NPL-97-0143, Forwards Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2.Corrected MOR for Feb 1997 for Unit 1,also Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:*-
{{#Wiki_filter:*-
Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant                                                                 (414) 755 2321 $
Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755 2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0143 April 3,1997 Document Control Desk.
6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0143 April 3,1997 Document Control Desk .
U. S. NUCLEAR REGULATORY COMMISSION
U. S. NUCLEAR REGULATORY COMMISSION
        . Mail Station PI-137 Washington, DC 20555 -
. Mail Station PI-137 Washington, DC 20555 -
Ladies / Gentlemen:
Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1997. Also attached is a corrected Unit 1, February 1997 Operating Data Report reflecting reactor critical hours.
DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1997. Also attached is a corrected Unit 1, February 1997 Operating Data Report reflecting reactor critical hours.
Sincerely, Q ?G-D. F. Johnson Manager -
Sincerely,
Regulatory Services & Licensing                                                                         ;
?G-Q D. F. Johnson Manager -
hds 4
Regulatory Services & Licensing hds 4
Attachments                                                                           -
Attachments cc:
cc:     L. L. Smith, PSCW NRC Regional Administrator, Region ill NRC Resident inspector I
L. L. Smith, PSCW NRC Regional Administrator, Region ill NRC Resident inspector I
L gg*9885!ZE' jig           o 6).
L gg*9885!ZE' jig 6).
R nswao-u nn c,-iu
o R
  .}}
nswao-u nn c,-iu
.}}

Revision as of 22:32, 11 December 2024

Forwards Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2.Corrected MOR for Feb 1997 for Unit 1,also Encl
ML20137P554
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/03/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137P563 List:
References
NPL-97-0143, NPL-97-143, NUDOCS 9704090270
Download: ML20137P554 (1)


Text

  • -

Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755 2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0143 April 3,1997 Document Control Desk.

U. S. NUCLEAR REGULATORY COMMISSION

. Mail Station PI-137 Washington, DC 20555 -

Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1997. Also attached is a corrected Unit 1, February 1997 Operating Data Report reflecting reactor critical hours.

Sincerely,

?G-Q D. F. Johnson Manager -

Regulatory Services & Licensing hds 4

Attachments cc:

L. L. Smith, PSCW NRC Regional Administrator, Region ill NRC Resident inspector I

L gg*9885!ZE' jig 6).

o R

nswao-u nn c,-iu

.