ML20137V931: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:._   .-                              _.    .            .  .      . . .  -              . .  - . _ . . - .
{{#Wiki_filter:._
4 i:
4 i:
APPENDIX B i NOTICE OF DEVIATION
APPENDIX B NOTICE OF DEVIATION i
,        Commonwealth Edison Company                                                   Docket No. 50-373 Docket No. 50-374 As a result of the inspection conducted August 12-14, 26-28, and September 3, 1985, the following deviation in four parts to NRC commitments contained in your LaSalle Unit I {{letter dated|date=December 22, 1983|text=letter dated December 22, 1983}}, were identified:
Commonwealth Edison Company Docket No. 50-373 Docket No. 50-374 As a result of the inspection conducted August 12-14, 26-28, and September 3, 1985, the following deviation in four parts to NRC commitments contained in your LaSalle Unit I {{letter dated|date=December 22, 1983|text=letter dated December 22, 1983}}, were identified:
: 1.         Commitment - Page 11, Paragraph 5, " Augmented temperature monitoring will be performed . . . to monitor actual temperatures to assure safety-related equipment does not degrade beyond pre-defined thresholds...."
1.
Attachment A of LAP-820-7 for procedure LLP 84-25 dated July 9, 1984, states that the reason for the special Unit 1 drywell temperature moni-toring program procedure is tu " provide a time table for collecting data 4                    regarding temperatures in the Unit 1 drywell thru first refuel."
Commitment - Page 11, Paragraph 5, " Augmented temperature monitoring will be performed... to monitor actual temperatures to assure safety-related equipment does not degrade beyond pre-defined thresholds...."
Contrary to the above, monitoring of drywell temperatures using the temporary thermocouples stopped in December 1984.
Attachment A of LAP-820-7 for procedure LLP 84-25 dated July 9, 1984, states that the reason for the special Unit 1 drywell temperature moni-toring program procedure is tu " provide a time table for collecting data regarding temperatures in the Unit 1 drywell thru first refuel."
,        2.         Commitment - Page 10, Paragraph 3, "A temperature menitoring p,rogram has
4 Contrary to the above, monitoring of drywell temperatures using the temporary thermocouples stopped in December 1984.
:                    been defined to evaluate the results from the short term fixes '.
2.
Commitment - Page 10, Paragraph 3, "A temperature menitoring p,rogram has been defined to evaluate the results from the short term fixes '.
Contrary to the above, adequate documented evaluation of the results was not available for review.
Contrary to the above, adequate documented evaluation of the results was not available for review.
: 3.         Commitmer;t - Page 14, Paragraph 1.c. , "Should the temperature in an area where safety related equipment is located exceed the, limiting temperature on which the 18-month life is based for that equipment, for more than 24 hours, an analysis for continued operation will be completed within seven days or the unit will be temporarily shut down for a visual inspection and i                     correction of the anomalous condition (s)".
3.
Commitmer;t - Page 14, Paragraph 1.c., "Should the temperature in an area where safety related equipment is located exceed the, limiting temperature on which the 18-month life is based for that equipment, for more than 24 hours, an analysis for continued operation will be completed within seven days or the unit will be temporarily shut down for a visual inspection and i
correction of the anomalous condition (s)".
Contrary to the above, such an ana!ysis was not available for review for various periods of time when the limiting temperature was exceeded for more than 24 hours.
Contrary to the above, such an ana!ysis was not available for review for various periods of time when the limiting temperature was exceeded for more than 24 hours.
: 4.         Commitment - Annex A, Technical Specification, "The temperature monitoring program will verify that these temperature limits are
4.
;                      correlated to Control Room CM Monitors (4).                                       ,
Commitment - Annex A, Technical Specification, "The temperature monitoring program will verify that these temperature limits are correlated to Control Room CM Monitors (4).
Contrary to the above, the analysis that was provided to correlate local temperatures in the drywell to alarm setpoints on control room containment 4
Contrary to the above, the analysis that was provided to correlate local temperatures in the drywell to alarm setpoints on control room containment monitoring (CM) recorders was found erroneous, 4
monitoring (CM) recorders was found erroneous, f
f i
i 8512100126 851206 gDR                   ADOCK 05000373 PDR t
8512100126 851206 gDR ADOCK 05000373 PDR t


Appendix                               2 Please provide in writing within 30 days of the date of this Notice a written explanation or statement describing corrective steps taken (or planned), the results achieved, and the date when corrective action will '
Appendix 2
be accomplished.
Please provide in writing within 30 days of the date of this Notice a written explanation or statement describing corrective steps taken (or planned), the results achieved, and the date when corrective action will be accomplished.
t
t
                      )2'       h' lD                             t / l AA Dated '     [                               C. J. )aperieflo, Director Divi on of Reactor Safety f
)2' h lD
/ l AA t
Dated '
[
C. J.
)aperieflo, Director Divi on of Reactor Safety f
3
3
(
(
      . - _ - . _}}
. - _ -. _}}

Latest revision as of 20:54, 11 December 2024

Notice of Deviation from Insp on 850812-14,26-28 & 0903
ML20137V931
Person / Time
Site: LaSalle  
Issue date: 12/06/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20137V922 List:
References
50-373-85-26, 50-374-85-27, NUDOCS 8512100126
Download: ML20137V931 (2)


Text

._

4 i:

APPENDIX B NOTICE OF DEVIATION i

Commonwealth Edison Company Docket No. 50-373 Docket No. 50-374 As a result of the inspection conducted August 12-14, 26-28, and September 3, 1985, the following deviation in four parts to NRC commitments contained in your LaSalle Unit I letter dated December 22, 1983, were identified:

1.

Commitment - Page 11, Paragraph 5, " Augmented temperature monitoring will be performed... to monitor actual temperatures to assure safety-related equipment does not degrade beyond pre-defined thresholds...."

Attachment A of LAP-820-7 for procedure LLP 84-25 dated July 9, 1984, states that the reason for the special Unit 1 drywell temperature moni-toring program procedure is tu " provide a time table for collecting data regarding temperatures in the Unit 1 drywell thru first refuel."

4 Contrary to the above, monitoring of drywell temperatures using the temporary thermocouples stopped in December 1984.

2.

Commitment - Page 10, Paragraph 3, "A temperature menitoring p,rogram has been defined to evaluate the results from the short term fixes '.

Contrary to the above, adequate documented evaluation of the results was not available for review.

3.

Commitmer;t - Page 14, Paragraph 1.c., "Should the temperature in an area where safety related equipment is located exceed the, limiting temperature on which the 18-month life is based for that equipment, for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, an analysis for continued operation will be completed within seven days or the unit will be temporarily shut down for a visual inspection and i

correction of the anomalous condition (s)".

Contrary to the above, such an ana!ysis was not available for review for various periods of time when the limiting temperature was exceeded for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.

Commitment - Annex A, Technical Specification, "The temperature monitoring program will verify that these temperature limits are correlated to Control Room CM Monitors (4).

Contrary to the above, the analysis that was provided to correlate local temperatures in the drywell to alarm setpoints on control room containment monitoring (CM) recorders was found erroneous, 4

f i

8512100126 851206 gDR ADOCK 05000373 PDR t

Appendix 2

Please provide in writing within 30 days of the date of this Notice a written explanation or statement describing corrective steps taken (or planned), the results achieved, and the date when corrective action will be accomplished.

t

)2' h lD

/ l AA t

Dated '

[

C. J.

)aperieflo, Director Divi on of Reactor Safety f

3

(

. - _ -. _