. Sager, Vice President,
cc w/ encl:
                              Generation Support
D. A. Sager, Vice President,
                            H. W. Keiser, Chief Nuclear
Generation Support
                              Operating Officer
H. W. Keiser, Chief Nuclear
                            T. Tulon, Station Manager
Operating Officer
                            T. Simpken, Regulatory Assurance
T. Tulon, Station Manager
                              Supervisor
T. Simpken, Regulatory Assurance
                            1. Johnson, Acting Nuclear
Supervisor
                              Regulatory Services Manager
1. Johnson, Acting Nuclear
                            Document Control Desk - Licensing
Regulatory Services Manager
                            Richard Hubbard
Document Control Desk - Licensing
                            Nathan Schloss, Economist,                                                                                             ,
Richard Hubbard
                              Office of the Attorney General                                                                                     l
Nathan Schloss, Economist,
                            State Liaison Officer                                                                                                 ,
,
                            Chairman, Illinois Commerce Commission
Office of the Attorney General
      Distribution:
State Liaison Officer
      Docket File w/ encl                         Rill PRR w/enci                           W. L. Axelson, Rlli w/ encl
Chairman, Illinois Commerce Commission
      PUBLIC:p w/ encl                           SRis, Braidwood, Byron,                   Enf. Coordinator, Rlll w/enci
,
      OC/LFDCB w/enci                               Zion w/ encl                           RAC1 w/ encl (E-mail)                           I
Distribution:
      DRP w/enci                                 LPM, NRR w/ encl                         CAA1 w/enci (E-mail)
Docket File w/ encl
      DRS w/enci                                 A. B. Beach, Allt w/enci                                                     , p<h
Rill PRR w/enci
                                                                                                                                /
W. L. Axelson, Rlli w/ encl
      DOCUMENT NAME: G:DRS\ BRA 96015.DRS
PUBLIC:p w/ encl
      To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure 'E" = Copy with attachment / enclosure
SRis, Braidwood, Byron,
      "N* = No copy                                                                             ,
Enf. Coordinator, Rlll w/enci
      TFl&             RIII                           RIIl               _ lN RIII         ////h     f_   RIII         /6(-       l6
OC/LFDCB w/enci
      NS/E             PLouden:jp7 W                   TKozak-T_. -                   RLanksUh     V           BClayton/Wrant
Zion w/ encl
      DATE             11/01/96 P                       11/ 8 /96                     11/13 i966               11/ IY /96
RAC1 w/ encl (E-mail)
                                                          & lCIAL FEDO GP(
I
DRP w/enci
LPM, NRR w/ encl
CAA1 w/enci (E-mail)
DRS w/enci
A. B. Beach, Allt w/enci
, p<h
/
DOCUMENT NAME: G:DRS\\ BRA 96015.DRS
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure
"N* = No copy
,
TFl&
RIII
RIIl
_ lN RIII
////h
f_
RIII
/6(-
l6
NS/E
PLouden:jp7 W
TKozak-T_. -
RLanksUh V
BClayton/Wrant
DATE
11/01/96 P
11/ 8 /96
11/13 i966
11/ IY /96
&
lCIAL FEDO GP(
}}
}}

Latest revision as of 03:41, 12 December 2024

Forwards Insp Repts 50-456/96-15 & 50-457/96-15 on 960916-1018.No Violations Noted
ML20134M237
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/15/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20134M240 List:
References
NUDOCS 9611220285
Download: ML20134M237 (2)


See also: IR 05000456/1996015

Text

,

_ . _ _ _ _ _ _ . . _ _

._ _ . . _ . _

__ . _ _

_

._

_

l

i

.

,

n,

-

s

v

November 15, 1996

i

i

Mr. H. G. Stanley

Site Vice President

+

Braidwood Nuclear Power Station

Commonwealth Edison Company

R. R. #1, Box 84

.

Braceville, IL 60407

-

i

SUBJECT:

'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .

456/96015(DRS); 50-457/96015(DRS)

}

Dear Mr. Stanley:

,

l

This refers to the inspection completed.on October 18,1996 at your Braidwood facility.

-

The enclosed report presents the results of that inspection.

-This insp'ection included an announced review of the licensee's radiation monitoring

system, the control room and auxiliary building filtered Heating, Ventilation, and Air-

l

Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms.

Special emphasis was placed on operability, and material condition of these systems. . In

i

addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.

-

ll

This inspection noted that the material condition of the radioactive waste tank rooms was .

j

good as evidenced by adequate housekeeping in the areas, minimal contaminated area,

i

and the low number of outstanding work request items for the equipment in these rooms.

Likewise the HVAC systems inspected were free of debris and found in good working

!

order.

The radiation monitors inspected were in good working order and appropriate corrective

actions were being implemented for the' four monitors which exhibit recurring operability

t

problems. However, the inspection identified that the basis document for the alarm set

i

point calculations for these monitors was informally controlled.

.

This inspection also noted that good radiological controls were being provided by the

radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-

,,

'

cycle outage. However, a review of the work control process noted a communication

deficiency which contributes to issues not being evaluated or discussed until the final

stages of the planning process, especially for short lead time activities.

l

!'

No violations of NRC requirements were identifie'd during this inspection.

.

-

1

I

i-

9611220285 961115

'

PDR

ADOCK 05000456

G

_PDR

-

7

1

_.

.

_ . . _ . _ .

_

_

__

4

I

i

H. Stanley

-2

November 15, 1996

.

.

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

i

Docket Nos. 50-456; 50-457

Licenses No. NPF-72; NPF-77

Enclosure:

Inspection Reports No.

50-456/96015(DRS);

-

50-457/96015(DRS)

'

cc w/ encl:

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpken, Regulatory Assurance

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

,

Distribution:

Docket File w/ encl

Rill PRR w/enci

W. L. Axelson, Rlli w/ encl

PUBLIC:p w/ encl

SRis, Braidwood, Byron,

Enf. Coordinator, Rlll w/enci

OC/LFDCB w/enci

Zion w/ encl

RAC1 w/ encl (E-mail)

I

DRP w/enci

LPM, NRR w/ encl

CAA1 w/enci (E-mail)

DRS w/enci

A. B. Beach, Allt w/enci

, p<h

/

DOCUMENT NAME: G:DRS\\ BRA 96015.DRS

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

"N* = No copy

,

TFl&

RIII

RIIl

_ lN RIII

////h

f_

RIII

/6(-

l6

NS/E

PLouden:jp7 W

TKozak-T_. -

RLanksUh V

BClayton/Wrant

DATE

11/01/96 P

11/ 8 /96

11/13 i966

11/ IY /96

&

lCIAL FEDO GP(