ML20138P367: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:}}
NUREG4748              i Vol. 5, No. 8
                                                                                                                  ~
OPERATING REACTORS LICENSING ACTIONS                                 
 
==SUMMARY==
 
l UNITED STATES NUCLEAR REGULATORY COMMISSION                                                                      ,
p aa e
{,
          )                  Pg";juWi'a "*'l                                                  e i
 
3 o
Available from Superintendent of Documents U.S. Government Printing Office Post Office Box 37082 Washington, D.C. 20013 7082 A year's subscription consists of 12 issues for this publication.
Single copies of this publication are available from National Technical information Service. Springfield, VA 22161 6
 
i' NUREG-0748 Vol. 5, No. 8 OPERATING REACTORS LICENSING ACTIONS
 
==SUMMARY==
 
1 Date Completed: August 1985 4                                  Date Published: October 1985 i
Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION i                                  Prepared by: OFFICE OF RESOURCE MANAGEMENT O.S. NUCLEAR REGULATORY COMMISSION j                                                  WASHINGTON, D.C. 20555 l
f ., ,,
                                    !A$#  7-,)
s,    e d'
 
1 I
a.
FOREWORD THE OPERATING REACTORS LICENSING ACTIONS
 
==SUMMARY==
IS DESIGNED TO j                        PROVIDE THE MANAGEMENT OF THE NUCLEAR REGULATORY C0t911SSION (NRC)
WITH AN OVERVIEW 0F LICENSING ACTIONS DEALING WITH OPERATING POWER AND NONPOWER REACTORS. THESE REPORTS UTILIZE DATA COLLECTED FROM THE DIVISION OF LICENSING IN THE OFFICE OF NUCLEAR REACTOR REGULATION AND ARE PREPARED BY THE OFFICE OF RESOURCE MANAGEMENT.
THIS SUPNARY REPORT IS PUBLISHED PRIMARILY FOR INTERNAL NRC USE IN MANAGING THE OPERATING REACTORS LICENSING ACTIONS PROGRAM.                        ITS                                ,
CONTENT WILL CHANGE BASED ON NRC MANAGEMENT INFORMATIONAL REQUIREMENTS.
1 6
k 4                                                                                                                                              I
                                                                                                                                              +
I
 
TABLE OF CONTENTS Definitions                                                                                                    I-III Section 1 Management Overview Report                                                                          Table A. Plot Showing Historical Sumary of Active Licensing Actions                                                A 1
B. Plot Showing Licensing Actions Completed Vs. FY85 Operating Plan                                          B l              C. Plot Showing Total Active Licensing Actions Per Month in FY85                                              C D. Fiscal Year to Date Licensing Action Summary                                                              D 1
l              D.1 Monthly Status Report on All Operating Plant-Specific Backfitting Issues                                    D.1 E. Completed Licensing Actions By Fee Class                                                                  E F. Manpower Sumary by Facility                                                                                F G. Operating Power Reactors Hearing Sumary                                                                    G H. Requests for NRR Assistance - Status Report                                                                H Section 2 Multiplant Action Overview I. Plot Showing MPA Completions Vs. Operating Plan                                                            1 J. Multiplant Issues Sumary Report                                                                            J K. Multiplant Action Completion Schedule                                                                      K L. Multiplant Actions - Lead Assignments and Contract Information                                            L M. Implementation of Resolved USIs                                                                            M N. D0L Points of Contact for USIs                                                                            N l
l
 
  . _ - _ - _ _ _ _                    __ - .      . - - - . _ .                                . - . - _ . . . . . - . .- - - . . . - . _ - . - _ _ - . - .    ... ..      _ ~ _ _ .-_ - ..
1
)                                                                                                                            2-                                                                  .
1 Table Section 3 Routine (Non-NUREG-0737) . Licensing Action Summary O. Plot of Total Active Routine Actions by Month'                                                                                                0
,                    P. Plot of New Routine Licensing Actions by Month                                                                                                P Q.    ' Plot of Routine Licensing Actions Completed ay Month                                                                                          q R. Table of Routine Licensing Actions by Month and by Facility R
S.. Table of Routine Licensing Actions (Incoming and Completions) by                                                                                                    -
Facility for Power Reactors                                                                                                                  5 Section 4 NUREG-0737 Licensing Actions
!                    T. Plot'of;NUREG-0737 Active Licensing Actions by Month                                                                                          T                    i U. Plot of New TAC (d) Opened for NUREG-0737 Licensing Actions by Month                                                                          U V. Plot of Completed NUREG-0737 Licensing Actions by Month                                                                                        y
                    - W. Table of NUREG-0737 Licensing Actions by Month and Facility                                                                                    W 1
X. Table of NUREG-0737 Licensing Actions (Completed and New TACs) by Facility                                                                                          '
X Y. Detail Status of NUREG-0737 Requirements Schedule'
,                                                                                                                                                                          Y Z. Overview of NUREG-0737 Implementation Schedule                                                                                                  Z Section 5 Condenced Management Report of Licensing Actions by Power Reactors Section 6 Multiplant Action Descriptions for Selected Active Issues i
                                , , _        . , -              - , - - - . . _ . . ~ _ _ . , .                                                              -
 
l l                                                                                                      DEFINITIONS 1                    Licensing Actions A. Active Licensing Action - an item which has been initiated but not completed.
: 1. Multi-Plant Licensing Action - a licensing action topic that applies to a class
            <                              of reactors.
: 2. Plant Specific Licensing Action - a liccasing action associated with a certain facility because of the uniqueness of the technical specifications or situation, l
e.g., reduce the number of incore detectors.
B. Types of Licensing Actions
: 1. Amendment - action that results in changes to facility licenses including technical specification changes.
: 2. Letters to Licensees - letters sent to licensee requesting information that will resolve or aid in the resolution of technical issues. Examples of letters sent to licensees are: fuel handling inside containment, assymetric loads or reactor vessel materials surveillance.                                                                                  1
: 3. Orders / Exemptions - actions on operating plant that result in an Order for Modification of a License or an exemption to the regulation.
C. Technical Assignment Control (TAC) Numbers
: 1. NRC generated number. assigned to each licensing action.
: 2. Used for administrative purposes to monitor progress on a given licensing action.
D. Multiplant Action Numbers
: 1. Assigned to' categories of actions applicable to a generic group of plants. May arise from solutions to " Unresolved Safety Issues" or from operating experience, f
J                                                                          *
 
                                                                                                                                        ,.s.
S' -
I
: 2. Categories of Multiplant Actions A .-
A-Series : actions directly attributed to a' specific regulation requirement, e.g., inservice inspection / testing requirements 10 CFR 50.55a(g).                            (Related to Regulations).
B.
* Bi$eries: action directly attributed to an occurrence of accumulative experience at licensed
                  ,          reactors, e.g. , fire protection.                    (Related to Operating Experience).
C. C-Series: action resulting from NRC staff reviews of license applications, generic topics and operating reactor licensing actions, e.g.,' reporting requirements, fuel handling accidents, or filter tech spec requirements. (A result of internal review.)
;                      D. D-Series: action required as a result of current data which shows that previously accepted requirements are no longer. acceptable or are overly restrictive, e.g., ECCS input errors, assymmetric loads, equipment qualification. This new information may result from technological advancements, research or advanced analytical studies. (A result of new information.)
E. E-Series: action requested by the licensee that does not fit any of the other sources of licensing actions. Usually these actions are requerted because of the licensee's desire to improve operational performance, e.g., core reloads, spent fuel pool modificatoins, or
                            . (N-1) loop operation. (A result of licensee requests.)
F.      F-Series: multiplant functions which are the direct result of NUREG-0737 concerning TMI Lessons Learned.
G.    . G-Series : multiplant actions which are a direct result of NUREG-0660, a precurser to
                            .NUREG-0737.
II. Significant Dates A. Initiation - This is the date an action was actually started or implementation was begun on a plant. It.is the date that a letter was issued to the licensee initiating the action, the date
                                                    ~
of a licensee request, or the date a TAC was issued for an-item arising out of an operating experience or new information event. The preferred date to use for initiation date is the
                    ~date of a. licensee submittal to the NRC to initiate review work.
 
B. RAI - request for additional information. -This is the date by which the NRC technical reviewer either plans to or has provided a request for additional information to the assigned project manager. In the " Condensed Management Report" (Section 5), RAI dates by themselves represent projected dates and RAI dates followed by a C (i.e., 02/01/84C) represent actual dates.
For licensing actions with multiple reviewers, the date shown in Section 5 is the latest date of the action as a whole.
C. RAI response date - request for additional information response date. This is the date by which the licensee either has or will respond to staff questions.              In the " Condensed Management Report" (Section 5), RAI response dates by themselves represent projected dates and RAI dates followed by a C represent actual dates.
D. TER Date - Technical Evaluation Review Date.            If the review is contracted out by the NRC, this is the date by which the contractor will provide their evaluation. This date will not be applicable to all reviews.
E. SER Inpr    hte - Safety Evaluation Report Input Date. This is the date by which final SER inputs are d9e      t,he assigned project manager. For licensing actions with multiple reviewers, the date shown in (
* tion 5 is the latest date for the action.as a whole. In Section-5, SER Input Dates by thems 9 vcs epresent projected dates and dates followed by a C represent completed dates.
F. LIC ACT Date - Licensing Action Date. This is the date on which all work, both technical and administrative, was or is projected to be completed and sent out of the agency. The actions listed for each plant in the " Condensed Management Report" are sorted by the LIC ACT Date into three categories as follows: active issues, unscheduled issues, and copleted issues. Completed issues are deleted at the end of each fiscal year.
III. Priorities A. For active issues, the plant listing in Section 5 " Condensed Management Report" sorted by licensing action date becomes the priority of work effort for that plant. However, it is understood that items not scheduled for completion for many months may still require significant resources now to meet the scheduled completion dates.            Furthermore, the projected completion dates are very dependent on the working relationship between the staff and the licensee.
 
B.          . Another priority system used by the NRC is as follows:
,                                              .1. lHigh (1)
: 1. Required by Rule, Order or NRC Letter
: 2. Safety-related items that use definite improvements in safety or would reduce the likelihood
                                                        ' of transients or accidents.
F                                                    3. Hearing-related matters.
: 4.  'High public interest in issue.
: 5. 1 Actions which, if.not completed, will affect power level or scheduled restart of a facility.
: 6. 2.206 petitions.
: 2. Medium (2)
: 1. Items which, if not. completed, could result in an otherwise unnecessary IE enforcement action.
t
: 2. Spent fuel pool expansions.
4                                                                  .
i
: 13. Task'should 'be completed within six nonths.
4
: 3. Low (3)
: 1. Licensee requests for amendments that have low safety significance.
: 2. Licensee requests for amendments which may have safety' significance but for which NRC action
                                                        ;is not required during the next six months (e.g., in early submittal of a core reload),
i 4
                        ,,                  m  _.                                                        v              - +                        -_________ _ _ _ __ ___
 
l l
l l
l l
l l
l SECTION I i
l MANAGEMENT OVERVIEW REPORT l
l l
l l
l l
 
n-                        a    _g,                -
l t
l I
f z                ,                                                                :
g< - . . . . . _  _ .      . . . . . _ . _ . . . . _ . . _ . .  . _ . _ _ . . .
l                    D o                          '
l O
t                                                    ,
l d.i i              i (S)3Y.L Mido .:10 H3EIMf1N i
i              -
l l
l l
l
 
m
                    .n nu Mm 1                                                          ?;                -
                    .                                        3d2; e
B
                                                                          =
N A
L P
E eA  Nng g C
I F?g I?
d;1 eg z
G N
I T
A R
s            _
sE E
P                                                              _
O 5                                                                        _
8                                                  P        -e
                                                                        .u Y
F  .
S
                                                                        .z
            .      .                  m      s            Gag U
S                                                  Ai g 2a V                8l              f LL Uig D                                                  Ji; s4 m
E                                                  Nip T                                                  U E                                                  J_uq L                                                  Y  L;;
P e
A Mi        3 M                                                          l1 O
o t        Pu33 R
m C                                          e        Al; 3
m Og n.
S N
O
                    /
                        /
                          /
Wnmn a ;g ea R
A M!;
Bbg E!g g
I 4
s T
C                        /
FHg N
A                                                  A1; e
j
                                      /                        JHg G                            /                      C N
s Eig
-                                                                          e I
S                              /                    DH V          ;
N                                /                  O3; E
C U                                  //          u    NH3 T
C3; O12 g
                                                          +        "
rb s
WP        e e
                                                                  .4h
                                    ..,r                          _P_8 i
_3" m      m                .      m      ,
                                                                          .t lg
 
l I
3 l
z        a s
a                  ~4
            /          ~
t
                        ~
i z
o g                  g
                        ~
i                      t
          ,\          \
s hI i --... i i    i 4
 
R-1208619-001                    T E C H N I-C A L    ASSIGNMENT            C0NTR0L        SYSTEM REPORT DATE: 09/17/85                      FY TO DATE MULTI-PLANT & PLANT SPECIFIC ACTION
 
==SUMMARY==
10/01/84 - 08/31/85 NEN                COMPLETED            ACTIVE LICENSING.            LICENSING          LICENSING ACTIONS                ACTIONS            ACTIONS MULTI-PLANT ACTIONS REGULATIONS                        10                    82                227 OPERATING EXPERIENCE              593                    422              1,018 INTERNAL REVIEWS                  63                    102                  75 NEW INFORMATION                    29                    21                127
                                      . LICENSE REQUIREMENTS                0                    5                  6                k NUREG-0737 ACTIONS                100                    287                687 NUREG-0660 ACTIONS-                '2                    0                  53 SUBTOTALS                797                    919              2,191 1,711                  1,777              1,855 PLANT SPECIFIC ACTIONS TOTAL                          2,508                  2,696              4,046 1
i
 
D.1-1 MONTHLY STATUS REPORT ON ALL OPEN i                                                                              PLANT-SPECIFIC BACKFITTING ISSUES SIMMARY OF ACTIVE BACKFIT APPEAL ISSilES FOR ASSISTANT DIRFCTOR OF OPERATING RFACTnRS i                                                                                                                        DATE IDENTIFIFD l                                          CODE      PLANT MAME                              ISSilE                      AS RACKFIT          NFXT APPEAL ACTION OR-84-?6    Maine Yankee              DWST Level Alam                              09/28/84          07/?8/65 AD Position OR-85-03    Farley 1/2              RVLIS                                        I?/18/84          03/04/85 AD Position SIM8ARY OF ACTIVE RACKFIT APPFAL ISStlES FOR DIVISION DIRECTOR OF DIVISION OF LICENSING DATE IDENTIFIFD CODE      PLANT NAME                            ISStlE                          AS RACKFIT          NEXT APPEAL ACTION i
L-84-10    Beaver Valley 2            Cable Room Fire Prot.                        05/?0/84                07/??/85 Mtg l
l                                        L-84-Il    Reaver Valley ?            Spent Fuel Cooling                          06/15/84                02/?8/85 Mtg l
L-84-l?    Beaver Vallev 2            Air Starting Sys./EDG                        06/15/84                07/27/85 Mtg L-84-13    Beaver Vallev ?            SG Level Control                            05/30/84                02/77/85 Mtg l
l
!                                        L-84-14    Peaver Vallev ?            MOV/ Failure                                06/15/84                07/78/85 Mtg L-84-16    Beaver Valley ?            Prob. Max. Precip.                          05/30/84                07/2?/85 Mtg L-84-17    Reaver Valley ?            Rocker Arm Lube Oil                          06/25/84                02/78/A5 Mtg Alam/EDG L-84-31    Reaver Valley ?            Diesel to Fill Proc.                        10/11/84                02/28/85 Mtg
 
D.1-2 DATE IDENTIFIED CODE PLANT NAME                ISSUE            AS BACKFIT    NFXT APPEAL ACTION L-84-32      Reaver Valley 2 Applic, of GDC 4 to        11/08/84        02/27/85 Mtg Lighting Systems L-84-33      Reaver Valley ? Appli. of GDC 2/4 to        11/08/84        02/27/85 Mtg Comunication Sys.
L-84-34      Reaver Valley 2 Appil. of GDC 5 to          11/08/84        07/??/85 Mtg Comunication Sys.
L-84-35      Beaver Valley 2 Dose Proj.                  11/08/84        07/??/85 Mtg L-84-36      Beaver Valley 2 Illum. Levels              11/08/84        02/22/85 Mtg L-84-37      Beaver Valley 2 DG Aux. Sys. Design        11/08/84        07/28/85 Mtg
 
9 R-1208821-001              REGULAT0RY                INF0RMATION                      TRACKING              SYSTEM                                    PAGEs'E-1 FISCAL YEAR: 1985        C0MPLETED              LICENSING                  ACTION $            BY      FEE            CLASS            REPORT DATE: 09/17/85 FEE CLASS          COMPLETED ACTIONS                      MANHOURS                AVG HOURS / ACTION                    AVG COST / ACTION AUG.      FY TO                TOTAL        TOTAL            FOR            TO                FIXED          ACTUAL 1.15ji    RAIE                FY 85      TO DATE          FY 85          RAIX                BY REO      3 $40/HR NONE                  66      1,210        27,382.5        108,113.8            22.6            89.3                    N/A      $3,572 1                    2          85        1,521.5          5,644.4            17.9            66.4                    400      $2,656 2                      0          67        1,635.5          3,262.2            24.4            48.6                  1,200        $1,944 3                    4        145        3,588.n          15,656.4            24.7          107.9                  4,000        $4,316 4                      0          33          625.0          2,793.0            18.9            84.6                12,300        $3,384 5                    0            0                  0.0            0.0            0.0          0.0              25,800              $0 6                      0            0                  0.0            0.0            0.0          0.0              45,900              $0 TOTAL                72      1,540        34,752.5        135,469.8            22.5            87.9                              $15,872 FEE CLASS          COMPLETED ACTIONS                      71ANHOURS              AVG HOURS / ACTION                    AVG COST / ACTION AUG.      FY TO                TOTAL        TOTAL            FOR            TO E          DAIE                FY.85      TO DATE          FY 85          RAIE                  ACTUAL 3 $62/HR FEE BEARING          95        720        28,860.2          32,369.2            40.0            44.9                      $2,783
.i NON-FEE BEARING      46'        444        13,279.0          15,744.5            29.9            35.4                      $2,194 TOTAL              141      1, 16 4      42,139.2          48,113.7            69.9            80.3                      $4,977 b
 
i R-1208814-001                                                          REGULAT0RY                                            INF0RMATION                                                      TRACKING                                        $YSTEM                                              PAGE: F            .1 l
REPORT DATEt 09/17/85                                                                    MANPOHER                                           
 
==SUMMARY==
BY                FACILITY FOR 08/01/85 - 08/31/85 MANHOURS EXPENDED LAST MONTH ON                                                                                                          MANHOURS                            AVG HOURS / COMPLETED ACTION FOR FACILITY                                                                                                                                                                                    EXPENDED HEARINGS                                              TMI                        TOTAL                    TO DATE                              GENERICS                PLANT                    TOTAL OR ROUTINE ACTIONS                                                                                                                                                                                                SPECIFIC FY 1985                                    -- --                - _ - _ - = = _ -==
                                                                                                                                                          = - . . . . . . - - - - . . . . . - - - _ - - - - _=_                                        .-----...____---
24.0                      129.0                            1,708.2                                  48.5                  83.4                    69.6 ARKANSAS 1                                                          105.0                                            0.0 2,05f.4                                110.4                117.7                  114.2 ARKANSAS 2                                                          191.0                                            0.0                                    39.0                      230.0 125.0                                          0.0                                    11.0                      134.0                            1,318.5                                126.5                  36.7                    50.7 BEAVER VALLEY t                                                                                                                                                                        158.5                            1,461.1                                105.6                  23.2                    47.9 BIG ROCK POINT 1                                                    143.5                                          0.0                                    14.0                                                                                                                                              41.9 0.0                                        7.0                      78.0                          t,f46.5                                  58.7                33.8
,                          BROWNS FERRY t                                                        71.0 31$0                                          0.0                                        5.0                        36 b                              6 5.0                                26.5                  11.9                  k94 BROHNS FERRY 2                                                                                                                                                                            32,0                              630.0                                20.9                  33.0                  27.9 BROHNS FERRY 3                                                        29.0                                          0.0                                        3.0 7.0                    108.0                            1,730.6                                  38.1                  43.8                  41.9        >
BRUNSHICK 1                                                        100.5                                          0.0 733.9                                26.2                  18.6                  21.3 136.5                                          0.0                                        3.0                    140.0 BRUNSHICK 2                                                                                                                                                                          283.5                              1,769.0                                  28.0                  59.6                  54.3 BYRON 1                                                            276.5                                            0.0                                        7.0                                                                                    -- -__. _ - . . . . . . -                        =-_---. .
                                                                                                                                            . = _ - _ - -            = _ _ - - - - -                                _, ----=                        .....- =--=.
                            ------..--....._                                    -_--          =-._      -
0.0                                    39.0                      427.5                              1,922.0                                  22.1                  74.6                  62.0
* CALLAHAY t                                                          388.0                                                                                                                                                                                                              62.7                  65.1 CALVERT CLIFFS 1                                                    166.0                                          0.0                                        9.0                      175.0                          2.490.6                                  69.3 CALVERT CLIFFS 2                                                      24.0                                          0.0                                        6.0                        30.0                                988.7                              56.9                  97.3                  71.2        4 38.0                      185.0                                918.2                                  8.0                39.2                  25.8 CATAHBA 1                                                            147.0                                          0.0 50.2                  61.1 COOK 1-                                                            267.5                                            0.0                                    16.0                      283.5                            2,061.4 79.4
                                                                                                                                                                                                                                                                                                                - ==_                                    ;
_=.. -.---.___                                                                        _ _ _ _              . _ - _ _
49.5                                          0.0                                    11.0                        60.5                          1,137.2                                  16.5                  55.5                  39.3 COOK 2                                                                                                                                                                                  175.0                          2.329.4                                  136.7                105.2                  122.9 102.0                                          0.0                                    71.0 COOPER STATION 89.0                      315.0                            3,007.2                                  63.2              118.8                  103.3 CRYSTAL RIVER 3                                                    226.0                                            0.0 1,126.5                              4,688.7                                133.4                  42.4                  76.9        '
DAVIS-BESSE 1                                                    1,068.5                                            0.0                                    58.0 322.0                            8,113.2                                  16.7              401.0                  221.7        !
DIABLO CANYON 1                                                    261.0                                          48.0                                      1!.0 0.0                                        0.b                                        0.b                            0.b                              21.5                                00                    0.b                  bb        i DIABLOCANYbN2                                                                                                      0.0                                        0.0                            0.0                              14.0                                0.0                18.0                  18.0 DRESDEN 1                                                              0.0                                                                                                                                            2,791.5                                                        40.2                  49.2 4
97.0                                          0.0                                    23.0                        120.0                                                                    59.4
:                              DRESDEN 2 19.0                      126.0                            1,239.5                                  37.3                  27.6                  33.1 4
DRESDEN 3                                                          107.0                                            0.0 4,037.0                                107.3                106.8                  107.0 214.0 - _=---                                    0.0                                        5.0                    223.0 DUANE ARNOLD                                                                                                  --
_-. - - - - _ _ _                            _. . _ = -                                                  _    -_=          __-          _
                                                                                                                                                                                                                                                                                                                            == ---------
3 2.0                    316.5                            2,241.9                                  28.4                  39.5                  36.9 FARLEY 2                                                          314.5                                            0.0 0.0                            397.5                                  0.0                  0.0                  0.0 FERMI 2                                                                0.0                                        0.0                                          0.0                                                                                                                                        105.3 4
212.0                                            0.0                                        9.0                    221.0                            2,984.5                                124.3                  88.3 FITZPATRICK 0.0                                  102.0                        139.0                            1,850.6                                140.5                  79.7                104.0 FORT CALHOUN 1                                                      37.0 03                                      18.0                      336 5                            337b.5                                    Sb.1                162.6                  23 2        !
FORT ST RkIN                                                      318.5                                                                                                              257.0                            3,182.7                                  54.6                118.4                  107.8 GINNA                                                              257.0                                            0.0                                          0.0                                                                                                                                        73.0 30.0                      647.5                            3,050.0                                  22.5                  85.6 GRAND GULF 1                                                      6 17.5                                          0.0 107.0                            1,323.7                                  98.9                  42.9                  64.6 100.0                                          0.0                                          7.0 HADDAM NECK                                                                                                                                                      0.0                295.0                            1,991.6                                101.9                    95.5                97.8 HATCH t                                                          295.0      _.
0.0
                                                                                                                                                                                                                                                                - - _ _        _        = - - _ _ -    _ . = _ - _ - _ .        _ -            _-
h i
i i
I
 
    - . . . - _ . . _ - -                        .._..~=            - _                      --- -                  -- - _ . _ - - . _ - - - -                                                                                  . . -        . - . _ _ _ ~ . . . _ - - - _ ~                                            _
R-1208814-001                                  REGULAT0RY                                                                                                                                                                                                                                            L INF0RMATION                                                    TRACKING                                    SYSTEM                                                    PAGE: F- 2                r REPORT DATE: 09/17/85                                                    MANPONER                               
 
==SUMMARY==
BY              FACILITY                                                                                                                    '
FOR 08/01/85 - 08/31/85                                                                                                                                                                        .
;                                      FACILITY                                      MAMHOURS EXPENDED L AST MONTH ON                                                                                        MANHOURS                                AVG HOURS / COMPLETED ACTION FOR                                      I EXPENDED OR ROUTINE ACTIONS                            HEARINGS                                  TMI                        TOTAL                      TO DATE                                  GENERICS                    PLANT                TOTAL
,                                                                                                                        = - -                      --=          .- .- ---
FY 1985 SPECIFIC 4
HATCH 2                                        131.0                                                                                                                                                                        ... _....._.._-___-                                ._...              ;
HUMBOLDT BAY 3 0.0                              0.0                      131.0                            t,113.6                                      46.1 389.0                                      0.0                              0.0                      389.0                              2,359.5 21.2                32.5
!                          INDIAN POINT 2                                  160.5                                      0.0                              5.0                      165.5                            1,803.7 0.0            1,556.3              1.556.3              !
e                          INDIAN POINT 3.                                216.5                                                                        1.0                                                                                                      38.9                  292.5                174.7 j                          KENAUNEE                                        146.0 0.0                                                      217.5                            2, 168 .7                                    116.4                      94.9              103.7 0.0                        165.0                        311.0                            2,683.2                                      91.2                      60.8 L
                                                                                                  - _ - z._. _ _ _ -                                    - - _ __                            .- ___ __ . - - _ _ - - - -
73.1            i l                          LA CROSSE                                                                                                                                                                                                              _- _ _ _ _ . _ -
308.5                                      0.0                              0.0                      308.5                              1,698.6
_ =_-                        ____
l LASALLE t                                      194.0                                      0.0                          128.0                                                                                                        152.7                      47.8                78.3 i                          LASALLE 2                                                                                                                                            322.2                            2,123.0                                          5.6                    50.2 118.7                                      0.0                              0.0                      118.7                                924.4                                                                                    27.9            i i
LIMERICK 1                                    239.5                                                                                                                                                                                    3.1                    49.1                27.5            ;
MAINE YANKEE 0.0                              0.0                      239.5                              1,774.0                                        0.0                  64.1                64.1
.                                                                        338.0                                      0.0                          28.0                        366.0                            3,286.7                                      149,1
                                                                                        .--_ - = - - -                    _=--          _
68.8                100.2 MCGUIRE t 160.5                                                                                                                                                                                                        __...          -....._
MCGUIRE 2 0.0                              2.0                      163.0                              1,400.1                                      15.5                    39.4                31.8
                                                                        -183.0                                      0.0                              9.0                      192.5                              1,174.4 MILLSTONE 1                                  472.0                                      0.0                              0.0                      472.0                            3,199.5 5.1                  40.8                30.0 i
MILLSTONE 2                                  294.0                                      0.0                              0.0 154.6                    205.0                185.9 j                          MONTICELLO 294.0                              2,530.1                                    109.2                      48.3 149.0                                    0.0                            35.0                        184.0                            1,614.0                                                                                    62.8            ?
                                                                      =:---- _
                                                                                                                                                                                                                  . . = - - _
82.9                  176.7                141.0 NINE MILE POINT t                              176.0                                    0.0                          57.0                        233.0                              1,721.9
_ _ _ _ =          _ _ - - .                -
NORTH ANNA t                                  219.0                                                                                                                                                                                  97.8                    52.8                71.7 NORTH ANNA 2 0.0                              6.0                      227.5                              1,174.0                                      80.2                    42.8                58.7 1
151.0                                    0.0                              6.0                      159.5                            1,453.9 l                        OCONEE 1                                      212.5                                                                                                                                                                                  34.3                  102.7                  77.5 DCONCE 2 0.0                              3.0                      215.5                              1,447.3                                      85.0                    20.0 l                                                                      100.0                                      0.0                              3.0                      103.0                            1,020.8                                                                                    41.7 4
28.6                      19.9                22.5 OCONEE 3                                      255.5                                      0.b                              3.h 4
OYSTER CREEK 1                                                                                                                                      258.5                              1,675.7                                      29.5                    26.3                27 4 78.0                                    0.0                          28.0                          106.0                            1,897.1 1
PALISADES                                      272,0                                                                    15.0 75.5                    26.0                39.9 PALD VERDE 1 0.0                                                        287.0                              1,425.5                                      69.3                    47.0 186.5                                                                                                                                                                                                                                59.4 I                                                                                                                  0.0                              3.0                      189.5                            2,156.9                                        3.0
* PEACH BOTTOM 2                                185.5                                                                                                                                                                                                        102.3                  94.7 0.0                              3.0 188.5                            1,784.5                                      77.4                    37.2                52.0              '
'                                                                                                                                                                                                                _ -- __- =_____ _--_...., _=                                          .. - _____
PEACH BOTTOM 3
'                                                                      103.0                                    0.0                              3.0                        106.0                            1,286.0                                      27.8 PILGRIM 1                                      226.0                                    0.0                            44.0                        270.0                            2,485.0 33.8                31.8 POINT BEACH t                                    85.5                                    0.0                              0.0 134.7                    106.2                121.8 POINT BEACH 2                                                                                                                                          86.0                            1,165.7                                      24.3                      44.2                40.9 62.0                                    0.0                              0.0                        62.5                                708.7 PRAIRIE ISLAND 1                              123.5                                                                                                                                                                                  18.5                    18,4                18 4 0.0 2.0                      125.5                              1,155.3                                      61.8                      59.5                60.3
                                                                                                                                                                                                                                                          ==_ .=_ ___ --
PRAIRIE ISLAND 2 89.0                                    0.0                              2.0                        91.0                            1,089.8 OUAD CITIES 1                                  88.5                                                                    36.0                                                                                                        44.6                      76.8                57.8 QUAD CITIES 2 0.0                                                        124.5                                869.5                                    36.3                      30.5                34.4 118.5                                    0.0                            24.0                        142.5                                928.5                                    26.5                    20.1 RANCHO SECD 1 ~                              482.0                                      0.0                              6.0                                                                                                                                                      23.7 488.0                            4,419.7                                      117.1                    102.9                107.4 ROBINSON 2                                    228.0                                      0.0                            28.0                        256.5                            2,638.6 152.3        _
96.6              114.7              l I
<                                                                                                                                                                                                                                                                                                                              I i
1                                                                                                                                                                                                                                                                                                                                r
                                                .        , ,-                  - . -        ,          ,,                                                                                              . - - . .          - -.                            -                                                            __ _ l
 
REGULAT0RY                                    INF0RMATION                                              TRACKING                                    SYSTEM                                                  PAGE: F- 3 f                                      R-1208814-001                                                                                                                                                                                                                                                                                                        '
f
^
REPORT DATE: 09/17/85                                                                            MANPONER                               
 
==SUMMARY==
BY            FACILITY FOR 08/01/85 - 08/31/85 MANHOURS EXPENDED LAST MONTH ON                                                                                    MANHOURS                                  AVG HOURS /CDMPLETED ACTION FOR FACILITY                                                                                                                                                                            EXPENDED TMI                    TOTAL                TO DATE                                  GENERICS                  PLANT              TOTAL OR ROUTINE ACTIONS                          HEARINGS                                                                                                                                                  SPECIFIC FY 1985                    - - - - = - - . . . . . - - - _ . _ _ - - - _ - = -_ -__ _ - -          .
                                                                                                                                .. ... .              --- - =__ - -----....--                                              ----------..- _ -                      _
e                                        ._-
49.0 5.0                144.0                      1,041.7                                      79.3                28.9 SALEM t                                                                        139.0                                  0.0 128.5                      1,065.2                                      94.2                35.8                  49.8 128.5                                  0.0                                    0.0 SALEM 2                                                                                                                                                        2.0                142.5                      1,969.3                                      51.7                76.5                  67.9 SAN ONOFRE 1                                                                    140.5                                  0.0 2,250.6                                      13.5              46.4                  44.5 233.0                                  0.0                                    2.0                235.0 SAN ONOFRE 2                                                                                                                                                  2.0                258.5                      1,846,0                                      30.5                23.0                  23.6 SAN ONOFRE 3                                                                  256.5            _ _ __-
0.0
                                                                                                                                                                    ---___                    -_ __              _-          _-.........._                          -- _ _ -                      =--                _ _ . _ _.-
52.6                  50.2 SEQUOYAH 1                                                                      115.0                                  0.0                              18.0                    135.0                      1,614.7                                      46.7 76.0                                  0.0                            20.0                        96.0                        770.0                                    16.7                40.8                  29.4 SEQUOYAH 2                                                                                                                                                      0.0              142.0                      2,207.5                                        0.0                4.5                    4.5 SHOREHAM                                                                        142.0                                  0.0 594.7                                  124.7                49.3                100.9 ST LUCIE 1                                                                        18.0                                  0.0                              14.0                      33.0 70.9 34.0                                  0.0                                    4.0                39.0                        673.1                                    25.4                89.8 ST LUCIE 2                                                                .... --... ..--                    _ _ _ . . ---- =                                                      -. ---                  -- ______- .___ _                                -==        _    _.--_______ _=
6.0              232.0                        1,912.2                -
23.0                50.3                  45.0 SUMMER 1                                                                        226.0                                  0.0 842.6                                    42.3                11.5                25.2 117 .0                                  0.0                              19.0                    136.0 15.2
                                        .SURRY 1 0.0                                    3.0                25.0                          423.6                                    20.9                11.2 SURRY 2                                                                          22.0                                                                                            195.0                      3,488.1                                      22.7                61.7                  58.3 177.0                                  0.0                              18.0 5USQUEHANNA 1 132.0                                  0.0                              13.0                    145.0                          995.0                                      3.6              37.3                  33.4
                                          $USQUEHANNA 2                                                                                                            ..----..                                        ._      . - _ _ _ ___ _
                                                                                                                                                                                                                                                                                            - _= _-__                    . _ _ _ _ _ - - _ _ _ = - -      ,
                                                                          - . ---.--..-.--.......=.
154.4                150.6 230.0                        452.0                      6,831.5                                      131.3 THREE MILE ISLAND 1                                                            202.0                                20.0 0.0                            0.0                                    0.0                0.0                    0.0 0.0                                0.0                                    0.0 THREE MILE ISLAND 2                                                                                                    0.0                              68.0                    317.0                      2,348.3                                    128.8                35.8                  84.3 TROJAN                                                                          249.0                                                                                                                        1,411.8                                      73.9                64.9                  68.2 68.0                                f2.0                                33.0                    113.5 J                                          TURKEY POINT 3 12.0                                      8.0                94.0                      1,033.3                                      48.8                40.6                  43.9 TURKEY POINT 4                                                                  74.0                        ___ _____ .- _-__                                    - - - -                            =-_....==_
0.0                              23.0                    117 .5                      1,255.0                                      88.5                90.3                  89.4 VERMONT YANKEE 1                                                                94.5 J.0                163.0                      2,019.5                                          9.0              48.9                  43.7 HASHINGTON NUCLEAR                                                              16 3.0                                  0.0                                                                                                                                                    43.1                  43.1 178.5                                                                      0.0 0.0                                    0.0                                          1,257.3 HATERFORD 3                                                                    178.5                                                                                            127.0                          680.5                                      0.0              22.0                  22.0 HOLF CREEK 1                                                                    127.0                                  0.0                                    0.0 128.6                79.1                  94.9 437.0                                    0.0                                  18.0                455.5                      4,333.3 YANKEE-RDNE 1                                                                                                                                                --                        __
                                                                                                                                                                                                                                                          -=_                              --______-----..__-                  -___      -
130.8 142.6 33.0                    177.5                      1,942.2                                      86.8 ZION 1                                                                          144.5                                  0.0 92.5                      1,169.2                                      21.8                24.0                  23.5 92.5                                  0.0                                    0.0 ZION 2 92.0                      1,894.2                    t),244.4                    179,388.3                                          69.6                68.4                  68.8      l t
GRAND TOTAL                                                17,258.2                                                                                                                                                                                            _=-_ _
)                                                                                                                            _--- -_                        _ - - . . . _ .                          =___-__ ...... -___-                                ---=___                    _          = _ __ _
i d
[
1 i
r
 
  . ~ . . ~ _ _ _ _ _ .                . _ _ _ - _ _ _ _          . _. _ . _ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ . _ _ . . _ _ _                                m __.. __ .__        _ _ _ _
TABLE G
;                                                                                                                                                                                                                  G-1
!                                                                                  CASES PENOING Bff0RE THE CopeII5510N. APPFAL BOARDS AND LIEENSING ROARDS 5EW/ mots l                          FACILITY                        SUPP.          FE5                          Aste 90ARD                              ASLAB BOARD ISSUED 155DfD A$t B*                          MEMBERS              A$ TAR
* MIPSE RS Copeel5510N*          HEARING STATUS (Decket No. & Vender) theratine License:
Bralduced, limits !                    SER          Yes            I        Grossaan. Chairman                          Edles. Chru.                  Contested hearing. Prehearing                    '-
                        &2                                11/83        6/84                    Callthan. Cole                              Gotchy Moore                  conference held 7/23/85; hearing (50-456/457)                                                                                                                                      to connence on 10/7/85.
(West)
Brenner. Chairman                                                          Outstanding contested issues: (1) trans-Ca11then. Cole                                                            mission lines; (2) emergency planning; (transatssionlines)                                                        (3) QA/0C.
Catamha. Units 1                        $ER            Tes                    Kelley. Chaftman I                          Rosenthal. Chre.          I    Contested hearing. Full power OL and 2                            2/83          1/83                  Foster. Purdon                              Moore. Wilber                  (Unit 1) authortred on 1/17/85. On (50-413/414)                                                                                                                                      7/2C/85. AstA8 issued ALA8 813 (West)                                                                Merge 11es. Chre.                                                          affirming PIDs on all but one issue Hooper. Lato                                                              (storage of spent fuel from other              i (Emergency Planning)                                                      plants); further decisinn rending.
Outstanding contested issues:
(1) construction QA; (2) emergency Pl anning; (3) reactor embs tttlement; (4) spent fuel storage; (5) conse.
quences of severe accidents.
I                                                                                                                                                                          Contested hearing. Hearings suspended rammache Peak.                          SEE          Yes          I        Bloch. Chatraen                              Rosenthal. Chem.
Units 1 & 2                      7/81          9/81                  Jorden. McCollem                            Johnson. Moore                pending completion of Staff review and (50-445/446)                    Supp.                                                                                                            Implementation of appitcants' corrective (urst)                          11/84                        I      Bloch, Chefruen                                                            action plan.
Jorden. Grossmen                                                                                                          1
                                                                                                .(Intteidation)
Outstanding contested issues: construc-l                                                                                                                                                                            tion and design QA/QC.
Lacrosse (FTIE)                        Me            Yes            I      sechhoefer Chru.                                                            Contested hearing. PIDs on environmental (50-400)                                      .4/00                  Andersan. Decker                                                            and seismic issues affirmed on 7/13/83 (AC)
(ALAB-733). Safety contentions have            l been deferred pending issuance of SER.        l l
Outstanding contested issues:
* Indicates before uhtch tribunal (s) the case is currently pending.
l 4
l l                      -        ,-                  -                                                -.        .
 
G-2 CASES PENDING BEFORE THE C0fel5510N. APPEAL BOARDS AND LICENSING BOARDS 5ER/A m FACILITY                SUPP. FE5              A5tB BOARD              ASLAS BOARD (Decket No. 8 Vendor)      ISSUED  1550fD Ast R
* MEMBERS      ASLAs*      MEMetRS      CO*HISSION*              HEARING STATt's thereting License:
Limerick. Units 1 8 2    SER        Yes          Hoyt Chm.          I      Kohl, Chru.                        Contested hearing. OL (Unit 1) issued (50-352/353)          8/83        4/84          Cole. Harbour            Edles Gotchy                        8/8/85. PIDs issued on 8/28/84 (Iow (GE)                                                                                                          power); 5/2/85 (emergency planning);
and 7/22/85 (revised EP contentions following remand); appeals pending on all 3 PIDs.
Outstanding contested issues:
(1) emergency planning; (2) welding 0A/0c; (3) effect of cooling tower Plume on aircraft; (4) severe accident analysts; (5) pipeline hazards.
Martie 14111. Units !    No        Iso      I    5mith Chafruen                                              Contested proceeding; factitty has been 82                                              Linenberger. Perfs                                          cancelled. Applicants have filed wttor:
(50-546/547)                                                                                                  to terminate proceeding; A5tB action (West)                                                                                                        awalttng Staff evaluation of App 1tcant?
environmental redress program.
Outstanding contested issues: environ-mental redress.
Nfdland, Units 1 8 2      SER        Yes            Bechhoefer. Chrw. I I                                Rosenthal. Chre.                  Contested hearing. Applicant has (50-329/330)          5/82      7/82          Cowen. Harbour            Moore                              terminated construction. Partial PID (Sau)                                                                                                        fssued on 1/23/85; parties' views as to whether PID should be vacated and proceeding terminated are pending before ASLA8.
Outstanding contested issues:
(1) generic safety issues; (2) cooling pond environmental analysis; (3) severe accident analysis; (4) NEPA cost-benefit analysis; (5) emergency planning; (6) quality assurance.
Indicates before which tribunal (s) the case fs currently pending.
 
1 G-3 Cast $ PENDING BEFORE THE C0ml55!0N. APPEAL BOARDS AND LICfMSING POARDS l -
srn/ acus l        FACILITY            SUPP.      FE5              ASL8 BOARD                    ASLA8 BOARD (Docket No. 8 Vendor)    ISSUfD    155UID Ast B*        MEMBERS    A$ TAO
* MIMBERS    Com155108t*          HEARING STATUS Operettne License:
l  Igorth Anna. Units 1      SER        Yes                              I          Rosenthal, Chrm.              OL 1ssued. Pending before ASLAR on l    82                      6/76                                                                                  radon issue; A5 TAR decision deferred i    (50-338/339)            Supp.                                                                                  pending Cosssission review of ALAB-701.
l    (West)                  12/77 Outstanding contested issues: radon.
Peach Setten. Units 2    SER        Yes                                          Moore. Chm.          I        ASLAB terminated review of radon issue 83                      8/72        4/73          McCollue                      Johnson                        on 11/19/82 (ALA8-701); petition for 50-277/278)                                                                                                Comunission review has been deferred by GE)                                                                                                        Order of 5/27/83 (CLI-83-14).
Outstanding contested issues: radon.
i
. Perry. Units 1 & 2        SER        Yes          Gleason. Chm.      I          Rosenthal. Chrm.              Contested hearing. Concluding PID l    (50-440/441)            5/82        8/82          Brfght. Kline                  Edles. Johnson                author 12tng issuance of OL issued on l    (GE)                    Supp.                                                                                  9/3/85.
2/84 Outstanding contested issues:
(1) emergency planning; (2) hydrogen control; (3) TDI diesel generators.
!  Robleson. lentt 2        N.A.        Yes          Wolf, Chairman    I          Johnson                        Pending before ASLAB on redon issue; i
(Sectfen3)                          4/75          Ca11then. Cole                                              ASLAB deciston deferred pending (50-261)                                                                                                      Coaunission review of ALAB-701.
(West)
Outstanding contested issues: redon.
I    San Onofre. Units 2                                                                                  I        Full power Ots have been issued.
j    and 3                                                                                                          Proceedtog reopened on remand from 50-361/362)                                                                                                D.C. Circuit.
t (CE)
(
l                                                                                                                    Outstanding contested issues: nedtcal services for general public exposed to radfatton.
* Indicates before which tribunal (s) the case fs currently pending.
1
 
G-4 CASES PENDING BEFORE THE COB 98155104 APPEAL 80APDS AND LICENSIE BOARDS 5EW/mCR5 FACILITY            SUPP. FES              A5tB BOARD              AstA8 BOARD (Docket flo. 8 Veeder)  ISSUED  1550fD ASLB*        M8enfR5      A5tA8*      M MRfRS    f 0 feel 55l0N*                                  HEARING STATUS theratine License:
Seabroot. Units 1 & 2  $ER -      Yes    I    Hoyt. Chairman            Rosenthal, Chm.
(50 433/434)        3/83      12/82 Contested hearing. Hearings have Marbour. LueMe            Edles, Wilber                    partially concluded; additional hearings (West)              Supp.                    (offsite emergency 6/83                    planning)                                                  will be held on offsite emergency planning.
I    Wolfe Chafrman                                              Outstanding contested issues:
Harbour. Luebke                                              (1) environmental qualification of (safety and onsite                                          electrical equf emergency planning)                                        monitoring; (3)pment;                                  Class 9(2) radiological accidents; (4) control room design; (5) qualf ty assurance; (6) operator training; (7) emergency planning; (8) decay heat removal.
Shearon Harris.          SER      Yet      I    Kelley. Chairman I        Moore. Chru.                    Contested hearing. appilcant tas Units I and 2        11/83      10/83        Bright. Carpenter          Gotchy. W11ber (50-400/401)                                                                                              announced cancellation of Unit 2.
(West)                                                                                                    PID on environmental matters issuel on 2/20/85; appeal pending. PID on safety matters issued 2/20/85; appeal pending.
Hearings on most emergency planning issues have concluded; hearing on remaining EP issue to commence 9/24/85.
Hearings on drug use to connence 9/30/85.
Outstanding contested issues:
(1) NEPA cost / benefit balance; (2) radiatfod effects; (3) radiation monitoring; (4) steam generators; (5) management qual 1ffcations; (6) qualffication of electrical equfpment; (7) fire protection and control; (R) emergency preparednt ss; (9) melding; (10) drug use; (11) concrete construction.
Indicates before nefch trfbonal(s) the case is currently pendfng.
 
_ _ . - _ _ . _ . _ _ . _ . _ _ .                _  _ _ . _ _ _              _ _ .      .__._m            _    ._        _ _ . _ _ _ _ _ _ _ _ . _ _ =              _. . . _ .        . _ _ _ _ _ _ . _ . .._ _ . _      _ . . - . _
I                                                                                                                                                                                                                                            1 G-5 CASES PEN 0lE BEFORE THE C0seII55104, APPEAL 80ARns AND tlCENSING SOARDS SER/ACR5                                                                                                                                                                    "
FACILITY                      $UPP. FE5                    AstB BOARD            .A5LA8 BOARD (Docket no. & vender)              ISSUED  1550fD Ast B*            MEMBERS    AStAP'      MEMBERS                    C089115510N*                  HEARING STATt'5                                      >
beretf as L f cease:
Shoreham                          SER      Ves              Brenner, Chrm.      I    Rosenthat Chre.                                      Contested hearing. Low power license (50-322)                        4/81    12/77            Ferguson, Morris          Edles Wilber                                          issued 7/3/85. PID on emergency (GE)                            Supp.                                                                                                      Planning issued on 4/17/85; appeals l                                                                  4/84                                                                                                      pending. PID on relocation centers, i
s'ergulies, Chm.                                                                  rendering ultimate EP conclusions, Kilne, Shon                                                                      issued on 8/26/85; appeals pending. P!D (emergency planning)                                                            on TDI diesels, allowing operation to 50 Power, issued 6/14/85; appeal pending.                        ,
Bright, Johnson (Iow power license)                                                              Outstanding contested issues:
(1) emergency planning; (2) emergency diesel generators; (3) low power securfty.
South Tesas, Usilts 1              No      No          I  Bechhoefer Chm.            Edles, Chm.                                          Contested hearing. Hearings conti d and 2                                                    Lamb, Shon                  Johnson, Moore                                        on 8/15/05; all proposed findings of fact (50-498/499)                                                                                                                              to be filed by 11/12/85.
(West)
Outstanding contested issues:
(1) management character and competence; (2) design adequacy; (3) quality assurance.                                                    ,
Three Rtle Island,                SER      Yes                                        Rosenthal, Chru.                    I                ASLAB decision on redon issued on thitt 2                        9/76    12/76          Linenberger                Johnson                                              11/19/82 (ALA8-701); petition for                              I (50-320)                        Supp.
Cosmutssion review has been deferred (88W)                          2/78                                                                                                      by Order of 5/27/83 (CLI-83-14).
Outstanding contested issues: redon.
Indicates before uhtch tribunal (s) the case is currently pending.
 
                                                      .            ..          .  . ..      . _ . - . . _ - ~.            - _ _ . ,        .  .. . . _ _ _                      .        - - -        - .-- __ .
G-6 CASES PENDlE BEFORE THE Colet!5SION, APPEAL ROARDS AND LICENSIE BOA @S 5Wnor)
FACILITY              SUPP.            FES              A5tP BOARD                        A$tA8 BOARD (Docket No. 8 vendor)      155ufD 1550f D ASI S*                MEMBERS      ASLAS*              MEMBERS            ComISSION*                        HEARING STATUS Operettne License:
Vogtle. Units I and 2    No                No        I  flergulles, Chru.                                                                    Contested proceeding. Emergency planning
,                    (50-425/426)                                          Linenberger Parts                                                                    contentfons admitted by Order of 8/12/85; (West)                                                                                                                                      discovery on all other issues has been completed. Motions for sunnary dispost-tion pending before ASLB.
Outstanding contested issues:
(1) quality assurance; (2) environmental s)ualf fication of electrical equfpment; (3) emergency diesels; (4) groundwater contamination; (5) cooling tower drift; (6) seismic conditions; (7) emergency planning.
Waterford. Unit 3          SER              Tes          Wolfe, Chefruen                  Kohl Chru.                  I                    Contested hearing. Full power ifcense (50-382)              7/81              g/81          Foreman, Jordan                  Johnson, WfIber                                    istued on 3/16/85. Motion to reopen (C d .)                Supp.                                                                                                                denied by ASLA8 on 7/11/85 (except as 12/84                                                                                                                to O! issues which were referred to Commission) (ALA8 812); petition for Commission review pending.
Outstanding contested issues: (1) quality assurance /qualfty control; (2) management competence and integrity.
l
* Indicates before d ich tribunal (s) the case is currently pending.
 
G-7 CASES PENDING BEFORE THE C0 peti 5510N. APPEAL 80AR05 AND LICEN51NG 80ARD5 l                                                          5WAct5 FACILITY            SUPP.                FF%            ASLB BOARD                          ASLA8 BOARD (Docket Ilo. 8 hador)              ISSUED 155000 A5t B*                  MNetR$            A5L AR
* MpefRS          C0pmI5510N*            HEARING STATUS Opecattne License:
l I                                                                                                                                                                                                                    )
11PP55. Unit !                      Ito                Ito      I    Grossman. Chru.                                                            Contested hearing. Proceeding held in (50-460)                                                    Bright. Harbour                                                            abeyance pending completion of Staff's review of issues in controversy, 1
Outstanding contested issues: (1) decay l                                                                                                                                                                        heat removal; (2) emergency planning; (3) environmental effects of ionizing radiation; (4) need for safety-grade valves; (5) seismic design; (6) con-struction QA; (7) fire protection; (8) diesel generators; (9) ECCS evaluation model.
WPP55. Unit 3                      IIe                  Ito    I    Margulfes. Chre.                  Rosenthal Chru.                          Contested proceedirq. A$th fias (50-508)                                                    Bright. Carpenter                  Edles. Wilber                            reconfirmed its det $1on grantion late petition for leave *o interar,e.
Outstanding contested issues: (1)hfPA cost / benefit analysis; (2) environmental qualification of electrical equipment; i                                                                                                                                                                        (3) design adequacy; (4) OA/0C; l                                                                                                                                                                        (5) diesel generators; [6) emergency planning.
1
* Indicates befere which tribunal (s) the case is currently pending.
t
 
CASES PENDING BEFORE THE C0pO415510N, APPEAL 80ARDS AND LICENSIE BOARDS sta/ acus FACILITY                SUPP.          FES                A5tB 80ARD                  A5tAf P0A#n (Docket No. 8 Vendor)      ISSUED !$5DED A$t B
* MEM8ERS    A51 AB*          MEM8ERS        COMMI5510N*          HEARIE STATUS Special:
i Sig Rock Point              No              No        I    Wolfe, Chaleinen                                                Contested hearing. In indefinite sus-
                                , Increase MDI Fuels)                                    Foreman, Shon                                                  pension as a result 6f CESMO dectston.
L50-155) fGE)                                                                                                                      Outstanding contested issues:
Midland,                    SER            Yes      I    8echhoefer, Chm. I          Rosenthal, Chm.                    Contested hearing. Applicant has Units I and 2            5/82            7/82            Couen, Harbour              Moore                              teminated construction. Hearing on (Soft Constructfan                                                                                                        soll issues has concluded; motion to Actfv1 ties)                                                                                                              reopen has been ffled. Partfal PID (50-32g/330)                                                                                                              issued on 1/23/85; parties' views (Bau)                                                                                                                    on whether proceeding should be temi-nated are pending before ASLA8.
Outstanding contested issues:
(1) remedf al measures for solls-related problems; (2) quality assurance.
Three Mile Island,          SER            EIA      I    Wolfe, Chalmen                                                  Contested hearing. Prehearing con-          '
Unit 2                    2/80            2/80            Paris, Shon                                                    ference held on 7/7-8/80. Negotiations (50-320-OLA)                                                                                                              on contentions in progress; partial (Bau)                                                                                                                    settlements have been reached.
Outstanding contested issues:
Three M11e Island,          SER            EIA            Smith, Chairman    I        Edles, Chatriman                    Contested hearing. PID on training Unit I (Westart)          6/80            3/81          Linenberger, Polfe          Johnson, Kohl                      issued on 5/3/85; oral argument on (50-289)                Supp,                                                                                          appeal to be held 10/24/85. PID on (84W)                    7/84                                                                                          me11 gram Issue rendered on 8/19/85; appeal has been filed. On 5/29/85, the Commission authortred restart upon satisfaction of certeln condf-tions (CLI-85-9); the Comission's restart decision has been stayed by the Court of Appeals pending expe-dited judicial revfew.
Outstandfeg contested issues:
(1) aanagement competence and integrity; (2) personnel training.
Three Mlle Island          N/A            N/A        I                                                                    Notice of hearing on conditions of Unit I (Musted)                                                                                                          C. Musted's employment issued by Com-(50-289-04)                                                                                                              mission on 9/5/85; petitions to fater-vene to be filed by 10/21/85.
* Indicates be* ore telch tribunal (s) the case is currently pending.
 
G_9 CASES PEN 0!IeG BEF0eE THE Coppel55104              3 APPEAt 804aD5 AND LICEN5inG BOMD5 5Ul/ACR5
                                .FACILI                  . SUPP-    FE5                    A5tB 80ASD                        A$tA8 80H O                                                                                                  ;
(Secket No. . dendor)              ISSUED 1550tD A5t R*              MEMRfp5        A5tA8*              petMsfes      C11858!55I04
* HfAalhG STATUS Lfconse Amenenent:
I Bhseholdt Say (deletion Ito                  No      I    Laro, Chairman                                                                Contested hearing. Nation to wtthdraw                                  -
of seismic condt-                                        Linenberger                                                                    OLA appitcition and to terminate the                                    t tiens)                                                  Schtak                                                                        proceeding filed on 12/31/80; decca-(50-133)                                                                                                                                missioning plan submitted in 8/84. OLA (GE)                                                                                                                                    for possesston only issued on 7/16/85.
Outstanding contested issues: none.
herth Anne,                        SER      EA            Wolfe, Chre.                I        posenthal, Chru.                        Contested proceeding. Initial decision tintts I and 2                  7/94      7/94          Ferguson, Kilne                      Edles, Gotchy                            issued 9/3/85, authorizing issuance of                                  *
,                            (Receipt of                                                                                                                            OLA.
Spent Fuel) i                            (50-338/339-OLA-1)                                                                                                                    Outstanding contested issues: environ-mental impacts of spent fuel shipment and dry cast storage alternatives.
Pilgria Unit i                                              Bloch, Chre.                          Rosenthal, Chre.          I              ASLB's dental of petition for leave to (Feel Pool K-eff.                                      Narbour,                              Edles, Johnson                          intervene affirmed on 9/5/85 (ALA8 816).
1                            Listts)                                                  ttnenbereer (50-293-4LA)
Tertey Polat,                    SER      No      I        Larc,Chru.                                                                  Contested proceeding. Susenery dis-Iantts 3 and 4              12/83                      Cole. Lueb6e                                                                position granted in part, and specific I                                  (Operationel                                                                                                                        issues for hearing identified by Order TemperatureLietts)                                                                                                                  of 8/16/85.
i (50-250/251 OLA-1)
Outstanding contested issues: (1) ECCS
<l                                                                                                                                                                    evaluation model; (2) effects of decreased 0N99 margin.
Turkey Potat,                    SER      EA      I        Laro, Chru.                                                                Petition for leave to intervene filed 4                                  Units 3 and 4                11/84    11/84            Cole. Lueb&e                                                                7/9/84 Prehearing conference held i                                  (SFP Espenston)                                                                                                                      3/27/85.
1                                  (50-250/251OLA-2)
]                                                                                                                                                                      Dutstanding contested issues:
                                                                                                                                                                                                                  ~~
I                                                                                                                                                                                                                                          i
}                              Tortey Potet.                    SER      ho      I        Laro, Chru.                                                                  Petition for leave to intervene filed Ilmits 3 and 4              g/84                      Cole Luttle                                                                  7/12/84 Prehearing conference held (Fuel Enrtcheent)                                                                                                                  3/28/85.
(50-250/251 ELA-3)
Outstanding contested issues:
21on, limits I and 2            IIe              I          Lato, Chre.                                                                Petition for leave to intervene has been Parts, Shon                                                                flied; AppIfcant has withdraun request                            '
(56-295/304)                                                                                                                        for license amenement.
t Outstanding contested issues: none f
    '
* Indicates befoes idstch tribune 1(s) the case is currently pending.
 
Fequests f or MR Assistance : Open Itees Status Report................ Sept.16,1985........................................Aug      2 1, 1985.........................Fage    H-4 TIA 4                        Title                    Cosp. Cate      franch - FM TA: I - FA I          MR Branches      Req. Of8
        +-                                    .-                                                                  _
TIA 6                        Title                    Ces;. Date      Bran:5 - FM TAC 4 - FA s          U R Branches    Req. Of8
:. .........., ...__        =.. ..... ... .. ,        --.........., ........,
        +....., . ....                    -..........-
92-21 Falisa:es-ISTPrcaraa                              94.07.318 CRB5 Wastach      !!214 -1163 PEB                        R-3 E2-2: Sequoya'i-Fire Fratection Features                95.06.30 Ll4-St a'ile        42599 -1162 CFE3                      R-2 BM: Sequoyait-Red Drep Frotectica for W P!rts            85.06.30 L54-Stahle          48581 -1162 CFB                        R-2 32-3:a M:Scire!
S2- 5 *:Guirel-Less of % gh Head Injectice              E5.05.31 Lf4-Ho:d            49 95 -1162 SPEB,FSB,5IB              R-2 25.07.31 0FB-25evan          42667 -1163 URAB                      R-3 82-43 GaadCitiest-Electric F:.er TS 32-4:a Guactittes                                                                    43666 -
IE GM7 Hatth!-Target Rock S8Vs                              65.05.30 CFB4-Rivenbarl 43771 -            PEB 6:-57a Fit:Fatrick E2-57t Filgria GM? iM CFD Systes Hy:raulic Leafs                        85.12.31 Lf44 ntner          4854 -1182 pef,RSL                      lE 82-72 R:tinssn-AFd the:b Valve Leanage                  84.69.!!I CREl-Fe;ua        4 064 -1162 PE9                        R-2 E: ':a CrystalFtve*:                                                                  49065 -
i SMt hab1:;.wceCable fray & Cenfuit                      65.06.30 LI M ackley        40:13 -1165 SES. PES                    R-5 23-01a hicVerde 8 M :t h;F1 S M :: b%2:
3 -01d n'3 50-01e  e'iS4 iM5 FortitV ain-hstr.re tatt:1 iet; stets                14.08.08 Osi! deit e*        49557 -!!64 : 53                        R-4 2 -!' Enet!! rte festte; :a ri*e 8.s;s                  E4. E 08 CFi!-aattnh        4U ) -Itti CLEB                        b:
BM: Ca'..ert:1 ffs-S;.rt:;t A::uatica cf 485/5FAS 52.06.51 CriNaHe                    8 M84 -1161 IC59,0cA!                  R-1 EM4 Gir.ra !Es A:tt;n Itees                              24.06.:01 Oc! M iller        45!0 -        EEFi                    VR SM6 ha:htiest-!! Irte*;retatice c- :: F: er              !!.05.108 0;l M even        4c993-!!t3 !!FB,Fi!                    R-3 E M ea G.acties:                                                                      45694 -
;      EM3 Faltsa:es-5E' 4:ti:n !tess                          24.12.318 ;*!5-dastact      42157 -        SEPE                    MF SM! Er: cfre:-&.tur.:e Alaras                        !!.11.15 2 M ia Er: fre:
3!-4: I qF::lFeint Fire Cas;e s Ti                      it.07. !0 8 CFM-Dudley      51:54 -!!63 C!!,55Fi                    R-3 i! 4: S sn*41pte; h!ysis 8eeten                          E!.09.01 L!4+:;ktrs          $14:1 !!6: rE!                          F-2 G:-2! 'resse: M E: A:tt:n Itess                          34.12.318 08E M ilte*t      5:46-          SE89                    MR EM6 lyster[*ee.-!!F Acti: 3 Ittes                        56.09.30 025Mor ees          4!O1 -        SEFi                      V8 SM: Laialle-!::an Fes;;9se tiee Testiag                  !!.06.14 LfM:arCa            5:474 -!;11 ::5!,5S:B                    R!
5 -!4 St'.. :te:-!eissic : cairns c4 8i;ir;              34.07.;18 Otf M ells        $1','4-!!!2    '!!                      F-2
                                                                                                                                        ;4 iMe F:*t! Vrta3.rie, er :* n tion !ct; 'uista,:e i4.0e.3]t C#I54atta:t                5:144 -:164 ?ES E M 6a f:rt:al5ca                                                                    51:9 -!!!4                              R-4 G M et frslai                                                                        51:96-!!6!                              R-5
'        2 M 6: a.tsiesse                                                                      !!!97 -1163                            F-3 iM63 ke a:1tYanket                                                                    !!393 1!61                              P!
,        83 '6e C:: nee                                                                          199-1162                              R-2 E4.06.08 CFI M assa:S        40X2 -157                              R-3 BM! Fi*e Fr:te: tion ti                                                                              C9El 3M0 :.a: itiest 15! iest Fr:;*ss                        E5.05.31 CF5Mev ar            520!0-!!61 "El                          b3 G N ca Caa::ities2                                                                    5:081 -
BMG Ii:r:-Active Fire Barrie's                            i4.07.308 CCBI %:rris        5:120-!!6    CFEl,$EFl                P-3 E M 0a It:r:                                                                          52121 -
a cett:e!!o Loss cf OHsite F:ner Event          25.05.30 CFP N ooney        52;87 -11e3 CR4,FSB                    R-3 63 61 0 - C eplete          8 - Overdee
 
Requests for hRR Assistaace : Open Itess Status Re;crt................ Sept.16,1985........................................Aug 2 1, 1983.........................Page H-4 T!4 4                      Title                  Cesp. Cate      Branch - P4 TA 4 - P4 i          NRR Branches Req. Off.
      + - + +.... . .....
                                                          -++.......+s.......-.....++s.......+            +----.......~.-++--...+
83-82 Shorehas-DG Crankshaf t Failure                  85.06.!0 LB2-Caruso                -141431 PSB. met,MTEB,0RAB      R-!
83-97 Energency Lighting Requirements                  64.06.308 CRP5-Waabach    520:9 -!!63 CHEB,PSB                    R-3 83-89 Hadda: Neck-SEP Actica Iteas                    65.10.31 ORB 5-Akstulemic252010 -          SEPB                  NRR 93-92 Pudel-Gould Mcde Settch Malfunctiens            64.07.31: LB2-Perch        40011 -1562 !CSB, CRAB                  IE 83-94 Brand 5ulf-Celava! 06 Evaluation                85.06.30 LB4-Kintner        52411 -!!!! PSB                        R-2 83-100 Diab!cCany:nt-Structural Allegations          55.06. D LB3-Schierling 52622 -1165 56EB,MEB                      R-5 8F101 Diablocan on-R4R Allegatians                    64.02.288 ,LBFSchierling 5:423 -l!65 ICEB,ASB                      R-5 SF105 FcrtStVrain-Fire Prctection Ceficiencies        34.03.318 CRBFHettrer      52647 -!:64 ChEB,ASB                  R-4 BF106 DC:c:k2-Containaent S; ray Additive Systes      84.07.318 CRB1-Wig;irton 52673 -!!63 CSP                          R-3 8!-107 Dresdenkin P ;e Cracts                        84.06. 08 CRB5-Silbert      52670 -1163 MTEB,RAB                  R-3 SF107a CuadCities?                                                                $2092 -
9F109 Rcbinsen24eacter irip Systee                    84.07.31: ORBl ftequa      53222-1162 ICSB                        R-2 83-111 Gra9dGalf-teficiencies cf Core Alteratirns    85.12.31 LB4-Kintner        53231 -!!62 SSFB                      R-2 23-llla BrcussFerry 83-111b Fatch 2 Fl!!c B unseick BFl!2 ve<s stfachee-Lc= level Fadioactive Release 95.09.;0 ORSFR::ney              5:2 M -1!61 METB                      R-1 93-115 Belle 8crte-Fire Pas;/Sprinklee Systess        E5.06.30 LB4-Sta51e                -141432 CHEB                    R-8F120 Lacrosse-M P ;e Cracks                          84.07. !!! Cc!5-hdley      $!:64 -!!63 M7E3,PcB                  R-3 Shl:2 S4:e 1 t i re Frctectico Ins; Assistrce          64.I'.;!    CFi5-Waebach  52541 -!!61 CFEP.A!B                  IE
      !!-122a Cabert:1if's                                                              5:543 -
      ! >l22b Occree                                                                                                                    ,
51:99 -                                        '
i    E3-122c MaireY elee 5:544 -
8Fl:2d N:rt' Anna
                                                                                        $2545 -
2 12:e i m                                                                        5:546 -
83-122f Surry
                                                                                        $2547 -
B F122g Racchcieco 5: 43 -
94-05 Laialle-Mats of Indeterairate Lality            85.)!.!! LB:-Bournia                !!6: ECB                      5-34-0!a Presden2 5?421 I    24-05b Dresdra!
5:424 -
24-10 tavtsiessel '0.59 Seviens                      85. M. 30 Cr!4-CeAgatto 5:4:3 -!!6! !CSi,'E!,SSE!,EE?,AEB R3 64-!! Cres:enFFire Protect :n issues                  54.08.318 ORB 5-6ltert    5:499 -1163      "ETP,ME9, FAB
'                                                                                                                              F-3 84-11a :resde*3 5:500 l    34 !!t 1.id:ities!                                                                5!5:1 E4 !!c L ad: sties:                                                                5:50: -
,    64-12 Lais11el-Ebi;seit Es;:su'es te Higt Tes;.        65.01.31 Lf2-Pournia        5415: -:16: E:B
!    24 14 Statr:ce- P f , Miss:!e Fath                                                                                        R-:
25.05.31 L!!-Nertes                -14141 #28                      Rt 14-16 9tticellc . , . .r s:6s                          85.06.!0 0852-Roccey        54455-!!63 Miti,45 34 ,1    vers:,tf a9ee r.rs F*e'*cti:e                                                                                    R3 64 (6.Dt 08B2-Rentey        54496 !!61 CH!B.A!9                    R1 (4-22 FertStvra n Cra:6ed Fuel Elerents                e+. 6.;CI CEBFHettner      $4414 -!!64 CPB                        R-4 Ga-24 Rectoiecom2 E ;!csio , F;te, loss of ',h!        35.07. 0 0824-Miner        56E42-!!63 1C59,P543                  R3 S4-27 lmeArncid-Mats of Irdetereinate Cnity            E!.05.01: CFibtiadant      !4679-1163 E;9                        F3 84-29 StLuciaFFire Prote: tion Features                64.09.33t 0351-Sells        $4746 -!!62 CHEB                      R2
:    84-35 Palisafes-Water " aster Dasa;e to 4Fd tvstes 84.06.DI C:35-Paulson          m ov -!!63 ASS.PTEI,959
!                                                                                                                              R-3 E4 :9 h ai:ities !C Battery 9 Sr satt*g                65.06.0! Cf!2-Bevan        55X3 -!!63 PS$                        R-3
(    34-!2 Cavistessel-Evaluation c4 SS T6te hbratten 95.06.30' CEi4-DeAprio 5:220 -!!63 PEB,Fil F-3
{    24 34 'ea:SP:ttes:-Cracts in Jet Pus; Inst h: rles 95.05.018 OGl4-6 ears          55174 1161 MIE!,RAB                    bl 64-34a Peach $citcal 55175-f - Coaplete        t - Overdue
 
Ret,.ests f ar VR Assistance : 0;er Itess States                Eesc*t................ Sept.16,1935........................................Aug    2 1, 1 8 5. . . . . . . . . . . . . . . . . . . . . . . . . F a ;e H- 4 Tit!t          Cena. 2 ate          Branch - FM TAC 6 - F4 I            U R Stan:hes Reg. Off.
TIA 8 85.06.30 CRE5-Akstulenic:55451 -116! EEFB                              R-1 94-57 Fafda de:t rico! A:ti:9 Leve!
94-61 Gasens EHluent Snaling                                        85.12.31 CRB4-Nicolaras 40023 -                  PETE,5;i              !E S4-6          Ferei2-R4 Feserveir Free:in;                          85.05.108 L91-Lynct'                  -1414!3nin                      R-3 34-67 !!;G:clF int-5EP action itaes                                  n.n.n        CRB5-hdley          $5546 -        SEFB                  MR 64-73 TPl!-Pissing ]T53 Flugs                                        24.1).318 ORAB-Silver            55621 !!61 CHEB,CFB,"EB              R-1 85.05.018 CE54 Sears            $5576 -116! MIEB                      R-!
54-74 Feat *Bottce2-Cracks in Fecirc SafeEnds l        94-74a PeacF5:ttc 3                                                                                  51577 -
24-76 5.ner-ES: Relar Testing                                        85.06.15 LB4-Hopkins            55937 -!!62 1:51                      R-2 E4-77 Myticelle-tytrol Raes Fire Detettir                            66.01.31 CRBI-Rooney            uin -1163 CdEB                        R-3 24 73 ! arc 3:3re 1-Etru:tural Afecacy of Intate                    E5.04.3?! ORB 5-Faulson          55928 -!!65 SEP,CHEB                  R-5 E4-60 P.11st:neM:ntainee,t Liner Evaluation                          95.06.15 LB1-Dealittle                -141415 PEB,MTEB                R-1 54-22 RancheSe:o-Ligaid EHluent Frchless                            95.07.30 CFB4-Piner              560:4 -l!65 PETB                      R-5 84-93 Trojan-3:eraticns,Paintenan:e,GA                              E4.!!.058 CRB3-Trasiell 57002 -!!65 HFE9                              R-5 94-E7 htch 1 ~ecirculatter- Systes Crac6s                            n.n.n 3554-Riventark 55600 -!!62 MfEB                                  R-2 E4-Bi Fal Verde in Closing Tiet fcr ten FW !s V;v 95.0!.31 LBI-Licitra                                      -141415 RIB                    R-5 E4-90 Fa!: verde-Pic C!csing Tiet ice FW !s Vis                      85.05.31 LII-Licitra                  -141415 RS9                    R-5 S4-9          5:420 05 2-4 ciliary Feef Dest;n Deh t                85.06.30 LB4-Stele              56272 -!!62 ICSB                      R-2 84-95 h aeCities-Eni:rcesent Cc1ference                              95.05.31 CFB2-tevai              57022 -1163 FSFB                      R-3 E4-96 i n 5; ras Selencid Valves                                    n.n.n        LB2-Caspa; tone 56369 -            0FA!,1CSB            hR1 64-97 f*:nesFerry ;rveell Tes;eratare                                95.05.31 CF52-Clart              56062 -!!62 ECB                      R-2 85.01.318 CRBMrassell 57001 -1165 EWE!                                R-5 i        24-100 *r:Jan-Silt A:: m latici at Intate 61-101 %2re! Fire he;s                                              55.06.14 LB4-Hood                56474 -!!62 CFEP                      R-2 E4-10!a P:3. ire 2                                                                                    56475 -
EMI FcrtStvrain-Sevies cf Issues                                    n.n.n        CFS!-Heitrer        $!294 -1164 04al,T5FJ,A;5,SEEB        R4 EM2 FortStvrain-Ele:t' ital fotes Nds, Fev i                        n.n.n        CFf3-Hettner        51955 -1164 F53,!5EB                  R-4 EM3 li:r,1-C:re Ferivaa ce tevie.                                    85.01.228 C5P!-herris            nin -!!63 CFB                        R-3 EM5 Forts:Vrain-Cc,t*:! cf Wea y ; ads                              E5.!!.15 0:23-Heltner            56N2 -!!64      f.5E                  R4
,          SM6            li:, Assistr:e e %;;. R Ins;e:tten                    E5.( 2.151 CCF16:rris            inn 1!63 C5'EB                        R-3
;          EM7 C:: reel-!!e, 4:ttisties in E9..rcerert                          55.07.31 CFf4-t colaras $4233 !!62                                    R2 E M 7a ::ree?                                                                                        $62:4 -
E H 't 0:cen3                                                                                        562:5 -
55-05 4:rtrAnnal Basen s sad.aste Treatsent                          u.u.n        CRI M ngle          nrn -!!62 AEB                          R2 SMEa 40 theraI EM) Fa' ley M e d:9 Fail r es                                        v.n.u        0F51 eeves          56317 -!!62 SGil,MTEB, CRAP            NRR E5-!! Fcrt:a!': e M :y:le Its;e: tion :( !$s                        25.0!.0!! C:B M :ari;nt !6648 -1164 MIER,CHEB                          R4 EM2 Tr:Ja,8:F iea! 8r:bles                                          !!.0!.158 C5P M rauell 57109 l!65 0:AB,EGB                              R-5 E!-14 F:te tia! Adverse EHe:ts :( '.*I Systess                      !!.09.01 Ll4-hod                                FEAl,959,CCAB          R-2 25-!! Watre udee-C:,t. H Fn;e *: niter                              25.05.30 059 -Haitrer            m u -1161 FAB                          R!
9M!a ve e:rt 4 % es
          $!-!!! !ain!
55 !!: Salo:
EM6 Sestre:6 It!                                                    6!.10.31 LB M erses              inn            CSI,$ set,FSI,"El      a GM0 Palo verde 2- Corr. of 5; rat F r d Pipe h!d: 25.05.101 L53-Licitta                              n us -!!65 MiEl                        R5 85-17 Fort!tVrain-Circulater 0.erspeed Setpoint                      85.07.30 CR23-Heitner            $50!2-!!64 FIEB                      R4 6!-21 Fects Se:c-Eval. of laren Conc.                                85.07.31 C584-Miner                      -!!65 CFB                      R5 j
EM2 rersi M lectrical Separation                                    85.06228 Lf!-Lynch                      -1163 ASB                      R3 BMI !as;. !-W Steas ;rpr & !; ray Fire Crach                        85.07.31 LB"-Caeparone 57349 -1161 MfEB                                R1
'                                                                                                                                                      R2 8M4 Farier 1/ M S Inter.,$ nutter 1rsp.Freq.                        85.07.31 0?ft-Peeves            57605/1-l!62 PE9 l          2545 Fersi 2-Fire Pipan; Hydrs. Test                                85.07.17 L!tLynch                          l!63 CHEB                    R!
9M! Stearon Harris-Loss of N58 Loads With offsite Foner Availlti-Buciley                                        !!62 FE8                    IE l
i r
 
C - Ccaplete        s - C<erfue Requests fa hER Assistance : C;er Iteis Status Re; ort.. .............fegt.:6,1035.e... .... ....        .....................Aq2 1, 1985.........................Fa;e    H-4 TIA 8                        Title                    C:s;. Date      Pra ch - FM TA: s - FA s          F9 E ar:*es  Feq. 24s.
33-27 Sarry 2-Repair of SS Weld Cra: king                E5.10.15 C'f!4es quor s 57713 -!!6" P'E5                        R-2 E!-28 Ilon-CR Eeer. Air Cleanin; Sys.Afe g a:y          !5.02.30 CF51-urris                -!!6! PETE                  R-:
( In Concurrecce) 83-29 Diablo Caiyon-A;plic.of ASPE Sec.II,1WV-!427 85.7.31          LP3-S:hier11 q          -!!!! "E3                    R-5 85-30 AN3 t-!ST Requireeents cf FCRV's                  85.09. 0 CF!4-Vissing              -!!61 PEP                    c.a 83-31 Guad Cities-TS, Safety Related D0 Fa.er            65.07.26 CcB2-feva-                -I!63 :53                    R-3 (In Concurrecce) 83-33 DavisBesse-MSIVTesting                            !!.38.30    CRB4-Despria            -!!e3 Ai!                    R-3
(!n Concurrence) 85-34 t'411st:ne 2-Chesical Cleaniig cf SG's
                                                                !$ 07.!0 CFBI-Cstc'ne                't'l  M'EB                F-1 (In Cucurrence) 85-35    Eusq.- Valve Fctiti:i Irdication Ye ificatie- E5.07.31 LB2-Caspa;rcre              -!!6: Aif                    K-1 (IN Ccitarrence) 83-36 D.C.Co:6-Testir; of ECCS F.s;s                    85.M.!) CFl!-Wig;irtcq              -!!63 '5E                    P-?
(In Cen:urrence) 85-37 WV 2-4:rcenfereante to A;;.R                      35.C!. 0 Lf:-Brad 8 te .            -!!6! PE!                    R-5 83-38 PcGaire-Cent.Fressure C:ntrcl Systee              E5.09.!0 L94-acce                  -!!62 ICEP                    F-2 85-39 Ferry-Battery Main.Liestag                        85.00.01    Lil-Stefanc            -!!63 FSB                    R-3 85-40 Diatle Cairon-EG cf therscce'.;le                  S5.09.30 Ll! Schierlar;            -!!65 EC5                    84 23-41 Davis lesse-Menitor W:rt on SFR25                  85.07.26 AD/SA-i.Denig                !!63 AU SA                  F-3 85-42 Hatch-Water Leak in CR                            65.09.!0 Ctl4-6.Ri v ett ar n        1162 "ET)                  F~
65-43 Grand Gulf-A;;eodie R (Urprete:ted Stee!)          85. ! 7. !! L94-L.htrtner          -!!62 AIP/>EE                R-2 83-44 IF 3-SS Weld Cracks                                25.M.!0 C;fi-D.Neig*tcrs            -!!!! PTE3                    R-!
85-45 Hadfas Ne:L-A;pendte J                            E!.11.!      ORi$ r.Akstolente      -!!61 ASS                    R-t (In Corturrence) 85 46 Saser-A;;eidin R                                  65.09.30 L!4-J.hpiins              -!!62 AillCLIE                R2 83-47 ! a'er-Thysical Se:urity                          f5.09.15 Ll4 J. N piins            -1162 $55f v E5              K-2 (In Cemrrecce) 83-48 Nc th Anna krtine Lead Lisiter                    85.09.:0 CF!36.Er;te                -!!e2 FS!                    R-2 85-49 Palo Verde-Corresten cf Barted P:;e                25.12.!! Ll!-M.Licitr.              -1165 CHE8                    P4 83-30 Turley Point Accusalatcr TS                        95.09.03 2 Fit D.PcDonald          -!!62 T!R3                    R-2 83-51 Turkey Point-IST                                  85.09.03 CFB14.P:Ecu!!                !!62 'EE                    F-2 Iln Concurrence) 85-$2 AND-1-Waste St: rage Facility                      65.09.20 CFi4-6.Visstrq            -!!64 FA2                    04 (In C xcu re.ce) 85-53 b4P2-!adine Plate-cut                              85.08.30 Lf 2-J.Be sth.te            !!6! AEl                    R4 lla Concurrence) 8544 Rancho Seco-Saa!! Bred LOCA                        65.12.31 C894 5.P:ner              -1!65 "fE8                    F5
(!n Concurrence) 8545 Fort Calhoun-Feefeater lesign                      &!.09.15 CFi -E.fcar.gir              !!64 Cf3                    R-4 t!N Ccncurrence) 85-!& Beaver Valley 1 -Feefeater Transiert              85 !!.25 CFil-P.Tas                  !!61 ICSB'll3              R-1 linCcecurrence) 85 57 Perry-instrueentSetpctnts                          85.09.30 LilJ.Stefano              -1 63 !CS3                    F-3 (In Concurrencel 8548 Palo Verde-!sproper Sc! vent                        85.10.31 L83-M.Licitra              -1.e3 CHEF                    R4 f!n Ccncurrence) l l
l    85 61 Malee Yankee-SG Pressure Inst.                      85.12.02 0F83-P. Sear s              l!61 CFAll!E/C*t3          R-1 l
 
4 4
C - C uplete              8 - Overdue t
i Requests f or NFR Assistuce ];e3 l tees States Feport................fe;t.16,19 8 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 2 ; 2 1, 1985.........................Fa;e H-4 a.
T!A 1                      Title                      Ceap. Date          Erar.ch - F."      TAC 6 - F A 8                MF franches                  Req. Off.
            ... .. , -            .. ............-        _ .... ,-              . +............., ..... ......,..................., ........,
3 un C:e:-rren o    e) i                                                                                                                                                                                        ,
l                T!4 S.esart 51303332315E23 C;er i!A's as of 3'2!/65                        175
                    ?!A's D4pleted Sir.ce 8/21/55                  04 IIA's A d ed Si9te 8!!!/B5                      :B 0;en TIA's as of 9/16/55                        M I
4 h
4 3
l l
i I
l L
i i
l
 
e b
W M
CC M  W
            %.. O O
W  Z h  C U  %
W  H M  U r              <
H Z
ct J
A w
W
                .J O
                *K i
w
 
l
* I l    E
                            }d
        \x N      N
                                    ~%
4 l
                    \              k il                N            5 28                  \          %
ss                              s            l 5                              %
i                              *s l
II    i smawnm i
i anns 4            l l
 
R-1208808-002                  REGULAT0RY            INF0RMATION              TRACKING    SYSTEM                                  PAGE: J-1 09/05/85                              MUL-TI-PLANT          I S S U E 5.   
 
