ENS 49765: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/27/2014 00:45 PST | | event date = 01/27/2014 00:45 PST | ||
| last update date = 06/06/2014 | | last update date = 06/06/2014 | ||
| title = Turbine | | title = Turbine and Rad Waste Buildings Radiation Monitors Inoperable Due to Planned Maintenance | ||
| event text = At 0045 PST on 1/27/14, the Turbine Building Exhaust Low and Intermediate radiation monitors and the Rad Waste Building Exhaust Low and Intermediate radiation monitors were declared inoperable because of planned maintenance for replacement of the monitors. Compensatory measures have been implemented per station procedures; however, the time required for installation, testing, and acceptance of the new equipment is expected to last several weeks. Therefore, this radiological monitoring equipment outage is being reported as a major loss of assessment capability under regulation 10 CFR 50.72(b)(3)(xiii). Compensatory measures will be in place throughout the duration of the planned equipment outage. | | event text = At 0045 PST on 1/27/14, the Turbine Building Exhaust Low and Intermediate radiation monitors and the Rad Waste Building Exhaust Low and Intermediate radiation monitors were declared inoperable because of planned maintenance for replacement of the monitors. Compensatory measures have been implemented per station procedures; however, the time required for installation, testing, and acceptance of the new equipment is expected to last several weeks. Therefore, this radiological monitoring equipment outage is being reported as a major loss of assessment capability under regulation 10 CFR 50.72(b)(3)(xiii). Compensatory measures will be in place throughout the duration of the planned equipment outage. | ||
The licensee has notified the NRC Resident Inspector. | The licensee has notified the NRC Resident Inspector. |
Latest revision as of 20:50, 1 March 2018
Where | |
---|---|
Columbia Generating Station Washington (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.67 h-0.153 days <br />-0.0218 weeks <br />-0.00503 months <br />) | |
Opened: | Bryan Heavilin 05:05 Jan 27, 2014 |
NRC Officer: | Jeff Rotton |
Last Updated: | Jun 6, 2014 |
49765 - NRC Website
| |