Forwards Insp Repts 50-456/96-15 & 50-457/96-15 on 960916-1018.No Violations Noted
ML20134M237
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/15/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20134M240 List:
References
NUDOCS 9611220285
Download: ML20134M237 (2)


See also: IR 05000456/1996015

Text

__ . _ _ _ ._ _ _ . _ _ _ _ _ _ . . _ _ ._ _ . . _ . _

,

l

i  !

.

l

,

n,

-

s

v

November 15, 1996

i

i Mr. H. G. Stanley

+

Site Vice President

Braidwood Nuclear Power Station

Commonwealth Edison Company

.

R. R. #1, Box 84

-

Braceville, IL 60407

i SUBJECT: 'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .

456/96015(DRS); 50-457/96015(DRS)

} Dear Mr. Stanley:

,

l;- This refers to the inspection completed.on October 18,1996 at your Braidwood facility.

The enclosed report presents the results of that inspection.

-This insp'ection included an announced review of the licensee's radiation monitoring

system, the control room and auxiliary building filtered Heating, Ventilation, and Air-

l Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms. l

Special emphasis was placed on operability, and material condition of these systems. . In i

-

addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.

ll This inspection noted that the material condition of the radioactive waste tank rooms was .

j good as evidenced by adequate housekeeping in the areas, minimal contaminated area, i

and the low number of outstanding work request items for the equipment in these rooms.

Likewise the HVAC systems inspected were free of debris and found in good working

! order.

The radiation monitors inspected were in good working order and appropriate corrective

t

actions were being implemented for the' four monitors which exhibit recurring operability

problems. However, the inspection identified that the basis document for the alarm set

i point calculations for these monitors was informally controlled.

.

!

This inspection also noted that good radiological controls were being provided by the

,,

'

radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-

cycle outage. However, a review of the work control process noted a communication

deficiency which contributes to issues not being evaluated or discussed until the final

stages of the planning process, especially for short lead time activities.

l

!' No violations of NRC requirements were identifie'd during this inspection.

.

-

1 I

'

i- 9611220285 961115

PDR ADOCK 05000456

-

G _PDR

7

1

__

_. . _ . . _ . _ . _ _

4

I

i .

H. Stanley -2 November 15, 1996

.

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR).

,

Sincerely,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety i

Docket Nos. 50-456; 50-457

Licenses No. NPF-72; NPF-77

Enclosure: Inspection Reports No.

-

50-456/96015(DRS);

50-457/96015(DRS)

'

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpken, Regulatory Assurance

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist, ,

Office of the Attorney General l

State Liaison Officer ,

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/ encl Rill PRR w/enci W. L. Axelson, Rlli w/ encl

PUBLIC:p w/ encl SRis, Braidwood, Byron, Enf. Coordinator, Rlll w/enci

OC/LFDCB w/enci Zion w/ encl RAC1 w/ encl (E-mail) I

DRP w/enci LPM, NRR w/ encl CAA1 w/enci (E-mail)

DRS w/enci A. B. Beach, Allt w/enci , p<h

/

DOCUMENT NAME: G:DRS\ BRA 96015.DRS

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure 'E" = Copy with attachment / enclosure

"N* = No copy ,

TFl& RIII RIIl _ lN RIII ////h f_ RIII /6(- l6

NS/E PLouden:jp7 W TKozak-T_. - RLanksUh V BClayton/Wrant

DATE 11/01/96 P 11/ 8 /96 11/13 i966 11/ IY /96

& lCIAL FEDO GP(