==SUMMARY==
REPORT COMPL.      COMPL.
CURRENT PRIOR GENERIC SUBJECT                                                                ACTIVE    EELERE FY (85)            FY          TOTAL
      - 1      to CFR 50.55 A(G) - ISI-                                                            0              0          0          2          2 A-02      APPENDIX 1 - ALARA                                                                to              0        25        15          50 A-03      SECURITY REVIENS-MODIFIED AMENDMENT PLANS                                          0              0          0            0          0 A-04      APPENDIX J - CONTAINMENT LEAK TESTING                                              0              0          3          7        to A-05      GE MARK I CONTAINMENT TECH SPECS-SHORT TERM                                        0              0          0            0          0 A-06      RESPIRATORY PROTECTION SYSTEM                                                      0              0          0          0          0 A-07      APPENDIX G - FRACTURE TOUGHNESS                                                    0              0          0            t          1 A-08      ECCS EVALUATION-GENERIC PER 50.46 COMPLIANCE                                        o              0          0            0          0 A-09      PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE                                      o              0          0            0          0 A-10      CONTINGENCY PLANNING                                                                0              0          0          0          0 A-11      GUARD TRAINING PLANS                                                                0              0          0            0          0 A-12      VITAL AREA ANALYSIS                                                                0              0          0          0          0 A-13      NON POWER REACTOR SAFEGUARDS PLANS                                                  0              0          0            0          0 A-14      '10CFR 50.55 A(G) - INSERVICE TESTING                                                7              0          3          8        18 A-15      QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARATOR FUEL DIL                      0              0          0            1          1 A-16      QUALIFICATIONS OF EXAMINATION, INSPECTION. TESTING AND AUDIT PERSONNEL              0              0          0          0          0 A-17      INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97)                      74              0          7          2        83 A-18      TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                  34              0        38        13          85 A-19      RECOMBINER CAPABILITY BNR MARK I                                                  12              0          4            1        17 A-20      to CFR 50.62 OPERATING REACTOR REVIENS                                            92              0          1          0        93 5-01      DIESEL GENERATOR LOCKOUT                                                            0              0          0            0          0 B-02      FIRE PROTECTION                                                                    O              O          O            O          O B-03      PHR MODERATOR DILUTION                                                              0              0          0            0          0 B-04      REACTOR VESSEL OVERPRESSURE PROTECTION                                              1              0          0            3          4 B-05      STRESS CORROSION CRACKING - BWR RCSPB                                              0              0          0        23          23 B-06      BWR RELIEF VALVE                                                                    O              O          0            0          0 B-07      STEAM GENERATOR FEEDWATER FLOW INSTABILITY                                          0              0          0            0          0 B-08      PHR HPSI-LPSI FLOH RESISTANCE                                                      O              0          0            0          0 B-09      CHARGING SYSTEMS PIPE VIBRA 1 IONS                                                  0              0          0            0          0 B-10      BURNABLE POISON ROD FAILURE - B&W                                                  0              0          0            0          0 B-11      FLOOD OF EQUIPHENT IMPORTANT TO SAFETY                                              0              0          0            0          0 B-12      STEAM GFNERATOR TUBE INSPECTION                                                    0              0          0            0          0 B-13      FUEL ROD B0H                                                                        0              0          0            0          0 B-14    'CEA GUIDE TUBE HEAR                                                                  0              0          0            0          0 B-15      C-E POISON ROD GRONTH                                                              0              0          0            0          0 B-16      EMERGENCY PLANNING AND REVISIONS                                                    0              0          0            0          0 B-17      TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS                                      to              0          6          3        19 B-18      HORTHINGTON RHR PUMP SHAFT INTEGRITY                                                0              0          0            0          0 B-19      NEUTRON SHIELDING - CE REACTORS                                                      0              0          0            0          0 5-20      CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION                                        0              0          0            0          0 B      LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIATOR SYSTEM                        0              0          0            0          0 5-22      TECH SPEC SURVEILLANCC REQUIREMENTS FOR MECHANICAL SNUBBERS                        6              0          7            5        18 B-23      DEGRADED GRID VOLTAGE                                                                O              O          3            3          6 B-24      VENTING AND PURGING CONTAINMENTS WHILE AT FULL POWER AND EFFECT ON LOCA            7              0          7        **          29 B-25      BHR FEEDHATER N0ZZLE CRACKING                                                        0              0          0          5          5 B-26      INADVERTANT SAFETY INJECTION DURING C00LD0HN                                        0              O          O            O          O B-27      REVIEW RESPGNSES TO IE BULLETIN 78-03 (OFFGAS EXPLOSIONS)                            0-            0          0            0          0 B-28      BHR JET PUMP FLON INDICATION ELIMINATION                                            0              0          0            0          0 B-29      BHR FEEDHATER PUMP TRIP                                                              O              O          O            O          O B-30      STEAM GENERATOR REPLACEMENT PROGRAM                                                  0              0          0            0          0 B-31      LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION                                  0              0          0            0          0
 
R-1208808-002                                  REGULAT0RY          INF0RMATION            TRACKING    SY$ TEM                PAGE: J-2 09/05/85                                            MULTI-PLANT            ISSUES     
 
==SUMMARY==
REPORT COMPL. COMPL.
                                    ~
CURRENT PRIOR B                                          AL DURING C00LDOHN                                            0                    7        8 B-33                      IDDINE SPIKING                                                                  0    0 B-34                                                                                                                    0        0        0 BHR JET PUMP INTEGRITY ASSURANCE                                                O    O      o        0 B-35                      ORIFICE ROD ASSEMBLY INTEGRITY - B&W                                            0    0 0
B-36                                                                                                                    0        0        0 RESISTANCE TEMPERATURE DETECTOR (RTD) RESPONSE - CE                              O    O      O        0        0 B-37                      STEAM GENERATOR TUBE DENTING AND SUPPORT PLATE MODIFICATIONS - CE                O    O B-38                                                                                                                    O        O        0 TENDON SURVEILLANCE - BECHTEL CONTAINMENTS                                      0    0      0        0        0 B-39                      PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS                                      0    0 B-40                                                                                                                    0        0        0 PIPE SUPPORT BASE PLATES                                                          0    0      0        0 B-41                                                                                                                                      0 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER SUPPLEMENTS)                    8    0      6      15      29 B-42                      TMI FOLLON UP - ALL PLANTS                                                      0    0 B-43                    ,PHR FEEDWATER LINE CRACKS                                                                      0        0        0 B-44                                                                                                      0    0      0        0        0 LESSONS LEARNED IMPLEMENTATION                                                  O    O B-45                    HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES"            0    0 O        O        O B-46                                                                                                                    0        0        0 ANALYSIS OF TURBINE DISC CRACKS                                                  0    0              0 B-47                    ECCS; CLAD SHELLING AND RUPTURE                                                  O    O 1                1 B-48                                                                                                                    O        O        O ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE                                D    0      5      3        8 B-49                    PHR CONTROL ROD MISALIGNMENT                                                      C    0 B-50                                                                                                                    0      0        0 AUXILIARY FEEDHATER SYSTEM EVALUATION                                            O    O      O      O B-51                    EVALUATION OF BULLETIN 79-06 AND 79-08                                            0    0 O  i B-52                                                                                                                    0      0        0  '
REVIEH OF SAFETY ASPECT OF INADVERTENT SAFETY ACTIONS DURING SUR. TEST            0    0      0      0        0
, B-53                      LESSONS LEARNED CATEGORY B (ITEMS)                                                0    0      0      0 B-54                                                                                                                                      0 LESSONS CATEGORY A TECH SPEC                                                      0    0      0      0        0 B-55                      B80 REPORT ON BHRS                                                                0    0      0 B-56                                                                                                                            0        0 CONTROL RODS FAILURE TO INSERT. BHR                                              0    0      0      0        0 B-57                      DHR CAPABILITY                                                                    4    0      2 B-58                      SDV CAPABILITY                                                                                          1        7 0    0      0      2        2 B-59                      MASONRY HALL DESIGN                                                              26    0 B-60                      ENVIRONMENTAL QUALIFICATION 15      8      49 9    0    60        5      74 B-01                      LOSS OF NON CLASS IE ISC PDHER                                                    0    0      0      0        0 B-62                      ESF RESET CONTROL DESIGN DEFICIENCY                                              0    0      0        1        1 B-63                      INTERIM PROCEDURES FOR SHORT TERM BLACKOUT                                        0    0      0      0        0 B-64                      B8C INDUCED FLUX ERRORS                                                          0    0      0      0        0 B-65                    SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BHR SCRAM SYSTEM                  19    0      0      0        19 B-66                    NATURAL CIRCULATION C00LDOHN                                                      3    0      4      3        10 3-67                    THERMAL SHOCK                                                                      0    0      0      0        0 A-68                    ECCS PUMP DEADHEADING                                                              0    0      0      0        0 B-69                    IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDWATER ADDITION                    O    O      2        1        3 B-70                    FATIGUE TR.*4NS!ENT LIMIT TS                                                      0    0      0      0        0 B-71                      120 VAC VITAL INSTRUMENT SUSSES AND INVERTER TECHNICAL SPECS.                    0    0      0      0        0 B-72                    NUREG 0737 1ECH SFECS (GENERIC LETTER 82-16)                                      6    0    14      40      60 B-73                    PLANS FOR PREVENTING EXCEEDING PTS SCREENING CRITERION                            O    O      O      O        O B-74                    THERMAL SHIELD FOLLOH UP ANALYSIS                                                  0    0      0      4        4 B-75                    REVIEN OF D8H CORE BARREL BOLTS CRACKING                                          0    0      0      0        0 5-76                    ITEM 1.1 - POST TRIP REVIEHs PROGRAM DESCRIPTION & PROCEDURES                    20    0    67        2      89 B-77                    ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTERFACE - RTS COMPONENTS          88      0      0      2      90 B-78                    ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDURES & VENDOR RECOMM.          70      0    18      0      88 B-79                    ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO TECH SPECS - RTS COMP.        70      0    17      2      89 B-80                    ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED MODS                48      0    to      0      58 B-81                    ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR REACTOR TRIP BREAKERS          37      0    21        0      58 B-82                    ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACH. FOR HEST & 88H                6    0    20      17      43 1
 
l l
: i. . R-1208808-002                                    R E G U.L A T 0 R Y 'INF0RMATION TRACKINO                                  SYSTEM                                  PAGE: J-3 09/05/85                                                  MULTI-PLANT              ISSUES             
 
==SUMMARY==
REPORT COMPL. COMPL.
CURRENT PRIOR
'  ' -                  S ERIC SUBJECT              .
ACTIVE      FUTURE FY (85)          FY          TOTAL ITCH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36 8 83-37 FOR NUREG 0737                                31              0        31          11          73-
  - B-84            ' INSPECTIONS OF BNR STAINLESS STEEL PIPING ACCORDING TO GENERIC LETTER 84                                  8
  ' B-85            . SALEM ATHS 1,2 DATA CAPABILITY                                                                                              0        16            1          25      r 56              0-      31            1          88
,    B-86              SALEM ATHS 2.2 S-R COMPONENTS                                                                              86              0        0            2          88 t
  - B-87            ' SALEM ATHS I.2.1 8 3.2.2 S-R COMPONENTS                                                                    76              0      14            0          90 B-88              SALEM ATHS 3.2.3 T.S. S-R COMPONENTS                                                                      74              0        14 -          2          90 B-89              SALEM ATHS 4.2.5 8 4.2.4 LIFF, COMPONENTS                                                                  58              0        0            0          58 B-90              SALEM ATHS'4.3 H AND B8H T.S.                                                                              32              0        6            7          45 B-91            ' SALEM ATHS 4.4 58N TEST PROCEDURES                                                                            8              0        0            0            8 B-92              SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES                                                                    69              0      19            0          88 B-93          ' SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERNATIVES                                                                  87              0        0            2          89 C-01              PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREMENTS                                            -          0              0        0            0            0 C-02            .BWR-RECIRC. PUMP TRIP (ATHS)                                                                                  0              0        0            0            0
  - C-05                0UALIFICATIONS OF RADIATION PROTECTION MANAGER                                                              0              0        0            0            0 C-04'          . FILTER TECH SPECS                                  -
0              0        0            3            3 C-05              CONVERSION TO STANDARD TECH SPECS                                                                            0              0        0            0            0 C-06              PUMP SUPPORT-LAMELLAR TEARING                                                                                0              0        0            0            0 C              FUEL HANDLING ACCIDENT INSIDE CONTAINMENT                                                                    0              0        2            2            4 C-08              BNR POST LDCA H2 CONTROL                                                                                    0              0        0            0            0 C-09              PHR AUX FW PUMPS .                            -    -
0              0        0          . 0            0      i C-10              CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE ONE)                                                      2              0      ,18          33          53      ,
;    C-11              RPS POWER SUPPLY                                                                                            0              0        2            5            7      r C-12              BORON SOLUBILITY DURING LONG TERM COOLING FOLLONING LOCA                                                    0              0        0            0            0 C-13              LOSS OF OFFSITE PDHER-                          .
0              0        0            0            0 C-10:              AUXILIARY FEEDWATER SEISMIC QUALIFICATION                                                                    6              0        1          5            12
  ..C-15                CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPA0 C-10)'                                                  2-            0      79            0          81 C-16            ' UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM GENERATORS                                      63              0        0            0          63 D-01          -GE MARK'I CONTAINMENT EVALUATION - LONG TERM                                                                  7              0        6            9          22
:1 D-02              ECCS ZIRC CLAD MODEL ERROR-CDMPLIANCE HITH 10 CFR-46                                                        0              0        0            0            0 D-03              PRESSURIZER HEATUP RATE ERROR                                                                                0              0        0            0            0 D-04              FHR REACTOR VESSEL CAVITY SEAL RING MISSILE POTENTIAL                                                        0              0        0            4            4-i'    D-05              PLANT UPI MODEL PROBLEM                                                                                      6              0        0            0            6
    'D-06              PEAKING MODEL CHANGE FOR CE REACTOR CORE                                                                    O              O        O            O            O
+
D-07              BWR POWER LEVEL-FOR RWM                                                                                      0              0        0-          0            0 D-08 DEFICIENCY IN CHEM ADDITION TO CONTAINMENT SPRAYS                                                            0              0        0            0            0 D-091            GE ECCS INPUT ERRORS                                                                                        0              0        0            0            0 D-10              ASYMMETRIC LOCA LDADS                                                                                      13              0        0          22          35 D-11              FISSION GAS RELEASE                                                                                          O              O        O            O            O D-12              NON-JET PUMP BNR CORE SPRAY PERFORMANCE                                                                      O              O        O            O            O D-13              38W SPALL BREAK ERROR                    .
0              0        0            0            0 D-14              REACTOR %ESSEL NELD - HIRE DEFICIENCY                                                                        0              0        0            0            0 D-15              HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAILURE                                                        O              O        O          43          43
    'D-16              REVIEN OF CORPORATE MANAGEMENT CAPABILITY                                                                    0              0        0            0            0 D-17              DEFINITION OF OPERABLE                                                                                      5              0        3            6            14 D-18:            NUREG 0630 CLADDING MODELS (B&W PLANTS)                                                                      0              0        0            0            0 D-19              DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)                                                        79              0        6            1          86 D-20            ' MARK I DRYMELL VACUUM BREAKERS - LICENSEE RESPONSE TO GEN LETTER 83-08                                      18              0        5            0          23 E-01              SPENT FUEL POOL-EXPANSIONS                                                                                  0              0        0          'O            O E-02              FUEL CASK DROP                                                .
0              0        0            0            0 E            CORE RELOADS REQUIRING PRIOR NRC APPROVAL                                                                    0              0        0            0            0 E-00              BNR SINGLE LOOP OPERATION                                                                                    6              0        2            0            8-
                                                                                                                                                                                              .l
 
R-1208808-002                      REGULAT0RY          INF0RMATION          TRACKING    SYSTEM                    PAGE: J-4 09/05/85                                MULTI-PLANT          ISSUES     
 
==SUMMARY==
REPORT COMPL. COMPL.
CURRENT PRIOR CQDE      GERERIC SU1JfG                                                                ACTIVE EMIMRE FY (85)  FY    TOTAL E-05    H N-1 LOOP 0PERATION                                                              0    0        3        1      4 E-06    CEA POSITION INLICATION FAILURES - CE                                              O    O        O        O        O E-07    REACTOR PROTECTION SYSTEM LOGIC - CE                                              O    O        O        O        O F-01      I.A.t.1 SHIFT TECHNICAL ADVISOR                                                    0    0        0        0        0 F-02      I.A.t.3 SHIFT MANNING                                                              O    O        O        8        8 F-03      I.A.2.1 UFGRADING OF RO AND SRO TRAINING                                          0    0        3        0        3 F-04      I.C.t.2/3.A EMERGENCY OPLRATING PROCEDURES GENERIC TECHNICAL GUIDELINES            1    0        6      57      64 F-05      I.C t.2/3.B PROCEDURES GENERATION PACKAGES (HUREG 0737, SUPP. 1)                  71    0        7        1      79 F-06      I.C.5        FEEDBACK OF OPERATING EXPERIENCE                                      O    O        O        1        1 F-07      I.C.6        CORRECT PERFORMANCE OF OPERATING ACTIVITIES                            1    0        0        0        1 F-08      I.D.1.1 DETAIIED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                          18    0      57        5      80 F-09      I.D.2        SAFETY PARAMETER DISPLAY SYSTEM                                      46    0      31        4      81 F-10      II.B.1      RCS HIGH POINT VENTS                                                  0    0        1        0        1 F-11      II.B.2      PLANT SHIELDING                                                      0    0        1      5        6 F-12      II.B.3      POST ACCIDENT SAMPLING                                              10    0      19      33      62 F-13      II.B.4      TRAINING FOR HITIGATING CORE DAMAGE                                  O    0        3        0        3 F-14      II.D.1      RV AND SV TRAINING                                                  53    0        6        9      68 F-15      II.E.1.1 AFH SYSTEM EVALUATION                                                    0    0        0        4        4 F-16      II.E.1.2.1 AFH SYSTEM INITIATION                                                  O    O        O        2        2 F-17      II . E.1.2.2 AFW SYSTEM l-LON INDICATION                                          O    O        O        2        2 F-18      II.E.4.1        DEDICATED HYDROGEN PENETRATION                                    O    O        O        1        1 F-19      II.E.4.2      CONTAINMENT ISOLATION DEPENDABILITY                                4    0        5        5      14 F-20      II.F.1.1        NOBLE GAS MONITOR                                                  0    0        2        0        2 F-21      II.F.1.2        IDDINE/ PARTICULATE SAMPLING                                      1    0        0        0        1 F 22      II.F.1.3      CONTAINMENT HIGH RANGE MONITOR                                      0    0        0        1        1 F-23      II.F l.4      CONTAINMENT PRESSURE INSTRUMENT                                    C    0        1      10      11 F-24      II.F.1.5      CONTAINMENT HATER LEVEL INSTRUMENT                                  1    0        1      to      12 F-25      II.F.1.6      CONTAINMENT HYDROGEN MONITOR                                        0    0        3        9      12 F-26      II.F.2        INSTRUMENTS FOR DETECTION ON INADEQUATE CORE COOLING              45    0      26        6      77 F-27      II.K.2.9      FMEA ON ICS                                                        0    0        0        0        0 F-28      II.K.2.10      SAFETY GRADE ARTS                                                  0    0        0        0        0 F-29      II.K.2.tl      CONTINUED OPERATOR TRAINING AND DRILLING                            0    0        0        0        0 F-30      II.K.2.13      THERMAL-MECHANICAL REPORT                                          0    0        0      50        50 F-31      II.K.2.14      LIFT FREQUENCY OF PORVS AND SVS                                    0    0        0        0        0 F-32      II.K 2.16      RCP SEAL DAMAGE                                                    O    O        O        O        O F-33      II.K.2.17      POTENTIAL FOR VOIDING IN RCS                                        0    0        1      21      22 F-35      II.K.2.20      SYSTEM RESPONSE TO SB LOCA                                          0    0        0        0        0 F-36      II.K.3.1      AUT6 PORV. ISOLATION                                                O    O        1        1      2 F-37      II.K.3.2      REPORT ON PORV FAILURES                                            0    0        0        1      1
      'F-38      II.K.3.3      REPORTING SV AND RV FAILURES AND CHALLENGES                        0    0        2        0        2 F-39      II.K.3.5      AUTO TRIP OF RCPS                                                  1    0        0        0        1 F-40      II.K.3.9      PID CONTROLLER                                                      0    0        0        0        0 F-41      II.K.3.10      ANTICIPATORY TRIP MODIFICATIONS                                    0    0        0        0        0 F-42      II.K.3.12      ANTICIPATORY TRIP DN TURBINE TRIP                                  0    0        0        0        0 F-45      II.K.3.13      HPCI AND RCIC INITIATION LEVELS                                    O    O        O        O        O F-44      II.K.3.14      ISOLATION CONDENSER ISOLATION MODIFICATION                          O    O        O        O        O l      F-45      II.K.3.15      ISOLATION OF HCPI AND ROIC MODIFICATIONS                            0    0        0        0        0
,      F-46      II.K.3.16      CHALLENGES AND FAILURES OF RELIEF VALVES                            0    0      22        0      22 F-47      II.K.3.17      ECCS DUTAGES                                                        0    0        0        0        0 F-48      II.K.3.18      ADS ACTUATION                                                      5    0        7        7      19 l      F-49      II.K.3.19      INTERLOCK RECIRCULATION PUMP MODIFICATION                          t    0        0        0        1 l
l
 
[
s R-1288808-002.
                                                                                              ~
REGULAT0RY            I N-F 0 R M A T I O N    TR.ACKING          SYSTEM                                      PAGE: J-5 09/05/85                                    MULTI-PLANT                ISSUES       
 
==SUMMARY==
REPORT COMPL.                COMPL.
GENERIC SUBJECT                                                                                        CURRENT PRIOR-II.K 3.21 RESTART OF CSS AND LPCI'                                                      ACTIVE  FUTURE FY (85)                  FY      TOTAL 0    0            0                    0            0
            . ' F-51            LII.K 3.22 RCIC SUCf' ION                                                                      1    0                                  4            6 F-52          .II.K.3.24 . SPACE COOLING FOR HPCI/RCIC MODIFICATION                                          0    0 1
0 F-53                                                                                                                                                    0            0 II.K 3.25 POWER ON PUMP SEALS                                                                3    0            3                    0-          6
              -F-54            'II.K.3.27      COMMON REFERENCE LEVEL                                                        0 F-55                                                                                                                0            0                    0            0 II.K.3.28      QUALIFICATION OF ADS ACCUMULATORS                                              5    0            8 F-56 5          18 II.K.3.29 -PERFORMANCE OF ISOLATION CONDENSERS                                                0    0            0
              .F-57              II.K.3.30      SB LOCA METH00S                                                                9    0        44 1            1 F-58                                                                                                                                                11          64 II.K.3.51      COMPLIANCE HITH 10 CFR 50.46                                                  49    0            8                    9        66 ti -              F-59          'II.K 3.44 ANTICIPATED TRANSIENTS HITH SINGLE FAILURES                                          0 F-60                                                                                                                0            0                    2            2 II.K.3.45 . MANUAL DEPRESSURIZATION                                                          O    O            O                    3            3 F- 61          II.K.3.46 ' MICHELSON CONCERNS F-02                                                                                                          O    O            b                    0            0
                              -II.K.3.57        MANUAL ACTUATION OF ADS                                                        0    0            0                    0 F-03            III.A.1.2                                                                                                                                            0 TECHNICAL SUPPORT CENTER                                                      72    0                                  2        75-F-64            III.A.1.2      OPERATIONAL SUPPORT CENIER                                                    71    0 1
F-65                                                                                                                              1                    2        74 III.A.1.2. EMERGENCY OPERATIONS FACILITY                                                    68    0            1                    3        72 F-06            III.A.1.2      NUCLEAR DATA LINK                                                              0    0            0                    0            0 F-67            III.A.2.1      EMERGENCY PLAN UPGRADE TO MEET. RULE                                          O                                        2 F-68                                                                                                                O            1                                  3 III.A.2.2 . METEOROLOGICAL DATA UPG2ADE                                                      73    0-            1                              75
.                F-09.          III.D.3.3 . IMPLANT RADIATION MONITORING                                                      0    0            0 1
0            0 F-70            III.D.3.4      CONTROL'R00M HABITABILITY                                                      5    0            0                    6          11        ;
F-71            I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLDHUP TO F-8)                                      76    0            9                    2        87 G-01            REACTOR COOL ANT PUMP TRIP (D660 - II.K.3.5)                                                53    0            0                    1        54
.                                TOTAL' GENERIC ISSUES                                                                    2,202      0      908                    687      3,797 1-1 i
'E_____-___
  .                            _-                r  .  -      . .  ,                                  - y-    ,      _                        y.., . , _ , .
 
TABLE K                                                                    K-01 NLTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for      Technical Schedule for Technical Inputs to DL        Actions Issued  Review Performed by Projected                                              Remaining                    by OL      In-      Contract Multi plant  FY84 Carryover            Review          FY 1985          Inputs to be FY    FY -FY      FY    FY House  Under Under MPA No.                                      Action Title J nouts/LAs)  Priority  Branch 1st 2nd 3rd 4th Total      Completed  1986  1987 1985 1986 1987  Staff    OL    Olv.
A-02 Appendix I - ALARA                                    16              1      RAB      5  1  10 0 16          0                      17 (5 yr. old) 16                      MIEB      5 4    7  0  16        0 A-04 Appendix J -                                                            1      CSB      1  0  0 0      1                              2 Containment Leak Testing (5 yr, old)
A-14 10 CFR 50.55 A(G) -                                                    1      REG      0 0    3  0    3                  3      0    9        0  0 Inservice Testing                                                              MEB      0  0  3  0    3 (5 yr. old)
A-17 Instrumentation                                        84              1      ICSB    0 13 16 10      39        45        45          84 to Follow A-19 Hydrogen Recombiners (Gen. Ltr 84-09)                                                              G5B    0 5      11  4  20                              20 B-05 Stress Corrosion                                                        1      MTEB Cracking BWR RCSPD (USI: A-42)
B-17 Tech Spec                                              (15/18)          2      REG    4    4    6  3    17  0    0  0    9    0    0    5 Surveillance for Hydraulic Snubbers
 
I K-02 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for              Technical Schedule for Technical inputs to DL Actions issued            Review Performed by Projected                                              Remaining          by DL                In-        Contract Multi-plant        FY84 Carryover              Review          FY 1985        Inputs to be FY    FY  FY  FY    FY  House Under Under MPA No. Action litle      , Inputs
(        /LAs)  Priority Branch 1st 2nd 3rd 4th Total    Completed  1986 1987 1985 1986 1987  Staff      DL    Div.
B-22    Tech Spec              (15/18)            2      REG 4    2 6      3            15        0    0    0  9    0    0        5 Surveillance Requirements for Mechanical Snubbers B-23    Degraded Grid          (Completed 5/1/85)
Voltage (5 yr. old)
B-24    Venting and Purging        0              1      CSB  0    0 0      0  0                            9 Containments While                                EQB  0    0 0      0  0          0                  9 at Full Power and Effect Or LOCA B-41    Fire Protection                            1 App. R                                            CHEB 1    1    1    3  6        0          0    0  6 B-48    Adequacy of Station (Completed 5/21/85)
Electric Distribrtion Voltage B-57    DHR Capability              (5'6)        3      RSB  4    1    0    0  5        0          0    0  6    0 S-59    Masonry Wall Design          (0/26)        2      SGEB 7    3    3    3  16      12        12    0    17    12    0    1        0    11 B-60    Environmental Qual.          (11/71)      1      EQB  46  15 9      0  70      0          1    0  30    25                  11 (U51: A-24)                  10                    CSB    0  10 0      0  10      0 1                    ASB    0  1    0    0    1      0 4
 
K-03 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for      Technical Schedule for Technical inputs to DL      Actions issued  Review Performed by Projected                                          Remaining                                                  by DL      In-      Contract Multi plant    FY84 Grryover                Review          FY 1985          Inputs to be FY    FY      FY    FY    FY House    Under Under Branch 1st 2nd 3rd 4th Total      Completed  1986 1987    1985 1986 1987  Staff    OL    Div.
HPA No.                        Action Title  R pets /*As)_    Priori _ty t
AS8    22 0 0        0  22        0          0    0      22    0          22 B-65        Safety Concerns                    (25/20)              1 Associated with                                                  AEB    22  0    0    0  22 Pipe Breaks in BWR Scram System Natural Circulation                                                      0    3 1    3  7        0          0    0        7    7    0 B-66                                          (7/9)                2          RSB Cooldown B-68    ECCS Pump                                                Not Yet Deadheading                                              Active B-69    PWR HSLB with                  (Completed 3/20/85)
Continued Feed water Addition B-72    NbREG 0737 TS                                            2      REG    17    19 19 19      74        0          0    0      40    34    0  54 (+20 in R!l)
B-75      Cracking of Core                                        1          MTEB Barrell B-76      Salem ATWS Item                                          1      LQB      0  18 22 32 72            16        16    0 88 0      0    3  81 1.1 Post Trip Rev.
Equip. Classification                                            ICSB    0 0      16 23 41          41        41  0 82      0    0
            'B-77
                      & Vendor Interface
* schedule to be established in 3rd quarter of FY85.
 
K-04 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for          Technical Schedule for Technical inputs to DL          Actions Issued  Review Performed by Projected                                                Remaining                        by DL Multi plant                                  FY84 Carrycver            Review In-      Contract FY 1985        Inputs to be FY      FY    FY      FY  FY House    Under under MPA No.                Action Title                                  (Inputs /tAs) Priority Branch 1st 2nd 3rd 4th Total        Completed    1986 1987 1985 1986 1987      Staff    DL      Div.
B-78      Post Maintenance Test                                        N/A                  Regions 1                0    0 4 26      30      49            49 0      79 Procedures
'B-79    Post Maintenance Testing N/A                                                  1    ICSB          NEGOTIATING IDAHO CONTRACT                      77 B-80      Trip System Reliability N/A                                                  1    Regions    0 0 4 8          12      40          40    52 B-81      Preventive Maintenance                                                        1                0  0 25 1      26 EQB                                  30          30 54              0    0  0        54 Program for Reactor Trip Breaker B-82      Item 4.3 in Generic Letter (20/33)                                          2    ICSB      0 0      7 6    13      0                        15              29 83-28'                                                                                                                                                                        4(051)
B-83    NUREG-0737 Tech Specs (G.L. 83-36, 37)
B-84      Inspection of BWR Stainless Steel Piping                                                                      MTEB        0    0 25 0      25                                25 B-85      Salem ATWS 1.2 Data Capability                                                                        HFEB        0    0  37 15      52    36          36            88 B-86      Salem ATWS 2.2 5-R Components                                                                        ICSB        0 0      4  8    12      70          70            82 B-87      Salem ATWS 3.2.1 & 3.2.2 S-R Components                                                                    Regs                                  83          0        83    0      83
" schedule to be estabilshed in 3rd gaarter of FY85.
 
TABLE K                                                                          K-05 MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for        Technical Schedule for Technical Inputs to DL      Actions issued      Review Performed by Projected                                                    Remaining                    by DL        In-      Contract FY84 Carryover                  Review          FY 1985        Inputs to be FY  FY    fy      FY    FY  House    Under Under Multi plant Branch 1st 2nd 3rd 4th Total    Completed  1986 1987 1985    1986 1987  Staff    DL    Div.
MPA No.      Action Title                                    .(Inputs /LAtl_  Priority B-88    Salem ATWS 3.2.3 TS S-R Components                                                                      IC58                                  83      83    0    0      B3 0 B-89    Salem ATWS 4.2.3 & 4.2.4 Life Components                                                                    EQB        0 0        0                      54    0    0      54 0 B-90    Salem ATWS 4.3 W and ICSB                                                      67      0    0 B&W T.S.
B-91    Salem ATWS 4.4 B&W Test Procedures                                                                    ICSB                                          8    0      0      8 0 B-92      Salem ATWS 4.5.1 Licensee                                                                                                                                  83
          . Trip Features                                              2                      Regs        0  0 21      22 43      40        0  40    0        0 B-93      Salem ATWS 4.5.2 &                                                                                                                                          83 55  28    0        0 4.5.3 Test Alternatives                                                            ICSB 2
C-07    Fuel Handling                                          (Completed 2/19/85)
Accident Inside Containment ASB      0    0    1  1  2      0          0  0      5      0    0            5 C-10    Control of Heavy                                      (16/19)        1 Loads Over Sptnt Fuel (USI:A-36)
C-11    RPS Power Supply                                      (Completed 6/21/85)
 
K-06 TABLE K MULTIPLANT ACTION COMPLETION SCHEOULE FY1985 Schedule for        Technical Schedule for Technical Inputs to DL          Actions Issued    Review Performed by Projected                                                  Remaining Multi plant  FY84 Carryover                                                                                by OL        In-    .. Contract Review          FY 1985        Inputs to be FY MPA No.                                Action Title Jinputs/LAs)      Priority Branch 1st 2nd 3rd 4th Total        Completed FY  FY    FY    FY  House Under Under 1986  1987 1985 1986 1987 Staff      OL      Div.
C-14                Auxiliary Feedwater Seismic Qualification ORAB      4    5 0 0 9 (7/21)                    ASB      0 2      2  3    7          0          0      0  6      0    0    0        21 C-15                Phase !! Heavy Loads              (Completed 6/28/85)
D-01                GE Mark 1 Containment              (4/2)                1    MEB      0 0      9 0 9              0          0      0  9    0      0 Evaluation Long Term                                                                                                                          0        10 (USI:A-7)                                              4      ICSB      0    0    0  0 0          0            0      0  10    0      0    0        10 D-03                Plant UPI Model                    (6/6)                3      RSB Problem D-10              Asymmetric LOCA                      (C/12)              2    MEB      0 0 0        6    6        6            6      0  12                17 Loads (USI: A-21)
D-17              Definition of                        (0/6)                2    ORB #4    0 0      1  0            0 Operable 1                      0      0  6    1      0  11        2 D-19              Diesel Generator Reliability Tech Specs (GL-84-15)                                                PSB      0    0  5  7  12        0            0      0  85    0      0 D-20            Mark I Dryweil Vacuum Breakers                                                  CSB      0 0 0 24          24        0            0    0  24    0      0
 
K-07 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for          Technical Sc; dule for Technical inputs to OL                Actions Issued  Review Performed by irojected                                                      Remaining                    by OL      In-      Contract Multi plant        FY84 Carryover              Review          FY 1985                Inputs to be FY    FY    FY    FY    FY House    Under Under MPA No.                            IIrputs/LAs) _      Priority Branch 1st 2nd 3rd 4th Total            Completed  1986 1987 1985    1986 1987 Staff    OL    Olv.
Action Title _
E-04    BWR Single Loop Operation 0    0  1 0            1        9          9    0    1      9  0  10 (5 yr, old)                  (10/10)                    CPB
                                                    *E-05    W N-1 Loop Operation        (Completed 1/17/85)
F-02      I.A.1.3 Shift Manning (Cowleted 7/5/85)
F-03      1.A.2.1 Upgrade            (Completed 4/22/85)
Training I.A.2.1.4 Modify Trng F-04      E0P Generic lechnical                                                                                                            0 PSRB 2    1 1      3        7        3            3    4    0 Guidelines PSRB 5    4 30      7      46          34      30    4    77 F-05      Procedures Generation Packages (Suppl. 1, NUREG-0737)
Post          PSRB 13 5 9 9                36        67        31      0 3.1 Draft SER                  103 104          Post          PSRB 0    13 5 9            27        81        50      0 3.2 SER Post        Reg 0      0    1    0        1      0        0      0      1 F-07      1.C.6 Performance of Operating Act.
                                                    *R5B - Reviews will be scheduled as licensee submittals are received.
 
K-08 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule fcr          Technical Schedule for Technical Inputs to DL              Actions Issued    Review Performed by Projected                                                        Remaining                      by DL        In-      Contract Multi plant  FY84 Carryover              Review          FY 1985              Inputs to be FY  FY    FY      FY  FY  House Under Under MPA Mo.                                                                    Action Title  (Inputs /LAs{,    Priority Branch 1st 2nd 3rd 4th Total            Completed  1936 1987 1985 1986 1987      Staff    OL    Div.
F-08                                                        I.D 1 Control Room            ( /6)                        HFEB 0 0 2 1            3              2          1    1    32      0    0 Design Review (Suppl., 1, NUREG-0137)
F-09                                                        I.D.2 Safety Parameter                                      HFEB 0    0 10 7        17              37        32      5  67      0    0 Display System                  71                          ICSB B 19 20 12 59                      12        12 (Suppl. 1, NUREG-0737)
F-11                                                        11.8.2 Plant Shielding        (Completed 5/09/85)
II.B.2.2 Modifications F-12                                                        II.B.3 Post Accident                                        CHEB 6      4    3    4          17        4        4    0      11 0      0 Sampling II.B.3.2 Upgraded                              Post        CEB 15      8    5    6          34    35        35    0    34      35    0  34 System F-13                                                        II.B.4 Training for          _ (Completed 4/22/85)
Mitigating Core                                                                                                              ,
Damage F-14                                                        II.D.1 RV & SV Testing          (15/17)        BWR          EQB  2    0      3    3          8              (BWR)        6 II.D.I.2.a BWR Plant                            Post        EQB  2    6 0      0    8              0        0      0    9      0    0                    8 Unique Analysis II.D.I.2.b PWR Test            (52/52)        Pre          MEB  0 0      3    8    11            39      39      0    0      50  0 Report II.D.1.3 PWR Plant                              Post          MEB  3    5 6        6      20        30        24      6    14    24    6 Unique l
 
K-09 TABLE K MULTIPLANT ACTION COMPLET10N SCHEOULE FY1985          ,
Schedule for          Technical Schedule for Technical inputs to DL            Actions !ssued    Review Performed by Projected                                                  Remaining                      by OL        In-        Contract Multi plant      FY84 Carryover          Review          FY 1985            Inputs to be FY  FY    FY      FY  FY  House Under Under MPA No.      Action Title      _{ Inputs /LAs) Priority Branch 1st 2nd 3rd 4th Total          Completed  1986 1987 1985 1986 1987      Staff    OL      Div.
F-19    11.E.4.2 Containment      (0/17)          1      CSB 0      0      00      0          0                  11      0    0 150 Dependability F-20    11.F.1.1 Noble Gas        (0/1)            Post    ET58 1                      1                              1 Monitor F-21  II.F.1.2 lodine /Partic                    Post    ETSB Monitor F-23  II.F.1.4 Cont Press        (0/11)          Post    CSB        0      1        1                              1        0    0  1 Monitor F-24  II.F.1.5 Cont. H,0        (0/11)          Post    CSB        0      1        1                              1        0    0  1 Level Monitor F-25  II.F.1.6 Cont. H 2O        (1/11)          Post    CSB  0 2        2    0    4        0                    2        0    0  2 Monitor F-26  II.F.2 Inadeq. Core                                PWRa 1      0 4          5    10    42        16  16      8    16  16 Cooling                    (45/35)                  CPB 2      0      5    3    10    33        12 21        53    0    0 (45/35)                  ICSB 2      3      2    3    10    35        35 II.F.2.2 Water Level      (28/28)          Post    CPB                                  28        28    0      0    28    0 F-36  II.K.3.1 PORV 1 solation (0/1)              Post    ICSB                                                          0      1    0 F-37  II.K.3.2 Rpt on PORY      (0/1)            Post    RRAB 0      0 0 0              0                      0      0      1    0
 
K-10 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for          Technical Schedule for Technical Inputs to DL      Actions Issued    Review Performed by Projected                                              Remaining                    by DL        In-Multi plant        FYB4 Carryover                                                                                                Contract Review          FY 1985        Inputs to be FY    FY  FY    FY    FY  House Under Under MPA No.            Action Title        (Inputs /LAs)  Priority  Branch 1st 2nd 3rd 4th Total    Completed    1986 1987 1985 1986 1987 Staff      DL    Div.
F-38        II,K.3.3 Rpt SV/RV          (0/1)      Post        ORB 83    0    0 0 0      0                            0    1    0 Failures F-46          II.K.3.16 Chall/ Fail      (0/22)      Post        RSB    22 0 0        0    22      0            22  0    22      0    0 of RVS Report F-48          II.K.3.18 ADS Actuation II.K.3.18a Study          (0/22)      Complete                                                            22 II.K,3.18b Design          30          Post      ICSB II.K.3.18c Modifications 5              Pre        RSB      0    0  0 0      0      0          0        5 F-49          II.K.3.19 Interlock RCPs (Completed 3/19/85)
F-53          Power on Pump Seals                                RSB        1  2    0 3    6      0            0    0    6    0    0 F-55          II.K.3.28 Qual, of ADS                  Post      EQB        1  2 0      10  13    0            0    0    13      0 F-57          II.K.3.30b SB LOCA          (53/28)      Pre        RSB      19 31 0      0  50      3            3 Methods
          " Schedule dependent on outcome of RSB review of new Owners' Group submittal.
 
K-11 TABLE K MULTIPLANT ACTION COMPLETION SCHEDULE FY1985 Schedule for              Technical Schedule for Technical Inputs to DL            Actions Issued        Review Performed by Projected                                                        Remaining                        by DL            In-        Contract Multi plant      FY84 Carryover                  Review            FY 1985          Inputs to be FY      FY      FY    FY    FY      House    under Under MPA No.          Action Title      (Inputs /LAs)      Priority  Branch 1st 2nd 3rd 4th Total        Cnmpleted    1986 1987 1985    1986 1987      Staff      DL    Div.
F-58      II.K.3.31 Compi                  53            Pre    RSB                                                3  50                  53 w/10 CFR 50.46 F-63      III.A.1.2 Tech Supp.                            Post    Reg /IE    Regions will issue audit reports which will complete action.
Ctr.
F-64      III.A.1.2 Ops Supp.                              Post    Reg /IE    Regions will issue audit reports which will complete action.
Ctr.
    "F-65    III.A.I.2 Emergency                              Post    Reg /IE    Regions will issue audit reports which will complete action.
Operations Facility              1                      AEB        1    0 0 0      1      NS RAB F-67      III.A.2.1 Emerg Plan      (Completed 1/17/85) to Upgrade Rule
    **F-68    III.A.2.2 Met Data        (72/72)                Post    Reg.        0    0  0 0      0          72        TBD TBD      0    TBD TB0        72 METB      0    0  3  2    5            0        0    0      5    0      0 F-70      III.D.3.4 CR Habibility 1I1.0.3.4.1 Design        (6/10)                Post      AEB        0    2  0  0    2          4          4    0    10 F-71      Detailed Control Room Review                                                    NFEB      0    0  12 8      20      29          1B    11      0    0    79 G-01      RCP Trip                  (53/48)                    1    RSB        0    0  32 0      32        3          3    0    0 48      0                      51 TOTALS      (/)
    *IE still develop additional review schedules.
    **RIgion will issue audit reports - TBD (to be determined).
 
TABLE L                                                                            L-1 MULTIPLAN1 ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                                            Lead      Review                            Contract Information Action                                                                                          Project  Contracted          Funding Contract Number                                        Title                            Status
* ManaQer    Yes        No      Division Manager            FIN No.      Contractor A-02                        Appendix 1 - ALARA                                    A        G. Gears      X                  DL/DSI    M. Carrington    B-6891    FRC II/EG&G A-04                        Appendix J - Containment Leak Testing                A        C. Miller      X                  DL        S. Bajwa        B-6590    FPC I (completed)
A-13                        Non Power Reactor Safeguards Plan                    I A-14                        10 CFR 50.55 A (G) - Inservice Testing                A        P. Tam                  X A-17                        Instrumentation to Follow the Course of an Accident (R.G. 1.97)                                A        J. Shea A-18                        10 CFR 50.72 & 50.73 Rule Change on LERs              A        H. Rood                X B-04                        Reactor Vessel Overpressure Protection                A        A. DeAgazio    X                  DSI                                  EC&G B-05                        Stress Corrosion Cracking - BWR RCSPB                A        R. Clark      X                  DL        F. Brenneman      A-6429  INEL (completed)
              .B-17                          Tech Spec Ourveillance for Hydraulic Snubbers        A        L. Engle      X        X**      Region 1  J. Donohew        A-0250  LLL (completed)
B-22                        Tech Spec Surveillance Requirements for
                                              -Mechanical Snubbers                                A        L. Engle      X        X**      Region 1  J. Donohew        A-0250  LLL (completed)
* A = Active, C = Complete, I = Inactive
 
TABLE L                                                                                L-2 MULTIPtANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                                    Lead        Review                        Contract Information Action                                                                                    Project    Contracted    Funding      Contract Number                                  Title                            Status
* Manager      Yes      No  Division Manager                FIN No.          Contractor B-23            Degraded Grid Voltage                                        A        R, Dudley        X          DL            J. Donohew        A-0250    LLL (completed)
F. Brenneman      A-6429    INEL (completed)
B-24            Venting and Purging Containment While at Full-Power and Effect on LOCA                              A        E. Reeves        X          DL            S. Bajwa          B-6590    FRC I (completed)
B-25            BWR Feedwater Nozzle Cracking                                C        (July 23, 1984)
B-41            Fire Protection - Final Tech Specs (Includes SER Supplements)                            A        T. Wambach      X          DSI                                        BNL B-48            Adequacy of Station Electric Distrib.
Voltage                                                A        R. Dudley        X          DL            J. Donohew        A-6429    INEL (completed)
F. Brenneman      'A-0250    LLL (completed)
B-57            DHR Capability                                              A        A. DeAgazlo      X          DL            J. Donohew        A-6429    INEL (completed)
B-59            Masonry Wall Design                                          A        C. Trammell      X          DL            M. Carrington      B-6891    FRC 11 B-60            Environmental Qualification of Electrical Equipment                                            A        R. Karsch        X          DL            S. Bajwa          B-6890    FRC I (completed)
  .B-65            Safety Concerns Assoc. with Pipe Breaks in the BWR Scram System                                  A        V. Rooney              X
* A = Active, C = Complete. I = Inactive.
ma review contracted only in some Regions.
i
 
    .. - _ _ . .            . . . -          _ . -  __s    . . . . . _ - - - . _ _ .          _-  ....._ _ . _ . _ _ _ . . . . _            .____.m.          --__ . - - ,    _ . . . - - - . -        . _    . . -        _.
TABLE L                                                                                                  L -
MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83' Multipiant.                                                                                              Lead      Review                                    Contract Information Action                                                                            ,
Project    Contracted l        Funding , Contract Number                              Title                                      Status
* Manager    Yes      No        Division Manager                            FIN No.        Contractor B-66            Nat. Cir. Cooldewn                                              A              K. Heitner L
B-68            ECCS Pump Deadheading                                            1 B-69            IEB 80-4 Mainsteam Line Break with Continued Feedwater Addition                                  A            .E. Tourigny      X                  DL            - M. Carrington              B-6891    FRC II (completed)--
B-70            Monitoring of Fatigue Transient' Limits for ECCS                1 B-71            120 VAC Vital Instrument Busses and Inverter                                                                                                                                                    ,
G. Rive,1 bark
                                                                                              ~
Technical Specifications                                      1**                                                                                                                            i
                  'B-72          :NUREG-0737 Tech Specs                                            A            C. Patel                X.
B-75            B&W Reactor Vessel Internals Bolting-                            A-            N. Kadambi              X-
~
B-76            Item 1.1 - Post-Trip Review - Progree .
Description and Procedures                                                  A. Bournia:
A                                    X B-77          -lten 2.1 - Equipment Classification and Vendor Interface - RTS Components                            A            R. Auluck              X
;-
* A,= Active, C = Complete I = Inactive.                                                                                                                                                                            ,
I b
c t
L 1
                                                                                      ~
                                                                            -t    +
4 ymr'                                        --'v1                r  'rm-*r          -
 
l I
1 L-4 TABLE L MilLTIPtANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                          Lead      Review                      Contract Information Action                            .                                            Project  Contracted      Funding Contract Number                          Titic                            Status
* Manager    Yes    No    Division Manager          FIN No. Contractor B-78        Items 3.1.1 and 3.1.2 - Post-Maintenance Testing Procedures and Vendoe Recommendations - RTS Components                    A        J. Hopkins          X B-79        Item 3.1.3 - Post-Maintenance Testing -
Changes to Tech Specs - RTS Components              A        J. Hopkins.          X B-80        Item 4.1 - Reactor Trip System Reliability Vendor Related Modifications                        A        J. Hopkins          X B-81        Items 4.2.1 and 4.2.2 - Preventative Maintenance Program for Reactor Trip Breakers - Maintenance and Testing                  A        R. Perch            X B-82        Item 4.3 - Automatic Actuation of Shunt Trip Attachnent for W and B&W Plants                A        L. Olshan            X B-83        Review of the Technical Specifications for NUREG-0737 (Generic Letters 83-36 and 83-37)                                          A        T. Alexion          X B-84        Inspection of BWR SS Piping                            A        P. Tremblay B-85        Salem ATWS 1.2 Data Capability                        A        T. Bournia          X B-86        Salem ATWS 2.2 5-R Components                          A        R. Auluck            X B-87        Salem ATWS 3.2.1 & 3.2,2 S-R Components                A                            X
* A = Active, C = Complete. I = Inactive.
  ** Action inactive pending CRGR review.
 
TABLE L L-5 MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Multiplant                                                                          Lead      Review                        Contract Information Action                                                                          Project    Contracted        funding  Contract Number                        Title                            Status
* Manager      Yes        No  Division Manager          FIN No. Contractor B-88        Salem ATWS 3.2.3 T.S. S-R Components                A                                    X B-89        Salem ATWS 4.2.3 & 4.2.4 Life Testing                A          R. Perch                  X s tl B-90        Salem ATWS 4.3 W and B&W T.S.                        A          L. 015han                  X B-91        Salem ATWS 4.4 B&W Test Procedures                  A          N. Kadambi                X B-92        Salem ATWS 4.5.1 Diverse Trip features              A          J. Stevens                X B-93        Salem ATWS 4.5.2 & 4.5.3 Test Alternatives          A          J. Stevens                X C-04        Filter Te-h Specs                ,
C          (August 2, 1984) 0-07        Fuel Handling Accident Inside Containment            A          J. Donohew                X C-10        Control of Heavy Loads Over Spent Pool (Phase 1)                                        A          D. Neighbors    X              DL        M. Carrington B-6891 FRC II 1
* A = Active, C = Complete, I = Inactive.
                  ** Action inactive pending CRGR review.
 
TABLE L                                                                            L-6 MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83
            -Multiplant                                                                      Lead        Review                          Contract Information Action                                                                        Project    Contracted        Funding Contract Number                        Title                        Status
* Manager      Yes                        Manager          FIN No.
No      Division                                Contractor C-11      RPS Power Supply                                    A          M. Thadani      X              DL          J. Donohew      A-0250  LLL (completed)
C-14      Aux. Feedwater Seismic Qualification                A          J. Beard        X              DL          J. T. Beard      A-0429  LLL C-15      Heavy Loads Phase 2                                A          D. Neighbors    X D-01      GE Mark I Containment Evaluation Long Term          A          B. Siegel        X              DL          S. Bajwa        A-3713  BNL (completed)
D-05      Plant UPI Model Problem                            A          D. 011 anni            X      DS!                                  SNL D-10      Asymetric LOCA Loads                                A          J. Shea                X D-17      Definition of Operable                              A          S. Miner        X              DL          F. Brenneman    A-6429  INEL D-19      Diesel Generator Reliability                        A          C. Stahl E-04      BWR Single Loop Operation                          A          R. Clark        X              DL          J. Donohew      A-0250  LLL (completed) l E-05      WN-1. Loop Operation                                C          (January. 17, 1985)
* A = Active C = Complete, I = Inactive.
 
TABLE L                                                                            l-7 MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                        Lead      Review                      Contract Information Action                                                                          Project  Contracted      Funding  Contract Number                        Title                          Status
* Manager    Yes        No  Division Manager            FIN No.      Contractor F-02        1.A.1.3  Shift Manning                              A        D. Fischer              X F-03        1.A.2.1 Upgrading of R0 and SRO Training            A        D. Wigginton    X            DL        S. Bajwa          B-8011    SAI (completed)
F-04a      I.C.1.2/3A Emergency Operating Procedures Generic Technical Guidelines                      A        F. Akstulewicz          X F-OS        1.C.1.2/3B Procedures Generation Packages (NUREG-0737, Suppl. 1)                            A        F. Akstulewicz X              DHFS F-07        1.C 6 Correct Performance of Operatirg Activities                                        A        P. Leech                :
F-08        1.D.1 Control Room Design Review                    A        C. Miller              X      DL        S. Bajwa          B-8011    SAI F-09        1.D.2  Safety Parameter Display System              A        C. Miller              X      DL        5. Bajwa          B-8011    SAI F-11        II.B.2 Plant Shielding                              A        E. Tourigny            X F-12        II.B.3 Post accident Sampling                        A        J. Norris F-13        II.B.4 Training for mitigating Core Damage          A        D. Wigginton    X            DL        S. Bajwa          B-8011    SAI (completed)
F-14        II.D.1 RV and SV Testing                            A        R. Dudley        X            DE
* A ,a Active. C = Complete I = Inactive.
 
l l
TABLE L                                                                                  L-8 MULT! PLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                                                                      Lead        Review                              Contract Information Action                                                                                                                      Project    ' Contracted          Funding Contract Number                                                          Title                                      Status
* Manager      Yes                Division, Manager No                                    FIN No.      Contractor F-15                                        II.E.1.1 AFW System Evaluation                                    A        H. Silver F-18                                        II.E.4.1 Dedicated Hydrogen Penetrations                          C        (September 26, 1984)
F-19                                        II.E.4.2 Containment Isolation Dependability                      A        E. Reeves F-20                                        I I . F .1.1 Noble Gas Monitor                                    A        H. Nicolaras F-21                                      II.F.1.2      Iodine / Particulate Sampling                        A        H. Nicolaras F-23                                      II.F.1.4 Containment Pressure Instrument                            A        H. Nicolaras F-24                                      II.F.1.5 Containment Water Level Instrument                        A        H. Nicolaras F-25                                      II.F.1.6 Containment Hydrogen Monitor                              A        H. Nicolaras F-26                                      II.F.2 Instruments for Detection of Inadequate Core Cooling                                        A        J. Shea          X                  OSI                                  ORNL
* A = Active, C = Complete, I = Inactive.
 
_ _ _ _ _ _ . _ . - - _ _ _ . _ _              . . .              _._            _          . _ _ _      _              _ . . . _ .        ..                          . _ _ ._            4    ___
TABLE L                                                                                    L.9 MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORMATION Date as of 04/08/83 Multiplant                                                                            Lead      Review                            Contract Information Action                                                                          Project  Contracted            funding  Contract Number                          Title                          Status
* Manager    Yes              No  Division Manager          FIN No.            Contractor F-30    II.K.2.13 Thermal-Mechanical Report                          C F-36    II.K.3.1 Auto PORV Isolation                                A    T. Colburn                    X F-37    II.K.3.2        Report on PORV Failures                      A    T. Colburn      X                  DL        M. Carrington    B-6891        FRC II (complet(1)
F-38    II.K.3.3 Reporting SV and RV Failures and                                                                                                                          i j                                          Challenges                                              A    T. Colburn                    X F-46    II.K.3.16 Challenges and Failures of Relief Valves                                                    A    R. Clark                      X F-48  11.K.3.18 ADS Actuation                                      A    R. Bevan                      X F-49  11.K.3.19 Interlock Recirculation Pump Modification                                              A    J. Donohew                    X F-51  II.K.3.22 RCIC Suction                                        C    (October 10, 1984)
F-53  II.K.3.25 Power on Pump Seals                                A    R. Hermann                      X F-55  II.K 3.28 Qualification of ADS Accumulators                  A  R. Hermann                      X F-57  II.K.3.30 SB LOCA Methods                                    A  D. Wigginton                    X  DSI                                      LANL F-58  II.K.3.31 Compliance with 10 CFR 50.46                        A    E. Sylvester                  X F-59  II.K.3.44 Anticipated Transients with Single Failures                                                  A    J. Lombardo                    X
* A = Active C = Complete, I = Inactive.
 
TABLE L                                                                            L-10 MULTIPLANT ACTIONS - LEAD ASSIGNMENTS AND CONTRACT INFORHATION Date as of 04/08/83 Multiplant                                                                                        Lead Action Review                    Contract Information Project        Contracted    Funding Contract Number                                  Title                        Status
* Manager          Yes        Division  Manager No                            FIN No.      Contractor F-63                III.A.1,2 Technical Support Center                  A          W. Paulson                    X F-64                III.A.1.2 Operational Support Center                A          W. Paulson                    X F-65                III.A.1.2 Emergency Operations facility            A          W. Paulson                    X F-67                III.A.2.1 Emergency Plan Upgrade to Meet Rule      C          (January 17, 1985)
F-68                III.A.2.2 Meteorological Data Upgrade              A          J. Donohew                    X F-70                III.D.3.4 Control Room Habitability                A          R. Gilbert                    X F-71                1.D.I.2 Detailed Control Room Review                A          C. Miller                    X    DL        5. Bajwa        B-8011  SAI              ,
G-1                  Reactor Coolant Pump Trip                          A        D. Jaffe
* A = Active, C = Complete, I = Inactive.
 
_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _    _ _ _ _    _ ._ _ _ _ _ __ __        ._.. _ __ ._.. _ . ._._. ._._              . ~ _ _ _ . _ . _  _ . _ . _ . . -_. .
                                                                                                            ~
IMPLEMENTATION'0F RESOLVED USIs                                  M-1 Resclved USIs which result in changes on operating reactors become multiplant actions (MPAs). The progress can be readily tracked by referring to the appropriate MPA. Below is a correlation between USI numbers and MPA numbers.
USI #                          MPA #                                Title                                              .,
4, l                                    A-2                            D-10                                Asymmetric LOCA Loads                                'i i
A                            0-01                                GEMarkIContainmentEvaluation-Longterm A-10                            B                              BWR Feedwater Nozzle Cracking A-24                            B-60                                Environmental Qualification A-26                            B-04                                Reactor Vessel Overpressure Protection A-36                            C-10                                Control of Heavy Loads Over Spent Fuel Pool A-42                            B-05                                Stress Corrosion Cracking - BWR RCSPB The'following USIs have been resolved but not backfitted on operating reactors:
A-9      ATWS - Involved in rulemaking                                                                                      .
A-31      Residual Heat Removal' Requirements 4
 
DIVISION OF LICENSING POINTS OF CONTACT                N-1 FOR UTRESOLVED SAFETY ISSUES AND OTHER ISSUES USI.                                                                CONTACT
                                  - A-1      Water Hammer                                                              J. Neighbors A-3/4/5  Steam. Generator Tube Integrity                                            R. Martin A-8      Mark II Containment Pool Dynamic Loads-                                  T. Bournia A-9      Anticipated Transients Without Scram                                      V. Rooney A-11      Reactor Vessel Material Toughness                                          A. DeAgazio A-12    Steam Generator and Reactor Coolant Pump Supports                          A. DeAgazio
                                  - A    Systems-Interaction                                                        T. Michaels A-39    SRV Pool Dynamic Loads                                                    B. Siegel A-40    . Seismic Design . Criteria - Short Term Program                            T. Cheng
                                    .A    Containment Emergency-Sump Performance                                    D. Jaffe A-44. Station Blackout                                                          -L. Engle A-45    Shutdown Decay Heat Removal Requirements                                  D. Dilanni A-40    Seismic Oualification of Equipment                                        P. Y. Chen 7              A-47    Safety Implications of Control Systems                                    J. T. Beard
                                            ' Hydrogen Control Measures                                                V. Rooney A-48 Pressurized Thermal Shock                                                G. Vissing
                                    .A-49
                                      ----    Low-Le:;al Waste Issues                                                  F. Brenneman
 
SECTION III ROUTINE (NON-NUREG 0737)
LICENSING ACTION SUM:1ARY
 
l l
TOTAL RCTIVE ROUTINE ACTIONS                      0-1 DIVISION OF LICENSING (EXCLUDES NUREG-0737 ITEMS) 4000 3500 --
3000-2500-2000-1500      ,    ,    ,    ,    ,    ,    ,    ,    ,        ,
OCT NOV DEC JAN FEB MAR APR M8Y JUN JUL AUG SEP TOTRL      3349 3861 3905 3872 3834 3779 3758 3638 3497 3406 3353 RCTIONS      3338 3850 3893 3861 3823 3767 3746 3627 3486 3397 3344 HmRINGS      11  11  12    11  !!  12  12  11  11'  09  09
 
NEW ROUTINE RCTIONS BY MONTH                                  pI l
DIVISION OF LICENSING j                            2000
!~
l 1500--
1000 -
500-N O          ,      ,    ,    ,    ,    ,          ,        ,
OCT NOV DEC- JAN FEB MAR APR MAY JUN JUL AUG SEP NEW flCTIONS      241    680    202  145  130  174  172  177  180      163  139 CUMULRTIVE        241  921    1123 1268 1398 1572 1744 1921 2101 2264 2403
 
COMPLETED ROUTINE RCTIONS BY MONTH                                    0-1 DIVISION OF LICENSING 2000 l
I l
1500 -
1000-500 -
OCT NOV DEC JAN FEB MRR RPR MAY JUN JUL AUG SEP 252  166    159      180  167    229  193  297  322  256  195 COMPLETED CUMULf1TIVE  252  418    577      757  924    1153 1346 1643 1965 2221 2416
 
R-1208812-001                                                                                      REGULAT0RY                                    INF0RMATION                                        TRACKING                        SYSTEM                                                  PAGE: R-1 FISCAL YEAR: 1985                                                                                            R0UTINE                          LICENSING                                  ACTION $                        BY      M0 NTH                          REPORT DATE: 09/17/85 FACILITY NAME                                                                                    OCT.                NOV.          DL                    JAN.              FEB.                MAR.            APR.            tig          JUNE          JULY
                                                                                    ,?
AUG.              SEPT.
ARKANSAS 1                                                        4                                  33                41                38                34                  36                  37              34            34            34            30                  26 ARKANSAS 2                                                                                            30                35                35                31                  33                  34              33            29            29            29                  29 BEAVER VALL EY 1                                                                                      47                50                47                41                  39                  40                38            38            43            41                  40 BIG ROCK POINT 1                                                                                      40                50              47                  51                  52                    50              50            49            46            45                  43 BROHNS FERRY 1                                                                                        37                44              45                  45                  45                  43                43            42            37            31                  31 BROHNS FERRY 2                                                                                        33                41                42                42                  42                  42              42            41            37            34                  34 BROHNS FERRY 3                                                                                        36                42                42                42                  43                  42              42            41            36            31                  31 BRUNSHICK 1                                                                                          34                40              40                  38                  39                  37                41            35            32            27                  29 BRUNSHICK 2                                                                                          36                42              42                  40                  38                  35                37            31            30            28                  30 BYRON 1                                                                                              40                40              40                  40                  32                  31              32            31            33            32                  34
                - - - - - - - - - - - - - - - - - - - - - - - - - - _                                                  -----------=--                          _ _ . _---------....--------------                                      ---...-- _          .___--- =_= ___-----__ _ _ .                          _-----
CALLAHAY 1                                                                                            31                31                32                33                  33                  31              28            30            27            29                  31 CALVERT CLIFFS 1                                                                                      31                38                38                36                  35                  34              34            29            31            29                  28 CALVERT CLIFFS 2                                                                                      21                28              28                  30                  30                  29                29            27            27            25                  26 CATAHBA 1                                                                                            17                19              28                  25                  25                  29                31            33            35            41                  43 COOK 1                                                                                                30                36              36                  34                  33                  35                34            34            29            34                  22
                .---                                -------                                    _ ----------------------... -------------------------------=-__-                                                                                  -_----------------------------- __                                  _ = - _ -
COOK 2                                                                                                32                39                39                37                  36                  37              34            33            29            28                  21 COOPER STATION                                                                                        23                29                30                29                  29                    30              32            31            29            27                  26 CRYSTAL RIVER 3                                                                                      50                57                58                63                  66                  67                67            70            68            63                  63 DAVIS-BESSE 1                                                                                        50                57                55                51                  52                  51              48            48            49            50                  60 DIABLO CANYON 1                                                                                      33                36                37                39                  39                    38              34            37            35            35                  35
__----------------                                                    -- -__ _ _ - - = _ - ___-_ - _
DIABLO CANYON 2                                                                                          1              1                    1                1                    1                  1                1            3              4              4                  4 DRESDEN 1                                                                                                1 DRESDEN 2                                                                                            46                50                53                49                  48                    47              47            39            37            34                  34 DRESDEN 3                                                                                            33                38              40                  39                  38                    38              38            31            29            28                  28 DUANE ARNOLD                                                                                          35                42                48                50                  49                    47              44            40            36            34                  32
_ - ==--.--.__-- ---.-                                    =.-------- __ _--
FARLEY 1                                                                                              26                30                28                28                  26                    28              29            27            26            26                  27 FARLEY 2                                                                                              38                42                39                37                  35                  39              40            28            27            27                  25 FERMI 2                                                                                                2                2                    2                2                    2                  11                11          11            12            12                  12 FITZPATRICK                                                                                          34                40                39                40                  39                  42              43            34            32            28                  26 FORT CALHOUN 1                                                                                        22                28                29                29                  30                  31              27            25            26            26                  24
                --------- ......-                                                            = -------------------
                                                                                                                                                    =-------------------------------------------------------------------------------------
FORT ST VRAIN                                                                                        27                33                35                35                  35                  36              37            40            39            36                  35 GINNA                                                                                                58                63              62                  64                  64                  62                60            57            54            49                  49 GRAND GULF 1                                                                                          30                36                54                59                  58                  55                59            59            57            67                  67 HADDAM NECK                                                                                          54                59              61                  59                  61                  60                57            57            56            54                  53 HATCH 1                                                                                              39                45              40                  39                  39                  39                43            40            38            39                  40
                ---------------..                                                        __                  __ _ _ = - - . - - - -          - _--- - - _ - - - - - - -                    . _ - -
                                                                                                                                                                                                                    - ==----------. -------==_ =_=_=------------------...----
HATCH 2                                                                                              35                42              41                  38                  39                  41                43            42            39            35                33 HUMBOLDT BAY 3                                                                                          3              3                    3                3                    3                  3                5            5              5              4                  4 INDIAN POINT 2                                                                                        46                53              49                  48                  51                    51              51            54            55            54                60 INDIAN POINT 3                                                                                        54                61              58                  59                  56                    58              52            52            47            39                  37 KEHAUNEE                                                                                              40                44              43                  36                  36                    36              35            37            36            34                26
____                                                _=_____ --_                                _ .------ ...------                        --------- -                - - - _ _        _. .--- -                    . ----------
_- == ______-
                                                                                                                                                                                                                                                                                                                                =
 
R-1208812-001                                                                REGULAT0RY                                          INF0RMATION                                                      TRACKING                              SYSTEM                                                    PAGE: R-2 FISCAL YEAR: 1985                                                                    R0UTINE                                LICENSINO                                                ACTIONS                        BY            M0 NTH                                REPORT DATE: 09/17/85 FACILITY NAME                                                    E                            HOV.                  DEC.            JAN.                              FEB.                MAR.              APR.                118 1          JUNE            RLX          h                    SEPT.
LA CROSSE                                                                      49                53                    54                  50                              52                    52                49                  45          43                  43                40 LASALLE 1                                                                      15              20                      20                  22                              23                    21                29                  26          27                  27                27 LASALLE 2                                                                      14                19                        19              20                              21                    20                24                  20          21                  19                21 LIMERICK 1                                                                    24              25                      28                  27                              27                    25                26                  20          20                  15                16 MAINE YANKEE                                                                    42                50                  47                  48                              45                    44                44                  44          44                  42                40 MCGUIRE 1                                                                      34              45                    45                  48                              47                    41                45                  45          46                  50                52 MCGUIRE 2                                                                      30                41                    41                  44                              43                    39              43                  43          43                  48                50 MILLSTONE 1                                                                    45              50                    49                  48                              47                    47                45                  44          45                  42                41 MILLSTONE 2                                                                    30              37                      38                  37                              36                    40                41                  42          42                  43                37 MONTICELLO                                                                      41              40                    39                  37                              37                    37                40                  39          38                  38                38 NINE MILb PbINT 1                                                              36              40                    4b                  38                              34                    33                31                  h8          hh                  hk                hh NORTH ANNA 1                                                                    31              36                      33                  37                              40                    39                40                  43          39                  39                36 NORTH ANNA 2                                                                    39              44                    41                  40                                44                    43                43                  44          40                  40                37 OCONEE 1                                                                        50              57                    56                  55                                51                    49                51                  48          48                  43                43 OCONEE 2                                                                        53              62                    62                  62                                56                    54                55                  53          51                  46                46 OCONEE 3                                                                        51              59                    58                  h6                                bh                    5b                52                  49          49                  44                k2                  j OYSTER CREEK 1                                                                  57              62                    62                  63                                66                    68                70                  58          59                  56                53                  :
PALISADES                                                                      43              48                    47                  46                                45                    47                47                  48          49                  47                42 PALO VERDE 1                                                                      3                3                  38                  38                                38                    38                38                  32          32                  34                31 PEACH BOTTOM 2                                                                  45              49                    51                  54                                51                    46                45                  49          39                  38                38                  ,
___                                    .-_-          _        . _ _ _ _ _ .                        .-- ___                              .-----....-...---                          =---  _---_ ..--..
PEACH BOTTOM 3                                                                  41              46                    50                  54                                51                    47                47                  49          42                  42                40 PILGRIM 1                                                                      32              37                    36                  35                                37                    35                37                  37          39                  40                35 POINT BEACH 1                                                                  37              44                    44                  47                                45                    43                41                  44          46                  41                41
'                                                                                                                                                                                                                                                                      39          41                  35                35 POINT BEACH 2                                                                  36              42                    42                  41                                39                    37                36 PRAIRIE ISLAND 1                                                                19              22                    22                  23                                22                    21                21                    19          13                  13                13
__ _              = - - - _ -                                                        _ _ . - - - - - - - . . . - -                    - - _ - - - - - - .              . _ - - - - - - _ _
PRAIRIE ISLAND 2                                                                19              23                    23                  24                                23                    22                22                  20          14                  14                15 QUAD CITIES 1                                                                  31              38                    38                  37                                35                    40                40                  35          35                  33                33 QUAD CITIES 2                                                                  33              40                    41                  42                                40                    43                43                  36          35                  34                34 RANCHO SECO 1                                                                  58                64                    64                  63                                60                    58                56                  55          52                  50                45 ROBINSON 2                                                                      49              51                    52                  51                                51                    45                45                  41          39                  40                37
                                                                                                                                              .----.-------- .                                    _ _ _ - - - = _ . . - - - - - _ - _            ----------------__.                              ___
SALEM t                                                                          35              44                    42                  44                                46                    44                43                  39          36                  36                39 SALEM 2                                                                          36              46                    45                  47                                47                    45                44                  38          34                  34                36 SAN ONOFRE 1                                                                    39              37                    38                  37                                35                    35                35                  36          35                  37                33 SAN ONOFRE 2                                                                  77                84                    80                  75                                76                    67                67                  70          66                  68                69 78                84                    81                  76                                77                    68                68                  72          68                  70                71
_ SAN ONOFRE 3 SEQb0YAH 1                                                                    45                51                    52                  46                                48                    k3                42                  k[          59                  h9                kb SEQUOYAH 2                                                                      36                44                    42                  40                                42                    42                41                  40          36                  36                37 2                4                        9              12                                11                    12              12                    16          17                  19                19 SHOREHAM                                                                                                                                                                                                                                                27                  29                29 ST LUCIE 1                                                                      30-              36                    36                  36                                32                    32                31                  31 34                42                    42                  43                                43                    39                38                  39          36                  37                38 ST LUCIE 2                                                                  __
_ _ _          -=          .. ...---...........-- _-_- .-
 
                              . - - ..- . --- -.                                    - _ .                              .. -- -.                                              =- _ _ - _ . - .                            . .      - _                    -              . ~ . _ _ - -                  - - . _ - .. ,                    . - -
R-1208812-001                                                  REGULAT0RY                                                        INF0RMATION                                                            TRACKING                          SY$ TEM                                                                PAGE:      P,-3 FISCAL YEAR: 1985                                                      R03 TINE                                              LICENSINO                                                      ACTIONS                          BY      M0 NTH                                        REPORT DATE: 09/t7/85 FACILITY NAME                                                gg.L.                                ggy                EfC                      JAll,                        f.LL.                  Ha!L,            Af.lb.          B&Y                JMME                  JM.LY          AUG                  SEPT, SUMMER 1                                                        29                                        34                36                            31                      31                    34                36              34                  32                  33                  34 SURRY t                                                        31                                        39                38                            35                      35                    34                34              33                  32                  35                  36 SURRY 2                                                        32                                        39                39                            37                      35                    34                35              35                  34                  37                  35 SUSQUEHANNA 1                                                  54                                        57                60                            64                      64                    63                38              35                  38                  39                  41 SUSQUEHANNA 2 24                                        25                25'                          27                      29                    28                26              21                  28                  19                  20
__ =            - - - - - - - - -
_ - - _ - _ _-- ..._                    = _ - _ -          -.....                  = . . = _ _                                            ..
THREE MILE ISLAND 1                                            49                                        58                57                            52                      51                    51                49              45                  43                  40                  34 THREE MILE ISLAND 2                                              1                                              1 TROJAN                                                          28                                        36                34                            38                      35                    33                34              35                  38                  39                  39 TURKEY POINT 3-                                                26                                        33                32                            32                      33                    33                33              31                  27                  28                  29 TURKEY POINT.4                                                  27                                        34                33                            33                      34                    35                35              33                  30                  29                  30
                                                                                                                                                                      -___                                _=____=_-__- __ ..--- ..=__                                          _- _ - - - _ _ , -                      _____________
VERMONT YANKEE 1                                                39                                        48                46                            47                      44                    46                45              48                  45                  41                  38 HASHINGTON NUCLEAR 2                                            18                                        27                26                            28                      32                    34                32              34                  35                  36                  37 NATERFORD 3                                                      13                                        15              26                            27                      28                    25                23              26                  28                  29                  !2 HOLF CREEK 1                                                    36                                        36                36                            36                      36                    41                41              43                  32                  31                  28 YANKEE-ROHE 1                                                  46                                        53                53                            51                      50                    49                52              54                  54                  48                  51
______                          =. _= -- =
ZION 1                                                        .45                                        51                47                            48                      48                    46                46              46                  43                  39                  38 ZION 2                                                          44'                                        49                46                            47                      47                    45                45              44                  42                  37                  37 GRAND TOTAL                                            3,349                                3,861            3,905                3,872                            3,834                  3,779            3,758            3,638              3,497                    3,406        3,353
                --    ___.                  _ _ _ - -              _.-            _                              __                        _                                                  ___---.                                _=-            _ _ _ - - - _ _ _ - - - -                                          -
 
        . .. ___          _ _. . _    __                      _ . . _ .__ _                          . _ . . . _ _ _                        ..          ._ _            m_                    __          _ _ _            -..                    _ _ _ - _            . . - . - _ . _ _ . _ _ _ _        .
i t
R-1208813-001                        REGULAT0RY                                                    INF0RMATION                                          TRACKING                                              SYSTEM                                                          PAGE: S-1 REPORT DATE: 09/17/85                                            R0UTINE                                        LICENSING                                          ACTION $
POHER                REACT 0RS                                                                                                                                                            !
FOR 08/01/85 - 08/31/85
                                                                                                                                                              -__ _                    . _ . -                  __---==-                  - - _ _ - - -                            . _ _ .                .
NEW                                                      COMPLETED ACTIONS                    NEH                              ACTIONS          COMPLETED                                                                                      NUMBER FOR THIS                ACTIONS                              FOR THIS          ACTIONS                                                                                          OF                    NUMBERS REPORTING                TO DATE                            REPORTING        .TO      DATE                                                                                ROUTINE                            OF                    TOTAL FACILITY          PERIOD                  IN FY 85                            PERIOD            IN FY 85                                                                                    ACTIONS                HEARINGS                ACTIONS
:                        ARKANSAS 1                                0                        23                              4                  31                                                                                        26                            0                        26 ARKANSAS 2                                1                        22                                1                26                                                                                        29                            0                        29 BEAVER VALLEY 1                          0                        40                                1                43                                                                                        40                            0                        40 BIG ROCK POINT 1                          3                        27                              5                  26                                                                                        43                            0                        43            '
BROHNS FERRY 1                          2                        23                              2                  34                                                                                        31                            0                        31
                                              .----                      ===          - - -
_ . _ - _                                    -=... -__                                                                    _ _ =
BROWNS FERRY 3                          2                        23                              2                  28                                                                                        31                            0                        31 BRUNSHICK 1                              5                        44                              3                  47                                                                                        29                            0                        29 BRUNSHICK 2                              6                        40                              4                  43                                                                                        30                            0                        30 JBYRON 1                                    3                        42                                1                  12                                                                                      34                            0                        34 CALLAHAY 1                              2                          15                              0                  24                                                                                        31                            0                        31 CALVERT CLIFFS 1                          1                        24                              2                  26                                                                                        28                            0                        28 CALVERT CLIFFS 2                        2                          19                              1                13                                                                                        26                            0                        26 CATAWBA 1                                2                        32                              0                    6                                                                                      42                            1                        43
                        ; COOK 1                                    0                        29 1                          12                    36                                                                                        22                            0                        22
_ = - - - - ._
COOK 2                  1                0                        22                              7                  32                                                                                        21                            0                        21 1                          COOPER STATION                            0                        17                              1                  13                                                                                      26                            0                        26 CRYSTAL RIVER 3                          0                        32                              0                  16                                                                                      63                            0                        63            i DAVIS-BESSE 1                          12                          40                              2                  26                                                                                        60                            0                        60 lDIABLO CANYON 1                            0                        17                              0                  15                                                                                      34                            1                        35 DIABLO CANYON 2                          0                          3                              0                    b                                                                                          k                        0                          k i                        DRESDEN 1                                0                          0                            0                      1                                                                                        0                        0                          0 i                        DRESDEN 2                                1                        15                              1                26                                                                                        34                            0                        34 DRESDEN 3                                2                        17                            2                  22                                                                                        28                            0                        28 DUANE ARNOLD                              0                        32                              2                  34 1                                                                                      32                            0                        32
                                                        . _ . _ - - - -        . . . . = - - - _ _ _ _ - - - ----- __                                  -                  --_ -                                    - - = =          _==                      _ . _      __---
FARLEY 1                                  2                        21                                1                25                                                                                        27                            0                        27 FARLEY 2                                  1                        22                              3                  39                                                                                        25                            0                        25 FERMI 2                                  0                        to                              0                    0                                                                                        12                          0                        12 FITZPATRICK                              1                        22                              3                  31                                                                                        26                            0                        26 l FORT CALHOUN 1                            1                        22                              3                  21                                                                                        24                            0                        24 FORTSTVRkIN              I                b                        21                                1                  th                                                                                      3h                            a                        3h GINNA                                    0                        24                                0                34                                                                                        49            '
0                        49 GRAND GULF 1                              4                        71                              4                  32                                                                                        67                            0                        67 HADDAM NECK                              1                        22                              2                  27                                                                                        53                            0                        53 l                      l HATCH 1                                  8                        36                              7                  36                                                                                        40                            0                        40
                                                                                ...                                                                                            _ __                    _ _ _                                            -=_ _              _ _ . . .              =
4 1
1
    -. _                                                +                    -
 
R-1208813-001                                                REGULAT0RY                                        INF0RMATION                                                TRACKING                          SYSfEM                                                          PAGE: S-2 REPORT DATE: 09/17/85                                                                    R0UTINE                            LICEN$INO                                      ACTIONS POHER                    REACT 0RS FOR 08/01/85 - 08/31/85 NEW                                          COMPLETED ACTIONS                    NEN                  ACTIONS            COMPLETED                                                                    NUMBER FOR THIS                  ACTIONS                FOR THIS                ACTIONS                                                                      OF                  NUMBERS REPORTING                  TO DATE              REPORTING                  TO DATE                                                                ROUTINE                    OF                        TOTAL FACILITY                              PERIOD                    IN FY 85 PERIOD                  IN FY 85 ACTIONS
                                                                                                                                                                                                                                                        - - _ . __=_
HEARINGS                ACTIONS HATCH 2                                                      4                      26                      6                      28                                                                        33                      0                        33 HUMBOLDT BAY 3                                                0                        2                      0                        3                                                                        4                      0                          4 INDIAN POINT 2                                              7                      38                        1                      24                                                                        60                      0                        60 INDIAN POINT 3                                                1                      25                      3                      40                                                                        37                      0                        37 KEHAUNEE                                                      O                      18                      8                      31                                                                        26                      0                        26
                                                                          ._                    -_        __ _                      ---            _                                          .-=__-                    - _-- ___ _-- ___                                                    ____            __
7--___
LASALLE 1                                                    3                      31                      3                        19                                                                      27                      0                        27 LASALLE 2                                                    4                      23                      2                        16                                                                      21                      0                        21 LIMERICK 1                                                    1                      25                      0                        14                                                                      16                      0                        16 MAINE YANKEE                                                                                                  3                      21                                                                        40                      0                        40 1
                                                                                                            ,, ___            _{                                  __ _                    ____ _                                                            ,___                    __                      ___
IMCGUIRE 1                                                      3                      38                      1                      20                                                                        52                      0                        52 MCGUIRE 2                                                    3                      41                      1                      20                                                                        50                      0                        50 MILLSTONE t                                                  2                      25                      3                      30                                                                        41                      0                        41 MILLSTONE 2                                                  1                      27                      7                      20                                                                        37                      0                        37 MONTICELLO                                                  O                      13                      0                        17                                                                      38                      0                        38 NINE MILE POINT 1                              1              1                      15                      0                      27                                                                        27                      0                        27 NORTH ANNA 1                                  1              0                      34                      4                      27                                                                        36                      0                        36 NORTH ANNA 2                                  1            0                      30                      5                      33                                                                        37                      0                        37 OCONEE 1                                      i              :          8 30                      1                      37                                                                        43                      0                        43 OCONEE 2                                      l              1 l                    34                      1                      41                                                                        46                      0                        46
_                    __ -_ ._____- -                                                      ___ ==-                                _          __
OYSTER CREEK 1                                              0                      31                      3                      33                                                                        53                      0                        53 PALISADES                                                    1                      23                      6                      22                                                                        42                      0                        42 PALD VERDE 1                                                0                      40                      3                        12                                                                      31                      0                        31 PEACH BOTTOM 2                                l              1 1                    27                      1                      34                                  _
38                      0                        38 PEACH BOTTOM 3                                                i                      32                      3                      32                                                                        kb                      0                        kb PILGRIM 1                                                    1                      27                      6                      24                                                                        35                      0                        35 POINT BEACH 1                                                0                      26                      0                      22                                                                        41                      0                        41 IPOINT BEACH 2                                                  0                      22                      0                      22                                                                        35                      0                        35 0                        9                      0                        17                                                                      13                      0                        13 l PRAIRIE ISLAND 1                                                                                  _
PRAIRIE ISLAND 2                                              1                      11                      0                        16                                                          I            15                      0                        15 QUAD CITIES 1                                                0                      16                      0                        13                                                                      33                      0                        33 QUAD CITIES 2                                                0                      19                      0                        17                                                                      34                      0                        34 RANCHO SECO 1                                                1                      34                      6                      41                                                                        45                      0                        45 l ROBINSON 2                                                      0                      21                      3                      34                                                                        37                      0                        37
 
