Line 16: Line 16:
| event date = 04/28/2017 05:00 EDT
| event date = 04/28/2017 05:00 EDT
| last update date = 06/06/2017
| last update date = 06/06/2017
| title = 60-Day Optional Telephonic Notification For An Invalid Auxiliary Feedwater Actuation
| title = 60-Day Optional Telephonic Notification for an Invalid Auxiliary Feedwater Actuation
| event text = This 60-day telephone notification is being submitted in accordance with paragraphs 10 CFR 50.73(a)(1) and 50.73(a)(2)(iv)(A) to report an invalid Auxiliary Feedwater (AFW) actuation at Watts Bar Nuclear Plant (WBN) Unit 1.
| event text = This 60-day telephone notification is being submitted in accordance with paragraphs 10 CFR 50.73(a)(1) and 50.73(a)(2)(iv)(A) to report an invalid Auxiliary Feedwater (AFW) actuation at Watts Bar Nuclear Plant (WBN) Unit 1.
On April 28, 2017 at approximately 0500 Eastern Daylight Time (EDT), Unit 1 maintenance personnel were performing 1-IMI-3.005, '18 Month Calibration of Anticipated Transient Without Scram System Actuation Circuitry (AMSAC),' when an AMSAC actuation signal was received.  Both Motor Driven Auxiliary Feedwater Pumps (MDAFWPs) were already in service when this actuation occurred.  The Turbine Driven Auxiliary Feedwater Pump (TDAFWP) did not start as it had been removed from service.  Additionally, steam generator blowdown isolated as required. During this event, AMSAC actuation was complete and equipment functioned as expected by its operating state.  
On April 28, 2017 at approximately 0500 Eastern Daylight Time (EDT), Unit 1 maintenance personnel were performing 1-IMI-3.005, '18 Month Calibration of Anticipated Transient Without Scram System Actuation Circuitry (AMSAC),' when an AMSAC actuation signal was received.  Both Motor Driven Auxiliary Feedwater Pumps (MDAFWPs) were already in service when this actuation occurred.  The Turbine Driven Auxiliary Feedwater Pump (TDAFWP) did not start as it had been removed from service.  Additionally, steam generator blowdown isolated as required. During this event, AMSAC actuation was complete and equipment functioned as expected by its operating state.  

Latest revision as of 21:42, 1 March 2018

ENS 52790 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+935.5 h38.979 days <br />5.568 weeks <br />1.281 months <br />)
Opened: David Allen
08:30 Jun 6, 2017
NRC Officer: Steve Sandin
Last Updated: Jun 6, 2017
52790 - NRC Website