B16246, Provides NRC Staff W/Changes to Bases Section 3/4.4.9 on Use of Safety Injection Pumps During Modes in Which Cold Overpressurization Protection Sys Analysis Restricts Use of Pumps to Inject Into RCS: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:=.                         .-                            -                -
{{#Wiki_filter:,
Hope Fmy HddHoute W,), Watedwd. CI M85 Northew l
=.
* T')f
T')f Nuclear Energy Northew Hope Fmy HddHoute W,), Watedwd. CI M85 l
        ' j Nuclear Energy                                            uai ione Noaear ro.er smion j                                                                       Northeet Nudear Energy Company P.O. Hoz 128 l                                                                       Waterford, CT 06385-0128 l                                                                       (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitie system f5 20 W Docket No. 50-423 B16246 Re: 10CFR50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Chanae to Bases Section 3/4.4.9 Northeast Nuclear Energy Company (NNECO) is providing the NRC Staff with changes to Bases Section 3/4.4.9 for information only. These changes have been reviewed and approved by the Millstone Unit No. 3 Plant Operating Review Committee on February 8, 1997, in accordance with the provisions of 10CFR50.59.
' j uai ione Noaear ro.er smion j
Description of Chanae The changes to Bases Section 3/4.4.9 provides clarification on the use of safety injection pumps during modes in which Cold Overpressurization Protection System analysis restricts the use of these pumps to inject into the reactor coolant system. The changes to the Bases Section provide five examples of meeting the analysis restriction of ensuring by the use of two independent methods, that the safety injection pumps are incapable of injecting into the reactor coolant system .
Northeet Nudear Energy Company P.O. Hoz 128 l
Additional Information The need to change Bases Section 3/4.4.9 was the result of our current efforts to review the licensing documents associated with Millstone Unit No. 3. This review revealed inconsistencies between the analysis of the Cold Overpressurization Protection System, Millstone Unit No. 3 Technical Specifications, Bases Section 3/4.4.9, plant procedures and the Safety                               [
Waterford, CT 06385-0128 l
Evaluation Report (SER). The SER states that power is removed from the safety injection pumps whenever Low Temperature Overpressurization Protection is                         (
(860) 447-1791 Fax (860) 444-4277 The Northeast Utilitie system f5 20 W Docket No. 50-423 B16246 Re: 10CFR50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Chanae to Bases Section 3/4.4.9 Northeast Nuclear Energy Company (NNECO) is providing the NRC Staff with changes to Bases Section 3/4.4.9 for information only. These changes have been reviewed and approved by the Millstone Unit No. 3 Plant Operating Review Committee on February 8, 1997, in accordance with the provisions of 10CFR50.59.
nnen-        .,.
Description of Chanae The changes to Bases Section 3/4.4.9 provides clarification on the use of safety injection pumps during modes in which Cold Overpressurization Protection System analysis restricts the use of these pumps to inject into the reactor coolant system. The changes to the Bases Section provide five examples of meeting the analysis restriction of ensuring by the use of two independent methods, that the safety injection pumps are incapable of injecting into the reactor coolant system.
pl , I f
Additional Information The need to change Bases Section 3/4.4.9 was the result of our current efforts to review the licensing documents associated with Millstone Unit No. 3. This review revealed inconsistencies between the analysis of the Cold Overpressurization Protection System, Millstone Unit No. 3 Technical Specifications, Bases Section 3/4.4.9, plant procedures and the Safety
9702260425 970220 PDR     ADOCK 05000423 P                     PDR
[
Evaluation Report (SER). The SER states that power is removed from the safety injection pumps whenever Low Temperature Overpressurization Protection is
(
pl, I nnen-9702260425 970220 f
PDR ADOCK 05000423 P
PDR


