ML20134P079: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.                           _     _
{{#Wiki_filter:.
                ' 1:             ,
_
                                              .
_
                                                                                                          .
' 1:
      .g
,
              #
.
                      =                                               AUG 36125
.
                            In Reply Refer To:
AUG 36125
  . .
#
                            Docket:         50-458/85-57
=
        ~
. g
                        , ,
In Reply Refer To:
Docket:
50-458/85-57
. .
~
, ,
"
"
                            Gulf States Utilities
Gulf States Utilities
                            ATTN: William J. Cahill, Jr.
ATTN: William J. Cahill, Jr.
                                      Senior Vice President
Senior Vice President
                                      River Bend Nuclear Group
River Bend Nuclear Group
                            P. O. Box 2951
P. O. Box 2951
                            Beaumont, Texas 77704
Beaumont, Texas 77704
          -
Gentlemen:
                            Gentlemen:
-
                            This refers to the inspection conducted by Dr. J. B. Nicholas of this office
This refers to the inspection conducted by Dr. J. B. Nicholas of this office
                            during the period July 22-26, 1985, of activities authorized by NRC Construc-
during the period July 22-26, 1985, of activities authorized by NRC Construc-
                            tion Permit) CPPR-145 for the River Bend Station, and to the discussion of our
tion Permit) CPPR-145 for the River Bend Station, and to the discussion of our
                            findings with Mr. J. C. Deddens, and other members of your staff at the
findings with Mr. J. C. Deddens, and other members of your staff at the
                            conclusion of the inspection.
conclusion of the inspection.
                            Areas examined during the inspection included the status of outstanding open
Areas examined during the inspection included the status of outstanding open
                            items in your chemistry / radiochemistry program. Within these areas, the
items in your chemistry / radiochemistry program.
                            inspection consisted of selective examination of procedures and representative
Within these areas, the
                            records, interviews with personnel, and observations by the inspectors. These
inspection consisted of selective examination of procedures and representative
                            findings are documented in the enclosed inspection report.
records, interviews with personnel, and observations by the inspectors.
                            Within the scope of the inspection, no violations or deviations were
These
                            identified.
findings are documented in the enclosed inspection report.
                            Should you have any questions concerning this inspection, we will be pleased to
Within the scope of the inspection, no violations or deviations were
                            discuss them with you.
identified.
                                                                            Sincerely,                         .
Should you have any questions concerning this inspection, we will be pleased to
                                                                                                              .
discuss them with you.
                                                                              Original signed aj
Sincerely,
                                                                                E. H. Johnson
.
                                                                            E. H. Johnson, Chief
Original signed aj
                                                                            Reactor Projects Branch
.
                            Enclosure:
E. H. Johnson
                            Appendix - NRC Inspection Report
E. H. Johnson, Chief
                              50-458/85-57
Reactor Projects Branch
                            cc w/ enclosure:       (see page 2)
Enclosure:
''                                     -
Appendix - NRC Inspection Report
                                                                gp       f.
50-458/85-57
                            RIV:FRPS             FRPS           SPB       .RP /A           C:RPB
cc w/ enclosure:
                            JBNicholas           BMurray     EHall         Jaudon         EHJohnson
(see page 2)
                            y /-tN85             Y/27/85     /J)/85     ( /jg/85         $/0/85
''
                                                                                              2
-
                                                                                                      4-
gp
                                      -
f.
                                                                    -
RIV:FRPS
                                                                                                                l
FRPS
                                      8509060129 850830                                               g         '
SPB
                                                ADOCK 05000450
.RP /A
                                                                                                            '
C:RPB
                                      PDR                                                              ,
JBNicholas
                                                                                                          I
BMurray
            <
EHall
                                      G                  PDR
Jaudon
  '
EHJohnson
                        '
y /-tN85
                .i             -
Y/27/85
3{r                                                                                                             j
/J)/85
( /jg/85
$/0/85
2
-
4-
-
8509060129 850830
g
'
PDR
ADOCK 05000450
'
,
I
G
PDR
<
'
.i
-
'
3{r
j


  *
*
..
..
    Gulf States Utilities                   -2-
Gulf States Utilities
    cc w/ enclosure:
-2-
    Gulf States Utilities
cc w/ enclosure:
    ATTN:   J. E. Booker, Manager-
Gulf States Utilities
                Engineering, Nuclear
ATTN:
                Fuels & Licensing
J. E. Booker, Manager-
    P. O. Box 2951
Engineering, Nuclear
    Beaumont, Texas 77704
Fuels & Licensing
    Louisiana State University,
P. O. Box 2951
      Government Documents Department
Beaumont, Texas 77704
    Louisiana Radiation Control Program Director
Louisiana State University,
    bcc to DMB (IE06)
Government Documents Department
    bcc distrib. by RIV:
Louisiana Radiation Control Program Director
    *RPB                             R. P. Denise, DRSP
bcc to DMB (IE06)
    * Resident Inspector             R. D. Martin, RA
bcc distrib. by RIV:
    *Section Chief (RPB/A)         *D. Weiss, LFMB (AR-2015)
*RPB
    * MIS System                   *B. Nicholas, FRPS
R. P. Denise, DRSP
    *RSTS Operator                 *B. Murray, FRPS
* Resident Inspector
    *R&SPB                           R. Bangart, DRS&S
R. D. Martin, RA
    *RIV File
*Section Chief (RPB/A)
    *w/766
*D. Weiss, LFMB (AR-2015)
                                                              -
* MIS System
*B. Nicholas, FRPS
*RSTS Operator
*B. Murray, FRPS
*R&SPB
R. Bangart, DRS&S
*RIV File
*w/766
-


