05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
| Title = Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
| Title = Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(ii)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000423
| Docket = 05000423
| LER year = 2096
| LER year = 1996
| LER number = 45
| LER number = 45
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 33: Line 33:


=text=
=text=
{{#Wiki_filter:.~             - - . - . - .    - . .
{{#Wiki_filter:.~
                ,.        o-
o-
            ")\     Northeast                                             i 7 8*'d*" 8'"", sup 06037 Utilities System                                       %rtheast Utilities service company P.O. Box 270 Ilartford, CT 06141-0270 t
")\\
(860) 665-5000 s
Northeast i 7 8*'d*" 8'"", sup 06037 Utilities System
i
%rtheast Utilities service company P.O. Box 270 Ilartford, CT 06141-0270 (860) 665-5000 t
;                                                                                  December 6,1996 Docket No. 50-423
s i
!                                                                                                  B16026
December 6,1996 Docket No. 50-423 B16026
}                                                                         Re:10CFR 50.73(a)(2)(ii) i
}
!-          U. S. Nuclear Regulatory Commission Document Control Desk                                                                                             l Washington, DC 20555                                                                                               i i                                      Millstone Nuclear Power Station Unit 3 -
Re:10CFR 50.73(a)(2)(ii) i U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
Licensee Event Report 96-045-00                                                       I j                                   Submitted Pursuant to 10CFR 50.73(a)(2)(ii) l           This letter forwards Licensee Event Report 96-045-00, documenting a condition
Millstone Nuclear Power Station Unit 3 -
;            that was determined at Millstone Unit No. 3 on November 7,1996. This LER is
Licensee Event Report 96-045-00 j
:            submitted pursuant to 10CFR 50.73(a)(2)(ii).             NNECO's commitments in response to this event are contained within Attachment 1 to this letter.
Submitted Pursuant to 10CFR 50.73(a)(2)(ii) l This letter forwards Licensee Event Report 96-045-00, documenting a condition that was determined at Millstone Unit No. 3 on November 7,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(ii).
NNECO's commitments in response to this event are contained within Attachment 1 to this letter.
Should you have any questions regarding this submittal, please contact Mr.
Should you have any questions regarding this submittal, please contact Mr.
!            James M. Peschel at (860) 437-5840.
James M. Peschel at (860) 437-5840.
i Very truly yours,                                                           j
i Very truly yours, j
;                                                                                                                              1
1 NORTHEAST NUCLEAR ENERGY COMPANY NJ/H. Broprs
.'                                                NORTHEAST NUCLEAR ENERGY COMPANY
}
!                                                NJ/H. Broprs
Unit Director, Mil tone U t No. 3 i
}                                                 Unit Director, Mil tone U t No. 3 i
l 100004 4
100004 i4 l
i 9612120105 961206
^
^
9612120105 961206 PDR       ADOCK 05000423 S                       PDR                                                                               g}
PDR ADOCK 05000423 S
PDR g}
y m, 1
y m, 1


l U.S. Nucl:ar R gulatory Commission                                                                             l B16026\Page 2
U.S. Nucl:ar R gulatory Commission B16026\\Page 2 Attachment: 1)
 
NNECO's commitments in response to LEE 36-045-00 2)
==Attachment:==
LER 96-045-00 cc:-
: 1)       NNECO's commitments in response to LEE 36-045-00                                       ;
H. J.
: 2)       LER 96-045-00 cc:- H. J. Miller, Region i Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3                                           ,
Miller, Region i Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 V. L.
V. L. Rooney, NRC Project Manager, Millstone Unit No. 3                                                 i W. D. Travors, Dr., Director, Special Projects                                                         1 I
Rooney, NRC Project Manager, Millstone Unit No. 3 i
1 W. D. Travors, Dr., Director, Special Projects I
1 i
1 i
i t
i t
6 I
6 I
i l
i 1
1 I
I i
i l
l l
1
1


            -                                                              i 1
i Docket No. 50-423 B16026 4
l Docket No. 50-423 l B16026 l 4
l, 1
1 i
1 i
i l
i
}
}
i i
i i
i Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments
i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 96-045-001 l
;                            in Response To (LER 96-045-001 l
i 1
i                                                                           l 1
i 1
i 1
4 d
4 d
i                                                                           i 4
i i
December 6,1996 c
4 December 6,1996 c
 
I i
.U.S. Nucl:ar Regulttory Commission 4
B13026%ttachment 1\\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this j
document.
Any other actions discussed in the submittal represent intended or planned actions by NNECO.
They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Manager Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Number


I l
==Commitment==
i            '                                                                                                          l 4
Due B16026-01 The plant will be revised to conform to the Prior to restart existing design basis, or the design basis will be revised to identify deviations from Regulatory Guide 1.75, Position C.6.
              .U.S. Nucl:ar Regulttory Commission                                                                      ;
B13026%ttachment 1\Page 2                                                                                !
Enclosure                                              l List of Regulatory Commitments                                              .
1 The following table identifies those actions committed to by NNECO in this                                j document. Any other actions discussed in the submittal represent intended or                              l planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager                              -
Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Number                        Commitment                                              Due B16026-01     The plant will be revised to conform to the                           Prior to restart existing design basis, or the design basis will be revised to identify deviations from Regulatory Guide 1.75, Position C.6.
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 02:07, 12 December 2024

Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
ML20135E840
Person / Time
Site: Millstone 
Issue date: 12/06/1996
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135E843 List:
References
RTR-REGGD-01.075, RTR-REGGD-1.075 B16026, NUDOCS 9612120105
Download: ML20135E840 (4)


LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)
4231996045R00 - NRC Website

text

.~

o-

")\\

Northeast i 7 8*'d*" 8'"", sup 06037 Utilities System

%rtheast Utilities service company P.O. Box 270 Ilartford, CT 06141-0270 (860) 665-5000 t

s i

December 6,1996 Docket No. 50-423 B16026

}

Re:10CFR 50.73(a)(2)(ii) i U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

Millstone Nuclear Power Station Unit 3 -

Licensee Event Report 96-045-00 j

Submitted Pursuant to 10CFR 50.73(a)(2)(ii) l This letter forwards Licensee Event Report 96-045-00, documenting a condition that was determined at Millstone Unit No. 3 on November 7,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(ii).

NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

i Very truly yours, j

1 NORTHEAST NUCLEAR ENERGY COMPANY NJ/H. Broprs

}

Unit Director, Mil tone U t No. 3 i

l 100004 4

i 9612120105 961206

^

PDR ADOCK 05000423 S

PDR g}

y m, 1

U.S. Nucl:ar R gulatory Commission B16026\\Page 2 Attachment: 1)

NNECO's commitments in response to LEE 36-045-00 2)

LER 96-045-00 cc:-

H. J.

Miller, Region i Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 V. L.

Rooney, NRC Project Manager, Millstone Unit No. 3 i

1 W. D. Travors, Dr., Director, Special Projects I

1 i

i t

6 I

i 1

I i

1

i Docket No. 50-423 B16026 4

1 i

i

}

i i

i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 96-045-001 l

i 1

i 1

4 d

i i

4 December 6,1996 c

I i

.U.S. Nucl:ar Regulttory Commission 4

B13026%ttachment 1\\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this j

document.

Any other actions discussed in the submittal represent intended or planned actions by NNECO.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Manager Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number

Commitment

Due B16026-01 The plant will be revised to conform to the Prior to restart existing design basis, or the design basis will be revised to identify deviations from Regulatory Guide 1.75, Position C.6.