TXX-4603, Interim Deficiency Rept SDAR-207 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Evaluation Continuing.Next Rept Will Be Submitted by 851207: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:.
{{#Wiki_filter:.
Log # TXX-4603 TEXAS UTILITIES GENERATING COMPANY File # 10110 SKYWAY MWER e 400 NomTH OLIVE STREET, L.B. A B
Log # TXX-4603 TEXAS UTILITIES GENERATING COMPANY File # 10110 SKYWAY MWER e 400 NomTH OLIVE STREET, L.B. A B
* DAELAS. TEXAS 75301 EMk^3aMfn'.h                                   October 16, 1985
* DAELAS. TEXAS 75301 EMk^3aMfn'.h October 16, 1985 F
                                                                                          =
=
F                    , .,
,-.3
                                                                                                                  ,-.3 i    O        t          _ji l..L,[j)~ ~~ ~ ~ 1;'Q1, Mr. R. P. Denise, Director-Division of Reactor Safety and Projects                                 b                           U U. S. Nuclear Regulatory Commission                                         \i < OCT 211985 L plJ                        p.
_ji l..L,[j)~
Region IV 611 Ryan Plaza Drive, Suite 1000
~~ ~ ~ 1;'Q1, i
                                                                                    !bb                          y)
O t
!          Arlington, Texas 76012                                                                                   -
Mr. R. P. Denise, Director-Division of Reactor Safety and Projects b
U L plJ < OCT 211985
\\i p.
U. S. Nuclear Regulatory Commission Region IV
!bb y) 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION                                       -
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05, 50-445 AND 50-446 REBAR DAMAGE QA FILE: CP-85-45, SDAR-207
DOCKET N05, 50-445 AND 50-446                                                                       ,
REBAR DAMAGE QA FILE: CP-85-45, SDAR-207


==Dear Mr. Denise:==
==Dear Mr. Denise:==
 
On September 26, 1985, we verbally notified your Mr. I. Barnes of a deficiency regarding the use of core boring equipment during the installation of shear lugs which could have resulted in undocumented j
On September 26, 1985, we verbally notified your Mr. I. Barnes of a deficiency regarding the use of core boring equipment during the
damaged reinforcing steel.
!          installation of shear lugs which could have resulted in undocumented j           damaged reinforcing steel.
i We are continuing our evaluation and anticipate completion by December 7, 1985.
i We are continuing our evaluation and anticipate completion by December 7, 1985.
i l                                                                                 Very truly yours,
i l
                                                                                          ,            CMt
Very truly yours, CMt W. G. Counsil By:
:                                                                                  W. G. Counsil By:
: 6. S. Marshall Licensing Supervisor JCH/grr
: 6. S. Marshall Licensing Supervisor JCH/grr
          -c- NRC Region IV (0 + 1 copy)
-c-NRC Region IV (0 + 1 copy)
Director, Inspartion & Enforcement (15 copies)
Director, Inspartion & Enforcement (15 copies)
U. S. Nucle u Regulatory Commission Washington, D.C. 20555 8510250321 e51016 PDR     ADOCK 05000445-                                                           $g g gef)SS                   S                           PDR A DEVISION OF TEXA8 t1TELITIES E12CTRIC COMPANY}}
U. S. Nucle u Regulatory Commission Washington, D.C.
20555 8510250321 e51016 PDR ADOCK 05000445-
$g g gef)SS S
PDR A DEVISION OF TEXA8 t1TELITIES E12CTRIC COMPANY}}

Latest revision as of 20:33, 11 December 2024

Interim Deficiency Rept SDAR-207 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Evaluation Continuing.Next Rept Will Be Submitted by 851207
ML20138F673
Person / Time
Site: Comanche Peak  
Issue date: 10/16/1985
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-207, TXX-4603, NUDOCS 8510250321
Download: ML20138F673 (1)


Text

.

Log # TXX-4603 TEXAS UTILITIES GENERATING COMPANY File # 10110 SKYWAY MWER e 400 NomTH OLIVE STREET, L.B. A B

  • DAELAS. TEXAS 75301 EMk^3aMfn'.h October 16, 1985 F

=

,-.3

_ji l..L,[j)~

~~ ~ ~ 1;'Q1, i

O t

Mr. R. P. Denise, Director-Division of Reactor Safety and Projects b

U L plJ < OCT 211985

\\i p.

U. S. Nuclear Regulatory Commission Region IV

!bb y) 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05, 50-445 AND 50-446 REBAR DAMAGE QA FILE: CP-85-45, SDAR-207

Dear Mr. Denise:

On September 26, 1985, we verbally notified your Mr. I. Barnes of a deficiency regarding the use of core boring equipment during the installation of shear lugs which could have resulted in undocumented j

damaged reinforcing steel.

i We are continuing our evaluation and anticipate completion by December 7, 1985.

i l

Very truly yours, CMt W. G. Counsil By:

6. S. Marshall Licensing Supervisor JCH/grr

-c-NRC Region IV (0 + 1 copy)

Director, Inspartion & Enforcement (15 copies)

U. S. Nucle u Regulatory Commission Washington, D.C.

20555 8510250321 e51016 PDR ADOCK 05000445-

$g g gef)SS S

PDR A DEVISION OF TEXA8 t1TELITIES E12CTRIC COMPANY