i U.S. Nucisar Regul: tory Commission                                               i B16246\Page 2                                                                     -
i U.S. Nucisar Regul: tory Commission i
i required. However, in practice the safety injection pumps are isolated from the   i reactor coolant system and run for testing or for filling the accumulator when the l plant is in modes 4, 5 and 6. This submittal corrects these inconsistencies.       '
B16246\\Page 2 i
NNECO will provide the NRC Staff with changes to the Technical Specifications -   :
required. However, in practice the safety injection pumps are isolated from the i
of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, !
reactor coolant system and run for testing or for filling the accumulator when the l
and 6.                                                                       >
plant is in modes 4, 5 and 6.
This submittal corrects these inconsistencies.
NNECO will provide the NRC Staff with changes to the Technical Specifications -
of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, and 6.
if you have any questions, please contact Mr. J. M. Peschel at (860) 437-5840.
if you have any questions, please contact Mr. J. M. Peschel at (860) 437-5840.
l Very truly yours,                               {,
l Very truly yours,
NORTHEAST NUCLEAR ENERGY COMPANY N       N M.H. B'others r                                       !
{
Vice President - Millstone Unit No. 3           l Attachment cc:     H. J. Miller, Region i Administrator                                     I W.D. Travers, Dr., Director, Special Projects J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 l
NORTHEAST NUCLEAR ENERGY COMPANY N
l l
N M.H. B'others r
i
Vice President - Millstone Unit No. 3 Attachment cc:
H. J.
Miller, Region i Administrator W.D. Travers, Dr., Director, Special Projects J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 i


Docket No. 50-423     :
Docket No. 50-423 B16246 t
B16246 t
i l
i l
,                                                                                                          i
i l
!                                                                                                          l l
1 i
1 e
e 1
i Attachment 1                                  1
)
                                                                                                          )
l Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i
l                                       Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i
1 i
i 1
l l
,                                                                                                          i l
i L
l                                                                                                          i L                                                                                     February 1997 4
February 1997 4
l
l
~
~
Line 58: Line 67:
6
6


U.S. Nucl::r Regulatory Commission                                                       ,
U.S. Nucl::r Regulatory Commission l
l       -
B16246%ttachment 1\\Page 1 i
B16246%ttachment 1\Page 1 i   .
Enclosure List of Regulatory Commitments l
Enclosure List of Regulatory Commitments                                   ,
The following table identifies those actions committed to by NNECO in this l
l        The following table identifies those actions committed to by NNECO in this l         document. Any other actions discussed in the submittal represent intended or
document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's l
!        planned actions by NNECO. They are described to the NRC for the NRC's l         information and are not regulatory commitments. Please notify the Manager -               :
information and are not regulatory commitments. Please notify the Manager -
;        Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any               l l         questions regarding this document or any associated regulatory commitments.
Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any l
Commitment                               Committed Date or Outage NNECO will provide the NRC Staff with changes to the             Prior to Startup Technical Specifications of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, and 6.                                     ;
l questions regarding this document or any associated regulatory commitments.
Commitment Committed Date or Outage NNECO will provide the NRC Staff with changes to the Prior to Startup Technical Specifications of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, and 6.
I l
I l
l i
i


      -    . _-  . . . .-. . . . .        . = -     _.  - - . - .      . . ~..-     .- .    .. _ . . - . . . _ .
. = -
        . I                                                                                                                 ,
.. ~..-
* r Docket No. 50-423 B16246 4
I r
Docket No. 50-423 B16246 4
4 i
4 i
i                                                                                                                               i a                                                                                                                               i i                                                                                                                               r 2
i i
t                                                                                                                               .
a i
5                                                                                                                               !
i r
Attachment 2                                                        !
2 t
J                                                                                                                                t i
5 J
i-                                     Millstone Nuclear Power Station, Unit No. 3                                               l Marked Up Bases Paaes
t i
;                                                                                                                                I d
i -
i 4
Millstone Nuclear Power Station, Unit No. 3 l
e i
Marked Up Bases Paaes I
j 1                                                                                                                               4
d i
;                                                                                                                                i 1, '                                                                                                                               i J
4 e
J                                                                                                                               l i
i j
2 1
1 4
l i
i 1, '
i
i J
J l
i 2
1 l
i i
'l F
'l F
February 1997 4
February 1997 4
J b
J b
1 l
1l r
r a
a 1
1 e
e
                                          , . . - . .                                        ,-.    .}}
-. -}}

Latest revision as of 04:01, 12 December 2024

Provides NRC Staff W/Changes to Bases Section 3/4.4.9 on Use of Safety Injection Pumps During Modes in Which Cold Overpressurization Protection Sys Analysis Restricts Use of Pumps to Inject Into RCS
ML20135A043
Person / Time
Site: Millstone 
Issue date: 02/20/1997
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135A047 List:
References
B16246, NUDOCS 9702260425
Download: ML20135A043 (5)


Text

,

=.