  - _ _              ._  _ _ . . . m.. - _ _      .    .-  -            .-          _ . - . - . _ . _ . _ _ - _ _                            .-    .          -        _            . _ -          ._ -
6 R-1208813-001                            REGULAT0RY                          INF0RMATION                                            TRACKING              SY$ TEM                                                  PAGE: S-3 REPORT DATE: 09/17/85                                    R 0,U T I N E                        LICENSING                                ACTIONS POHER                            REACT 0RS FOR 08/01/85 - 08/31/85 NEW                            COMPLETED ACTIONS        NEW                ACTIONS                    COMPLETED                                                  NUMBER FOR THIS    ACTIONS                FOR THIS                    ACTIONS                                                      OF                NUMBERS REPORTING      TO DATE              REPORTING                    TO DATE                                                  ROUTINE.                    OF              TDTAL FACILITY                PERIOD      IN FY 85                PERIOD                      IN FY 85                                                ACTIONS              HEARINGS              ACTIONS          :
____                                                                          ____ =-- ______ -_-                          - ___= ______            !
l SALEM 1                                3            23                          0                            18                                              39                        0                39 SALEM 2                                2            27                          0                            24                                              36                        0                36 SAN ONOFRE 1                            0            22                          4                            28                                              35                        0                33 SAN ONOFRE 2                            1            30                          0                            34                                              69                        0                69 l SAN ONOFRE 3                            1            31                          0                            34                                              71                        0                71 SEQUOYAH 1                              1              19                        0                            21 1                                            40                        b                40 SEQUOYAH 2                              1              19                        0                            15                                              37                        0                37 SHOREHAM                                0              19                        0                              2                                              19                        0                  19 ST LUCIE 1                              0              14                        0                            14                                              29                        0                29
.                IST LUCIE 2                              1              17                        0                            14                                              38
                                                                                                                                                                                                      ==
0                38 SUMMER 1                                2            28                            1                            28                                              34                        0                34 SURRY 1                                3            24                          2                            24                                              36                        0                36 SURRY 2                                1            20                          3                            21                                              35                        0                35 SUSQUEHANNA 1                          2            46                          0                            56                                              41                        0                41        ,
4                  SUSQUEHANNA 2                          1            21                          0                            26                                              20                        0                20 THREE MILE ISLAND 1                    0            36                          6                            57 I                                            33                        1                34 THREE MILE ISLAND 2                    0                    1                    0                              1                                                0                        0                      0    '
TROJAN                                  1            28                            1                            21                                              39                        0                39 TURKEY POINT 3                          1            27                          0 1                          26                                              26                        3                29 l TURKEY POINT 4                          1            26                          0 l                          26                                              27                        3                30 VERMONi hANKEE t                        0            21                          3                            23                                              38                        0                38 HASHINGTON NUCLEAR 2                    2            34                            1                            23                                              37                        0                37 NATERFORD 3                            4            25                            1                            6                                              32                        0                32
,                  WOLF CREEK 1                            0                    9                    3                            17                                              28                        0                28 YANKEE-ROHE 1                          3            24                          0                            22                                              51                        0                51 ZION 1                                  2            23                          3                            50                                              38                        0                38 4                  ZION 2                                  2            20                          2                            48                                              37                        0                37 GRAND TOTAL              139      2,403                          195                ~2,416                                                    3,344                          9            3,353 2
i i
 
O SECTION IV NUREG-0737 LICENSING ACTIONS
 
TOTRL RCTIVE NUREG-0737 RCTIONS                                          T-1 DIVISION OF LICENSING 3000 I
2500 -
2000 -
1500-1000 -
C                    ~
t 1
l                                        500 -
o          .      .    '.        .      .      .        .    .      .    .    .
OCT NOV DEC JAN FEB MAR RPR MAY JUN JUL RUG SEP TOTAL              904    882  881      854    840'    829  817      785    731  710  693 ACTIONS            904    882  881      854    840      829 ,817        785    731  710  693 HfflR!NGS          00      00    00      00    00      00    00        00    00    00    00
 
NEW NUREG-0737 ACTIONS BY MONTH                          u-1 DIVISION OF LICENSING 300 280 -
260 -
210 -
220-200 -
180 -
160 I
113 -
123-l 100-80 -
60 -
13 -
23 -
0      ,    ,      ,    ,    ,    ,7.          ,        .
OCT NOV OEC JRN FE8 MRR APR NAY JUN JUL AUG SEP NEW fCTIONS    82    02      07  00  01    01    04 00  00  07  01 CtRAATIVE      82    84      91  91  92    93    97 97  97  104 105
 
        - _                      ..            .-.            _    -.        .=_-              .    ._ . -
COMPLETED NUREG-0737 ACTIONS BY MONTH                                    V-1 l                                              DIVISION OF LICENSING 1
600 560-520-
!                    180 -
I
!                    440 -
100 -
360 -
320 -
280 -
l                    243 -
200 -
l                    160 -
120-go _
13 -
0      ,      ,    ,      ,    ,    ,      ,    ,      ,    ,    ,
OCT NOV DEC JRN FEB MRR RPR MRY JUN JUL RUG SEP i
COMPLETED      54      24  08  27      15    12    16    32      54    28    18 CU?*,JLATIVE    54      78  86  113    128  140  156    188  242    270  288
 
  - - - - , - ,      - - , - - - - - .            ,-      t ,,.                -          _                                    -  , _ _ - _                          + - . - .
R-1208812-001                      REGULAT0RY                                INF0RMATION                                        TRACKINO                        SYSTEM                                                            PAGE8 Ef.1 FISCAL YEARS 1985                NUREO-0737                              LICEN$INO                                ACTION $                      BY        M0 NTH                              REPORT DATE: 09/17/85 FACILITY NAME                    E                E            DL                  h                  h            MAIL,            AEfL              MAI                        Rtig      RLX                  AE                  SEPT.
AEKANSAS 1                            11              11          11                    11                11                  11      11                      11                  11            11                10 l              ARKANSAS 2                            12              12          12                    12                12                  12      12                      12                  to            10                10 l              BEAVER VALLEY 1                        11              11          11                    11                11                  11      11                      10                  10            10                10 BIS ROCK POINT 1                      12              11          It                    to                to                  10      to                      10                  to              9              9 BROHNS FERRY 1                        14              13          13                    13                13                  13      13                      13                  13            11                11
                                                                          .                - - - - - - . . - - - _ . _-_ ....                      _          --. ----__                                    _ _ - - - - -. _ = - -      __-            -----
l              BROWNS FERRY 2                        14              13            13                  13                13                  13      13                      13                  13            11                11 BROWNS FERRY 3                        14              13          13                    13                13                  13        13                    13                  13            11                ft BRUNSHICK 1                            10                9              9                  8                    8                8          9                      7                  7              8              8 BRUNSHICK 2                            to                9              9                  8                    8                8          9                      7                  7              8              8 BYRON 1                                  3                3              3                  3                    3                3          3                      3                  3              3                3 CALLARAY 1                              2                2              2                  2                    2                2          2                      2                  2              2                2 CALVERT CLIFFS 1                      13              13            13                  13                12                  12        12                      12                  to          10                to CALVERT CLIFFS 2                      13              13            13                  13                12                  12        12                      12                  10          to                to CATAMBA 1                                4                4              5                  5                    5                5          5                      5                  4            4                4 COOK 1                                13              13            13                  13                12                  12        1I                    to                  10          10                  9 COOK 2                                12              12            12                  12                12                  12        11                    10                  to          10                  9 COOPER STATION                          9                8              9                  9                    9                9          9                      9                  9            9                7 CRYSTAL RIVER 3                        13              13            13                  13                13                  13          13                    13                  13          13                11 DAVIS-BESSE 1                          11              11            11                  11                11                  11          11                    11                  11          to                10 DIABLO CANYON 1                          6                6              6                  6                    6                6          6                      6                  6            6                6 l
l              DIABLO CANYON 2                                                                                                                                                                                                            1 l              DRESDEN 2                              12              12              to                  7                    7                7          7                      7                  7            7                7 DRESDEN 3                              12              12              to                  7                    7                  7        7                      7                  7            7                7 DUANE ARNOLD                          11              to              10                to                    9                  8        8                      8                  7            7                7 FARLEY 1                              11              11              11                11                  11                11          11                    10                  9            9                9 FARLEY 2                              11              11              11                11                  11                11          11                    10                  9            9                9 FITZPATRICK                            10                9              9                  9                    9                  9          9                    9                  9            8                8 FORT CALHOUN 1                        11              11              11                11                  11                11          11                    11                10              8                8 FORT ST VRAIN                          11              11              11                11                  11                to          10                    to                  9            9                8 CINNA                                  12              12              12                12                  12                12          11                    11                to            to              10
                                                                                                                ~            ~
GRAND GULF 1                            5                5            6                  6                    6                  5    ~2~~                      6                  6            6                4 HADDAM NECK                            16                16            16                16                  16                16          16                    15                12            12              12 HATCH 1                                  9                9            9                  8                    7                  7          7                      7                  7            7                7 HATCH 2                                  9                9              9                  8                    7                  7          7                    7                  7            7                7 IZDIAN POINT 2                        12                12            12                  11                  11                11          11                    10                to              9                9 ITDIAN POINT 3                        13                13            12                  12                  12                  2        12                    l1                  11            to              10 13                13            13                  13                  13                13            9                      8                  7              7                7 KEHAUNEE                                                                                                                                                                                                                    8 LA CROSSE                              to                9            9                    9                  8                  8          8                      8                  8              8 LASALLE 1                                3              3            3                    3                  3                  3          3                      2                  2              2                2 LASALLE 2                                2                2            2                    2                  2                  2          2                      1                  1 1                  1
 
R-1208812-001                    REGULAT0RY                          INF0RMATION                                                        TRACKING                                  SYSTEM                                                              PAGE: W-2 FISCAL YEAR: 1985            NUREG-0737                            LICENSING                                            ACTIONS                                      BY        M0 NTH                              REPORT DATE: 09/17/85 FACILITY NAME                OCTm          NOV.            DEC.                    JAN.                FEB.                  MAR.                      APR.                  218 1              JUNE              JULY              fUG.                  SEPT.
MAINE YANKEE                        12                12          12                          12                  12                      12                12                    12                12                  12                  11 MCGUIRE 1                          6                6          6                            6                  5                        5                5                    5                  4                  4                  4 MCGUIRE 2                          11                11          It                          11                  to                      to                to                    10                  8                  8                  8 MILLSTONE 1                        14                13          13                          13                  12                      to                to                      9                  8                  8                  8 MILLSTONE 2                        12                12          12                          12                  12                      12                12                    11                11                  11                  1:
MONTICELLO                          13                12        I2                            to                  io                        9                9                    9                  9                  9                  9 NINE MILE POINT t                  to                9          9                            8                    7                        7                7                    7                  7                  7                  7 NORTH ANNA 1                      13                to        10                            10                to                      to                    9                    9                  8                  8                  7 NORTH ANNA 2                      12                10        10                            10                10                      10                    9                    9                  8                  8                  7 OCONEE 1                          12                12        12                            12                12                      12                  12                    12                  9                  7                  7 OCONEE 2                          12                12        12                            12                12                      12                  12                    12                  9                  7                  7 OCONEE 3                          13                13        13                            13                13                    13                  13                    13                to                    8                  8 OYSTER CREEK 1                    12                12        12                            11                11                    11                  11                    11                10                  to                  9 PALISADES                          13                13          13                            12                12                    12                  12                    11                11                    9                  9 PEACH BOTTOM 2                      9                9          9                            9                  8                        8                8                      8                  8                  8                  7 PEACH BbfkOM 3                      9                9          9                            9                  8                        k                k                      k                  k                  k                  7 PILGRIM t                          15                14          14                            14                15                    14                  14                    12                to                  10                  10 POINT BEACH 1                      12                12          12                            11                11                    11                  11                    11                to                  10                  10 POINT BEACH 2                      12                12          12                            11                11                    11                  11                    11                to                  10                  10 PCAIRIE ISLAND 1                  11                11          11                            11                11                    11                  11                    11                10                    9                  9
                                                                                                                                        ------._                            _ . _ _              .__-----------.. __                                      =--
PRAIRIE ISLAND 2                    11                11          11                            11                11                    11                  11                    11                to                    9                  9 QUAD CITIES 1                      13                11          11                            9                  9                        9                7                      6                6                  6                  6 QUAD CITIES 2                      11                  9          9                            7                  7                        7                7                      7                6                  6                  6 RANCHO SECO 1                      11                11          to                            to                10                    to                  10                    to                10                  to                10 ROBINSON 2                          14                14          14                          14                  14                    14                  14                    13                13                  11                  11 SALEM 1                            11                11          18                          11                  11                    11                  11                    11                10                  to                to SALEM 2                            10                to          to                          to                  10                    to                  to                    10                10                  to                  10 SAN ONOFRE I                        13                13          13                          13                  13                    13                  13                    12                12                  12                12 SAN ONOFRE 2                          5                5          5                            5                  5                        5                5                      5                  5                  5                  5 SAN ONOFRE 3                          5                5          5                            5                  5                        5                5                      5                5                    5                  5 SEQUOYAH t                          10                10          10                          10                  10                          9                9                      8                7                  6                  6 SEQUOYAH 2                          13                13          13                        13                    13                    12                  11                    11                10                  9                  9 SHOREHAM                                                2          3                            3                  3                        3                3                      3                  3                  3                  3 ST LUCIE 1                          11                11          11                        11                    11                    11                  11                    11                  7                  7                  7 ST LUCIE 2                            4                4          4                            4                  4                        4                4                      4                2                  3                  3 SUMMER 1                              7                7          7                            7                  7                        7                7                      7                5                  5                  5 SURRY 1                            10                10          10                        10                    10                  10                    10                      8                8                  8                  8
              $URRY 2                            10                10          10                        10                    10                  10                    10                      8                8                  8                  8 SUSQUEHANNA 1                        6                6          6                            6                  6                        6                5                      5                5                  6                  6 SUSQUEHANNA 2                        4                4          4                            4                  4                        4                4                      4                4                  4                  4
 
    - . _ . . . .        . . . . . _ .  -. .. ..            - . _ .        . -          . . . . - . . . .-.- - . . - . . _ - - - . .                                                              . ~ . - , - - _ - , - . - _ _ . -                                      . _ - - _ _ . .      .
k R-1208812-001                                    REGULAT0RY                                INF0RMATION                                                        TRACKING                          SYSTEM                                                                          PAGE: W-3
. FISCAL YEAR: 1985                              NUREG-0737                              LICENSINO                                                    ACTIONS                            BY    M0 NTH                                    REPORT DATE: 09/t7/85 FACILITY NAME                                  E                NOV.          DEC.                  JAN                    El                        MAR.                    Elk      HM                            JUNE          JULY                AUG.                        SEPT.  !
THREE MILE ISLAND 1                              10                  to            10                      10                      10                      to                      8            8                                8              7                  7 TROJAN                                            to                  10            11                      11                      11                      11                    11          11                                10        to                    10 TURKEY POINT 3                                    11                11              11                      10                      to                        9                    9            7                                7              7                  7 TURKEY POINT 4                                    11                  11            18                      to                      10                        9                    9              7                              7              7                  7
!  VERMONT YANKEE 1                                  12                  11            18                      to                      10                        9                    9              9                              9              9                  9 i
  ! HASHINGTON NUCLEAR 2                              3                  3              3                        3                    3                        3                    3              3                              3              3                  3
;  HATERFORD 3                                                                                                                                                                                                                                        2                  2 i  WOLF CREEK 1                                                                                                                                                    1                    1              1                              1              2                  2                          i YANKEE-ROHE 1                                    12                  12            11                      to                      10                      to                    to            to                              10        to                      9                          1 ZICM t                                            12                  12            12                      12                      11                      18                    11            11                              to        to                    to
                                                      - ._                                    . - - _ _ _          _ _ _ - _            _ _ - _ .            ...... ..-                    .......                        .                            _._                    _=
ZION 2                                            11                  11            11                      11                    to                      to                    10            10                                9              9                  9
                                                                                                                                                                                                                                                                                                      )
l                  GRAND TOTAL                      904              882            881                    854                      840                      829                    817        785                            731          710                693 1                                                                    ==. _
_          =                                . _ . - -        -_ ......_= _                                  .__                    .__ _ - _ _ - - _ . __.... ...
s
)
I i
 
R- 1208813-0 01                                    REGULAT0RY                                                  INF0RMATION                                          TRACKING                                SYSTEM                                                    PAGE: X-1 REPORT DATE: 09/17/85                                                            NUREG-0737                                        LICENSINO                                ACTIONS POHER                    REACT 0RS FOR 08/01/85 - 08/31/85 NEH                                                COHPLETED                                                                                                                l ACTIONS                            NEW                    ACTIONS                  COMPLETED                                                                NUMBER FOR THIS                        ACTIONS                    FOR THIS                  ACTIONS                                                                    OF                  NUMBERS l                                      REPORTING                        TO DATE                  REPORTING                    TO DATE                                                              ROUTINE                          OF                TOTAL l          FACILITY                      PERIOD                          IN FY 85                    PERIOD                    IN FY 85                                                              ACTIONS                  HEARINGS                ACTIONS
: ARKANSAS 1                                                0 l                      1                          1                      2                                                                      10                          0                to ARKANSAS 2                                                0                        1                          0                      3                                                                      10                          0                10 BEAVER VALLEY 1                                          0                        1                          0                      2                                                                      10                          0                to BIG ROCK POINT 1                                          0                        1                          0                      4                                                                        9                        0                  9 BROHNS FERRY 1                                            0                        1                          0                      3                                                                      11                          0                11
        -                  ___        _          _                      ......-----_                      --------------                    _=---------------- __                                    ..-------__-
                                                                                                                                                                                                          .                                    __        =__-_ -------
lBROHNS FERRY 2                                                0                        1                          0                      3                                                                      11                          0                11 BROHNS FERRY 3                                            0                        1                          0                      3                                                                      11                          0                11 BRUNSHICK 1                                              0                      3                          0                      4                                                                        8                        0                  8 BRUNSHICK 2                                              0                      3                          0                      4                                                                        8                        0                  8 BYRON 1                                                  0                      0                          0
                                                                                                                                -=-
1          0 l                      _-- __---------------------------------===
3                        0                  3
                -            _ -_  .--==_                          ..----------------__                                                        _ -- _
CALVERT CLIFFS 1                                          0                        1 1                        0                      4                                                                      10                          0                10 CALVERT CLIFFS 2                                          0                        1                          0                      4                                                        l            10                          0                to CATAWBA 1                                                0                        1                          0                        1 l              4                        0                  4 COOK 1                                                    0                        1                          1                      4                                                        I              9                        0                  9
                                                                                                      -------- _____ __                              _----_                _ - _ = = _              _ - _ - - .
COOK 2                          1                        0 1                    2                          1 l                    4 I                                                                      9                        0                  9 COOPER STATION                  l                        0                      2                          2      1                3                                                                        7                        0                  7 CRYSTAL RIVER 3                                          0                        1                          2      1                2                                                                      11                          0                  11 DAVIS-BESSE 1                                            0                        1                          0      1                3                                                                      10                          0                  10 DIABLO CANYON 1                                          0                        1                          0      1                0                                                                        6                        0                  6
[DkABLOCANh0N2                                                  1                      1 1                        0                      0                                                                        $                                            1 DRESDEN 2                                                0                        1                          0                      8                                                                        7                        0                  7 DRESDEN 3                                                0                        1                          0                      8                                                                        7                        0                  7 DUANE ARNOLD                                              0                        1                          0                      5                                                                        7                        0                  7 I (FARLEY 1                                                    0                        1                          0                      4                                                                        9                        0                  9 l FARLEY 2                                                  0                        1                          0                      4                                                                        9                        0                  9 FITZPATRICK                                              O                        1                          0                      3                                                                        8                        0                  3 FORT CALHOUN 1                                            0                        1                          0                      4                                                                        8                        0                  8 FORT ST VRAIN                                            O                        1                          1                      3                                                                      8                        0                  8 GINNA                                                    0                        1                          0                      2                                                                      to                        0                  to I HADDAM NECK                      l                        0                        1                          0                        4                                                                      12                        0                  12 HATCH 1                                                  0                        1                          0                        3                                                                      7                        0                  7 HATCH 2                                                  0                        1                          0                        3                                                                      7                        0                  7 l INDIAN POINT 2                                            0                        1                          0                        4                                                                      9                        0                  9
 
R-1208813-001                                                                      REGULAT0RY                                  INF0RHATION                                  TRACKING                            SYSTEM                                          PAGE: X-2 REPORT DATEt 09/17/85                                                                                NUREG-0737                                  LICENSINO                            ACTIONS POHER                    REACT 0RS FOR 08/01/85 - 08/31/85 NEW                                  COHPLETED I ACTIONS                      NEH              ACTIONS              C0t"PLETED                                                      HUHBER FOR THIS                ACTIONS              FOR THIS              ACTIONS                                                          OF              NUHBERS REPORTING                        TO DATE            REPORTING                10 DATE                                                        ROUTINE                OF                TOTAL FACILITY                        PERIOD                  IN FY 85            PERIOD                  IN FY 85
          .l--                                    _ - - - - - - = - - = - - - - ___ ---------------------------------------------- _
ACTIONS          HEARINGS Al,!I9NS KEHAUNEE                                                                  O                            1                0                    6                                                            7                    0                  7 LA CROSSE                                                                  O                            1                0                    3                                                            8                    0 LASALLE t                                                                                                                                                                                                                                            8 0                          0                0                      1                                                          2                    0 ILASALLE 2                                                                        0 2
0                0 1                    1                                                            1                  0                  t MCGUIRE 1                                                                    0                          0                0                    2                                                            4                    0 MCGUIRE 2                                                                    0 4
0                0 1                  3                                                            8                    0                  8 MILLSTONE t                                                                  0                            1 0 l                  7                                                            8                    0                  8 MILLSTONE 2                                                                  0                            1                0 1                  1                                                          11                    0                11
___==_ --- -------- _-_ ____==- - - - - - - - - - - - - - - - - - = = -                                                    --_------------------------------....----------
NINE MILE POINT 1                                                            0                          1                0                    4                                                            7                    0                  7 NORTH ANNA 1                                        1                      0                          1                1                    6                                                            7                    0                  7 NORTH ANNA 2                                        1                      0                          1                1                    5                                                            7                    0                  7 l    0CONEE 1                                            1                      0                            1                0                    5                                                            7                    0                  7
____- _ __-__-- _                              - _ . _            = - - - - - -                    _ _
OCONEE 2                                            l                      0 l                          1                0 1                  5                                                            7                    0                  7 OCONEE 3                                            l                      0                            1                0 1                  5                                                            8                    0                  8 OYSTER CREEK 1                                      1                      0                          2                  1                    6                                                            9                    0                  9 PALISADES                                            I                      O                            1                0                    5                                                            9                    0                  9 PALO VERDE 1                                        1                      0                            t                1                    1                                                            0                    0                  0
___ =- _-_---=--
PEACH BOTTOM 2                                                                0                            t                t l                  4                                                            7                    0                  7 PEACH BOTTOM 3                                                                0                          1                  1 1                  4                                                            7                    0                  7 PILGRIM 1                                                                    0                          2                  0 1                  7                                                            to                    0                10 POINT BEACH 1                                                                0                          1                0 l                  2                                                            to                    0                10 (POINT BEACH 2                                                                      0                          1                0 l                  2                                                            10                    0                10
      -------- = __==_                                                _______ __                            .---------                              -----------------------------------
PRAIRIE ISLAND 1                                                              0                          1                0                    3                                                            9                    0                  9 PRAIRIE ISLAND 2                                                              0                          1                0                    3                                                            9                    0                  9 QUAD CITIES 1                                                                0                          1                0                    8                                                            6                    0                  6 IQUAD CITIES 2                                                                      0                          1                0 l                  6                                                            6                    0                  6 l RANCHO SECO 1                                            1                      0                          1                0 1                  3                                                          to                    0                to
      ----------=.                                          __=__                __-
ROBINSON 2                                            1                      0                          1                0                    3 I                                                        tt                    0                11 SALEM 1                                                '
0                          1                0                    2                                                          10                    0                to SALEM 2                                                                      0                          1                0                    1                                                          to                    0                  10 SAN ONOFRE 1                                                                  0                          1                0                    1                                                          12                    0                  12 l SAN ONOFRE 2 0
1                0 1 0                                                            5                  0                  5
 
R-1208813-001                                  REGULAT0RY                        INF0RHATI0N                          TRACKING                      SYSTEM                                                    PAGE: X-3 REPORT DATE: 09/17/85                                      NUREG-0737                        LICENSING                      ACTIONS POHER            REACT 0RS FOR 08/01/85 - 08/31/85
      ---- _                              _ _---- --------------------------------------- .                            __-----=-_ .-___                                    == __ ------------- -----
l    NEH                            COMPLETED                      I l ACTIONS              NEW            ACTIONS        COMPLETED                                                    NUMBER I FOR THIS          ACTIONS          FOR THIS        ACTIONS                                                        OF                  NUMBERS l REPORTING        TO DATE          REPORTING        TO DATE                                                  ROUTINE                      OF              TOTAL l          FACILITY                l PERIOD            IN FY 85 i PERIOD                  IN FY 85                                                  ACTIONS                  HEARINGS            ACTIONS
      -_= -___.
SAN ONCFRE 3                                0 1              1                0              0                                                                5                    0                    5 SEQUOYAH 1                                  0                1                0              4                                                                6                    0                    6 SEQUOYAH 2                                  0                1                0              4                                                                9                    0                  9 SHOREHAM                                    0    .          3                0              0                                                                3                    0                  3 ST LUCIE 1                                  0 1              1                0              5                                                                7                    0                  7
                                                                                                                                --- ---=-              - _ _ - = _ = _                        ===__              ------
            ---  . -----_ __                  _ -_ ___ ----------= __--_ =-------------- . -
0 1              2                0              3                                                                  3                    0                    3 IST LUCIE 2                        1 0              3                                                                  5                    0                    5 SUMMER 1                                    0 l              1 8                    0                    8
            $URRY 1                                    0  l              1                0              3 SURRY 2                                    0  l              1                0              3                                                                  8                    0                    8
          .SUSQUEHANNA 1                              0  l-_            2                0              1 ------
1 __----                                                    6                    0                  6
                                                                ==------------------- _
                                                                                                                                          . .===_=_ __-------------.----
1 1              0              0                                                                  4                    0                    4 ISUSQUEHANNA 2                                0  l                                                                                                                7                    0                  7 0                                  0              3 lTHREE MILE ISLAND 1                                            1 0              2                                                                10                      0                10 ITROJAN                                        O                1 0                1                0              4                                                                  7                    0                  7 0                                  0              4                                                                  7                    0                  7 ITURKEYPOINT3 TURKEY POINT 4                  1                            1 0                                  0              5                                                                  9                    0                  9 IVERMONT YAtlKEE 1                                                1 0                                                                  3                    0                  3 HASHINGTON NUCLEAR 2                      0                2                0 0                2                0              0                                                                  2                      0                  2 HATERFORD 3                                                                                                                                                    2                      0                  2 HOLF CREEK 1                              0                2                0              0 0                                                3                                                                  9                      0                  9
          , YANKEE-RONE 1                    1                            1                1
                                                                                                              -- _=---          .---=                ----------=____                                --=_        __----
1 1            0              2                                                                  9                      0                  9 ZION 2                                    0 I                I GRAND TOTAL                    1 l          105 l              18 1          288                                                            693                          0              693 i                  ___
                                                                                                                                                                        -_. ____-                .__ _=----------
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE Y-1 i                                  ISSUED TO                      TECHNL                                TECHNICL                  TECHNL    LICENSEE NRC DEVELPMT OPERATG PRE / POST REVIEW                    ORDERS      SUBMTTLS REVIEW            SER        SPECS    SCHEDULE COMPLTN COMPLTD REACTORS IMPLMNTN ORGNTZN                    ilSSUED  (RECEIVED COMPLETE ISSUED                    ISSUED  CODE        SCHEDULE COMPLETE II.A.1.1.1          lY          lY              l POST        lDL        165(65) 165(65) 165(65) 165(65) 165(65) lA                                110/81        65(65) i ISTA ON DUTY        l          l              l            l          l            l            l            l          l        l          l                          l II.A.1.1.3          lY          lY                    POST        LQB        65(65)      65(65)        65(65)      65(65)      65(65)    B          06/82      65(65) l ISTATRAINED PER LL CAT B                I 1(F-01)                        l I.A.1.1.4          Y      lY                    POST        LQB        65(65)      65(65)        65(65)        NA        NA        B          06/82      65(65))
ISTALONGTERM                    l l PROGRAM                      l II.A.1.2            lY            Y            l POST          DL          65(65)      65(65)        65(65)        65(65)      NA        A          05/80      65(65)      1 l SHIFT SUPERVSRl l DUTIES
.....___.__...      .I......___.........................___..________                          ..... .......__ ............................................
II.A.1.3.1          lY          lY              IPOST            IE        65(65)  165(G5)          65(65)        65(65)      NA        B          12/81      65(65) l LIMIT OVERTIMEl              l                l                                    l l(F-01)            I          i              l                                      i lI.A.1.3.2              Y      lY              l POST          LQB        NE        '65165)          65(65) 165;65) 165(65)            D          09/84      65(65) l MIN SHIFT CREW                l                l                                                                l          l l(F _..._....___........___..__....____..........
l                l                                                                l          l
___-02)                                                                ...........___..__.. ..____........ ..........___........____ ...__........
lI.A.2.1.1        lY          lY              l POST      lOLB        lNE          INA          165(65) lNA                INA      lB        l03/80    165(65) l l                        l            l              l            l          l        l          l          l              l ISRO EXPERIENCEl                l                            l                                                                                                -........_
II.A.2.1.2          lY        lY              IPOST        lOLB        lNE          lNA            l65(65) lNA              INA      18        103/80    165(65) !
l          l            l            l            l          l        l          l          l              l lSRO    BE RO 1 YRI            l              l II.A.2.1.3          lY          lY              l POST          OLB      lNE          INA          165(65)          NA          NA        B        03/80      65(65) l3 MO TRAINING 1                I                l                        l            l            l lON    SHIFT        l          l              l                        l            l            l II.A.2.1.4          lY              Y                PO;T      OLB        65(65)        65(65)        65(65)        65(65)      NA        D        09/83      65(65)
MODIFY TN        l
: PROGRAM          l                              l llF-03)              l                          I l FACILITY CERTIl              l                l            l                        l            l            l          l II.A.2.3          IY          lY              '
POST    lOLB          NE          NA          165(65)        NA          NA        B          03/80      65(65) l INSTR COMPLETE                                            l                                      1 l                                      l ISRO TRAINING ________ .._______________..__________........____ ....__________...._...____ . _________...______..________.
l LICENSEE SCHEDULE CODE KEYS: A- STLL                                                        OTHER KEYS: XX(XX)- NO. COMPLETE (TOTAL NO. TO BE COMPLETED)
B- THROUGH 6/30/81 EXCLUDING STLL                                    Y- COMPLETE C- 6/30/81 TO 03/01/82                                              NA- NOT APPLICABLE D- AFTER 03/01/82                                                  NE. NO ENTRY E- SUPPLEMENT 1                                                    TBD- TO BE DETERMINED
 
_ _ . __-                    .      _ - -                  -            ~            _    -                    . - .                            . _ - .
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE Y-2 IISSUED l l To            i                TECHNL                                              TECHNICL                            TECHNL            LICENSEE NRC DEVELPMTIOPERATG l PRE / POST REVIEW                        ORDERS          SUBMTTLS REVIEW                      SER            SPECS              SCHEDULE COMPLTN COMPLTD l REACTORS                          ORGNTZN          ISSUED          RECEIVED COMPLETE ISSUED                              ISSUED            CODE            SCHEDULE COMPLETE
  ....-----_______________.........IIMPLMNTN                              ..............--.................-.......-_______.........                              ......__._-.__....--.-- _-._---
II.A 3.1.1                              lY            lY              lOLB            NA              NE              NA                65(65)              NA              NA                B                03/80            65(65)
ISCOPE OF                              l            l              l l LICENSING EXAMI                                    I                I II.A.3.1.2                              lY          lY              INA            IOLB            INE              lNA              l65(65) lNA                        lNA                lB              l03/a0          165(65)            l
  .............--......--------.....l..__.-.-i l PASSING GRADE l                                    i                                                l                i
                                                                                          -------------_------....---.--------------...I......---l-----....I........1 i                  I l
l SIMULATOR EXAMI                                    i                i                                                                                                                        l II.C.1.1                                lY          IV              l POST        IRSB            lNA              l65(65) l65(65)                      l65(65)        lNA                lA              l05/80              65(65)
ISB LOCA PROCEDI
  .. ...                        __.----...........I...--..-I -.......----_-------.........------------_------.-_--......------....--
I              i                i                I                  I              l                  l l
II.C.I.2A                              lY          lY              IPRE            PTB          165(65)            65(65)            65(65)              65(65)          NA              lB              112/81              65(65)
IICC GUIDELINESI                                    i                l                              1                                                                                          l                l l            l                l                              l                                                                                          l                l
  .l          .(..--..............--._------....---.
F -04 )                                  ..--...------_------_---.......---...-..-------_-..-___.---_---...---.__---...----...
lICC PROCEDURESI                                      e                I                                                                                                                                          l l(F-04)
    .....--.---....-.----.............l    l            I l
l II.C.1.3A                                lY          BY              l PRE            RSB          l65(65)            65(65)            65(65)              65(65)          NA                B                09/82            65(65) l TRANSIENT /ACC l                                    1                I                              l l GUIDELINES                            l            l                l                              l l(F-05)                                  l            l                l                              l ITRANS/ACCIDENTI                                                                                                        l IPROCEDURES                            I                              I              I                                i 1(F-05)
  .---_--............._....I              i                . ..__....I                  I              l                1 I
I.C.2                          lY            lY              IPOST          lDL                65(65)          65(65)            65(65)              65(65)          NA                A                05/80            65(65)
ISHIFT/ RELIEFl                                      l              l              l l TURNOVER PROCD                                                      l              l
  ._--......--___.1........1                                -__ ..................------_.._------.........--_-__.... - . --....--_-_--........-- .... .. _____
I.C.3                          lY            lY              IPOST          IDL            l65(65)          l65(65) 185(65)                      165(65)        INA                lA              l05/80            165(65) I I                  i
  .ISHIFTSUPRESPl........__.....--____..i.----...l....___-l---......I.....____I                                                                                                  1 l                l                l                l I.C.4                          lY            lY              IPOST          lDL            185(65) l65(65) 165(65) 165(65) lNA                                                        lA              105/80            165(65) 1 J  ICONTRMACCESSI                                        l              l              l              l                l                l                  l              l                  l                l                l l
II.C.5                                    Y          lY              IPOST            IE              65(65)          NA                65(65)            165(65)          NA                B                12/81            65(65)
FEEDSACK OF                                    l              l                                                                                      l l              l                                                                                      l
  .IOPERATG
          ...----_-_-___..........--..          EXPERC Y            Y              POST          IE              65(65)          NA                64(65)              64(65)          NA                C                09/83            64(65)
II.C.6 PERF OF OPERTG l ACTIVITIES
 
STATUS OF MUREG-0737 REQUIREMENTS SCHEDULE                                                                                Y-3 l                    I            IISSUED                          i l                    l            l TO                                TECHNL                                TECHNICL                      TECHNL          LICENSEE NRC l                    IDEVELPMTIOPERATG PRE / POST REVIEW                          ORDERS      SUBMTTLS REVIEW                SER          SPECS            SCHEDULE COMPLTN i                    ICOMPLTD l REACTORS                                ORGNTZN  .1SSUED      RECEIVED . COMPLETE ISSUED                  ISSUED          CODE        SCHEDULE COMPLETE
,    ..___..__.______.          _________.... __lIMPLMNTN___..____.____......________ .______._______.........__...._____________..___...____..____
II.D.1 NE          NE            NE              IHFEB/LLL 0(65)            1(65)          0(65)          0(65)        NA              E          TBD              Ol65)
ICONTROL ROOM                                                        l l DESIGN REVIEW                                                      l l(F-08)                l                        1                  l l
II.D.2.1                lNE        lNE          INE                IHFEB/LLLl0(65)        I O(65)        l 0(65)        l Ot65) lNA                  lE          ITBD          I 0(65) l            l                  l          l          l              l              l            l                l          l              l
_ISPDS        DESCRIPTNl II.D.2.2              lNE        INE          lNE                lHFEB/LLLINE            l 0(65) l 0(65)                    0(65)          0(65)          E          TBD              Ot65)
ISPDS INSTALLEDI                  i            l                  l          l          l              l l(F-09)                I          l            l                  l          l          l              l l  ___........________.....___ .___..________._________...._____________.___. ___.___......_.............._____...... _______..
III.B.1.1              lY          lY            l POST            lRSB/LLL NE            l65(65)          65(65) 165(65)                NA              C          09/83          65(65) lRCS VENT DESGNl                  l            l                  l                      l                              l ltF-10)                l          l            l                  l          l          l                              l III.B.1.2              lY              Y        IPRE                  RSB/LLL NE          165(65)          65(65)          65(65)        37(65)          D          09/84          37(65) lRCS VENT INSTLI                                l                                          l l(F-10)                i                        l                                          l lRSB/LLL NE            165(65)          65(65) l65(65)            '
NA              D        109/83            65(65)
III.B.1.3              IY          lY          IPRE lRCS VENT PROCD                    l            l                  l                      l                              l                                          l l(F-10)                            l            l                  l                      l                              l                                          l III.B.2.1              lY              Y          l POST            'OL/ EGG      65(65) 165(65) 165(65) 165(65) INA                                        A        l05/80            65(65)
ISHIELDG REVIEWI                                I                                        l              l              l              l                          l ItF 11)
___                    l
_ ______ .._______..______......i              .  .... ___...____._________.l___......l.._______l__                        ......l.      ________________l__.......... ____.
III.B.2.2              lY          lY            l POST            lRAB/  EGG    65(65) 165(65)            64(65)          64(65)    lNA                  C          09/84          64(65) lSHIELDG MODS l                    l            l                  l                      l                                            l                                                        ;
l(F-11)                l          l            l                  l                      l l
III.B.2.3              lY          lY            IPOST              IEQB/FRC INE              65(65) 165(65) INA                          NA            ID          09/83          65(65)
IEQUIP QUAL            l          l            l                  l          t                          l              l                              l l          l            l                  l          l                          l
___...________.......____......._...._____......._____ . .____.. _____. _.____1._..._________..__l______ ...______.ll___
l(B-60)                                                                                                                                                                                    .....
III.B.3.1              lY          IV            IPOST                DL      165(65) 165(65)              65(65)          65(65)        NA            IA          05/80        165(65) lACC SAMP INTERI                  l            l                              l          l                                                            l                          l l SYSTEM              l          l            l                            l            l                                                            l                          l III B.3.2              lY          lY            l POST                                    165(65] l42(65) 42165) 115(65) I C                                        09/84          15(65)
IUPGRADE ACC            l          l            l                  lETB/INELl65(65) l          l              l ISAMP                  l          l            l                  l          l          l              l l(F 12)                l          l            l                  1          l          l              l LICENSEE SCHEDULE CODE MEYS: A- STLL                                                            OTHER KEYS: XX(XX)- NO. COMPLETE (TOTAL NO. TO BE COMPLETED)
B- THROUGH 6/30/81 EXCLUDING STLL                                            Y- COMPLETE i                                                                                                                          NA- NOT APPLICABLE C- 6/30/81 TO 03/01/82                                                  NE- NO ENTRY                                                                    !
D- AFTER 03/01/87 E- SUPPLEMENT 1                                                        TBD- TO BE DETERMINED i
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
                              ._____________...______________..______________........__.___....___..___.______.._____....__________...___.___..___Y___4__
TO                          TECHNL                                          TECHNICL                    TECHNL    LICENSEE NRC DEVELPMT OPERATG PRE / POST PEVIEW                                        ORDERS            SU8MTTLS REVIEW              SER      SPECS    SCHEDULE COMPLTN lCOMPLTD REACTORS IMPLMNTNIORGMTZN                                          ISSUED            RECEIVED COMPLETE ISSUED              ISSUED    CODE      SCHEDULE COMPLETE 1I1.8.4                        lY                lY                    POST            OLB                65(65)            65(65)    65(65)              65(65)  NA        C        09/83      65(65) lTRG PROG                      l                l l CORE DAM                    i                l l                l                                    l
                              .i _t__...._________..________...___________.........._.._______...
F -13 ]                                                                                _________________._____............____...__... ___........
III.D.I.1                        Y              lY                    POST            DL/ EGG 165(65)                      65(65)    65(65)              65(65)  NA        A        05/80      65(65)
RV/SV TEST                                    I i                              PROGRAM                                        l (F-14)                      l                l l
                                'II.D.I.2A                    lY                lY                  IPOST              MEB/ EGG          NE                24(24) 124(24)                NA      NA        C        07/82      24(24)
TEST PROGRAM i                                I                    l COMP. BWR'S                  I                l                    l (F 14)                      l                l l              l                  l l          l III.D.I.2A*                    lY Y                IPOST              ME8/ EGG INE                      140(40)      40(40)              NA    INA        C        09/83    140(40)
TEST PROGRAM i                                                    l                                    l                l ICOMP.PWR*S                  l                                      l                                    1                I 1(F-14)                      l                                      l                                    l                l          l iij ?6Ti!j ?g!~~ ~ j y ~~~ ~ ~ ~~ ~y ~~ ~ ~ ~ ~ ~ ~ ~'[ ~ ~ ~ ~ ~ {s6sfi66~ ~j 6[i6i"~ ij6ii6i'~ i"6{ j 6} ~ ~ ~ ~6ij6j '~ ~ni- ~ ~ ~ ~ ~ ~6~ ~ ~ ~ ~ ~ ~ ~69 fij ~ ~ ~ ~ ~6ij 6i'~ ~
,                              IPLANT SPEC                  I                                                      l                                    l lRPTS. PWR'S                  l                                                      l                                    l l(F-14)                      {                                      l                l l
II.D.1.28 IPSPECRPT,BWR1 lY              lY                    IPRE                EQB            124(24) 124(24)              120(24)              20(24) INA        D        09/84      20(24) l                    l                                  l                1          l                            l l(F-14)                        l                l                    l                                  l l          l                            l l                                                      l                  l                                                                                                  l IBKVALVE TESTING                      l                                                      l                  i                                                                                                  l l(F-14)                        I                  ,
1                  I I                                                                    i III.D.3.1                      lY              [Y                    IPOST          lDL                    65(65) 165(65)              65(65)          l65(65)    65(65) lA          09/81      65(65) I tvALVE PCS                    l              l                      l              l                                    l                              l                  l
.                            IIMDIC INSTL                  i              l                      l              l                                    1                              I                  i III.D.3.3                      lY              lY                    IPOST          IEQB/FRC INE                              65(65)  165(65)              NA        NA      :D          09/83      65(65) l VALVE POS                    l              l                      l              l                  l                            l IENVIR QUAL                  I                l                      l              l                  l                            l l(8                          i                I                      l              l                  l                            l
                            .. _-60)  _____..._________.__          ....._________...............__.__..._..__._________...___..___......... ___.._____.. ._....._____.
lAFS EVAL                    l                l                                      l                  l                l l(F-15)                      l                I
                                                                                              ~ '
l                i                  l                l l                            iiiIkIIIEIII~"ih"""'ih lAFS INIT                      l                4 PRb        ~fbL ~~fkbfkbf l                  l kbfkbf    kbfkbf              kbfkbf  kbfkbf fk l
bk/85      kbfkbf~
l CONT GRADE                  l                l                    l                l                  l                                                                    l l(F 16 i
__.3...___...l...____..t ________.________.......________________            l                  l                l                              l l
i
 
  . _ _ _ _ .                            _      - _ _ . _ .          _ . - . _.._..__ _ --                        __ _ ___ __ _ - _ _          _ __ _. m              .___          .-_- .          _ -              .-_ _                  -
STATUS OF NUREG-0737 REQUIREMENTS' SCHEDULE Y- s' l                                                      ISSUED i                                                        TO                              TECHNL                                      TECHNICL                        TECHNL            LICENSEE NRC l                              DEVELPMT OPERATG                          PRE / POST REVIEW          ORDERS                SUBMTTLS REVIEW                SER          SPECS            SCHEDULE COMPLTN l                            ,COMPLTD                REACTORS IMPLMNTN ORGNTZN                        ISSUED                RECEIVEDlCOMPLETE ISSUED                    ISSUED          CODE              SCHEDULE COMPLETE l        iiiIbIIIbI55b"~h~~~~~~~'i~~~~~~~iPbkh                                                      kbhb  ~~kbfkbh ~ kbfkbh ' kbfkbf~ ~kbfkbf ~hhfkbf                                            b~ ~              b9hkh        'h5fkbh~~~
,          RAFS INIT (SAFE GRADE l          l{F-16)                    l                    l
                                                                                                        ~ ~
l          iiiIbIiI555I'~ih~~~~~~'IE~~~'~~~~Pbbi"~~~bL                                                            kbfkb~kkbfkbh                    kbfkbi~            kbfkbi      kbkkbi            k~          ~~bh/8k~"kbfkbi~
l lAFS FLOW                  l                    l l          l CONT GRADE                i                    I ilF-1T)                    l                    l                                  l                                                                                                                  l l
III.E.1.2.2.8              lY                    lY                      POST        IICSB      140(40)                  40(40)    40(40l          140(40)          29(40)          C                09/83          29(40) lAFS FLOW                  l                    l                                    l                                                                l l SAFE GRADE                I                    I                                    I                                                                l l(F-17) i                    I
                                                                      .....I                      I                                                                I
!          I E ME RG PWR                l l          [FOR HEATERS                I l
:          III.E.4.1.1                      Y                lY                  : PRE          lDL        185(65)                  65(65)    65(65)              65(65)        NA              A                05/80          65(65) l            lDED H2                                          l                                  l lPENET DESIGN                                    I                                  l                                                                                                                                                    i f(F-18)                                          l                    l              1 i            III.E.4.1.2                lY                    lY                      POST          CSS      lNE                      65(65) 165(65) 165(65)                      NA              C                12/81          65(65) l            IDED H2                    I                                                                    l                                l                  l lPENET INSTALL l                                                                                  l                                l                  l l(F-18)                      I
            -------...-----.-------.---..-----                    .....                          ----------.l........---------I                    ..... -----.. .
I
                                                                                                                                                                                -I.-...------              ...-----.-------.--...--
lII.E.4.2.1-4              lY                    BY                  l POST            DL      165(65)                  65(65)    65(65)              65165)    165(65)            A                09/81          65(45)
IDIVERSE                    I                      l                                              l lISO SIG                    i                    i                                              I l(F-19)                      l                    I                                  l          l                    l III.E.4.2.5A                lY                    lY                  IPRE            CSB/LLL      65(65)              165(65) '65(65)                  65(65)    INA                B              109/81          65(65) l CONT PRESS                l                    l                    l                                                l                                          l lSETPT                      I                    l                    l                                                l                                          l l<                                                                                                                                    l        l                                l                l
((F-19)                    l                    l                    l                                                                                                                        "              ~
iiiIiIiI2I5b'~~ii'~~~~'~~i'~~~~~~IPbbk~                                                  bkB)LLL      kbkibi~              kbi5bi    5bkkbi~ibkib) ikbk5bi~~b                                          ~b9/hh          ~kbikbi ~
ICONT PRESS                1                                          l                                                                                              l l MODIFY                    l                    l                    1                                                                                              l I                    i                    l              i                                                                l            I
            .f(F-19)
LICENSEE SCHEDULE CODE KEYS: A- STLL                                                                                          OTHER KEYS: XX(XX)- NO. OOMPLETE(TOTAL NO. TO BE COMPLETED)
B- THROUGH 6/30/81 F'CLUDING STLL                                                      Y- COMPLETE C- 6/30/81 TO 03/01,.e.                                                              NA. NOT APPLICABLE D- AFTER 03/01/82                                                                    NE- NO ENTRY E- SUPPLEMENT 1                            ,
TBD- TO BE DETERMINED
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
        ..........___......_____......._______................__-........._______..___........_______..____...-__......._____Y..6_...
I                                                  IISSUED I                                                  l TO                                    TECHNL                          TECHNICL            TECHNL          LICENSEE NRC DEVELPMTIOPERATG PRE / POST REVIEW                                        ORDERS    SUBMTTLS REVIEW        SER      SPECS            SCHEDULE COMPLTN l                          ICOMPLTD l REACTORS IMPLMNTN ORGNTZN                                        ISSUED    RECEIVED COMPLETElISSUED        ISSUED          CODE          SCHEDU                  COMPLETE
        ...-.___... __.... ___ ...........--......................__..............__,.. __________ .........__.....                                                                            __..LE..__ .......
III.E.4.2.5                lY                        lY                            POST    CSB/LLL 65(65)        65(65)    60(65)      60(65)  NA              C              09/83                    60(65)              '
l CONT PURGE              l                                                                                                                                                                                                    '
IVALVES                    I l(F 19)                    l                                                                                    l
      ..____.............__--..._____........._......___.......___-..____.................._______....._..l..........__.--_..
Y III.E.4.2.7 RAD SIG Y                          IPOST    CSB/LLL    65(65)    65(65)    N63(65)      63(65)  30(65)          C              09/83                    30(65)              '
J IONPURGEVAL l(F.19)                                                                                              I
      ...........-__ ..._______.__......___.__ .....................-___.......__..........._-.._--.....                                                                        ..-_-__t ____.... -_. --___
III.F.1.1 l NOBLE GAS Y                        Y                        IPOST      ETSB/
INEL 65(65)    65(65) 165(65) 165(65) 24(65) C                                09/84                    24(65) l I          l                                                                                        r IMONITOR                                                                                                                    l          !
l(F-20)                    i                                                                                                1          l III.F.1.2                    Y                        Y                          POST    ETS8/      65(65)    65(65)    65(65)      65(65)  18(65)          C              09/84                    18(65)
IODINE /PART                                                                            INEL MONITOR (F                    l                        l                                    l i
3    .__-21) .--......    ........................__........--_.. -_ .... ...-__.._ -___..---..........--___.-____ -_-__-__. --_.... ____                                                                                              .
III.F.1.3                  lY                        lY                            POST    ETSB/    165(65) 165(65) 165(65) 165(65)              21(65)          C              09/83                  21(65)
ICONT HI-RANGE I                                                                            INEL    l                    l          l
^
l MONITOR                  I                                                                          l                    l          l 1.(F-22)                    l                                                    i        l          l                    l          l
;      'II.F.1.4                lY                        lY                        IPOST        CSB/LLL 65(65) 165(65)            65[65)      65(65)  24(65)          C              09/83                  24(65)
CONT PRESS              l                                                    l                              l l  MONITCR                I                                                    !                              l
;    l(F-23)                    l                                                                                    l II.F.1.5              lY                          Y                          POST      CSB/LLL 65(65)        65(65)    65(65)      65(65)  25(65)          C            109/83                  25(65)
ICONTH2O                  l                                                                                                                                                      l l LEVEL                    1                                                                                                                                                      l l(F-24)                    l                                                                                                                                      I              I                                        l III.F.1.6                      Y                        Y                          POST      CSB/        65(65)    65(65)    65(65)      65(65)  27(65) .C                      09/83              '27(65)
CONT                                                                                      LLL HYDROGEN (F-251                                                                      l                    l ISue COOL                                            l                          l        l                                                                                                                                      ,
IMETER                    I                        l                          l        l          l III.F.2.3                  lY                          Y                          POST      CPB-    107(65) -165(65) 1 5(65) I 5(65) I 1(65)                      D              09/84                            1(65)
I          l          l          l        l IINSTRUMENTATNI (F-26)                l                                                                          I          l          l          l        I v
                                      .                                            .                                      .n.,                                                            -        -- --- - __- _ _ ___
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
                                  ....._____..-__...........___...._..___..........____..___........._______._________.......__.....__..__.-___....._Y___9__._
l                              l                    ???UED                                                                                                            1                      1 l                                                          TO                      TECHNL                                  TECHNICL                        TECHNL 4 LICENSEE NRC l                                  DEVELPMT OPERATG PRE / POST REVIEW                          ORDERS        SUBMTTLS REVIEW                SER            SPECS        l SCHEDULE COMPLTN RECEIVED COMPLETE ISSUED                      ISSUED    l CODE          SCHEDULE COMPLETE
                                  .l ____...., ..'............ _............______........._______..........
_                  COMPLTD REACTORS IMPLMNTN ORGNTZN                          ISSUED l UPGRADE POWER I                                    l lPONV, LVL INST l                                    l                                                                    l lY                  IV                IPOST    lDL        INA          l65(65) 165(65) l65(65) INA                                  18        106/81      l65(65)      l III.K.1 IE BULLETINS l l                l        l          l            l            l                1              l l          l          l            l l UPGRADE AFW                              ._____...._____......l                ...______.... _. ...____... ___...... __. ______..___l________.l._____
l FEMA ON ICS                  I                  l                  l        l                                                                      1
                                                                                                                                                                                                                                                  '4 l(F
                                    .._-27)                          l                  l                  l        l          :
l SAFE GRADE                                                          I I                                    TRIP                                                                l (F-28).___-_.__.
                                    .....                                .......__-...._-_I___............__....___                      ...__-...__..--.._____-_____.......... ___.________..............
OPER TNG &
DRILLING (F-29)                                            l                                      i            I II.K.2.13A                      Y                lY                IPOST      RSB/LLL 07(07)              7(07]        7(07) I 7(07)                    7(07)        C        '09/84          7(07) idERM MECH                                        l RPT B&W                                            l (F-30)                                            l III.K.2.138                    lY                    Y              l POST    RSB/LLL NE                33(33)        33(33)          33(33)          33(33)        C        '09/84        33(33)
THERM MECH                    I                                    l RPT CE&W                      l                                      i u(F-301                        l                                      l III.K.2 14                      lY                    Y              IPOST    RRAB        07(07)        7(07)        7(07]            7(07)          NA            B        106/82      1 7(07)
ILIFT FREQ                      l                                                                                                                                                              l lPORV &SV                      i                                                                                                                                                              i l(F ___..........._..                                                                                                                                                                          l
___-31) l l                                  l                                              l                                      l ISLUG FLOW                      I III.K.2.16                        Y                  lY                  POST    RSB/ EGG 07(07)            7(07)        7(07)            7(07)          NA            B          12/81          7(07)
RCP SEAL                                          l DAMAGE                                            I (F-32)
_________..                                          l LICENSEE SCHEDULE CODE KEYS: A- STLL                                                                          OTHER KEYS: XX(XX)- NO. COMPLETE (TOTAL NO. TO BE COMPLETED)
B- THROUGH 6/30/81 EXCLUDING STLL                                      Y- COMPLETE C- 6/30/81 TO 03/01/82                                                NA- NOT APPLICABLE D- AFTER 03/01/82                                                    NE. NO ENTRY E- SUPPLEMENT 1                                                    TBD- TO BE DETERMINED
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
                  ...._____....______________......._______......________..__................___..__...........___.._____.....______..__Y..8...
TO                          TECHNL                                          TECHNICL            TECHNL    LICENSEE NRC DEVELPMT OPERATG      PRE / POST REVIEW              ORDERS          SUBMTTLS REVIEW            SER      SPECS      SCHEDULE COMPLTN COMPLTD REACTORS IMPLMNTN ORGNTZN ISSUED                              RECEIVED COMPLETE ISSUED            ISSUED    CODE      SCHEDULE COMPLETE II.K.2.17                            Y      Y          IPOST            RSB            07(07)          40(40)          40(40)    40(40)  NA        C        09/84    40(40)
VOIDING IN                                              l RCS                                                      I (F-33)
                  ....__..............__..__..______i____..........____..__.                                            _______.......____...!.......___.......____.....___......____.__...
SEQ AFS FLOW (F-34)B&W II.K.2.19B                          Y        Y            POST            RSB            NE              33(33) ' 33(33)            33(33)                        07/81    33(33)
NA        C SEQ AFS-FLOW, Ci&W (F-34)                                                                                                  l SYS RESP TO SB LOCA (F-35)                                                                                                                                                            I PORV ISOL                                                                l                              l              l (F.36)                                                                  l                              I              I l
EPT PORV FAILURES (F-37)
I III.K.3.3                            Y      lY            POST            RRAB          65(65)        165(65)          65(65)    65(65)  37(65)    C        09/83    37(65) l RPT SV & RV                                                                                              i FAILURES                                                                                                l (F 38)                                                                                                  I RCP AUTO TRIP DESIGN (F.39)
II.K.3.5B                                                  PRE            RSB            NE              40(40)        l40(40)      40(40)  NA                  09/82    40(40)
Y        Y                                                                                                            C RCP AUTO TRIP MODIFY (F-39)
II.K.3.9                          Y        Y            POST          IIE/DL          25(25)        125(25)        125(25)      25(25)  NA      IB          09/81    25(25)
PID CONTROLLER                                                          1                              1              I                              I (F-40)                                                                  l                              i              l l
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE Y- 9 ISSUED TO                        TECHNL                                        TECHNICL              TECHNL  LICENSEE NRC DEVELPMT OPERATG            PRE / POST REVIEW              ORDERS        SUBMTTLS REVIEW              SER        SPECS    SCHEDULE COMPLTN COMPLTD        REACTORS IMPLMNTN ORGNTZN                  ISSUED        RECEIVED COMPLETE ISSUED                ISSUED  CODE      SCHEDULE COMPLETE II.K.3.10                    Y              Y            PRE            ICSB          NE            25(25) 125(25)              25(25) '  NA      B          06/82    25(25)
ANTICIP TRIP                                                                                                          l (F.41)                                                                                                                l II.K.3.11                    Y              Y            POST            RSB            NA            NA              65(65)      NA        NA      B          09/81    65(65)
USE OF CERTAIN PORV II.K.3.12                    Y Y            POST          IICSB            25(25)          25(25)          25(25)      25(25) *lNA        C        (09/81    25(25)
ANTIC TRIP ON TT (F-42)
I II.K.3.13A              '
Y Y            POST            RSB            17(17)          17(17)          17(17)      17(17)    NA      B          10/81    17(17)
HPCI/RCIC INIT LEV DESIGN (F-43)
II.K.3.13B                lY Y            POST          IICSB            NE              17(17)          17(17) l17(17)          8(17)  C          09/83    8(17)
HPCI/RCIC                l                                                                                                        l MODS                      l                                                                                                      l (F-43)                    i                                                                                                      i ISO COND MODS (F-44)
II.K.3.15                    Y              Y            POST            RSB            19(19)          19(19)          19(19)      19(19)      17(19)  C          09/83    17(19)
ISO OF HPCI/RCIC (F-45)                                                                I
:II.K.3.16A                  Y              Y            POST            RRAB/FRC 24(24)                24(24)          24(24)      24(24)      NA      B        '09/83    24(24)
RV FAIL REPORT (F-46)
II.K.3.16B                  Y              Y            PRE            RSB/FRC NE                    24(24)            1(24)      1(24)      O(24)  D          09/83    0(24)
RV FAIL MODS (F-46)                    i                                                                                                                                                          i EiCEA5EE'5dEE6UE5'E66E~KEE5I~ '~5iEL~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~Y-~COMPLETE                                              ~ ~ bib 5 R Kk h 5I~ E ki k k} _ ~hb5 "EbkP[kik i kbik[~ kb B- THROUGH 6/30/81 EXCLUDING STLL C- 6/30/81 TO 03/01/82                                                      NA-  NOT  APPLICABLE D- AFTER 03/01/82                                                            NE- NO ENTRY E- SUPPLEMENT 1                                                            TBD- TO BE DETERMINED
 
_ _ _ _ _ _ _ _ _ _ _          .-              -                                .                      _.                  -        . _ _  . -                  .- =              - -          _.
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
              ......___________.___......_______________..____..________...____........__.__....____........________________...___Y_.lO ISSUED TO                      TECHNL                                        TECHNICL                          TECHNL LICENSEE NRC DEVELPMT OPERATG                PRE / POST REVIEW                  ORDERS        SUBMTTLS REVIEW      SER                  SPECS  SCHEDULE COMPLTN COMPLTD        REACTORS IMPLMNTN ORGNTZN ISSUED                                  RECEIVED COMPLETE ISSUED                    ISSUED COD        SCHEDULE CDMPLETE
            .. __.._________________ _______...._________________                                              .....____..__________________..______________E_.._________..______....
II.K.3.17        Y              Y              POST          RRAB/FRC 65(65)                    85(65)    65(65)      65(85)
ECCS OUTAGE NA    C          09/83          65(65)
REPORT l(F-47)
            . II.K.3.18A ADS ACT STUDY Y              Y              POST          RSB                  24(24)        24(24)    24(24)      24(24)                NA    B          04/82          24(24)
(F-48)
II.K.3.188 Y              Y              POST          ICSB/RSB 24(24)                    24(24)    24(24)      24(24)                24(24) D          09/84          24(24]
ADS ACT DESIGN (F
___-48)      ____.__________________....______......                    __ _...____.__________...___________.........____________________..___...________
II.K.3.18C        Y              Y              PRE            ICSB/RSS NE                        24(24)    12(24)      12(24)                2(24)
ACS ACT MODS D          '09/84        l 2(24)
(F                                                                                                                                                                                I
___-48)____.__.._______.......__..                    _____....... _____...........___________________________.. ____________________..._i                                                    _________
INTERLOCK RECIRC (F
___-49)                                                                                        H LOSS SVC WATER                                                                        l                        l AT BRP                                                                                  l                        l II.K.3.21A        Y              Y              POST          RSB/ EGG 24(24)                      24(24)    24(24)      24(24)                NA                09/82 RESTART LPCI/
B                          24(24)
CSS DESIGN (F-50)
II.K.3.218        Y            lY              INE              ICSB/ EGG NE                        24(24)) 24(24)) 24(24)) NA                          C          09/83          24(241 RESTART LPCI/                      I CSS MODS (F-50)
II.K.3.22A          Y              Y              POST          IE                    17(17)        NA        17(17)      17(17)                NA    B          08/81          17(17)
RCIC SUCT PROCEDURES (F-51)                                          I RCIC SUCTION MODS (F-51)
III.K.3.24                  Y              Y              POST          RSB                    19(19)        19(19) l19(19)        19(19)                NA    C          09/83          19(19)
SPACE COOLING FOR RCIC/HPCI (F-52)
                                        , , _  _s      %w. w            ,    r,.    -- , . , , -                    _r                  e        * - - - - - - -                        _ _ . __        _ _ _ _ _ _ _ _ _
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE Y-il ISSUED TO                  TECHNL                                  TECHNICL                  TECHNL            LICENSEE NRC DEVELPMT OPERATG          PRE / POST REVIEW          ORDERS        SUBMTTLS REVIEW          SER        SPECS              SCHEDULE COMPLTN ISSUED        RECEIVED COMPLETE ISSUED              ISSUED            CODE                                SCHEDULE COMPLETE
                    '.COMPLTD REACTORS IMPLMNTN ORGNTZN III.K.3.25A            Y            Y          POST        RSB          NE            24(24)      24(24)      24(24)      NA                C                              112/81                          24(24)
PUMP SEAL                                                                                                                                                                        l STUDY                                                                                                                                                                            I l
(F-53)(BWR)
II.K.3.25A              Y          Y          POST          RSB          NE            33(33)      33(33)      33(33)      NA                C                                    06/82                    33(33)
PUMP SEAL STUDY (CE&W)
(F
___-53)_____.__....._________I___________            .________.__________________..... _____________.___________________..__________________
II.K.3.25B              Y          Y          PRE          IE          NE            24(24)      24(24)      24(24)      NA                D                                      09/83                    24(24)
PUMP SEAL MODS (BWR)
(F 53)
II.K.3.25B            Y          Y          PRE          IE          NE          '33(33)      30(33)      30(33)      NA                D                                      09/83                    29(33)
PUMP SEAL MODS (CE&W)
.(F-53)
.....____ .. ______________ ....___ ... _________.. ___.____.I.. ...______________________.._________________________________
II.K.3.27              Y          Y          POST          ORB 2        24(24)      24(24)      24(24) 124(24)            24(24)          C                                      01/82                  24(24)
COMMON REF.
LEVEL (F 54)
II.K.3.28              Y          iY          POST        EQB          NE          21(21)        10(21)      10(21)        O(21)            C                                      09/83                    0(21)
QUAL OF ADF ACC (F-55) .
I PERF OF ISO COND (F 56)
II.K.3.30A              Y          Y          POST        IRSB          65(65)        65(65)      65(65)      NA          NA                B                                        04/81                  65(65)
SB LOCA SCHEDULE (F 57)
II.K.3.308 Y          Y          PRE          RSB/ EGG 0(65)            65(65)      24(65)      24(65)      NA                D                                        09/84                24(65)
SB LOCA METHOD
..(F-57)
LICENSEE SCHEDULE CODE KEYS: A- STLL                                                        OTHER KEYS: XX(XX)- NO COMPLETE (TOTAL NO. TO BE COMPLETED)
B- THROUGH 6/30/81 EXCLUDING STLL                                  Y- COMPLETE C- 6/30/81 TO 03/01/82                                            NA- NOT APPLICABLE D- AFTER 03/01/82                                                NE- NO ENTRY E- SUPPLEMENT 1                    #                          TBD- TO BE DETERMINED
 
1 STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
_......________.______..___________.....__________.........__...____________..___.....__........___...__________.Y.__IA...                                  .
ISSUED TO                    TECHNL                          TECHNICL        TECHNL  LICENSEE NRC DEVELPMT OPERATG PRE / POST REVIEW                          ORDERS    SUBMTTLS REVIEW  SER    SPECS    SCHEDULE COMPLTN COMPLTD              REACTORS IMPLMNTN ORGNTZN              ISSUED  RECEIVED COMPLETE ISSUED ISSUED  CODE        SCHEDULE COMPLETE II.K.3.31          Y                    Y        PRE            RSB          0(65)      22(65)  22(65)  22(65) 22(65)
SB LOCA PUA D            09/84    122(65)
I (F-58)
  ......__.__..._______.... ___.....__.__________._________..___..__...___._________.__....__..                              ___...........____...l_________
II.K.3.44          Y                    Y        POST          RSB          24(24)    24(24)  22(24)  22(24) NA                    09/82 TRANS W/ SINGLE C                      22(24)
FAILURE (F-59)
II.K.3.45          Y                    Y        POST          RSB/ EGG 24(24)          24(24)  24(24)  24(24) NA      C            09/83      24(24)
MANUAL DEPRESS (F-60)
II.K.3.46          Y                    Y        POST          RSS          NE        24(24)  24(24)  24(24) NA      B            08/81      24(24)
MICHELSON CONCERNS (F-61 II.K.3.57          Y                    Y          POST          RSB          NE        24(24)  24(24)  NA    NA      B            TBD      124(24)
MAN ACT OF ADS                                                                                                                                    q (F-62)                                                                                                                                            l III.A.1.1          Y                      lY        POST          DL            65(65)    65(65)  65(65)  65(65) NA      A            05/80      65(65)
IEMERGPLAN                              I ISHORT TERM-                            l III.A.1.2.1        Y                    Y          POST        DL            65(65) 165(65)      65(65)  65(65) NA      A            05/80      65(65)
INTERIM                                                                                  i FACILITIES                                                                              l DESIGN UPGRD FACIL (F-63,64)
III.A.2.1          Y                    Y        ' POST          IE            NE        65(65)  64(65)  64(65) NA      D            TBD        64(65)
UPGRADE EMER PLAN (F-67) 4 III.A.2.2          Y                    Y        POST          IE            0(65)      O(65)    0(65)    O(65)  0(65)  E            09/84      0(65) I METEOROLOGICAL DATA (F-68)                                {
III.D.1.1          Y                    Y        POST          DL            65(65)    65(65)  65(65)  65(65) NA      A            09/81      65(65)
PRIMARY COOLANT LEAK
 
STATUS OF NUREG-0737 REQUIREMENTS SCHEDULE
                                  .________..___________.__......_______________._____....______.________..__..______.________.......________..........__.....                          Y-13 ISSUED                                                                    l TO                    TECHNL                                                        TECHNL LICENSEE NRC DEVELPMT OPERATG TECHNICLl PRE / POST REVIEW        ORDERS      SUBMTTLS REVIEW                      SPECS  SCHEDULE COMPLTN COMPLTD      REACTORS IMPLMNTN ORGNTZN ISSUED                  RECEIVED COMPLETE              lSER ISSUED CODE ISSUED                    SCHEDULE COMPLETE III.D.3.3.1        Y            Y            POST        DL          65(65)      65(65)        65(65) ' 65(65)      NA    A          05/80    65(65)
I DETECT SHORT TERM III.D 3.3.2        Y            Y            POST        IE/INEL 65(65)            65(65)        65(65)      65(65)  NA    B          03/82    65(65)
I DETECT UPGRADE (F-69)
III.D.3.4.1        Y            Y            POST        AEB/PNL 65(65)            65(65)        65(65)      65(65)  NA    B        109/83    65(65)
CR HABIT                                                                                                                                l REVIEW.
(F-70)
IIII.D.3.4.2        Y            Y            POST        AEB/PNL 65(65)            65(65)        60(65)      60(65)  21(65) D          09/83    21(65)
CR HABIT MOOS iF-70)
 
R-1214303-001                                                                                                                      l'I LICENSING            ACTION      TRACKING          SYSTEM NRR      IMPLFMENTATION                REVIEW COMPLETION            STATUS LICENSEE                                  SUBMITTALS                      SER                      TECH SPEC SCHEDULE        NUMBER OF                  RECEIVED                      ISSUED                      ISSUED        ACTIONS CODE              ACTIONS      S ACTIONS # COMPLETEQ      8 ACTIONS 9 COMPL U LQ      # ACTIONS S COMPLETED COMPLETED A                  1,240          1,240        1,240          1,240        1,240            395          395  1,240 B                  1,430            893          893            821          821            72          72  1,430 C                  1,933          1,803        1,803          1,804        1,757            863          437  1,886 D                    948            948          905            818          546            397          172    676 E                    455            455            1            455            0            195            0        0 TOTALS      6,006          5,339        4,842          5,138          4,364          1,922        1,076  5,231 LICENSEE SCHEDULE CODE KEYS: A- STLL B- THROUGH 6/30/81 EXCLUDING STLL C- 6/30/81 TO 03/01/82 D- AFTER 03/01/82 E- SUPPLEMENT 1
 
M O
H U
W M
E    E O    W CL    3 W    O E    A W    >=
Z    CD
  >  W E    D Z  W    Z O    O
  .O.
  -  ac' L --e H  Z  O &
O  <    U W  E    <
M C    C W    Z M    M Z    M W    Z O    W Z    U O    M U    -J d
I i
l s
l i
l
 
          , _ - - - _ ~ - -                -.- . ..- -          - - -      -                .-        -.-.          - .  - -              -      -            .
C-1208687-001                    REGULAT0RY            INF0RHATION                    TRACKING          SYSTEM                            PAGE NO.        1 C0NDENSED          MANAGEMENT                REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ARKANSAS 1 PLANT LOCATIONt 6 MI HNH OF RUSSELLVILLE, AR          LICENSED POWER: 2568 MHT                      PROJECT MANAGER: G. VISSING DOCKET NUMBER: 050-00313                              DESIGN PONER:      0850 MHE                    BRANCH CHIEF:            J. STOLZ ARCH / ENGINEER: BECH                                  NSSS VENDOR:      B8H                        LIC. ASSISTANT: R. INGRAM IE INSPECTORS.        H. JOHNSON RAI                          SE TAC    MPA        RAI      RESPONSE            TER      INPUT      LIC Ac!
TITLE                                                                HUMBER      HQ.        RALE        DATE              Dalk        DATE      _,011E_
CDCM ACTIVE ISSUES MMMM NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                      M45923 F-63                                                              09/15/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                    M45994    F-64                                                          09/15/05 HUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                  M46066    F-65                                                          09/15/d5 1: IN FURTHERANCE CERTIFICATE FOR POLLUTION CONTROL BONDS          M59414                                                                    09/19.-85 T.S. FOR OPERABILITY OF PORV                                        M43595                N/A                                                09/3rs/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46282 F-68                                                              09/30/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR        M53112    B-81                                                          09/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53650    B-86                                                          09/30/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53816    B-88                                                          09/30/85 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX        M53899    B-89                                                          09/30/8S 1 - RESPONSE TO 50.54F LETTER - RCP SEAL ISSUE                    M56530                                                                    09/30/85 1 - REVISED ENVIRORMENTAL TECH. SPEC. (APPENDIX B)                M12374                                                                    10/01/85 REVIEH CONTAINMENT LEAKAGE RATE TEST REPORT                        M57278                                                                    10/01/85 STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS          M58043 C-16                    06/14/85                                  11/01/85 REVIEH OF APPENDIX R REANALYSIS                                    M55669                                                                    11/30/85 SECOND 10 YR INSERVICE INSPECTION PROGRAM                          M55783              05/01/85- 05/30/85                                    11/30/85 REACTOR COOLANT PUMP TRIP                                          M49699    G-01                                                          12/30/85 II.B.3 PROBLEMS CONCERNING BORON & CHLORIDES                      M57141                        08/30/85                                  12/30/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH              M52978    B-79                03/30/85                                  01/30/86
,                        ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED        M53059    B-80                                                          01/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -      M56100    F-71                08/14/85          09/14/85                01/30/86 SECOND 10 YEAR PUMP & VALVE IST PROGRAM                            M57110                                                                    01/30/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53567    B-85                                                          01/31/86 RV AND SV TESTING                                                  M44560    F-14                05/07/85C                                  02/28/86 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL-83-43)                M55696    A-18                                                          02/28/86 ITEM 4.( - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES        M53952    B-91                                  03/30/86                04/30/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)            042842 F-05        08/30/85 .                    07/30/85                05/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG            M51069 A-17        03/13/85  05/13/85                                  05/30/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            Mi1219 F-09                                                              07/15/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52816 B-77                                                              10/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53960 3-93        03/11/85C                                            10/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53733 B-87                                                              12/31/86 NUREG-J737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION      M45112 F-26                                                              01/30/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54043    B-92                                                          01/31/87 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                  M48144    F-58                08/31/86                                  03/31/87 DDD COMPLETED ISSUES MMM I.D 1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN -      M51359    F-08                11/25/83C                                10/10/84C
_ _ _ _                                                                                                                            - - = -                                    --
 
  - - _ ~ _                _      _.    . _                . _ , . _ _ .            . __ - . _ . _ .        ._      _ _. __          __ _      _ . . .      __      _ _ _ _ __  _
R-1208687-001                  REGULAT0RY                      INF0RMATION                        TRACKINO              SY* TEM                          PAGE NO.        2 C0NDENSED                        MANAGEMENT                    REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ARKANSAS 1-RAI                        SE TAC          MPA        RAI          RESPONSE        TER      INPUT        LIC ACT TITLE                                                                            NUMBER            &        DAlf,          DATE          DME          DATE            DATE 000 COMPLETED ISSUES MMM        (CONTINUATION)
,            CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)                        M07971          C-10  04/09/84        08/31/84                                10/11/84C        "
MECHANICAL SNUBBERS-                                                            M11266          B-22                    06/15/84C                              10/15/84C HVDRAULIC SNUBBERS                                            -
Mil 267          B-17                    06/15/84C                              10/15/84C OTSG TUBE SLEEVING PROGRAM AND TECH. SPEC. CHANGE '
M55572                                                                          11/08/84C OTSG TUBE SURVEILLANCE TECH. SPEC. CHANGE                                        M55573                                                                          11/08/84C ENUIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                        M42514 B-60                              06/01/84C                              12/03/84C TECHNICAL SPECIFICATION FOR EFH SYSTEM                                          M55793                                                                          12/20/84C
              ' REL9AD FOR CYCLE 7                                                            M56024                                                                          12/20/84C TECH. SPEC. CHANGE RELATION TO HYDROTEST OF SECONDARY SYSTEM                    M56030                                                                          12/20/84C INSTRUMENTATION CHANGE FOR FPRESSURIZER LEVEL                                    M56052                                                                          12/20/84C        ,
REUIEW OF 10 YEAR TENDON SURVEILLANCE REPORT                                    M55519                                                                          12/28/84C HASTE GAS H/0 LIMITS T.S. CHANGE                                                M43164                  02/01/84        07/05/84                                01/14/85C i            1 TECH. SPEC. FOR OVERPRESSURE PROTECTION                                      M54483                                  07/15/84                                01/30/85C 2            RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1 .                      M54380                                  01/06/84                              01/31/85C        ,
!            TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                      M54514 B-83                              07/06/84                              Ot/31/85C 1 TS CHANGES RELATED TO KEY LOCK SHITCHES FOR PURGE VALVES                      M51584                  05/03/83                                                03/18/85C 1 - UPPER CORE BARREL BOLT REPLACEMENT, CYCLE 7                                M56338                                                                          03/27/85C II.B.3 METHOD OF ESTIMATING CORE DAMAGE                                          M57124                                                                          04/10/85C 1 - ISI RELIEF REQUEST FOR RCP INSPECTION                                        M56340                                                                          04/15/85C 1 REVIEH EFH ISSUE OPEN ITEMS GL-9 8 GL-2                                        MS3259                  05/17/84        06/22/84                                04/30/85C 1,  ISI RELIEF REQUEST FOR RCP INSPECTION TO NEXT REFUELING                    M56593                                                                          06/04/85C CONYROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                        M52206          C-15                                                          06/28/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                  M52897          B-78                                                          07/10/85C NATURAL CIRCULATION COOLDOHN (GENERIC LTR 81-21),                                M47181          B-66                    09/01/84                              07/11/85C 10CFR50.62 OPERATING REACTOR REVIENS                                            M59068          A-20                                                          07/13/85C 1: CONFIRMING ORDERS FOR SUPP. 1 TO NUREG-0737                                  M59048                                                                          07/19/85C TECH SPEC FOR APSR POSITION LIMITS.                                              M57123                                                                          07/25/85C YTEM l.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                              M52735 B-76            03/25/85                                                08/06/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                            M55836 .D-19                                                                    08/06/65C OTSG SLEEVED TUBE INSPECTION                                                    M56553                                                                          08/14e85C
';          * - SALP FOR PERIOD 7/1/84 - 6/30/85                                            M57579                                                                          08/29/85C NUREG-0737 II.K.3.30, SB LOCA DUTLINE                                            M45803 F-57            07/03/85        08/20/85                              08/30/85C 1 - BOUNDING ANALYSIS OF NUREG 0630 MODEL HITH FLECSET                          M53310                                                05/31/85                09/09/85C i
1 I
l
 
R-1308687-001                    REGULAT0RY        INF0RMATION              TRACKING          SYSTEM                      PAGE NO. 3 C0NDENSED          MANAGEMENT            REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ARKANSAS 2 PLANT LOCATION: 6 MI HNH OF RUSSELLVILLE, AR      LICENSED P0HER: 2815 MHT                  PROJECT MANAGER: R. LEE DOCKET NUMBER: 050-00368                          DESIGN POWER:    0912 MHE                BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: BECH                              NSSS VENDOR:    COMB                    LIC. ASSISTANT: P. KREUTZER IE INSPECTOR:      H. JOHNSON RAI                    SE TAC    MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                            NUMBER    &        DAIE        DATE      DAIE        DATE        DATE MMDR ACTIVE ISSUES MMMM as IN FURTHERANCE CERTIFICATE FOR POLLUTION CCNTROL BONDS        M59415                                                          09/10/85 NUREG 0737, II.K.3.25 POWER ON PUMP SEALS                        M48442 F-53                                                    09/30/85 2, REACTOR COOLANT PUMP SEAL INTEGRITY                          M55474        05/30/85    12/10/84C    N/A                    09/30/85 TECH. SPEC. CHANGE PERTAINING TO CHEMICAL ADDITION SYSTEM        M56877                                                          09/30/85 RV AND SV TESTING                                                M44561  F-14  12/18/84C 05/07/85C                            10/30/85 20 TSCR, CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT          M57202                                                          10/30/85 2,  DELETION OF APPENDIX B TECH SPEC                            M57538                                                          10/30/85 2 - 1985 SALP                                                    M57914                                                          10/30/85 EVALUA1 ION OF PROBLEMS RELATED TO BORON AND CHLORIDE            M57253                    08/30/85                              11/30/85 TSCR-SPENT FUEL HANDLING AREA VENTILATION                        M57107                                                          12/30/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS      M58044  C-16            06/14/85                              12/30/85 2: CYCLE 5 SHOULDER GAP EVALUATION                              M59436                                                          03/20/86 REVIEH OF APPENDIX R REANALYSIS                                  M55668                                                          04/01/86 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55697  A-18                                                  04/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                  M45924  F-63                                                  06/30/86 NUREG-0737 III.A.I.2, OPERATIONAL SUPPORT CENTER                M45995 F-64                                                    06/30/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY              M46067  F-65                                                  06/30/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                M46283 F-68                                                    06/30/86 REACTOR COOLANT PUMP TRIP                                        M49676  G-01            05/04/84C                            06/30/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                  M52898  B-78              11/05/83C                            06/30/86 ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR    M53113  B-81  11/19/84C                                      06/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M53651  B-86  04/24/85C 07/26/85C                              06/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT 1ESTING PROCEDURES AND          M53734  B-87              11/05/83C                            06/30/86 ITEM 3.2.3 - POST-MAINT TESTING                                  M53817  B-88              11/05/83C                            06/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX      M53900  B-89  04/24/85C 07/26/85C                              06/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -    M56101  F-71            05/05/86    06/05/86                08/30/86 FIRE PROTECTION-LICENSE CONDITION RESOLUTION                    M12083        03/30/85  06/30/85      N/A                    09/30/86 PROCEDURES GENERATION PACKAGE REVIEH (HUREG 0737 SUPP/t)        M44281  F-05                          11/30/85                09/30/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M52817  B-77  04/24/85C 07/26/85C                              09/30/86 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED      M53060  B-80              11/05/83C                            09/30/86 10CFR50.62 OPERATING REACTOR REVIEHS                            M59069  A-20                                                  09/30/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51220  F-09  08/07/85C 04/15/83C                              10/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M53961  B-95  04/24/85C tt/05/83C                              10/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG          M51070  A-17  04/30/85C 07/01/85C                              11/30/86 ITEM 3.f.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH            M52979  B-79              11/ 05/ 83C                          11/30/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION    M45113  F-26  07/12/84    08/30/84C    N/A                    01/31/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE        M54044  B-92              It/05/83C                            01/31/87 DM UNSCHEDULED ISSUES MM
                      '2 : TECH. SPEC. CHANGE REQUEST RELATED TO CPC                  M59640
 
