ENS 53150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:
| event date = 11/06/2017 EST
| event date = 11/06/2017 EST
| last update date = 01/05/2018
| last update date = 01/05/2018
| title = Agreement State Report -  Stuck Shutters On Fixed Nuclear Gauges
| title = Agreement State Report -  Stuck Shutters on Fixed Nuclear Gauges
| event text = The following was excerpted from an email received from the state of South Carolina:
| event text = The following was excerpted from an email received from the state of South Carolina:
On January 5, 2018, the licensee called [South Carolina Department of Health and Environmental Control] to provide notification of stuck shutters on 2 sets of three-rod Berthold Model LB300L fixed gauging devices. The shutters were stuck in the open position. The gauging devices contain Co-60 in amounts of 0.11, 0.41, and 1.81 milliCuries in one and 0.189, 0.5, and 1.50 milliCuries in the other. The [licensee's] Radiation Safety Officer found the shutter stuck in the open position on November 6, 2017 and the licensee notified the State on January 5, 2018. The licensee called Berthold to come out to evaluate corrective measures on the shutter mechanisms. Berthold technicians came to the plant on December 19, 2017. After being informed of proper procedures on reporting requirements, the licensee stated that a written report will be sent within 30 days of the event.  
On January 5, 2018, the licensee called [South Carolina Department of Health and Environmental Control] to provide notification of stuck shutters on 2 sets of three-rod Berthold Model LB300L fixed gauging devices. The shutters were stuck in the open position. The gauging devices contain Co-60 in amounts of 0.11, 0.41, and 1.81 milliCuries in one and 0.189, 0.5, and 1.50 milliCuries in the other. The [licensee's] Radiation Safety Officer found the shutter stuck in the open position on November 6, 2017 and the licensee notified the State on January 5, 2018. The licensee called Berthold to come out to evaluate corrective measures on the shutter mechanisms. Berthold technicians came to the plant on December 19, 2017. After being informed of proper procedures on reporting requirements, the licensee stated that a written report will be sent within 30 days of the event.  

Revision as of 21:41, 1 March 2018

ENS 53150 +/-
Where
Domtar Paper Company
Bennettsville, South Carolina (NRC Region 1)
License number: Sc 438
Organization: Sc Div Of Health & Env Control
Reporting
Agreement State
Time - Person (Reporting Time:+1451.2 h60.467 days <br />8.638 weeks <br />1.988 months <br />)
Opened: Leland Cave
16:12 Jan 5, 2018
NRC Officer: Bethany Cecere
Last Updated: Jan 5, 2018
53150 - NRC Website