                                                                                          ,
,
                                                                                            1
1
                                                                                            '
'
                                                                      -
-
      *
*
    .
.
                                              APPENDIX
APPENDIX
                                U. S. NUCLEAR REGULATORY COMMISSION
U. S. NUCLEAR REGULATORY COMMISSION
                                              REGION IV
REGION IV
        NRC Inspection Report:     50-458/85-57           Construction Permit:   CPPR-145
NRC Inspection Report:
        Docket:   50-458
50-458/85-57
  ,     Licensee: Gulf States Utilities (GSU)
Construction Permit:
                    P. O. Box 2952
CPPR-145
                    Beaumont, Texas 77704
Docket:
        Facility Name:   River Bend Station (RBS)
50-458
        Inspection At:   RBS Site, St. Francisville, Louisiana
,
        Inspection Conducted: July 22-26, 1985
Licensee: Gulf States Utilities (GSU)
        Inspector:           A
P. O. Box 2952
                                        '
Beaumont, Texas 77704
                                    a //'/UA(gl//                           bDate'W b
Facility Name:
                      J. Blair Nicholas,' RadiatMh Specialist,
River Bend Station (RBS)
                      Facilities Radiological Protection Section
Inspection At:
        Approved:     /     M/ J       f//ld/?E/                                 87/ 85
RBS Site, St. Francisville, Louisiana
                      Blaine Murray, Chief, Fac'ilities Radiological
Inspection Conducted: July 22-26, 1985
                                                *
Inspector:
                                                                              Date /
A
                        Protection Section
a //'/UA(gl//
        Inspection Summary
b 'W b
        Inspection Conducted July 22-26, 1985 (Report 50-458/85-57)
'
        Areas Inspected:   Routine, announced inspection of the licensee's
J. Blair Nicholas,' RadiatMh Specialist,
        chemistry / radiochemistry program including review of outstanding open items,
Date
        training program, chemistry / radiochemistry program, facilities and equipment,
Facilities Radiological Protection Section
        and administrative and analytical procedures. The inspection involved 17
Approved:
        inspector-hours onsite by one NRC inspector.
/
        Results: Within the areas inspected, no violations or deviations were
M/ J
        identified. Three previously identified open items were closed.
f//ld/?E/
                                                                                .
87/ 85
Blaine Murray, Chief, Fac'ilities Radiological
Date /
*
Protection Section
Inspection Summary
Inspection Conducted July 22-26, 1985 (Report 50-458/85-57)
Areas Inspected:
Routine, announced inspection of the licensee's
chemistry / radiochemistry program including review of outstanding open items,
training program, chemistry / radiochemistry program, facilities and equipment,
and administrative and analytical procedures.
The inspection involved 17
inspector-hours onsite by one NRC inspector.
Results: Within the areas inspected, no violations or deviations were
identified.
Three previously identified open items were closed.
.
L
L
}}
}}

Latest revision as of 04:16, 12 December 2024

Forwards Insp Rept 50-458/85-57 on 850722-26.No Violation or Deviation Noted
ML20134P079
Person / Time
Site: River Bend 
Issue date: 08/30/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20134P081 List:
References
NUDOCS 8509060129
Download: ML20134P079 (2)


See also: IR 05000458/1985057

Text

.

_

_

' 1:

,

.

.

AUG 36125

=

. g

In Reply Refer To:

Docket:

50-458/85-57

. .

~

, ,

"

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

-

This refers to the inspection conducted by Dr. J. B. Nicholas of this office

during the period July 22-26, 1985, of activities authorized by NRC Construc-

tion Permit) CPPR-145 for the River Bend Station, and to the discussion of our

findings with Mr. J. C. Deddens, and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included the status of outstanding open

items in your chemistry / radiochemistry program.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

These

findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

.

Original signed aj

.

E. H. Johnson

E. H. Johnson, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-458/85-57

cc w/ enclosure:

(see page 2)

-

gp

f.

RIV:FRPS

FRPS

SPB

.RP /A

C:RPB

JBNicholas

BMurray

EHall

Jaudon

EHJohnson

y /-tN85

Y/27/85

/J)/85

( /jg/85

$/0/85

2

-

4-

-

8509060129 850830

g

'

PDR

ADOCK 05000450

'

,

I

G

PDR

<

'

.i

-

'

3{r

j

..

Gulf States Utilities

-2-

cc w/ enclosure:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bcc to DMB (IE06)

bcc distrib. by RIV:

  • RPB

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • MIS System
  • B. Nicholas, FRPS
  • RSTS Operator
  • B. Murray, FRPS
  • R&SPB

R. Bangart, DRS&S

  • RIV File
  • w/766

-

,

1

'

-

.

APPENDIX

U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-458/85-57

Construction Permit:

CPPR-145

Docket:

50-458

,

Licensee: Gulf States Utilities (GSU)

P. O. Box 2952

Beaumont, Texas 77704

Facility Name:

River Bend Station (RBS)

Inspection At:

RBS Site, St. Francisville, Louisiana

Inspection Conducted: July 22-26, 1985

Inspector:

A

a //'/UA(gl//

b 'W b

'

J. Blair Nicholas,' RadiatMh Specialist,

Date

Facilities Radiological Protection Section

Approved:

/

M/ J

f//ld/?E/

87/ 85

Blaine Murray, Chief, Fac'ilities Radiological

Date /

Protection Section

Inspection Summary

Inspection Conducted July 22-26, 1985 (Report 50-458/85-57)

Areas Inspected:

Routine, announced inspection of the licensee's

chemistry / radiochemistry program including review of outstanding open items,

training program, chemistry / radiochemistry program, facilities and equipment,

and administrative and analytical procedures.

The inspection involved 17

inspector-hours onsite by one NRC inspector.

Results: Within the areas inspected, no violations or deviations were

identified.

Three previously identified open items were closed.

.

L