    - _ _ _ - _ _ _ _ _ _ - _ - - - _ - - - - _ - ..-                                      - -..                .--              -          . - _ . .    . . - . . - - .                    _ _ -. . . - .                  ~ - -.      -.
                                                                                                                                                                                                                                              ')
R-1208687-001                                                              REGULAT0RY        INF0RMATION. TRACKING                                                  SYSTEM                                    PAGE NO.        4 C0NDENSED                            MANAGEMENT              REP 0RT                                        RUN DATE: 09/17/85 (HEADQUARTERS)
                                                                              ^
FACILITY: ARKANSAS 2 RAI                      SE TAC  MPA          RAI              RESPONSE          TER    INPUT                  LIC ACT TITLE                                                                                                                      NUMBER  &          RAIf.                DATE          PAIf,      DATE                __p(Jf,..
  -MM UNSCHEDULED: ISSUES MM                                              (CONTINUATION)
MMM COMPLETED ISSUES MMM I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN -                                                              M5tt40  F-08                          05/02/84C          N/A                              10/tO/84C CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)                                                                  M12946  C-10 03/06/84C 08/31/84                  09/24/84C                              10/11/84C 2, TECH SPEC CHANGE REQUESTS FOR REMOTE SHUTDOHN PANEL                                                                    M52635      08/01/84                09/15/84          N/A                              10/29/84C 4    "NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 82-16 OR                                                                      M49723 B-72                          03/16/84C          N/A                              10/30/84C 2 - LEAK TESTING OF SEALED RADI0 ACTIVE SOURCES                                                                            M52383    .
11/09/83C 05/24/84C                        N/A                              11/19/84C j  MISC. CHANGES TO FIRE PROTECTION T.S.                                                                                      M12542  B-41                                            N/A                              tt/23/84C              "
i  ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                                                  M42496  B-60 04/26/84C 07/15/84C                                                          11/27/84C 4    APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                                                                                N08159  A-02                          10/01/78C 05/01/84C                                12/14/84C VERFICATION OF CECOR                                                                                                        M55628                                                                                    01/ 08/85C DIESEL GENERATOR RELIABILITY TECH SPECS. (GL 84-15)                                                                        M55837  D-19                          01/ 09/8 5C                                        Ot/09/85C HASTE GAS H/0 LIMITS T.S. CHANGE                                                                                            M43165      12/05/83C 07/11/84C                        N/A                              01/14/85C 1
SURVEILLANCE FOR HYDRAULIC SNUBBERS (B-17)                                                                                  M12069  B-17                        05/19/84C          N/A                              01/29/85C T.S. SURVEILLANCE MECHANICAL SNUBBERS (B-22) (B-22)                                                                        M12070  B-22                        05/19/84C          N/A                              01/29/85C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                                                    M54381      06/11/84C 08/22/84C                                                          01/31/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                                  M54515 B-83  06/11/84C 08/22/84C                                                          01/31/85C              .
2, TS CHANGES RELATED TO KEY LOCK SHITCHES FOR PURGE VALVES                                                                M51585      05/03/83                10/16/84C          N/A                                                    ;
03/18/85C 2, REVIEN OF METHODOLOGY FOR ESTIMATING CORE DAMAGE                                                                        M57232                                                                                    04/15/85C
* 2 - TSCR-STEAM GENERATOR LOW LEVEL TRIP SETPOINT                                                                            M56616                                                                                    04/30/85C              -
2, EVALUATE CPC METHODOLOGY CHANGES FOR CYCLE 5                                                                            M56343                                                  N/A                              05/07/85C TECH. SPEC. CHANGE REQUEST - CPC UPDATE                                                                                    M56866                                                                                    05/07/85C              ;
REVIEW OF REVISED ROD BON PENALTIES                                                                                        M56888                                                                                    05/07/85C REVIEH OF 5 YEARS RB TENDON SURVEILLANCE REPORT                                                                            M55545                                                                                    05/08/85C              !
  . INSERVICE TESTING PROGRAM (A-14)                                                                                          Mt2062                              06/15/78C          N/A                              06/20/85C.            t NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                                                      M45804  F-57                                                                              06/26/85C              1
. NUREG 0737 II.K.3.51 COMPLIANCE WITH 10 CFR 50.46                                                                          M48145  F-58                                                                              06/26/85C i  LCONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                                                                    M52207  C-15                                                                              06/28/85C              '
2, LICENSE AMENDMENT FOR IAEA SAFEGUARD INSPECTION PROGRAM                                                                  M52636                                                  N/A                              07/16/85C              ;
{  SUPPLEMENTARY CONFIRMATORY ORDER - EMERGENCY RESPONSE                                                                      M57871                                                                                    07/19/85C              i ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                                                                        M52736  B-76 03/25/85                tt/05/83C 12/30/84                                  08/07/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                                                M53568  B-85                          11/05/83C                                          01/30/86C i
I h
i
 
R-1208687-001                                                                REGULAT0RY          INF0RHATION              TRACLING        SYSTEM                        PAGE NO. 5 C0NDENSED          MANAGEMENT            REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH                                                        LICENSED POWER: 2660 MHT                PROJECT MANAGER: P. TAM DOCKET NUMBER: 050-00334                                                                          DESIGN POWER:    0835 MHE                BRANCH CHIEF:      S. VARGA ARCH /ENGIMEER: SSH                                                                              NSSS VENDOR:    HEST                    LIC. ASSISTANT:    C. PARRISH IE INSPECTOR:                                                  H. TROSKOSKI RAI                      SE TAC    MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                                                                          NUMBER    &      DAlf      DATE        RAlf        DATE        DATE DMDM ACTIVE ISSUES MMMM ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                                                    M55114  B-81  04/25/85C 06/15/85                              09/30/8F ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                      M53652  B-86  03/13/85C 05/20/E5                              09/30/85 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                        M53735  B-87                                                  09/30/85 SCHEDULAR EXEMPTION FOR STRUCTURAL STEEL FIRE PROTECTION                                                        M59067                                                        09/30/85 ROD B0H PENALTY MULTIPLIER                                                                                      M59311                                                        10/15/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                        M54045  B-92                                                  10/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                      M54516  B-83                                                  10/30/85 IMPLEMENTATION OF INTEGRATED SCHEDULES FOR PLANT                                                                M57569                    06/26/85C                            10/30/85 IODINE SAMPLER CARTRIDGES, TECH. SPEC. TABLES 3.5-13 AND                                                        M59014                                                        10/30/85 RESPONSE TO SUPPLEMENTAL SE ON THE IST PROGRAM                                                                  M59058                                                        10/30/85 RV AND SV TESTING                                                                                              M44562  F-14  08/22/85  01/10/85C                            10/31/85 APP. "R" - D.G. FIRE PROTECTION SYSTEM                                                                          M57949                                                        10/31/85 APPENDIX "R" - LIGHTING & COMMUNICATION SYSTEM FOR FIRE                                                        M57950                                                        10/31/85 SEISMIC INSTRUMENT CALIBRATION SCHEDULE                                                                        M59312                                                        11/15/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 0737 ITEM II.B.1                                                      M54382                                                        1t/30/85 NUREG-0737        III.A.1.2,                                          TECHNICAL SUPPORT CENTER                  M45925 F-63                                                    12/30/85 NUREG-0737          III.A.t.2,                                        OPERATIONAL SUPPORT CENTER                M45996  F-64                                                  12/30/85 NUREG-0737          III.A.1.2,                                        EMERGENCY OPERATIONS FACILITY            M46068  F-65                                                  12/30/85 NUREG-0737          III.A.2.2,                                        METEOROLOGICAL DATA UPGRADE              M46284  F-68            12/21/83C                            12/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                                                M53061  B-80                                                  12/30/85 REACTOR COOLANT PUMP TRIP                                                                                      M49695  G-Ot  06/28/85C 10/07/85                              12/31/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                                                                M52899  B-78                                                  12/31/85 ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                                                    M53166  B-82  03/20/85C 05/10/85C                            12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                        M53818  B-88' 12/31/85 TECH SPEC CHANGE FOR FACILITY ORGANIZATION                                                                    M55106                    07/31/85                            12/31/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                                    M55348  B-90  05/23/85                                        12/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                          H55838  D-19                                                  12/31/85 TRIP SYSTEM INSTRUMENT RESPONSE TIME SURVEILLANCE                                                              M57468                                                        12/31/85 CONFIRMATORY ORDER FOR TMI ITEMS: DCRDR & R. G. 1.97                                                          M57903                                                        12/31/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS                                                    M58045 C-16              06/14/85                            12/31/85 10CFR50.62 OPERATING REACTOR REVIENS, ATHS RULE                                                              M59070  A-20            06/26/85C                            12/31/85 REVIEW OF ASYMMETRIC LOCA LOADS                                                                                N08597  D-10  07/31/84  02/19/85C    N/A                    01/31/86 SALP FOR 4/84 TO 10/85                                                                                        M54627                                                        02/28/86 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                                  M56102  F-71            11/30/85    12/30/85                03/31/86 ITEM t.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                                    M53569  B-85                        04/04/85                04/30/86 POTENTIAL IST BACKFIT, PRESSURE ISOLATION VALVES                                                              M56916                                                        04/30/86 TECH. SPEC. CHANGES FOR N-1 LOOP OPERATION                                                                    M55024                    08/31/85                            06/30/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                  M45114 F-26            x 04/24/84C                            07/31/86 FIRE PROTECTION FOR STRUCTURAL STEEL                                                                          M55694                                                        07/31/86
 
R-1208687-001                  REGULAT0RY          INF0RMATION                TRACKING        SYSTEM                  PAGE NO.:    6 C0NDENSED          MANAGEMENT              REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BEAVER VALLEY 1 RAI                SE TAC    MPA        RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                            NUMBER    NJL.      DALE      DATE      DAlf    DATE        DATE DOMM ACTIVE ISSUES MMMM      (CONTINUATION)
SUPPLEMENTARY FIRE PROTECTION EXEMPTION REQUEST                  M56566                                                    07/31/86 STEAM GENERATOR TUBE INTEGRITY, GEN. LTR. 85-02                  M57503 C-16                                              07/31/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)        M44282  F-05    11/30/85  06/28/84C 10/30/85            08/31/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M52818  B-77  07/30/85              07/30/85            09/30/86 QA GUIDANCE FOR ATHS EQUIPMENT THAT IS NOT SAFETY RELATED        M57431          04/16/85C 10/31/85                        09/30/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51221  F-09              04/15/83C                      10/30/86 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG          H51071  A-17                                              12/30/86 ITEM 3.1.3-POST-MAINT TESTING-CHNGS TO TECH SPECS-RTS            M52980  B-79                                              12/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTIVE MAINT. PROGRAM FOR RX TRIP        M53901  B-89  05/15/85                                  12/31/86 hUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46                M48146  F-58              05/31/86                      01/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M53962  B-93  03/13/85C 06/20/85                        01/31/87 DOM COMPLETED ISSUES MMM TECHNICAL SPECIFICATION CHANGE DUE TO NEH LOCA AND FUEL          M55235                                                    10/03/84C TECH SPEC CHANGE FOR ERROR CORRECTION, CLARIFICATION ETC.          M55102                                                    10/09/84C TECH SPEC CHANGE FOR REACTOR LEAKAGE DETECIION SYSTEM              M55103                                                    10/09/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN        M51141  F-08                                              10/10/84C TECH SPEC CHANGE FOR RADIATION PROCESS MONITORS                    M55101                                                    10/15/84C N0ZZLE THERMAL STRESSES DUE TO INADVERTENT SI ACTUATION            M52027                                                    10/20/84C USE OF ASME SECTION XI CODE CASE N-401                            M56086                                                    11/06/84C TECHNICAL SPECIFICATION FOR CONTAINMENT EMERGENCY AIR LOCK          M55244                                                    11/08/84C BYPASSES TO BLOCK TRIP SYSTEM INSTRUMENTS AND ESF CHANNELS        M52071          09/24/84  10/30/84                      11/13/84C CYCLE V RELOAD                                                      M55992                                                    11/26/84C TS CHANGES TO CONFORM HITH NEN 50.72 AND 50.73                      M55010  A-18                                            11/27/84C CONTAINMENT PURGE SUPPLY AND EXHAUST VALVES                          M55423                                                    12/12/84C CYCLE 5 RADIAL PEAKING FACTOR LIMIT REPORT                          M57050                                                    12/17/84C CONTAINMENT AIR LOCKS                                                M52069                                                    12/19/84C TECH SPEC CHANGE FOR VESSEL IRRADIATION SURVEILLANCE                M55104                                                    12/19/84C CNTRL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)              M07972 C-10                10/09/84                      12/20/84C SCHEDULAR EXEMPTION AND TECH. SPEC. CHANGE, APPENDIX J TYPE          M55312                                                    12/31/84C TECH. SPEC. CHANGE ON SURVEILLANCE OF FIRE PROTECTION                M55829                                                    12/31/84C EQ SCHEDULAR EXTENSION                                              M56496                                                    12/31/84C ASSORTED FIRE PROTECTION TECH SPEC CHANGE                            M55105                                                    01/04/85C reb 1 SED INSERVICE INSPECTION PROGRAM                              H51513                                                    Ot/09/85C TECH. SPEC. CHANGE TO IMPROVE DIESEL GENERATOR RELIABILITY          M55457                                                    01/11/85C ESF INSTRUMENTATION TECH. SPEC. CHANGE                              M55455                                                    01/25/85C RADI0 ACTIVE GASEOUS EFFLUENT MONITORING TECH. SPEC. CHANGE          M55456                                                    01/25/85C L OH-L EVEL HASTE COMPLI ANCE WITH PART 61. GEN. LTR. 84-12          M56562                                                    01/25/85C ELIMINATION OF SNUBBER LISTING IN TECH. SPEC. (GL 84-13)            M55458                                                    02/22/85C CHANGE REQUEST 99 EDITORIAL CHANGE                                    M57068                                                    02/22/85C TECH. SPEC. FOR AUXILIARY FEED PUMP BAY DRAIN MONITOR                M57069                                                    02/22/85C RECIRCULATION SPRAY PUMP SURVEILLANCE TECH. SPEC.                    M57070                                                    02/22/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL            M42459  B-60            01/25/85C    N/A              03/07/85C RESPONSE TO IST SER                                                  M49437          07/31/84  05/17/84C                      03/07/85C
 
__      _ __. -      _ _ _ _ _ . . _ _ . _ _ _ _ _ . . _ _ .        _ . . _ -        ._ . . _ _ _ . ~ . _ _ . _ _ _ _ .                . . _ . .      ...._._m      . _ . _ . _ . _ _ . . . . . .
R-1208687-001                                REGULAT0RY' I N F 0 R.M A T I O N                                  TRACKING '            SYSTEM                                PAGE NO.s              '7 C0NDENSED              MANAGEMENT                              REPORT                                RUN DATE: 09/17/85 (HEADQUARTERS).
FACILITY: BEAVER VALLEY 1 RAI                          SE TAC            - MPA            RAI    RESPONSE      TER.        - INPUT                LIC ACT TITLE                                                                                  NUMBER                &            DAIf,      DATE        PJQg            DATE                    DATE 000 COMPLETED. ISSUES MMM                  (CONTINUATION)
BIDFOULING ACTIONS                                                                      M56003                                    01/14/85C                                          03/07/85C TH0 LOOP OPERATION FOR MODE 3~                                                          M56380-                                                                                      04/24/85C-      i M55766 4
1985 EMERGENCY EXERCISE DATE                                                                                                                                                          04/25/85C        ,
INTERPRETATION OF AMEND. 18 FIRE HYDRANT SURVEILLANCE                                  M56587                                                                                        05/14/85C        :
ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                    M52737 B-76                                                                                  05/20/85C NUREG-0737 II.K.3.30. SB LOCA DUTLINE                                                  M45805 F                                                                                  05/28/85C' ELIMINATION OF APPENDIX B TS, NON-RADIOLOGICAL                                          M53208                          01/22/85C 03/21/85C                                          06/24/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                                M52208 C-15                                                                                  06/28/85C RIVER HATER AND COMPONENT COOLING HATER PUMP SURVEILLANCE                                M57289 '                                                                                    07/05/85C DELETION OF EQUIPMENT QUALIFICATION DEADLINE FROM TECH.                                M57342                                                                                        07/10/85C RADIOLOGICAL ENVIRONMENTAL-MONITORING TECH. SPEC. CORRECTION                            M57343                                                                                      07/10/85C REFUELING HATER STORAGE TANK TECH. SPEC. CHANGE                                          M57344                                                                                        07/10/85C ISI. CODE CASE N-288                      .                                              M57933                                                                                        07/24/85C      i SAFEGUARDS REGULATORY EFFECTIVENESS REVIEH (RER)                                        M56880                                                                                        08/29/85C 06/27/85C
~
REVISED DVERPRESSURE PROTECTION TECH. SPEC. CHANGE                                      M56620                                                                                        09/06/85C      j i
i 1
4 1
i
[
i t N -
r-+r 7- W--
 
                                        ,  . . _ - -  ..  - - . - - -              __ - . _ .                  --  -.-                - -  - .          .  ~. ..-      - -.
R-1208687-001                        .REGULAT0RY                    I-N F 0 R M A T I O N        TRACKING            SYSTEM                            PAGE NO.      8 C 0 N D E N S'E D      MANAGEMENT                REP 0RT                              RUN DATE: 09/17/85-(HEADQUARTERS)
FACILITY BIG ROCK POINT 1 PLANT LOCATION: 4 MI NE OF CHARLEVOIX, MICH                          LICENSED P0HER: 0240 MHT                      PROJECT MANAGER: T. ROTELLA DOCKET NUMBER:        050-00155                                      DESIGN P0HER:      0072 MHE                  BRANCH CHIEF:        J. ZHOLINSKI ARCH / ENGINEER: BECH                                                NSSS VENDOR:        GE                        LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:        S. GUTHRIE RAI                          SE TAC-    MPA        'RAI    RESPONSE        TER        INPUT        LIC ACT    -
TITLE                                                                                NUMBER    &          DAIf,    DATE          DAlf.          DATE          DATE MMCM ACTIVE ISSUES MMMM DEFINITION OF OPERABILITY                                                            M57535                                                                07/15/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54046  B-92                06/01/84C                                08/30/85 TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY                              M43044  D-17                                                        08/31/85 ATHS RECIRCULATION PUMP TRIP                            .
M08277                      07/27/78C                                09/30/85 ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                              M42515 B-60                  01/28/85C                                09/30/85 CONTAINMENT PRESSURE & WATER LEVEL MONITOR T.S.                                        M51974  F-24                07/19/85C                                09/30/85 REPORTING REQUIREMENTS TECH. SPEC.                        .
M55536  A-18                                                          09/30/85'    .
TECHNICAL SPECIFICATION CHANGE SECTION 6 PLANT STAFF                                  M59471                                                                09/30/85 TECH. SPEC. CHANGE FOR SURVEILLANCE FREQUENCIES                                        M59248                                                              09/31/85 ISI RELIEF REQUESTS (REV. 3)                                                          M53379                      05/14/84C 08/31/84                      10/01/85    i BOP QA                                                                                M55077                                                                10/01/85    i CONTROL ROD TESTING FREQUENCY                                                          M57505                                                                10/15/85    l INTEGRATED LIVING SCHEDULE                                                            M57948                                                                10/15/85    '
IST RELIEF REQUESTS                                                                    M57443                                                                10/31/85 10CFR50.62 OPERATING REACTOR REVIEHS                                                  M59071 A-20                                                          10/31/85 CYCLE 21 RELOAD TECH. SPEC. CHANGE PACKAGE                                            M59464                                                                11/01/85 4
            - RETENTION OF CONTAINMENTED SOIL ON-SITE C10CFR20.302)                                  M59508                                                                11/01/85 i
CONTAINMENT AIRLOCK EXEMPTION                                                          M57035                                                                11/15/85
,            STRUCTURAL CAPABILITY FOR SEVERE HEATHER                                              M55068                                                                11/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                        M52900  B-78                10/02/84C                                12/01/85 ITEM 3.1.5-POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                            M52981  B-79    05/16/83    08/16/85                                12/01/85 STRUCTURAL DESIGN AND SEISMIC LOADS                                                    M55069                                                                12/01/85 l'            NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                          M45115 F-26                  12/19/80C                                12/31/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                    M52738 B-76    03/21/85    10/01/85    12/12/84                    12/31/85 ADMINISTRATIVE TECH. SPECS.                                                            M56547                                                                12/31/85 GAMMA MONITOR CALIBRATION FREQUENCY                                                    M57906                                                                12/31/85 CONTROL ROD WITHDRAHAL RATE LIMIT T.S.                                                  M52012                                                              01/01/86 ALTERNATE SHUTDOHN INSTALLATION 8 PROCEDURES                                            M55067                                                              01/31/86 FIRE PROTECTION MODS                                                                  M55075                                                              01/31/86
;              I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                M51222 F-09                                                          04/30/86      '
SYSTEM STABILITY                                                                        M55072                      01/31/85                                06/30/86 SCRAM DUMP TANK VALVES                                                                  M55073                                                              06/30/86 UPDATED DESIGN DATA                                                                    M55078-                      11/02/84C                              06/30/86 IPSAR SUPPLEMENT                                                                      M55544                                                              06/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                          M56103 F-71                  04/15/86                                06/30/86 RDS MODIFICATIONS                                                                      M55071                                                              06/31/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                          M45926 F-63                  12/19/80C                              07/31/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                        M45997 F-64                  12/19/80C                              07/31/86      r NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                    M46069 F-65                  12/19/80C                              07/31/86      !
1
 
R-1208687-00t                      REGULAT0RY            INF0RHATION              TRACKING          SYSTEM                PAGE NO.      9 C0NDENSED            MANAGEMENT          REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BIG ROCK POINT 1 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC-ACT TITLE                                                                  NUMBER  &      DAlf,      DATE      DALE    DATE        DATE nuMu ACTIVE ISSUES MMMM          (CONTINUATION)
NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                    M46285  F-68            12/19/80C                      07/31/86 TEN YEAR IST PUMP & VALVE PROGRAM                                    M49589                  10/04/84C                      07/31/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M53963 B-93  05/16/85C 08/16/85                        07/31/86 ITEM 2.1 - EQUIPMENT CLASSIFICATICH AND VENDOR INTERFACE -          M52819  B-77  01/22/85C 08/16/85C 03/30/86              09/30/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53570  B-85            12/01/84                      09/30/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53736  B-87            06/28/84C                      09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53819  B-88  0 5/16/85C 07/28/84                      09/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53653  B-86            08/16/85                      12/31/86 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG            M5:072 A-17                                            05/30/87 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)            M44283 F-05  09/30/86  06/15/85    08/30/86          06/30/87 M55546                                                  12/3f/87 FOLLOHUP TO INTEGRATED ASSESMENT                                                                                            03/31/89 CONTAINMENT ISOLATION                                                M55070 HM UNSCHEDULED ISSUES MM REPORTING REQUIREMENT EXEMPTION REQUEST SPURIOUS RPS                M59592 K2M COMPLETED ISSUES MMM NUREG 0737 ITEM II Ft.6 CONTAINMENT HYDROGEN MONITOR                M47723 F-25              12/19/80C                      10/05/84C NUREG 0737 TECH SPECS                                              M51668 B-72                                              10/10/84C M51988                                                  10/11/84C TRANSFER CASK TRIP TEST T.S.                                                                                                10/11/84C POOL EXPANSION AMENDMENT                                          M55961 I.D.1.1. DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN        M51142 F-08              07/02/84                      11/07/84C M55527                                                  12/10/84C PRC APPROVAL METHOD TECH. SPEC.                                                              11/02/84C                      12/14/84C VALVE RELIABILITY                                                  M55076 M56372                                                  12/18/84C RDS VALVE TESTING                                                                            12/19/80C                      01/10/85C NUREG-0737 II.D.1, RV AND SV TESTING                              M44563 F-14 M55325                                                  03/25/85C EXEMPTION TO APP.R. III.G.2                                        M56986                                                  03/26/85C BIG ROCK POINT: ALTERNATE SHUTDOWN PANEL RELOCATION                                                                        03/27/85C EQUIPMENT QUALIFICATION SCHEDULAR EXEMPTION                      M56939 M57271                                                  04/11/85C CONTAMINATED SOIL                                                                          01/10/85C                      04/18/85C INCORPORATION OF BYPRODUCT LICENSE                                M55045 M55315                                                  05/ 01/85C CRD PERFORMANCE TEST FREQUENCY T.S.                                                        11/02/84C                      05/24/85C DEBRIS SCREENS, VENT VALVE TESTS, VALVE PERCENT TIME OPEN        M49499 M56549                  06/30/85                      06/07/85C AUTO-ISOLATION (CV-4049) TECH. SPEC.                              M51975                    tt/08/84C                    06/10/85C STACK GAS MONITORING SYSTEM T.S.                                  M55074                  02/20/85C                      06/12/85C INCORE DETECTORS                                                                                                        06/13/85C ORGANIC COATINGS INSIDE CONTAINMENT                              M57691 M57881                                                  06/21/85C RESPONSE TO TRANSMITTAL LETTERS FOR CONTROLLED DRAHINGS                                                                  06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPAIC-10)          M52209 C-15 M56833                                                  07/01/85C ORGANIZATIONAL TECH. SPECS.                                              B-84            07/02/85                      07/02/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDIrG TO            M55589 M52485  F-10                                            07/17/85C REQUEST FOR EXEMPTION TO 10 CFR 50.44 (C)(3)(III) - HIGH        M59249                                                  08/06/85C PLANT SPECIFIC DESIGN CHARACTERISTICS
 
t R-1208687-001                              REGULAT0RY                                                                          INF0RMATION                TRACKING      SYSTEM                  PAGE NO.            10 C0NDENSED                                          MANAGEMENT          REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY BIG ROCK POINT 1 RAI                SE TAC    MPA    RAI  RESPONSE    TER    INPUT      LIC ACT TITLE              '
NUMBER    &              DATE                                                  '
DATE              RAIE    _DATE        DATE UDM COMPLETED ISSUES MMM                (CONTINUATION) i DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                            M55839  D-19                                          08/19/85C APPENDIX I TECH SPEC IMPLEMENTATION REVIEW                                                                                                        M08096 A-02            Ot/07/85C 07/30/85C            08/26/85C ADMINISTRATIVE TECH. SPEC. CHANGES RELATED TO RETS                                                                                              M59037                                                08/26/85C FINANCIAL QUALIFICATION PETITION                                                                                                                M56325                                                08/30/85C                  '
?
4 1
i 6-P 4
b 4
1
 
R-1208687-001                                                          REGULAT0RY        INF0RHATION                  TRACKINO            SYSTEM                      PAGE NO.      11 C0NDENSED          MANAGEMENT                  REPQRT                            RUN DATE: 09/17/85 (HEADQUARTERS)
F/u1LITY: BROHNS FERRY 1 PLANT LOCATION: 10 MI NN GF DECATUR, ALA                                                LICENSED P0HER: 3293 MHT                        PROJECT MANAGER: R. CLARK DOCKET NUMBER: 050-00259                                                                DESIGN PONER:      1065 MNE                    BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: TVA                                                                    HSSS VENDOR:      GE                            LIC. ASSISTANT: S. NORRIS IE INSPECTOR:                    J. PAULK RAI                    SE TAC        HPA          RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                                                                  NUMBER      HQ_,. RAlf.        DATE        A EAJ1        DATE        DATL acMM ACTIVE ISSVES MMMM j
NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                                            M44423      F-12  05/01/84    08/15/84                            08/30/85 NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                                            M45680      F-48                                                    08/30/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                              M51223      F-09  10/22/84    01/18/85      N/A                    08/30/85 DEFINITION OF SECONDARY CONTAINMEhT INTEGRITY                                                        M59024                                                              08/30/85 LIFE OF PLANT NDT CURVES                                                                            M52444            01/23/84    01/15/85                            09/20/85 APPENDIX I T.S. IMPLEMENTATION REVIEH REVIEH                                                          N08135 A-02        12/20/83    01/15/79C                            09/21/85 INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                                              M55590 B-84                                                          09/26/85 NDT SUP.VEILLANCE SPECIMENS                                                                          M5948'2                                                              09/27/85 SFISMIC QUALIFICATION OF CABLE TRAYS                                                                M59517                                                              09/27/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                        M43727 E-65                                                          09/30/85 TECH. SPEC. RHR CROSSTIE                                                                            M56936                          07/22/85                            10/04/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                                            M51073      A-i7  01/21/85                                          10/10/85
                .2,3- ISI AND T IMPLEMAENTATION DATES.                                                            M11938                                                              10/22/85 TECH. SPEC. CHANGES - TVA REORGANIZATION                                                            M56027                                                                10/25/85 MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                                        M57144      D-20                                                      10/25/85 MISC TECHNICAL SPECIFICATI0H CHANGES (TS-208)                                                        M57454                                                                10/25/85 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                        M4S116      F-26                                                      10/31/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                        M53654 E-86                                                          11/29/85 TECH. SPEC, FOR SHIFT 0.T. LIMITATIONS (GL 83-02)                                                  M57964                                                                11/29/85 APPENDIX R MODS & EXEMPTION REQUESTS                                                                M5/296                                                                12/06/85 FIRE PROYECTION SYSTEM HYDRAULIC REQUIREMEt4TS                                                    M57622                                                                12/20/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                      M53964      B-93                                                      12/27/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                          M54047      8-92                                                      12/30/85 INTEGRATED SCHEDULE                                                                                M55595                                      11/30/84                  12/30/83 INSERVICE TESTING                                                                                M11324      A-14  02/10/84      10/01/84C                            12/31/85 REVISED INSERVICE PUMP AND VALVE TESTINS PROGRAM                                                  M49221            02/10/84      10/ 01/84C                          12/31/85 IVEM 3.1.3-POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                                      M52982      B-79                                                      12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECt'.                                          M53820      B-88                                                      12/31/85 SINGLE LOOP OPERATION                                                                              M48131      E-04                                                    01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENt.HCF TESTING                                                  M52901      B-78                                                    02/14/86 ITEM 2.1 - EQUIPMENT CL ASSIFICATION AMD VENDCR INTERFACE -                                      M52820      B-77                                                    03/28/86 M55840    D-19                                                    06/20/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                          02/28/86                  12/31/86 PROCEDURES GENERATION PACKAGE REVIEH OPERATOR GUIDELINES                                          M44284    F-05  03/30/86 ITEMS 3.2. 1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                          M53737    B-87                                                      12/31/86 2
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAMS PLAN                                      M51143    F-08    11/19/84                                        04/33/87 M56104    F-71                            02/01/87                04/30/87 I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                                                                                          06/30/87 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                    M45927    F-63 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                  M45998    F-64                                                    06/30/87 t!UREG-0737 III A.1.2, EMERGENCY OPERATIONS FACILITY                                              M46070    F-65                                                      06/30/87
 
R-1208687-001                                  REGULAT0RY        INF0RMATION                    TRACKING        SYSTEM                        PAGE N0.8    12 C0NDENSED              MANAGEMENT              REPQRT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BROHNS FERRY 1 RAI                      SE TAC      MPA      RAI  RESPONSE            TER    INPUT      LIC ACT TITLE                                                                              HM!iKR    &        Dalg      DATE            JMIE    DATE          DATE l
umMM ACTIVE ISSUES MMMM                      (CONTINUATION)
NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                  M46286    F-68                                                  06/30/87 MM UNSCHEDULED ISSUES MM 10CFR50.62 OPERATING REAC(OR REVIENS                                                M59072 A-20 RAD NONITOR SURVEILLANCE                                                            M59472 MMM COMPLETED ISSUES MMM UPDATE PRESSURE VS TEMPERATURE CURVE                                                M49018          01/23/84  09/14/84                              10/01/84C CONTAINMENT LEAK TESTING - APP. J (GENERIC)                                        M08715 A-04                                                      10/24/84C CRD MAINTENANCE REQUIREMENTS AND OTHER AND OTHER CHANGES TO                        M48476                                                          10/26/84C NUREG 0737 TECH SPECS                                                              M51669    5-72                                                  10/26/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                          M54518    B-83                                                  10/26/84C REVISED PHYSICAL SECURITY PLAN (AMEND 115)                                          M54687                                                          10/29/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                            M45584 F-46      04/05/84  06/29/84                            11/13/84C APPENDIX R MODS                                                                      M55028                                                          12/28/84C APPENDIX R MODS                                                                      M55034                                                          12/28/84C TORUS RESTRAING SNUBBERS                                                            M56299                                                          01/24/85C RNCU ISOLATION VALVE                                                                M55651                                                          02/15/85C CYCLE 6.LLRT EXTENSIONS                                                              M56581                                                          03/28/85C CYCLE 5 PIPE CRACK GROHTH                                                            M56582                                                          03/28/85C REQUEST 10 EXTEND EQ DEADLINE                                                        M56788                                                          03/28/85C VACUUM RELIEF SYSTEM FOR SECONDARY CONTAINMENT.                                      M57019                                                          04/05/85C 16 1 KV ELECTRICAL SYSTEM (AMEND 117) UNIT 1 16 1 KV                                M56224                                                          05/02/85C MARK I CCNTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                  M07929 D-01                                10/26/84            05/06/85C TECH. SPEC. DEFICIENCIES, REPLY TO RII MEMD DTD 12-26-84                            M56903                                                          06/06/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                          M53571    B-85                                                  06/12/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                  M52739 B-76      03/25/85                                      06/17/85C RPS POWER SUPPLY                                                                    M08929          10/31/84  08/09/84C                            06/27/85C RPS MODIFICATION                                  .
M52192          10/31/84  12/14/84                            06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                            M52210 C-15      06/06/84  12/14/84                            06/28/85C LONG TERM REVIEH CONTAINMENT PURGE AND VENT (B-24)                                  M42568    B-24  05/13/83  12/30/84                            07/01/85C NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY                            M44832    F-19                                                  07/01/85C LON VACUUM SCRAM (AMEND 118)                                                        M56391                                                          07/08/85C ADMINISTRATIVE TECH SPEC CHANGES (AMEND 119)                                        M56609                                                          07/08/85C
    " ADMINISTRATIVE TECH SPEC CHANGES (AMEND 114)                                        M56610                                                          07/08/85C ADMINISTRATIVE TECH SPEC CHANGES (AMEND 90)                                        M56611                                                          07/08/85C IREP                                                                                M41011            12/23/82  08/31/84                            07/09/85C REACTOR VESSEL HATER LEVEL INSTRUMENTS                                              M57071                                                          07/22/85C NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS                          M48260 F-55      05/29/84  07/23/84                            07/24/85C HYDRO TEST PRESSURE RELIEF                                                          M53352                                                          07/24/85C    -1' ANALOG TRANSMITTER FAILURES                                                          M54167                                                          07/25/85C POTENTIAL OVER VOLTAGE CONDITION                                                    M55212            06/19/84  01/18/85                            07/31/85C IENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                              M42481    B-60  05/24/84  01/31/85                            08/08/85C
 
                                      -    - . . . - . . . . _ . . . . . _ _ _ . _ _ _ . .        . . _ .    . _ . __. _ _ _ .      _ . .      _ . _ _ . . . _ _ _ . ,_. .        . _ . . _ . _ _ _ . _ . . ~ . _ _ . . _ . . . _ . .
i R-1208687-001                      REGULAT0RY                                    INF0RMATION                      TRACKING                                  SYSTEM                                                    PAGE N0.8    13-
                                                                                            .C0NDENSED. MANAGEMENT                              REPORT                                                                        RUN DATE 09/17/85
'                                                                                                            (HEADQUARTERS)
FACILITY: BROHNS FERRY 1 RAI                                            SE TAC          MPA          RAI                    RESPONSE              TER                          INPUT                LIC ACT TITLE                                                                                            HUMBER        &          DAlf                            DATE      RAIE                                DATE              DATE
                  '0D0 COMPLETED ISSUES MMM        (CONTINUATION)
POSC RESPONSIBILITIES (AMEND 120)                                                                M56762                                                                                                                    08/09/85C i
V i                                                                                                                                                                                                                                                              .
T v
 
R-1208687-001                                                      REGULAT0RY        INF0RHATION                    TRACKING            SYSTEM                      PAGE NO. 14 C0NDENSED          MANAGEMENT                  REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BROHNS FERRY 2 PLANT LOCATION: 10 MI NH OF DECATUR, ALA                                            LICENSED POWER: 3293 MHT DOCKET NUMBER: 050-00260                                                                                                            PROJECT MANAGER: R. CLARK DESIGN P0HER:      1065 MHE                  BRANCH CHIEF:      D. VASSALLO RRCH/ ENGINEER: TVA                                                                  NSSS VENDOR:      GE                          LIC ASSISTANT:
IE INSPECTOR:                                            J. PAULK                                                                                      S. NORRIS RAI                    SE TAC        MPA        RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                                                              NUMBER        HL        M            DATE      E            DATE        DATE DROM ACTIVE ISSUES MMMM NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                    M46287      F-68 NUREG-0737 II,B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                                                                                                                  06/28/85 M44424      F-12    05/01/84  08/15/84                              08/30/85 NUREG-0737 II.K.3.18. ADS ACTUATION STUDY                                                            M4 5681    F-48                                                      08/30/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                              M51224      F-09    10/22/84  01/18/85      N/A                    08/30/85 DEFINITION OF SECONDARY CONTAINMENT INTEGRITY                                                        M59025                                                                08/30/85 LIFE OF PLANT HDT CURVES                                                                              M52445              01/23/84  01/18/85 INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                                                                                                                      09/20/85 M55591      B-84                                                    09/26/85 NDT SURVEILLANCE SPECIMENS                                                                            M59483 SEISMIC QUALIFICATION OF CABLE TRAYS                                                                                                                                        09/27/85 M59518                                                              09/27/85 APPENDIX I T.S. IMPLEMEf4TATION REVIEN REVIEH                                                          N08134 A-02          12/30/83  01/15/79C                            09/30/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                          M43731 B-65                                                          09/30/85 VECH. SPEC. RHR CROSSTIE                                                                              M56937              07/22/85                                          10/04/85 TNSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                                              M51074 A-17        01/21/85                                          10/10/85 R.P.S. INST CHAN FAILURE                                                                              M56021 VECH. SPEC. CHANGES - TVA REORGANIZATION                                                                                                                                    10/25/85 M56028                                                                10/25/85 MARK I DRYHELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC                                            M57145 D-20                                                          10/25/85 MISC TECHNICAL SPECIFICATION CHANGES (TS-208)                                                          M57455                                                                10/25/85 NUREG-0737 II.r.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                            M4'i 117  F-26 HYDROGEN CONTROL                                                                                                                                                            10/31/85 M55954    A-19    07/30/85  09/15/85                              11/15/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M53655    B-86                                                      11/29/85 TECH. SPEC. FOR SHIFT 0.T. LIMITATIONS (GL 83-02)                                                      M57965                                                                11/29/85 APPENDIX R MODS & EXEMPTION REQUESTS                                                                  M56297                                                                12/06/85 CYCLE 6 RELOAD                                                                                          M55653                                                                12/20/85 FIRE PROTECTION SYSTEM HYDRAULIC REQUIREMENTS                                                          M57683                                                                12/20/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                          M53965 B-93                                                          12/27/85 INTEGRATED SCHEDULE                                                                                    M55596                                      11/30/84                12/30/85 INSERVICE TESTING                                                                                      M11325 A-14          01/17/83  10/ 01/84C                            12/31/85 REMISED INSERVICE PUMP AND VALVE TESTING PROGRAM                                                        M49228              01/17/83  C4/06/83C                            12/31/85 ITEM 3.1.3-POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                                            M52983 B-79                                                          12/31/85 ITEM 3.2.5 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                M53821 B-88                                                          12/31/85 SINGLE LOOP OPERATION                                                                                    M48132 E-04                                                          01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                          M52902      B-78                                                      02/14/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M52821      B-77                                                      03/28/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                    M55841      D-19                                                      06/20/86 IVEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                M54048      B-92                                                      11/30/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/t)                                                M44285      F-05    03/30/86                02/28/86                12/31/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                M53738      B-87                                                      12/31/86 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAMS PLAN                                            M51144      F-08                                                      04/30/87 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                            M56105      F-71                            02/01/87                04/30/87
 
R-1208687-001                                          REGULAT0RY      INF0RMATION              TRACKING          SYSTEM                PAGE NO.:    15 C0NDENSED          MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BROHNS FERRY 2 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                                                IEWafR    !&      DAlf      DATE      PA_If  DATE        DATE nunu ACTIVE ISSUES MMMM                        (CONTINUATION)
NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                                        M45928  F-63                                            06/30/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                      M45999  F-64                                            06/30/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                  M46071  F-65                                            06/30/87 nu UNSCHEDULED ISSVES MM BACKUP EMERGENCY POWER TECH. SPEC. REVIEH                                            M56459 10CFR50.62 OPERATING REACTOR REVIEWS                                                  M59073 A-20 RAD MONITOR SURVEILLANCE                                                              M59473 CMM COMPLETED ISSUES MMM CONTAINMENT LEAK TESTING - APP. J (GENERIC)                                          M08716  A-04              02/26/76C                      10/24/84C CRD MAINTENANCE REQUIREMENTS AND OTHER AND OTHER CHANGES TO                          M48477                                                  10/26/84C NUREG 0737 TECH SPECS                                                                M51670  B-72                                            10/26/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                            M54519  B-43                                            10/26/84C REVISED PHYSICAL SECURITY PLAN (AMEND 109)                                            M54688                                                  10/29/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                              M45585 F-46    04/05/84  06/29/84                      11/13/84C TORUS RESTRAING SNUBBERS                                                              M56300                                                  01/24/85C NUREG 0737 ITEM II.F.I.I AND II.F.1.2                                                M56387                                                  02/12/85C REQUEST TO EXTEND EQ DEADLINE                                                        M56789                                                  03/28/85C
' VACUUM RELIEF SYSTEM FOR SECONDARY CONTAINMENT (AMEND 111)                            M57020                                                  04/05/85C 151 KV ELECTRICAL SYSTEM (AMEND 112) UNIT 2 161 KV                                  M56225                                                  05/02/85C MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                  N07930  D-01                        10/26/84            05/06/85C TECH. SPEC. DEFICIENCIES, REPLY TO RII MEMO DTD 12-26-84                              M56904                                                  06/06/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                          h53572 B-85                                              06/12/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                  M52740 B-76    03/25/85                                  06/17/85C RPS P0HER SUPPLY                                                                      N08930  C-11    10/31/84  10/15/78C                    06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                              M52211  C-15  06/06/84    12/14/84                      06/28/85C LONG TERM REVIEN CONTAINMENT PURGE AND VENT (B-24)                                    M42569  B-24              12/30/84                      07/01/85C NUREG-0737 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY                              M44833  F-19                                            07/ 01/85C LOW VACUUM SCRAM (AMEND 113)                                                          M56392                                                  07/08/85C REACTOR VESSEL HATER LEVEL INSTRUMENTS                                                M57072                                                  07/22/85C NUREG 0737 II.K.3.28, VERIFY QUALIFICATION QUALIFICATION OF                          M48261  F-55  05/29/84  07/23/84                      07/24/85C POTENTIAL OVER VOLTAGE CONDITION                                                      M55213        06/19/84  01/18/85                      07/31/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                              M42482 B-60    05/24/84    12/30/84                      08/08/85C PORC RESPONSIBILITIES (AMEND 115)                                                    M56763                                                  08/09/85C
 
    . _ - - - _ . _ _ _ _ _ - _ . .- -          ._ .-        -    - -__.    .-          . _ -        . -              .      - . . - . -        . . -              -          -~
R-1208687-001                      REGULAT0RY          INF0RMATION                      TRACKING          SYSTEM                                PAGE NO.*      16 C0NDENSED            MANAGEMENT                    REP 0RT                                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BROWNS FERRY 3 l
PLANT LOCATION: 10 MI NH OF DECATUR, ALA                LICENSED PDHER: 3295 MNT                          PROJECT MANAGER: R. CLARK DOCKET NUMBER: 050-00296                                DESIGN PONER:        1065 MHE                    BRANCH CHIEF:                D. VASSALLO ARCH / ENGINEER: TVA                                    NSSS VENDOR 8        GE                          LIC, ASSISTANT:              S. NORRIS IE INSPECTOR:        J. PAULK RAI                              SE TAC        MPA          RAI    RESPONSE            TER            INPUT      LIC ACT TITLE                                                                  NUMBER        HQ.        DAlf        DATE            DAIE            DATE        DATE
;                NNNN ACTIVE ISSUES MMMM NUREG-0737 II.B.3.2 POST ACCIDENT SAMPLING MODIFICATIONS                M44425      F-12    05/01/84    08/15/84                                      08/30/85 NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                M45682      F-48                                                                08/30/85 I -
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                  M51225 F-09          05/15/85    01/18/85                                      08/30/85 DEFINITION OF SECONDARY CONTAINMENT INTEGRITY                          M59026 LIFE OF PLANT NDT CURVES                                                                                                                                  08/30/85      [
M52446                01/23/84    01/18/85                                      09/20/85 NDT SURVEILLANCE SPECIMENS                                              M59484                                                                            09/27/85 SEISMIC QUALIFICATION OF CABLE TRAYS                                    M59519                                                                            09/27/85 APPENDIX I T.S. IMPLEMENTATION REVIEH REVIEH                            M08135 A-02            12/20/83  01/15/79C                                      09/30/85 SMFETY CONCERNS ASSOCIATED HITH PIPE FREAKS IN THE BHR SCRAM            M43736 B-65                                                                      09/30/85 1ECH. SPEC. RHR CROSSTIE                                                M56938                07/22/85                                                  10/04/85 INSTRUMENTATION TO FOLLOW THE COURSE 0. AN ACCIDENT (RG                M51075 A-17            01/21/85                                                  10/10/85 R.P.S. INST CHAN FAILURE                                                M56022                                                                            10/25/85 TECH. SPEC. CHANGES - TVA REORGANIZATION                                M56029                                                                            10/25/85 MARK I DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC            M57146 D-20                                                                      10/23/85 MISC TECHNICAL SPECIFICATION CHANGES                                    M57456                                                                            10/25/85 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION            M45118      F-26                                                                10/31/85 HYDROGEN CONTROL                                                        M55955      A-19      07/30/85    09/15/85                                      11/15/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53656      B-86                                                                11/29/85
            ' TECH. SPEC. FOR SHIFT 0.T. LIMITATIONS (GL 83-02)                        M57966                                                                            11/29/85 APPENDIX R MODS & EXEMPTION REQUESTS                                    M56298                                                                            12/06/85 FIRE PROTECTION SYSTEM HYDRAULIC REQUIREMENTS                    .      M57684                                                                          -12/20/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING            M53966      B-93                                                                12/27/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                M54049 B-92                                                  '
12/27/85 INTEGRATED SCHEDULE                                                      M55597                                              11/30/84                      12/30/85 INSERVICE TESTING                                                        M11326      A-14      02/10/84    04/06/83C                                      12/31/85 REVISED INSERVICE PUMP AND VALVE TESTING PROGRAM                        M49229                02/10/84    10/01/84C                                      12/31/85 ITEM 3.1.5-POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS              H52984      B-79                                                                12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                  M53822      B-88                                                                12/31/85 SINGLE LOOP OPERATION                                                    M48133      E-04                                                                01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                          MS2903      B-78        N/A                                                    02/14/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M52822'      B-77                                                                03/28/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                    M55842      D-19                                                                06/20/86 PROCEDURES GENERATION PACKAGE REVIEW (HUREG 0737 SUPP/1)                M44286      F-05      03/30/86                    02/28/86                      12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                  M53739      B-87                                                                12/31/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                            M45929      F-63                                                                04/30/87 I.D 1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAMS PLAN              M51145      r-08                                                                04/30/87 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -            M56106      F-71                                  02/01/87                    04/30/87 NUREG-0737 III.A.t.2, OPERATIONAL SUPPORT CENTER                          M46000      F-64                                                                06/30/87 NUREG-0737 III.A.t.2, EMERGENCY OPERATIONS FACILITY                      M46072 F-65                                                                      06/30/87      s I
 
R-1308687-001                        REOULAT0RY                  INF0RMATION              TRACKING                  SYSTEM                PAGE NO.          17 l                                                      C0NDENSED              MANAGEMENT                      REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BROHNS FERRY 3 RAI              SE TAC    MPA                RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                        NUMBER    !L              DAlf,      DATE      JLQE    DATE        DATE DM00 ACTIVE ISSUES MMMM            (CONTINUATION)
NUREG-0737 III.a.2.2, METEOROLOGICAL DATA UPGRADE                            M46288  F-68                                                      06/30/87 D0 HRSCHEDULED ISSUES MM 10CFR50.62 OPERATING REACTOR REVIENS                                          M59074 A-20 RAD MONITOR SURVEILLANCE                                                      M59474 MMO COMPLETED ISSUES MMM CRD MAINTENANCE REQUIREMENTS AND OTHER AND OTHER CHANGE TO                    M48478                                                            10/26/84C NUREG 0737 TECH SPECS                                                        M51671  B-72                                                      10/26/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                    M54520  B-83                                                      10/26/84C REVISED PHYSICAL SECURITY PL AN ( AMEND 83)                                  M54689                                                            10/29/84C TIA, LEAKS IN INSTRUMENT N0ZZLE                                              M55140                                                            11/01/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                      M45586 F-46        04/03/84      06/29/84                      11/13/84C HEAD SPRAY LINE - (AMEND 84)                                                  M55215                                                            11/26/84C INSPECTION OF BWR STAINLESS STEEL PIPING ACCORDING TO                        M55592 B-84                                                      12/18/84C TORUS RESTRAING SNUBBERS              .
M56301                                                            01/24/85C .
NUREG 0737 ITEM II.F.I.I & II.F.1.2                                          M56386                                                            02/12/85C SCHEDULAR EXEMPTION TO to CFR 50.49                                          M55141                                                            05/28/85C
  . REQUEST TO EXTEND EQ DEADLINE                                                M56790                                                            03/28/85C-
!  VACUUM RELIEF SYSTEM FOR SECONDARY CONTAINMENT ( AMEND 86)                    M5702'                                                            04/05/85C
!    161 KV ELECTRICAL SYSTEM ( AMEND 88) UNIT 3 161 KV ELECTRICAL                M5622'                                                            05/02/85C
(  MARK I CONTAINMENT LONG TERM PROG. IMPLEMENT.                                M07931  D-01                                  10/26/84            05/06/85C l ' TECH. SPEC. DEFICIENCIES, REPLY TO RII MEMO DTD 12-26-84                      M56905                                                            06/06/85C ITEM 1.2 -. POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                  M53573 B-85                                                      06/12/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND.                          M52741 B-76        03/25/85                                      06/17/85C        .
!  RPS POWER SUPPLY-                                                            M08931 C-11          10/31/84      08/09/84C                    06/27/85C        !
RP3 POWER SUPPLY MODIFICATIONS                                                M54136              10/31/34      12/14/84                      06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                      M52212 C-15        06/06/84        12/14/84                      06/28/85C LONG TERM REVIEN CONTAINMENT PURGE AND VENT (B-24)                            M42570  B-24        05/13,83        01/31/85                      07/ 01/85C HUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY                      M44834  F-19                                                      07/01/85C LON VACUUM SCRAM (AMEND 89)                                                  M56393                                                            07/08/85C REACTOR VESSEL HATER LEVEL INSTRUMENTS                                        M57073                                                            07/22/85C i  HATER LEVEL INDICATOR FAILURE                                                M57132                                                            07/22/85C l  NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS                    M48262 F-55          05/29/84      07/23/84                      07/24/85C MSIV LEAKAGE                                                                  M47869                                                            07/25/85C POTENTIAL OVER VOLTAGE CONDITION                                              M55214              06/19/84      01/18/85                      07/31/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                    M42483  B-60        05/24/84      01/31/85                      08/08/85C PORC RESPONSIBILITIES (AMEND 91)                                              M56764                                                            08/09/85C
 
R-1208687-001                                                                REGULAT0RY      INF0RMATION                  TRACKING              SYSTEM                    PAGE NO,8    18 C0NDENSED          MANAGEMENT                  REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BRUNSHICK 1 PLANT LOCATION: 3 MI N OF SOUTHPORT, NC                                                      LICENSED P0HER: 2436 MHT                        PROJECT MANAGER: M. GROTENHUIS DOCKET NUMBER: 050-00325                                                                      DESIGN POWER:      0821 MNE                    BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: UEC                                                                          NSSS VENDOR:      GE                          LIC. ASSISTANT:    S. NORRIS IE INSPECTOR:                                        H. RULAND RAI                  SE TAC    MPA            RAI    RESPONSE      TER      INPUT      LIC ACT IXILE                                                                                                        NUMBER  Li.Q          DAlf        DATE      DAll        DATE          DATE MOMM . ACTIVE ISSUES MMMM CONTROL ROOM HABITABILITY                                                                                    M57421  F-99                                                      08/15/85 ASME CODE RELIEF REQUEST EXCESS FLOH CHECK VALVES                                                            M57584                          07/05/85C                          08/30/85 PRIMARY CONTAINMENT ISOLATION VALVES - CAC SYSTEM                                                            M57566                                                              09/01/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                                M43737  B-65                                                      09/30/85 DC SYSTEM LCO AND SURVEILLANCE                                                                              M56483                          06/28/85C                          09/30/85 IGSCC INSPECTION RELOAD 4                                                                                    M57093                          08/01/85                            10/01/85 PRIMARY CONTAINMENT AIR LOCKS                                                                                M57054            05/02/85C 07/08/85C                                10/15/85 SPDS - RESPONSE REVIEH                                                                                        M57732 F-99      05/16/85C 07/19/85C                              10/16/85 NEN APPENDIX R TO 10 CFR 50 REGARDING FIRE PROTECTION                                                        M43418 B-41                    12/21/84C                          10/30/85 INTEGRATED SCHEDULE                                                                                          M55528                          08/20/85C                          10/30/85 MARK I CONTAINMENT 8/1/84                                                                                    M55584                                                              10/30/85 H RECOMBINER GL 34-09                                                                                        M55645 A-19      03/26/85C 07/30/85                                10/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                          M55843  D-19                  06/28/85C                          10/30/85 TURBINE STOP VALVE SURVEILLANCE                                                                              M57638                                                              10/30/85 RPS AND CR BLOCK INSTRUMENTATIONS                                                                            M59191                                                              12/30/85 ROD SEQUENCE CONTROL SYSTEM                                                                                  M59193                                                              12/30/85 ITEM 2.1 - EQUIPMENT CL ASSIFICATION AND VENDOR INTERFACE -                                                  M52823 B-77                    11/07/83C                          01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCF TESTING                                                                M52904 B-78      07/01/85      12/30/85                            02/25/86 PROCEDURES GENERATION PACKAGE REVIEW (fiUREG 0737 SUPP/1)                                                    M44287  F-05    07/30/85      06/28/85C 05/30/85                  03/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                                  M53967  B-93                  11/07/83C                          09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                      N53740  B-87    07/01/85C 07/ 01/85C                              12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                    M53657  B-86    04/23/85C 06/28/85C                              01/30/87 I.D.1.2 DETAILED CONTROL K00M DESIGN REVIEN
 
==SUMMARY==
REPORT -                                                  M56107  F-71                  12/31/84  01/31/87                04/02/87 NUREG-0757                III.A.1.2, TECHNICAL SUPPORT CENTER                                                M45930  F-63                  12/27/84C                          04/30/87 NUREG-0737              III.A.1.2, OPERATIONAL SUPPORT CENTER                                                M46001  F-64                  12/27/84C                          04/30/87 NUREG-0737              III.A.1.2, EMERGENCY OPERATIONS FACILITY                                            M46073  F-65                  12/31/84C                          04/30/87 NUREG-0737              III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                M46289  F-68                                                      04/30/87 REG. GUIDE 1.97 IMPLEMENTATION                                                                                M57899                                                              05/01/88 na UNSCHEDULED ISSUES MM SEALED SOURCE CONTAMINATION                                                                                  M59582 RHR/ SUPPRESSION POOL COOLDJG MODE                                                                            M59584 ROD BLACK MONITOR OPERABILITY                                                                                M59586 SPECIAL NUCLEAR MATERIAL                                                                                      M5958A ECCS ACTUATION INSTRUMENTATIONS                                                                              M59590 MARK I DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                                                N57147    D-20                                                          N/S REMIEW OF CHLORINE DETECTION SYSTEM                                                                          M58011                                                                N/S 10CFR50.62 OPERATING REACTOR REVIENS                                                                          M59075 A-20                                                            N/S
 
ft- i2086 87-0 01              REGULAT0RY            INF0RHATION              TRACKING          SYSTEM                  PAGE NO.*    19 C0NDENSED            MANAGEMENT            REPQRT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BRUNSHICK 1 RAI                SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                                NUMBER    E      MIf        DATE      RAlf,  DATE        DATE_
tn UNSCHEDULED IS$t;ES um      (CONTINUATION)
Enu COMPLETED ISSVES unu S.F.P. BUFFER ZONE                                                  M55925                                        .          10/12/84C RESPONSE FOR OL-84-11 PIPE CRACK INSPECTION                          M55419                                                    10/18/84C THERMAL - HYDRAULIC CODE                                            M51816                    07/31/84    08/30/84            10/22/84C 1983 INSERVICE INSPECTION REPORT                                    M54270                                                    10/22/84C SPENT FUEL POOL HATER LEVEL                                          M55258                                                    10/25/84C IGSCC INSPECTION 10/09/84                                          M56025                                                    10/30/84C ADMINISTRATIVE CONTROLS                                              M55256                    08/30/84                        11/01/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF              M45587  F-46              05/17/84C                      11/14/84C CHANNEL TRIP                                                        M55230                                                    12/04/84C CLARIFICATION OF OPERATING CONDITION                                M55Z32                                                    12/04/84C APPENDIX J EXEMPTION LLRT                                            M55692                    10/22/84C                      12/06/84C IGSCC INSPECTION 11/84                                              M56318                                                    12/07/34C RELIEF FROM SECTION XI RE HYDRO TEST                                M56409                                                    12/07/84C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45119  F-26              12/10/84C                      01/08/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                  M42876  B-59              12/21/84C 11/16 /84C          01/30/85C QA PROGRAM FOR RADIO. MAT. PKGS.                                    M57051                                                    O t/31/85C RADIDACTIVE GASSOUS EFFICIENT INSTRUMENTATION                      M55974                                                    02/07/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL            M42484 B-60                11/30/84C                      03/05/85C SCALING FACTORS - RADWASTE                                          M54190
* 03/05/85C RAYCHEM CABLE TEST                                                  M54961                    02/11/8 SC                      03/05/85C QA PROGRAM CLARIFICATION                                            M56035                                                    03/11/ 85C TECH SPECS FOR PURGE / VENT OPERATION                              M55425                    12/21/84C
* 03/25/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                M52742  B-76                                              04/15/65C OPERATOR REPLACEMENT TRAINING PROGRAM                              M56075          12/24/85C 05/14/83C                      05/03/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PL AN        M51146  F-08              12/27/84C                      05/06/85C DISPOSAL OF HASTE OIL                                              M53233                    04/20/84C                      05/06/85C SINGLE LOOP OPERATION                                              F 1489  E-04              05/08/85C                      0$/08/85C INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG            M51076  A-17    10/26/84C 01/22/85C                      05/14/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51226  F-0)              04/19/8 5C  N/A              05/16/85C PURGE AND VENT VALVE STOPS                                          M57614                                                    05/20/35C ELECTRICAL DISTRIBUTIDH VOLTAGE                                    M49276                    01/18/85C                      05/23/85C DEGRADED VOLTAGE RITAG T/S                                          M54193          11/14/8 4C 01/18/85C 01/30/85            05/23/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55698  A-18              04/25/85C                      05/28/85C ADMINISTRATIVE CONTROLS 10-29-84                                    M56268                    04/25/85C                      05/28/85C ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES          M12829  B-48              01/18/8 5C                    05/29/85C ACTIONS RE GE SIL-402                                              M56405                                                    06/06/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53574  B-85              11/07/83C 01/31/85            06/10/85C CORE SPRAY SYSTEM SURVEILLANCE                                      M56976                    04/04/85C                      06/21/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)            M52213  C-15              03/20/84C                      06/28/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54050  B-92              11/07/83C                      07/ 01/8 5C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO              M55593  B-84              12/10/84C                      01/ 01/85C INSERVICE INSPECTION INTERVALS - COMMON DATE                        M57751                                                    07/01/85C
* E a
 
i-f-
              ~
2 c.k-1208687-001                                          REGULAT0RY            INF0RHATION                TRACKING            SYSTEM                  PAGE NO.      20 C0NDENSED          MANkGEMENT REPORT                                      RUN DATE: 09/17/85
                                                                                                  'lHEADOUARTERS)                      ,
                                                                                                                                    ~
FACILITY: BRUNSHICK 1                      '#
RAI                SE m,                                          TAC    MPA        RAI'      RESPONSE      TER    INPUT        LIC ACT TITLE                                                                                    NUMBER    &        31&Il DATE      p_A ale  DATE          DATE DMM COMPLETED ISSUES MMM                            (CONTINUATION)                                                    ,-
SUPPRESSION POOL TEMPERATURE MONITORING SYSTEM                                            M57135                                                          07/08/85Ce ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                      M52985  B-79    06/30/85      11/ 07/8 3C                        07/16/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                  M53823  B-88
                                                                                                                          ^
11/ 07/83C                        07/16/85C CONTAINMENT INTEGRITY - MSIV CLOSURE                                                      M54840                      05/06/85C                          07/30/85C ADS LOGIC MODIFICATION                                                                    M57218                                                      '97/30/85C
      ,      RELOAD CYCLE 5                                                                            M57522                                ~~'''
                                                                                                                                                                        ~c 7/30/85C r
              <EFUELING OPERAITONS-FUEL NEAR SOURCE                                                      M57353                                                          08/06/85C RAD. LIQUID EFFLUE;4T MONITORING                                                          M59223 PIPING STRESS ANALYSI,1 DAMPING VALVES
* 08/19/85C  ,
M57774                                                          08/2s/85C
    /        SERVICE HATER RAD. EFFLUENT MONITORING                                                    M59007 09/05/85C
                                                                                                                                                          .)
y
                    ~
m                                                                                            .
                          $                                                                                  '1 f
r
 
R-1208687-001                          REGULAT0RY          INF0RMATION                        TRACKING          SYSTEM                      PAGE NO. 21 C0NDENSED                    MANAGEMENT              REPQRT                              RUN DATES 09/17/85 y'
(HEADQUARTERS)
FACILITY: BRUNSHICK 2 PLANT LOCATION: 3 MI N OF SOUTHPORT, NC                  LICENSED POWER: 2436 MHT                          PROJECT MANAGER: M. GROTENHUIS DOCKET NUMBER: 050-00324                                DE*IGN P0HER:            0821 MNE                BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: UEC                                    NSSS VENDOR:              GE                      LIC ASSISTANT:      S. NORRIS IE INSPECTOR:        H. RULAND                                                                              RAI                      SE TAC    MPA      RAI    RESPONSE        TER        INPUT      LIC ACT NUMBER    &        MIL        DATE        MIX          DATE        DATE TITLE 00*M ACTIVE ISSUES MMMM CONTROL R0uM HABITABILITY                                                      M57422 F-99                07/05/85C                            08/15/85 M57803                                                          09/01/85 EQ EXTENSION (3-15/85)                                                        M43735- B-65                                                    09/30/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                              06/28/85C                            09/30/85 D2 SYSTEM LCO AND SURVEILLANCE                                                M56484 M57585                    07/05/85C                            09/30/85 ASME CODE RELIEF REQUEST EXCESS FLOH CHECK VALVES                                                                                              10/01/85 TURBINE STOP VALVE SURVEILLANCE M57639 M57055          05/02/85C 07/08/85C                              10/15/85 PRIMARY CONTAINMENT AIR LOCKS                                                                05/16/85C 07/19/85C                              10/16/85 SPDS - RESPONSE REVIEN                                                        M57733 F-99 NEN APPENDIX R TO 10 CFR 50 REGARDING FIRE PROTECTIDH                        M43417  B-41              12/21/84C                            10/30/85
                                                                              '                                            M55529                    08/30/85C                            10/30/85 INTEGRATED SCHEDULE                                                                                                                          10/30/85 MARK I CONTAINMENT 8/1/84                                                    M55585 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)
                                                                                                                  '        M55844  D-19              06/28/85C-                            10/30/85 M59224                                                          10/30/85 RAD. LIQUID EFFLUENT MONITORING                                    '
A-19  03/26/85C 07/30/85                              11/30/85 H RECOMBINER GL 84-09                                                        M55646 M52905 B-78    07/01/85    12/30/85                            01/30/86 ITEMS 3.1.1 3 3.1.2 - POST MAINTENANCE TESTING                              M52824 B-77    '06/28/85    11/07/83C 07/30/85                  02/28/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                  M44288  F-05  06/30/85  06/28/85C 05/30/85                    03/30/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)                            B-93              11/ 07/8 3C                          09/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                MS3968 M53741  B-87  07/01/85C 07/01/85C                              12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                    M53658  B-86  04/23/85C 06/28/85C                              01/31/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                  M56108  F-71              12/31/84    01/31/87                04/02/87 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                M45931  F-63              12/27/84C                            04/30/87 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                            M46002  F-64              12/27/84C                            04/30/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                        M46074 F-65                12/27/84C              s            04/30/87 M46290  F-68                                                    04/30/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                                                            05/01/88 REG. GUIDE 1.97 IMPLEMENTATION >                                            M57900 OM jjfdpHEDULED ISSUES MM HPSI STEAM LINE ISOLATION VALVE LEAK                                        M59547 SEALED SOURCE CONTAMINATION                                                M59583 RHR/ SUPPRESSION POOL COOLING MODE                                          M59585 ROD BLACK MONITOR OPERABILITY                                              M59587 SPECIAL NUCLEAR MATERIAL                                                    M59589 ECCS ACTUATION INSTRUMENTATIONS                                            M59591 M57148  D-20                                                      N/S MARK I DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                                                                                  N/S REVIEN OF CHLORINE DETECTION SYSTEM                                        M58012 M59076 A-20                                                        N/S 10CFR50.62 OPERATING REACTOR REVIENS MMM f&ftP_LEILD ISSUES MMM M55924                                                          10/12/84C S.F.P. BUFFER ZONE
 
R-1208687-001                                      REGULAT0RY        INF0RMATION                TRACKING          SYSTEM                  PAGE NO.      22 C0NDENSED        MANAGEMENT            REPQRT                          RUN DATE: 09/17/85 l                                                                                    (HEADQUARTERS)
FACILITY: BRUNSHICK 2 RAI                SE TAC    MPA      RAI      RESPONSE      TER    INPUT lilLE                                                                                                                                              LIC ACT HMtilfR  HL      RAlf        DATE      DALE    _DM1          DATE UDM COMPLETED ISSUES MMM                          (CONTINUATION)
RESPONSE FOR CC-84-11 PIPE CRACK INSPRCTION                                          M55420 THERMAL - HYDRAULIC CODE                                                            M51817                                                      10/18/84C SPENT FUEL POOL HATER LEVEL                                                                                    07/ 31/ 84C 08/30/84              10/22/84C M55259                                                      10/25/84C ADMINISTRATION CONTROLS                                                              M55257 NUREG-0737 II .K. 3.16, CHALLENGES AND FAILURES OF RELIEF                            M45588  F-46              05/17/84C 11/01/84C CHANNEL TRIP                                                                          M55231                                                      11/14/84C CLARIFICATION OF OPERATING CONDITION                                                M55233                                                      12/04/84C BATTERY CAPACITY                                                                    M54147                                                      12/04/84C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                      12/10/84C                      12/10/84C M45120    F-26              12/10/84C                      01/08/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                  M42877    B-59              12/21/84C 11/16/84C QS PROGRAM FOR RADIO. MAT. PKGS.                                                    M57052                                                      01/30/85C RADI0 ACTIVE GASSOUS EFFICIENT INSTRUMENTATION                                      M55975                                                      01/31/85C DRYNELL HYDROGEN /0XYGEN HONITORS                                                    M55969                                                      02/07/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                            M42485 B-60                                                  02/20/85C SCALING FACTORS - RADHASTE                                                                                        11/30/84C                      03/05/85C M54191                                                      03/05/85C RAYCHEM CABLE TEST                                                                  M54962 QA PROGRAM CLARIFICATION                                                                                        02/11/85C                        03/05/85C M56036                                                      03/11/85C TECH SPECS FOR PURGE / VENT OPERATION                                                M55426                      03/21/84C RELIEF FROM HYDRO TEST                                                              M57321 03/25/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                  M52743 B-76                                                04/05/85C OPERATOR REPLACEMENT TRAINING PROGRAM                                                                                                          . 04/15/85C M56076          12/24/85C 03/14/85C                        05/03/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN
                                                -                                        M51147  F-08              12/27/84C                      05/06/85C DISPOSAL OF HASTE DIL                                                                M53234                      04/20/84C SINGLE LOOP OPERATION                                                                M46779  E-04                                              05/06/85C 05/08/85C                      05/08/85C INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCTDENT (RG                              M51077  A-17    10/26/84C 01/22/85C                        05/14/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                M5t227  F-09              04/19/85C PURGE AND VENT VALVE STOPS                                                                                                                        05/16/85C M57615                                                      05/20/85C ELECTRICAL DISTRIBUTIOil VOLTAGE                                                      M49277                      01/18/84C DEGRADED VOLTAGE RITAG T/S                                                                                                                        05/23/85C M54194          11/14/84C 01/18/85C 01/30/85              05/23/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                  M55699  A-18              04/25/85C                      05/28/85C ADMININSTRATIVE CONTROLS 10-29-84                                                    M56269                      04/25/85C ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES                                                                                        05/28/85C M12830  B-48              01/18/85C                      05/29/85C ACTIONS RE GE SIL-402                                                                  M56406 2 TEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY 06/06/85C M53575  B-85              11/07/83  01/31/85            06/10/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPABC-10)                              M52214  C-15              05/20/84C                        06/28/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54051  B-92              11/07/83C                      07/01/85C
  -INSPECTION OF BHR STAINLESS STEEL. PIPING ACCORDING TO                                M55594    B-84              12/10/84C                      07/ 01/85C INSERVICE INSPECTION INTERVALS - COMMENCE DATA                                        M57752                                                      07/01/85C SUPPRESSION POOL TEMPERATURE MONITORING SYSTEMS                                      M57136 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                  M52986    B-79 07/08/85C 06/30/85    11/07/83C                      07/16/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                              M53824    B-88              11/07/83C                      07/16/85C CONTAINMENT INTEGRITY - MSIV CLOSURE                                                  M54839                      05/06/85C                        07/30/85C REFUELING OPERAITONS-FUEL NEAR SOURCE                                                M57354                                                      08/06/85C PRIMARY CONTAINMENT AIR EMERG. TECHNICAL SPECIFICATION                                M59237                                                      08/12/&5C RECOMBINER CAPABILITY EXEMPTION                                                      M55229                                                      08/26/85C
 
R-1208687-001                                                  REGULAT0RY                    I N F-0 R M A T I 0 N                                        . RACKING            S Y.S T E M                      PAGE NO.s            23 C0NDENSED                                          M A N A G E M E.1 T.- REPORT                                                      RUN DATE ' 09/17/85 (HEADQUARTERS)
                                                                                                                          - FACILITY: BRUNSHICK 2 RAI                        SE TAC    MPA'        RAI      RESPONSE          TER          INPUT      LIC ACT TITLE                                                                                                                                    NUMBER        &          DAIX            DATE      PAIE            DATE        DATE 000 COMPLETED ISSUES MMM                                    (CONTINUATIDH)
PIPING STRESS ANALYSIS DAMPING VALVES                                                                                                    M57775                                                                        08/28/85C SERVICE HATER RAD. EFFLUENT MONITORING                                                                                                  M59008                                                                        09/05/85C RPS AND CR BLOCK INSTRUMENTATIONS                                                                                                        M59192                                                                        10/30/8SC' ROD. SEQUENCE CONTROL. SYSTEM.                                                                                                          M59194                                                                        10/30/85C i
j.
4 4
r 1
a-k.
)
        .                                                                      . . . m.  ,_          _
rr_        _                  .._._,-_m                - . _ , _ _    ,,      - -          ~  ._.,_.m -
 
i l
l    R-1208687-001                  REGULAT0RY          INF0RHATION              TRACKING        SYSTEM                        PAGE NO. 24
!                                              C0NDENSED          MANAGEMENT              REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BYRON 1 PLANT LOCATION: 17 MI SH OF ROCKFORD, ILL          LICENSED POWER: 3411 MNT                  PROJECT MANAGER: L. OLSHAN DOCKET NUMBER: 050-00454                          DESIGN P0HER:    1120 MNE                BRANCH CHIEF:      J. YOUNGBLOOD ARCH / ENGINEER: 58L                              NSSS VENDOR:    HEST                    LIC. ASSISTANT: M. RUSHBROOK
  ~ IE INSPECTOR:        .
RAI                      SE TAC    MPA        RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                          NUMBER    f&      DAIl      DATE        PJ_If        DATE        DATE MMMM ACTIVE ISSUES MMMM GENERIC LETTER 83-28 (SALEM ATHS) ITEM 4.2.1/ 4.2.2              M56283  B-81  05/03/85  08/08/85                              08/30/85 POST FUEL LOAD INITIAL TEST PROGRAM                              M57081                                                          08/30/85 LEAK BEFORE BREAK                                                M56375                                                          11/01/85 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 2.1                      M56276  B-77  03/12/85  05/07/85C                            01/c2/86 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 2.2                      M56277  B-86  03/12/85C 05/07/85C                              01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) IT EM 3.1.1/ 3.1.2            M56278  B-78                                                    01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 3.1.3                    M56279  B-79                                                    01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) IT EM 3.2.1/ 3.2.2            M56280  B-87                                                    01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 3.2.3                    M56281  B-88                                                    01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 4.1                      M56282  B-80  06/24/85C 08/08/85                              01/02/86 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 4.3 TS                    M56286  B-90  05/23/85C                                        01/02/86 GENERIC LETTER 83-28 ITEM 1.2 (SALEM ATHS) ITEM 4.5.2/4.5.3      M56288  B-93  03/12/85C 06/12/85C                              01/21/86 UPGRADE E0P                                                      M57199  F-5              12/27/85                              03/27/86 GENERIC LETTER 83-28 ITEM 1.2 (SALEM ATHS)                      M56275  B-85                                                    04/01/86 NATURAL CIRCULATION TESTING                                      M56199                                                          01/02/87 SV & RV (THI ITEM II.D.1)                                        M56200                                                          01/02/87 PUMP 8 VALVE IST                                                M56201                                                          01/02/87 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 4.2.3/ 4.2.4              M56284  B-89  05/15/85                                        01/02/87 IODINE / PARTICULATE SAMPLING                                    M57076                                                          01/02/87 RELOCATION OF CONTROLS FOR HIS                                  M57077                                                          01/02/87 SEISMIC QUALI. OF HESTINGHOUSE ESE-13                            M57078                                                          01/02/87 REACTOR SYSTEM TECH. SPECS.                                      M57079          10/18/84C                                        01/02/87 STEAM GENERATOR TUBE RUPTURE                                    M57080          05/15/84C 05/24/85C                              01/02/87 TRENDING FOR BACKUP SMM                                          M57082                                                          01/02/87 VIBRATION OF D.G. INSTRUMENTATION                                M57086          08/23/85C                                        01/02/87 CHARGING PUMP DEADHEADING                                        M57083                                                          01/27/87 DCRDR
 
==SUMMARY==
REPORT                                            M57196  F-71              12/01/86                              03/01/87 R.G. 1.97 COMPLIANCE                                            M57198  A-17              03/01/87                              06/01/87 GENERIC LETTER 83-28 (SALEM ATHS) ITEM 4.5.1                    M56287  B-92                                                    06/30/87 MN UNSCHED*Jt ED ISSVES MM SPDS                                                            M57197  F-9    11/02/84  05/29/85 LCO RELAXATION                                                  M57242 REVIEH OF REVISED LICENSED OPERATOR REQUALIFICATION TOPICAL      M57572 STEAM GENERATOR GENERIC REVIEN CONCERNING STEAM GENERATORS      M58046  C-16      0      06/17/85 HIGH RAD. AREA ADMIN. CONTROLS                                  M59027 10CFR50.62 OPERATING REACTOR REVIEWS                            M59077  A-20 HELB MONITORING / ISOLATION                                      M59441
 
R-1208687-001                                                                            REGULAT0RY                      INF0RMATION                  TRACKING              SYSTEM                PAGE NO.            25 C0NDENSED                      MANAGEMENT                REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: BYRON 1 RAI              SE TAC    MPA          RAI      RESPONSE      TER  INPUT      LIC ACT TITLE                                                                                                                                    NUMBER    &            DAlf          DATE      DAlf    DATE        DATE un UNSCHEDULED ISSUES MM                                                                (CONTINUATION)
EMERGENCY RELIEF FROM PSI                                                                                                                M59599 MMM COMPLETED ISSUES MMM TECH SPECS FOR FULL POWER                                                                                                                M56346                                                          02/14/85C VENTURE FOULING                                                                        .
M57075                        02/05/85C                        02/14/85C CONTROL ROOM VENTILATION SYSTEM                                                                                                          M57084                        01/11/85C                        02/14/85C' JET IMPINGEMENT EFFECTS                                                                                                                  M57085                                                          02/14/85C CONTROL OF HEAVY LOADS (PHASE II)                                                                                                        M57087                                                          02/14/85C JID FOR HELB (SUPERHEAT)                                                                                                                M57088                        01/08/85C                        02/14/85C VOLUME REDUCTION SYSTEM                                                                                                                  M57089                                                          02/14/85C J RIVER SCREENHOUSE SEISMIC RESPONSE                                                                                                      M57090                                      01/15/85            02/14/85C GENERIC LETTER 83-28 ITEM 1.2 (SALEM ATHS) ITEM 4.3                                                                                      M56285 B-52                                                    03/13/85C TURBINE MAINTENANCE PROGRAM                                                                                                              M56202                                                          05/20/85C GENERIC LETTER 83-28 ITEM 1.1 (SALEM ATHS)                                                                                              M56274 B-76        05/15/85C 06/05/85C                        07/11/85C UPDATED FSAR                                                                                                                            H59255                                                          08/27/85C
 
R-1208'687-001                      REGULAT0RY      INF0RMATION                  TRACKING            S'Y S T E M                    PAGE NO. 26 C0NDENSED          MANAGEMENT                REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CALLAHAY.1 PLANT LOCATION: 10 MI SE OF FULTON, M0                LICENSED PONER: 3411 MHT                      PROJECT MANAGER: T. ALEXION DOCKET NUMBER: 050-00483                              DESIGN POWER:    1I71 MHE                    BRANCH CHIEF:      B. YOUNGBLOOD ARCH / ENGINEER: BECH                                NSSS VENDOR:    HEST                          LIC. ASSISTANT:    M. RUSHBROOK
.        IE INSPECTOR:
,                                                                                                              RAI                      SE TAC        MPA        RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                              HUMBER      HQ.        RAlg      DATE        DAlf          DATE        DATE ODUM ACTIVE ISSUES MMMM LOW TEMPERATURE OVERPRESSURE PROTECTION MODIFICATIONS              M55208                                                              07/30/85 TYPE "C" TESTS ON CONTAINMENT ISOLATION VALVES                      M57754
  ' LEAK BEFORE BREAK REVIEH                                                                                                                    08/09/85 M55814                                                              09/01/85
-      SPDS REVIEH                .
M57032 10/01/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -        M56109    F-71                05/01/85    02/01/87                01/01/86 CALLANAY AUTOMATIC ACTUATION OF SHUNT TRIP FOR SCRAM                M56895    B-90                                                      01/01/86 DELETION OF RESISTANCE CHECKING OF FUSES                            M57753                                                              01/01/86 ITEM 3.1.3 - POST MAINTENANCE TESTING CHANGES TO TECH SPECS          M55193 B-79                                                          02/28/86
      . ITEM 3.2.3 POST MAINTENANCE TESTING -CHANGES TO TECH SPECS          M55203 B-88                                                          02/28/86 ITEM 2.1 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE              M55196 B-77          03/13/85C 06/01/85                              03/31/86 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR          M55199 B-81                                                          03/31/86 ITEM t.2 - POST TRIP REVIERH - DATA AND INFORMATION                  M55201 B-85                                                          04/01/86 LOCA REANALYSIS                                                      M55209-                                                              05/01/86 INSERVICE INSPECTION                      -
M55191                                                              06/08/86 INSERVICE TESTING OF PUMPS AND VALVES                                M55487                                                              06/01/86 CULTURAL RESOURCES - SECTION 4.3 0F APP "B"                          M57661                                                              09/01/86 STEAM GENERATOR TUBE RUPTURE                                          M55207                                                              12/31/86 II.D.1, RV AND SV TESTING                                            M55989    F-14                                                      01/01/87 ITEM 2.2 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL          M55200    B-86      03/t3/85C 06/01/85                              03/31/87 ITEMS 4.2.3 & 4.2.4 - LIFE TESTING & REPLACEMENT                    M55204    B-89                                                      03/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING          M55206    B-93      03/13/85C 08/01/85                              03/31/87 DC UNSCHEDULED ISSUES MM TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                  M55700 A-18 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55845 D-19 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS          M58047 C-16                    06/19/85 10CFR50.62 OPERATING REACTOR REVIEWS                                M59078 A-20 EXTENSION OF THE INITIAL 18-MONTH. SURVEILLANCE INTERVAL FOR        M59207 HIDE RANGE GAS MONITOR ACCIDENT' IODINE SAMPLING                      M59290 HYDROSTATIC TESTING OF CIVS SERVING THE CONTAINMENT AIR              M59353 i
INSERVICE TENDON SURVEILLANCE                                        M59438 FIRE PUMP DIESEL INSPECTION                                          M59540 2    ORGANIZATION TITLE CHANGE REGARDING SUPERVISOR RADWASTE              M59541 MOD COMPLETED ISSUES MMM PREOP TEST FSAR REVISIONS                                            M55181                                                                10/01/84C PUMP ANV VALVE OPERABILITY                                            M55182                                                                10/01/84C t
i m      -              -                -
 
