ENS 52566: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/18/2017 15:37 CST
| event date = 02/18/2017 15:37 CST
| last update date = 02/19/2017
| last update date = 02/19/2017
| title = Loss Of Control Building Chilled Water
| title = Loss of Control Building Chilled Water
| event text = At 1537 CST on February 18th, 2017, while the plant was in MODE 5 for a scheduled refueling outage, the main control room experienced a loss of Control Building chilled water and the associated ventilation systems while attempting to alternate divisions for testing.  An equipment malfunction in a breaker supplying a Main Control Room air handling unit caused a loss of both divisions of Control Room and Control Building chilled water systems and associated ventilation systems until 1737 CST.  During the period between 1537 and 1737, neither division of Control Building chilled water was able to perform the support function for cooling Division 1 and 2 AC and DC power distribution systems or the support function for the Division 1 and 2 Control Room Fresh Air systems.  
| event text = At 1537 CST on February 18th, 2017, while the plant was in MODE 5 for a scheduled refueling outage, the main control room experienced a loss of Control Building chilled water and the associated ventilation systems while attempting to alternate divisions for testing.  An equipment malfunction in a breaker supplying a Main Control Room air handling unit caused a loss of both divisions of Control Room and Control Building chilled water systems and associated ventilation systems until 1737 CST.  During the period between 1537 and 1737, neither division of Control Building chilled water was able to perform the support function for cooling Division 1 and 2 AC and DC power distribution systems or the support function for the Division 1 and 2 Control Room Fresh Air systems.  
Shutdown Cooling remained in service throughout this event.  There were no apparent effects on any plant equipment from the loss of chill water and ventilation.   
Shutdown Cooling remained in service throughout this event.  There were no apparent effects on any plant equipment from the loss of chill water and ventilation.   

Latest revision as of 21:43, 1 March 2018

ENS 52566 +/-
Where
River Bend Entergy icon.png
Louisiana (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat
Time - Person (Reporting Time:+2.73 h0.114 days <br />0.0162 weeks <br />0.00374 months <br />)
Opened: Michael D. Branscum
00:21 Feb 19, 2017
NRC Officer: Jeff Herrera
Last Updated: Feb 19, 2017
52566 - NRC Website
Loading map...