REVISED NARRATIVE  
REVISED NARRATIVE  


==SUMMARY==
==SUMMARY==
OF MONTHLY OPERATING EXPERIENCE August 1985 August 1     The Station was in Operational Mode 1 with reactor power through       at a nominal 100 percent. Reactor Coolant System was at August 28     normal operating pressure and temperature.
OF MONTHLY OPERATING EXPERIENCE August 1985 August 1 The Station was in Operational Mode 1 with reactor power through at a nominal 100 percent.
August 29   At 1250 hours a reactor trip / safety injection occurred due to a loss of instrument air caused by a broken line on the instrument air dryer.           An unusual event was declared at 1300 hours.       Notification to NRC and others required by the Emergency Plan were made. At 1315 hours the unusual event was terminated.
Reactor Coolant System was at August 28 normal operating pressure and temperature.
August 30     Plant cooldown was in progress with the Unit entering through       Mode 4 at 0332 hours on the 30th and Mode 5 at 0017 hours August 31     on the 31st.
August 29 At 1250 hours a reactor trip / safety injection occurred due to a loss of instrument air caused by a broken line on the instrument air dryer.
An unusual event was declared at 1300 hours.
Notification to NRC and others required by the Emergency Plan were made. At 1315 hours the unusual event was terminated.
August 30 Plant cooldown was in progress with the Unit entering through Mode 4 at 0332 hours on the 30th and Mode 5 at 0017 hours August 31 on the 31st.
(
(
B5121%$
B5121%$ h PDR R
PDR h  ,
1
R 1
_}}
_ . _ _}}

Latest revision as of 20:14, 11 December 2024

Revised Monthly Operating Rept for Aug 1985
ML20138A823
Person / Time
Site: Beaver Valley
Issue date: 08/31/1985
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20138A815 List:
References
NUDOCS 8512120120
Download: ML20138A823 (1)


Text

...

REVISED NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE August 1985 August 1 The Station was in Operational Mode 1 with reactor power through at a nominal 100 percent.

Reactor Coolant System was at August 28 normal operating pressure and temperature.

August 29 At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> a reactor trip / safety injection occurred due to a loss of instrument air caused by a broken line on the instrument air dryer.

An unusual event was declared at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />.

Notification to NRC and others required by the Emergency Plan were made. At 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> the unusual event was terminated.

August 30 Plant cooldown was in progress with the Unit entering through Mode 4 at 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br /> on the 30th and Mode 5 at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> August 31 on the 31st.

(