    -.              .          .  .  .          . ..      - ._-              .  . . . .      .. ~ . - - - - .                --.
R-1208687-001                    REGULAT0RY          INF0RMATION                        T R A'C K I N G S Y S'T E M                    PAGE NO. 27 C 0 N D E N S.E D    MANAGEMENT                        REP 0RT                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CALLAHAY 1 RAI              SE TAC    MPA            RAI          RESPONSE  TER  INPUT      LIC ACT i    TITLE                                                                      NUMBER    HQ.          RAlg            DATE    EAIE    DATE        DATE DDD COMPLETED ISSUES MMM      (CONTINUATION)
SEISMIC AND DYNAMIC QUALIFICATION                                          M55183                                                            10/01/84C QUALIFICATION AND SEAL HATER INJECTION FILTER                            M55184                                09/04/84                    10/01/84C 1  I.D.1.1 - DETAILED CONTROL' ROOM DESIGN REVIEH PROGRAM PLAN              M55185 F-08                                                        10/01/84C ICC ISOLATION DEVICES                                                    M55187                                                              10/ 01/84C OPERATOR EXPERIENCE                                                      M55188                                                              10/01/84C PSI EXEMPTION REQUEST                                                    M55189                                                              10/01/84C FIRE PROTECTION ITEMS                                                    M55190                                                              10/01/84C ENVIRONMENTAL ERRORS FOR SECONDARY TRIPS                                  M55192                                                              10/01/84C REVISION TO TECH SPEC FIGURE 6.2.1                                        M55389                                                              10/18/84C CHANGE TO TECH. SPEC. 3.4.9.3 AND 4.6.1.2 RE: APPENDIX J                  M55434                                                              10/18/84C PREPARATION FOR FULL-POWER LICENSE                                        M56070                                          N/A                10/18/84C ORGANIZATIONAL CHANGE                                                    M56060                                                              01/30/85C ADDITIONAL BATCH HASTE RELEASE TANKS                                      M56071                                                              02/04/85C TECH SPEC CHANGES FOR SOURCE RANGE MONITORS                              M55454                                                              03/06/85C-REVISION TO LC 2.C.(3).(A)                                                M56637                                                              03/28/85C SURVEILLANCE OF CONTAINMENT VESSEL TENDONS                                M56893                                                              04/04/85C REG GUIDE 1.97, REV. 2                                                    M55180              06/26/84C 08/14/84C 01/00/85C                  04/10/85C
. TECH. SPEC. ORGANIZATIONAL CHARTS                                        M56894                                                              04/29/85C
  ' ITEM 1.1 POST TRIP REVIEW - PROGRAM DESCRIPTION AND                      M55195 B-76                                                        05/07/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING PROCEDURES                M55194 B-78                                                        06/25/85C
  . ITEM 4.1 - REACTOR SYSTEM RELIABILITY VENCOR RELATED-                    M55198 B-80                                                        06/25/85C ITEM 3.2.1 & 3.2.2 POST MAINTENANCE TESTING PROCEDURES AND                M55202 B-87                                                        06/25/85C ITEM 4.5.1 REACTOR TRIP SYSTEM FUNCTIONAL TESTING - DIVERSE              M55205 B-92                                                        06/25/85C EXEMPTION REQUEST FOR APPENDIX J                                          M55453                                                              10/05/85C CONTAINMENT PURGE VALVE OPERABILITY                                      M55679  B-24                                                        10/26/85C r
 
R-1208687-001                  REGULAT0RY                  INF0RMATION                      TRACKING          SYSTEM                          PAGE NO.      28 C0NDENSED        MANAGEMENT                        REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)-
FACILITY: CALVERT CLIFFS 1 PLANT LOCATION: 40 MI S OF ANNAPOLIS, MD                  LICENSED PONER: 2700 MHT                            PROJECT MANAGER: D. JAFFE DOCKET NUMBER: 050-00387                                  DESIGN POWER:            0845 MHE                  BRANCH CHIEF:        E. BUTCHER APCH/ ENGINEER: BECH                                      NSSS VENDOR:              COMB                      LIC. ASSISTANT:      P. KREUTZER IE INSPECTOR:      T. FOLEY RAI                        SE TAC    MPA          RAI  RESPONSE        TER        INPUT      LIC ACT TITLE                                                                        NUMBER      HQ.          R&lg    DATE        DAIE          DATE          DATE      ,
4 0000 ACTIVE ISSUES NMMM MISC. CHANGES TO T/S DTD 4/26/85                                              M57667                                                                09/01/85 NUREG 0737, II.K.3.25 POWER ON PUMP SEALS                                      M48443 F-53                                                            09/30/85 ISI CODE RELIEF (RCP SURVEILLANCE)                                            M56884                                                                09/30/85 CHANGE TO DG TECH. SPEC. (NON 84-15)                                          M59200                                                                09/30/85 RTB TECH. SPEC. CHANGE                                                        M59201                                                                09/30/85 MISC. TECH. SPEC. CHANGES (APPL. DATED 6/28/85)                                M59269                                                                09/30/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE'                    M54052 B-92                                                            10/30/85
,        I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -                  M56tto      F-71                            06/26/85                  10/30/85 TS FOR HYDROGEN PURGE SYSTEM                                                  M53365            11/20/84                                            10/31/85 CHANGE TO TECH. SPEC. FOR STATION BATTERY                                      M59268                                                                10/31/85 DIESEL GENERATOR RELIAEILITY TECH. SPECS. (GL 84-15)                          M55846      D-19                                                      11/15/85 ITEM 3.1.5-POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                        M52987      B-79                                                      11/30/85
,        ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                        M53825 B-88                                                            11/30/85 HATER LEVEL MONITOR                                                            M56849                                                                11/30/85 CONTROL ROOM HVAC -            -
M56990                                                                11/30/85 RCS VENTS TECHNICAL SPECIFICATI0HS NUREG 073 ITEM II.B.1                      M54383                                                                12/15/85 REVIEN OF ASYMMETRIC LOCA LOADS                                                M08951      D-10                                                      12/31/85 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)                      M44289      F-05  07/19/85C                10/19/84C                  12/31/85 REACTOR COOLANT PUMP TRIP-                        .
M49674 G-01                    04/05/85C                              12/31/85 ITEMS 3.1.1 & 3.1.2 -- POST MAINTENANCE TESTING                                M52906 B-78                                                            12/31/85 REACTOR TRIP SYSTEM RELIABILITY- VENDOR RELATED                                M53062 B-80                                                            12/31/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                    M53576 B-85                                                            12/31/85 RV AND SV TESTING                                                              M44569      F-14  06/28/85C 10/31/85                                  01/31/86
,        I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                        M51228      F-09                                                      03/30/86        -
NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUM'.NTATION                  M45121      F-26  01/09/85    07/01/85                              07/31/86 ITEM 2.1 - EQUIPMENT CL ASSIFICATION AND VENDOR INTFf ACE -                  M52825 B-77                                                            08/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M53659 B-86                                                            12/01/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                      M51078      A-17                                                      12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                      M53742 B-87                                                            12/31/86 YTEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                  M53902      B-89'                                                      12/31/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL lESTING                  M53969      B-93  04/02/85                                            12/31/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                M45932 F-63                                                            12/31/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                              M46003      F-64                                                      12/31/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                          M46075 F-65              -                                            12/31/87 737 III - A.2.2, METEOROLOGICAL DATA UPGRADE                                  M46291 F-68                                                            12/31/87 MO UNSCHEDULED ISSUES MM UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                  M58048 C-16                      06/19/85 t
 
R-1208687-001                      R2GULAT0RY          INF0RMATION              TRACKING        SYSTEM            PAGE NO.:    29 C0NDENSED          MANAGEMENT          REPORT                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CALVERT CLIFFS 1 RAI          SE TAC    MPA      RAI    RESPONSE  TER  INPUT      LIC ACT TITLE                                                                NUMBER    &      DAIL      DATE  PAlf. DATE        DATE Mu UNSCHEDULED ISSUES Mu          (CONTINUATION) 10CFR50.62 OPERATING REACTOR REVIEHS                              M59079 A-20 ASME CODE EXEMPTION (CK VALVES)                                      M59603 tuu COMPLETED ISSUES WMM I.D.1.1 - DETAILED CONTROL ROOM DES 4N REVIEH PROGRAM PLAN        M51148  F-08              09/01/83                  10/10/84C AFH                                                                M55249                                              11/14/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42494  B-60              08/22/81C                11/20/84C CHANGE TO ETS - REPORTING                                          M54776                                              01/14/85C FIRE PUMP TESTING                                                  M54977                                              01/14/85C TS FOR MONTHLY VALVE LINE-UP                                      M55430                                              01/14/85C TS FOR COMPONENT COOLING OP.                                      M55431                                              01/14/8 5C ALTERNATE HIDE RANGE NEUTRON FLUX INSTRUMENTATION                  M55432                                              01/14/85C CLARIFICATION OF HOSE STATIONS LOCATIONS                          M55433                                              01/14/8 5C NUREG-0737 II.B.3.2 POST ACCIDENT SAMPLING MODIFICATIONS          M44428  F-12                                      02/12/85C APPENDIX J (ILRT) SCHEDULE                                        M55990                                              02/14/85C APPENDIX I TECH. SPEC IMPLEMENTATION REVIEW                        M08156 A-02              01/15/79C                02/22/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54523 B-83                                        02/22/85C EQUAL SCHEDULE RELIEF                                              M56967                                            03/12/85C DESCRIPTION AND PROCEDURES                                        M52744 B-76                                        04/11/8 5C IST DATE                                                          M56804                                            04/18/85C LICENSE DA1E CHANGE                                                M55289                                            0 5/ 01/85C IREP                                                              M54810                                            05/09/85C G2 DER DATE CHANGE II.F.1.1                                        M56307                                            05/09/85C CYCLE 8 SNUBBER MODS                                              M56799                                            05/16/85C MISC. TECH. SPEC. CHANGES ( APPL. DATED 1/31/85)                  M56826                                            05/16/85C CYCLE 8                                                            M56437                                            05/10/85C CODE RELIEF (SPRAY LINE HELD)                                      M57624                                            05/20/85C NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                M48153 F-58                                        06/25/85C NUREG-0737 II.K.3.30, SB LOCA DUTLINE                            M45812 F-57                                        06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)          M52215 C-15                                        06/28/85C ITEMS 4.2.1 & 4.2.2- PREVENTATIVE MAINT PROGRAM FOR REACTOR      M53115 B-81                                        07/10/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42890 B-59    11/21/84C 06/15/85                  07/18/85C ALTERNATE STA QUAL. T/S                                          M57668                                            08/01/85C ASME-CC-N-411                                                    M57617                                            08/06/85C
 
w R-1208687-001                              REGULAT0RY      INF0RMATION              TRACKING        SYSTEM                        PAGE NO.8    30 C0NDENSED        MANAGEMENT            REPQRT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CALVERT CLIFFS 2 PLANT LOCATION: 40 MI S OF ANNAPOLIS, M0                  LICENSED PONER: 2700 MHT                PROJECT MANAGER: D. JAFFE DOCKET NUMBER: 050-00318                                  DESIGN PONER:    0845 MHE                BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: BECH                                      NSSS VENDOR:    COMB                    LIC. ASSISTANT    P. KREUTZER IE INSPECTOR                      T. FOLEY RAI                      SE TAC    MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                                    NUMBER  Hai      DATE      DATE        DAlf        DATE        DATE DDRO ACTIVE ISSUES MMMM NUREG 0737. II.K.3.25 P0HER ON PUMP SEALS                                M48444 F-53    04/30/85                N/A                    09/30/85 TS FOR HYDROGEN PURGE SYSTEM                                            M53556                                                        09/30/85 ISI CODE RE!.IEF (RCP SURVEILLANCE)                                      M56885                                                        09/30/85 CHANGE TO DG TECH. SPEC (NON D-19)                                      M59455                                                        09/30/85 CHANGE TO TECH. SPEC. FOR STATION BATTERY                                M59456                                                        10/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -            M56111  F-71                          06/26/85                10/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                    M55847  D-19                                                  11/15/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                  M53826  B-88                                                  11/30/85 CONTROL ROOM HVAC                                                        M56991                                                        11/30/85 HRTER LEVEL MONITOR                                                      M56850                                                        11/31/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.t                  M54384                                                        12/15/85 REVIEN OF ASYMMETRIC LOCA LOADS                                          N08950  D-10                                                  12/31/85 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                  M44290  F-05  07/19/85C              10/19/84C                12/31/85 REACTOR COOLANT PUMP TRIP                                                M49675 G-Of              04/05/83C                            12/31/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                            M52907 B-78                                                    12/31/85 REACTOR TRIP SYSTEM RELIABILITY- VENDOR RELATED                          M53063 B-80                                                    12/31/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY              M53577 B-85                                                    12/31/85 RV AND SV TESTING                                                        M44570  F-14  06/28/85C 10/31/85                            01/31/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                  M51229  F-09                                                  03/30/86 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION            M45122  F-26  01/09/85  07/01/85                            07/31/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M52826  B-77                                                  08/30/86 ITEM 3.1.5-POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                  M52988  B-79                                                  11/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                  M51079  A-17                                                  12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53660  B-86                                                  12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                  M53743  B-87                                                  12/31/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP              M53903  B-89                                                  12/31/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING            M53970  B-93  04/02/85                                        12/31/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                M54053  B-92                                                  12/31/86 NUREG-0737 III.A.t.2. TECHNICAL SUPPORT CENTER                          M45933  F-63                                                  12/31/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                        M46004  F-64                                                  12/31/87 NUREG-0737 III.A.I.2, EMERGENCY OPERATIONS FACILITY                      M46076  F-65                                                  12/31/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                        M46292  F-68                                                  12/31/87 00 UNSCHEDULED ISSUES MN UTILITY REL _'ISES TO STAFF RECOMMENDATIONS CONCERNING STEAM            M58049  C-16            06/19/85 10CFR50.62 1PERATING REACTOR REVIENS                                    M59080 A-20 CYCLE 7                                                                  M59594 ASME CODE EXEMPTION (CK VALVES)                                          M59604
 
  -        - - . - .        . . . . - - . - - ,            - -        ~  . - -  . ,- -        =_ ~ .. .        - - .      . . .    -. . . . - - . - - .            . .  - . _ .      -
R-1208687-001                                REGULAT0RY              INF0RMATION                      TRACKING              SYSTEM                            PAGE NO.s      31
,                                                                C0NDENSED                MANAGEMENT                  REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CALVERT CLIFFS 2 RAI                          SE TAC          MPA        RAI      RESPONSE                    TER INPUT      LIC ACT TITLE                                                                                NUMBER        HIL,    R81E          DATE                  DAIE    DATE          DATE 00 UNSCHEDULED ISSUES MM                    (CONTINUATION)
MOD COMPLETED ISSUES MMM I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                          -M51149        F-08                09/01/83                                    10/10/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                            M42495 B-60                      08/22/81C                                    11/20/84C AUX. FDHTR-TS                                                                        M54775                                                                        12/28/84C NUQEG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                            M44429        F-12                                                            02/12/85C
      . APPENDIX I TECH SPEC IMPLEMENTATION REVIEW-                                          M08137      A-02                01/15/79C                                    02/22/85C
    ' TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                            M54524      B-83                                                              02/22/85C EQUAL SCHEDULE RELIEF                                                                M56966                                                                        03/31/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                  M52745 B-76                                                                    04/11/85C ORDER DATE CHANGE II.F.1.1                                                          M56308                                                                        05/09/85C MISC. TECH.. SPFC. CHANGES ( APPL'. DATED 1/31/85)                                  M56825                                                                        05/16/85C NUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46                                    M48154      F-58                                                              06/25/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                M45813 F-57                                                                    06/28/85C HIGH BURNUP REPORT                                                                  M48946                                                                        06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                            M52216      C-15                                                              06/28/85C          r ITEMS 4.2.1 & 4.2.2- PREVENTATIVE MAINT-PROGRAM FOR REACTOR                          M53116      B-81                                                              07/10/85C          i MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                  M42891      B-59  11/21/84      01/15/85                                    07/18/85C HPSI FLOH CHANGE                                                                    M57622                                                                        08/30/85C l
1 t
4 k
i i
 
            .R-1208687-001                          REGULAT0RY                    INF0RMATION                          TRACKING              SYSTEM                          PAGE N0.8  '32' C0NDENSED                MANAGEMENT                      REP 0RT                                RUN DATE: 09/17/85 (HEADQUARTERS)
                                                                                . FACILITY: CATAHBA 1 PLANT LOCATION: 6 MI NNW OF ROCK HILL, SC                          LICENSED PDHER: 3411 MHT                                PROJECT MANAGER: K. JABBOUR DOCKET NUMBER: 050-00413                                          DESIGN POWER:              1145 MHE                    BRANCH CHIEF:      E. ADENSAM ARCH / ENGINEER' DUKE                                              NSSS VENDOR:                HEST                        LIC. ASSISTANT: M. DUNCAN IE INSPECTOR:
RAI                        SE TAC    MPA        RAI      RESPONSE      TER        INPUT        LIC ACT TITLE                                                                                      NUMBE8      HQ -      RALE          DATE        DALE            DATE        DATE 000* ACTIVE ISSUES MMMM
            ' HYDROGEN CONTROL MEASURES II.B.7 (L.C. 814)                                                M56633                                                                  09/30/85 SAFETY PARAMETER DISPLAY SYSTEM (L.C. 012)                                                M56634                                                                  09/30/85 RELIEF FROM SECTION XI 0F THE 1980 ASME                                                    M57882                                                                  09/30/85 EMERGENCY PROCEDURES GUIDELINES                                                            M57888                                                                  09/30/85 SEISMIC GUALIFICATION OF EQUIPMENT (LIUNSE COND. 19, NPF-35)                              M59059                                                                  09/30/85 MAZN STEAM LINE BREAK INSIDE CONTAIRMENT                                                  M56552                                                                  10/31/85 MSLB SUPERHEAT                                                                            M57330                                                                  10/31/85
            - FOG MONITORING PROGRAM, ENVIRONMENTAL PROTECTION PLAN                                      M59346                                                                    10/31/85 POST-FUEL-LOADING STARTUP TEST PROGRAM (LICENSE COND. 83)                                  M59347                                                                  10/31/85 M57329 UPGRADE OF PRESSURIZER & STEAM GENERATOR PORVS                                                                                                                      11/29/85 TURBINE OVERSPEED PROTECTION TECH. SPEC. 3/4.3.4.1                                        M57726                                                                    12/02/85 ICE CONDENSER D00R$ TECH. SPEC. 3/4.6.5.3                                                M57725                                                                    12/20/85
+
UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                              M58050 C-16                      07/17/85                                12/20/85 i HEARING BEFORE U.S. COURT OF APPEALS                          .
M56485                                                                    12/31/85 CELAXATION OF RITS OUTAGE TIMES PER HCAP-10271                                            M59322                                                                    12/31/85 NUREG=0737 III.A.2.2 METEOROLOGICAL DATA UPGRADE                                          M59339      F-68                                                          12/31/85
            ' NUREG-0737 III.A.1.2 TECHNICAL SUPPORT CENTER                                              M59343 F-63                                                              12/31/85            ,
NUREG-0737 III.A.1.2 OPERATIONAL SUPPORT CENTER                                            M59344 F-64                                                              12/31/85 NUREG-0737 III.A.1.2 EMERGENCY OPERATIONS FACILITY                                        M59345 F-65                                                              12/31/85 EMERGENCY PLANNING ISSUES (LICENSE CONDITION NUMBER 23)                                  M59394                                                                    12/31/85 INSERVICE TESTING OF PUMPS & VALVES REVIEN                                                M56487                                                                    01/31/86 GL83-28 ITEM 3.1.1/3.1.2 POST-MAINTENANCE TESTING                                          M57740      B-78                                                          01/31/86 GL83-28 ITEM 4.1 RTS RELIABILITY (VENDOR RELATED                                          M57741      B-80                                                          01/31/86 GL83-28 ITEM 2.2 EQUIP. CLASS. & VENDOR INTERFACE (ALL OTHER                              M57742      B-86                                                          01/31/86 GL83-28 ITEM 2.1 EQUIPMENT CLASSIFICATION AND VENDOR                                      M57743 B-77                                                              01/31/86 GL83-28 ITEMS 4.5.2/4.5.3 RTS RELIABILITY (SYS FUNCTION                                  -M57744 B-93                                                                01/31/86 GL83-28 ITEMS 4.2.1/4.2.2 RTS RELIABILITY MAINT. AND                                      M57748 B-81        05/04/85                                              01/31/86 10CFR50.62 OPERATING REACTOR REVIENS                                                    M59081 A-20                                                              01/31/86 INSERVICE INSPECTION PROGRAM (LICENsf CONDITION 06)                                      M56630                                                                    02/28/86 GL83-28 ITEM 3.2.3 POST MAINTENANCE TESTING TECH. SPEC.                                    M57723      B-88                                                          04/30/86 GL83-28 ITEM 3.1.3 POST MAINTENANCC TESTING TECH. SPEC                                    M57739      B-79                                                          04/30/86 INSTRUMENTATION FOR INADEQUATE CORE COOLING (L.C. 815)                                    M56631                                                                    07/31/86 R.G.I.97, REV. 2 COMPLIANCE (L C. 812A)                                                  .M56635              09/16/85                                              07/31/86          ''
I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN - F-71                                        M56692                                                                    07/31/86 4            GL83-28 ITEM 4.3(TECH. SPEC.) RTS RELIABILITY (AUTO                                        M57745    B-90                                                          12/20/86 GL83-28 RTS RELIABILITY (TESTING & REPLACE'MT) ITEMS                                      M57746    B-89                                                          12/20/86 GL83-28 ITEM 4.5.1 RTS RELIABILITY (SYSTEM FUNCTIONAL                                      M57747. B-92                                                              12/20/86 GL83-28 ITEMS 3.2.1/3.2.2 POST MAINTENANCE TESTING                                        M57724    B-87                                                          12/31/86 GENERIC LETTER 83-28 (L.C. 822)                                                            M56632                                                                    01/31/87 i
 
  -                    -    . . -    .-        . . -      ~  - - . -        =              ..__~.      ..      - . -          -          . . - - -          . -          ...
R-1208687-001                  REGULAT0RY                INF0RMATION                  TRACKIHG1 SYSTEM                                        PAGE N0.8      33 C0NDENSED                MANAGEMENT                  REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CATAWBA 1 RAI                          SE TAC    MPA            RAI      RESPONSE      TER            INPUT        LIC ACT      <
TITLE                                                                  NUMBER    ti[L.        DAlf,        DATE        DAlf            DATE          DATE EMuu ACTIVE ISSUES MMMM      (CONTINUATION) nM UNSCHEDULED ISSUES MM TECH. SPEC. 3/4.8.1 DN DIESEL GENERATOR RELIABILITY (0.L.              M59459 RELEASE OF SHIFT ADVISORS (L.C. 810)                                  M59526 TDI OWNERS GROUP DR/QR              .
M59537
            . TECH. SPEC. FIGURE 3.2-3 CONCERNING RCS TATAL FLOH RATE                M59641 TECH. SPEC. 4.8.2.1.1A CONCERNING ELECTROLYTE                          M59642 TECH SPEC. 6.5, 6.6, 6.8 AND 6.10.2.L CONCERNING                      M59643 G. L. 85-12 REGARDING IMPLEMENTATION OF II.K.3.5 AUTO TRIP.            M59646  G-1 TECH. SPEC. CHANGE CONCERNING ELIGIBILITY REQUIREMENTS FOR            M59650
            ' u::n COMPLETED ISSUES MMM INTERNAL CORROSION PROTECTION FOR FUEL DIL STORAGE TANKS              M56486                                                                        01/07/85C l
REVIEW OF TRAINING (FSAR SECTION 13.2 RES, 10)                        M56511                                                                        01/14/85C i
TECHNICAL SPECIFICATIONS AND ENV. PROT. PLAN (L.C.82)                  M56636                                                                        01/17/85C INITIAL STARTUP TEST PROGRAM (LICENSE CONDITION 83)                    M56510                                                                        01/18/85C GL83-28 SALEM ATHS ITEM 1.2 POST-TRIP REVIEW (DATA AND                M57537 B-85                                  04/04/85                        06/21/85C GL83-28 SALEM ATHS ITEM 1.1 PSOT-TRIP REVIEH (PROGRAM                  M57538 B-76                                                                  06/21/85C
            'NUREG 0737, II.K.3.30, SB LOCA METHODS                                  M59011 F-57                                                                  06/26/85C l
l l
                      \
m                --                .a    , - .
 
R-1208687-001                      REGULAT0RY        INF0RMATION              TR4CKING        SYSTEM                          PAGE NO. 34 C0NDENSED        MANAGEMENT            REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: COOK 1 PLANT LOCATION: 11 MI S OF BENTON HARBOR, MI        LICENSED POWER: 3250 MNT                  PROJECT MANAGER: D. HIGGINTON DOCKET NUMBER: 050-00315                            DESIGN P0HER:    1030 MNE                BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: AEP                                  NSSS VENDOR:    HEST                    LIC. ASSISTANT:    C. PARRISH IE INSPECTORt            E. SHANSON RAI                        SE TAC    MPA      RAI    RESPONSE      TER          INPUT      LIC ACT TITLE                                                              NUMBER    &        DAlf      DATE        RJEE            DATE        DATE unum ACTIVE ISSUES uwan ITEM 4.3 CTS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55349  B-90                                                      05/01/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53661  B-86              03/30/84                                06/15/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M53971  B-93  03/11/85C 11/04/83                                06/15/85 10CFR50.62 OPERATING REACTOR REVIENS                              M59082 A-20                                                        08/16/85 RV AND SV TESTING                                                  M44573  F-14  03/14/85  07/01/85                                09/30/85 SURVEILLANCE REFERENCE TO 4.0.5                                    M51602                                                            09/30/85 EXEMPTION FOR ASYMMETRIC LOADS                                      M55519                                                            09/30/85 RCP IN MODE 3                                                      M56440                                                            09/30/85 AUXILIARY FEEDHATER PUMPS 83-37 8 INTERPRETATION                    M57680                                                            10/15/85 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION        M45126 F-26              05/30/85                                10/30/85 VALVE TESTING MODS TD TECH SPECS                                    M56242                                                            10/30/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM        M58051 C-16              06/21/85                                11/01/85 TECH. SPEC. REVIEW ORGANIZATION                                    M56846                                                            12/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53578  B-85              11/04/83                                12/31/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52827  B-77              11/04/83                              01/01/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55848  D-19                                                    01/01/86 REACTOR COOLANT PUMP TRIP                                          M49701    G-01            05/30/84                                01/16/86 NUREG-0737 III.A.I.2, TECHNICAL SUPPORT CENTER                      M45937    F-63                                                    02/01/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                    M46008    F-64                                                    02/01/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46080    F-65                                                    02/01/86
'      NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46296    F-68                                                    02/01/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)            M44294    F-05  07/30/85              04/ 01/85C                  03/30/86 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG            M51080    A-17  03/01/85                                          04/15/86 ITEM 4.2.3 8 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX          M53904    B-89  05/15/85  11/04/83                                11/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                  M54054    B-92              11/04/83                                11/30/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                  M48158    F-58  05/24/85  05/31/86                                12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53744    B-87                                                      12/31/86 HYDROGEN CONTROL FINAL RESOLUTION                                  M49520                    07/01/86                                01/15/87 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -        M56112    F-71              12/15/86  0t/15/87                    04/01/87 unu COMPLETED ISTUES MMM ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M52989    B-79              11/04/83                              10/29/84C ITEM 3.2.5 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53827    B-88              11/04/83                              10/29/84C AFHS FLOW FOR STEAM BREAK                                          M57017                                                            10/30/84C F/Q INCREASE AND EXTEND BURNUP                                      M55659                                                            11/29/84C 50.49 EXTENSION                                                    M55507                                                            12/10/84C ISI (NRC) REQUESTED SUPPLEMENT                                      M51323                                                            12/18/84C ISI/IST START DATE HITH RELIEFS                                    M55951                                                            12/18/84C
 
R-1208687-001                  R-E G U L A T 0 P. Y INF0RMATION              TRACKING        SYSTEM                PAGE i40.8    35 C0NDENSED          MANAGEMENT          REPQRT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: COOK 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            HUMBER    &      MIX      DATE      MIX    DATE        DATE 1103 COMPLETED ISSUES MMM      (CONTINUATION)
ISI RELIEF 7/23/84                                              M55497                                                01/10/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL        M42460  B-60            10/18/84                    01/11/85C ITEM 4.5 - AUTDAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR      M53167  B-82            12/01/84                    01/23/85C I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN      M51150  F-08            12/29/83                    02/01/85C STRUCTURAL ANALYSIS OF THE CONTAINMENTS ULTIMATE STRENGTH        M43072        08/15/84                              02/21/85C EQUIPMENT SURVIVABILITY: HYDROGEN BURN                          M43523        08/15/84                              02/21/85C ENVIRONMENTAL QUAL EXTENSION                                    M56438                                                03/01/85C ICE CONDENSER TECH SPEC CHANGES                                  M56606                                                04/ 01/ 85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS        M44433  F-12  05/02/84  11/07/84                    04/tt/85C
          'AFHS FLOH INTERPRETATION                                          M56427                  03/01/85                      04/11/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52746  B-76            03/30/84  12/12/84          05/10/85C NUREG-0737 II.K.3.30, SB LOCA DUTLINE                            M45818  F-57                                          05/23/85C ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR      MS3117  B-81  11/14/84 03/30/85                      05/23/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,      M54525 B-83    08/13/84 04/01/85                      05/23/85C SAFETY INJECTION MINIFLON INCREASE                              M57125                                                06/24/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                  M52908  B-78            11/04/83                    06/27/85C REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                M53064  B-80            11/04/83                    06/27/85C HEAT UP COOL DOHN CURVE                                          M56923                                                06/27/85C C0ZTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)        M52217 C-15                                          06/28/85C ISI RELIEF PRESSURE TESTS                                        M57692                                                06/28/85C MISCELLANEOUS T.S. CHANGES DATED 3.29/82 AEP659                  M48291                  01/01/85                      08/05/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55701  A-18                                          08/05/85C REVIEW GROUP, LER, OTHER TECH. SPEC. CHANGES                    M56556                                              08/05/85C ELECTRICAL POWER SYSTEM CHANGES                                  M57693                                                08/05/85C COLD OVERPRESSURIZATION                                          M59270                                                08/09/85C HEAT UP COOL DOHN CURVE REVISION                                M59271                                                08/09/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51230  F-09  12/21/84 04/03/85C    N/A              08/12/85C PIPE HYDRO RELIEF REQUEST                                        M59272                                              08/13/85C ECCS ERROR AND CORE HEIGHT F(Q)                                  M57236                                              08/14/85C ADMIN CONTROL EQ DELETION                                        M57961                                              08/19/85C REACTOR TRIP AND ESF SYSTEM INSTRUMENTATION                      M57331                                                08/26/85C BART ERROR                                                      M59299                                                08/26/85C FIRE EXEMPTIONS PART 2 HATCH / GAP                              M55809                                                08/27/85C INSERVICE TESTING - IST OF PUMPS & VALVES - to CFR 50.55A(G)    M11331  A-14  02/01/85 05/10/85  04/30/85          09/04/85C RDF RDT SETPOINTS                                                M59318                                                09/04/85C
 
_ _ _ _ _ _                  _ _ _ . _ _ _ _ __ _, ___ _                                          _      . _ _ _ .          _-          _ . _ _ . ._          _ _ . , _ . . _ _ _ _ _ _ . _ _ _ .                          _. .        ~    . _ _ .
i R-1208687-001                                                  REGULAT0RY                INF0RMATION                      TRACKING                                SY$ TEM                                  PAGE NO.      36 4
C0NDENSED                MANAGEMENT                        REPORT                                                      RUN DATE: 09/17/85 (HEADQUARTERS) l FACILITY: COOK 2 PLANT LOCATION: 11 MI S OF BENTON HARBOR, MI                                            LICENSED PONER: 3411 MHT                                          PROJECT MANAGER: D. HIGGINTON DOCKET NUMBER: 050-00316                                                                DESIGN P0HER .          1100 MNE                                    BRANCH CHIEF:                      S. VARGA ARCH / ENGINEER: AEP                                                                    NSSS VENDOR:          HEST                                        LIC. ASSISTANT: C. PARRISH
              .IE INSPECTOR:                      E. SHANSON RAI                                SE TAC        MPA                RAI              RESPONSE                      TER        INPUT        LIC ACT TITLE                                                                                                      NUMBER      &                RAlf,                    DATE                  R_Alf.        DATE          DATE Muun ACTIVE ISSUES MMMM 1              ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                                M55350      B-90                                                                                      05/01/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                M53662      B-86                              03/30/84                                                06/15/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                              M53972      B-93            0 3/11/85C 11/04/83                                                        06/15/85 RV AND SV TESTING                                                                                          M44574      F-14            03/14/85          07/01/85                                                09/30/85 SURVEILLANCE REFERENCE TO 4.0.5                                                                            M51603                                                                                                09/30/85 EXEMPTION FOR ASYMMETRIC LOADS AND C3A LIC. COND.                                                          M55820                                                                                                09/30/85 RCP IN MODE 3                                                    -                                        M56441                                                                                                09/30/85                !
AUXILIARY FEEDHATER PUMPS 83-37 8 INTERPRETATION                                                          M57681                                                                                                10/15/85 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION                                              M45127      F-26                              01/30/85                                                10/30/85 VALVE TESTING MODS TO TECH SPECS                                                                          M56243                                                                                                10/30/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                M58052 C-16                                    06/21/85                                                11/01/85 TECH. SPEC. REVIEW ORGANIZATION .                                                                          M56847                                                                                                12/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                                MS3579 B-85                                    11/04/83                                                12/31/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                M52828      B-77                              11/04/83                                                01/01/86 i
DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                      M55849      D-19                                                                                      01/01/86 REACTOR COOLANT PUMP TRIP                                                                                  M49702 G-01                                    05/30/84                                                01/15/86 i
NUREG-0737 III.A.t.2, TECHNICAL SUPPORT CENTER                                                            M45938      F-63                                                                                      02/01/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                          M46009      F-64                                                                                      02/01/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                        M46081      F-65                                                                                      02/01/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                          M46297      F-68                                                                                      02/01/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/t)                                                  M44295 F-05                07/30/85                                      04/ 01/85C                  03/30/86 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                                                    M51081 A-17                11/01/85                                                                  04/15/86 ITEM 4.2.3 & 4.2.4 - PREVENTATIVE MAINTENANCE PROGRAM FOR RX                                              M53905 B-89                05/15/85          11/04/83                                                11/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                  M54055 B-92                                    11/04/83                                                11/30/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                                                          M48159 F-58                                    05/31/86                                                12/31/86 M53745 B-87                                                                                            12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                                                                  07/01/86                                                01/15/87 HYDROGEN CONTROL FINAL RESOLUTION                                                .                        M49519                      07/01/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                              M56113 F-71                                    12/15/86                    01/15/87                    04/01/87 um UNSCHEDULED ISSUES MM t
i              10CFR50.62 OPERATING REACTOR REVIENS                                                                      M59083 A-20 STEAM GENERATOR TUBE LEAKS                                                                                M59633 MMN COMPLETED ISSUES MMM ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                                      M52990 B-79                                    11/04/83                                              10/29/84C TTEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                    MS3828      B-88                                11/04/83                                              10/29/84C M57018                                                                                                10/30/84C AFHS FLOW FOR STEAM BREAK l
_ _ _ .                      , _ _ _ _ _ _ _ _ .        - _ _ . -        _              _                              -          ~                                -
 
R-1208687-001                      REGULAT0RY            INF0RMATION                TRACKING        SYSTEM                PAGE NO. 37 C0NDENSED            MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: COOK 2 RAI              SE TAC      MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                  NUMBER    11Q      DAIf      DATE      Dale  DATE        DATE 000 COMPLETED ISSUES WMM          (CONTINUATION) 50.49 EXTENSION                                                        M55508                                                  12/10/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN            M51151  F-08              12/29/83                      12/14/84C ISI (NRC) REQUESTED SUPPLEMENT                                        M51324                                                  12/18/84C ISI/IST START DATE HITH RELIEFS                                        M55952                                                  12/18/84C ISI RELIEF 7/23/84                                                    M55498                                                  01/10/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL              M42461  B-60              06/30/84                      01/11/85C ITEM 4.3 - AUTDAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR            M53168  B-82                12/01/84                    01/23/85C STRUCTURAL ANALYSIS OF THE CONTAINMENTS ULTIMATE STRENGTH              M43071          08/15/84                                02/21/8 5C EQUIPMENT SURVIVABILITY: HYDROGEN BURN                                M43524                                                  02/21/85C ENVIRONMENTAL QUAL EXTENSION                                          M56439                                                  03/01/85C ICE CONDENSER TECH SPEC CHANGES                                        M56607                                                  04/01/85C PANEL 8 ELEC SHITCHGEAR QUAL-LIC. COND. 3(R) COND. 3(R)                M12619          02/21/84  12/07/84                    04/09/85C CYCLE 5 AND ONE HALF PEAKING FACTORS                                  M55660                                                  04/09/85C NUREG-0737 II.B.3.2. POST ACCIDENT SAMPLING MODIFICATIONS              M44434 F-12      05/02/84  08/31/84                      04/11/8 5C AFHS FLOW INTERPRETATION                                              M56428                    03/01/85                      04/11/8 5C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                    M52747  B-76              03/30/84  12/12/84          05/10/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                  M45819  F-57                                            05/23/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR            M53118  B-81    11/14/85  03/30/85                      05/23/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,            M54526  B-83    08/13/84  04/01/85                      05/24/85C ECCS ERROR AND CORE HEIGHT F(Q)                                        M57237                                                  06/12/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M52909  B-78                11/04/83                    06/27/85C REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                      M53065 B-80                11/04/83                    06/27/85C HEAT UP COOL DONN CURVE                                                M56924  .
06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPA8C-10)              MS2218 C-15                                              06/28/85C ELEC SYS (BARTONS) QUAL FOR STEAM BREAK /LOCA LOCA                    N04997                                                  07/22/85C MISCELLANEOUS T.S. CHANGES DATED 3/29/82 AEP659                        M48292                      12/01/84                    08/05/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                    M55702  A-18                                            08/05/85C REVIEW GROUP, LER OTHER TECH. SPEC. CHANGES                            M56557                                                  08/05/85C ELECTRICAL P0HER SYSTEM CHANGES                                        M57694                                                  08/05/85C ADMIN CONTROL EQ DELETION                                              M57962                                                  08/19/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51231  F-09                05/01/85                    08/22/85C QEACTOR TRIP AND ESF SYSTEM INSTRUMENTATION                            M57352                                                  08/26/85C FIRE EXEMPTIONS PART 2 HATCH / GAP                                    M55810                                                  08/27/85C INSERVICE TESTING OF PUMP AND VALVES- 10 CFR 50.55 A(G)              M11334  A-14    02/01/85  03/01/85  04/30/85          09/04/85C
 
R-1208687-001                  q REGULAT0RY            INF0RMATION              TRACKING            SYSTEM                    PAGE NO. 38 4            C0NDENSED              MANAGEMENT            REP 0RT                          RUN DATE: 09/17/85 W                                  (HEADQUARTERS)
FACILIIY COOPER STATION PLANT LOCATION: 23 MI S OF NEBRASKA CITY, NEB          LICENSED POWER: 2381 MHT                  PROJECT MANAGER: E. SYLVESTER DOCKET NUMBER: 050-00298                                DESIGN PONER:    0778 MHE                BRANCH CHIEF:      D. VASSALLO ARCH / ENGIt4EER : B&R                                NSSS VENPOR:    GE                      LIC. ASSISTANT:    S. NORRIS IE IharECTOR+      D. DUBOIS RAI                  SE TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLE                                                                NUMBER    I!L      DAIf        DATE      DAlf        DATE        DATE n*** ACTIVE ISSUES Muun ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52829 B-77                06/30/85                            09/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                  M55850  D-19              05/15/85C                          09/30/85 PURGE AND VENT VALVE ORIENTATION                                      M57062                                                        09/30/85 HYDROGEN RECOMBINER CAPABILITY, RESPONSE TO GENERIC LETTER            M55322  A-19    02/04/85  07/17/85C                          10/08/85 SINGLE LOOP OPERATION                                                  M42418  E-04    07/01/85  09/16/85                            10/15/85 SECOND TEN-YEAR ISI PLAN                                              M54588          05/15/85  03/31/85    07/12/85                10/15/85 PROPOSED CHANGE NO 16 - ARM FLON/ ADS LOGIC / MISC.                    M56601                    09/30/85                            10/15/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM          M43729  B-65                                                  10/30/85 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                M51082 A-17    01/03/85  05/15/85C                          10/30/85 PRUPOSED CHANGE NUMBER 15 - SPECIAL TESTS AND EXEPTIONS                M57568                                                        10/30/85 PROPOSED CHANGE 19 - STATION BATTERY SURVEILLANCE                      M57634                                                        10/30/85 PROPOSED CHANGE 18 - SGTS, CONTROL ROOM VENT, RV HATER LEVEL          M57610                                                        11/01/85 LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)                    M42573 B-24    07/11/85  09/05/85C                          11/30/85 ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS              M52991 B-79                                                    12/31/85 VENT / PURGE ISOL ATION VALVES L EAK TEST                              M56462                    09/03/85C                          12/31/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51232 F-09    07/13/84C 02/28/85C      N/A                  01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M52910 B-78                                                  01/31/86 IST PROGRAM - SECOND TEN YEAR INTERVAL                                M54682          06/01/84  06/15/84                          01/31/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -          M56114  F-71    07/30/85  02/04/85C 03/26/85                04/30/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)                M44291  F-05    09/30/85  03/31/86    08/30/85              09/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL 1ESTING          M53973 B-93    04/23/85                                      09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECP.                M53829  B-88                                                  10/30/86 NUREG-0737 III.A.S.2, TECHNICAL SUPPORT CENTER                          M45934  F-63                                                  10/31/86    ,
NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                        M46005 F-64 10/31/86 NUREG-0'37 III.A.1.2, EMERGENCY OPERATIONS FACILITY                    M46077  F-65                                                  10/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                M53746  B-87                                                  12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53663  B-86              06/30/85                          01/01/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                M54056  B-92                                                  01/31/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                      M46293 F-68                                                  03/31/87 t
EM UNSCHEDULED ISSUES **
MARK I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE DTO GENERIC            H57149  D-20 PROPOSED CHANGE 22 - HALON FIRE SUPPRESSION SYSTEM                      M57951 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM              M58053  C-16 10CFR50.62 OPERATING REACTOR REVIENS                                  M59084 A-20 MMM COMPLETED ISSUES MMM NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                  M45589 F-46              05/29/84C                            11/13/84C
 
R-1208687-001                  REGULAT0RY          INF0RHATION              TRACKING        SYSTEM                PAGE NO.s    39 C0NDENSED          MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: COOPER STATION RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER    &      DAIX      DATE      pfAJf, A    M            DATE CO2 COMPLETED ISSUES MMM      (CONTINUATION)
APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                        M08140 A-02              06/19/84C                      12/24/84C NUREG-0737 TS IN RESPONSE TO GENERIC LETTER 83 CNS          M54430                                                  Ot/03/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42486  B-60  11/06/84C 12/26/84C                      01/30/85C EMERGENCY PLAN EXERCISE- REQUEST FOR EXEMPTION                    M56639                                                  04/01/85C ITEM t.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52748 B-76                        12/14/84            05/06/uSC PROPOSED CHANGE NO. 13 - MARK / CONTAINMENT MODIFICATION          M55005                  05/24/85                      OS/13/85C TECH. SPEC. CHANGE 14 - SNUBBERS (GL 84-13) AND RECIRC            H56090                                                  05/20/85C PROPOSED CHANGE NO. 17 - CYCLE to RELOAD AND HYBRID CONTROL      M56776                                                  06/05/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53580  B-85                        04/04/85            06/10/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)          M52219 C-15                                            06/28/85C ILSPECTION OF BHR STAIHLESS STEEL PIPING ACCORDING TO            M55595 B-84    12/17/84  04/30/85C                      07/31/85C RECIRCULATION PIPING REPLACEMENT RADIATION PROTECTION            M55627                                                  07/31/85C NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUNUs.ATORS      M48265 F-55    05/29/84C 07/26/84C                      08/09/85C NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION      M45123 F-26              05/31/85C                    08/21/85C APPENDIX "R" EXEMPTIDN REQUEST                                    M57672                                                  08/25/85C
 
R-1208687-001                      REGUI AT0RY    INF0RMATION                TRACKING          SYSTEM                        PAGE NO.:    40 C0NDENSED        MANAGENENT              REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CRYSTAL RIVER 3 PLAtT LOCATION: 7 MI NH OF CRYSTAL RIVER, FLA      LICENSED POWER: 2544 MHT                  PROJECT MANAGER      H. SILVER DOCKET NUMBER: 050-00302                            DESIGN POWER:    0825 MNE                BRANCH CHIEFS        J. STOLZ ARCH / ENGINEER: GIL                                NSSS VENDOR:      B8H                      LIC ASSISTANT:      R. INGRAM IE INSPECTOR:            T. STETKA RAI                      SE TAC      MPA        RAI    RESPONSE        TER        INPUT      LIC ACT TITL E                                                            NUMBER    &        DAlf.      DATE        DAlf,        DATE        DATE MMuu ACTIVE ISSUES WMuw NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                    M45935    F-63    N/A                    N/A NUREG-0737 III.A.1,2, OPERATIONAL SUPPORT CENTER                                                                                      06/30/85 M46006    F-64    N/A                    N/A                    06/30/85 NUREG-0737 III.A.1.2, EMERGEf4CY OPERATIONS FACILITY              M46078  F-65      N/A                    N/A 3 - TSCRN 883 INCREASE CONTROLLED LEAKAGE RATE                                                                                      06/30/85 M57446                                                            08/15/85 3 - REFUELING CAVITY HATER SEAL                                    M57402                                                            08/30/85 3 - TSCRN 9116 - ES TESTING                                        M57447                                                            09/02/85 3 - CONTROL OF HEAVY LOADS                                        M57448                                                            09/02/85 GENERIC LTR 82-17 EMERG. PLAN, AND 82-25 SECJRITY PLAN - 12        M49440          05/01/84  07/15/84C      N/A                    09/15/85 TSCR 110 - ADMIN CONTROL OF CONT VALVES                            M54892            N/A                    N/A                    09/15/85 3 - TSCRN 8126. AMENDMENT HEATUP COOLDOHN CURVES                  M57441                                                            09/15/85 REVIEH REQUEST FOR RELIEF FROM ASME SEC. XI PUMP & VALV;          N04549  A-14              07/01/85      10/00/83C                09/30/85 CRYSTAL RIVER 3 NUREG 0737 TECH SPECS (GENERIC LTR 82-16)          M49729  B-72    07/06/84  09/01/84      12/31/8 3C              09/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53581  B-85                            04/04/85                09/30/85 CHANGE PUMP INSERVICE TESTING TO QUARTERLY                          M54798          07/20/84                                        09/30/85 TECH. SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55703 A-18                                                      09/30/85 3 AUX. BLDG. VENTILATION SYSTEM TSCR 121                            M55825                                                          .09/30/85 3 RETS CHANGES                                                      M56093                                                            09/30/85 3 OPERATING MODES FOR RV HEAD SEISMIC INSTRUMENTATION              M56095                                                            09/30/85 DECAY HEAT REMOVAL CAPABILITY TECH SPECS                            M42121  B-57      N/A                    N/A                    09/31/85 STEAM GEN. RUPTURE MATRIX DISCONNECT FROM AFH VALVES                M42027                                                            10/01/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56115  F-71              04/05/85      07/01/85                  10/01/85 3 INTERP. OF 10 CFR 20.203(F)-LABELLING                            M57603                                                            10/01/85 3 TSCRN 8133 AUTOMATED ISOTOPIC MONITORING SYSTEM                  M57602                                                            10/04/85 3 - TSCRN 8132 - PRESSURIZER PORV'S                                M57640                                                            10/04/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1            M54387          07/05/84  08/01/84C      N/A                    10/30/85 1
TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,          M54527  B-83    07/05/84  08/ 01/8 4C '  N/A                    10/30/85
      /TSCR 8114 DELETE LER ADMIN REQMTS                                  M55004            N/A                    N/A                    10/30/85 3 CABLE TUNNEL SUMP PUMP SURVEILLANCE                              M56094                                                            10/30/85 3 - CORRECTIONS TO ESF TECHNICAL SPECIFICATIONS                    M57711                                                            10/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 44-15)              M55851    D-19                                                    11/02/85 3 - TSCRN 8130-FIRE SERVIFE SYSTEM SHITCHING TABLES FROM            M57404                                                            11/15/85 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/I)            M44292 F-05      07/10/84C              04/18/84C                11/30/85 REVIEW TECH SEC AMENDMENT FOR DECAY HEAT REMOVAL SYSTEM            M54445              N/A                    N/A                    11/30/85 UPGRADE OF P0HER AND INSTRUMENTATION FOR A FH SYSTEM BEYOND        M49059                                      N/A                    12/01/85 3 - EXEMPTION REQUEST FROM GDC-4 TO REDUCE NUMBER OF                M57403                                                            12/01/85 INTAKE CANAL ACCEPTANCE CRITERIA                                    M48472          06/07/84  09/30/85        N/A                    12/15/85 NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS          M44431    F-12  07/18/84C 09/30/85        N/A                    12/31/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                M52749    B-76  05/06/85C                                        12/31/85 NATURAL CIRCUL ATION C00LDOHN (GENERIC LTR 81-21)                  M47166    B-66  04/23/84  05/23/84C      N/A                    01/30/86
 
        -_ _          _ - _ _ _ _        __      . . . _ . - _ . ~ . - . _ _ _ _ ._ _ - . _ .
_                                                    -_  _ _ _ _ _ _ _ _ _ _,                              _ . _ .      .-m      .    ._ =
a R-1208687-001                    R.E G U L A T 0 R Y                              INF0RMATION                  TRACKING                    SYSTEM                      PAGE NO.      41 C0NDENSED                          MANAGEMENT                            REPORT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: CRYSTAL RIVER 3 RAI                    SE TAC      MPA                      RAI    RESPONSE    -TER        INPUT      LIC ACT.
TITLE                                                                                          NUMBER    HQ.                    Ralg      DATE      Dalg        DATE      __Ralf_
l t          DOOD ACTIVE ISSUES MMMM        (CONTINUATION)
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                        M51233 F-09                    04/04/83  08/31/84      N/A                    01/30/86          t MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                            M42902 B-59                    12/03/84C 09/30/85    12/01/85                02/15/86          i M56096                                                                        02/15/86 3 NEW REMOTE SHUTDOHN SYSTEM TECH. SPEC.                                                                                                              N/A                    02/28/86 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                                        M51083 A-17                              04/13/84C i^
RV AND SV TESTING                                                                              M44571  F-14                  09/01/85  10/15/85    N/A                    03/10/86 DEGRADED GRID VOLTAGE PROT TS & DESIGN                                                        M52039                        09/30/85  11/30/85    N/A                    03/15/86 REACTOR COOLANT PUMP TRIP                                                                      M49668 G-01                    10/15/85  11/15/85                            03/30/86 M53953  B-91                                                                04/30/86 ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                  M45124 F-26                    09/06/83  02/15/84                            12/31/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                                              M48156  F-58                            08/31/86                            03/31/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                              M46294  F-68                    N/A                  N/A                    12/15/87 i            DD UNSCHEDULED ISSUES MM CALIBRATION OF NUCLEAR INSTRUMENTATION CHANGE 53                                              M12526                                    03/15/80C    N/A                                      '
+
IREP REVIEH                                                                                  M48921 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                    M52830 B-77 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                                  M53119  B-81 M53405                            N/A                  N/A 1
            /REVIEN RADHASTE PROCESS CONTROL PROGRAM ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                    M53664 B-86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                  M53906  B-89 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                  M53974 B-93 M54372                          N/A                  N/A
              /REVIEH FLORIDA POWER PROPOSED ALTERNATE OFF-SITE POWER                                                B-90 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                    M55351 3 TSCRN 9134 REACTOR TRIP BREAKER SHUNT TRIP                                                  M57601 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                    M58054 C-16                              07/09/85 10CFR50.62 OPERATING REACTOR REVIENS                                                          M59085 A-20                                                                                  .
1 3: TSCR 8156 CORRECTION OF SEC. 3.1.2.9 ACTION STATEMENT                                      M59479+                                                                                      ;
3: EVALUATION OF FIRE BARRIERS DEVIATIONS                                                    M59480                                                                                        '
4              3: TECH. SPEC. CHANGE REQUEST 6. REVL. UNDERVOLTAGE                                          M59481 3 - LICENSED OPERATOR REQUALIFICATION TRAINING PROGRAM                                        M59596 000 COMPLETED ISSUES Muu M08163                                    10/11/77C                          10/11/84C PHR HPSI-LPSI FLOW RESISTANCE - GENERIC                                                      M53330                          N/A                  N/A                    11/08/84C
              / TECHNICAL SPECIFICATION CHANGE - FUEL P0OL ENRICHMENT LIMIT                                M56681                                                                        02/14/85C S - SURVEILLANCE EXTENSIONS                                                                  M42512 B-60                              05/20/83C    N/A                    02/28/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                    M56092                                                                        03/08/85C 1            3 151 RELIEF REQUEST                                                                          M53169  B-82                  07/08/83  05/30/84C                          0 3/11/85C l
ITEM 4.5 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                                  M56091                                                                        03/12/85C 3 HIGH ENERGY LINES FOR BD OF OTSG                                                          M57137                                                                        06/27/85C REQUESTS FOR RELIEF FROM CERTAIN ASME INSERVICE IhSPECTION                                  M52220 C-15                                                                  06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                                      M55176                                                                        06/28/85C TSCR NO. 120 - CHANGE TO SECTION 3.0.4 APPLICABILITY                                        M57405                                                                        07/03/85C 5 - TSCRN 8131 HYDROGEN RECOMBINER VALVE REPL ACEMENT
 
R-1208687-001                  REGULAT0RY                              INF0RMATION                            TRACKING                          SYSTEM                      PAGE NO.              42 C0NDENSED          MANAGEMENT                              REPORT                                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ' CRYSTAL RIVER 3 RAI                    SE TAC              MPA              RAI              RESPONSE        TER        INPUT          LIC ACT TITLE                                                                                NUMEER            H.L              DAlf                    DATE    DAlg      . DATE            DATE Knu COMPLETED ISSUES MMM -(CONTINUATION)-
3 RV HEAD VENT EXEMPTION                                                              M56196 3 - TSCRN 122 EMERGENCY FEEDWATER INITIATION AND CONTROL                              M57470                                                                                      07/11/85C
,                          3 - TSCR 8135, CYCLE VI RELOAD REPORT                                                  M57528                                                                                      07/16/85C FIRE PROTECTION EXEMPTION REQUESTS                                                    M55950                                                                                      07/16/85C 3 - TSCRN 0128 - ES ACTUATION TESTING                                                  M57654                                                                                      07/18/85C                  i NUREG-0737 II.K.3.5, REPORT ON R$1/SV FAILURES                                        M45335 F-38                                                                                07/23/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                  M45815 F-57                                                                                08/09/85C N/A                            12/30/84                  08/30/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                        M52911        B-78                                                                        09/09/85C ITEM 4.1 RX TRIP SYSTEM RELIABILITY-VENDOR RELATED                                    M53066        B-80                                                                        09/09/85C ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                M53747        B-87                                                                        09/09/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54057        B-92                                                                        09/09/85C ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                              M52992 B-79                                                                                09/11/8 5C '
ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                M53830        B-88                                                                        09/11/85C DEDICATED HVAC                                                                        M59296 09/11/85C i
i i
i
 
R-1208687-001                    REGULAT0RY          INF0RMATION                    TRACKING          SYSTEM                        PAGE NO.s    43 C0NDENSED          MANAGEMENT                  REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DAVIS-BESSE 1 PLANT LOCATION: 21 MI E OF TOLEDO, OH                LICENSED POWER: 2772 MHT                        PROJECT MANAGER: A. DEAGAZIO DOCKET NUMBER: 050-00346                            DESIGN POWER:        0906 MHE                  BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: BECH                                NSSS VENDOR:          B&H                      LIC, ASSISTANT:    R. INGRAM IE INSPECTOR:      H. ROGERS RAI                      SE TAC          MPA        RAI    RESPONSE        TER      INPUT      LIC ACT TITLE                                                              NUMBER        &        DAlf,      DATE        DAIf,        DATE        DATE En:M ACTIVE ISSUES Muuu AFH PUMP PCHER DIVERSITY                                          M55581                          11/21/84                              06/01/85 DN SITE DISPOSAL, 20.302(A) REQUEST                                M52484                11/16/84  03/11/85C                              06/30/85 APPENDIX R COMPLIANCE ASSESSMENT REVIEH FOR SAFE SHUTDOWN          M56864                                                                06/30/85 SPDS CONFIRMATORY REVIEH                                          M57033                                                                06/30/85 IST RELIEF REQUEST NO. 30                                        M55824                          04/15/85C                              07/20/85 REDUCED MINIMUM RCS FLOW                                          M57219                                                                08/15/85 NUREG-0737 II.B.3.2. POST ACCIDENT SAMPLING MODIFICATIONS          M44432        F-12                                                    08/30/85 FIRE PROTECTION T.S.S.                                            M54259                                                                08/30/85 DELETE SFAS TO CONTAINMENT SAMPLE VALVES                          M54260                                                                08/30/85 MULI YEAR INTEGRATED SCHEDULE                                      M55588                          04/15/85                              08/30/85 PUIGE 1 VENT VALVE LEAK TESTING                                    M56794                                                                08/30/85 ORGANIZATION CHART UPDATE                                          M56795                                                                08/30/85 MECHANICAL SNUBBERS                                                M11311        B-22              01/30/85C                            09/30/85 HYDRAULIC SHUBBERS                                                M11312 B-17                      01/30/85C                            09/30/85 REVIEW OF SFAS LEVEL 5 SINGLE FAILURE CRITERIA                    M43253                12/12/84  05/13/85                              09/30/85 REACTOR COOLANT PUMP TRIP                                        M49662 G-01                      09/07/84C                            09/30/85 DHR OPERABILITY                                                  M52416                                                                09/30/85 ENVIRONMENTAL PROTECTION PLAN                                    M52418                                                                09/30/85 REVIEH ENVIRONMENTAL SURVEILLANCE RESULTS                        M52420                  N/A                                            09/30/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55704        A-18                                                    09/30/85 AFHS TECHNICAL SPECIFICATIONS                                    M55782                          07/20/85                              09/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55852        D-19              10/05/84                              09/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56116        F-71              03/28/85    10/01/84                09/30/85 AFHS PRES. INTERLOCK INTERLOCK                                    M56793                                                                09/30/85 HPI SYSTEM IST                                                    M57676                                                                10/15/85 ST RELIEF ALT TEST NO. 30                                        M57291                                                                10/30/85 NATURAL CIRCULATION C00LDOWN (GENERIC LTR 81-21)                  M47182 B-66                      02/04/85C                            11/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53067        B-80                                                    11/30/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR      M53120        B-81    11/20/84  03/29/85C                            11/30/85 SU2.VEILL ANCE CAPSULE ANALYSIS                                  M56041                                                                11/30/85 l                                          CONTAINMENT ISOLATION VALVES                                      M57877                                                                  11/30/85 1                                            ITEM 3.1.5 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS          M52993        B-79                                                    12/31/85 i                                            ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      MS3582        B-85                                                    12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53831        B-88                                                    12/31/85 APP. R COMPLIANCE ASSESSMENT REVIEN                              M56205                                                                  12/31/85 TRAINING EVALUATION                                              M57230                                                                  12/31/85 EVENT OF 6/9/85 FOLLOHUP                                          M57932                                                                  12/31/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                  M52912 B-78                                                            02/15/86 RV AND SV TESTING                                                  M44572      F-14    06/03/85  07/19/85C                            03/31/86
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKINO        SYSTEM                PAGE N0.8    44 C0NDENSED          MANAGEMENT          REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DAVIS-BESSE 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER    HR. Ralf      DATE      DAlf  DATE        DATE McWM ACTIVE ISSUES MMMM      (CONTINUATION)
ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES      M53954  B-91                                        07/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE        M54058  B-92                                          11/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53748  B-87                                          12/31/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP      M53907  B-89                                          12/31/86 BESSE 1 - PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737      M44293 F-05    09/30/85            08/30/85          03/30/87 BESSE -NUREG 0737 II.K.3.31 COMPLI ANCE HITH 10 CFR 50.46        M48157 F-58              08/30/86                    03/31/87 cu UNSCHEDULED ISSUES MM NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION    M45125 F-26 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                  M45936  F-65            03/01/84C NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                M46007  F-64            03/01/84C NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY              M46079  F-65            03/01/84C NUREG-0737 III.A.2.2 METEOROLOGICAL DATA UPGRADE                M46295 F-68 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG          M51084 A-17    06/30i85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M52831 B-77 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M53665  B-86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M53975 B-93    04/02/85C UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM      M58055 C-16              06/24/85 10CFR50.62 OPERATING REACTOR REVIENS                            M59086 A-20 GENERAL USE OF CODE CASE N411                                    M59225 BESSE 1 - FINDING REPORT REVIEW AFH 599 & AF 608                  M59416 BESSE 1 - FINDINGS REPORT REVIEH - TURBINE BYPASS VALVE          M59417 BESSE 1 - FINDINGS REPORT REVIEW - AFH FEEDPUMP TURBINE T/T      M59418 BESSE 1 - FINDINGS REPORT REVIEW PORV                            M59419 BESSE 1 - FINDINGS REPORT REVIEH SP7A                            M59420 BESSE 1 - FINDINGS PEPORT REVIEH MAIN FEEDPUMP                    M59421 BESSE 1 - FINDINGS REPORT REVIEN - MS 106                        M59422 BESSE 1 - FINDINGS REPORT REVIEH SERVICE HATER TRANSFER          M59423 BESSE 1 - FINDINGS REPORT REVIEW NI 1 & NI 2                      M59424 BESSE 1 - FINDINGS REPORT REVIEH MSIV                            M59425 BESSE 1 - FINDINGS REPORT REVIEH SFRCS                            M59426 MAINTENANCE SURVEY                                                M59520 ALLEGATION NRR 85-A-0056 FOLLOH-UP                                M59635 mMM COMPLETED ISSVES MMM I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN        M51154  F-08            06/30/84C                    10/10/84C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51234  F-09            09/24/84                    10/10/84C BESSE 1-CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG        M10993 C-10              08/24/84                    10/26/84C ORGANIZATIONAL CHANGE NO. 2                                      M43333                                                11/05/84C DEENERGIZE DHR SYSTEM VALVES                                      M53297                                                11/06/84C EQUIPMENT QUALIFICATION DEADLINE EXTENSION                        M56077                                                11/23/84C DELETE POST ACCIDENT MONITORING REQUIREMENT FROM CRS              M54279                                                11/28/84C STEAM GENERATOR CONTAINMENT ISOLATION VALVES                      M47040                  09/11/84C                    12/11/84C
 
R-1208687-001                REGULAT0RY          INF0RMATION              TRACKING        SYSTEM                PAGE NO.*    45 C0NDENSED          MANAGEMENT            REP 0RT                  ~RUN DATE: 09/17/85-(HEADQUARTERS)
FACILITY: DAVIS-BESSE 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER  &      DAI.E      DATE      DAlf,  DATE        DATE unu COMPLETED ISSUES wuN    (CONTINUATION)
CYCLE 5 RELOAD ANALYSIS                                          M55531                                              .12/13/84C IST OF HPI CHECK VALVES                                          M57024                                                12/13/84C SURVEILLANCE CAPSULE SCHEDULE CHANGE                            M55652                                                12/17/84C AFH OPERABILITY --CYCLE 5 STARTUP                                M56590                                                12/20/84C SALP REVIEH - 1983-1984                                          M55620                                                01/04/85C REVIEN SUFP OPERATION                                            M57023          -
01/09/85C ENVIRONMENTAL QUALIFICATIONS OF SAFETY RELATED ELECTRICAL        M42508 B-60  05/15/84  06/26/84C                    01/30/85C ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR      M5317 0 B-82                                          01/31/85C MASONRY HAL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42903  B-59                      09/15/84          05/11/85C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1        M54388                  11/20/84                    03/13/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,      M54528  B-83                                          03/13/85C VARIANCE FOR ANIS 0 KINETIC SAMPLING                            M55442                                                05/27/85C HIGH POINT VENT SYSTEM                                          M56714                                                04/03/85C JUSTIFICATION FOR S.H. SYSTEM OPERABILITY                        M55957                                                04/11/85C REQUEST FOR APPROVAL TO USE ASME CASE N-411                      M57231                                                04/15/85C' ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND              M52750 3-76                        12/12/84          04/23/85C CONTROL OF MEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)        M52221  C-15                                          06/28/85C
: APPENDIX I TECH SPEC IMPLEMENTATION REVIEN                      M08141 A-02    N/A      01/lb/79c                    07/02/85C
' NUREG-0737 II.K.3.30, SB LOCA OUTLINE                          -M45817 F-57                        12/30/84          07/18/85C REPORTING REQUIREMENTS FOR PORV/SV                              M56042                                                08/22/85C LIMIT ON OVERTIME                                                M57025                                                08/22/85C
 
R-1208687-001                    REGULAT0RY        INF0RMATION                TRACKING        SYSTEM                          PAGE NO.s    46 C0NDENSED          MANAGEMENT              REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DIABLO CANYON 1 FLANT LOCATION: 12 MI HSH OF SAN LUIS OBISPD      LICENSED POWER: 3338 MHT                  PROJECT MANAGER: H. SCHIERLING DOCKET NUMBER: 050-00275                          DESIGN P0HER:    1086 MHE                BRANCH CHIEF:      G. KNIGHTON ARCH / ENGINEER: PG8E                              NSSS VENDOR:    HEST                      LIC. ASSISTANT: J. LEE IE INSPECTOR:      1. YOUNG RAI                        SE TAC      MPA      RAI    RESPONSE      TER          INPUT      LIC ACT TITLE                                                            NUMBER    HD.      RAlg      DATE        Dalg          .DATE        DATE cauw ACTIVE UltJES Muww REQUESTED VARIANCE FROM STANDARD H COLD LICENSE PROGRAM          M51008                                                              07/30/85 TECH SPEC UPDATE                                                  M54435                      05/30/85    N/A                        07/30/85 RADIOLOGICAL EFFLUENT TECH. SPEC CHANGES                          M57714                                                              07/30/85 DIESEL GENERATOR FUEL OIL TECH. SPEC. CHANGE                      M57715                                                              07/30/85 MOVEABLE CONTROL ROD ASSEMBLIES TECH. SPECS.                      M57778                                                              07/30/85 REACTOR TRIP SYSTEM INST. TECH SPEC                              M57780                                                              07/30/85 CUREG-0737 II.K 3.5, AUTO TRYP OF RCPS                            M49111  F-39                                                      09/30/85 REACTOR COOLANT PUMP TRIP                                        M49654  G-01                                                      09/30/85 RV AND SV TESTING (II.D.1)                                        M51590 F-14                                                        09/30/85 PROPOSED MODS TO TECH SPECS DEALING HITH FIRE PROTECTION          M51633                                                            09/30/85 CONTRUL ROOM DEISGN REVIEN (I.D.1)                                M52154 F-08                                                        09/30/85 ITEM 2.1 - EQPMNT CLASSIF & VEND INTERi - RTS COMP                M52832 B-77                                                        09/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINT TEST PROC / VEND REC - RTS      M52913 B-78      03/21/85                                          09/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53068  B-80                                                      09/30/85 ITEM 4.5 - AUTO ACTUATION OF SHUNT TRIP ATTACH (H AND B & H)      M53171  B-82                                                      09/30/85 SYSTEMS INTERACTION REPORT                                        M53246                                                            09/30/85 ITEM 2.2 - EQUIPM CLASSIF & VEND INTERF VENDOR INTERFACE          M53666  B-86                                                      09/30/85 ITEMS 4.2.3 & 4.2.4 PREVENT MAINT PROG FOR RX TRIP BREAKERS      M53908  B-89                                                      09/30/85 ITEMS 4.5.2 & 4.5.3 - TRIP SYSTEM FUNCT TEST - ALT & TEST        M53976  B-93    06/20/85C                                        09/30/85 RESOLUTION OF ALLEGATIONS INCLUDING SSER PREPARATION              M54434                                                            09/30/85 POST FUEL - LOADING INITIAL TEST PROGRAM                          M54492                                                            09/30/85 PROCEDURES GENERATION PACKAGES (SUPPLEMENT 1, NUREG-0737)          M55337          07/30/85              05/30/85                    09/30/85 ITEM 4.3(TS) - AUTO ACTUAT OF SHUNT TRIP (H AND B&H) - TECH        M55353 B-90                                                        09/30/85 NAT. CIRCL./ BORON MIX. TEXT                                      M55634                                                            09/30/85 2.206 PETITION ON ANTITRUST (08/08/84)                            M55693                                                            09/30/85 TECH. SPECS. AFFECTED BY 50-.72 AND 50.73 (GL 83-43)              M55705 A-18                                                        09/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55853    D-19                                                      09/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56117    F-71              12/31/84    03/12/85C                  09/30/85 CEG. CODE 1.97                                                    M56737                                                              09/30/85 SPDS                                                              M57138                                                              09/30/85 NUREG 737 ITEM II.F.2 ICCI SYSTEM INCLUDING TECH SPECS LAR        M57249                                                              09/30/85 EMERGENCY RESPONSE FACILITIES APPRAISAL                          M57653                                                              09/30/85 SAFETY PARAMETER DISPLAY SYSTEM (I.D.2)                          M52155 F-09                              N/A                      02/01/86 I
ITEM 3.1.3 - POST MAINT TESTING-CHANGES TO TECH SPECS - RTS      M52994    B-79                                                      02/28/86 ITEM 3.2.3 - POST-MAINT TEST - CHANGES TO TECH. SPEC.            MS3832    B-88                                                      02/28/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TEST PROC & VEND RECOM -        M53749    B-87                                                      12/31/86 NU::EG 0737. II.K.31, COMPLIANCE HITH 10 CFR 50.46                M57575 F-58                07/31/86                                02/28/87 SEISHIC REEVALUATION PROGRAM                                      M55305                                                              04/30/89 Mu UNSCHEDULED ISSUES MM STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS        M58056 C-16                06/17/85
 
C-1208687-001                  REGULAT0RY        INF0RMATION                TRACKING        SYSTEM                    PAGE NO.t    47 C0NDENSED        MANAGEMENT            REP 0RT                        RUN DATds 09/17/85 (HEADQUARTERS)
FACILITY: DIABLO CANYON 1
!                                                                        TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT I    TITLE                                                            NUMBER    fi[L    RAlg      DATE                  DATE        DATE RA_Il cu UNSCHEDULED ISSUES MM      (CONTINUATION) 10CFR50.62 OPERATING REACTOR REVIENS                            M59087 A-20 GONPRAC TECH. SPEC.                                              M59256 E22 COMPLETED ISSUES num BLOCKING SI SIGNAL DURING C00LDOWN                              M49424 B-52                                                tt/tt/84C PROPOSED MODS TO TABLE 3.5-11 0F TECH SPECS                      M51634                                                      11/11/84C INSERVICE INSPECTION & TESTING PROGRAM                          M51635                                                      11/11/84C REPLACEMENT OF INVERTER TECH SPEC CHANGE                        M51636                    12/29/82C                        11/11/84C CERTIFICATION OF AIR & WATER POLLUTION CONTROL LETTER            M56744                                                    03/19/85C CONTROL OF HEAVY LOADS (PHASE I)                                M52375 C-10                                                04/00/85C STLUCTURAL ALLEGATIONS                                          M52622                                                    04/00/85C LHR ALEGATIONS                                                  M52623                                                    04/00/85C ALLEGATIONS                                                      M53210                                                    04/00/85C PIPING AND SUPPORTS EVALUATION                                  M54885                                                    04/00/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND              M52751  B-76                                              05/15/85C ITEMS 4.2.1 & 4.2.2 - PREV MAINT PROGRAM TRIP BREAKERS          M53121  B-81                                              06/24/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53583  B-85                      04/04/85              06/25/85C CfNTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)        M52222 C-15                                                06/28/85C ITEM 4.5.1-FUNCT TEST-DIV TRIP FEATURES                          M54059 B-92                                                07/08/85C l
l l
r
                                                                /
e                                                                      *                  ,
                  #"                                                                                                  l                        -k 4                                                                a
                    )                                                                                    * /
 
t                      . . si s
t R-1208687-001                REGULAT0RY            INF0RMATION                    TRACKINO            SYSTEM                            PAGE NO. 48-
                              /            C 0 N D E M-5 L D    M A N A G'E M E N T        R'E P 0 R T                            RUN DATE: 09/17/85      ,
(HEADQUARTERS)
FACILITY: DIABLO CANYON 2                                    /                                    - r J
PLANT LOCATION: 12 MI HSH OF SAN TUIS OBISPD      LICENSED POWER: 000 MHT                          PROJECT MANAGER: H. SCHIERLING DOCKET NUMBER: 050-00323                          DESIGN POWER:      1106 MHE                      BRANCH CHIEF:        G. KNIGHTON
.- ARCH / ENGINEER: PG8E                              NSSS VENDOR:        HEST                          LIC. ASSISTANT: J. LEE IE INSPECTOR:    T. YOUNG RAI                        SE TAC      MPA        RAI        RESPONSE        TER        INPUT        LIC ACT TITLE                                                            NUMBER      HD.,. PAJE          DAT L        DAIX.        DATE          DATE MM UNSCHEDULED ISSUES MM      /                                                                                                    -
MOVEABLE CONTROL ROD ASSEMBLIE'S TECH. SPE(S.                    M57779                                                              $N REACTOR TRIP SYSTEM INST. TECH SPEC                    e          M57781 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS        M58057    C-16                    06/17/85 10CFR50.62 OPERATING REACTOR REVIEWS                            _ M59088 A-20 RV AND SV TESTING (II.D.1)                                        M59602 F-14
                                                                    /
                                                                                                                                    /
4 1
1 9
i a
i
 
_ _ _ _ - _ _ _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ - _ _ _-_                . _ _ . _ _ _ _ , - .          . _ . .                . - .            _ _ .    ., _ _    . - _      ~        -    . .    ._ -_        - -      -.
R-1208687-001                                                        REGULAT0RY                          INF0RMATION                                  TRACKI,NG              SYSTEM                                  PAGE NO.s      49 C0NDENSED                MANAGEMENT                            REPORT                                        RUN DATE: 09/17/85
( HEADQUr.RT ERS)
FACILITY: DRESDEN 1
      ' PLANT LOCATION: 9 MI E OF MORRIS, ILL                                    '
LICENSED P0HER: 0700 MHT                                        PROJECT MANAGFR          P. ERICKSON 4
4
    '  DOCKET NUMBER: 050-00010                                                                                DESIGN POWER:          0200 MNE                                  BRANCH CHIEF:            J. ZHGLINSKI ARCH / ENGINEERS BECH                                                                                    NSSS VENDOR:          GE                                        LIC, ASSISTANT:          C. JAMERSON IE INSPECTOR:                                              T. TONGUE                                                                                                                                                                    ,
RAI                                SE                      '
TAC                MPA            RAI    RESPONSE              TER        INPUT            LIC ACT TITLE                                                                                                                        NUMBER              &        DATE            DATE            A8J1              DATE          DATE 000 COMPLETED ISSUES MMM
,      REVIEH OF MOBILE VOLUME REDUCTION SYSTEM                                                                                    M54768                                                                                        11/07/84C 4
 
R-1208687-001                    REGULAT0RY          INF0RHATION              TRACKING        SYSTEM                      PAGE NO.:    SG C0NDENSED          MANAGEMENT            REPORT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DRESDEN 2 PLANT LOCATION: 9 MI E OF MORRIS, ILL                LICENSED POWER: 2527 MHT                PROJECT MANAGER: R. GILBERT DOCKET NUMBER: 050-00237                            DESIGN P0HER:    0794 MHE              BRANCH CHIEF:      J. ZHOLINSKI ARCH / ENGINEER      S&L                              NSSS VENDOR:    GE                    LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:      T. TONGUE RAI                    SE TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLE                                                              NUMBER    &      DAJ1      DATE        DAJE        DATE        DATE umuu ACTIVE ISSUES wwww TECH. SPECS. RE EFFLUENT MONITORING OF THE MVRS                    M56373                                                      06/28/85 SPDS - CONFIRMATORY ITEM RE ISOLATION DEVICES                      M57004                                                      06/28/85 REVIEW OF REVISED LICENSED OPERATOR REQUALIFICATION TOPICAL        M52326        06/21/85  08/07/84      N/A                  08/16/85 MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                M07935 D-01                          06/21/85C              09/30/85 ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42519 B-60                                                  09/30/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM      M43719  3-65                                                09/30/85 NUREG 0737 II.K.3.28 VERIFY QUALIFICATION OF ACCUMULATORS          M48266 F-55              07/31/85                            09/30/8S PROPOSED TS CHANGES RE APPENDICES H AND G, METAL                  M48299        06/09/83                N/A                  09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52833  B-77            06/01/84                            09/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53584  B-85                                                09/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVICH
 
==SUMMARY==
REPORT -      M56tt8  F-71  06/01/85              06/01/85                09/30/85 M56463        06/24/85  05/31/85                            09/30/85 EVALUATION OF REPORT ON INSTALLATION OF LIQUID H2 TANK                                                                          09/30/85 APPROVAL PER 20.305 FOR USE OF MVRS                                M56676 M57324                                                      09/30/85 FIRE PROTECTION SCHEDULAR EXEMPTION REQUEST                                                              N/A LONG TERM REV CONTAINMENT PURGE AND VENT (B-24)                    M42608 B-24    06/07/85  08/05/85                            10/20/85 IST PROGRAM, SECOND 10 YRS                                        M49083                                N/A                  12/31/85 M49361                  04/01/85                            01/01/86 DESIGN CODES. 10AD COMBINATION                                                                          02/28/84C              01/01/86 CAPABILITY HITHSTAND HIND AND TORNADOES (INCLUDING MISSILES        M49363 SEISMIC QUALIFICATION                                              M49365                                N/A                  01/01/86 M49369                                N/A                  01/01/86 ELECTRICAL ISOLATION OF RPS                                        M52141                                N/A                  01/01/86 POL -> FTOL CONVERSION - ENVIRONMENTAL EVALUATION                                                        N/A                  01/01/86 INTEGRATED ASSESSMENT SUPPLEMENT                                  M52436 M11222                                                      01/31/86 CONVERSION POL TU FTOL                                                                                                          01/31/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH              M52995 B-79 M55833 B-88                                                  01/31/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M44297 F-05    07/16/85C              N/A                  06/30/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                                                                        06/30/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53977 B-93    04/29/85C M42909 B-59                                                  09/30/86 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIM 80-11                  M46011 F-64                                                  12/31/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                                                12/31/86 HUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46083 F-65 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46299  F-68                                                12/31/86 M53667  B-86            06/01/84                            12/',1/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -
MM UNSCHEDULED ISSUES **
NUREG-0737 III.A.1.2      TECHNICAL SUPPORT CENTER                M45940 F-63 M51085 A-17    01/12/87 INSTRUMENTATION TO FOLLDH THE COURSE OF AN ACCIDENT (RG          M52223 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)          M55171
: FIRE PROTECTION ISSUES
 
