ML20137K666: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:F                                                                                             I
{{#Wiki_filter:F
  .
.
                                                                                              l
SAFEGUARDS INFORMATION
                                SAFEGUARDS INFORMATION
JAN 171986
                                      JAN 171986
Florida Power and Light Company
    Florida Power and Light Company
ATTN:
    ATTN:   Mr. C. O. Woody
Mr. C. O. Woody
            Group Vice President
Group Vice President
    Nuclear Energy Department
Nuclear Energy Department
    P. O. Box 14000
P. O. Box 14000
    Juno Beach, FL 33408
Juno Beach, FL 33408
    Gentlemen:
Gentlemen:
    SUBJECT:   REPORT NOS. 50-335/85-35 AND 50-389/85-35
SUBJECT:
    On December 16 - 20, 1985, NRC inspected activities authorized by NRC Operating
REPORT NOS. 50-335/85-35 AND 50-389/85-35
    License Nos. DPR-67 and NPF-J for your St. Lucie facility. At the conclusion of
On December 16 - 20, 1985, NRC inspected activities authorized by NRC Operating
    the inspection, the findings were discussed with those members of your staff
License Nos. DPR-67 and NPF-J for your St. Lucie facility.
    identified in the enclosed inspection report.
At the conclusion of
    Areas examined during the inspection are identified in the report. Within these
the inspection, the findings were discussed with those members of your staff
    areas, the inspection consisted of selective examinations of procedures and
identified in the enclosed inspection report.
    representative records, interviews with personnel, and observation of activities
Areas examined during the inspection are identified in the report. Within these
    in progress.
areas, the inspection consisted of selective examinations of procedures and
    Within the scope of the inspection, no violations or deviations were identified.
representative records, interviews with personnel, and observation of activities
    In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
in progress.
    security measures are exempt from public disclosure; therefore, the enclosures to
Within the scope of the inspection, no violations or deviations were identified.
    this letter, with the exception of the report cover page which presents a
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
    nonexempt summary, will not be placed in NRC's Public Document Room.
security measures are exempt from public disclosure; therefore, the enclosures to
    Should you have any questions concerning this letter, please contact us.
this letter, with the exception of the report cover page which presents a
                                              Sincerely,
nonexempt summary, will not be placed in NRC's Public Document Room.
                                              Vincent W. Panciera, Acting Chief
Should you have any questions concerning this letter, please contact us.
                                              Reactor Projects Branch 2
Sincerely,
                                              Division of Reactor Projects
Vincent W. Panciera, Acting Chief
    Enclosure:
Reactor Projects Branch 2
    Inspection Report Nos. 50-335/85-35 and
Division of Reactor Projects
      509-389/85-35
Enclosure:
      (Safeguards Information)
Inspection Report Nos. 50-335/85-35 and
                                                8601240179 860117
509-389/85-35
    cc w/ encl:                                 PDR   ADOCK 05000335
(Safeguards Information)
    K. N. Harris, Vice President                 a                 PDR
8601240179 860117
      St. Lucie Nuclear Plant
cc w/ encl:
    D. A. Sager, Plant Manager
PDR
    N. Weems, Site QA Superintendent                                 EnctosuRs ccNTAINS
ADOCK 05000335
                                                                    SAFEGUARDS INFOREATION
K. N. Harris, Vice President
    bec w/ encl:   (See page 2)                                     UPU" 8 PARATION TH18
a
                                                                    .Av u[,DECONTROLLtu.
PDR
                                                                    ,,
St. Lucie Nuclear Plant
                          SAFEGUARDS INFORMATION-                         go<O \
D. A. Sager, Plant Manager
                                                                                            .
N. Weems, Site QA Superintendent
EnctosuRs ccNTAINS
SAFEGUARDS INFOREATION
bec w/ encl:
(See page 2)
UPU" 8 PARATION TH18
.Av
u[,DECONTROLLtu.
,,
SAFEGUARDS INFORMATION-
go<O \\
.