T')f Nuclear Energy Northew Hope Fmy HddHoute W,), Watedwd. CI M85 l

' j uai ione Noaear ro.er smion j

Northeet Nudear Energy Company P.O. Hoz 128 l

Waterford, CT 06385-0128 l

(860) 447-1791 Fax (860) 444-4277 The Northeast Utilitie system f5 20 W Docket No. 50-423 B16246 Re: 10CFR50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Chanae to Bases Section 3/4.4.9 Northeast Nuclear Energy Company (NNECO) is providing the NRC Staff with changes to Bases Section 3/4.4.9 for information only. These changes have been reviewed and approved by the Millstone Unit No. 3 Plant Operating Review Committee on February 8, 1997, in accordance with the provisions of 10CFR50.59.

Description of Chanae The changes to Bases Section 3/4.4.9 provides clarification on the use of safety injection pumps during modes in which Cold Overpressurization Protection System analysis restricts the use of these pumps to inject into the reactor coolant system. The changes to the Bases Section provide five examples of meeting the analysis restriction of ensuring by the use of two independent methods, that the safety injection pumps are incapable of injecting into the reactor coolant system.

Additional Information The need to change Bases Section 3/4.4.9 was the result of our current efforts to review the licensing documents associated with Millstone Unit No. 3. This review revealed inconsistencies between the analysis of the Cold Overpressurization Protection System, Millstone Unit No. 3 Technical Specifications, Bases Section 3/4.4.9, plant procedures and the Safety

[

Evaluation Report (SER). The SER states that power is removed from the safety injection pumps whenever Low Temperature Overpressurization Protection is

(

pl, I nnen-9702260425 970220 f

PDR ADOCK 05000423 P

PDR

i U.S. Nucisar Regul: tory Commission i

B16246\\Page 2 i

required. However, in practice the safety injection pumps are isolated from the i

reactor coolant system and run for testing or for filling the accumulator when the l

plant is in modes 4, 5 and 6.

This submittal corrects these inconsistencies.

NNECO will provide the NRC Staff with changes to the Technical Specifications -

of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, and 6.

if you have any questions, please contact Mr. J. M. Peschel at (860) 437-5840.

l Very truly yours,

{

NORTHEAST NUCLEAR ENERGY COMPANY N

N M.H. B'others r

Vice President - Millstone Unit No. 3 Attachment cc:

H. J.

Miller, Region i Administrator W.D. Travers, Dr., Director, Special Projects J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 i

Docket No. 50-423 B16246 t

i l

i l

1 i

e 1

)

l Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i

1 i

l l

i L

February 1997 4

l

~

1

I i

6

U.S. Nucl::r Regulatory Commission l

B16246%ttachment 1\\Page 1 i

Enclosure List of Regulatory Commitments l

The following table identifies those actions committed to by NNECO in this l

document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's l

information and are not regulatory commitments. Please notify the Manager -

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any l

l questions regarding this document or any associated regulatory commitments.

Commitment Committed Date or Outage NNECO will provide the NRC Staff with changes to the Prior to Startup Technical Specifications of Millstone Unit No. 3 to address safety injection pump operation in modes 4, 5, and 6.

I l

i

. = -

.. ~..-

I r

Docket No. 50-423 B16246 4

4 i

i i

a i

i r

2 t

5 J

t i

i -

Millstone Nuclear Power Station, Unit No. 3 l

Marked Up Bases Paaes I

d i

4 e

i j

1 4

i 1, '

i J

J l

i 2

1 l

i i

'l F

February 1997 4

J b

1l r

a 1

e

-. -