R-1208687-001                                                          REGULAT0RY          INF0RMATION              TRACKING        SYSTEM              PAGE NO.*    51 C0NDENSED          MANAGEMENT            REP 0RT                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DRESDEN 2 RAI            SE TAC    MPA      RAI    RESPONSE  TER  INPUT      LIC ACT TITLE                                                                                                  NUMBER    &      DAIf,      DATE    R&If. DATE        DATE Du UNSCHEDULED ISSUES MM                                            (CONTINUATION)
RECOMBINER CAPABILITY REQUIREMENT OF 10CFR50.44 - RESPONSE                                              M56579 MARK I DRYHELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC                                            M57152  D-20 10CFR50.62 OPERATING REACTOR REVIENS                                                                    M59089 A-20 PROPOSED TECH. SPEC AMENDMENT RE SPENT FUEL STORAGE                                                    M59569 Exu COMPLETED ISSUES MMM I.D.1.1 - DETAILED CONTROL ROOM DESIGN REIVEN PROGRAM PLAN                                              M51155  F-08                                        10/10/84C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                  M51235  F-09  06/22/84                              10/10/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                                                M45591  F-46  04/11/84  06/12/84C                  10/22/84C LEAK DETECTION                                                                                          M49367                              N/A              11/02/84C REVIEW OF MOBILE VOLUME REDUCTION SYSTEM                                                                M54769                              N/A              11/07/84C APPENDIX I                                                                                              M08110 A-02              12/15/78C N/A              11/26/84C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                            M45129 F-26                                          12/17/84C NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                                              M45687 F-48                                          12/20/84C NUREG-G737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                                              M44436  F-12            04/16/84  N/A              01/14/85C EXTENSION OF CERTAIN MAPLHGR CURVES FOR CYCLE 10 RELOAD                                                M55772                                              01/17/85C TECH. SPEC. CHANGES RE SCRAM DISCHARGE SYSTEM MODIFICATIONS                                            M56062                                              01/17/ 85C TECH. SPEC. CHANGE TO ALLOW USE OF HAENIUM AS A CONTROL ROD                                            M56063                                              01/17/85C TECH. SPEC. CHANGES RE CALIBRATION / FUNCTIONAL TEST FREQUENCY                                          M56064                                              01/17/85C HUREG-0737 I.A.2.1.4, UPGRADING OF R0 AND SRO TRAINING                                                  M44156  F-03              06/21/84  N/A              01/25/85C NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE                                                      M44506  F-13                        N/A              01/25/85C UPDATE OF SNUBBER TABLES                                                                                M54662                              N/A              02/27/85C MULTIPLE CHANGES TO ADMINISTRATIVE CONTROLS                                                            M51066                              N/A              03/20/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                                    M55706  A-18                                        03/20/85C PIPING INSPECTION AND REPAIR PLAN DURING CYCLE 10 REFUELING                                            M55771                                              03/22/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                          M52914 B-78                                          05/16/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                M53750 B-87                                          05/16/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                              M54060  B-92                                        05/16/85C REVIEH OF CECO RESPONSE TO G.E. SIL 402                                                                M57596                                              05/22/85C SHORT CIRCUIT CALCUALTIONS & BRFAKER COORDINATION                                                      M49368                                              05/29/85C REACTOR COOLANT IDDOINE ACTIVITY LIMITS                                                                M49370                              N/A              05/29/85C ECONOMIC GENERATION CONTROL                                                                            H51516                                              05/29/85C CHANGES TO TABLE 3.7.1, CONTAINMENT ISOLATION VALVES                                                    M54469                              N/A              05/29/85C INSTALLATION OF BYPASS VALVE IN RHCU SYSTEM                                                            M55770                                              05/29/85C INSPECTION OF BWR STAINLESS STEEL PIPING ACCORDING TO                                                  M55596  B-84                                        06/19/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                              M54529  B-83                        N/A              06/24/85C THERMAL OVERLOADS                                                                                      M49366                              N/A              07/09/85C EVALUATION OF PLANT SPECIFIC CORE DAMAGE EXTIMATE PROCEDURE                                            H57940                                              07/23/85C ITEM 1.1 - POST TRIF REVIEH PROGRAM DESCRIPTION AND                                                    M52752 B-76    03/25/85                              07/25/85C TECH. SPEC. RELATING TO DISPOSAL OF HASTE OIL BY BURNING                                              M56563                                              08/28/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                  M55554  D-19                                        09/12/85C
 
Q-1208687-001                                REGULAT0RY              INF0RMATION                            TRACKING              SYSTEM                          PAGE NO.        52  ,
C0NDENSED                  MANAGEMENT                  REPQRT                                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DRESDEN 3 PLANT LOCATION: 9 MI E OF MORRIS, ILL                                LICENSED P0HER: 2527 MHT                                    PROJECT MANAGER: R. GILBERT DOCKET NUMBER: 050-00249                                              DESIGN POWER:              0794 MHE                        BRANCH CHIEF:      J. ZHOLINSKI ARCH / ENGINEER s        $8L                                          NSSS VENDOR:                GE                              LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:            T. TONGUE RAI          -            SE TAC      MPA        RAI          RESPONSE        TER        INPUT          LIC ACT TITLE                                                                                        NUMBER      Hg.      R&lg            DATE        Dalg          DATE            DATE DRDM ACTIVE ISSUES MMMM                                                                                                                                                                i SPDS - CONFIRMATORY ITEM RE ISOLATION DEVICES                                                M57005                                                                        06/25/85
+
APPRO/AL PER 20.305 FOR USE OF MVRS                                                          M56677                                            1 06/27/85 ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                      M42487    B-60                                                                06/28/85 TECH. SPECS. RE EFFLUENT MONITORING OF THE MVRS                                              M56374                                                                  '
06/28/85    '
REMIEW OF- REVISED LICENSED OPERATOR REQUALIFICATION TOPICAL                                  M54151            06/21/85        08/07/84    N/A                          08/16/85 TECH. SPEC. AND LICENSE AMENDMENT RE DELETION OF                                              M57813                                                                        08/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                  M56119  F-71                      05/ 01/85C 06/01/85                        08/31/85 MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                            M07936  D-01                                06/21/85C                      09/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                            M42879  B-59                                                                09/30/85
      . SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                  M43722  8-65                                                                09/30/85 NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS                                    M48267  F-55      03/16/83        07/31/85                                  09/30/85 PROPOSED TS CHANGES RE APPENDICES H AND G. METAL                                              M48300                                          N/A                          09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                    M52834 B-77                        06/01/84                                  09/30/85 FIRE PROTECTION SCHEDULAR EXEMPTION REQUEST                                                    M57325                                                                        09/30/85 LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)                                            M42574  B-24      06/17/85        08/05/85                                  10/20/85 ISV PROGRAM, SECOND 10 YRS                                                                    M47096                                          N/A                          12/31/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                  M53585 B-85                                                                  12/31/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                          M52996 B-79                                                                  01/31/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                                      M44298  F-05      07/16/85C                    N/A                          06/30/86 ZTEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                  M53978  B-93      04/29/85C                                                  06/30/86 NUREG-0737          III.A.I.2,      TECHNICAL SUPPORT CENTER                                  M45941  F-63                                                                12/31/86
'        NUREG-0737          III.A.1.2,      OPERATIONAL SUPPORT CENTER                              M46012    F-64                                                                12/31/86 NUREG-0737          III.A.1.2,      EMERGENCY OPERATIONS FACILITY                            M46084    F-65                                                                12/31/86 NUREG-0737          III.A.2.2,      METEOROLOGICAL DATA UPGRADE              .              M46300    F-68                                                                12/31/86 ITEM 2.2 - EQUIFMENT CLASSIFICATION-AND VENDOR INTERFACE -                                    M53663    B-86                      06/01/84                                  12/31/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                      M53G34    B-88                                                                12/31/86 00 UNSCHEDULED ISSUES MM INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                                      M51086    A-17      01/12/87 s FIRE PROTECTION ISSUES                                          1                          M55172 4
RECOMBINER CAPABILITY REQUIREMENT'0F 10CFR50.44 - RESPONSE                                    M56580 MARK I DRYNELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC                                    M57153 D-20 RECIRCULATION SYSTEM PIPING REPLACEMENT PLAN                                                  M58001 10CFR50.62 OPERATING REACTOR REVIENS                                                          M59090 A-20 SCHEDULAR EXEMPTION FROM APPENDIX J - TYPE B AND C INTERVALS                                  M59524 PROF 0 SED TECH. SPEC. AMENDMENT RE SPENT FUEL STORAGE                                        M59570 UAu COMPLETED ISSUES MMM s
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                                    M51156    F-08                                                                10/10/84C
 
6 R-1208687-001                          REGULAT0RY              INF0RMATION                      TRACKING            SYSTEM                    PAGE NO.        53 C0NDENSED            MANAGEMENT                      REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DRESDEN 3 RAI                SE TAC      MPA          RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                                              NUMBER      [fL        Pall      DATE      RAll    DATE              DATE 004 COMPLETED ISSUES MMM              (CONTINUATION)
I .D.2. SAFETY PARAMETER DISPLAY SYSTEM                                          M51236      F-09    06/22/83                                    10/10/84C NUREG-0737 II.K.3.16      CHALLENGES AND FAILURES OF RELIEF                        M45592 F-46                                  N/A                10/22/84C REVIEN OF MOBILE VOLUME REDUCTION SYSTEM                                          M54770                                                          11/07/84C APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                                        M08111      A-02                12/15/78C    N/A                11/26/84C NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION                      M45130 F-26                                                      12/17/84C NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                          M45688 F-48                                                      12/20/84C EQ OF ELECTRICAL EQUIPMENT - SCHEDULAR EXEMPTION                                  M55578                                                          01/03/85C
                  . HUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                        M44437      F-12                04/16/84                        01/14/85C      '
NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING                            M44157      F-05    06/21/84                N/A                01/25/85C NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE                                  M44507      F-13                                                01/25/85C UPDATE OF SNUBBER TABLES                                                          M54663                                      N/A                02/27/85C TECH.. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                              M55707      A-18                                                03/20/85C MULTIPLE CHANGES TO ADMINISTRATIVE CONTROLS                                        M51067                                      N/A                03/30/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING -                                  MS2915      B-78                                                05/16/85C      I ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                          M53751      B-87                                                05/16/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                          M54061      B-92                                                05/16/85C REVIEH OF CECO RESPONSE TO G.E. SIL 402                                          M57597                                                          05/22/85C ECONOMIC GENERATION CONTROL                                                      M51517                                      N/A                05/29/85C T.S. CHANGE FOR SEP TOPIC VI-7.C.1-125/250 V BATTERIES                            M54239                                      d/A                05/29/85C T.S. CHANGE FOR SEP TOPIC XV-16-PRIMARY COOLANT ACTIVITY                          M54240                                      n/A                05/29/85C CHANGES TO TABLE 3.7.1, CONTAINMENT ISOLATION VALVES                              M54470                                      N/A                05/29/85C INSTALLATION OF BYPASS VALVE IN RHCU SYSTEM                                      M54661                                      ft/A                05/29/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                            M55597      B-84                                                06/19/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                        M54530      B-83                            N/A                06/24/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)                          M52224 C-15                                                      06/28/85C EVALUATION OF PLANT SPECIFIC CORE DAMAGE EXTIMATE PROCEDURE                      M57941                          05/06/85                        07/23/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                              M52753 B-76          03/25/85                                  07/25/85C LPCI-LOOP A - TECH. SPEC. FOR EXTENSION OF LCO                                    M59313                                                          08/05/85C TECH. SPEC. RELATING TO DISPOSAL OF HASTE DIL BY BURNING                          M56564                                                          08/28/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                              M55855      D-19                                                09/12/85C i
t 4
i 4
 
R-1208687-001                    REGULAT0RY            INF0RMATION                TRACKING          SYSTEM                      PAGE N0.8    54 C0NDENSED            MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: DUANE ARNOLD PLANT LOCATION: 8 MI NH OF CEDAR RAPIDS, IA            LICENSED POWER: 1658 MHT                    PROJECT MANAGER: M. THADANI DOCKET NUMBER: 050-00331                              DESIGN P0HER:    0538 MNE                  BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: BECH                                  NSSS VENDOR:      GE                        LIC. ASSISTANT:    S. NORRIS IE INSPECTOR          J. HIEBE RAI                    SE TAC    MPA      RAI      RESPONSE      TER      INPUT      LIC ACT TITLE                                                                NUMBER    &        E          DATE        E          DATE        DATE UDMM ACTIVE ISSUES MMMM MATERIALS OF INDETERMINATE QUALITY - TIA                            M54679                                                            10/01/85 ADDL. APPENDIX R EXEMPTIONS                                          M55994                                                            10/15/85 APPENDIX J EXEMPTIONS                                                M56809                      07/17/85                            10/15/85 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45131    F-26                                                    10/31/85 REVISION TO ENVIRONMENTAL TECH. SPECS. - ETS-30                      M54173                      10/04/84                            10/31/85 157 CHANGES FOR II.F.1-4 THROUGH 6                                  M54230          03/30/85                                        10/31/85 157 CHANGES FOR III.D.3.4                                          M54231          03/30/85                                        10/31/85 OVERTIME FOR OPERATORS - RTS169                                      M56236                                                            10/31/85 HYDROGEN RECOMBINE CAPABILITY REVIEH                                M55635 A-19                                                      11/01/85 ELIMINATE DRYHELL/HETHELL DP-RTS162                                  M56237                                                            11/30/85 ACTION STATEMENTS FOR LCO'S - RTS 174                                M56240                                                            11/30/85 OPERATIONS & SAFETY COMMITTEE'S DUTY CHANGES - RTS -172              M56765          04/01/85                                        11/30/85 ADDITIONAL ASME CODE REQUIREMENTS OF 7/1/85                          M59316                                                            11/30/85 NUREG-0737 III.A.2.2, NETEOROLOGICAL DATA UPGRADE                    M46301    F-68                                                    12/01/85 ADS ACCUMULATOR SURVEILLANCE - RTS 184                                M59315                                                            12/18/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52835 B-77      08/30/85                                        12/31/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53586 B-85      06/27/85  08/27/85                              12/31/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M53669 B-86                                                      12/31/85 REVISION TO FIRE HATCH REQUIREMENTS (RTS-173)                        M56432                                                            12/31/85 24 VOLT STATION BATTERY - RTS-166                                    M56981                                                            12/31/85 ASME SECTION XI CODE RELIEF REQUESTS                                  M57173                                                            12/31/85 ADDITIONAL ASME CODE RELIEF OF 071285                                M59317                                                            12/31/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                    M42880    B-59                                                    01/31/86 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM          M43730 B - t,5                                                    01/31/86 NbREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                        M45942    F-63              01/31/86                              01/31/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                      M46013    F-64              07/03/85                              01/31/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                  M46085  F-65              07/03/85                              01/31/86 ND TEN YEAR IST PROGRAM                                              M55667                                                            01/31/86 2ND 10 YEARS ISI                                                      M57671                                                            01/31/86 10CFR50.62 OPERATING REACTOR REVIENS                                H59091  A-20                                                    01/31/86 PURGE / VENT OPERATION DURATION - RTS-185                            M57456                                                            02/28/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)              M44299 F-05                              02/01/85C                03/28/86 MA'!K I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC          M57154 D-20                                                      03/31/86 1hS W MENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG              M51087  A-17              07/03/85                              05/15/86 I T Ef!. 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53979  B-93    04/23/85C                                        07/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -          M56120  F-71              04/30/86                              10/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53752 B-87                                                      12/31/86 MUD COMPLETED ISSUES MMM NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY              M44847  F-19                                                    10/01/84C
 
R-1208687-001                                                      REGULAT0RY          INF0RMATION                TRACKING        SYSTEM                PAGE NO.s    55 C0NDENSED          MANAGEMENT            REPQRT                    RUN DATE 09/17/85 (HEADQUARTERS)
FACILITY: DUANE ARNOLD RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                                                NUMBER    li(L    PAIf      DATE      DME    DATE        DATE MOD COMPLETED ISSUES MMM                                          (CONTINUATION)
CONTAINMENT PURGE & VENT VALVE OPERABILITY                                                            M51861                                                  10/01/84C ANALYSIS OF REDUCED RHR SERVICE HTR FLOH (RTS-152)                                                    M52084                                                  10/29/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                                              M45593  F-46                                            11/13/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                              M42488  B-60            05/31/85C                      01/10/85C APPENDIX I TECH SPEC IMPLEMENTATION REVIEN                                                            M08142 A-02              01/15/79C                      01/14/85C TECH. SPECS. CHANGE FOR ADS-RTS171                                                                    M56238                                                  02/01/85C REVISED TURBINE BYPASS SETPOINT (RTS-168)                                                            M55638                                                  02/05/85C APP FOR P0HER OPERATION HITH SINGLE RECIRC LOOP                                                      M47837                                                  02/15/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                                            M51157  F-08            12/17/84                      02/25/85C AMENDMENT TO SECURITY PLAN                                                                            M56239                                                  02/26/85C ADMINSTRATIVE CHANGES REL ATED TO SNUBBERS (RTS-161)                                                  M55637                                                  03/12/85C MISCELLANEOUS ADMINISTRATIVE CHANGES (RTS-156A)                                                      M55639                                                  05/14/85C NUREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES                                              M44229  F-04                                            03/25/85C STRETCH POWER                                                                                        M55640                                                  03/27/85C CONFIRMATORY REVIEH OF SPDS                                                                          M56085                                                  04/10/85C SPENT FUEL STORAGE FOR L.T.A (RTS-178)                                                                M56542                                                  04/11/85C CYCLE 8 RELOAD REVIEH                                                                                M55636                                                  04/17/85C LEAD TEST ASSEMBLY REVIEHS (RTS-179)                                                                  M56545                                                  04/18/85C TECH. SPEC. AMENDMENTS FOR HUREG-0737 RTS-157                                                        M54172                                                  04/23/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                                  M52754 B-76                                            05/06/85C CONFORMANCE HITH APPENDIX J - RTS-177                                                                M56749                                                  05/28/85C ARTS APPLICATION - RTS-182                                                                            M56767                                                  05/28/85C UPDATE NDT OPERATING LIMITS RTS-181                                                                  M56810                                                  05/28/85C THERMAL HYDRAULIC STABILITY AND SINGLE LOOP TECHNICAL                                                M56879                                                  03/28/85C SCHEDULAR EXEMPTION FOR APPENDIX 'R'                                                                  M57435                                                  05/28/85C INSERVICE INSPECTION / TESTING                                                                        M54429                                                  06/10/85C NUREG-0737 II.B.3.2. POST ACCIDENT SAMPLING MODIFICATIONS                                            M44438  F-12    03/05/85 04/15/85                      06/11/85C GROUP 6 & 7 CONTAINMENT ISOLATION VALVES (RTS-170)                                                    M56543                                                  06/11/85C EMERGENCY CHANGE FOR NDT LIMITS - RTS-191                                                            M57994                                                  06/20/85C APPENDIX "R"                                                                                          M56766          04/12/85 04/05/85                      06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                                              M52225 C-15                                            06/28/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                                                M55598 B-84                                            07/09/85C EXTENSION OF INTEGRATED PLAN - RTS-183                                                                M56982                                                  07/09/85C STAINLESS STEEL REPAIR AND PLANT RESTART                                                              M57688                                                  07/09/85C ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                                            M52997  B-79                                            07/16/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                              M53835  B-88                                            07/16/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                      M52916  B-78                                            08/06/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                            M54062  B-92                                            08/06/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                  M55856  D-19                                            09/06/85C MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                                  M07937  D-01                        06/21/85C          09/11/85C
 
          . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _                      - _ _                __                  .            --        ..      .    . - . -        =    _.
R-1208687-001                                            REGULAT0RY      INF0RMATION                TRACKING        SYSTEM                          PAGE NO.      56 C0NDENSED          MANAGEMENT              REPORT                            RUN DATE: 09/17/85        1 (HEADQUARTERS)
FACILITY: FARLEY 1 i
PLANT LOCATION: 18 MI SE OF DOTHAN, ALA                                    LICENSED POWER: 2652 MHT                  PROJECT MANAGER: E. REEVES DOCKET NUMBER: 050-00348                                                  DESIGN P0HER:    0829 MHE                BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: SSI                                                      NSSS VENDOR:      HEST                    LIC ASSISTANT:    C. PARRISH IE INSPECTOR:                                H. BRADFORD RAI                      SE TAC    MPA      RAI    RESPONSE      TER        INPUT        LIC ACT TITLE                                                                                    HUMBER    E        DATf,    DATE        RAll        DATE          DATE DOMM ACTIVE ISSUES Muun SNUBBER INSPECTION TIA                                                                  M57605                                                            09/26/85 NUREG-0737 III.A.2.2, METEOR 0 LOGICAL DATA UPGRADE                                      M46302 F-68                                                      09/30/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                                  M51088 A-17    02/07/85  04/10/85C                              09/30/85 FIRE AREA EXEMPTIONS FOR UNITS 2 AND SHARED AREAS HITH UNIT                              M57243                                                            09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                              M52836    B-77                                                    10/18/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                              M53670    B-86  03/11/85  04/22/85C                              10/18/85 RM AND SV TESTING II.D.1                                                                M44579    F-14  07/02/84  09/30/85                              10/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                    M55857    D-19  02/15/85  09/28/84C                              10/31/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS                              M58058    C-16            06/14/85                              11/01/85        t PETITION ON LICENSE CONDITION 2.F(ANTITRUST)                                            M55463                                                            11/30/85 ITEMS 4.5.2 & 4.5.3 - RTS FUNCTIONAL TESTING -ALTERNATIVES &                            M53980    B-93  03/11/85C 09/30/85'                              12/30/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                              M55354    B-90  05/23/85  10/15/85                              12/30/85 CONTINUOUS PURGE OPERATIDH AND LEAK TEST                                                M57452                    09/16/85                              12/30/85 FIRE AREA EXEMPTIONS                                                                    M57854                                                            12/30/85 ITEM 3.3.3 - POST MAINT TESTING-CHANGES TO TS'S RTS                                      M52998    B-79  12/30/84                                        12/31/85 ITEMS 4.2.1 & 4.2.2 - PM PROGRAM FOR RTB'S - MAINTENANCE &                              M53122    B-81  02/13/85  04/22/85C                              12/31/85 AMENDMENT NUMBER 6 FIRE PROTECTION PROGRAM                                              M59351                                                            02/28/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)                                M44300    F-05  08/30/85  01/14/81C 07/30/85                    03/30/86 ITEM 3.2.3 - POST-MAINT TESTING - CHANGES TO T/S'S - ALL SR                              M53836    B-88  03/11/85  04/22/85C                              11/30/86 ITEM 4.2.3 & 4.2.4 - PM PROGRAM FOR RTB'S -LIFE TESTING &                                M53909    B-89  05/15/85  07/15/85                              12/30/86 NUREG 0737 II .K.3.31 COMPLI ANCE HITH 10 CFR 50.46                                      M48163    F-58            05/31/86                              12/31/86 ITEMS 3.2.1 3 3.2.2 - POST-MAINT TP'S AND VENDOR                                        M53753    B-87  06/11/85  10/01/85                              12/31/86 I.D.1.2 DETAILED CONTRL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT                                M56121    F-71            10/01/86  12/01/86                    01/30/87 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                            M45132 F-26      11/30/84  02/20/85C                              10/30/87 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                          M45943 F-63                                                      03/30/88 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                        M46014    F-64                                                    03/30/88 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                      M46086    F-65                                                    03/30/88 un UNSCHEDULED ISSUES nu REACTOR COOLANT PUMP TRIP (GL 85-12)                                                    M49688  G-01              10/31/85 10CFR50.62 OPERATING REACTOR REVIEHS                                                    M59092    A-20                        10/16/85 CONTAINMENT TENDON ANCHOR HEAD REVIEN                                                    M59555 CONFIRM RHST CHECK VALVES TESTS AND FREQUENCY                                            M59605 RESPONSE TO GL 83-28 ITEM 1.1 EVALUATION SEC IIIC AND IIIE                              M59651 UUU COMPLETED ISSUES MMM REQUEST FOR 5 EXEMPTIONS FOR IMPLEMENTATION DATES FOR FIRE                              M48569          07/18/84C 08/06/84C                              10/04/84C
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                PAGE N0.8    57 C0NDENSED          MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FARLEY 1 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                            NUMBER    &        DAlf      DATE      DJEE  DATE        DATE 000 COMPLETED ISSUES MMM      (CONTINUATION)
REVISE MET T0HER TECH SPECS                                      M54450                                                  10/04/84C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS        M44439  F-12              02/17/84C                    10/11/84C PRESSURE ISOLATION VALVE TS CHANGE IN CRITERIA                    M48714                    06/03/83C                    10/15/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN        M51158  F-08              11/20/83C                    10/15/84C AUX FEED SYSTEM ADMIN TECH. SPEC. CHANGE                          M55609                                                  10/17/84C EXEMPTION FOR USE OF RADI0 IODINE CANISTER                        M53468                    03/05/84C                    10/23/84C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M4?861  B-59              03/05/84C 09/24/84            10/25/84C TECH. SPEC. CHANGES FOR INCREASED FUEL ENRICHMENT                M54672                                                  11/09/84C ADMINISTRATIVE TECH SPECS FOR MANAGEMEllT CHANGE                  M55029                                                  11/13/84C IST RELIEF FOR ACCUM AND RHST CHECK VALVES                    M55169                    10/24/84C                    11/15/84C INFURTHERANCE CERTIFICATE FOR POLLUTION CONTROL CONTROL BOND      M56097                                                  11/19/84C TECH. SPEC. FIGURE 6.2-2 CHANGE FOR TH0 ASSISTANT PLANT          M55412                    09/24/84C                    11/27/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42462  B-60  05/01/84C 05/23/84C                      12/13 /84C REMOVAL OF SNUBBER TABLES FROM TECH. SPECS. PER GL 84-13 AND      M55409                                                  12/19/84C CHANGE TECH. SPEC. TO DELETE 8 HOUR HORK SHIFT                    M56203                                                  12/23/84C TECH SPECS FOR PURGE / VENT SYSTEM                                M54350                                                  01/31/85C REPORTING REQUIREMENYS TS PER GEN LTR 83-43                      M54235 A-18    11/16/84  11/26/84C                    02/19/85C ONE TIME CriANGE TO ANNUAL SCH OF OPERATOR REQUALS                M56672                                                  02/28/85C REACTOP. VESSEL CAPSULE REPORT 3:02 EFPY                          M54449                                                  05/02/85C TECH. SPECS. FOR 7.0 EFPY                                        M54894                                                  05/02/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                M52755 B-76  05/05/85              12/12/84          05/21/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                              M45824 F-57                                            05/23/85C REVISE TECH SPECS FOR BATTERIES PER IEEE 450-1980                  M51629                  09/06/84C                    05/24/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51238  F-09              11/30/83                    06/12/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53587  B-85  06/04/85C 06/03/85    04/04/85          06/12/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPetC-10)          M52226  C-15  01/30/85                                06/28/85C SUPPLEMENTAL CONFIRM ORDER: NUREG-0737 SUPPL 1                    M57790                                                07/27/85C POST ACC CORE DAMAGE PROCEDURE                                    M56590                                                08/04/85C ITEMS 3.1.1 & 3.1.2 - POST MAINT TP'S AND VENDOR                  M52917  B-78                                          09/10/85C ITEM 4.1 - RTS RELIABILITY - VENDOR RELATED MODIFICATIONS        M55069  B-80                                          09/10/85C ITEM 4.5.1 - RTS FUNCTIONAL TESTING - DIVERSE TRIP FEATURES      M54063  B-92                                          09/10/85C FIRE SCHEDULE EXEMPTION: DISCONNECT SH CHG PUMP VALVES            M57855                                                09/28/85C FIRE SCHEDULE EXEMPTION: PROCEDURES                                M57856                                                09/28/85C
 
R-1208687-001                  REGULAT0RY              INF0RMATION              TRACKING            SYSTEM                      PAGE NO. 58 C0NDENSED            MANAGEMENT            8t E P 0 R T                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FARLEY 2 PLANT LOCATION: 28 MI SE OF DOTHAN, ALA                LICENSED P0HER: 2652 MHT                  PROJECT MANAGERS E REEVES DOCKET NUMBER: 050-00364                                DESIGN P0HER:    0829 MHE                  BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: SSI                                    NSSS VENDOR:    HEST                      LIC. ASSISTANT:    C. PAARISH IE INSPECTOR:      H. BRADFORD RAI                    SE TAC    MPA        RAI      RESPONSE      TER      INPUT      LIC ACT TITLE                                                                NUMBER  E        D.Alf,        DATE      DATE        DATE        DATE MMDM ACTIVE ISSUES MMMM SNUBBER INSPECTION T/A                                                M57606                                                          09/26/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                    M46303 F-68                                                    09/30/85 FIRE AREA EXEMPTIONS FOR UNIT 2 AND SHARED HITH UNIT 1                M57244                                                          09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52837  B-77                                                    10/18/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M53671  B-86  03/11/85    04/22/85C                          10/18/85 RV AND SV TESTING II.D.1                                              M44580  F-14  07/20/84    08/30/84C                          10/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                  M55858  D-19  02/15/85    09/28/85C                          10/31/85 FAILURE OF CONTAINMENT TENDON ANCHOR HEAD                              M56817                      08/12/85C                          10/31/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS            M58059 C-16                06/14/85                            11/01/85 PETITION ON LICENSE CONDITION 2.F(ANTITRUST)                          M55464                                                          12/01/85 RTS FUNCTIONAL TESTING - ALTERNATIVE & TEST INTERVALS                  M53981  B-93  03/11/85C 09/30/85                              12/30/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND            M55355  B-90  05/23/85    10/15/85                            12/30/85 CONTINUOUS PURGE OPERATION AND LEAK TEST                              M57453                      09/16/85                            12/30/85 ITEMS 3.1.3 POST MAINT TESTING - CHANGES TO TECH. SPEC. RTS          M52999  B-79                                                    12/31/85 ITEMS 4.2.1 & 4.2.2 - PM PROGRAM FOR RTB'S - MAINTENANCE &            M53123  B-81  02/13/85    04/22/85C                          12/31/85 EVALUATE SAFETY GRADE BACKUP MEANS OF RCS DEPRESSURIZATION            M49021                      11/22/85                          01/31/86 AMENDMENT NUMBER 6 FIRE PROTFCTION PROGRAM                            M59352                                                          02/28/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/t)              M44301  F-05  08/30/85    11/01/79C 07/30/85                03/30/86 ITEM 3.2.3 - POST-MAINT TESTING - CHANGES TO TECH. SPEC. -            M53837  B-88  03/11/85    04/22/85C                          11/30/86 ITEM 4.2.3 & 4.2.4 - PM PROGRAM FOR RTB'S -LIFE TESTING &            M53910  B-89                07/15/85                            12/30/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                    M48164  F-58                05/31/86                            12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TP'S AND VENDOR                      M53754  B-87  06/11/85    10/01/85                            12/31/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT            M56122  F-71  10/01/86    10/01/86    12/01/86              01/30/87 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG              M51089  A-17  10/31/84    04/10/85C                          08/01/87 NUREG-0737  II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45133 F-26    11/30/84C 11/30/84                              10/30/37 NUREG-0737  III.A.1.2, TECHNICAL SUPPORT CENTER                      M45944 F-63                                                      10/30/87 NUREG-0737  III.A.1.2, OPERATIONAL SUPPORT CENTER                    M46015  F-64                                                  10/30/87 NURCG-0737  III.A.I.2, EMERGENCY OPERATIONS FACILITY                M46087  F-65                                                  10/30/87 OM UNSCHEDUL Q ISSUES MM REACTOR COOLANT PUMP TRIP (GL 85-12)                                  M49689 G-01                  10/31/85 10CFR50.62 OPERATING REACTOR REVIENS (GL 85-06)                      M59093 A-20 CONFIRM RHST CHECK VALVES TESTS AND FREQUENCY                        M59606 RESPONSE TO GL 83-28 ITEM 1.1 EVALUATION SEC IIIC AND IIIE            M59652 CDM COMPLETED ISSUES MMM REQUEST FOR 5 EXEMPTIONS FOR IMPLEMENTATION DATES FOR FIRE            M48570          07/18/84    08/06/84C                          10/04/84C
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING          SYSfEM                PAGE NO.*    59 C0NDENSED          MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FARLEY 2 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER    E        DAIf,      DATE    DATE  EX          DATE 000 COMPLETED ISSUES WWM      (CONTINUATION)
REVISE MET T0HER TECH SPECS                                      M54451                                                  10/04/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN -      M51159  F-08              11/20/83C                    10/10/84C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATI0HS        M44440  F-12              02/17/84C                    10/11/84C PRESSURE ISOLATION VALVE TS CHANGE IN CRITERIA                    M48715                    06/03/83C                    10/15/84C ANX FEED SYSTEM ADMIN TECH. SPEC. CHANGE                          M55610                                                  10/17/84C cXEMPTION FOR USE OF RADIGI00 DINE CANISTER                      M53469                    03/05/84C                    10/23/84C TECH. SPEC. CHANGES FOR INCREASED FUEL ENRICHMENT                M54673        05/10/84C 05/29/84C                      11/09/84C ADMINISTRATIVE TECH SPECS FOR MANAGEMENT CHANGE                  M55030                                                  11/13/84C 2 IST RELIEF FOR ACCUM AND RHST CHECK VALVES                      M55170                    10/24/84C                    11/15/84C INFURTHERANCE CERTIFICATE FOR POLLUTION CONTROL CONTROL BOND      M56098                                                  11/19/84C TECH. SPEC. FIGURE 6.2-2 CHANGE FOR TH0 ASSISTANT PLANT          M55413                                                  11/27/84C EQUIPMENT ENVIRONMENTAL QUALIFICATION (HUREG 0588)                M46590  B-60  05/ 01/84C 05/23/84C                    12/13/84C REMOVAL OF SNUBBER TABLES FROM TECH. SPECS. PER GL 84-13 AND      M55410                                                  12/19/84C CHANGE TECH. SPEC. TO DELETE 8 HOUR HORK SHIFT                    M56204                                                  12/26/84C ISI RELIEF FOR CP CASING HELDS AND CLASS 2 SG PIPE                M55496                                                  12/31/84C ISI RELIEF FOR CP CASING AND SUPPORT HELDS, AND CLASS 2 SG        M55625                                                  01/10/85C REACTOR VESSEL CAPSULE REPORT 1.1. EFPY                          M53266                    06/18/84C                    01/22/85C REVISE TECH SPECS HEATUP/COOLDOHN CURVES                          M54234                    06/18/84C                    01/22/85C MODIFIED CONTAINMENT VENT AND PURGE SYSTEM (LIC COND              M47479                    03/23/84C                    01/31/85C REPORTING REQUIREMENTS TS PER GEN LTR 83-43                      M54236  A-18    11/16/84  11/26/84C                    02/19/85C ONE TIME CHANGE TO ANNUAL SCH OF OPERATOR REQUALS                M56673                                                  02/28/85C POST ACC CORE DAMAGE PROCEDURE                                    M56591                                                  03/26/85C NUREG-0737 II.K 3.30, SB LOCA OUTLINE                            M45825 F-57                                            05/00/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND              M52756  3-76  05/06/85    06/25/84C 12/12/84          05/21/85C REGUEST TO DELETE LIC CONDITION 2 C (19) (D) TURBINE DISC        M48016  B-46              07/01/82C                    05/23/85C PAD 3.3 AS APPLICABLE TO SUCCESSIVE FUEL CYCLES (LIC COND        M49067                                                  05/23/85C DELETE LICENSE COND. 2.C. ( 18) EVIRONMENTAL QUALIFICATION      M49212                    01/ 07/83C                  05/23/85C DELETE LICENSE CONC. 2.C.(20) REGULATORY GUIDE 1.97              M49213                    01/ 07/8 3C                  05/23/85C DELETE LICENSE COND. 2.C.(21) EMERGENCY OPERATING PROCEDURES    M49214                    01/07/83C                    05/23/85C DELETE LICENSE COND. 2.C.(21) (B) REACTOR COOLANT SYS. VENTS    M49215                    01/ 07/8 3C                  05/23/85C DELETE LICENSE COND. 2.C.(21) (G) RV LEVEL INSTR                M49216                    01/07/83C                    05/23/85C DELETE LICENSE COND. 2.C.(21) (H) (1) ANALYSIS OF THERMAL        M49217                    01/07/83C                    05/23/85C DELETE LICENSE COND. 2.C.(21) (H) (2) VOIDING IN RCS            M49218                    01/07/83C                    05/23/85C DELETE LICENSE COND. 2.C.(21) (I) (4) SMALL BREAK LOCA MODEL    M49220                    01/07/83C                    05/23/85C REVISE TECH SPECS FOR BATTERIES PER IEEE 450-1980                M51631                    09/06/84C                    05/24/85C
                                              'I.D.2. SAFETY PARAMETER JISPLAY SYSTEM                        M51239 F-09    11/05/85  04/10/85C                    06/12/85C ITEM 1.2 - POST TRIP REVIEN-DATA AND INFORMATION CAPABILITY      M53588 B-85              06/04/85C                    06/12/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA8C-10)          M52227 C-15    01/30/85                                06/28/85C SUPPLEMENTAL CONFIRM ORDER: NUREG-0737 SUPPL 1                  M57791                                                  07/27/85C SCHEDULAR EXEMPTION: TRAIN A CHG PUMP CABLES (2-037)              M57245                                                08/28/85C SCHEDULAR EXEMPTION: DISCONNECT SHITCHES FOR CHG PUMP VALVES      M57246                                                08/28/85C FIRE SCHfDULE EXEMPTION: PROCEDURES                              M57789                                                08/28/85C ITEMS 3.1.1 & 3.1.2 - POST MAINT. TP'S & VENDOR                  M52918 B-78                                            09/10/85C ITEM 4.1 RTS RELIABILITY - VENDOR RELATED MODIFICATIONS          M53070 B-80                                            09/10/85C ITEM 4.5.1 - RTS FUNCTIONAL TESTING - DIVERSE TRIP FEATURES      M54064 B-92                                            09/10/85C
 
R-1208687-001                                        REGULAT0RY          INF0RHATION                  TRACKING        SYSTEM                        PAGE NO.:  60 C0NDENSED          MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85
,                                                                                    (HEADQUARTERS) i FACILITYs FERMI 2-PLANT LOCATION: LAGUNA BEACH, MICH                                        LICENSED P0HER: 000 MHT                    PROJECT MANAGER: P. ERICKSON DOCKET NUMBER                        050-00341                          DESIGN PONER:      1993 MHE              BRANCH CHIEF:      J. YOUNGBLOOD ARCH / ENGINEER: S8L                                                      NSSS VENDOR:        GE                    LIC. ASSISTANT:    M. RUSHBROOK i IE INSPECTOR:                          . N/A RAI                      SE TAC      MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                                                  NUMBER      &        RAll      DATE        RAIE          DATE      DATE UQ UNSCHEDULED ISSUES MM NUREG 0737, VERIFY QUALIFICATION OF ADS ACCUMULATORS                                    M57543 MK.I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE TO GL 83-08                              M58015 D-20      +
REVIEN OF CONTROL ROOM HABITABILITY                                                    M59017 NUREG-0737, III.D.1.1                                                                  M59018 NUREG-0737, SUPP. 1 PROCEDURES GENERATION PACKAGE-                                      M59019 EVALUATION OF ELECTRICAL SEPARATION (ICSB)                                              M59020 EVALUATION OF ELECTRICAL SEPARATION (PSB)                                              M59021 NUREG-0737, SUPP                      1, DETAILED CONTROL ROOM DESIGN REVIEH,          M59022 REVIEW OF CYGNA IDVP                                                                    M59023 REVIEW OF FIRE PROTECTION DEVIATIONS OF FIRE DOORS                                      M59053 TECH. SPEC. CHANGES SPEC. REVISION REQUEST                                              M59054 10CFR50.62 OPERATING REACTOR REVIENS                                                    M59094 A-20 FVALUATION OF SRV IN-PLANT TESTING                                                      M59607 E'/ALUATION OF SUPPRESSION POOL TEMPERATURF MEASUREMENTS                                M59608 ENVIRONMENTAL QUALIFICATION OF EQUIPMENT                                                M59609
,  EVALUATION OF CONTROL ROOM HABITABILITY                                                M59610 EVALUATION OF NULITIPLE CONTROL 1YSTEM FAILURES STUDY                                  M59611 EVALUATION OF THE IMPLEMENTATION OF THE INDEPENDENT                                    M59612
,  EVALUATION OF EMERGENCY DIESEL LUBE DIL SURVEILLANCE PROGRAM                            M59613 EVALUATION OF LOH-PRESSURE TURBINE DISC INSPECTION PROGRAM                              M59614 EVALUATION OF PERSONS HITH BWR OPERATING EXPERIENCE ON SHIFT                            M59615 EVALUATION OF IN3ERVICE INSPECTION PROGRAM                                              M59616 EVALUATION OF IDDINE/ PARTICULATE SAMPLING SYSTEM (II.F.1.2)                            M59617 EVALUATION OF RESPONSE TO GENERIC LETTER 83-28 (SALEM ATHS)                            M59618 EVALUATION OF DETAILED CONTROL ROOM DESIGN REVIEH fDCRDR)                              M59619 EVALUATION OF DECO COMPLIANCE HITH R.G. 1.97, REV. 2                                    M59620 EVALUATION OF UPGRADED EMERGENCY OPERATING PROCEDURES                                  M59621 EVALUATION OF SAFETY PARAMETER DISPLAY SYSTEM.                                          M59622
 
f REGULAT0RY                INF0RMATION                      TRACKING                SYSTEM                      PAGE NO.*        61 R-1208687-001 C0NDENSED            MANAGEMENT                      REPQRT                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FITZPATRICK PLANT LOCATION: 8 MI NE OF OSHEGO, NY                          LICENSED P0HER: 2436 MHT                                PROJECT MANAGER: H. ABELSON DOCKET NUMBER: 050-00333                                        DESIGN PONER:        0821 MHE                          BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: S8H                                            NSSS VENDOR:          GE                                LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:          L. DOERFLEIN                                                                                      RAI                      SE-TAC    MPA              RAI-      RESPONSE      TER        INPUT        LIC ACT TITLE                                                                        NUMBER        &            MJ1            DATE        pME        _DATE            DATE 0000 ACTIVE ISSVES MMMM ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    MS2838 B-77                                                                      09/30/85 M55859        D-19                                                              10/15/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                                          10/15/85 TECH. SPEC. CHANGE INSERVICE INSPECTION                          .
M56861 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                  M43734 B-65                                                                    10/30/85 M52919      B-78                                                              10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                M53438                                                                          10/30/85 i                        .TS CHANGE RE RBCLCHS ISOLATION VALVES                                            M54065      B-92                                                              10/30/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                      M57207                                                                          10/30/85 ISI RELIEF REQUESTS                                                          M57800                                                                          10/30/85 APP.R EXEMPTION - FIRE DAMPERS                                                M58038                  09/15/85                                              10/30/85 APPENDIX "R" EXEMPTION DURING SAFE SHUTDOHN                                                                                                                  10/31/85 CONTAINMENT AIRLOCK TESTING                                                  M47394 M53473                                                                        11/15/85 TS CHANGES RE CONTAINMENT PURGE / VENT                                        M49371      E-04                                                              12/15/85 SINGLE LOOP OPERATION                                                          M06864                                03/15/79                                12/30/85 MSIV LEAK DETECTION SYSTEM                                                    M51678      B-72                                                              01/15/86 HUREG 0737 TECH SPECS                                                                    B-83                      12/06/84C                              01/15/86 TECHNICAL SFECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                    M54533                  08/30/85 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                      M44302 F-05            04/16/85C                  07/30/85                    03/15/86 M47018                                                                        04/15/86 NUREG-0313 TECHNICAL SPECIFICATIONS                                          M53589      B-85                                                              04/15/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                  M55709      A-18                                                              04/15/86 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                            M56123 F-71                          11/15/85    12/15/85                    06/15/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -                  M57155 D-20                                                                  08/31/86 MARK I DRYHELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC                                                                                                  09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                      M53755 B-87 M53982 B-93            04/23/85C                                              10/30/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                  M53672    B-86                                                              01/01/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M45945 F-63                                                                  05/15/87 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                                                              05/15/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                              M46016    F-64 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                            M46088    F-65                                                              05/15/87 M46304    F-68                                                              05/15/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                                                                          05/15/87 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                      M51090    A-17        07/22/85 M51240 F-09          01/08/85                      N/A                      05/15/87
  .                            I.D.2. SAFETY PARAMETER DISPLAY SYSTEM MD UNSCHEDULED ISSUES MM NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                  M45134 F-26 10CFR50.62 OPERATING REACTOR REVIENS                                        M59095 A-20 BHR FEEDHATER N0ZZLE CRACKING ANALYSIS                                        M59560 000 COMPLETED ISSUES MMM M51160  F-08                                                              10/10/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN ~
i
 
R-1208687-001                REGULAT0RY              INF0RMATION              TRACKING          SYSTEM                PAGE NO.          62 C0NDENSED            MANA0EMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FITZPATRICK RAI              SE TAC  MPA        RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                              NUMBER  Hai      2Alf        DATE    DAlf    DATE        DATE D00 COMPLETED ISSUES MMM    (CONTINUATION)
CONTR01 ROD DRIVE SURVEILLANCE FREQUENCY                            M47525                                                  10/11/84C TECH. SPEC. CHANGE - ADS LOGIC MODS                                M55574                                                  10/11/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF            M45594 F-46                                            11/13/84C STA/SRL TRAINING PROGRAM APPROVAL                                  M57009                                                  12/11/84C MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                M07938  D-01                        06/21/85C          12/12/84C EVALUATION OF END-RISER CRACK                                      M55960                                                  01/14/85C TECH. SPEC. CORRECTION - RECIRCULATION PUMP TRIP HIGH              M56074                                                  01/30/85C RESPONSE TO GENERIC LETTER 84-23 (REACTOR HATER LEVEL              M57524                                                  02/07/85C CONTROL OF HEAVY LDADS OVER SPENT FUEL POOL (NUREG 0612)-            M07990 C-10                                            02/11/8 5C TS CHANGE RPS INOPERABLE DURNG REFUELING                            M56480                                                02/22/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL            M42489  B-60                                          03/12/85C RELOAD 6/ CYCLE 7                                                    M56708                                                05/02/85C SCHEDULAR EXEMPTION - APPENDIX R MODS.                              M57172                                                05/06/85C FIT 2 PATRICK TECH SPEC CHANGES TO SUPPORT ATTS INSTALLATION        M57201                                                05/07/85C TECH. SPEC. CHANGES RELATED TO HYDROGEN CHEM. TEST                  M55818                                                05/16/85C APPENDIX I TECH SPECS (EVALUATE RESPONSE TO HRC LETTER OF            N08045 A-02              12/15/78C                    05/29/85C HYDRAULIC SNUBBERS                                                  M08598  B-17              06/30/79C                    05/29/85C MECHANICAL SNUBBERS                                                  M 10756 B-22              ;6/30/79C                    05/29/85C DISPOSAL OF CONTAMINATED FUEL DIL PER 10 CFR 20.302                  M52147                                                05/29/85C TECH. SPEC. CHANGE PROCESS PIPING VALVE ISOLATION SIGNALS            M56862                                                05/29/85C INSPECTIDH OF BNR STAINLESS STEEL PIPING ACCORDING TO                M55599 B-84                                            06/06/85C IGSCC EVALUATION FOR CYCLE 7 RESTART                                M57527                                                06/06/85C PROPOSED EXEMPTION TO THE HYDROGEN RULE                              M52017 A-19                                            06/17/85C SHUTDOHN MARGIN DEMONSTRATION PROBLEMS                              M57799                                                06/21/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPASC-10)            M52228  C-15                                          06/28/85C LONG TERM REVIEH CONTAINMENT PURGE AND VENT (B-24)                  M42576  B-24                                          07/ 01/85C REVIEH OF PIPE SUPPORT INSPECTION PLAN                              M58039                                                07/22/85C NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS          M48269  F-55              09/04/84                    07/24/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M53000  B-79                                          07/30/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53838  B-88                                          07/30/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                  M52757  B-76  04/30/85                                08/09/85C TECH. SPEC. CHANGE - SAFETY REVIEN COMMITTEE ORGANIZATION            M56928                                                08/09/85C APPENDIX "R" INSPECTION                                              M57874                                                08/21/85C
 
R-1208687-001                  REGULAT0RY            INF0RMATION              TRACKING        SYSTEN                          PAGE N0.8    63 C0NDENSED            MANAGEMENT            REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FORT CALHOUN 1 PLANT LOCATION: 19 MI N OF OMAHA, NEB                LICENSED P0HER: 1500 MHT                PROJECT MANAGER: E. TOURIGNY DOCKET NUMBER: 050-00285                              DESIGN P0HER:    0478 MHE                BRANCH CHIEF:        E. BUTCHER ARCH / ENGINEER: GHDR                                NSSS VENDOR:    COMB                    LIC. ASSISTANT: P. KREUTZER IE INSPECTOR:      L. YANDELL RAI                        SE TAC    MPA      RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                              NUMBER    H[L    281L      DATE          pall        DATE        DATE DROM ACTIVE ISSUES MMMM I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        M56124  F-71            04/01/85C 05/28/85                      09/30/85 REACTOR COOLANT PUMP TRIP                                          M49696  G-01                            N/A                    10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52839  B-77            11/04/83C      N/A                    10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                      M52920  B-78            11/04/83C      N/A                    10/30/85 ITEM 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP          M53911  B-89            11/04/83C      N/A                    10/30/85 DIESEL GENERATOR RELIABILIIY TECH. SPECS. (GL 84-15)                M55860  D-19            01/31/85C                              10/30/85 ISI RELIEF FOR RECIRCULATION PIPING BURIED IN CONCRETE              M58000                                                          11/30/85 STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS          M58060  C-16            06/18/85                                11/30/85 ALTERNATIVE SHUTDOHN CAPABILITY FOR THE UPPER ELETRICAL            M59204                  08/30/85C                              11/30/85 ADMINISTRATIVE TECH SPEC. CHANGES: MGMT TITTLES AND EQ              M59218                                                          11/30/85 HUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                      M45946  F-63                            N/A                    12/30/85 NUREG-0737 III.A.I.2, OPERATIONAL SUPPORT CENTER                    M46017  F-64                            N/A                    12/30/85 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46089  F-65                            N/A                    12/30/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46305  F-68                            N/A                    12/30/85 ADMINISTRATIVE TS CHANGES AS A RESULT OF RULE CHANGES              MS3219  A-18  06/30/85  06/15/85C      N/A                    12/30/85 CAPSULE REMOVAL SCHEDULE TECH. SPEC. CHANGE                        M59219                                                          12/30/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                M52758  B-76  05/07/85  08/30/85C                              12/31/85 AMEND TS'S REGARDING APPENDIX J                                    M48807                    10/30/85        N/A                    01/30/86 PUMPS AND VALVES RELIEF REQUEST FROM ASME BXPV CODE                M54804        10/23/84C                  N/A                    01/30/86 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED        M53071  B-80            11/04/83C      N/A                    01/31/86 RU AND SV TESTING                                                  M44582  F-14  07/31/85                                          02/28/86 ITEM 3.1.3-POST-MAINTENANCE TESTING-CHANGES TO TECH                M53001  B-79            11/04/83C      N/A                    03/30/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45135  F-26            09/28/84C      N/A                    07/30/86 10CFR50.62 OPERATING REACTOR REVIEHS                              M59096  A-20                                                    09/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53673  B-86            11/04/83C      N/A                    10/30/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53756  B-87            11/ 04/83C      N/A                    10/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53839  B-88            11/04/83C                              10/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53983  B-93  03/25/85C 06/24/85C                                10/30/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)            M44303  F-05  03/30/86  03/01/85C 02/28/86                      12/30/86 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG            M51091  A-17  04/01/86  04/01/85                                12/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54066  B-92            11/ 04/8 3C    N/A                    01/31/87 DC UNSCHEDULED ISSUES MM HUMAN FACTORS REVIEW OF THE SPDS (CONFIRMATORY ITEM NO. 1          M59638 TECH. SPECS. FOR CYCLE 10 OPERATION                                M59649 DDM COMPLETED ISSUES MMM Z.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN        M51161  F-08            10/25/83        N/A                    10/10/84C
 
R-1208687-001                          REGULAT0RY              INF0RMATION                  TRACKING. SYSTEM                        PAGE NO.t  64 C0NDENSED          MANAGEMENT                REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FORT CALHOUN 1 RAI            SE TAC        MPA      RAI        RESPONSE  TER  INPUT      LIC ACT-TITLE                                                                        NUMBER        &      DAIf          DATE    DME    DATE        DATE MMM COMPLETED ISSUES MMM              (CONTINUATION) 8NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 82-16 OR'                      M49733 ~ B-72                              N/A              10/11/84C RELIEF FROM ISI PLAN OF 1973-1983                                            M55662                                                      11/14/84C FT. CALHOUN, NEUTRON SOURCE DATA FOR FLUX REDUCTION                          M55043                                    N/A              01/05/35C
,                                    ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                    M42491    B-60                  01/31/85C N/A              02/15/85C 1
STEAM GENERATOR TUBE INSPECTION HAIVER                                      M56848                                                      03/08/85C EQ. DEADLINE ADDITIONAL EXTENSION                                            M55411                          02/15/85C N/A              03/29/85C APP. I TECH. SPEC. IMP. REVIEW                                              N08143 A-02                      10/18/84C N/A              04/03/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                M53124 B-81                      11/04/83C N/A              04/24/85C REEVALUATION OF LICENSEE'S POSITION REGARDING ADEQUACY OF                    M55505                                                      04/24/85C TECH. SPEC. FOR TAKE GAS MONITORING                                          M56919                                                      04/29/85C AMENDED TS'S INOPERABILITY OF RPS/ESFAS CHANNELS                            M48534            05/23/85      04/06/84  N/A              05/09/85C TECH. SPECS. FOR POST ACCIDENT SAMPLING                                      M57131                                                      05/24/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                      M51241    F-09                  12/30/84C N/A              06/07/85C ITEM 1.2 - POST TRIP REVIEN-DATA AND INFORMATION CAPABILITY                  M53590 B-85                      11/04/83C                  06/13/85C ECCS ERROR AND CORE HEIGHT F(Q)                                              M57235                                                      06/13/85C ISI RELIEF REEVALUATION - REACTOR VESSEL TO N0ZZLE HELDS                    M57234                                                      06/19/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPAOC-10)                    M52229    C-15                            N/A              06/28/85C
,                                    NUREG-0737 II.K 3.30s SB LOCA DUTLINE                                        M45827    F-57                            N/A              07/01/85C NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                            M48166 F-58                                N/A              07/01/85C APPENDIX R EXEMPTION REQUESTS                                                M52353            11/27/84      01/15/85C                  07/03/85C APPENDIX R EXEMPTION REQUEST CONTAINMENT                                    M56481            03/15/85                                07/03/85C
:  TESTING FREQUENCY OF AFH PUMPS TECH SPEC CHANGE                              M57909                                                      08/19/85C PCP SURVEILLANCE REQUIREMENTS TECH. SPEC.                                    M57866                                                      08/22/85C CORE RELOAD METHODOLOGY CHANGES FOR CYCLE 10                                M57995                                                      08/26/85C i
e e
t
 
R-1208687-001                                                                              REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                          PAGE NO.:    65 C0NDENSED        MANAGEMENT            REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FORT ST VRAIN PLANT LOCATION: 35 MI N OF DENVER, COL                                                                          LICENSED POWER: 0842 MHT                  PROJECT MANAGER: P. HAGNER DOCKET NUMBER: 050-00267                                                                                        DESIGN P0HER:    0330 MHE                BRANCH CHIEF:        E. JOHNSON ARCH / ENGINEER: S&L                                                                                            NSSS VENDOR:    GAC                      LIC, ASSISTANT:      E. HAYCRAFT IE INSPECTOR:                                                                  G. PLUMLEE RAI                        SE TAC    MPA      RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                                                                                          NUMBER    UpL    ILATE      DATE        ILA_Il        DATE        DATE DRMM ACTIVE ISSUES MMMM SEVENTY PERCENT MOISTURE MONITOR RESPONSE TEST                                                                                M55053                                  N/A                      01/15/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                                    M52840  B-77  05/08/8S    11/04/83C                              06/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                                    M53674  B-86  05/08/85                                          06/30/85 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                                                  M53984  B-93  05/08/85C  06/18/85C                              06/30/85 CHANGES TO CIRCULATION OVERSPEED TRIP SETTING                                                                                  M55052        10/25/84C  12/27/84C      N/A                      07/25/85 ELECTRICAL MODIFICATIONS INCLUSION INTO TECH SPECS                                                                            M51955        10/15/84C  02/06/85C      N/A                      08/15/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                          M55861  D-19  07/02/84C  02/06/85C      N/A                      08/15/85 BUILDING 10 EVALUATION                                                                                                        M55287                                  N/A                      09/01/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                                    M54535 E-83                07/30/84C 07/ 01/85C                  09/30/85 PCRV TENDON CORROSION PROBLEM                                                                                                M54639        07/20/84C 08/09/84C 12/01/84                      09/30/85 TECH. SPEC. UPGRADE PROGRAM                                                                                                  M56565                    10/15/85                              09/30/85 ISI/IST TECH SPECS                                                                                                            M53417                                  N/A                      10/15/85 NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                                                                    M44443 F-12    07/08/85C 09/15/85                                10/20/85 APPENDIX R EXEMPTION REQUESTS                                                                                                M54373                    07/15/84C    N/A                      10/30/85 RETRANSFER OF LICENSING AUTHORITY TO NRR                                                                                      M59302                                                            10/30/85 CONTROL OF HEAVY LOADS; PHASE I 0F REEVALUATION                                                                              M56302        02/05/84C 12/05/84C      N/A                      11/15/85 CLORIDE SOURCE AND CONSEQUENCES IN PRIMARY COOLANT                                                                            M57248                                  N/A                      11/15/85 FUEL ELEMENT INSPECTION PROGRAM                                                                                              M57625                    06/10/85C    N/A                      11/15/85 PROCEDURES GENERATION PACKAGE REVIEW (HUREG 0737 SUPP/1)                                                                      M44304  F-05  04/30/85                  N/A                      11/30/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                                        M51242  F-09                                                    11/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                                                M56125  F-71              04/30/85    05/30/85                  11/30/85 XENON STABILITY TESTING TECH. SPEC.                                                                                          M57788                                                            12/06/85 ORGANIZATICHAL CHANGES                                                                                                        M56743                    06/10/85C    N/A                      12/14/85 LCD 4.1.9 NON-CONSERVATIVE ANALYSIS ASSUMPTIONS                                                                              M52634        05/23/84C 08/01/85                                12/15/85 EMVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                                                    M42527  B-60  05/17/85C 06/15/85                                12/30/85 INSTRUMENT SETPOINTS                                                                                                        M47416                    06/21/85C    N/A                      12/30/85 FUEL BLOCK CRACK MODELING                                                                                                    M49055        05/11/84C 08/13/84C 12/15/84                      12/30/85 CIRCULATOR OPERABILITY TECH. SPEC. CHANGE                                                                                    M56927        08/06/85                  N/A                      12/30/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                                  M58061  C-16  04/17/85C 07/11/85                                12/30/85 10CFR50.62 OPERATING REACTOR REVIENS                                                                                      M59097  A-20                                                    12/30/85 REVIEN OF REVISION 3 0F SAR                                                                                                  M59314                                                            12/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                                                            M42925 B-59                07/16/85C                              12/31/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                                                        M53002  B-79  05/08/85    11/04/83C                              12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTIHG -CHANGES TO TECH.                                                                      M53840  B-88  05/08/85                                          12/31/85 ZTEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                                              M52921  B-78              11/04/83C                              01/30/86 NOSLE GAS MONITORING (II.F.1.1)                                                                                              M57944                    05/17/85C                              06/17/86 INSTRUMENTATION TO FOLLDH THE COURSE OF AN ACCIDENT (RG                                                                      M51092 A-17                02/28/85C    N/A                      08/30/86 HUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                                M45947  F-63                                                    09/30/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                                            M46018  F-64                                                    09/30/86
 
R-1208657-001                    REGULAT0RY            INF0RMATION                TRACKING        SYSTEN                PAGE N0.8    66 C0NDENSED            MANAGFMENT            REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: FORT ST VRAIN RAI              SE TAC    MPA        RAI    RESPONSE    TER  INPUT      LIC ACT ILTlf                                                                NVMBER    (([L. DAlf      DATE      p]QE  JM          DATE DuuM ACTIVE ISSUES MMMM          (CONTINUATION)
NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46090 F-65                                            09/30/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46306 F-68                                            09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53757 B-87                                              12/31/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54067  B-92                                            01/30/87 000 COMPLETED ISSUES MMd FAILURE TO SCRAM ON 6-23-84                                        M55286                                                  10/05/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                  M55710  A-18                                            10/05/84C CORE SEGMENT 2 REPORT REVIEW (CRACKED FUEL ASSEMBLIES)                M52035                                                  10/12/84C SECURITY PLAN REVISION 14                                            M54265          07/01/84  09/15/84C    N/A              10/12/84C CHANGES TO SECONDARY COOLANT ACTIVITY SR                              M55051                    05/10/84C    N/A              10/26/84C STEAM GENERATOR TUBE TECH, SPEC.                                    M55626                      10/12/84C  N/A              11/09/84C FIRE HOSE STATION TECHNICAL SPECIFICATION                            M56026            N/A                  N/A              01/05/85C EXEMPTION TO 10CFR 50.54(H)                                        M51954          05/02/84C              N/A              02/08/85C SECURITY PLAN REEVALUATION                                            M57003          12/15/84              N/A              03/22/85C NUREG-0737 I.C.1.2.A,        INADEQUATE CORE COOLING GUIDELINES      M44234  F-04    04/30/85              N/A              C3/28/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                  M52759  B-76                                            06/06/85C NUREG-0737 II.F.1.1, HOBLE GAS MONITOR                                M44923  F-20    10/24/84C 11/28/84C    N/A            06/17/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)              M52250  C-15                                            06/28/85C STARTUP TEST PROGRAM CHANGES                                          M52354          10/22/84C 01/15/84    N/A              07/05/85C SEGt1ENT 3 AND FTE-2 EXAMINATION REPORT                              M57247                                  N/A              07/08/85C MOISTURE INGRESS                                                      M55294          10/16/84C 01/04/85C                    07/19/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53591  B-85                          04/04/85          07/23/85C LIOUID EFFLUENT RELEASE MONITORS                                      M56608          03/11/85C 05/15/85C    N/A              07/30/85C NUREG 0737, SUPP.        1, CONFIRMATORY ORDER                        M57646                                  N/A              08/02/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN            M51162 F-08                04/30/85                    08/20/85C l
i l
l t
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKINO        SYSTEM                      PAGE NO. 67 C0NDENSED          MANAGEMENT            REPORT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: GINNA.
PLANT LOCATION: 15 MI NE OF ROCHESTER, NY          LICENSED POWER: 1520 MHT                PROJECT MANAGER: C. MILLER DOCKET NUMBER: 050-00244                            DESIGN PONER:    0470 MWE                BRANCH CHIL.*      J. ZHOLINSKI ARCH / ENGINEER: GIL                                NSSS VENDOR:    HEST                    LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:      H. COOK RAI                    SE TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLE                                                            NUMBER    lEL      PAIL      DATE      PAIE        DATE        DATE UDMD ACTIVE ISSUES MMMM TS SURVEILLANCE - HYDRAULIC SNUBBERS                              N08414  B-17            06/30/79C                          09/30/85 TS SURVEILLANCE FOR MECHANICAL SNUBBERS TEST RESULTS              N08416 B-22              06/30/79C                          09/30/85 TENDON SURVEILLANCE PROGRAM                                      M12461                                12/15/84                09/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42910  B-59                                                09/30/85 TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY          M43047  D-17                                                09/30/85 TECH SPEC CHANGE FOR RHST OPERABILITY AND OTHER                  M49178                                                        09/30/85 HEATUP & C00LOOHN - REACTOR SURVEILLANCE CAPSULE T                M49292                                                        09/30/85 REACTOR COOLANT PUMP TRIP                                        M49677  G-01                                                09/30/85 TS CHANGE - REVISE LIST OF HYDRAULIC SNUBBERS                    M52404                                                        09/33/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR VENDOR            M52841  B-77                                                09/30/85 ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR      M53174  B-82            03/19/85C                          09/30/85 SEPSTRUCTUAL UPGRADE PROGRAM FOLLOHUP                            M54364                                  N/A                  09/30/85 SEISMIC STRUCTUAL EVAL. MAIN CONTROL BOARD SEP III-6              M54371                                                        09/30/85 EXEMPTION INSPECTION OF CONTAINMENT TENDONS FOR BROKEN HIRES      M55300                                                        09/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55862  D-19                                                09/30/85 GINNA                                                            M56244                                                        09/30/85 SEP-STORAGE TANK SEISMIC PULIFICATION FOLLOHUP                    M56596                                                        09/30/85 TECH. SPEC. CHANGE - REVIEW OF LCO AND ACTION STATEMENTS          M57011                                                        09/30/85 RESPONSE TO GL 84-04; ASYMMEDTRIC BLONDOHN LDADS ON POWER        M57034                                                        09/30/85 CONSOLIDATED FUEL STORAGE                                        M57516                                                        09/30/85 SEP TECH. SPEC. (TOPIC VIII-3.A) BATTERY TESTING                  M57797                                                        09/30/85 XTEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                M54068  B-92                                                10/30/85 RV AND SV TESTING                                                M44584  F-14  10/31/84  05/24/85C                          10/31/85 TECHNICAL SPECIFICATION CHANGE - USE OF TSC BATTERY IN PLACE    M53311                    03/01/85                            11/01/85 TECH SPEC CHANGES FOR SEP TOPICS II-A AND III-7.A                M48880                                                        11/30/85 PUMP & VALVE INSERVICE TESTING                                  M49135                                                        12/30/85 TECH SPEC CHANGE VALVE EXERCISING AND SURVEILLANCE              M49175                                                        12/30/85 T/S CHANGE - REDUCE REQUIREMENT FOR LON PZR HATER LEVEL AND      M54370          12/30/84  04/30/84                            12/50/85 ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION DESCRIPTION      MS2760  B-76  04/19/85                                      12/31/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR      M53125  B-81  10/11/34C                                    12/31/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                  M52922  B-78                                                01/01/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH            M53003  B-79                                                01/01/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                M53072  B-80                                                01/01/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND      M55356  B-90                                                01/01/86 RADIOLOGICAL CONSEQUENCES OF SGTR                                M49341                                                        01/31/86 TECH SPEC TO INCREASE THE MAXIMUM ALLOHABLE ACTIVITY IN THE      M49899                                                        02/01/86 ITEMS 4.5.2 8 4.5.3 - PEACTOR TRIP SYSTEM FUNCTIONAL TESTING    M53985  B-93  08/00/85                                      04/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -    M56126  F-71              12/31/85  01/31/86                04/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                  M45948  F-63                                                06/30/86
 
    - _ _ _ _ _ _ _ _ . - - - . _            - .-          _ --    -      .            -    .-        -.-.      -        - , .    ~ .
R-1208687-001                  REGULAT0RY            INF0RMATION                TRACKING                  SYSTEM                PAGE NO.r'  68.
C0NDENSED          MANAGEMENT                      REPORT                      RUN DATE: 09/17/85 -
(HEADQUARTERS)
FACILITY: GINNA RAI              SE TAC    MPA              RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                              NUMBER    LEL          - DAIL        DATE      plJE  DATE        DATE MMMu ACTIVE ISSUES MMMM        (CONTINUATION)
ITEM 1.2 - POST' TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53592    B-85        09/30/85    11/30/85    04/04/85          09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53758    B-87                                                  09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53841    B-88                                                  09/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX        M53912    B-89        05/15/85                                    12/30/86 ECCS EVAL THAT ALLONS FOR UPPER PLENUM INJECTION (UPI)              M07739    D-05        02/12/85                                  01/15/87
              .NUREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46                      M48168    F-58                    06/15/86                      01/15/87
                'NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                      M46019    F-64                                                    09/30/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46091    F-65                                                    09/30/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46307    F-68                                                    09/30/87 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG            M51093    A-17        06/21/86                                    09/30/87 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51243    F-09                                                    09/30/87 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)            M44305    F-05        04/30/86                03/30/86          11/31/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53675    B-86                                                    01/30/88 MM UNSCHEDULED ISSUES MM NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45137    F-26 SEP TIA ITEMS                                                      M54786 T007 INADEQUATE CORE CODING INSTRUMENTATION                              M57618 STEAM GENERATOR GENERIC REVIEN CONCERNING STEAM GENERATORS          M58062 C-16                      07/11/85C 10CFR50.62 OPERATING REACTOR REVIEHS                              M59098 A-20 STATIONS OPS. MGR. SRO LICENSE                                      M59600 QA RECORD RETENTION REQUIREMENTS INCONSISTENCY                      M59601 MMM COMPL ETED ISSUES MMM T/S CHANGE - DELETE SPACING RESTRICTIONS OF RECENTLY                M54369                                                            10/05/84C M54849                                                            10/17/84C LICENSE CONVERSION SER SUPPLEMENT                                                                                                    10/17/84C JUSTIFICATION OF HESTINGHOUSE DNBR H-3 CORRELATION DESIGN          M55316 M54509                                                            10/23/84C DISPOSAL OF LOW LEVEL RADI0 ACTIVE HASTE                                                                                              10/26/84C EXEMPTION REQUEST - EMERGENCY EXERCISE                              M54291 PROCESS CONTROL PROGRAM                                            M53432                            12/27/83C                      11/ 07/84C M54762                                                            11/14/84C
                ' INCREASE CAPACITY OF SPENT FUEL POOL STORAGE RACKS                                                    08/05/72C                      12/10/84C CONVERSION POL TO FTOL                                              M11220 M55437                                                            12/20/84C REQUEST FOR MODIFICATION OF TMI CONFIRMATORY ORDER (ITEM                                                                              12/31/84C NON-TECH SPEC TMI RELATED ITEMS                                    M43307 M56524                                                            12/31/84C PROPOSED MODIFICATIONS TO AUX.. BUILDING CRANE
;                  ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL            M42520    B-60                                                    02/27/85C M53431                                                            02/27/85C i                  ALTERNATIVE SHUTDOHN SYSTEM - APP R                                                                                                  03/08/85C TEMPORARY CLOSURE PLATE Y                                          M56836 M56342                                                            03/21/85C APP.R TECH EXEMPTIONS                                                                                                                03/22/85C
!                  REVIEN OF ADDITIONAL SUBMITTALS ON SGTR                            M48474 M56837                                                            03/25/85C
!                  CORE DAMAGE ASSESSMENT BY RAD. ANAL.                                                                                                  04/02/85C TUBE SHEET SLEEVING, 1985
                                                    ~
M56989 M57209                                                            04/05/85C LOCA ANALYSIS i
                                                                                                      ,      c                                      __              _ _ _ _ _ - .
 
_ _ _ _ _.      . ,_        _  __        ___ _ .                _    ..      . . . _  .- __ -    s-~. -            _        ..      - -
R-1208687-001                    REGULAT0RY                  INF0RMATION                TRACKING              S Y S T E.M            PAGE N0.8    69 C0NDENSED                MANAGEMENT                REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: GINNA RAI              SE TAC    MPA          RAI      RESPONSE      TER INPUT      LIC ACT TITLE                                                                      NVMBE8    &          MIX        DATE        gjQg _DATE          DATE
              . 000 COMPLETED ISSUES MMM        (CONTINUATION)
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                  M51163    F-08                                              04/16/85C-BATTERY CHARGER CONFIGURATION                                              M56546                          08/31/85                      04/19/85C TECH. SPEC. CHANGE - DELETION OF OUTDATED HOT CHANNEL                      M55624                                                        05/30/85C      's FUEL FUNNEL                                                                M56488                                                      05/30/85C SPENT FUEL POOL CHARCOAL ABSORBERS                                          M57515                                                      05/30/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                      M45829    F-57                                              06/06/85C
              - TECH. SPEC. CHANGE - REPORTING REQUIREMENTS - CONF. HITH                    M54659 A-18                                                  06/07/85C 4
~              TS CHANGE ADJUSTMENT OF ISI PGM to YR INTERVAL START DATES                  M53433                                                      06/19/85C TS CHANGES TRAVEL RESTRICTION ON CRANE OF AUX BUILDING CRANE              M56597                                                        06/25/85C CONTROL OF HEAVY LOADS - PHASE II'(FOLLONUP OF MPASC-10)                    M52231  C-15'                                              06/28/85C
              . TECHNICAL SPECIFICATION MANAGEMENT REORGANIZATION                          M57514                                                      07/10/85C TECH SPEC CHANGE TO ALLON LOW P0HER PHYSICS TESTING PRIOR TO                M49177                                                      07/25/85C T.S. CHANGE - DELETE RESPONSE TIME TESTING OF AUX FD SYS AND                M52396                                                      07/30/85C
              'SEP TS CHANGES                                                            M52399                                                        07/30/85C r
T/S CHANGE - DELETE RESTRICTION ON MOVEMENT OF SHIPPING                    M54363                                                        07/30/85C RCS VLNTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                  M54392                                                        07/30/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                  M54536    B-83                                              07/30/85C l
i
+
{
t          n -
 
R-1208687-001                  REGULAT0RY          INFrRHATION                TRACKING        SYSTEM                        PAGE N0.8    70 C0NDENSED          MANAGEMENT            REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: GRAND GULF 1 PLANT LOCATION: 25 MI S OF VICKSBURG, MISS        LICENSED POWER: 3833 MHT                  PROJECT MANAGER: L. KINTNER DOCKET NUMBER:    050-00416                      DESIGN PONER>    1250 MHE                BRANCH CHIEF:      E. ADENSAM ARCH / ENGINEER: BECH                              NSSS VENDOR:    GE                      LIC. ASSISTANT:    M. DUNCAN IE INSPECTOR:      A. HAGNER RAI                      SE TAC      MPA      RAI    RESPONSE      TER        INPUT      LIC ACT IQLE                                                              NUMBER    &      DME        DATE        PALE        DATE        DATE nuca ACTIVE ISSUES MMMM ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M53986    B-93  03/15/85C 06/12/85C                            07/30/85 REVISED FIRE HAZARDS ANALYSIS                                    M57623                                                        08/15/85 DYN2MIC QUALIFICATION TESTS OF SERVICE HATER PUMPS              M56972                    03/20/85C                          08/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53593 B-85                09/15/85    05/21/85C              08/31/85 SURVEILLANCE TESTING OF FUSES USED IN OVERCURRENT PROTECTION      M56733                                                        08/31/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION 8 VENDOR INTERFACE - ALL    M53676    B-86  03/15/85C 05/14/85C                            09/15/85 EMERGENCY OPERATING PROCEDURES                                    M56455                    04/11/85C                          09/15/85 PRESERVICE INSPECTION RELIEF NO. 00014                            M52631                                                        09/30/85 REV. 2 & 3 TO ODCM                                                M55391                    08/30/85                            09/30/85 PRSERVICE INSPECTION NO. 00012                                    M55523                                                        09/30/85 PRESERVICE INSPECTION RELIEF NO. 00015                            M55762                                                        09/30/85 ENFORCEMENT ACTION EA-84-75, DATED MARCH 21, 1985                M59505                                                        09/30/85 CORE DAMAGE ESTIMATE PROCEDURE                                    M56443                    08/30/85                            10/01/85 TECH SPEC CHANGE REQUEST DATED 7/3/85, ITEMS 1 AND 3, FIRE        M59184                                                          10/01/85 TECH. SPEC. CHANGE REQUEST DATED 7/3/85, ITEM 2 CONTAINMENT      M59185                                                          10/01/85 ITEM 4, CONTAINMENT ISOLATION VALVES                              M59186                                                          10/01/85 SECOND CONTAIN BOUNDARY ITEM S SECONDARY CONTAINMENT              M50187                                                          10/01/85 LICENSE AMENDMENT REQUEST DATED 7/12/85, ITEM 9 SCRAM            M59363                                                          10/01/85 LICENSE AMENDMENT REQUEST DATED 7-12-85 ITEM 6 RADIATIDH          M59360                                                          10/06/85 LICENSE AMENDMENT REQUEST DATED 7/12/85 ITEM 8 CONTAIN'MT        M59362                                                          10/06/85 L ECENSE AMENDMENT REQUEST DATED 7/12/85, ITEM 10, ADDITIONAL    M59364                                                          10/06/85 LICENSE ADMENDMENT REQUEST DATED 7/12/85, ITEM 11, DIESEL        M59365                                                          10/06/85 MASONRY HALL DESIGN IE BULLETIN 80-11 IE BULLETIN 80-11          M49996  B-59                                                  10/15/85 STARTUP TEST REPORTS                                              M57521                                                          10/15/85 TECHNICAL SPECIFICATION CHANGE, ITEM 12 CONTAINMENT              M59439                                                          10/15/85 TECHNICAL SPECIFICATI0H CHANGE, ITEM 13 PRESSURE ISOLATION        M59440                                                          10/15/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52842 B-77    03/15/85C 08/30/85                              10/30/85 REUISED FSAR SECTION 13.2, TRAINING & APPENDIX 9B FIRE            M59358                                                          10/30/85 QUALIFICATION OF ADS ACCUMULATORS NUREG-0737. II.K.3.28          M49992 F-55    03/15/85C 08/15/85    02/19/85C                11/01/85 RHR RELIEF VALVE DISCHARGE TO SUPPRESSION POOL                    M55759          06/11/85C 09/09/85                              11/15/85 ENCROACHED AREA 0F SUPPRESSION POCL                              M56303                    09/15/85                            12/01/85 CONTROL ROOM LEAK RATE                                            M56445                                                          12/01/85 INPLANT SRV TESTS                                                M56446          08/25/85  06/01/85                            12/01/85 OPERATIONAL READINESS REPORT FOR 100% POWER OPERATION            M56774                    10/01/85                            12/01/85 HEIR HALL OVERFLON                                                MS/159                    09/05/85                            12/01/85 REQUEST FOR EXEMPTION TO REPORTING REQUIREMENTS (10CFR50.73)      M59359                                                          12/15/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55863 D-19                                                    12/30/85 MP8L RESPONSE TO TDI OHNERS GROUP RECOMMENDATIONS                M56456                    09/30/85                            12/30/85 MARK III CONTAINMENT CONCERNS RAISED BY J. HUMPHREY              M57140                                                          12/31/85
 
R-1208687-001                -REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                  PAGE NO.      71 C0NDENSED          MANAGEMENT            REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: GRAND GULF 1 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT NUMBER    &        DAIX        DATE      DAIK    DATE        DATE TITLE D000 ACTIVE ISSUES WMMM        (CONTINUATION)
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51244  F-09              07/ 31/8 5C                    01/30/8(
ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53842  B-88  03/15/85C  03/15/85C                        01/30/86 INSERVICE INSPECTION RELIEF NOS. I-00001 THRU I-00011            M55522        08/19/85C  09/30/85    11/01/85            01/30/86 10 YEAR ISI PLAN                                                M55524        08/19/85C  09/30/85    11/01/85            01/30/86 INSERVICE INSPECTION RELIFF NO. I-00012                          M57222        08/19/85C  09/30/85    11/01/85            01/30/86 REACTOR INTERNALS TEST RESULT                                    M56444                    12/01/85                        01/31/86 INVERPLANT COMMUNICATIONS SYSTEMS                                M56453                    11/30/85                        02/15/86 INSERVICE TESTING AND INSPECTION (IST) PUMPS / VALVES            M51477                    06/28/85C                      02/28/86 LOOSE PARTS MONITORING                                            M56451                    12/01/85                        05/01/86 TMI ACTION ITEM I.G.1 SPECIAL LOH POWER TESTS                    M56423                    01/15/85                        05/15/86 ADS LOGIC MODIFICATIONS (II .K.3.18)                              M56447                    02/01/86                        06/01/86 PARTIAL FEEDHATER HEATING                                        M56448                    02/28/86                        06/01/86 HYDROGEN CONTROL MEASURES                                        N48756        09/14/84C                                  08/01/86 M51094  A- 17  11/15/85  02/28/85C 05/15/86              08/01/86 INSTRUMENT ATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                        03/01/86    06/01/86                        08/01/86 CONTAINMEt4T/DRYHELL PURGE                                        M53548 M56454                    05/15/86                        08/01/86 REMOTE SHUTDOWN PANEL ROOM TEMPERATURE                                                      08/01/86                        11/01/86 INSPECTION OF TURBINE DISCS                                      M56442 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -    M56127  F-71              07/31/86    08/31/86            11/30/86 M56450                    04/01/86                        12/01/86 CORE STABILITY ANALYSES                                                                      06/01/86                        12/01/86 CIRCULATING HATER SYSTEM FAILURE                                M56452 SURMEILLANCE OF CONTROL BLADES                                  M56449                    09/15/86                        12/15/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTEt.ANCE TESTING                  M52923  B-78                                              12/31/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53759  B-87                                                12/31/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54069  B-92                                              12/31/86 TECHNICAL SUPPORT CENTER APPRAISAL                                M57390                                                    12/31/86 OPERATIONS SUPPORT CENTER APPRAISAL                              M57391                                                    12/31/86 EMERGENCY OPERATIONS FACILITY APPRAISAL                          M57392                                                    12/31/86 EMERGENCY PROCEDURES GENERATION PACKAGE                          M57393  F-05  10/15/85                                    03/31/87 M59099  A-20              10/16/85                        08/01/87 ANTICIPATED TRANSIEt4TS WITHOUT SCRAM IMPLEMENTATION (10 CFR DO UNSCHEDULED ISSVES **
FINAL TEST REPORT SRV INPLANT TESTS                              M59535 LICENSE AMENDMENT REQUEST DATED 08/23/85 ITEM 14 STANDBY        M59536 000 COMPLETED ISSUES num M55850                                                    10/25/84C STEAM CONDENSING MODE TEST                                                                                                  11/13/84C LECTER DTD 11/2/84. REQUEST FOR CERTIFICATION OF POLUTION        M56198 M49997                                                    11/19/84C INSERVICE INSPECTION                                            M52412                                                    12/15/84C REMIEH OF REVISED TECH SPECS                                    M56044                                                    02/ 01/8 5C TECH. SPEC. CHANGE, DATED OCTOBER 9, 1984                                                                                  G2/12/85C QUALIFICATION OF CONTROL SYSTEM IEN 79-22) MP&L LETTER DATED    M57049 REMOTE PANEL TRANSFER SWITCHES                                  M53418                    01/87/85C                      02/15/85C M56595                                                    02/26/85C SCHEDULAR EXEMPTION REQUEST FOR FSAR UPDATE l
l
 
