TXX-4603, Interim Deficiency Rept SDAR-207 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Evaluation Continuing.Next Rept Will Be Submitted by 851207

From kanterella
(Redirected from TXX-4603)
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-207 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Evaluation Continuing.Next Rept Will Be Submitted by 851207
ML20138F673
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/16/1985
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-207, TXX-4603, NUDOCS 8510250321
Download: ML20138F673 (1)


Text

.

Log # TXX-4603 TEXAS UTILITIES GENERATING COMPANY File # 10110 SKYWAY MWER e 400 NomTH OLIVE STREET, L.B. A B

  • DAELAS. TEXAS 75301 EMk^3aMfn'.h October 16, 1985 F

=

,-.3

_ji l..L,[j)~

~~ ~ ~ 1;'Q1, i

O t

Mr. R. P. Denise, Director-Division of Reactor Safety and Projects b

U L plJ < OCT 211985

\\i p.

U. S. Nuclear Regulatory Commission Region IV

!bb y) 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05, 50-445 AND 50-446 REBAR DAMAGE QA FILE: CP-85-45, SDAR-207

Dear Mr. Denise:

On September 26, 1985, we verbally notified your Mr. I. Barnes of a deficiency regarding the use of core boring equipment during the installation of shear lugs which could have resulted in undocumented j

damaged reinforcing steel.

i We are continuing our evaluation and anticipate completion by December 7, 1985.

i l

Very truly yours, CMt W. G. Counsil By:

6. S. Marshall Licensing Supervisor JCH/grr

-c-NRC Region IV (0 + 1 copy)

Director, Inspartion & Enforcement (15 copies)

U. S. Nucle u Regulatory Commission Washington, D.C.

20555 8510250321 e51016 PDR ADOCK 05000445-

$g g gef)SS S

PDR A DEVISION OF TEXA8 t1TELITIES E12CTRIC COMPANY