ML20138N584: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:_ _ _ | {{#Wiki_filter:_ _ _ | ||
k- - | k- - | ||
^ | |||
MATER!E TitA?t3MITTED 11EPEET1! Wts4 s | |||
Docket No. .70-2984' ,' | 7 2.790 liif0RMAT10N The Information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-2984/85-02-(IE-V-715) | ||
License No. SNM-1922 | Docket No..70-2984',' | ||
Safeguards Group III | License No. SNM-1922, | ||
Safeguards Group III t | |||
Licenbee: Arizona Public Service Company Arizona Nuclear Power Project P.10. Box .52034 - | :~ | ||
Phoenix, Arizona ,85072-2034'., | Licenbee: Arizona Public Service Company Arizona Nuclear Power Project P.10. Box.52034 - | ||
Phoenix, Arizona,85072-2034'., | |||
. s. | |||
Type of Inspectio : | 'Palo Verde Nuclear Generating Station, Unit-2 | ||
' Facility Name: | |||
Inspection at: Wintersburg, Maricopa County, Arizona Inspection Conducted: October 7 through 10, 1985 Date of Last Material _ Control and Accounting Inspection: July 11 through 14 and August 5, 11 and 22, 1983 (Unit 1) | |||
Type of Inspectio : | |||
anounced Preoperational Material Control and Accounting Safeguards lh Inspectors: | |||
A. V. Wieder, Safeguards Auditor Da'te signed 4A hG e-zc-ss | |||
'G. | |||
B. Nelson, Chemist Date Signed Approved by: 47) h ud | |||
/6 JO M~ | |||
.M. D. Sch'uster, Chief Date Signed | |||
~ | |||
Safeguards Section Inspection Summary: | |||
N Area Inspected: Material Control and Accounting - Power Reactor. The inspection involved 48 inspector-hours on site and two inspector-hours off-site by two NRC inspectors. During the inspection, Inspection Procedure 85102 was covered. | N Area Inspected: Material Control and Accounting - Power Reactor. The inspection involved 48 inspector-hours on site and two inspector-hours off-site by two NRC inspectors. During the inspection, Inspection Procedure 85102 was covered. | ||
Results: Within the area inspected, two violations were identified. The violations were in the manner of documenting new fuel receipts. | Results: Within the area inspected, two violations were identified. The violations were in the manner of documenting new fuel receipts. | ||
MATERIAL TRAtl3MITTED REPnnm 8511050237 851029 2.790 liif0RMAT1ON PDR ADOCK 07002984 C | |||
PDR | |||
. -}} | |||
Latest revision as of 18:36, 11 December 2024
| ML20138N584 | |
| Person / Time | |
|---|---|
| Site: | 07002984 |
| Issue date: | 10/29/1985 |
| From: | Nelson G, Schuster M, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19344C133 | List: |
| References | |
| 70-2984-85-02, 70-2984-85-2, NUDOCS 8511050237 | |
| Download: ML20138N584 (1) | |
Text
_ _ _
k- -
^
MATER!E TitA?t3MITTED 11EPEET1! Wts4 s
7 2.790 liif0RMAT10N The Information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-2984/85-02-(IE-V-715)
Docket No..70-2984','
License No. SNM-1922,
Safeguards Group III t
- ~
Licenbee: Arizona Public Service Company Arizona Nuclear Power Project P.10. Box.52034 -
Phoenix, Arizona,85072-2034'.,
. s.
'Palo Verde Nuclear Generating Station, Unit-2
' Facility Name:
Inspection at: Wintersburg, Maricopa County, Arizona Inspection Conducted: October 7 through 10, 1985 Date of Last Material _ Control and Accounting Inspection: July 11 through 14 and August 5, 11 and 22, 1983 (Unit 1)
Type of Inspectio :
anounced Preoperational Material Control and Accounting Safeguards lh Inspectors:
A. V. Wieder, Safeguards Auditor Da'te signed 4A hG e-zc-ss
'G.
B. Nelson, Chemist Date Signed Approved by: 47) h ud
/6 JO M~
.M. D. Sch'uster, Chief Date Signed
~
Safeguards Section Inspection Summary:
N Area Inspected: Material Control and Accounting - Power Reactor. The inspection involved 48 inspector-hours on site and two inspector-hours off-site by two NRC inspectors. During the inspection, Inspection Procedure 85102 was covered.
Results: Within the area inspected, two violations were identified. The violations were in the manner of documenting new fuel receipts.
MATERIAL TRAtl3MITTED REPnnm 8511050237 851029 2.790 liif0RMAT1ON PDR ADOCK 07002984 C
. -