R-1208687-001                                    REGULAT0RY          INF0RMATION                  T R A C K.I N G        SYSTEM                      PAGE NO.s    72 C0NDENSED            MANAGEMENT              REP 0RT                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: GRAND GULF 1 RAI                    SE TAC      MPA    . RAI      RESPONSE        TER        INPUT        LIC ACT TITLE                                                                                NUMBER    11      DAIX            DATE    PAlg          DATE        DATE UDM COMPLETED ISSUES MMK.                        (CONTINUATION)
SEISMIC AND DYNAMIC QUALIFICATION                                                    M56781                    .02/28/85                                03/01/85C FSAR AMENDMENT 59 REVISIONS TO CHAPTER'14 STARTUP TEST                                M56803                                                              03/13/85C INSTRUMENTS FOR DETECTION ON INADEQUATE CORE COOLING'                                M49459 F-26      10/26/84C 12/06/84C                                03/18/85C INSPECTIONS OF BNR SS PIPING (GL 84-11)                                              M56304 B-84                                                        03/27/85C REQUEST FOR EXTENSION OF DATE TO COMPLETE ENVIRONMENTAL                              M56575                      02/22/85C                              03/27/85C PROPOSED TECH. SPEC. CHANGE REGARDING QUALITY ASSURANCE                              M56819                                                              04/01/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                              M52232 C-15                                                        04/04/85C OPERATIONAL READINESS REPORT FOR 50% PONER OPERATION                                  M56594                                                              04/08/85C 4
MODIFICATION OF SRV IN PLANT TEST PROGRAM                                            M57193                                                              04/11/85C i    RECIRCULATION PUMP TRIP TEST RESULTS                                                  M57520                                                              04/29/85C I
DELAVAL DIESEL GENERATOR                                                              M52411                                                              05/10/85C ITEM 1.1 POST TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES                          M52761  B-76                                                      05/10/85C YECHNICAL SPECIFICATION CHANGE REGARDING EXTENSION OF DIESEL                          M57493                                                              05/10/85C
    -PROPOSED MODIFICATION TO STARTUP TEST 25B                                            M57467                                                              05/13/85C TECHNICAL SPECIFICATION CHANGE REGARDING OFFSITE                                      M57463                                                              05/15/85C SOIL STRUCTURE INTERACTION                                                            M49995          10/29/84C 01/28/85C                                06/13/85C ELIMINATION OF TESTING OF AUTOMATIC LOAD FOLLONING                                    M57490                                                              06/21/85C ECCS VOLTAGE REPORTING (II.K.3.17)                                                    M57609                                                              06/27/85C DRYHELL VACUUM BREAKER POSITION INDICATION                                            M57769                                                              07/23/85C CHANGE TO INPLANT SRV TEST PROGRAM                                                    M57860                                                              07/23/85C NOTIFICATION OF PLANS TO RELEASE SHIFT ADVISOR                                        M59064                                                              07/23/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                            M51164 F-08      04/22/85C 06/27/85C                                08/01/85C TECHNICAL SPECIFICATION CHANGE REGARDING OFFSITE AND ONSITE                          M57721                                                              08/07/85C LICENSE AMENDMENT REQUEST DATED 7/12/85, ITEM 7 PAR. 2.C.(2)                          M59361                                                              08/12/85C ZTEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                  M53004 B-79                01/16/85C                              08/14/85C II.D.1 - RV 8 SV TESTING                                                              M54587  F-14    07/18/84C 03/29/85C                                08/15/85C HIGH GROUNDHATER LEVEL                                                                M54498                      03/25/85C                              08/19/85C GRAND GULF SPENT FUEL POOL EXP.                                                      M57619                                                              10/06/85C i
 
R-1308687-001                        REGULAT0RY              INFGRMATION                TRACKING          SYSTEM                      PAGE NO.      73 C 0 N-D E N S E D    MANAGEMENT              REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: HADDAM NECK PLANT LOCATION: 13 MI E OF MERIDEN, CONN                    LICENSED PDHER: 1825 MWT                  PROJECT MANAGER: F. AKSTULEHICZ DOCKET NUMBER: 050-00213                                  DESIGN POWER:    0582 MHE                BRANCH CHIEF:      J. ZHOLINSKI ARCH / ENGINEER: S&W                                        NSSS VENDOR:      HEST                    LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:        T. REBELONSKI                                                                    RAI                    SE TAC      MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLE                                                                    NUMBER    E22      DAlf      DATE        DAlf        DATE        DATE MuGO ACTIVE ISSUES MMNw M51932                                                          09/30/85 SERVICE HATER SYSTEM ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52843 B-77    03/14/85C 05/30/85                              09/30/85 M54393                                                          09/30/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                M56802                                                          09/30/85 INSERVICE INSPECTION PROGRAM UPDATE TO 1980 ASME CODE                                                                                  09/30/85 RESPONSE TO UCS COMMENTS ON EQUIPMENT QUALIFICATION RULE              M56900 M57262                                                          09/30/85 ISAP-NEAR TERM                                                                                                                        09/30/85 TECH. SPEC. CHANGES TO PRESSURE / TEMPERATURE CURVES                  M57913 RV AND SV TESTING                                                      M44585    F-14  09/28/84  07/30/85                            10/30/85 M51930                                                          10/30/85 FLOODING EVALUATION                                                              B-92                                                  10/30/85 ITEM 4.5.1 - REACTOR SYSTEM FNNCTIONAL TESTING - DIVERSE              M54070 M57620                                                          10/30/85
                                .3 CORE COOLING SYS                                                  M425?1    B-60              01/21/83                            11/30/85 ENVIRONMENTAL QUALIFICATI0H OF SAFETY RELATED ELECTRICAL                M49852                                                          11/30/85 COMBUSTIBLE GAS CONTROL IN CONTAINMENT                                          B-83              09/30/85                            11/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,              M54530          07/30/85 M57757                                                          11/30/85 REACTOR CAVITY HATER LEVEL TECH. SPEC.                                  M58063 C-16                06/25/85                            11/30/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM            M59259                                                          11/30/85 ADMINISTRATIVE CONTROLS ON FACILITY STAFF OVERTIME                      M59274                                                          11/30/85 TECH. SPEC. - FLAMMABLE LIQUIDS IN CONTROL ROOM                        M08465  B-17                                                  12/30/85 TECH SPEC SURVEILLANCE FOR HYD. SNUBBERS                                        B-22                                                  12/30/85 TECH SPEC SURVEILLANCE FOR MECH. SNUBBERS                              M08469 M48825                                                          12/30/85 1CCH SPEC DEFINITION OF CONT INTEGRITY REMOVAL PLAN FOR                M48019                                                          12/31/85 STA.1DARD TECH SPEC REVIEH                                                                                                            12/31/85 MISCCLLANEOUS ADMINISTRATIVE TS                .                      M51599 M53005 B-79                                                    12/31/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                  M55712  A-18                                                  12/31/85 TECH SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                    M44306  F-05    10/30/84C 02/28/85    07/27/84C                Ot/3J/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M49667  G-01  06/30/85    11/15/84                            01/30/86 REACTOR COOLANT PUMP TRIP                                              M52924  B-78  07/01/85                                        01/30/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M53073    B-80  07/01/85                                        01/30/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                      M47367                                                          01/31/86 SURVEILLANCE AND OPERABILITY REQUIREMENTS FOR DIESEL                  M56917                                                          01/31/86 INSERVICE TESTING FOR EMERGENCf DIESEL GENERATOR AUXILIARIES          MS9100  -A-20                                                  01/31/86 10CFR50.62 OPERATING REACTOR REVIEHS                                  M59487                                                          01/31/86 REUISION TO TECH. SPEC. ON FIRE PROTECTION AUDIT PROGRAM              M57727                                                          03/31/b6 INSERVICE TESTING UPDATE TO 1980 AMSE CODE                            M42911    B-59  07/22/85C 10/01/85                            05/30/86 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                    M53987    B-93  03/14/85C 09/30/85                            06/30/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTI0hAL TESTING          M51095 A-17      07/17/85                                      07/30/86 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG              M52010                                    N/A                  09/30/86 HADDAM HECK INTEGRATED ASSESSMENT SUPPLEMENT                          M53760    B-87                                                  09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND
 
R-1208687-001                    REGULAT0RY          INF0RHATION                                                      TRACKING        SYSTEM                PAGE NO.      74 C0NDENSED                                                  MLNAGEMENT            REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: HADDAM HECK RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                                                      NUMBER    &      RAIX      DATE      DAlf  DATE        DATE uMMM ACTIVE ISSUES MMMM        (CONTINUATION)
NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                                      M45830  F-57              04/04/83C                    10/30/86 RPS ISOLATION                                                                                              M51933                                N/A              10/30/86 DilSITE STANDBY AC POWER SYSTEM                                                                            M519f4                                N?A              10/30/86 I.D. i.2 DET AILED C0t4 TROL POOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                            M56128  F-71                                          10/30/86 i:UREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46                                                          M48169  F-58                                          10/31/86 C0t4TAINMENT ISOLATION SYSTEM                                                                              tl51935                              N/A              10/31/86    i PIPF BREAKS                                                                                                M51936                                N/A              10/31/86    l SEISMIC                                                                                                    M51937                                                10/31/86 MISSILES                                                                                                    H51938                                N/A              10/31/86 INTEGRATED STRUCTURAL ANALYSIS                                                                              M51939                                                10/31/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                                M53913  B-89  05/15/85                                11/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                    M53843 B-88                                            12/30/86 HUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                              M45949  F-63                                          12/31/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                            M46020  F-64                                          12/31/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                        M46092  F-65                                          12/31/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                          M46308  F-68                                          12/31/86 I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVILH PROGRAM PLAN                                                  M51165  F-08            02/28/86  03/21/86          12/31/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                      M51245  F-09                                          12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                  M53677  B-86  03/14/85C 05/30/85                      12/31/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                M45138 F-26                                            03/71/87    l MM UNSCHEDUIJJ ISSUES MM PLANT SPECIFIC -'II.F.1.6                                                                                  M59273 MMM COMPLETED IS3VES MMM REACTOR CAVITY SEAL RING FAILURE (TIA)                                                                      M55632                                                .10/02/84C SHUTDOHN MARGIN DURING THREE-LOOP OPS.                                                                      M54900                                                10/15/84C ZIRCONIUM CLAD DEMONSTRATION ASSEMBLIES                                                                    M55308                                                10/15/84C CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL PLANTS (NUREG                                                  N07993 C-10              08/05/83                      10/ 31/84C APPENDIX R-EXEMPTION REQUEST                                                                                M43625 B-41                                            11/i4/84C ITEM 4.3 - AUTOAMTIC ACTUATICN OF SHUNT TRIP ATTACHMENT FOR                                                M53175 B-82                                            11/28/84C ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                                  M55357  B-90                                          11/28/8se 5HIFT STAFFING TECH SPEC CHANGE                                                                            M53301                                                0 t/15/r m STA TRAINING                                                                                                M54295                                                01/15/3M DUAL ROLE OF SRO/STA                                                                                        M56944                                                01/15/6t-ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                                        M52762 B-76                                            05/2u/8dC REQUEST FOR SCHEDULAR EXTENSION OF EQUIPMENT QUALIFICATION                                                  M57096                                                03/27/85C IPSAR SECTION 4.23.3                                                                                        M56715                                                04/02/85C REQUEST FOR EXEMPTION FROM 10CFR50.71(C) FSAR UPDATE                                                        M56899                                                04/11/85C REVISED ROD INSERTION LIMIT CURVE                                                                          M56555                                                0(/26/85C NUREG 0737, II.K.3.25 P0HER ON PUMP SEALS                                                                  M48420 F-53              11/04/84C                    PS/01/85C ADM CONTROLS TS CHANGE                                                                                      M51639                                                0 5/17/85C REPORTING SAFETY AND RELIEF VALVE FAILURES                                                                  M54300                                                05/22/85C
 
TRACKING                      SYSTEM                  PAGE N0.8      75 R-1208687-001                  REGULAT0RY          INF0RMATION C0NDENSED              MANAGEMENT                                                                  REPORT                      RUN DATE 09/17/85 (HEADQUARTERS)
FACILITY: HADDAM NECK                                                                                                  SE RAI TAC                        MPA                          RAI  RESPONSE    Tik    INPUT      LIC ACT NUMBER                            11L.                        DAIX    DATE      DAlf,  ..DATE          DATE_
TITLE DON COMPLETED ISSUES MMM      (CONTINUATION)
M56745                                                                                                06/04/85C PREPARATION AND ISSUANCE OF SALP REPORT FOR ASSESSMElli                        M54444                                                                                                06/10/ 8 5C RCP ISI EXEMPTION          .
M47603                          F-23                                  02/28/**                        06/24/85C NUREG 0737 ITEM II F1.4 - CONTAIt4 MENT PRFSSURE INSTRUMENT                    M47674                          F-24                                  02/28.E'                        06/24/85C NUREG 0737 ITEM II F1.5 CONTAINMENT HATER LEVEL M0t4ITOR                      M47745 F-25                                                          02/28/ 5                        06/24/85C NUREG 0737 ITEM II Ft.6 CONTAIt4 MENT HYDROGEN MONITOR                        M52233                          C-15                                                                  06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                      M53126                          B-81                        11/28/84  01/15/85                        U7/01/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                  M56320                                                                                                07/01/85C ORDER MODIFICATION RE: CONTROL ROOM HABITABILITY                              M51704                                                    01/01/84C 02/14/85C                        07/02/85C DEGRADED GRID VOLTAGE PROCEDURES                                              M53594 B-85                                                                    04/04/85              07/03/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                    M54299                                                                12/31/84C                      07/09/85C TECH. SPEC. To LIMIT OVERTIME                                                  M52074                                                                                                08/12/85C DELETI0t1 0F TS FOR EQ OF ELECT EQUIP.                                        M59030                                                                                                08/26/85C SUPPLEMENTAL CONFIRMATORY ORDERS - 14UREG-0737 SUPP. 1                        M55163                                                    02/14/85C 05/f3/85C                        09/03/85C ECCS PUMPS DISCHARGE PRESSURE REQUIREMEt4TS                                    M57595                                                                                                09/03/85C TECHNICAL SPECIFICATION FOR POST ACCIDENT INSTRUMENTATION                      M57621                                                                                                09/03/85C DELETION OF PRESSURIZER LEVEL TRIP FROM TECHNICAL                              M08098                          A-02                        08/03/84  10/31/84                        09/05/85C APPENDIX I TECH SPEC IMPLEMENTATI0t1 REVIEH                                    M55864                          D-!9                        07/02/84  02/04/85C                      09/06/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)
                                                                                                                                                                                            - ,      s s                  J gj
 
v                                                                                                                                    .%__
g                    .
R-1208687-001                            REGULAT0RY                              INF0RMATION                      TRACK.ING            . SYSTEM                          PAGE NO      76 C0NDENSED              MANAGEMENT                REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)            ,,
                                                                        ,              FACILITY HATCH 1 PLANT LOCATION: 11 MI N OF BAXLEY, GA                                              LICENSED POWER 2436.MNT                              PROJECT MANAGER: G. RIVENBARK DOCKET NUMBER: 050-00321                                                          DESIGN P0HER - 0777 MHE                              BRANCH CHIEF:          J. STOLZ ARCH / ENGINEER:'  BECH                                                            NSSS VENDOR:          GE                            TIC. ASSISTANT: R. INGRAM IE INSPECTOR      P. HOLMESRAY                                      ' -                                                                                -  l'
                                                                                                                                        ,  ' RAI                  _        SE e                                      TAC    MPA          RAI        RESPONSE icM        INPUT      LIC ACT TITLE                                                                                                  NUMBER    HQ.        RAlg      ,
DATE          DAlg        DATE        DATE
: d.    -
DDMM ACTIVE ISSUES MMMM                                                                                          ;f SCHEDULE EXTENSION FOR ATHS RULE IMPLEMENTATION                                                      /M59307                                                                    08/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M52844                                                                    09/30/85 M534S*' "1-77' H2 AND 02 Mr:JITORING TS                                                                                                                                                          09/30/85 CORRECT TyrdGRAPHICAL ERROR IN TECH. SPEC. 4.5.D.2                                                    M59267 '                                                                  09/30/85 ISI RELILF FROM ALME CODE -                                                                          M59304              4                                                      09/30/85 DETECTICH 8 SUPPRESSION OF-THERMAL - HYDRAULIC INSTABILITY                                            M59404                                                                    09/30/85-FRACTUr.E MECHANICS ANALYSIS PER GL 81-11.                                                            M55966                                                                    10/30/85    '
TECH. SPEC. CHANGE TO SUPPORT COMPLETION OF ATTS                                                      M59309                                                                    11/08/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                                          M43733 B-65                                                                11/30/85 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                          M45139 F-26      06/05/85C 09/30/85                                      11/30/85 DISCREPANCIES IN THE PLANT SEISMIC ANALYSES                                                            M56227            03/01/85C 04/01/85                                      11/30/85 MODIFY FIRE PROTECTION TECHNICAL SPECIFICATION                                                        M56882                                                                    11/30/85 l . DELETE TECH. SPEC. ON PRIMARY LEAKAGE                                                                  M57907                                                                    11/30/85 ADD COMPONENT CYCLIC AND TRANSIENT LIMITS TO TECH. SPEC.                                              M59308                                                                    12/15/85
,  DEFN OF OPERABLE                                                                                      M13277  D                    10/01/85                                12/30/85 l  CLOSURE TIME FOR SDV VENT AND DRAIN VALVES                                                            M53327                                                                    12/30/85 i  RESPONSE TO GL 84-15 AND REQUEST FOR DIESEL GENERATOR TS                                              M56522 D-19                      08/30/85                                12/30/85 REVISFD INSERVICE INSPECTION PROGRAM                                                                  M56540            08/12/83C                                                12/30/85 ADS LLH HATER LEVEL ACTUATION TIMER TECHNICAL SPECIFICATION                                            M57309                                                                    12/30/85-CHANGE TECH. SPEC. SURVEILLANCE REQUIREMENTS FOR ECCS AND                                              M5;334                                                                    12/30/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                                    M52763 B-76      05/01/85                                                12/31/85 NEH to YEAR INSERVICE INSPECTION PLAN                                                                  M59202                                                                    12/31/85 PURGE & VENT VALVE SYST DESIGN AND TS CHANGES                                        .
M51984                                                                    01/30/86 CHANGE TECH. SPECS. TO DELETE THE DEFINITION FOR " CUMULATIVE                                          M56881                                                                    01/30/86 PROCEDURES' GENERATION PALKAGE REVIEH (HUREG 0737 SUPP/1)                                              M44307  F-05    06/02/85C                    03/21/85C                  02/26/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                        M52925  B-78                                                              03/30/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                                  M53006  B-79                                                              03/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                M53844  B-88                                                              03/30/86 AMENDMENT 3 TO " RESPONSE TO APPENDIX R AND" 10CFR5048"                                                M59306                                                                    07/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                          M53988  B-93    04/04/85C                                                09/30/86 ITEM 4.5.t - REACTOR SYSTEM FUNCTIONAL CAPABILITY                                                      M54071  B-92                                                              10/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                          M45950 F-63                                                                12/30/86 NUREG-0757 III . A. 8.2, OPERATIONAL SUPPORT CENTER                                                    M46021  F-64                                                              12/30/86
  'NUREG-G,37 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                    M46093  F-65                                                              12/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                          M56129  F-71                    06/30/86      07/30/86                  12/30/86 NUREG-0737-III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                      M46309  F-68                                                              12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                M53761  B-87                                                              12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M53678 B-86                                                                01/01/87 10CFR50.62 OPERATING REACTOR REVIENS                                                                  M59101  A-20                                                              09/30/88 l
 
R-1208687-001                                REGULAT0RY            INF0RMATION              TRACKING          SYSTEM            PAGE NO. 77 C0NDENSED            MANAGEMENT            REP 0RT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: HATCH 1 RAI          SE TAC    MPA      RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                                            NUMBER    HQ,      RAlg      DATE  DAIE  DATE        DATE DDMM ACTIVE ISSUES MMMM'                    (CONTINUATION)
MD UNSCHEDULED ISSUES MM TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                              M55713 A-18 JUSTIFICATION FOR CONTINUED OPERATION FOR UNLIMITED CYCLES                      M59539 TECH, SPEC. FOR HIGH RADIATION CLOSURE OF PURGE AND VENT                        M59542 TECH. SPEC. SURVEILLANCE REQUIREMENTS FOR SGTS FAST ACTING                      M59543
    -TECH. SPEC. CHANGES REFLECTING DRYUNELL PNEUMATIC SYSTEM                        M59558 TECH SPEC. CHANGES REFLECTING DRYUNEL L PNEUMATIC SYSTEM                        M59559 DMM COMPLETED ISSUES MMM NUREG-07 37 II . K . 3.16. CHALLENGES AND FAILURES OF RELIEF                    M45595 F-46                                        10/19/84C POLLUTION CONTROL FACILITIES                    "IN FURTHERANCE" CERTIFICATE    M55671                                              10/25/84C EXTENSION OF MARK I CONT. MOD. ORDER                                            M55977                                              10/31/84C REQUESTS FOR EXTENSION OF QUALIFICATION DEADLINES FOR ATTS                      M55489                                              11/30/84C LOAD BUNDLES AROUND SOURCE RANGE MONITORS                                        M55813                                              12/03/84C ANALOG TRANSMITTER TRIP SYSTEM TS                                                M54168                                              12/07/84C DIESEL GENERATOR RELIABILITY TECH. SPECS.-(GL 84-15)                            M55865 D-19                                        12/26/84C APRM/RBM TECH SPEC CHANGES                                                      M54432                                              12/31/84C ANALOGUE TRANSMITTER TRIP SYSTEM TECH. SPEC.                                    M55695                                              12/31/84C PIPING INSPECTION PROGRAM FOR 1984 REFUELING OUTAGE                              M55236                                              01/03/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                            M55600  B-84                                        01/03/85C APPENDIX R SCHEDULAR EXEMPTIONS                                                  M54802                                              01/16/85C Y.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                      M51166  F-08                                        01/24/85C 1 TSIODINE LIMITS                                                                M53476                                              02/04/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                          M51246  F-09                                        02/14/85C HPCI AND RCIC LCO CHANGE TU 150 PSI                                              M54495                                              03/12/85C TECH SPECS FOR TMI ACTION PLAN ITEM II.F.t.1,                  .2, .3          M54461                                              03/18/85C POST ACCIDENT SAMPLING CAPABILITY TECH. SPEC. (II.B.3)                          M55641                                              03/18/85C' HYDROGEN RECOMBINER REQUIREMENT - EXEMPTION REQUEST PER GL                      M56045 A-19                                        04/09/85C EXPEDITED RELIEF FROM CODE TESTING REQUIREMENT ON MSIVS                          M57410                                              05/10/85C EXPEDITED RELIEF FROM CODE TESTING REQUIREMENT ON MSIVS                          M57411                                              05/10/85C SCHEDULAR EXEMPTION OUTAGE RELATED APPENDIX "R"                                  M57415                                              05/14/85C MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                    M57156  D-20                                        05/24/85C IST                                                                              M11260  A-14                                        06/04/85C TITLE CHANGES OF PLANT REVIEH BOARD MEMBERS IN APP.A & B                        M49076                                              06/27/85C APPENDIX I TECH SPECS                                                            N08043 A-02                                        06/28/85C PROPOSED T.S. CHANGE FOR FLOH MONITORING OF GASEQUS RELEASES                    M49090                                              06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                        M52234 C-15                                        06/28/85C ALLEGATION RE-USE OF AUTHORIZED NUCLEAR INSPECTOR                                M57450                                              07/16/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                      M53595 B-85    05/03/85C                            07/18/85C SPDS ELECTRICAL ISOLATION                                                        M57465                                              07/18/85C INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                          M51096 A-17    02/01/85  04/11/85C                07/30/85C PIPE CRACK INSPECTION PROGRAM / MITIGATION PROGRAM - 1985                        M59029                                              08/ 01/85C
 
l i              R-1208687-001                    -REGULAT0RY                I.N F 0 P. M A.T I O N        TRACKING            SYSTEM                PAGE NO. 78
                                                            .CDNDENSED                MANAGEMENT                .R E P 0 R.T.                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: HATCH 1 RAI              SE TAC MPA          RAI      RESPONSE  TER    INPUT      LIC ACT.
TITLE                                                                          NUMBER  ji[L.      .DAlf,      DATE    DAlg      DATE        DATE CIU M COMPLETED ISSUES MMM-      (CONTINUATION)
SURV. OF MECHANICAL SNUBBERS'                                                M08310 B-22                                                08/05/85C ADS LEAK RATE LIMIT TECH. SPEC.'- HUREG 0737 II.K.3.28                        M56047                                                      08/05/85C
          ' SCHEDULE RELIEF FOR EDP TRAINING AND DCRDR IMPLEMENTATION                      M57307                                                      38/06/85C TH0 STAGE TARGET ROCK SAFETY / RELIEF VALVE PROBLEMS (TIA.4                  M48771                                                      38/14/85C-DELETE HIGH DRYNELL PRESSURE SCRAM BYPASS-                                    M56983 -                                                    08/27/85C ENUIRONMENTAL. QUALIFICATION OF SAFETY RELATED ELECTRICAL                    M42505 B-60      04/04/85    07/10/85C                    08/29/85C
          - DELETE AERIAL REMOTE SENSING FROM' ENVIRONMENTAL TECH. SPEC.                    M56050                        12/31/84C                    09/09/85C' DELETE ADMINISTRATIVE TECHNICAL SPECIFICATION SECTION ON EQ                  M57304                                                      09/09/85C 1
 
R-1208687-001                    REGULAT0RY            INF0RMATION              TRACKING        SYSTEM                      PAGE NO.:    79 C0NDENSED            MANAGEMENT            REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: HATCH 2 PLANT LOCATION: 11 MI N OF BAXLEY, GA                  LICENSED P0HER: 2436 MHT                PROJECT MANAGER: G. RIVENBARK DOCKET NUMBER: 050-00366                                DESIGN PDHER:    0784 MHE                BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: BECH                                  NSSS VENDOR:    GE                      LIC. ASSISTANT: R. INGRAM IE INSPECTORt      P. HOLMESRAY RAI                    SE TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLL                                                                NUMBER    H2. palg      DATE        RAlg        DATE        DATE DnDU ACTIVE ISSUES MMMM PURGE & VENT VALVE - SYST-DESIGN & TS CHANGES                        M51985                                                      01/30/85 DEFINITION OF OPERABLE 1                                              M13278  D-17                                                06/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52845  B-77                                                09/30/85 DETECTION & SUPPRESSION OF THERMAL - HYDRAULIC INSTABILITY            M59405                                                      09/30/85 FEEDHATER N0ZZLE FRACTURE MECHANICS ANALYSIS PER CL 81-11            M55967                                                      10/30/85 DISCREPANCIES IN THE PLANT SEISMIC ANALYSES                          M56228        03/01/85C 04/01/85                            10/30/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM          M43738  B-65                                                11/30/85 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION          M45140  F-26  06/05/85C 09/30/85                            11/30/85 CLOSURE TIME FOR SDV VENT AND DRAIN VALVES                            MS3328                                                        11/30/85 TECH. SPEC. FOR NURFEG 0737 ITEM II E.4.2(7)                          M56049                                                        11/30/85 REQUEST THAT NRC RECIND JULY 8,      1983 CONFIRMATORY ORDER FOR      M57359                                                      11/30/85 OMERCURRENT PROTECTION - CONTAINMENT ELECTRICAL PENETRATIONS          M57643                                                        11/30/85 RESPONSE TO GL 84-15 AND REQUEST FOR DIESEL GENERATOR TS              M56523                  08/30/85                            12/30/85 REMISED INSERVICE IMSPECTION PROGRAM                                  M56541        08/12/85                                      12/30/85 RECOMBINER HEATER INTEGRITY - SURVEILLANCE T/S                        M59335                                                        12/30/85 JTEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                  M52764 B-76    05/01/85                                      12/31/85 10 YEAR INSERVICE INSPECTION PLAN                                  M59203                                                        12/31/85 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M44308  F-05  06/02/85C              03/21/85C              02/28/86 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                      M52926  B-78                                                03/30/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M53007  B-79                                                03/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53845  B-88                                                03/30/86 AMEND 3 TO 6PC " RESPONSE TO 10CFR50.48 AND APPENDIX R"              M59305                                                      07/30/86 SETTLEMENT OF CLASS I STRUCTURES                                      M11158                                                      08/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M53989  B-93  04/04/85C                                    09/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE              M54072  B-92                                                10/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                        M45951  F-63                                                12/30/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                      M46022  F-64                                                12/30/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                  M46094  F-65                                                12/30/86 I.D.1.2 DETAILED CONTROL RGOM CESIGN REVIEH
 
==SUMMARY==
REPORT -        M56130  F-71            06/30/86    07/30/86              12/30/86 HUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                    M46310  F-68                                                12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53762  B-87                                                12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53679  B-86                                                01/01/87 10CFR50.62 OPERATING REACTOR REVIENS                                M59102 A-20                                                  09/30/88 DD UNSCHEDULED ISSUES MM H2 AND 02 MONITORIGO iS                                              M53455 SURVEILLANCE TECH. lFlC. FOR ATHS RECIRCULATION PUMP TRIP            M55543 TECH. SPEC. SURVEILLANCE REQUIREMENTS FOR SGTS FAST ACTING          M59544
 
R-1208687-001                REGULAT0RY              INF0RMATION                TRACKING            $YSTEM            PAGE NO.s  80 C0NDENSED              MANAGEMENT              REP 0RT                RUN DATE: 09/17/85 (HEADQU4RTERS)          ,
FACILITY: HATCH 2 RAI          SE TAC    MPA          RAI    RESPONSE  TER INPUT      LIC ACT-TITLE                                                                NUMBER  j&        RAlf        DATE  PAJ1  DATE        DATE DM UNSCHEDULED ISSUES MM      (CONTINUATION)
RCIC-SUCTION-CONDENSATE STORAGE TANK' LEVEL SHITCN OVER              M59576 000 COMPLETED ISSUES MMM NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF              M45596  F-46                                          10/19/84C POLLUTION CONTROL FACILITIES        "IN FURTHERENCE" CERTIFICATE      M55672                                                10/25/84C-DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                  M55866  D-19                                          12/26/84C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                M55601  B-84                                          01/03/85C APPENDIX R SCHEDULAR EXEMPTIONS                                      M54803                                                01/16/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRM PLAN            M51167  F-08                                          01/24/85C
* TECH. SPEC. CHANGE RESTRICTION FOR OPERATION IN ELLA REGION          M55530                                              Ot/24/85C RELAXATION OF TIP LCO                                                M53598                                              01/31/85C IODINE LIMITS                                                        M53477                                              02/04/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM-                              M51247  F-09                                        02/14/85C TECH SPECS FOR TMI ACTION ITEM IIF.1.1, 2 AND 3                      M54462                                              03/18/85C POST ACCIDENT SAMPLING CAPABILITY TECH. SPEC.                        M55642                                              03/18/85C EQ SCHEDULE EXTENSION FOR H2, 02 ANALYZER                            M57133                                              03/27/85C HYDROGEN RECOMBINER PEQUIREMENT - EXEMPTION REQUEST PER GL-          M56046 A-19                                          04/09/85C SCHEDULAR EXEMPTION OUTAGE RELATED APPENDIX "R"                      M57416                                              05/14/85C MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC          M57157  D-20                                        05/24/85C IST                                                                  M11261  A-14                09/21/78C                06/04/85C TITLE CHANGES OF PLANT REVIEW BOARD MEMBERS IN APP. A & B            M4!177                                              06/27/85C APPENDIX I TECH SPEC IMPLEMENTATION REVIEN                            M08095 A-02                                          06/28/85C PROPOSED T.S. CHANGE FOR FLON MONITORING OF GASEOUS RELEASES          M49091                                              06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA8C-10)              M52235 C-15                                          06/28/85C ALLEGATION RE-USE OF AUTHORIZED NUCLEAR INSPECTOR                    M57451                                              07/16/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53596  B-85    ::N3/85C                            07/18/85C SPDS ELECTRICAL ISOLATION                                            M57466                                              07/18/85C INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG              M51097 A-17    02/01/85                              07/30/85C SURV. OF MECHANICAL SNUBBERS                                          M08298  B-22                                        08/05/85C ADS LEAK RATE LIMIT TECH. SPEC. - HUREG 0737 II.K.3.28                M56048                                              08/05/85C SCHEDULE RELIEF FOR E0P TRAINING AND DCRDR IMPLEMENTATION            M57306                                              08/06/85C DELETE HIGH DRYHEL L PRESSURE SCRAM BYPASS                            M56984                                              08/27/85C ADS LOW HATER LEVEL ACTUATION TIMER TECHNICAL SPECIFICATION          M57308                                              08/27/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL              M42506  B-60  04/04/85C 05/10/85C                  08/29/85C DELETE AERIAL REMOTE SENSING ~FROM ENVIRONMENTAL TECH. SPEC.          M56051                                              09/09/85C HC PRESSURE ALARM SETPOINT                                            M56985                                              09/09/85C DELETE ADMINISTRATIVE TECHNICAL SPECIFICATION SECTION ON EQ          M57305                                              09/09/85C
 
R-1208687-001                              R E G U L-A T 0 R Y  INF0RMATION              TRACKING          SYSTEM                            PAGE NO.      '81 C0NDENSED            MANAGEMENT              REP 0RT                              RUN DATE: 09/17/85 (HFADQUARTERS)
FACILITY: HUMBOLDT BAY 3 PLANT LOCATION: 4 MI SH OF EUREKA, CA                            LICENSED P0HER: 0'220 MHT                  PROJECT MANAGER: P. ERICKSON DOCKET NUMBER: 050-00133                                        . DESIGN PONER:-    0065 MHE                BRANCH CHIEF:        J. ZHOLINSKI ARCH / ENGINEER: .BECH                                            NSSS VENDOR:      GE                      LIC, ASSISTANT:      C. JAMERSON IE INSPECTOR .                  P..MORRILL RAI                          SE TAC    MPA        RAI    RESPONSE        TER        INPUT          LIC ACT TITLE                                                                          NUMBER    &          RAlg      DATE        RAlg            DATE          DATE D000 ACTIVE ISSUES MMMM EMERGENCY PLAN FOR SAF3 TOR DECOMMISSIONING                                    M57489                                                                07/31/85 SECURITY PLAN FOR SAFSTOR                                                      M57720                                                                09/!3/85 DECMMISSIONING PLAN-POSSESSION ONLY LICENSE APPLICATION                        M55484                      04/15/85C                                10/31/85 000 COMPLETED ISSUES MMM SEISMIC CONCERNS                                                              M01863 X                                                              10/11/84C MICR0 SEISMIC MONITORING NETHORK                                                M53378                                                                10/11/84C ISSUANCE OF POSSESSI0IN - ONLY LICENSE AMENDMENT                              M57652                                                                07/16/85C VERY LOH LEVEL HASTE DISPOSAL                                                  M57578          07/13/85    08/13/85                                  09/03/85C
 
R-1208687-001                                        REGULAT0RY        INF0RMATION                TRACKING          SYSTEM                        PAGE NO.:    82 C0NDENSED          MANAGEMENT              REF0RT                              RUN DATER 09/17/85 (HEADQUARTERS)
FACILITY: INDIAN POINT 2 PLANT LOCATION: 25 MI N OF NE'                            ' CITY, NY    LICENSED P0HER: 2758 MHT                  PROJECT MANAGER: D. NEIGHBORS DOCKET NUMBER: 050-00247                                                DESIGN P0HER:    0873 MHE                  BRANCH CHIEF        S. VARGA ARCH / ENGINEER: UEC                                                    NSSS VENDOR:    HEST                      LIC, ASSISTANT:    C. PARRISH IE INSPECTOR:                          L. ROS5 BACH RAI                      SE TAC    MPA        RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                                                NUMBER    Li[L. Pilf      DATE        PAlf          DATE        DATE D000 ACTIVE ISSUES                        M*M*
CTMT PURGE AND VENT TECH. SPEC.                                                      M59509                                                            03/31/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                            M54539  B-83              12/31/84                              09/15/85 CONTROL ROOM HABITABILITY                                                            M56948                                                          09/15/85 DECAY HEAT REMOVAL CAPABILITY TECH SPECS                                              M42096  B-57              09/14/84C                              09/30/85 OUER PRESSURE PROTECTIC.'1 TECHNICAL SPECIFICATION                                    M51915                                                            09/30/85 BORIC ACID ADDITION TECH. SPEC. CHANGE                                                M51918                                                            09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INT 8 FACE -                          MS2846  B-77                                                    09/30/85 OPS TEMPERATURE LIMITATIONS                                                          M57111                                                            09/30/85 MINIMUM NUMBER OF REACTOR COOLANT PUMPS                                              M57112                                                            09/30/85 10CFR50.62 OPERATING REACTOR REVIENS                                                  M59103 A-20                                                      09/30/85 FllEL REMOVAL TIME CONSTRAINTS                                                        M57442                                                            10/15/85 SURUEILLANCE TESTING RELIEF                                                          M59407                                                            10/15/85 ITE'' 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                            M54073 B-92                                                      10/30/85 SAFE SHUTDOWN CAPABILITY                                                              M43963 B-41      10/24/84C 03/19/81C                              10/31/85 CONTROL OF HEAVY LOADS TEACHNICAL SPECIFICATION                                      M51922                                                            10/31/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                                        M52927  B-78                                                    10/31/85 FIRE PROTECTION TECHNICAL EXEMPTION                                                  M57314                                                            10/31/85 INITIAL REACTOR CORE DESIGN                                                          M59408                                                            10/31/85 BORON INJECTION TANK OPERATION AND SURVEILLANCE REQUIREMENTS                          M48223                                                            11/15/85 UTILITY RES?ONSES Tr STAFF RECOMMENDATICJ4S C0t:CERNING STEAM                        M58064 C-16                06/17/85                              11/15/85 TEMPORARY CLOSURE PL. 'E FOR REFUELING CTMT ENTRY                                    M59409                                                            11/30/85 NUCLEAR PEAKING FACT 0k AND ACCUMULATOR HATEP. VOLUME                                M57462                                                            12/15/85 JULY 30, 1984 RELIEF REQUEST                                                          M57762                                                            12/30/85 HYDRAULIC SHUBBERS                                                                    M08763  B-17    11/26/84C 07/19/85                              12/31/85 INSERVICE INSPECTION PROGRAM TECH. SPEC. CHANGE                                      M51913          10/25/84C 01/31/85C                              12/31/85 ALTERNATE SHUTDOHN CAPABILITY TECH. SPEC. CHANGE                                      M51914                .                                          12/31/85 STS UPGRADE                                                                          M51925          02/22/84C  09/28/84                              12/31/85 RELIEF REQUEST ASME PV SECTION XI                                                    M56728                                                            12/31/85 SU 8 RV FAILURES & CHALLENGES (II.K.3.3) TECH. SPEC.                                  M57116                                                            12/31/85 LIMITING OVERTIME - CONTINUATION OF 82-16 REVIEW                                      M57117                                                            12/31/85 REACTOR TRIP SYSTEM FOLLOH-UP                                                        M57128                                                            12/31/85 QA RECORD RETENTION                                                                  M57220                                                            12/31/85 GENERIC LETTER 82-23 TECH. SPEC. REVISION                                            M57274                                                            12/31/85 GENERIC LETTER 82-17 TECH. SPEC. REVISION                                            M57275                                                            12/31/85 AFH-SEISMIC QUALIFICATION SYSTEM                                                      M57326                                                            12/51/85 ANTICIPATORY TRIP DN TURBINE TRIP TECHNICAL SPECIFICATION                            M57440                                                            12/31/85 MAY 11, 1984 RELIEF REQUEST                                                          M57760                                                            12/31/85 MARCH 8,                        1984 RELIEF REQUESTS                                  M57761                                                            12/31/85 AUGUST 17, 1984 RELIEF REQUEST                                                        M57763                                                            12/31/85
 
R-1208687-001                      REGULAT0RY            INF0RMATION                TRACKING        SYSTEM                PAGE NO.*    83 C0NDENSED            MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: INDIAN POINT 2 RAI              SE TAC    MPA        RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                NUMBER  L10      Mig        DATE      MIE    DATE        DATE DacM ACTIVE ISSUES MMMM          (CONTINUATION)
CONTAINMENT COOLING, IODINE REMOVAL LCO TECH. SPEC.                  M57970                                                  12/31/85 JUNE 18, 1985 ORGANIZATIONAL TECH. SPEC. CHANGE                      M59049                                                  12/31/85 STATION NUCLEAR SAFE 1Y COMMITTEE CHANGE                            M59050                                                  12/31/85 BORON INJECTION TANK REMOVAL                                        M59428                                                  12/31/85 APPENDIX 'R' AUDIT                                                  M59442                                                  12/31/85 IST PROGRAM II                                                      M54226          10/26/84C                              01/15/86 RV AND SV TESTING                                                    M44588  F-14    12/31/84  09/30/85                    01/31/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                MS3008  B-79                                            01/31/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                    M53074  B-80                                            01/31/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND          M55358  B-90                                            02/28/86 DIESEL GENERATOR AND CONTROL BUILDING HIND RESISTANCE                M57712                                                  02/28/86 REACTOR COOLANT PUMP TRIP                                          M49672  G-01                12/10/85                    04/30/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)            M44309  F-05    08/30/85            07/30/85          05/30/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45141  F-26    08/30/85                                07/31/86 FIRE PROTECTION SUPPLEMENTAL EVALUATION                            M57772                                                  08/31/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53846  B-88                                            09/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP        M53914  B-89                                            09/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53990  B-93                                            09/30/86 EXTERNAL FLOODING CONDITIONS TECH. SPEC.                            M51921                                                  12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53763  B-87                                            12/31/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55867  D-19                                            12/31/86 ISI RE-REVIEH                                                      M59253                                                  12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53680  B-86                                            01/01/87 NUREG 0737 II.K.3.31 COMPLI ANCE HITH 10 CFD 50.46                M48172  F-58              05/31/86                    01/31/87 INSTRUMENTATION TC FOLLOL! THE COURSE OF AN ACCIDENT (RG          M51098 A-17                08/30/85                    01/31/87 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                      M45952 F-65                                            03/31/87 NUREG-0737 OPERATIONAL SUPPORT CENTER                              M%023 F-64                                              03/31/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46095  F-65                                            03/31/87 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51248  F-09                                            06/30/87 UU UNSCHEDULED ISSUES MM NUREG-0737 III.A.2.2, METER 0 LOGICAL DATA UPGRADE                M46311  F-68 UDM COMPLETED LQUI,1 MMM I.D.1.1 - DETIALED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN        M51168  F-08              02/14/84                    10/10/84C REACTOR VESSEL FLAN                                                M55623                                                  10/16/ 84 C PHR MSLB HITH CONTINUED FEEHATER ADDITION                          M46839  B-69                                            11/08/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42464  B-60              02/27/81C                    12/07/84C PASS CORE DAMAGE ASSESSMENT METHOLOLODY                            M56334                                                  12/12/84C GAS TURBINE OPERATION                                              M12842                    04/11/80C                    12/18/84C LICENSE EVENT REPORT SYSTEM TECHNICAL SPECIFICATIONS              M55336                                                  12/20/84C TECHNICAL SPECIFICATIONS DEFINIi4G OPERABILITY FOR SAFETY        M43006  D-17                                            12/26/84C NUREG 0737 TECH. SPEC. CHANGE PER 10/7/81 AND 11/19/81            M51912 F-20                                            01/08/85C
 
R-12086C7-001                  REGULAT0RY          INF0RMATION              TRAL KING          SYSTEM                PAGE NO. 84 C0NDENSED          MANAGEHENT            REPORT                      RUN DATE: "9/17/85 (HEADQUARTEPS)
FACILITY: INDIAN POINT 2 RAI              SE TAC    MPA      RAI      RESPONSE      TER INPUT      LIC ACT TITLE                                                            NUMBER    &        PAlg        DATE      ]LQE  DATE        DATE CMM COMPLETED ISSUES MMM        (CONTINUATION)
ORGANIZATION STRUCTURE TS CHANGE                                M54221                                                  01/10/85C CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)          M07996  C-10                06/22/81                    02/19/85C RCS VENTS TECHNICAL SPECIFICATIONS HUREG 073 ITEM II.B.1        M54394                                                  02/28/85C TECH. SPECS, AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55715  A-18              -
04/22/85C ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR    M53127  B-81    11/24/84C                                04/26/85C PRA                                                              M48055                                                  05/07/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                            M45833 F-57                                              05/28/85C YTEM 1.2 - POST TRIP REVIEW-DATA AND INFORMATION CAPABILITY      M53597 B-85                          04/04/85          06/06/85C REACTOR VESSEL AUGMENiED ISI TECH. SPEC.                        M56577                                                  06/06/85C CONTAINMENT PURGE VENT TECH. SPEC. PLANT SPECIFIC                M56883                                                  06/17/85C CONTAINMENT SEISMIC CAPABILITY                                    M49799                                                  06/20/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)          M52236 C-15                                              06/28/85C REQUEST FOR RELIEF FRON B & PV CODE SECTION XI                  M56482                                                  07/ 01/85C RESCISSION OF ORDER                                              M57717                                                  07/05/85C YTEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND              M52765 B-76    04/11/85                                07/17/85C GREEN TICKET - DEBRIS I:JCORE                                    M59028                                                  07/17/85C HEAT UP AND C00LDOHN TECH. SPEC.                                M57108                                                  07/22/85C I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -    M56131  F-71                06/01/86  07/01/86          07/26/85C REGULATORY EFFECTIVENESS REVIEN                                  M57189                                                  08/29/85C
 
R-1208687-001                  REGULAT0RY          INF0RHATION                TRACKING            SYSTEM                        PAGE NO.      85 C0NDENSED            MANAGEMENT                REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: INDIAN POINT 3 PLANT LOCATION: 25 MI N OF NEW YORK CITY, NY        LICENSED P0HER: 3025 MHT                      PROJECT MANAGER: D. NEIGHBORS DOCKET NUMBER: 050-00286                            DESIGN POWER:    0965 MNE                    BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: UEC                                NSSS VENDOR:    ' JEST                      LIC. ASSISTANT: C. PARRISH IE INSPECTOR:      T. KENNY RAI                      SE TAC      MPA        RAI      RESPONSE      TER        INPUT        LIC ACT TITL E                                                            NUMBER    &          DAlf        DATE        MIf          DATE        DATE DDMM ACTIVE ISSUES MMMM APP. "R"                                                          M56345                                                              08/31/85 S/G TUBE C-3 INSPECTION                                            M59338                                                              09/06/85 FZRE PROTECTION MODIFICATIONS TECH SPEC CHANGE                    M51952                                                              09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52847    B-77                                                      09/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53075 B-80                                                          09/30/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR      M53128 B-81      11/09/84    12/28/84                              09/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53681 B-86    01/22/85      03/30/85                              09/30/85 RCS VENTS TECHNICAL SPECIFICATIONS HUREG 073 ITEM II.B.1          M54595                                                              09/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54540 B-83    08/15/85      10/15/85    11/15/85                  09/30/85 TECH. SPECS. FOR PURGE / VENT OPERATION                            M55414                                                              09/30/85 SHIFT OVERTIME TECH. SPECS,                                        M57176          03/15/85                                            09/30/85 ISI PROGRAM (REVISED)                                              M59055                                                              09/30/85 10CFR50.62 OPERATING REACTOR REVIENS                              M59104 A-20                                                          09/30/85 SECURITY PLAN REVISION                                            M59232                                                              09/30/85 DELETE PART I 0F ETS. (APPENDIX B)                                M57187                                                              10/01/85 REVIEH OF ASYMMETRIC LOCA LOADS SUBMITTAL                          M08773    D-10                                                      10/'5/85 SI REVIEH AND EVALUATION                                          M43373                        03/26/81C                            10/30/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55359    B-90                                                      10/30/85 LON TEMPERATURE OVERPRESSURE PROTECTION SYSTEM TECH. SPECS.        M59257                                                              10/30/85 REACTOR COOLANT PUMP TRIP                                          M49687    G-01                                                      10/31/85 INSTRUMENTATION TO FOLLON THE C0dRSE OF AN ACCIDENT (RG            M51099    A-17                                                      10/31/85 STEAM GENERATOR GENERIC REVIEN CONCERNING STEAM GENERATORS        M58065    C-16                06/18/85                              11/01/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH              M53009    B-79  03/31/85                                            12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53847    B-88                                                        12/31/85 REGULATORY EFFECTIVENESS REVIEW                                    M57190                                                              01/01/86 ANTICIPATORY TRIi' ON TURBINE TRIP (II.K.3.12)                    M57607                                                              01/01/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51249    F-09                                                      01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                    M52928    B-78                                                      01/31/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56132    F-71                10/31/85    11/30/85                  01/31/86 RU AND SV TESTING                                                M44589    F-14                                                      03/30/86 STANDARD TECH SPECS                                                M 12817                        07/07/80C                            05/01/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP      MS3915    B-89  05/15/85                                            11/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53764    B-87                                                        12/31/86 PROCEDURES GENERATION PACKAGE REVIEW                              M44310    F-05    04/30/86                03/30/86                  01/31/87 NUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46                M48173    F-58                05/31/86                              01/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      MS3991    B-93    03/07/85C                                        01/31/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54074    B-92                                                      01/31/87 METEOROLOGICAL DATA UPGRADE                                      M59293    F-68                                                      01/31/87 INTEGRATED LIVING SCHEDULES                                      M59369                                                              01/31/87
 
                                              - -.,.- n . .        -.-- _.---. .__. . . . ~                        --
5 '
R-1208687-001                      R E G U L A_T'O R Y              INF0RMATION                T R A C K'I'N G              SYSTEM'                            PAGE NO.:    86 C 0 N D E N S.E D    MANAGEMENT                        R'E P O R T                              RUN DATES 09/17/85 (HEADQUARTERS)
FACILITYt INDIAN POINT 3 RAI                          SE
.                                                                                                              TAC      MPA                RAI      RESPONSE . TER            INPUT      LIC ACT~
TITLE      ,
HUMBER    &              . RAIf ~        DATE        PAIX              DATE        DATE OMMM ACTIVE ISSUES MMMM          (CONTINUATION)
NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                    M45953 F -6 3                          12/30/80C                                02/01/87          L NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                  M46024    F-64                        12/30/POC                                02/01/87 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                M46096    F-65                        12/30/80C                                02/01/87 NUREG-0737 II.F.2.3, INADEQUATE CORE C00LINC INSTRUMENTATION                      M45142 F-26                            12/30/80C                                03/31/87 DC UNSCHEDULED ISSUES MM
!                          EXTEND SUPPLEMENT 1 ORDER FOR DCRDR
 
==SUMMARY==
REPORT                                M59521 REVISE SUPPLEMENT 1 ORDER - REG. , GUIDE 1.97                                      M59525 3                          unM COMPLETED ISSUES MMM                                                                                                                                                              r
                          !.D.1.1 - DETIALED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                        M51169 F-08                          08/17/84                                  10/24/84C i                        ' TECH. SPEC. ON TUBE PLUGGING LIMIT                                                M57060                                                                          15/09/84C SVEAM GENERATOR TUBE HOT LET PLUGGING                                              M56289                                                                          11/14/84C APPENDIX I TECH SPEC IMPLEMENTATION REVIEN                                          M08114 A-02                            12/15/78C                                12/07/84C        ,
                        'RETS TECH SPEC CHANGE                                                              M51946                                                                          12/ 07/84C LONG TERM CONTAINMENT PURGE AND VENT (B-24)                                        M42558 B-24                          09/11/80C                                  12/17/84C NUREG 0737, II.K.3.25 POWER DN PUMP SEALS                                          M48422 F-53                                                                      12/18/84C SHIFT MANNING - PLANT SPECIFIC                                                      M53227-                                                                          12/31/84C        '
CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)                            M07997 C-10                          05/15/81C                                02/13/85C 2
LER ADMINISTRATIVE CONTROLS TECHNICAL SPECIFICATION-                                M54850                                                                          02/25/85C ENVIRONMENTAL QUALIFICATION SCHEDULAR EXEMPTION                                  . M56617                                                                          02/25/85C "NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 OR 83-02)"                            M49737    B-72                        02/17/84                                  03/13/85C
* HYDRAULIC SNUBBERS.                                                                M08765    8-17                        11/29/81C                                04/02/85C        't
: j.                        SNUBBER SURVEILLANCE TECH SPEC CHANGE M51949                                                                          04/02/85C'        i DECAY HEAT REMOVAL' CAPABILITY TECH SPECS                                          M42097 , B-57                        -12/03/84                                04/08/85C ADEQUACY OF- STATI0tt ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES                        M12993 B-48                            10/31/84                                04/09/85C POTENTIAL EQUIPMEN1 FAILURES ASSOCIATED HITTH GRID VOLTAGE                          M10029 B-23                            10/31/84                                04/19/85C (IP-3).- TECHNICAL w ECIFICATION TO ALLOW ASYMETRIC STEAM                          M57417-                                                                        04/19/85C          t
!                        BAT't ERY FAILURE EST. - ELECTRICAL MODIFICATION                                    M55415                                                                          04/22/85C STEAM GENERATOR TUBE PLUGGING LIMIT                                                M56798                                                                          05/02/85C PRA-      .                                                                        M48056                                                                          05/07/85C NUREG-0737 II.K.3.30. SB LOCA OUTLINE                                              M45834 F-57                                                                    05/24/85C OPERABILITY (REVISED)                .                                            M56344                                                                          05/28/85C 4                        ENUIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                            M42474    B-60                        03/10/81C                                06/05/85C 4
_IVEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                        M53598    B-85                                    04/04/85                    06/10/85C
* CONTAINMEN; ISOLATION VALVES TECH SPEC CHANGE                                      M51944                                                                          06/24/85C CONTAINMENT ISOLATION VALVE TECH SPEC CHANGE                                        M51945                                                                          06/24/85C
,                        INSERVICE tNSPECTION PROGRAM (REVISED)                                              M56360                                                                          06/24/85C
!                        CONTROL OF HEAVY LOADS - PHASE II (FDLLOWUP OF MPASC-10)                            M52237    C-15                                                                  06/28/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS.                          M44448    F                      07/20/81                                  07/01/85C l                        SITE MANAGEMENT REORGANIZATION TECH SPEC CHANGE                                    M51943                                                                          07/ 01/85C
;                        MANAGEMENT REORGANIZATION TECH SPEC CHANGE (6/82)                                  M51950                                                                          07/01/85C MANAGEMENT REORGANIZATION TECH SPEC CHANGE (3/83)                                  M51951                                                                          07/ 01/85C        ,
4 e
1 l
 
  .-.          . . - . -  . .. .        -.      . . -        . -  - -        - . - -        -. ~                ~...                ~ . - - ~ .        -  .          . - .
4 R-1208687-001                    R E G U L A.T 0 R Y        INF0RMATION                        TRACKING                    SYSTEM                              PAGE NO.s'        87 C0NDENSED            MANAGEMENT                          REP 0RT                                      RUN DATE: 09/17/85 (HEADQUARTERS) 3                                                                  FACILITY: . INDIAN POINT'3 RAI                        SE TAC.      MPA          RAI            RESPONSE          TER    INPUT              LIC ACT TITLE                                                                          NUMBER      fE.        DAlf,              DATE            PAIE    .DATE                DATE umu COMPLETED ISSUES www      (CONTINUATION)
TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                            M55716 'A-18                                                                            07/01/85C INDEPENDENT AUDIT OF EMERGENCY PREPAREDNESS PLANS (82-17)                      M57191                                                                                '07/01/85C-INDEPENDENT AUDIT OF SECURITY PLANS (82-23)                                    M57192                                                                                  07/01/85C REPORTING SV AND RV FAILURES'AND CHALLANGES                                    M57608          .
                                                                                                                    -                                                            07/01/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                            M52766 B-76          04/12/85                                                          07/05/85C              ,
RESCISSION OF ORDER                                                            M57718                                                                                  07/05/85C
* REVIEW OF CONTAINMENT COOLING TECHNICAL SPECIFICATIONS                          M49873-                              .
07/06/85C' ITEM 4.3 - PUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                    M53177      B-82                      . 04/16/85 T,                                    07/10/85C-
        ' SAFETY REVIEW COMMITTEE ORGANIZATION
                                                        ^
M56290                                                                                  08/08/85C STEAM GENERATOR TUBE PLUGGING TO 30%                                            M57413                                                                                  08/27/85C
      ' CYCLE 4/5 REFUELING                                                            M57611                                                                                  08/27/85C ANALYSIS OF CAPSULE Y.                                                        M56305                                                                                  09/05/85C-DIESEL GENERATOR RELIABILITY TECH.' SPECS. (GL 84-15)                          M55868      D-19                                                                        09/06/85C b
4 9
4 s
4 h
I
                                                                                                                        ..v.                            -
 
  ._ _ _ _ __ _ ~                    _ - .          .__    ___      _ _      .            .___              __    ,        .        - _      .
R-1208687-001                  REGULAT0RY            INF0RMATION                  TRACKING        SYSTEM                      PAGE NO. 88 1 C0NDENSED          MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: KEHAUNEE PLANT LOCATION: 27 MI E OF GREEN BAY, HI.            LICENSED P0HER: 1650 MHT                  PROJECT MANAGER: M. FAIRTILE DOCKET NUMBER: 050-00305                              EESIGN PONER:      0535 MNE                BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: PSE                                  NSSS VENDOR:      HEST                    LIC. ASSISTANT: C. PARRISH IE INSPECTOR:        R. HELSON RAI                    SE TAC    MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                              ff!LM.Bfd  li(L    DAIX      DATE      DAlf.        DATE        DATE MMMM ACTIVE ISSUES MMMM ISI 2ND YEAR PROGRAM                                                M54740                                                          09/20/85 RV AND SV TESTING                                                    M44590    F-14            04/01/82C                            09/26/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52848    B-77                                                  09/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        M56133    F-71            06/30/85    07/31/85                09/30/85 GREEN TICKET NO. 748 - RSPONSE TO U.C.S. COMMENTS OF MAY 23,        M59182                                                          09/30/85 AIRLOCK DOOR SEAL TESTING PROP. TECH. SPEC. CHANGE                  M59250                                                          09/30/85 TECH SPEC SURVEILLANCE OF HYDRAULIC SNUBBERS                        M03525    B-17            04/03/81C                            10/31/85 REACTOR COOLANT PUMP TRIP                                            M49671    G-01                                                  10/31/85 STEAM GENERATOR GENERIC REVIEN CONCERNING STEAM GENERATORS          M58066    C-16            06/17/85                            11/01/85 2-17                                                                M49609                                                          11/08/85 EXEMPTION REQUEST TO 10CFR50 APP. R - CABLE COMBUSTIBILITY          M57722                                                          12/27/85 APPENDIX J TECH. SPECS.                                              M49131                      01/13/83C                            12/30/85 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN          M51170 F-08                04/tS/83C                            12/31/85-ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION DESCRIPTION          M52767 B-76      05/03/85              12/12/84                12/31/85 2ND TEN YEAR PROGRAM                                                  M54739                                                          12/31/85 ASYMMETRIC LOCA LOADS                                                M10754    D-10            04/11/50C                            01/15/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51250    F-09            04/15/83C                            01/31/86 ITEMS 4.2.t & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR          M53129    B-81                                                  01/31/86 ITEM 1.2 - POST TRIP REVIEH-DATA & INFORMATION CAPABILITY            M53599    B-85                                                02/15/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M53010    B-79                                                  03/31/86.
ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND            M55360    B-90                                                06/30/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING          M53992    B-93  02/04/85C                                    09/30/86 ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX          M53916    B-89  05/15/85                                      11/30/86 NUREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46                    M48174 F-58                05/31/86                            12/31/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG              M51100    A-17            04/15/83C                            12/31/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)              M44311    F-05  04/30/86              03/30/86                01/31/87 NUREG-0737 II.F.2.3, ItJADEQUATE CORE COOLING INSTRUMENTATION        M45143 F-26                12/28/81C                          01/31/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M53682    B-86                                                01/31/88 HESTINGHOUSE UPPER PLENUM ECCS INJECTION - LONG RANGE                N08350    D-05  02/13/85                                      05/30/88 ITEM i. .3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53848    B-88                                                  12/31/88 MN UNSCHEDULED ISSUES MM IMPLEMENTATION OF ATHS RULE - 10CFR50.62                              M59105 A-20 MMM COMPLETED ISSUES MMM OPERATOR TRAINING (BLUE TICKET 86 '79)                                M55806                                                          10/11/84C ANALOG ROD POSITION INDICATI0t4                                      M49859                      Od/15/84C                            11/08/84C E
 
R-1208687-001                    REGULAT0RY          INF0RMATION              TRACKING        SYSTEM            PAGE NO. 89 C0NDENSED          MANAGEMENT            REPORT                  RUN DATE: 09/17/85 (HEADQUARTERS) t                                                                  FACILITY: KEHAUNEE l                                                                                                            RAI          SE TAC    MPA      RAI    RESPONSE  TER  INPUT      LIC ACT IITLE                                                              NUMBER    &      MIf.      DATE  RA_J1  DATE        DATE DDM COMPLETED ISSUES MMM        (CONTINUATION)
CONTAINMENT FAN COIL T.S.                                          M55329                  06/18/84C                  11/18/84C ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR      MS3178  B-82            08/ 31/84C                11/26/84C REGULATORY EFFECTIVENESS REVIEW                                    M55949                                              11/29/84C DELET LIST OF SNUBBERS FROM TECH. SPECS.                          M55948                                              12/26/84C REVIEH OF II.F.1.2 SOURCE TERM AND II.F.1.3 INSTRUM. CALIBR.      M56341                                              01/02/85C REVISED REPORTING REQUIREMENTS (TECH. SPEC.)                      M55506                                              01/04/85C RCS VENTS TECHNICAL SPECIFICATIONS NURE9 073 ITEM II.B.1          M54396                                              01/ 09/85C
!            TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54541  B-83                                        01/09/85C l              EVALUATE REMOVAL OF RHR AUT0 CLOSURE FEATURE                      M53488        08/25/84C                            01/16/85C RELIEF REQUESTS (HYDRO TESTS)                                    M54195                                              01/22/8 5C ADMINISTRATIVE TECHNICAL SPECIFICATION CHANGES                    M55221                                              01/22/85C EXTENSION OF DATES IN NRC ORDER OF 06/12/84                      M55973                                              02/19/85C REQUEST FOR EXTENSION OF TIME FOR EQUIPMENT QUALIFICATIONS        M57008                                              03/08/85C MAIN STEAM SAFETY VALVE TECH. SPEC. CHANGE                        M56858                                              04/04/85C EXEMPTION REQUEST TO 10 CFR 50.46 - APPENDIX K SECTION I.A        M57233                                              04/04/85C NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                    M45954  F-63            10/20/81C                  04/10/85C NUREG-0737 III.A.I.2, OPERATIONAL SUPPORT CENTER                  M46025  F-64  05/08/85  10/20/81C                  04/10/8fC NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY              M46097  F-65            04/15/83                  04/10/85C NUREG-0737 III.A.2.2, METEOROLOGICAL DATA. UPGRADE                M46313  F-68            11/17/81C                  04/10/85C NUREG-0737 II.K.3.30, SB LOCA DUTLINE                            M45835 F-57              12/28/81C                  05/28/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS        M44449 F-12              01/ 05/81C                06/18/85C REVIEW OF NEH EXXON FUEL-HIGHER BURN UP LIMITS                    M56425                                              06/20/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA8C-10)          M32238  C-15                                        06/28/85C TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY          M45008  D-17              12/23/80C                07/05/85C CONTROL ROOM FILTERS - ITEM III.D.3.4 0F GEN.LTR.83-37            M56410                                              07/05/85C MISC. CHANGES TO 43 PAGES OF TECHNICAL SPECIFICATIONS            M56436                                              07/05/85C APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                        M08145 A-02              01/14/83C                  07/29/85C ADMINISTRATIVE TECH. SPEC. CHANGES - MISC.                        M57880                                              08/05/85C ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING TESTING          M52929  B-78                                        08/12/85C REACTOR TRIP SYSTEM RELIABILITY- VENDOR RELATED                  M53076  B-80                                        08/12/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53765  B-87                                        08/12/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE        M54075 B-92                                        08/12/85C PRELIMINARY REVIEW OF TRANSMISSION LINE MJDIFICATIONS            M59212                                              08/15/85C XEHAUNEE PRESSURE ISOLATION VALVES                              M46817                                              08/19/85C REVIEW OF LICENSEE COMMENTS ON REG. EFFECTIVENESS REVIEH        M57559                                              08/20/85C REACTOR VESSEL OVERPRESSURE PROTECTION                          M06886  B-04            06/15/79C                  09/06/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)            M55869  D-19                                        09/09/85C
 
    - -        _ . _ - _ _              __      -      - - _ _ - - - - - _ . ~          - - - - - - - - - ~ ~ - --                                - - - - - ~ ~                  . - ~ ~ - - - - +
R-1208687-001                      REGULAT0RY                      INF0RMATION                                  TRACKING          3YSTEM                                PAGE N0.8        90-
{                                                                        C0NDENSED            MANAGEMENT                            REP 0RT-                                  RUN DATE: 09/17/85                    :
d
                                                                                        -(HEADQUARTERS) i                                                                                FACILITY: LA CROSSE                                                                                                                  ;r PLANT LOCATION: 19 MI S OF LACROSSE, HISC                            LICENSED POWER: 0165 MHT                                    PROJECT MANAGER: J. STANG DOCKET NUMBER - 050-00409                                            DESIGN PONER:                    0050 MHE                  BRANCH CHIEF:              J. ZHOLINSKI ARCH / ENGINEER: S&L                                                NSSS VENDOR:                    AC                        .LIC, ASSISTANT:            C. JAMERSON IE. INSPECTOR:        I. VILLALVA RAI                              SE                                    '
TAC          MPA        RAI    RESPONSE              TER        INPUT                                        [
TITLE                                                                                                                                                                              LIC ACT MlMlfR              &-        DATE      DATE              DAIE        DATE              DATE
* b DONw ACTIVE ISSUES wwww l          SEP TOPIC II-3.C        LOSS OF ULTIMATE HEAT SINK                                        M54660                    01/22/85C                                                  09/15/85
!          FLOODING TECH. SPECS.                                                                      M55958                    Ot/22/85C                                                    09/15/85                      >
SEP TOPIC 111-2, WIND 8 TORNADO LOADINGS                                                  M51867                              10/11/84C SEP TOPIC 111-3.A, EFFECTS.ON HIGH HATER LEVEL ON STRUCTURES                                                                                                                    09/30/85                        "
M51868                                                                                09/30/85
,          SEP TOPIC 111-4.1, TORNADO MISSLES                                                        M51869                              10/11/84C IODINE SAMPLER SHIELDING EXEMPTION                                                                                                                                              09/30/85 M55611                              06/30/85                                        09/30/85                    ';
i        ECCS TECH SPEC REVISION                                                                    M52169                                                                                10/01/85
!          SEP TOPIC III-7.B. DESIGN CODES, DESIGN CRITERIA, LOAD                                    M51874                                                                                10/15/85                    0
;_          NUREG-0737 II.B.3.2. POST ACCIDENT SAMPLING MODIFICATIONS                                  M44450 F-12                                                                            10/31/85                      !
SEP TOPIC III-6. SEISMIC DESIGN CONSIDERATIONS
                                                                                                                            ~
M51873                                                                                10/31/85                      ?
LACROSSE INTEGRATED ASSESSMENT SUPPLEMENT                                                  M51880                                                                                10/31/85                      !
DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                      M55870 D-19                                                                            10/31/85                      i
.          DCRDR OPEN ITEMS                                                                          M57461-                              04/12/85C                                        10/31/85                      !
          . MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                        M42912 B-59                                                                            11/15/85                      I PURGE VALVE TECH. SPECS.                                                                  M55438                                                                                  11/15/85                      i
'          SEP TOPIC VI-4, CONTAINMENT ISOLATION                                                      M56955                                                                                  11/15/85                  "i NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                              M45144 F-26                                                                            11/30/85 CONTAINMENT LEAK TESTING                                                                  M48681                                                                                  11/30/85                      I TYPE B LEAK TEST EXEMPTION                                                                M49895                                                                                  11/30/85                  'l E.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                    M51251              F-09  02/2f/85  05/24/85C            N/A                        11/30/85                      i PROPERTY DAMAGE INSURANCE EXEMPTION                                                        M56853                                                                                                                '
11/30/85 4-INCH VENT VALVE OPERABILITY TESTING                                                      M58020                                                                                  11/30/85
* CONTROL ROOM HABITABILITY TECH. SPECS-                                                    M58022                                                                                11/30/85
        - CONFIRf1ATION OF SEP ACTION ITEMS
        "                                                                                            M52514                                                                                12/15/85 4          FTL CONVERSION                                                                            Mt1233                                10/09/74C                                        12/31/85                      .
ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION DESCRIPTION                                M52768 B-76                04/25/85                                                    12/31/85                    ''
LER RULE REPORTING REQUIREMENTS                                                            M54666 A-18                                                                            12/31/85 IMSPECTION OF BHR STAINLESS STEEL PIPING (GL-84-11)                                        M56859 B-84                                                                            12/31/85 MENT VALVE DEBRIS SCREENS                                                                  M58019                                                                                12/31/85                      s LIMIT NOURS OF CONTAINMENT PURGING                                                        M58021                                                                                12/31/85
* ITEM 3. t.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                      M53011 '. B-7 9                                                                        01/01/86' NOBLE GAS MONITOR DEVIATION                                                                M57719                                                                                01/01/86                      i IN-SERV *CE TESTING                                                                        M49136                                                                                02/28/86 l          ITEM 1.4 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                M53600 B-85                                          04/04/85                        04/15/86
:          PROCEDJRES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/t)                                  M44312 F-05                07/30/85  12/31/84            N/A                        04/30/86 NUREP-0737      III.A.1.2, TECHNICAL SUPPORT CENTER                                      M45955 F-63                                                                            07/31/86                      i NUREi-0737      III.A.1.2, OPERATIONAL SUPPORT CENTER                                    M46026 F-64                                                                            07/31/86 NUREG-0737      III.A.1.2, EMERGENCY OPERATIONS FACILITY                                  M46098 F-65                                                                            07/31/86                      '
NUREG-0737      III.A.2.2, METEOROLOGICAL DATA UPGRADE                                  M46314 F-68                                                                            07/31/86 1
 
  . _ _ _ _ _ _ _ ~ -                  ___ __,            _ _ _ _ _ . . _ _ _ .                    _ _ _    __ _ .            ___m    . _ _ , - - .      . . _    _ _ . . -
7
                                                                                                                                                                                              ,1
                                                                                                                                                                                                  ~
l R-1208687-001                      REGULAT0RY                      INF0RMATION                  T R A C K-I N G        S-Y S T E M                  PAGE NO.:        91 C0NDENSED                MANAGEMENT            '
REPORT                            RUN DATE: 09/17/85.
(HEADQUARTERS)                                                                                -      .
FACILITY: LA CROSSE
                                                                                                            .                          -RAI                  SE TAC    MPA          -RAI      RESPONSE          TER INPUT              LIC ACT TITLE                                                                              NUMBER    _&            Mlf, -        DATE          M]I    DATE              DATFg unun ACTIVE ISSUES MMMM          (CONTINUATION)
ITEM 2.1 - EQUIPMENT' CLASSIFICATION AND VENDOR VENDOR                            M52849    B-77      03/22/85C                                            09/30/86 ITEMS 3.1.1 3 3.1.2 - POST MAINTENANCE TESTING                                    M52930    B-78                                                            09/30/E5 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR IN1.RFACE -                        M53683 B-86          J3/22/85C                                            09/30'*6 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TEuh.                          M53849 B-88                                                                10/30/66 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                          M53766 B-87          -
                                                                                                                                                                            '10/31<86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                      M53993 B-93          03/22/85C                                            10/31/86            '
INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                          M51101 A-17          07/21/86                                          _01/01/87' un UNSCHEDULED ISSUES MM 10CFR50.62-OPERATING REACTOR REVISHS                                            M59106 A-20 EXEMPTION TO 10CFR50.62-                                                        M59397
              .MMu COMPLETED ISSUES MMM l                  I . D .1 '.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                  M51171    F-08                                                              10/10/84C APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                                      N08099 A-02                                                                10/18/84C l              ' NUCLEAR INST. TECH SPEC                                                          M52172                                                                      10/18/84C l                  RV AND SV TESTING                                                                M44591    F-14                    11/29/84C                                ti/30/84C POST ACCIDENT TECH SPECS                                        .                M54197                                                                      11/30/84C l                  TECHNICA'. SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                      M54542 B-83                                                                11/30/84C          '
!-                737 TECH SPECS                                                                  M51682 B-72                                                                01/08/85C-VENT VALVE OPERABILITY TEST                                                      M51318                                                                    01/15/85C l                                                                                                  M56678                                                                    01/23/85C i                  REVIEH ODCM                                                                                                                                                01/30/85C SALP 5 REPORT                                                                    M56773 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                    M56134 F-71                                                                02/21/85C          '
i l                  CHECK VALVE IST RELIEF REQUEST                                                  M55618                                                                    02/28/85C RT-NDT SHIFT TECH SPEC                                                          M52171                                                                    03/28/85C AIRBORNE DOSE CALCULATIONS                                                      M54621      .                      12/31/84C                              04/12/85C ENVIRONMENTAL QUALIFICATION OF SAFETY _RELATED ELECTRICAL                      M42522 B-60                                                                04/18/85C M51870                                                                      04/19/85C
                'SEP TOPIC III-4.B. TURBINE MISSILES                                              'M56828                                                                      04/23/85C APPENDIX J TECH. SPEC. CHANGES                                                                                    12/20/84C                                04/24/85C SEP TOPIC VIII-3.B. DC BUS VOLATGE MONITORING                                  M51878 M57311                                                                      04/26/85C SHUTDOHN CONDENSER ISOLATION VALVE SCHEDULE-                                                                                                                05/08/85C RECIRC. HELD REPAIR                                                            M57310 M57656                                                                      05/16/85C RPS POWER SUPPLY AND SIGNAL ISCLATION SCHEDULE                                                                                                              05/17/85C I1EM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                        M54076    B-92 M53413                                                                      05/28/85C SEP TECH SPECS                                                                                                                                              05/28/85C HATER QUALITY TECH SPECS                                                        M53414 M56548                                                                    06/05/85C SEALED SOURCE AMENDMENT                                                                                                                                    06/07/85C
                  . SAFETY VALVES                      .                                            M52170 M52239 C-15                                                                06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)                                                                                                    07/26/85C ATHS RULE CLARIFICATION                                                        M55943 SEP TOPIC III-5.A, PIPE BREAK INSIDE CONTAINMENT                                M51871                            07/31/85          N/A                    08/13/85C M49088                                                                    08/19/85C SECURI'Y PLAN AMENDMENT l
 
  - _ _ - - _ . . .              _    _.    . .._, . _ _ _ .      . _ . _ _ .    .. _ _ _ . _ _ , - . _ _ . . . _ .        -  _,  -. _ _ . . . _ . . . . . _ _ . m _._. .            . _
l R-1208687-001                        REGULAT0RY            INF0RMATION                                  TRACKING ' SYSTEM                                        PAGE NO.s  92 C0NDENSED                MANAGEMENT                            REP 0RT                                      RUN DATE: 09/17/85 (HEADQUARTERS)
                                      ~
FACILITY: LA-CROSSE RAI                                  SE TAC            MPA    RAI    RESPONSE        'TER                INPUT      LIC ACT-TITLE                                                                            NUMBER                &      DATE      DATE        RAJE                    DATE        DATE nun COMPLETED ISSUES.MNw        (CONTINUATION)
SCHEDULAR EXEMPTION FROM REQUIRtD DATE FOR SUBMITTAL OF FSAR                    M59266                                                                              08/2085C 4
a h
j
 
                          - - .    - - -  __.  - _.          - -    _~ - -_              -    -_ _ _                - -
R-1208687-001                  R E G U'L A T 0 R Y          I N F 0 R M A T-I O N          TRACKING              SYSTEM                        PAGE NO.*    93 C0NDENSED                    MANAGEMENT                    REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: LASALLE 1 PLANT LOCATION: 11 MI SE OF OTTAHA, ILL                    LICENSED POWER: 3323 MHT                            PROJECT MANAGER: A. BOURNIA DOCKET NUMBER: 050-00373                                    DESIGN PONER:          1078 MHE                      BRANCH CHIEF:      H. BUTLER ARCH / ENGINEER: S&L                                      NSSS VENDOR:            GE                            LIC. ASSISTANT: E. HYLTON IE INSPECTOR:      R. HEISHMAN RAI                      SE l                                                                                  TAC    MPA            RAI    RESPONSE      TER        INPUT      LIC ACT' l TITLE                                                                          NUMBER    &      RAll-            DATE        RAIX        DATE        DATE usuu ACTIVE U $y11 MMMM HAIVER OF 18-MONTH SURVEILLANCE INTERVAL                                        M59211                                                              09/22/85 REVIEW INSERVICE TESTING OF PUMPS AND VALVES                                    M54995                                                              09/30/85 l PROCEDURES GENERATION PACKAGES (SUPPLEMENT 1, NUREG-0737)                      M55338  F-05  03/12/85C                    N/A                    09/30/85 MEETING TO DISCUSS SLENDERNESS RATIO ND UNBRACED LENGTH                        M56675                                                              09/30/85 REVIEW OF REVISED LICENSED OPERATOR REQUALIFICATION TOPICAL                    M57523                                                              -09/30/85 SPECIFICATION 3.0.4 DOES NOT APPLY, ADDITION TO TECHNICAL                      M57548                                                              09/30/85
! DECAY CORRECTION OF LIQUID EFFLUENT BATCH RELEASES FOR LOWER                    M57550                                                              09/30/85 l CONTROL ROOM EMERGENCY MAKE-UP TRAIN HEATERS                                    M57552                                                              09/30/85 l RCJC PUMP ROOM DIFFERENTIAL TEMPERATURE ISOLATION                              M57560                                                              09/30/85 l RCJC PUMP ROOM DIFFERENTIAL TEMPERATURE ISOLATION                              M57561                                                              09/30/85 RPIS INDICATION AND SURVEILLANCE                                                M57562                                                              09/30/85 RPIS INDICATION                                                                M57563                                                              09/30/85 CORRECTION OF TYPOGRAPHICAL AND ADMINSTRATIVE ERRORS AND                        M57564                                                              09/30/85 PROPOSED ELIMINATION OF PIPE WHIP RESTRAINTS                                    M57593                                                              09/30/85 REVIEW OF EXTENDED BLONDOHN TEST EVALUATION OF SUPPRESSION                      M52297                                                              10/15/85 ADDITION OF SUPPRESSION POOL MONITORING INSTRUMENTATION TO                      M57475                                                              10/30/85 DISPOSAL OF LOW LEVEL RADI0 ACTIVE CONTAMINATED SLUDGE BY                      M57766                                                              10/30/85 MODIFICATION OF ADS LOGIC TO MEET LICENSE CONDITION                            M59210                                                              10/30/85 REVISION TO SRV SETPOINTS AND SETPOINT TOLERANCES                              M59462                                                              10/30/85 ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                      M42536  B-60                                                        11/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M52850 B-77                    11/25/83C                            02/03/86 CONFFIRMATORY REVIEW OF ELECTRICAL /ND ELECTRONIC ISOLATION                    M56087                                                              02/03/86
  . INSTRUMENTS FOR DETECTION ON INADEQUATE CORE COOLING                          M49460  F-26                                                        02/28/86 l  ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                  MS3994  B-93  03/19/85C 11/25/83C                                  09/01/86 l  INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                        M51102 A-17    03/31/85                                              01/24/87 ITEM 2.2 - EQUIPMENT CLASSIFICATI0h AND VENDOR INTERFACE -                    M53684 B-86                    11/25/83C                            05/31/87 l
CM UNSCHEDULED ISSUES MM APPLICATION OF MECHANICAL STRESS IMPROVEMENT                                  M59575 APIM CALIBRATION GAIN ADJUSTMENT FACTORS                                      M596 7 CRD SYSTEM SCRAM ACCUMULATOR ALARM                                            M59628 n=2 COMPLETED ISSUES MMM CHANGE ACTION STATEMENT IN TECH. SPEC. FOR ACCIDENT                            M55580                                                              11/09/84C LOSS OF FEEDHATER HEATING ANALYSIS MEETING                                    M56457                                                              12/15/84C REVISE TECH. SPECS FOR REACTOR HATER CLEANUP PUMP ROOM HIGH                    M55773                                                              01/08/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPASC-10)                      M52240 C-15                                                          03/15/85C l
l l
1
 
R-1208687-001                  REGULAT0RY          INF0RMATION              T R A C K I si G    SYSTEM                PAGE NO. 94 C0NDENSED          MANAGEMENT              REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: LASALLE 1 RAI              SE TAC    MPA        RAI      RESPONSE      TER  INPUT      LIC ACT TITLE                                                            NUMBER    LIQ,. RAlg        DATE      Rfdf  DATE        DATE 000 COMPLETED ISSUES MMM      (CDNTINUATION)
EXTENSION OF DEADLINE FOR ENVIRONMENTAL QUALIFICATION OF        M56626                                                      03/29/85C T/S/ CHANGE FOR SBGTS HEATER FROM 20 KH TO 23RH                  M56734                                                      04/29/85C CHANNEL CHECK REQUIREMENTS                                      M56908                                                      04/30/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                  M52931  B-78                  11/25/83C                    05/01/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53767  B-87                  11/25/83C                    05/01/85C ITEM 4.5.1 - REACTOR SYSTCH FUNCTIONAL TESTING - DIVERSE        M54077  B-92                  11/25/83C                    05/ 01/85C REVIEW FIRE DAMPER SURVEILLANCE PROGRAM                          M5564?                                  01/23/85            05/03/85C-II.O.1 - RV & SV TESTING                                        M54582  F-14    07/25/84C 10/22/84C                        05/22/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55718  A-18                02/28/85                      05/22/85C' ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53601  B-85                            04/04/85            05/24/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND              M52769  B-76    04/11/85C              12/12/84          07/12/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M54970                        11/25/83C 12/12/84            07/12/85C ACCEPTANCE CRITERIA FOR FIRECODE GYPSUM FIRE STOPS              M57782                                                      07/16/85C FINE MOTION CONTROL ROD DRIVE DEMONSTRATIGN TEST                M57770                                                      08/09/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TErri            M53012 B-79                  11/25/83C                    08/22/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53350 B-88                  11/25/83C                    08/22/85C
 
