ML20138N584

From kanterella
Jump to navigation Jump to search
Matl Control & Accounting Safeguards Insp Rept 70-2984/85-02 on 851007-10.Violation Noted Re Documentation of New Fuel Receipts.Details Withheld (Ref 10CFR2.790)
ML20138N584
Person / Time
Site: 07002984
Issue date: 10/29/1985
From: Nelson G, Schuster M, Wieder A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19344C133 List:
References
70-2984-85-02, 70-2984-85-2, NUDOCS 8511050237
Download: ML20138N584 (1)


Text

_ _ _

k- -

^

MATER!E TitA?t3MITTED 11EPEET1! Wts4 s

7 2.790 liif0RMAT10N The Information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-2984/85-02-(IE-V-715)

Docket No..70-2984','

License No. SNM-1922,

Safeguards Group III t

~

Licenbee: Arizona Public Service Company Arizona Nuclear Power Project P.10. Box.52034 -

Phoenix, Arizona,85072-2034'.,

. s.

'Palo Verde Nuclear Generating Station, Unit-2

' Facility Name:

Inspection at: Wintersburg, Maricopa County, Arizona Inspection Conducted: October 7 through 10, 1985 Date of Last Material _ Control and Accounting Inspection: July 11 through 14 and August 5, 11 and 22, 1983 (Unit 1)

Type of Inspectio :

anounced Preoperational Material Control and Accounting Safeguards lh Inspectors:

A. V. Wieder, Safeguards Auditor Da'te signed 4A hG e-zc-ss

'G.

B. Nelson, Chemist Date Signed Approved by: 47) h ud

/6 JO M~

.M. D. Sch'uster, Chief Date Signed

~

Safeguards Section Inspection Summary:

N Area Inspected: Material Control and Accounting - Power Reactor. The inspection involved 48 inspector-hours on site and two inspector-hours off-site by two NRC inspectors. During the inspection, Inspection Procedure 85102 was covered.

Results: Within the area inspected, two violations were identified. The violations were in the manner of documenting new fuel receipts.

MATERIAL TRAtl3MITTED REPnnm 8511050237 851029 2.790 liif0RMAT1ON PDR ADOCK 07002984 C

PDR

. -