                                  .-.           . . . . . .
.-.
      '
. . . . . .
  '
'
                                                                                                        '
SAFEGUARDS INFORMATION-
                              SAFEGUARDS INFORMATION-
'
.
'
      Florida Power and Light Company                     2
.
                                                                          d4$ j 7 lggg
d4$ j 7 lggg
,
Florida Power and Light Company
i   bec w/ enc 1:
2
      IE File
,
i
bec w/ enc 1:
IE File
;
;
    NMSS/SGPL
NMSS/SGPL
    NRR/DL/SSPB
NRR/DL/SSPB
    bcc w/ Inspection Sumary:
bcc w/ Inspection Sumary:
    Document Control Desk, 016
Document Control Desk, 016
    NRC Resident Inspector
NRC Resident Inspector
    State of Florida
State of Florida
                                                                                                .
.
4
4
i
i
                                            i
i
                                            i
i
                                              *i
*i
'l
'l
i
i
    RII   -
RII
                    RII             RII                   RII,     RI
-
    JEknis:1b       DMcGuire             er                 JStahr   S rod
RII
    01/j/86         01/g/86                   86
RII
                                                            01/t(/86
RII,
                                                                f    01/h /86
RI
                                                                                ENCLOSURE CONTAIN3
JEknis:1b
l                                                                               8AF*iG'i ~;0 INFORMATION
DMcGuire
!                                                                               UP0;I :,d anA7;gg 7gg3
er
JStahr
S rod
01/j/86
01/g/86
86
01/t(/86 01/h /86
f
ENCLOSURE CONTAIN3
l
8AF*iG'i
~;0 INFORMATION
!
UP0;I :,d anA7;gg 7gg3
l
l
                                                                                PAGE Is DECONTROLLED-
PAGE Is DECONTROLLED-
                        ,
SAFEGUARDS INFORMATION-
                              SAFEGUARDS INFORMATION-
,
l
l
}}
}}

Latest revision as of 23:02, 11 December 2024

Forwards Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations or Deviations Noted
ML20137K666
Person / Time
Site: Saint Lucie  
Issue date: 01/17/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20137K671 List:
References
NUDOCS 8601240179
Download: ML20137K666 (2)


See also: IR 05000335/1985035

Text

F

.

SAFEGUARDS INFORMATION

JAN 171986

Florida Power and Light Company

ATTN:

Mr. C. O. Woody

Group Vice President

Nuclear Energy Department

P. O. Box 14000

Juno Beach, FL 33408

Gentlemen:

SUBJECT:

REPORT NOS. 50-335/85-35 AND 50-389/85-35

On December 16 - 20, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-67 and NPF-J for your St. Lucie facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Vincent W. Panciera, Acting Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-335/85-35 and

509-389/85-35

(Safeguards Information)

8601240179 860117

cc w/ encl:

PDR

ADOCK 05000335

K. N. Harris, Vice President

a

PDR

St. Lucie Nuclear Plant

D. A. Sager, Plant Manager

N. Weems, Site QA Superintendent

EnctosuRs ccNTAINS

SAFEGUARDS INFOREATION

bec w/ encl:

(See page 2)

UPU" 8 PARATION TH18

.Av

u[,DECONTROLLtu.

,,

SAFEGUARDS INFORMATION-

go<O \\

.

.-.

. . . . . .

'

SAFEGUARDS INFORMATION-

'

'

.

d4$ j 7 lggg

Florida Power and Light Company

2

,

i

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPB

bcc w/ Inspection Sumary:

Document Control Desk, 016

NRC Resident Inspector

State of Florida

.

4

i

i

i

  • i

'l

i

RII

-

RII

RII

RII,

RI

JEknis:1b

DMcGuire

er

JStahr

S rod

01/j/86

01/g/86

86

01/t(/86 01/h /86

f

ENCLOSURE CONTAIN3

l

8AF*iG'i

~;0 INFORMATION

!

UP0;I :,d anA7;gg 7gg3

l

PAGE Is DECONTROLLED-

SAFEGUARDS INFORMATION-

,

l