R4120a687-001                          REGULAT0RY                  .INF0RMATION                            TRACKING                SYSTEM                                  PAGE NO.s-  95 C0NDENSED- MANAGEMENT                                    REP 0RT                                            'RUN DATE: 09/17/85 (HEADQUARTERS) 4
                                                                    'FACILITYr LASALLE 2 PLANT LOCATION: 11 MI SE OF OTTAHA, ILL                            LICENSED P0HER: 3323 NHT                                      PROJECT MANAGER: A. BOURNIA DOCKET NUMBER: 050-00374                                          DESIGN POWER:        '1074 MHE                                BRANCH CHIEF:              H. BUTLER ARCH / ENGINEER: S!!                                              NSsS. VENDOR:          GE                                    LIC. ASSISTANT: E. HYLTON-IE INSPECTORn            R. HEISNMAN RAI'                              SE TAC-            MPA      RAI            RESPONSE          TER              INPUT      LIC ACT TITLE                                                                                NUMBER            HR.      DAlt              DATE            R&Lg              _p&lg        DATE      ,
utmM ACTIVE ISSUES MMMM REVIEW INSERVICE TESTING OF PUMPS AND VALVES'                                        M54996                                                    -
09/30/85 PROCEDURES GENERATION PACKAGES (SUPPLEMENT                1, NUREG-0737)            M55339                  03/12/85C                          N/A                          09/30/85 REVIEW OF REVISED LICENSED OPERATOR REQUALIFICATION TOPICAL                          M57539                                                                                  09/30/85 i  SPECIFICATION 3.0.4 DOES NOT APPLY, ADDITION TO TECHNICAL                            M57549                                                                                  09/30/85 DECAY CORRECTION PF LIQUID EFFLUENT BATCH RELEASES FOR LOHER                          M57551                                                                                  09/30/85 CONTROL ROOM EMERGENCY MAKE-UP TRAIN HEATERS                                          M57553                                                                                  09/30/85 CORRECTIDW a.T TYPOGRAPHICAL & ADMIN. ERRORS & INCLUSION OF                          M57565                                                                                  09/30/85 PRO *CacD ELIM1R* TION OF PIPE HHIP RESTRAINTS                                        M57594                                                                                  09/30/85 PiSPOSAL OF LDH L.' VEL RADI0 ACTIVE CONTAMINATED SLUDGE BY                          M57767                                                                                  10/30/85 REVISION TO SRV SETPOINTS AND SETPOINT TOLERANCES                                    M59463                                                                                  10/30/85 ENVIRONMENTAL QUA!IFICATION OF SAFETY RELATED ELECTRICAL                              M42537        B-60                                                                      11/30/85 CONFIRMATORY REVIEW OF ELECTRICAL AND ELECTRONIC ISOLATION                            M56088                                    02/08/85                                      02/03/86-DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT                                    M57498        F-08                      04/14/83C                                    02/03/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTERFACE - RTS                          M57731        B-77                                                                    02/03/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                          M53995 B-93            03/19/85C 11/25/83C                                            09/01/86 INSTRUMENTATION TO FGLLCH THE COURSE OF AN ACCILIENT (R.G.                            M56407 A-17                                                                            01/24/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M53685 B-86                              11/25/83C                                    05/31/87      '
ADDITION OF SUPPRESSION POOL MONITCRING INSTRUMENTATION TO                            M57476                                                                                  06/28/87
;  100FR50.62 OPERATING REACTOR REVIEHS                                                M59108 A-20                              11/01/85                                      06/30/87.
um UNSCHEDULED TSSUES MM REVISE TECH. SPEC. ON A ONE-TIME-ONLY BASIS TO EXTEND TIME                            M59534 APRM CALIBRATION GAIN ADJHSTMENT FACTORS                                              M59626 CRD SYSTEM SCRAM ACCUMULATOR ALARM                                                    M59629 usu COMPLETED ISSUES MMM CHANGE ACTION STAiEMENT IN TECH. SPEC. FOR ACCIDFNT                                  M55563                                                                                  11/09/84C
!                                                                                        M55775                                                                                  12/17/84C
'! k'5W    TECH.
EVISE TECH.SPEC. SPECSCH.TNGES FOR REACTORTOHATER INCORPORATE        SCRAM CLEANUP PUMP  ROOM  GN    LOH CRD HIGH        PUMP M55774                                                                                  01/ 08/85C EXTENSION OF DEADLI.lE FOR ENVIRONMENTAL QUALIFICATION OF                            M56627                                                                                  03/28/85C      >
TS CHANGE FOR SBGTS HEATER FROM 20 KH TO 23KH                                        M56735                                                                                  04/29/85C CHANNEL CHECK REQUIREMENTS                                                            M56909                                                                                  04/30/85C ITEMS 3.2.1 & 3.2.2 - FOST-MAINT TESTIhG PROCEDURES AND                              M53768 B-87                              11/25/83C                                    05/01/85C ITEM 4.5:1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54078 B-92                                                                            05/01/85C SALEM ATHS 3.1.1 & 3.1.2 POST MAINTANCE TEST PROCEDURES                              M57352 B-78                                                                            05/01/85C REVIEW FIRE DAMPER SURVEILLANCE PROGRAM                                              M55650                                                                                  05/03/85C II.D.1 - RV & SV TESTING                                                              M54583 -F-14            07/25/84          10/22/84C                                    05/22/85C i
4                                                                                                                                                                                              ,
c  ,            _
 
  . .  .---.....-n...              - . .    - . - .    . . . -    . . - ..- _.... .            ...    .-.      . . . , - - _ _ . . . -. .-                  - - . .      .... .            . -. .,
P R-1208687-001                          REGULAY0RY                            INF0RMATION                  TRACKING                          SYSTEM                          PAGE NO. - . 96 f CDNDENSED                    MANACEMENT                          REP 0RT                                  RUN DATE:'09/17/85 4
(HEADQUARTERS)
FACILITY: LASALLE 2 RAI                    SE TAC    MPA-                    RAI          ' RESPONSE    TER        INPUT        LIC ACT TITLE                                                                                      NUMBER    Bjb..                DAIX                DATE      RALE          DATE          DATE~
DDM COMPLr.'ED ISSUES MMM.              (CONTINUATION)
TECH. SPEOS. AFFECTED BY 50.72 AND 50.73 (GL 83-45)                                        M55719  A-18                                  02/28/85                              05/22/85C ITEM 1.2 - POST TFIP REVIEH-DATA AND INFORMATION CAPABILITY                                M5!602 B-85                                    11/25/83C 01/31/85                    05/24/85C            . ,
FMERGENC TECH. SPEC. TO CHANGE THE MAIN STEAM LINE LOH                                    M57939                                                                              -07/01/85C ACCEPTAL.'E CRITERIA FOR FIRECODE GYPSUM FIRE STOPS                                        M57783                                                                                07/16/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                    M53851  B-88                                    11/25/83C                            08/22/85C ITEM 3.v.3 - POST-MAINTENANCE TESTING,~ CHANGES TO TECH.                                  M57730  B-79                                                                          08/22/85C l
I I
i i                                                                                                                                                                                                            'i
 
              . . - - _ - - -            . -    - . . - - . - - - . -        - - - - -                  ._.-~_. _.-          .- -      .. -          . . -      - - . - . .          . - . .
R-1208687-001                          REGULAT0RY                  INF0RMATION                    TRACKING          SYSTEM                        PAGE NO.          97 i                                                                        C0NDENSED              MANAGEMENT                  REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: LIMERICK 1                                                                                        i PLANT LOCATION: 21 MI NH OF PHILADELPHIA,PA                        LICENSED POWER: 0165 MHT                        PROJECT MANAGER: R. MARTIN DOCKET NUMBER: 050-00352                                          DESIGN POWER:    1055 MHE                      BRANCH CHIEF:      H. BUTLER ARCH /ENGINEERt BECH                                              NSSS VENDOR:    GE                            LIC, ASSISTANT:    E. HYLTON
                .IE INSPECTOR:        J. HIGGINS                                                                                                                                                ,
RAI                      SE                              ,
TAC          MPA        RAI    RESPONSE        TER        INPUT            LIC ACT TITLE                                                                            NUMBER        &        D.Alg      DATE        PAlf.        DATE              DATE i
NNMM ACTIVE ISSUES MMMM i
2.206 PETITION OF R ANTHONY DATED 12-23-84                                      M56694                                                                      07/30/85 FULL POWER LICENSE PACKAGE (PART OF OL REVIEH)                                  M56896                                                                      07/30/85 ITEM 1.2 - POST TRIP REVIEN DATA AND INFORMATION CAPABILITY                      M56255              10/26/84    08/31/84                                    10/26/85 ITEM 2.1 EQUIPM2NT CLASSIFICAITON AND VENDOR INTERFACE -                        M56256              10/26/84    08/31/84                                    10/26/85
!                  ITEM 2.2 - EQUIPMENT CLASSIFICAITON AND VENDOR INTERFACE -                      M56257              10/26/84    08/31/84                                    10/26/85 ITEMS 3.2.1 & 3.2.2 - POST MAINTANCE TESTING PROCEDURES AND                      M56260              10/26/84    08/31/84                                    10/26/85 ITEM 3.2.3 - POST MAINTENANCE TESTING CHANGES TO TECH. SPEC                    M56261              10/26/84    08/31/84                                    10/26/85 1
ITEM 4.5.1 REACTOR SYSTEM FUNCTIONAL TESTING DIVERSE TRIP                      M56262              10/26/84    08/31/84                                    10/26/85 I                  ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING .M56263                                  10/26/84    08/31/84                                    10/26/85 INSERVICE INSPECTION PROGRAM                                                    M56249              10/26/84    10/26/85                                    10/26/86 ITEMS 3.1.1 & 3.1.2 POST MAINTENANCE TESTING                                    M56258              10/26/84    08/31/84                                    03/31/87 TURBINE SYSTEM MAINTENANCE PROGRAM                                              M56250              10/26/87                                                10/26/88 uw UNSCHEDULED ISSUES MM ITEM 3.1.3 - POST MAINTENANCE TESTING CHANGES TO TECH.                          M56259              10/26/84    08/31/84 10CFR50.62 OPERATING REACTOR REVIENS                                            M59109 A-20 OPERATOR REQUALIFICATION TRAINING PROGRAM                                        M59238 i                  R. ANOTHONY 2.206 APPEAL OF 8 EXEMPTIONS                                        M59461 EMM COMPLETED ISSUES MMM
?
SRM/IRM 11/18/84 LOSS OF POWER                                                  M56388                                                                      01/21/85C SALP-84                                                                          M56670                                                                      03/12/85C REVIEH OF DST PRA INSIGHTS REPORT                                                M56671                                                                      03/29/85C        i 2.206 PETITION OF R SUGARMAN DATED 11-21-84                                      M56693                                                                      05/17/85C ENVIRONMENTAL QUALIFICAITON JUSTIFICATION BOUNDING EQ                          M56246              10/26/84    03/31/85                                    05/22/85C REG. GUIDE 1.97 INSTRUMENTS                                                      M56248              04/13/84                                                05/22/85C ULTIMATE HEAT SINK                                                              M56252              10/26/84    12/20/84C                                  05/22/85C
)                  CONTROL OF HEAVY LOADS, PHASE II                                                M56253              10/26/84    08/13/84                                    05/22/85C INDEPENDANT DESIGN VERIFICATION REVIEN                                          M56669                                                                      05/22/85C INSERVICE TESTING OF PUMPS AND VALVES                                          M56245                10/26/84  06/15/84    11/01/85                      07/23/85C DETAILED CONTROL ROOM DESIGN REVIEH                                            M56247                                                                      07/23/85C        '
REMOTE SHUTDOHN SYSTEM                                                          M56251                10/26/84  02/15/85C                                  07/23/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                            M56254                10/26/84  08/31/84                                    07/23/85C SAFETY PARAMETER DISPLAY SYSTEM LIMERICK                                        M57182                                                                      07/23/85C I
J
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING            SYSTEM                      PAGE N0.8    98 C0NDENSED          MANAGEMENT                REP 0RT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MAINE YANKEE PL/04T LOCATION: 10 MI N OF BATH, NE              LICENSED POWER: 2630 MHT                    PROJECT MANAGER: P. SEARS De',KET NUMBER: 050-00509                        DESIGN P0HER:    0825 MHE                  BRANCH CHIEF:      E. BUTCHER ARCH /ENGINEEka S&H                              NSSS VENDOR:      COMB                      LIC. ASSISTANT: P. KREUTZER IE INSPECTOR:    C. HOLDEN RAI                    SE TAC    MPA        RAI    RESPONSE      TER        INPUT      LIC ACT IIT1E                                                            IMiBLE    E        Mig          DATE      MJ1          DATE        DATE DDDM ACTIVE ISSUES MMMM APS VOLTAGE STUDY                                                M53475          05/14/84    09/30/84                            06/30/85 TECH. SPEC. FOR LIMITING DVERTIME (PC 109)                      M56083          01/15/85    02/15/85                            06/30/85 SECOND IST INTERVAL                                              M49711                      07/ 01/84C                          08/15/85 AFH SYSTEM RESOLUTION                                            M55295          07/30/8.5    09/30/84                            08/30/85 REMIEW OF ASYMMCTRIC LOCA LOADS SUBMITTAL                        M08898  D-10  06/01/84    07/01/84                            08/31/85 MSLB TOPICAL REPORT (YAEC-1447)                                  M56426                                                          09/15/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11              M42893  B-59                05/01/85C                          09/30/85 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG        M itc3 A-17    04/21/86                                        09/30/85 DEGRADED GRID VOLTAGE PROCEDURES                                M51703                                                          09/30/85 CONTAINMENT ISOLATION VALVES UNDER ADMINSTRATIVE CONTROL        M57635                                                          09/30/85 SEISMIC QUALIFICATION OF THE AUXILIARY FEEDHAlER SYSTEM          M43653  C-14  08/09/84    10/15/84                            10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M52851  B-77  04/19/85    06/19/85C                            10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                  M52932 B-78                                                      10/30/85 TECH SPECS FOR SAFE SHUTDOWN                                    M53513          04/15/85    05/21/85C                            10/30/85 IVEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE        M54079 B 02                                                      10/30/85 CONTAINMENT LEAK TESTING II                                      M56699                                                            10/30/85 PC 108 S. G. TUBE SURVEILLANCE                                  M57175                                                            10/30/85 PC 107 SUPP. 91 ACCIDENT MONITORING TECHNICAL SPECIFICATIONS    M57223                                                            10/30/85 HYDRAULIC SNUBBERS                                              N08904  B-17                06/30/79C                            10/31/85 NUREG-0737 III.A.1.2, TECENICAL SUPPORT CENTER                  M45956  F-63                                                    11/30/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                M46027  F-64                                                    11/30/85 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY              M46099  F-65                                                    11/30/85 NUREG-0737 III. A.2.2, METEOROLOGICAL DATA UPGRADE              M46315 F-68                                                      11/30/85 REVIEW OF 10CFR 61                                              M53407                                                            11/30/85 RCS VENTS TECHNICAL SPECIFICATIONS HUREG 073 ITEM II.B.1        M54397                                                            12/15/85 DIESEL GENERATOR RELTABILITY TECH. SPECS. (GL 84-15)            M55873  D-19                                                    12/15/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -    M56135  F-71                03/15/85C 05/08/85                  12/15/85 RU AND SV TESTING II.D.1                                        M44592  F-14                06/11/85C 09/30/85                  12/30/85 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION    M45145  F-26  06/26/85C 07/25/85                                12/30/85 REACTOR COOLANT PUMP TRIP                                        M49673  G-01  08/07/84    05/28/85C                            12/30/85
* TECH SPEC FOR AFH INITIATION                                    M53546                      06/30/84                            12/31/85 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                M48176  F-58                09/30/85                            01/31/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53603  B-85                                                    04/01/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51253  F-09  03/06/85    05/31/85C                          04/30/86 IVEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS    MS3013  B-79                                                    04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53852 B-88                                                      04/30/86 ESFAS & RP5 SENSOR TECH SPEC                                    M48999          11/16/83    03/04/85C                          05/31/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/2)        M44313 F-05    02/28/86    08/15/86    01/30/86                06/30/86 BRIEFINGS ON SEISMIC REVIEH PLAN                                M49475                                                          06/30/86
 
_ . - . _ _ _ . . _ _ - - _ - - _ _ _ . _ . - . . - . _ _ ._._..._ , _ .                                                      _ - - _ _          4 __ . . .      _ . - _ . - -        -.                r_ _
i R-1208687-001                                                            REGULAT0R.Y          INF0RMATI0N ' TRACKING                              SYSTEM                                PAGE NO.      - 99 C0NDENSED                MANAGEMENT            REPORT                                      RUN DATE '09/17/85 (HEADQUARTERS)                                                                                                <
FACILITY: MAINE YANKEE RAI            -
                                                                                                                                                                              . SE~
TAC  MPA    RAI            RESPONSE,          TER    INPUT ~          LIC ACT TITLE                                                                                                          NUMBER    E      MTI              DATE          MIf, '      DATE              DATE
: unum ACTIVE ISSUES MMMM                                              (CONTINUATION)                                                                                                                                      '
NUIEG-0737 II.K.3.30, SB LOCA OUTLINE                                                                          M45837  F-57 05/15/84        07/15/84C                                      10/30/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                                                M53077  B-80                                ,                              10/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                        M53769  B-87                                                                10/30/86                      '
    . ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                                    M53917  B-89                            -
10/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                                  M53996  B-93 04/19/85C 06/07/85C                                            10/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                    - M53686 B-86  04/19/85        06/19/85                                      02/01/87 i    un UNSCHEDULED ISSUES MM EFFECTIVE REANALYSIS NECESSITATED BY SMALL DIMEUSIONAL                                                        M57504
.      CYCLE 9 CORE PERFORMANCE TECH. SPECS.                                                                          M58031 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                    M58067 C-16                  07/12/85 10CFR50.62 OPERATING REACTOR REVIENS                                                                          M59110 A-20                                                                                              I OCFR2.206 EQ OF ELECTRICAL EQUIPEMENT                                                                          M59253 REVIEN REQUEST FOR RELIEF FROM ASME CODE REQM'TS FOR                                                          M59538 MHM COMPLETED ISSUES MMM-I.D 1.1            DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                                            M51175 F-08                                                                  10/10/84C CASKIN SPENT FUEL POOL                                                                                        M55G'                                                                        10/26/84C ENVIRONMLNTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                                      M424.    "-60                08/29/81                                      12/13/84C REVISED DEFINITION OF CONTAINMENT INTEGRITY                                                                    M5344>                                                                      12/26/84C.
i    .P2! POSED CHANGE 105                                                                                            M55296  A-18                                                                12/26/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                    M54543 B-83                                                                  01/29/85C APP J TECH SPEC CHANGE                                                                                        M48632                                                                      02/04/85C FIRE PROTECTION.- EXTRA EXEMPTION REQUESTS                                                                    M53408                                                                      02/08/85C
    . MAINE YANKEE, NEUTRON SOURCE DATA FOR FLUX REDUCTION                                                          M55044'                                                                      02/14/85C SECOND ISI INTERVAL                                                                                            M52011                                                                      03/05/85C REVISED CONFIRMATORY ORDER                                                              .
M56818                                                                      03/06/85C
      .1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES                                                      M52770 B-76                                                                  04/24/85C                    i APPENDIX I TECH SPEC IMPLEMENTATION REVIEN                                                                    M07752 A-02                  03/15/79C                                      04/28/85C 4
CEA EJECTION ANALYSIS                                                                                          M56775        04/24/85        06/25/85C                                      06/26/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)                                                      M52241 . C-15                                                                06/28/85C MAINE YANKEE BACKFIT DETERMINATION TESTING FREQUENCY OF                                                        M58017                                                                      06/28/85C THERMAL SHIELD INSPECTION AND REPAIR                                                                          M54958                                                                      06/30/85C FIRE PROTECTION EXEMPTION FOR                                                                                  M48582                                                                      07/30/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                                                  M53130  B-81                                                                07/30/85C
,      LTOP TECHNICAL SPECIFICATION CHANGES (PC106)                                                                  M54959        06/22/84        09/30/84C                                      08/ 01/85C M56099                                                                      08/01/8 5C POWER SUPPLIES FOR SAFE SHUTDOWN                                                                                            04/01/85        06/15/85
:    NUREG-0737 II.B.3.2 POST ACCILENT SAMPLING MODIFICATIONS                                                      M44451  F-12 C9/06/84        05/20/85C                                      08/08/85C BACXFIT DETERMINATION-AFHS REQUIREMENTS FOR TURBINE DRIVEN                                                    M58016                                                                      08/26/85C
,                                                                      a l
m m  ,    w    _ -    e        n                            m w-                            c-              a  _ - - - - -
 
R-1208687-001                                                                                        REGULAT0RY        INF0RMATION                TRACKING          SYSTEM                          PAGE NO.'  100 C0NDENSED          MANAGEMENT                REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MCGUIRE 1 PLANT LOCATION: 17 MI N OF CHARLOTTE, NC                                                                              LICENSED PONER: 3411 MHT                    PROJECT MANAGER: D. HOOD PCCKET NUMBER: 050-00369                                                                                              DESIGN P0HER:    1180 MHE                    BRANCH CHIEF:        E. ADENSAM ARCH / ENGINEER: DUKE                                                                                                  NSSS VENDOR:    HEST                        LIC, ASSISTANT:      M. DUNCAN IE INSPECTOR:                                          H. ORDERS RAI                        SE TAC    MPA          RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                                                                                                NUMBER    11 2 ,. PAJE      DATE          DA]I        DATE        DATE umuu ACTIVE ISSUES Muww TS CHANGE FOR FIRE PUMP C                                                                                                            M57340                                                              09/13/85 ICE CONDENSER DOORS TECH. SPEC. 3/4.6.5.3                                                                                            M57673                                        N/A                  09/16/85 I.D.2. SAFETY PARAMETER DISPL AY SYSTEM                                                                                              M51254 F-09        05/15/85  08/15/85        N/A                  09/30/85
: EVALUATE LICENSEE JUSTIFICATION FOR LONGTERM OPERATION                                                                            M51610                        12/14/83C                            09/30/85 EVAL MCGUIRE RADI0 ACTIVE MAT'L DISPOSAL PROCEDURE PURSUANT                                                                          M55085                                                              09/30/85 TECHNICAL SPECIFICATION ON SNUBBER FUNCTIONAL TESTS - CHANGE                                                                        M57394                                                              09/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                                          M53687  B-86      05/01/85C 05/24/85C                              10/02/85 REVIEH 1984 FSAR UPDATE REGARDING NEH QUARRY NEAR SITE                                                                              M59208                                        N/A                    10/10/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                                          M58068  C-16                  07/17/86                              10/14/85 10CFR50.62 OPERATING REACTOR REVIENS - ATHS RULE                                                                                    M59111 A-20                                                          10/14/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                                                            M54398                                                              10/15/85 T.S. AMEND FOR COLD LEG ACCUMULATOR ISOLATION VALVE                                                                                  M56476                                                              10/15/85 TECH. SPEC. AMEND FOR COLD LEG ACCUMULATORS AND UHI                                                                                  M56873                                        N/A                    10/15/85 T.S. AMEND FOR ADMINISTRATIVE CONTROLS FOR SHIFT HORK AND                                                                            M56628                                                              10/17/85 ELEMINATE DOSE PROJECTIONS FOR TREATED EFFLUENTS - TECH SPEC                                                                        M56777              N/A                      N/A                    10/17/85 CONTAINMENT PRESS REANALYSIS FOR TECHNICAL SPECIFICATION                                                                            M57335                                                              10/17/85 T.S. AMEND FOR GROUNDHATER MCHITORING SYSTEM                                                                                        M56472                        07/15/85                              10/2S/85 EVALUATE TECH. SPEC. FOR REACTOR COOLANT SYSTEM VENT SYSTEM;                                                                        M55821                        04/15/85      '                        10/30/85 MSLB IN DOGHOUSE                                                                                                                    M59035                                                              10/31/85 REL AXATION OF RTS OUTAGE TIMES PER HCAP-10271                                                                                      M59320                                                              11/01/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR                                                                          M53131  B-81      02/22/85  05/24/85C                              11/15/85 DELETION OF TECH. SPEC. CONTAINMENT ISOLATION REQUIREMENTS &                                                                        M59241                                                              11/15/85 REPLACEMENT & REQUALIFICATION TRAINING PROGRAM - G.L. 84-14                                                                          M56962            07/24/85  09/24/85                              11/25/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                M55874  D-19                09/28/84                              12/00/85 EVALUATE REVISED IMPLEMENTATION DATE FOR LICENSE CONDITION                                                                          M53503                                                              12/01/85 TECH. SPEC. SURVEILLANCE INTERVAL FOR ICE CONDENSER DOORS                                                                            M59239                                                              12/02/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                                                                  M55720  A-18      04/25/85                                          12/05/85 REVIEN OF TECHNICAL SPECIFICATIONS (DPO)                                                                                            M55435            07/09/85  10/09/85                              12/09/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                                                      M52933 B-78        05/01/85C 05/24/85C                              12/16/85 TECH. SPEC. SURVEILLANCE H/ CLOSED REACTOR TRIP BREAKERS &                                                                          M57322                                                              12/17/85 REV. 8 TO PUMP AND VALVE INSERVICE TESTING PROGRAM                                                                                  M59336                                                              12/27/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                                                    M46316 F-68                                                          12/30/85 REACTOR COOLANT PUMP TRIP                                                                                                            M49653  G-01                  08/22/85C                              12/31/85 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                                                            M53078  B-80                                                        12/31/85 EVALUATE & APPROVE MCGUIRE UNIT 1 REV7 TO MCGUIRE PUMP &                                                                            M55392                                                              12/31/85 EVALUATE PROPOSED TECHNICAL SPECIFICATION FOR STANDBY                                                                                M55789                                                              12/31/85 INSERVICE INSPECTION PLAN REVIEH PER SSER 6 SECTION 5.2.3.1                                                                          M56682                                                              12/31/85 CONFORMANCE TO HYDROGEN CONTROL RULE (50 FR 34-98)                                                                                  M57945                                                              01/02/86 DG RELIABILITY, TESTING AND SURVEILLANCE                                                                                            M59263                                                              01/02/86
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING            SYSTEM                PAGE NO.*    101 C0NDENSED          MANAGEMENT            REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MCGNIRE 1 RAI              SE TAC    MPA        RAI    RESPONSE      TER  INPUT      LIC ACT lilLE                      .                                      [10% ER  &        pm          DATE      DM    _DAJ1        DATE unkt ACTIVE ISSUES MMMu        (CONTINUATION)
EVALUATE FIRE PROTECTION PROGRAM DEVIATIONS FROM APP R            M55615                                                    03/01/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH              M53014  B-79                                              04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53853  B-88                                              04/30/86 UHI DELETION                                                      M57649                                                    10/02/86 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG            M5tt04  A-17    11/28/85                                  12/00/86 JTEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52852  B-77    05/31/85                                  12/00/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54080  B-92                                              12/00/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55361  B-90    05/23/85                                  12/00/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX        M53918  B-89    05/15/85    08/15/86                      12/20/86 ITEMS 3.?.1 3 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53770  B-87                                              12/31/86 STATUS OF BI0 FOULING POTENTIAL; IE BULLETIN 81-03 UPDATE;        M57444          05/06/85                                  12/31/86 NUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46      .
M48177  F-58    06/30/86                                  01/31/87 ITEMS 4.5.2 3 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M53997  B-93    05/01/85; 05/24/85C                        01/31/87 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPPL. 1)        M59277  F-05                                              02/28/87 MN UNSCHEDULED ISSUES un CONTAINMENT INTEGRATED LEAK RATE INCREASE TECH. SPEC.              M59577 TECH. SPEC. INCREASE IN TIME TO RESTORE BORON CONC. IN C. L.      M59579 SUBSTITUTION OF TURBINE OVERSPEED RELIABILITY ASSURANCE            M59623 nwu COMPLETED ISSUES **w EVALUATE PROPOSED TECH. SPEC. SURV CHANGE RELATING TO I.C.        M52178                                                    10/05/84C EVAL T.S. CHANGES RELATED TO CONTAINMENT INTEGRITY                M52327                                                    10/05/84C EVALUATE APPLICATION FOR APPROVAL TO DISPOSE OF VERY LOH          M55306                                                    ft/02/F4C EVAL PROPOSAL ALLOHING UNIT OP LESS THAN OR EQ TO 46%          M52160                                                    12/10/84C EVALUATE GENERATOR TIME OVERCURRENT PROTECTION FOR EMERGENCY      M55787            N/A      10/26/84                      02/01/85C UNI (UNIT 2 RELOAD)                                                M56337            N/A                    N/A              02/06/85C EVALUATE ICCI TECH. SPEC. REVISIONS; REF: DUKE LTR. 7/31/84      M55517  F-26                            N/A              02/28/85C TECH. SPEC. AFH FREQUACY                                          M56478                                                    03/01/85C 612)                                                              M47127 C-10    02/03/81    02/22/85  08/31/82          05/12/85C CONTROL OF HEAVY 10 ADS - PHASE II (FOLLOHUP OF MPASC-10)          M52242 C-15                                              03/12/85C EVALUATC DUKt TOPICAL NO. DPC-NF-2010 " NUCLEAR PHYSICS          M55470          10/ 31/84C 12/19/84C    N/A              03/13/8 5C EVAL. TECH. SPEC. SURV. REQ'T CHANGE RELATING TO S/G              M55970                                  N/A              0 3/18/85C TYPOS, CONSISTENCY HITH UNIT 2                                    M56494            N/A                    N/A              03/22/85C RELIEF REQUEST ASME CODE SECTION XI, SNUBBER TESTING; REF:        M54882                      01/17/8 5C                    03/26/85C EVALUATE PROPOSED PIPING SEISMIC ANALYSIS USING PVRC              M55566          08/01/84    12/20/84                      04/08/85C CYCLE 3 RELCAD AMENDMENT                                          M56746            N/A                    N/A              05/15/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND              M52771  B-76                          12/12/84            05/30/85C M53604  B-85    05/01/85C 05/24/85C                        06/21/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY              F-57                                              06/26/85C NUREG 0737, II.K.3.30. SB LOCA METHODS                            M58041 M53179  B-82                                              07/00/85C ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                                                                  07/26/85C OL AMENDMENT TO STORE OCONEE SPENT FUEL                          M57316 HEDS'S FROM DCRDR
 
==SUMMARY==
REPORT, (I.D.1.2), TAC M56136          M57094          03/01/85C 05/03/85C                        08/06/85C
 
l I
R-1208687-001                  REGULAT0RY          INF0RMATIoN                  TRACKING          SYSTEM                        PAGE NO. 102 C0NDENSED            MANAGEMENT                REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY -MCGUIRE 2 PLANT LOCATION: 17 MI N OF CHARLOTTE, NC            LICENSED POWER: 3411 MHT                      PROJECT MANAGER: D. HOOD DOCKET NUMBER: 050-00370                            DESIGt4 POWER:    1180 MHE                  BRANCH CHIEF:      E. ADENSAM ARCH / ENGINEER: DUKE                                NSSS VENDOR:      HEST                        LIC. ASSISTANT 8 M. DUNCAN IE INSPECTOR:      H. COTTLE RAI                      SE TAC      MPA        RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                              NUMBER    &        MIf,        DATE        DAJE        DATE        DATE MMMd ACTIVE ISSUES muum TS CHANGE FOR FIRE PUMP C                                          M57341                                                            09/13/85 ICE CONDENSER DOORS TECH. SPEC. 3/4.6.5.3                          M57674                                      N/A                    09/16/85
: EVALUATE LICENSEE JUSTIFICATION FOR LONGTERM OPERATION          M51609                        12/14/85C                            09/30/85 EVAL MCGUIRE RADIDACTIVE MAT'l DISPOSAL PROCEDURE PURSUANT          M55086                                                            09/30/85 TECHNICAL SPECIFICATION ON SNUBBER FUNCTIONAL TESTS - CHANGE        M57395                                                            09/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53688    B-86  0 5/ 01/8 5C 05/24/85C                            10/02/85 REVIEH 1984 FSAR UPDATE REGARDING f4EH QUARRY NEAR SITE            M59209                                      N/A                    10/10/85 UTILITY RESPONSES TO STAFF RECONMENDATIONS CONCERNING STEAM        M58069    C-16                07/17/85C                            10/14/85 10CFR50.62 OPERATING REACTOR REVIENS - ATHS RULE                    M59112 A-20                                                        10/14/85 T.S. AMEND FOR COLD LEG ACCUMULATOR ISOLATI0t1 VALVE                M56477                                                            10/15/85 TECH. SPEC. AMEND FOR COLD LEG ACCUML ATORS AND UHI                  M56874            N/A                      N/A                    10/15/85 T.S. AMEND FOR ADMINISTRATIVE CONTROLS FOR SHIFT HORK AND            M56629                                                            10/17/85 ELEMIt4 ATE DOSE PROJECTIONS FOR TREATED EFFLUENTS - TECH SPEC      M56778            N/A                      N/A                    10/17/85 CONTAINMENT PRESS REANALYSIS FOR TECHNICAL SPECIFICATION            M57536                                                            10/17/85 T.S. AMEND FOR GOUNDHATER MONITORING SYSTEM                        M56473                        07/15/85                            10/25/85 EVALUATE TECH. SPEC. FOR REACTOR COOLANT SYSTEM VENT SYSTEMr        M55822                                                            10/30/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51255 F-09      05/15/85C 08/15/85                                10/31/85 MSLB IN DOGHOUSE                                                    M59006          09/04/85C                                        10/31/85 CONFORMANCE TO HYDROGEN CONTROL RULE (50 FR 34-98)                  M57946                                                            11/01/85 RELAXATION OF RTS OUTAGE TIMES PER HCAP-10271                        M59321                                                            11/01/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR          M53132    B-81  02/22/85C 05/24/85C                              11/15/85 DELETION OF TECH. SPEC. CONTAINMENT ISOLATION REQUIREMENTS &        M59242                                                            11/15/85 REPLACEMENT & REQUALIFICATION TRAlf3ING PROGRAM - G.L. 84-14        M56963          07/24/85C 09/24/85                                11/25/85 NUREG-0737, III.A.2.2, METEOROLOGICAL DATA UPGRADE (REF:            M53287    F-68                                                    11/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55875    D-19                09/28/84                            12/00/85 TECH. SPEC. SURVEILLANCE INTERVAL FOR ICE CONDENSER DOORS            M59240                                                            12/02/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                  M55721    A-18                04/25/85                            12/05/85 REVIEH OF TECHNICAL SPECIFICATION (DPO)                              M55456          07/09/85    10/09/85                            12/09/85 ITEMS 3.1.1 & 3.1.2 - POST MAIt3TEtJANCE TESTING                    M52934 B-78                  05/24/85C                            12/16/85
  ' TECH. SPEC. SURVEILLANCE H/CLOSEU REACTOR TRIP BREAKERS 8          M57323                                                            12/17/85 REV. 4 TO PUf1P AND VALVE INSERVICE TESTING PROGRAM                  M59337                                                            12/27/85 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED            M53079    B-80                                                    12/31/85 REACTOR C00LAt4T PUMP TRIP (REF: TACs 49653)                        M53290    G-01                08/22/85C                            12/31/85 EVALUATE & APPROVE MCGUIRE UNIT 2 REV3 TO MCGUIRE PUMP &            M55593                                                            12/31/85 EVALUATE PROPIMED TECHNICAL SPECIFICATION FOR STANDBY                M55790              ,                                            12/31/85 INSERVICE INSPECTI0tt PLAN REVIEH PER SSER 6 SECTION 5.2.3.1        M56683                                                            12/31/85 UHI DELETION                                                        M57650                                                            01/02/86 DG RELIABILITY, TESTING AND SURVEILLANCE                            M59264                                                            01/02/86 II.D.1 - RV & SV TESTIt4G                                            M54601    F-14  03/11/85C 06/12/85C                              01/06/86
 
R-1208687-001                        REGULAT0RY        INF0RMATION              TRACKING          SYSTEM                  PAGE NO.s    103 C0NDENSED          MANAGEMENT            REPQRT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MCGUIRE 2 RAI                SE TAC    MPA        RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                                IMiaM    E        MIX        DATE        MIX  .DATE        DATE unum ACTIVE ISSUES unuw            (CONTINUATION)
EVALUATE FIRE PROTECTION PROGRAM DEVIATIONS FROM APP R              M55616                                                    03/01/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M55015  B-79                                              04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53854  B-88                                              04/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG              M51105  A-17  11/28/85                                  12/00/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52853  B-77  05/31/85                                  12/00/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54081  B-92                                              12/00/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND          M55362  B-90  05/23/85                                  12/00/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53771  B-87                                              12/16/86 i
ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX          M53919  b-89  05/15/85    08/31/86                      12/20/86 STATUS OF BI0 FOULING POTENTI AL s IE BULLETIN 81-03 UPDATE          M57445          05/06/85                                  12/31/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M53998  B-93  05/01/85C 05/24/85C                        01/31/87 NUREG 0737. II.K.3.51, COMPLIANCE WITH 10 CFR 50.46                  M57576  F-53  06/30/86                                  01/31/87 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)            M55340  F-05  06/30/86                05/30/86          03/28/87 MM UNSCHEDULED ISSUES **
NUREG-0737 III.A.1.2 TECHNICAL SUFPORT CENTER                        M59566  F-63 NUREG-0737 III.A.1.2 OPERATIONAL SUPT CENTER                        M59567  F-64 NUREG-0737 III.A.1.2 EMERGENCY OPERATIONS FACILITY                  M59568  F-65 CONTAINMENT INTEGRADED LEAK RATE INCREASE TECH. SPEC.                M59578 TECH. SPEC. INCREASE IN TIME TO RESTORE BORON CONC. IN C. L.        M59580 SUBSTITUTION OF TURBINE OVERSPEED RELIABILITY ASSURANCE              M59624 l
MMM COMPLETED ISSUES MMM EVALUATE PROPOSED TECH. SPEC. SURV CHANGES RELATING TO I.C          M52179                                                    10/05/84C EVAL T.S. CHANGES RELATED TO CONTAINMENT INTEGRITY                  M52330                                                      10/05/!4C EVALUATE APPLICATION FOR APPROVAL TO DISPOSE OF VERY LOW            H55307                                                      11/02/84C EVAL PROPOSAL ALLOHING UNIT OP LESS THAN OR EQ TO 46%            M52159                                                    12/10/84C EVAL GENERATOR TIME OVERCURRENT PROTECTION FOR EMERGENCY            M55788                      10/26/84    N/A              02/01/85C UHI                                                                M56495            N/A                    N/A              02/06/85C EVALUATE ICCI TECH. SPEC. REVISIONS REF: DUKE LTR 7/31/84          M55518  F-26                            N/A              02/28/85C TECH. SPEC. AFH                                                    M56479                                                    0 3/ 01/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA8C-10)            M52243 C-15                                                03/12/85C EVALUATE DUKE TOPICAL NO. DPC-NF-2010 " NUCLEAR PHYSICS            H55471          10/ 31/84C 12/19/84      N/A              03/13/8 5C EVAL. TECH. SPEC. SURV. REQ'T CHANGE RELATING TO S/G                M55971                                    N/A              03/18/85C RELOAD CYCLE 2                                                      M56336                                                    03/22/85C RELIEF REQUEST ASME CODE SECTION XI, SNUBBER TESTING: REF:          M54883                      01/17/85C                      05/26/85C M55567          08/01/84    12/20/84                      04/08/85C EVALUATE PROPOSED PIPING SEISMIC ANALYSIS USING PVRC                                                                          04/19/85C REINSTATE PRE-AMEND 35 TECH. SPECS. ON RERACK UNTIL 3RD            M56736 TECHNICAL SPECIFICATION AMENDMENTS FROM UNIT 1 RELOAD (SG          M56747            N/A                    N/A              05/15/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                M52772  B-76                                              05/30/85C ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR        H53180  B-82                                              06/00/85C M53605    B-85  05/01/85C 05/24/85C                        06/21/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY NUREG 0737, II.K.3.30. SB LOCA METHODS                              M58042 F-57                                                06/26/85C
 
R-1208687-001                REGULAT0RY            INF0RHATION              TRACKINO            $YSTEM            PAGE NO.                            104 C0NDENSED          MANA0EMENT              REP 0RT                  RUN DATE: 09/17/85 (NEADQUARTERS)
FACILITY: MCGUIRE 2 RAI          SE TAC  MPA        RAI    RESPONSE    TER INPUT      LIC ACT TITLE                                                              11 UMBER &        RAIE          DATE  DAJE  DATE              DATE D04 COMPLETED ISSUES MMM    (CONTINUATION)
NUREG 0737. II.K.3.30, SB LOCA METHODS                            M58142 F-57                                          06/26/85C OL AMENDMENT TO STORE OCONEE SPENT FUEL                            M57317                                                07/26/85C HED'S FROM DCRDR
 
==SUMMARY==
REPORT, (I.D.1.D), TAC M56136            M57095        03/ 01/8 5C 05/05/85C                  08/06/85C
 
R-12086?7-001                          REGULAT0RY        INF0RMATION                      TRACKING              SYSTEM                            PAGE NO.      105 C0NDENSED          MANAGEMENT                    REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MILLSTONE 1 PLANT LOCATION: 5 MI SH OF NEH LONDON, CONN              LICENSED POWER: 2011 MHT                              PROJECT MANAGER: J. SHEA DOCKET NUMBER: 050-00245                                  DESIGN P0HER          0660 MWE                      BRANCH CHIEF:      J. ZHOLINSKI ARCH / ENGINEER: EBASCO                                  NSSS VENDOR:          GE                            LIC. ASSISTANT: C. JAMERSON IE INSPECTOR:        T. SHEDLOSKY                                                                                                          SE RAI TAC      MPA        RAI        RESPONSE      TER      INPUT            LIC ACT TITLE                                                                    fM11LR          IfL      Mlf            DATE      DME          DATE                DATE unum ACTIVE ISSUES MMMM 1 Y.S. CHANGES TO MEET FINAL RULE ON ENVIR QUAL to CFR 50.49            M51698                              02/11/8 5C 07/02/85                          08/15/85 M57266                                                                          09/01/85 ANCHORAGE / SUPPORT GAS TURBINE BATTERY RACK & STRIP RECORDER                                                                                              09/01/85 REACTOR VESSEL SURVEILLANCE PROGRAM                                      M57464 M51961                              05/29/85C 04/15/85                          09/15/85 ALTERNATIVE APPENDIX I TECH. SPEC. REVIEH                                M57655                              08/15/85                                    09/15/85 PROVIDE SEPARATE SER THAT ENCOMPASSES THE PREVIOUS SER & NEH                                                  08/15/85                                    10/15/85 SAFETY FACTOR FOR PENETRATION X-10A                                      M49290 M56741                            09/30/85                                    10/15/85 VACUUM BREAKERS                                                                                  11/15/84    08/07/85C                                    10/30/85 1 EXEMPTION REQUESTS - FIRE PROT APP.R RULE                              M48664 M57261                                                                          11/01/85 ISAP NEAR TERM                                                            M55722      A-18                  07/09/85C                                    12/01/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                        M11221                              09/01/72C                                  12/12/85 CONVERSION POL TO FTOL                                                                          10/15/84                                                  12/15/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                M54545 B-83                        10/15/85 M44315 F-05          09/07/84C 07/30/85        07/ 01/84C                      12/31/85 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                  M51702                              12/12/85                                    01/15/86 DEGRADED GRID VOLTAGE PROCEDURES                                          M52935 B-78                                                                    01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                            M53445                            03/15/85C                                  02/05/86 PESPONSE TO GEN LTR 81-54 RE MPA B-65                                      M42913    B-59      07/22/85C                                                02/15/86 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                        M53606    B-85                                                                02/15/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                M56840                                                                        03/30/86 NEH ATHS RULE 10CFR50.62                                                  M51106    A-17      04/22/85      07/22/85    10/22/85                        07/01/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                    M51256      F-09                  08/06/86                                    10/12/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                    M45958    F-63    08/10/86                                                  11/12/86 NUREG-0737 III.A.I.2, TECHNICAL SUPPORT CENTER                                                                                                            02/10/87 NUREG-0737 III.A t.2, OPERATIONAL SUPPORT CENTER                            M46029      F-64    08/10/86 NUREG-0737 III.A.t.2, EMERGENCY OPERATIONS FACILITY                        M46101      F-65  08/10/86                                                  02/10/87 NUREG-0757 III.A.2.2, METEOROLOGICAL DATA UPGRADE                          M46317      F-68  08/10/86                                                  02/10/87 M51176      F-08                  03/02/87                                    07/10/87 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                M56138      F-71                  03/02/87  01/02/87                        07/10/87 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -
um UNSCHEDULED ISSUES MM FAULT TRANSFERS M49384 M49385 ELECTRICAL ISOLATION                                                        M49386 GRID SEPARATION PROCEDURES                                                  M49387 EMERGENCY P0HER                                                            M49780
,                            FLOODING CHON-STRUCTURAL)                                                  MS2854 B-77 1                            ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                M53016      B-79 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                      M53689      B-86 ITEM 2.2 - EQUIPMENT CL ASSIFICATION AND VENDOR INTERFACE -                M53772    B-87 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND
 
R-1208687-001                  REGULAT0RY            INF0RMATION              TRACKING          SYSTEM                PAGE N0.8  106 C0NDEN5ED            MANAGEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MILLSTONE 1 RAI              SE TAC    MPA        RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                              Eyggg    &        pME        DATE      Dalf  DATE        DATE nu UNSCHEDULED ISSUES um      (CONTINUATION)
ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53855  B-88 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M55999  B-93    03/05/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54082  B-92 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55876  D-19              02/04/85C MAINTENANCE AND SURVEILLANCE PROGRAM PLAN (MSPP)                    M57768 LIMITING OVERTIME TECH. SPEC. CHANGE                                M57845 SALP 1985/1986                                                      M57846 PLANT SPECIFIC ANALYSIS OF DBA P/T PROFILE                          M57904 10CFR50.62 OPERATING REACTOR REVIENS                                M59113 A-20 CONTAINMENT PURGE AND VENT                                          M59196 FIRE PROTECTION AUDITS                                              M59488 RELOAD 10                                                            M59548 mum COMPLETED ISSUES WMM NUREG-0737, II.K.3.16. CHALLENGES AND FAILURES OF RELIEF            M46533 F-46                                              10/18/84C RECIRCULATION LOOP DECONTAMINATION                                  M34693                                                  10/25/84C SUBC00 LED POST DBLOCA RADIOLYSIS                                    M48229                                                  11/01/84C SUBC00 LED POST DBLOCA RADIOLYSIS                                    M48293                                                  11/01/84C NUREG 0737 II.K.3.28. VERIFY QUALIFICATION OF ACCUMULATORS          M48280 F-55              08/01/84                      11/29/84C INSPECTION OF BNR STAINLESS STEEL PIPING ACCORDING TO                M55602 B-84                                              12/16/84C REVIEH FINAL ENVIRONMENTAL STATEMENT UPDATE                          M49488                    12/01/84                      12/17/84C 1 RESPONSE TO NRC 6/8/83 LETTER OPTION ON II K.3.18                H51795                                                  01/08/85C
: 1. IREP - REPORT EVALUATION - NNECO FEEDBACK BY 7-1-83              M5 tS81                    12/12/84                      01/25/85C INTEGRATED SAFETY ASSESSMENT PROGRAM                                H53294                                                  02/06/85C 1: REVIEH RESPONSE TO GE SIL-402 DRYHELL VENT HEADER                M54491          10/05/84  04/13/84                      02/21/85C LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)                  M42612  B-24  02/27/85C 04/27/85                      02/25/85C NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY            M44863  F-19    12/15/84  02/27/85C                    02/25/85C IPSAR SUPPLEMENT                                                    M49786                                                  02/25/85C PREPARE SER CONSIDERING LICNESEE COMMENTS & IREP-REPORT.            M51305                                                  02/28/85C REVIEW NEED FOR SCRAM DISCHARGE VOLUME DIVERSE LEVEL                M51559                                                  03/06/85C OCCUPATIONAL DOSE REDUCTION BNL                                      M53435                                                  03/12/85C NUREG-0757 I.C.1.2.A,      INADEQUATE CORE COOLING GUIDELINES        M44245  F-04                                            03/26/85C NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION        M45147  F-26              03/15/85                      03/26/85C REQUEST FOR SCHEDULAR EXTENSION OF EQUIPMENT QUALIFICATION          M57097                                                  03/28/85C MARK 1 DRYHELL VACUUM BREAKERS. LICENSEE RESPONSE TO GENERIC        M57158  D-20                                            04/02/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                  M52773  B-76                          12/12/84          04/05/85C CEQUEST FOR EXEMPTION FROM 10CFR50.71(E) FSAR UPDATE                M56898                                                  04/11/85C REPORTING SAFETY AND RELIEF VALVE FAILURES - II.K.3.3(F-38)          M57657  F-38                                            05/00/85C CONTAINMENT LEAK TESTING - APPENDIX J (GENERIC)                      M10137  A-04              12/07/84C                    05/10/85C INSERVICE TESTING (IST)                                              M11210                                06/00/83C          05/22/85C CONTAINMENT LEAK RATE CONTINUOUS MONITORING                          N07426          04/01/85  05/19/85C                    05/30/85C SALP 1984                                                            M53349                                                  06/04/85C FORTY EIGHT HOUR OPERATION HITHOUT INSERTING                        M57647                                                  06/05/85C NUREG 0737 ITEM II F1.6 CONTAINMENT HYDROGEN MONITOR                M47754 F-25    02/25/85  07/30/84C 09/30/84            06/24/85C
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKINO        SYSTEM            PAGE N0.8  107 C0NDENSED          MANAOEMENT          REPORT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MILLSTONE 1 RAI          SE TAC    MPA      RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                            NVMBER  lEL,    DAIX      DATE  DAll  DATE        DATE nuu COMPLETED ISSUES Mhw      (CONTINUATION)
CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)        M52244 C-15            01/14/85C                06/28/85C ORDER MODIFICATION RE: CONTROL ROOM HABITABILITY                M56319                  11/07/84C                07/01/85C REVISE MARCH 14, 1983 ORERS                                      M56742                                          07/01/85C ENVIRONMENTAL QUALIFICATIONS OF SAFETY RELATED ELECTRICAL        M42523 B-60            07/05/85                07/30/85C CHANGE TECH. SPEC. TO REMOVE TRAINING SUPERVISOR FROM TECH.      M57216                                          08/06/85C IGSCC ISI FOR RELOAD 10 SCHEDULED FOR 10/85                      M57729                  07/01/85C                08/14/85C HNECO REQUEST FOR ADDITIONAL RELIEF FROM ASME CODE SECTION      M57103                                          08/22/85C H2 MONITOR TMI II.F.1.6                                          M59199                  08/30/85C                10/15/85C
 
  .. - . .- -                - -      - - -      . _ . - _ .            -. ~ -            .-.- .-. . . - - .----- .                                - --            -      -  -.            .
R-1208687-001                    REGULAT0RY                      INF0RMATION                            TRACKING          SYSTEM                          PAGE NO.I    108 C0NDENSED              MANAGEMENT                      REPQRT                                RUN DATE: 09/17/85
;                                                                                            (HEADQUARTERS)
FACILITY: MILLSTONE 2 PLANT LOCATION: 5 MI SH OF NEN LONDON, CONN                      LICENSED POWER: 2700 MHT                              PROJECT MANAGER: D. OSBORNE DOCKET NUMBER: 050-00336                                          DESIGN POWERS              0870 MHE                  BRANCH CHIEF:        E. BUTCHER ARCH / ENGINEER: BECH                                              NSSS VENDOR:              COMB                      LIC. ASSISTANT: P. KREUTZER
,                  IE INSPECTOR      T. SHEDLOSKY RAI                        SE TAC        MPA      RAI    RESPONSE        TER        INPUT          LIC ACT
;                TITLE                                                                                  NUMBER          &        DAlf        DATE        DAlf          DATE          DATE muun ACTIVE ISSUES NMwW EXEMPTION FROM APP. R. IIIG TECHNICAL                                              M48642        B-41              O t/31/85C                              07/30/85          ,
REVIEH ALTERNATIVE APPENrIX I TECH SPECS -                                            M49558                          03/22/85C                              08/30/85            '
FOLLOHUP AMENDMENT OF IST PROGRAM RELATIVE TO PUMPS AND                                M51574                          01/15/85C                              08/30/85 EDDY CURRENT TEST RESULTS ON STEAM GENERATOR TUBES                                    M57598                                                                  08/30/85 TECH. SPEC. CHANGE RE STEAM GENERATOR TUBE INSPECTION                                  M52339                06/20/84  08/01/85                                09/01/85 REVIEH OF ASYMMETRIC LOCA LOADS                                                        N08949        D-10              10/07/81C                              09/15/85 4
NUREG-0737 II.E.4.2. CONTAINMENT ISOLATION DEPENDABILITY                              M44864        F-19              08/30/85                                09/30/85 DEGRADED GRID VOLTAGE PROCEDURES                                                      M51701                          06/30/84C                              09/30/85 TECH. SPEC. CHANGES ON FIRE PROTECTION                                                M57809                                                                  09/30/85 CORRECTION OF TYP0 GRAPHICAL ERROR                                                    M59254                                                                  09/30/85          1 4
PROCEDURES GENERATION PACKAGE REVIEW (HUREG 0737 SUPP/t)                              M44316        F-05  09/05/84C 01/30/85C 04/18/84C                      10/30/85 l
RV AND SV TESTING                                                                      M44595        F-14  11/30/84  06/tt/85C                                10/30/85 EXEMPTION FROM APPENDIX R. ALTERNATE SAFE SHUTDONN                                    M48643                06/30/85  05/25/83C                              10/30/85          -
ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                          M53133          B-81              01/30/85C                              10/30/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54083          B-9"                                                      10/30/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                            M58070 C-16                      06/25/85C                              11/01/85 SPENT FUEL POOL MOD.                                                                  M59294                            08/19/85C                              11/01/85 TECH. SPris. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                    M55723 A-18                      bl/15/85C                              11/30/85 ELIMINATIuN OF BATTERY SERVICE TEST HHEN DISCHARGE TEST IS                            M58013                                                                    11/30/85 ADMINISTRATIVE CONTROLS ON FACILITY STAFF OVERTIME                                    M59258                                                                    11/30/85 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                                M51107          A-17  06/30/85              08/15/85                    12/03/85 10 YEAR INSERVICE INSPECTION AND TESTING PROGRAM                                      M59265                            09/Ot/85C                              12/15/85 CYCLE CONFIRMATORY SUBMITTALS                          .
M54199                            10/30/85                                12/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                            M54546          B-83              08/31/85                                12/30/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                  M53017          B-79                                                      12/31/85 NUREG-0737 II.K.3.30, SB LOCA DUTLINE                                                  M45840 F-57                      12/31/8tC                              01/30/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M52855 B-77                      06/30/85C                              01/30/86
              -ITEMS 3.t.1 & 3.1.2 - POST MAINTENANCE TESTING                                          M52936 B-78                                                              01/30/86 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                              M53080          B-80                                                      01/30/86
.                ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                            M53607          B-85                                                      04/30/86            .
i                ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                            M53920          B-89  05/15/85                                          10/15/86            !
I.D 2. SAFETY PARAMETER DISPLAY SYSTEM                                                M51257          F-09                                                      10/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                M53856          B-88                                                      10/30/86 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                          M56t39          F-71              09/30/86  05/26/85                    12/3C/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                M53773          B-87                                                      12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M53690          B-86              06/30/85C                              01/30/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                          M54000          B-93  04/17/85C 07/30/85                                01/30/87 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                            M45148          F-26            05/30/85C                                02/15/87 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                                      M48179 F-58                                                              06/01/87 I
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING          SYSTEM              PAGE NO.*  109 C0NDENSED          MANAGEMENT          REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MILLSTONE 2 RAI            SE TAC    MPA      RAI      RESPONSE    TER  INPUT      LIC ACT TITLE                                                            HW1318  lHL    DAlf        DATE    DAIL  _pM1        DATE unnu ACTIVE ISSUES Munu      (CONTINUATION)
NUREG-0737 III . A.2.2, METEOROLOGICAL DATA UPGRADE              M46318  F-68            12/15/80C                    06/31/87 l      utt UNSCHEDULED ISSUES M*
;      NUREG-0737 III.A.t.2. TECHNICAL SUPPORT CENTER                    M45959  F-63            06/05/81C l      NUREG-0737 III.A.t.2. OPERATIONAL SUPPORT CENTER                  M46030  F-64            06/03/81C l
r EXEMPTION FROM APP.R III G, SCHEDULAR                          M48644 REACTOR COOLANT PUMP TRIP                                        M49658  G-Of            05/30/85C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 0737 ITEM II.B.1        M54399 10CFR50.62 OPERATING REACTOR REVIENS                            M59114 A-20 FIRE PROTECTION AUDITS                                            M59489 MNu COMPLETED ISSUES num STEAM GENERATOR LEAK RATE DETECTION                              M54741                  06/12/84C                    01/28/85C CONTAINMENT PENETRATION OUTAGE EQUIPMENT HATCH DOOR              M56458                                                02/12/85C SPENT FUEL POOL MODIFICATION                                      M54671                                                02/19/85C FUEL LEAKAGE                                                      M55219        10/18/84C 02/19/85C                    02/19/85C USE OF AiME CODE CASE N-416                                      M57497                                                03/14/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42493  B-60            02/18/82C                    03/20/85C CHANGE TECH. SPEC. TO REMOVE TRAINING SUPERVISOR FROM TECH.      M57215                                                04/02/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42894  B-59            01/03/85C                    04/17/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN      M51177  F-08                                          05/23/85C RELOAD CYCLE 7 ANALYSIS                                          M56814                    05/15/85C                  06/19/85C CONTROL ROOM HABITABILITY MODIFICATIONS                          M57263                                                06/19/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPASC-10)          M52245 C-15                                          06/28/85C TECHNICAL SPECIFICATION FOR LIMITING OVERTIME                    M55328                    06/30/85C                  07/09/85C ITEM 1.t - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52774  B-76  04/03/85C 05/30/85C 01/30/85          07/10/85C ADMINISTRATIVE CHANGE TO ECCS SUBSYSTEMS                          M57423                                                08/02/85C ADMINISTRATIVE CHANGE TO FLOOD LEVEL                              M57424                                                08/02/85C SURVEILLANCE REQUIREMENTS FOR DIESEL GENERATOR TESTING          M57425                                                08/02/85C ADMINISTRATIVE CHANGE TO RADI ATION MONITORING                  M57426                                                08/02/85C DELETION OF CYCLE 5 SPECIFIC FOOTHOTES                          M57427                                                08/02/85C ORGANIZATIONAL CHANGE TO TECH. SPEC.                            M57174                                                08/06/85C tDMINISTRATIVE CHANGE TO TECH. SPEC. FOR ENVIRONMENTAL          M57512                                                08/12/85C l      DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)            M55877  D-19              02/04/85C                  09/06/85C
 
. _ _ _ _ _ _ _ . _ _ _ _                        _              . _m                              .      . _ _              ..                      _ _                    ._ _
R-1208687-001                    REGULAT0RY          INF0RMATION                TRACKINO            SYSTEM                      PAGE NO. 110 C0NDENSED        MANAGEMENT                  REPQRT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: MONTICELLO PLANT LOCATION: 30 MI NH OF MINNEAPOLIS. MINN        LICENSED POWER: 16 7 0 MHT                    PROJECT MANAGER: R. AULUCK DOCKET NUMBER: 050-00263                            DESIGN POWER:    0545 MHE                    BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER : BECH                              NSSS VENDOR:      GE                          LIC. ASSISTANT:    S. NORRIS IE INSPECTOR:      C. BROHN RAI                    SE TAC    MPA            RAI  RESPONSE      TER      INPUT      LIC ACT TITLE                                                              NUMBER    [L          MIf        DATE      MIX          DATE        DATE unna ACTIVE ISSUES unnu SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BNR SCRAM      M43720    B-65                                                      09/30/85 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                M52775    B-76                                                      09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52856    B-77                                                      09/30/85 I T EMS 3.1.1 & 3.1. 2 - POST MAINTENANCE TESTING                  M52937    B-78                                                      09/30/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54084    B-92                                                      09/30/85 REVIEH OF LICENSEE'S RESPONSE TO UNRESOLVED FIRE PROTECTION        M48648                                                              10/15/85 JET PUMP OPERABILITY                                              M49158                                                              10/15/85 SCREEN HASH / FIRE PUMP                                            M49931                                                              10/15/85 TURBINE BYPASS VALVES                                              M49787                                                              10/30/85 FEEDHATER/ TURBINE TRIP INSTRUMENTATION                            M49788                                                              10/30/85 MAXIMUM ALLOHABLE LEAKAGE RATE INCREASE L A                        M49934                                                              10/30/85 REVIEH OF SURVEILLANCE TECH RPT ON REACTOR VESSEL RADIATION        M52435                                                              10/30/85 FUEL ENRICHMENT LIMITS                                              M57630                                                              10/30/85 STATION BATTERY SYSTEM                                              M51335                                                              11/30/85 PURGE 8 VENT TECH SPEC FOLLONUP                                    M55398                                                              11/30/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55724 A-18                                                        11/30/85 LER REPORTING (GL 83-43)                                            M55930                                                              11/30/85 CONTROL ROOM TECHNICAL SPECIFICATION                                M56977                                                              11/30/85 COMBUSTIBLE GAS CONTROL SYS (SECTION 50-44)                        M57629                                                              11/30/85 ADMINSTRATIVE CHANGES                                              M57652                                                              11/30/85 ISI/IST PROGRAM-SECOND TEN YEAR INTERVAL                            M46510                                                              12/01/85 S/R VALVE SIMMER MARGIN IMPROVEMENT                                M59437                                                              12/10/85 REVISED LICENSE AMENDMENT ON SINGLE LOOP OPERATION                  M48646                                                              12/30/85 CLARIFICATION OF RADIATION MONITORING REQUIRMENT                    M55800                                                              12/30/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        M56140    F-71                07/31/85  09/02/85                  12/31/85 MARK 1 DRYHELL VACUUM BREAKERS. LICENSEE RESPONSE TO GENERIC        M57159    D-20                                                    03/31/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53608    B-85                                                    04/01/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53857    B-88                                                    04/30/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M54001    B-93      04/23/85C                                    09/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                      M4596 0  F-63                                                      11/30/86 NUREG-0737 III.A.1.2. OPERATIONAL SUPPORT CENTER                    M46031    F-64                                                      11/30/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46103    F-65                                                      11/30/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                M53018    B-79                                                      12/01/86 PROCEDURES GENERATION PACKAGE REVIEH (HUREG 0737 SUPP/1)            M44517    F-05      11/30/85              10/30/85                12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53774    B-87                                                      12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53691    B-86                                                    01/01/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46319    F-68                                                    01/10/87 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN          M51178    F-08                12/28/83  02/03/84                01/30/87
                      'NUREG-0737 II.F.2.5, INADEQUATE CORE COOLING INSTRUMENTATION          M45149    F-26                                                    09/31/87
 
                                                                                                                                                          .  - _ _ _ . _ _ _ - _ _ - - ~ ~ _ . -
i
;                    R-1208687-001                  REGULAT0RY                              INF0RHATION' TRACKING                                      SYSTEM                                          PAGE NO. 111 i                                                                  C0NDENSED                                        MANAGEMENT              REP 0RT                                              RUN DATE: 09/17/85 (HEADQUARTERS) i FACILITY: MONTICELLO RAI                                        SE                          i TAC    MPA    RAI    RESPONSE                TER                INPUT      LIC ACT          ;
TITL E                                                                                                  NUMJER  &      DAll        DATE            RAlg                      DATE        DATE unna ACTIVE ISSUES mwmu        (CONTINUATION)
DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                    M55878 D-19                                                                    12/30/87            i
,                    I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                M51258 F-09            12/31/84C          N/A                                  03/30/88 um UNSCHEDULED ISSUES un i
INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                                                M51104 A-17 EXEMPTION REQUEST FROM FIXED SUPPRESSION IN THE CONTROL ROOM                                          M51338 l                    REVISED LICENSE AMENDMENT ON ENVIRONMENTAL TECHNICAL                                                    M51785                                                                                            's I
INSERVICE INSPECTION AND TESTING PROGRAM AND RELIEF REQUESTS                                          M57631 10CFR50.62 OPERATING REACTOR REVIENS                                                                  M59115 A-20
^
unu COMPLETED ISSUES MMM RHR INTERTIE LINE ADDITION                                                                            M55211                                                                          10/31/84C NYBRID I CONTROL RODS                                                                                  M55673                                                                          11/02/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAT URES OF RELIEF                                                M45598  F-46 04/03/84C 06/12/84C                                                11/13/84C EXEMPTION ON SNIFT STAFFING RULE                                                                      M53561                                                                          11/14/84C          i REVIEN OF MODIFICATIONS ON SRV LOH-LOW SE. POINT                                                      M52086                                                                          11/16/84C ARTS                                                                                                  .M55210                                                                          11/16/84C LOH-LON SETPOINT TECH SPECS                                                                            M55758                                                                          11/16/84C ALTERNATE ROD INJECTION                                                                                M49101                                                                          11/26/84C DEGRADED GRID VOLTAGE TECH. SPECS.                                                                    M55615                                                                          11/27/84C-ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                              M42475  B-60 05/07/84C 05/31/84                                                12/13/84C 1                    737 TECH SPECS                                                                                        M51685  B-72                                                                    12/31/84C
!                    NUREG - 0737 II. 3.225, RCIC SUCTION MODIFICATIONS                                                    M47857  F-51                                                                    01/15/85C REPLACEMENT OF RECIRCULATION PIPING REVIEW                                                            M52204      05/15/85C                                                          01/19/85C NUIEG-0737 II.K.3.18, ADS ACTUATION STUDY                                                              M45694  F-48                                                                    01/29/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                                                  M55603  B-84                                                                    01/30/85C I
NUREG 0737 II.K.3.28. VERIFY QUALIFICATION OF ACCUMULATORS                                            M48270 F-55                                                                    03/04/85C RADIOLOGICAL CONSEQUENCES OF LOCA DURING PURGING                                                      M56975                                                                          05/27/85C REQUEST FOR EQ EXTENSION                                                                              M56550                                                                          03/28/85C SURVEILLANCE REQUIREMENTS                                                                              M49102                                                                          05/28/85C REVIEN OF THE UNDERVOLTAGE RELAY TRIP EVENT                                                            M52089                                                                          06/05/85C HEAVY LOADS (C-10) (FDLLOHUP OF MPASC-10)                                                              M52246 C-15            07/11/84C                                              06/28/85C MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                                    M01942  D-01                                                                    09/12/85C l'
i d
2
{ __                          _, ~          .-                                      ,-_                                                        -- __.        -      -_ _                _ - -                    _ . _ _
 
d i
i      R-1208687-001                                                    REGULAT0RY        INF0RMATION                                      TRACKING                              SYSTEM                                PAGE NO. 112
<                                                                                    C0NDENSED          MANAGEMENT                                            REPORT                                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: NINE MILE POINT 1 PLANT LOCATION: 8 MI NE OF OSHEGO, NY                                              LICENSED POWER: 1850 MHT                                                            PROJECT MANAGERS R. HERMANN DOCKET NUMBERS 050-00220                                                            DESIGN POWER:              0620 MHE                                                BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER
* NIAGARA                                                          NSSS VENDOR 8              GE                                                      LIC. ASSISTANT:    S. NORRIS IE INSPECTOR:                        S. HUDSON RAI                      SE                            <
TAC                  MPA                RAI                RESPONSE      TER        INPUT                LIC ACT TITLE                                                                                                NUMBER                      HQ.            Dalg                      DATE      DAlf      .. D A T E                DATE NMuu ACTIVE ISSUES muun SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN THE BHR SCRAM                                          M43718                    B-6 5                                                                                09/01/85 SNUBBER ADDITIONS AND DELETIONS                                                                      M42424                                                                                                          09/15/85 LIMITED CODE REVISION TO APPROVED ISI PROGRAM PER to CFR                                              M54436                                                                                                          09/15/85 T S. CHANGE FOR CAPSULE SURVEILLANCE PROGRAM PER APPENDIX H                                          M54210                                                                                                          10/01/85 I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                          M56141                    F-71                                07/01/85    08/01/85                            10/01/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                          M53609                    B-85                                                                                  10/15/85 i        ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                              M54085                    B-92                                                                                  10/30/85 INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                                                M55604                    B-84                                                                                  10/30/85 ADDITIONAL EXEMPTION REQUEST FROM APPENDIX R (GENERIC LETTER                                          M53390                                                                                                          10/31/85 1 - PLANT SPECIFIC APPENDIX J. REVIEH                                                              -M54152                                                                                                            10/31/85 1 - EVALUATION OF GASKET SEAL MATERIAL IN PUMPS VALVES                                              M55465                                                                                                          10/31/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                        M52938 B-78                                                                  12/12/84                            11/01/85 1, TECH. SPEC. - ADS AND DVERPRESSURIZATION VALVE SET POINTS                                          M54752                                                                                                          11/01/85
      'EQ EXTENSION REQUEST FOR COMMISSION ACTION                                                            M57954                                                                                                          11/30/85 TECHNICAL SPECIFICATION - MK-1 PLANT SPECIFIC CHANGES                                                M57633                                                                                                          12/07/85    '
j        I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                M51259                    F-09      04/11/85                                                                    12/15/85
,      PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                                              M44318                    F-05      08/23/85                                10/19/84C                          12/31/85 REVIEH CHANGE IN SURVEILLANCE METHOD FOR DETECTING BORON                                              M57953                                                                                                          01/15/86 ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                                              M53019                    B-79      04/23/85                  06/23/85                                        02/28/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION ANDVENDOR INTERFACE -                                            M53692                    B-86      04/23/85                  06/23/85                                        02/28/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                              M53858                    B-88      04/23/85                  06/23/85                                        02/28/86      <
MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                                    M42884                    B-59      09/07/84                  11/01/84                                        04/01/86      f DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                  M55879                    D-19                                                                                  04/01/86 MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                                          M57160                    D-20                                                                                  04/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                        M45961                    F-63                                                                                  06/01/86 i                                                                                                                                                                                                                              06/01/86 i      NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                      M46032                    F-64 l      NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                    M46104                    F-65                                                                                  06/01/86 4        NU2EG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                    M46320                    F-68                                                                                  06/01/86
'        INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                                              M51109                    A-17      05/08/85                                                                    06/01/86 M53775 B-87                                                                                                      09/30/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND I
ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                          M54002 B-93                          04/23/85C 06/23/85                                                          09/30/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M52857 B-77                          04/23/85                  06/23/85                                        09/30/88 NW UNSCHEDULED ISSUES mu
{
10CFR50.62 CPERATING REACTOR REVIENS                                                                  M59tt6 A-20 i      NRC CERTIFICATION OF IN FUTHERANCE FOR POLLUTION CONTROL                                              M59557 7
NME COMPL ETED ISSUES muu M51179 F-08                                                                                                      10/01/84C I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN i
i
                                                                                                                  , =- _ ~ , - - . , ~ .                                                                , - _ - . . , . . ,
 
    -_ - _ _ _ _ _ _ _ _ . . . . _ _ _ _ . _ _ _ _ . _ . _ -                            _ _ _  ___ _._..        - .      .___ _      ._ _ _ - _. - _ _ _... .- ~ .                  . - - _ _ _ - -
i R-1208687-001                                        REGULAT0RY            INF0RMATION                      TRACKING                    SYSTEM                        PAGE NO.s            113 1                                                                          C0NDENSED            MANA0EMENT                        REP 0RT                                      RUN DATE: 09/17/85                i (HEADQUARTERS)
FACILITY: NINE MILE POINT t i
RAI                      SE                                -
1                                                                                                            TAC      MPA        RAI          RESPONSE                TER  INPUT          LIC ACT            I TITLE                                                                                          NUMBER      &          DAIE                DATE              DAlf. DATE                DATE num COMPLETED ISSUES MMM                            (CONTINUATION)
TECH. SPEC. - TRIPLE LOW REACTOR HATER LEVEL SETPOINT                                          M54751                                                                          'to/02/84C TS - ADMIN CONTROL SECTION. OVERTIME ETC.                                                      M54187                                                                            10/24/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                            M55725 A-18                                                                      10/29/84C
,          APPENDIX I TECH SPECS IMPLEMENTATION REVIEH                                                    N08118 A-02                        12/15/ 78C                                    11/02/84C TECH. SPEC. - INT. OF DIESEL GENERATORS ON LOSS OF OR                                          M54753                                                                            13/09/84C
'          NUREG-0737 II .K.3.16. CHALLENGES AND FAILURES OF RELIEF                                      M45599 F-46                                                                      11/14/84C TECH. SPEC. - DELETE SECURITY AUDIT FROM TECH. SPEC.                                          M55568                                                                            12/06/84C
  ,        ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                      M42476    8-60                                                                  08/10/85C            i MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                                            M07943    D-01                                                                  01/22/85C
.          NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                                      M45695 F-48                                                                      01/22/85C            i l'        REVIEW OF DECOUPLING SCREENHOUSE/ REACTOR BLDG HALL                                            M54129                                                                          02/04/85C            '
EVALUATE EMERGENCY PREPARDNESS SCHEDULE                                                        M56032                                                                          02/14/85C TS - CHANGE IN MANAGEMENT ORGANIZATION .                                                      M55475                                                                          02/19/85C 4            1. MK CONTAINMENT VENT HEADER CRACKS                                                      M55049                                                                          02/20/85C i          REACTOR VESSEL HATER LEVEL INSTRUMENTATION                                                    M41032 F-26                                                                      02/21/85C i          TECH. SPEC - DELETE "ALL" FOR AUDIT OF DEFICIENCES                                            M55569                                                                          02/25/85C I'        CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)                                      M08063 C-10                                                10/31/84              03/05/85C EQ EXTENSION REQUEST                                                                          M56698                                                                          03/15/85C'
"            1 - TECH. SPEC. FOR RCS LEAKAGE                                                              M55443                                                                          05/27/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                    M54548 B-83                                                                      04/01/85C TECH. SPEC.                                                .
M55048                                                                          04/01/85C i
EVALUATE RESPONSE TO GENERIC LETTER 84-09                                                      M55978    A-19                                                                  04/29/85C 1- ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                        M52776    B-76                                                                  05/01/85C EMERGENCY RELIEF REQUEST FROM ASME SECT XI                                                    M57675                                                                            05/tS/85C
]            1 - ADMIN. CHANGE - CONTAINMENT LEAKAGE                                                      M56640                              04/28/85                                      05/16/85C
:          REVIEW PROCESS CONTROL PROGRAM (FDLLOH ON TO RETS)                                            M57315                                                                            05/16/85C REVIEW RESPONSE (LONG TERM) TO NRC 50.54(F) LETTER - TURBINE                                  M55612                                                                            05/24/85C 5
TS - CONTROL ROOM AIR TRENT. SYSTEM SYSTEM                                                    M56038                                                                            06/11/85C i        CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                                      M52247 C-15                                                                      06/28/85C UNIT PLANT SPECIFIC EVALUATION OF CORE SPRAY PERFORMANCE                                  M51334                                                                          07/24/85C 1
i
 
R-1203687-001                        REGULAT0RY              INF0RMATION                    TRACKING          SYSTEM                        PAGE NO. 114 C0NDENSED          MANA0EMENT                  REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: NORTH ANNA 1 PLANT LOCATION: 40 MI NH OF RIENMOND, VA                    LICENSED P0HER: 2775 MHT                        PROJECT MANAGER    L. ENGLE DOCKET NUMBER: 050-00338                                    DESIGN POWER    0907 MHE                        BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: SSH                                        NSSS VENDOR:    HEST                            LIC, ASSISTANT:    P. KREUTZER IE INSPECTOR:      M. BRANCH RAI                      SE TAC    MPA            RAI      RESPONSE        TER        INPUT      LIC ACT TITLE                                                                      NUMBER    HQ.            DAIL        DATE        DAIL          DATE        DATE unum ACTIVE IMQG muu 2, REVISE TS 3.0.5 TO TAKE ACTION WITHIN 2 HRS                            M56358                                                                  08/30/85
: REQUEST EXTENSION OF INTERIM RELIEF GRANTED FOR INSERVICE                M56871                                                                  08/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                        M42895 B-59                      11/14/84C                            09/03/85      <
1: REVISE TS TO REDUCE BORIC ACID CONCENTRATION                            M57240                                                                  09/15/85 REVISED TECH SPEC TO EXTEND ALLOHABLE TIME FOR INOPERABILITY              M57786                                                                  09/15/85 1 REVISE TS FOR LEAKAGE INTEGRITY TESTS-CONT. PURGE LINES                  M56349                                                                  09/30/85 1: REVISE TS TO REFLECT CURRENT ORGANIZATION                              M56350                                                                  09/30/85 1: REVISE TECH. SPEC. TO REDUCE ROD B0H PENALTY                            M57916                                                                  09/31/85 1: REVISED TECH. SPEC. TO REDUCE MIN NBR OF THIMBLES FOR                  M57926                                                                  10/01/85 1: REVISE TECH SPEC FOR SEISMIC RECORDERS                                  M57915                                                                  10/30/85 1: REVISE TECH. SPEC. TO ALLOH POSITIVE MODERATOR                          M57920                                                                  10/30/85 to REVISED TECH. SPEC. TO DELETC SAMPLING OF FUEL DIL FROM                M57930                                                                  10/30/85 1: AMEND LICENSE FOR RECEIPT AND STORAGE OF SPENT FUEL FROM                M48868                                                                  10/31/85 1: REVISE TECH. SPEC. FOR PRESSURE / TEMPERATURE LIMIT CURVES              M57918                                                                  11/30/85 1: REVISE TECH. SPEC. NOMINAL INTERMEDIATE RANGE NEUTRON                  M58007                                                                  11/30/85 1: REVISE TECH. SPEC. PER GENERIC LTR 83-28, LCO'S & SR'S                  M58009                                                                  11/30/85 RV AND SV TESTING                                                          M44598  F-14        04/26/85    11/30/85                              12/30/85 REACTOR COOLANT PUMP TRIP                                                  M49665 G-01                                                            12/30/85 1: INSERVICE TESTING (PUMPS & VALVES)                                      M52414                                                                  12/30/85 ITEMS 3.t.1 & 3.1.2 - POST MAINTENANCE TESTING                            M52939  B-78                                                          12/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                          M53081  B-80                                                          12/30/85 1: TEST AND RESULTS-20X OVER VOLTAGE ON CONTRACTOR COILS                  M56353                            12/30/84                              12/30/85 1: REVISED TECH. SPEC. FOR CORE UPRATE(2893 MHT)                          M57928                                                                  12/31/85 M56142 F-71                      08/31/85    09/30/85                  01/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                                                                      01/31/86 1 STARTUP CERTIFICATION PROGRAM                                            M55539 M53020 B-79                                                            04/30/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                    M53859 B-88                                                            04/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                            M45962  F-63                                                          06/30/86 t.2, OPERATIONAL SUPPORT CENTER                      M46033  F-64                                                          06/30/86 NUREG-0737 III.A                                                          M46105                                                                  06/30/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                F-65 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                          M46321  F-68                                                          06/30/86 M56355                                                                  06/30/86 1: SERVICE HATER PIPING CORROSION & PRESERVATION PROGRAM                                                                                          12/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                M53693  B-86 M53921  B-89                                                          12/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                M54003  B-93        08/00/85                                          12/30/86 ITEMS 4.5.2 3 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING              M55880  D-19                                                          12/30/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                      M53776  B-87                                                          12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                    M48182 F-58                      06/15/85                              01/15/87 NUREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46 mR UNSCHEDULED ISSUES wm INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                    M51110 A-17          12/30/84    01/30/85
 
              -.-. ,                        -          .                      =  -.
R-1208687-001                  REGULAT0RY              INF0Rf.ATIOH                TRACKING            SYSTEM                PAGE NO. 115 C0NDENSED            MANAGEMENT                REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: NORTH ANNA 1 RAI              SE TAC    MPA          RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                  IMlfR    &            ]LAll      DATE      Mlf    E lf          DATE um UNSCHEDULED ISSUES wu      (CONTINUATION)
ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52858  F-77 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE              M54086  B-92 1: REVISE TS TO INCLUDE CONT. HOGGER AS PART OF GASEOUS              M56352 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM            M5807t  C-16                06/17/85 10CFR50.62 OPERATING REACTOR REVIENS                                  M59117  A-20 num COMPLETED ISSUES man NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION          M45150  F-26                                                11/06/84C ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES              M13109  B-48                05/30/84C 11/15/84            11/13/84C 1: ADMIN CHANGES TO T.S. REORGANIZATION OF NUC OPS DEPT.,            M52053                                                      11/13/84C j NUREG-0737 I.C.1.2.A. INADEQUATE CORE COOLING GUIDELINES              M44249  F-04                                                11/15/ 84C 4  1: REVISED CYCLE 5 RELOAD CORE DESIGN                                M55478                                                      11/15/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN            M5tt80  F-08                                                11/19/84C 1: EVALUATE NA MAIN TRANSFORMER FAULTS                                M49525                                                      11/27/84C 2: REVISE TS PER GEN.LTR. 83-30                                        M54500                                                      11/28/84C 1 AMEND TS BY REDUCING LENGTH OF TIME FOR CORE SURVEILLANCE          M52478                                                      12/03/84C 1: REVISE TS FOR REACTOR TRIP SYS INTERLOCK SETPOINT P-7 FOR          M53522                                                      12/06/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL              M42497  B-60                08/19/81C                      12/12/84C 1 AMEND T.S. FOR AUGMENTED SPENT FUEL STORAGE                        M48870                                                      12/21/84C 1: AMEND T.S. BY ADDING EXEMPTION FOR ENGINEERING EVAL FOR            M53252            11/27/84  12/27/84                      01/ 07/8 5C RELOAD DESIGN AUDIT                                                    M56081                                                      Ol/08/85C 1: REVISE TS FOR LCO FOR SURVEILLANCE IN MODES 3,4 AND 5              M53524                                                      02/01/85C 1: REVISE TS FOR LER REPORTING PER 10CFR PART 50.72 & 50.73          M54505  A-18                  11/21/84C                    02/01/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                  M52777  B-76                            12/12/84            03/29/85C 1: SCHEDULAR EXEMPTION FOR ENVIRONMENTAL QUALIFICATION OF            M57265                                                      03/29/85C UTILITY VISIT - REVIEW OF RISK IMPORTANCE OF CURRENT                  M56921                                                      03/30/85C 1: REVISE TS FOR ALLOHING t OUT OF 2 HX RECOMBINERS TO                M53521            02/28/85    12/27/84                      04/02/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR          M53134  B-81                                                04/24/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51260  F-09      12/06/83              N/A              04/25/85C NU2EG-0737 II.K.3.30, SB LOCA OUTLINE                                M45843 F-57                                                  06/04/85C ITEM t.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53610 B-85                                                  06/14/85C 1 - SHS MECHANICAL CLEANING PROGRAM DURING 72 HOUR LCO              M57901                                                      06/25/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)              M52248 C-15                                                  06/28/85C CCS VENTS TECHNICAL SPECIFICATI035 NUREG 073 ITEM II.D.t              M54400                                  01/31/85            06/28/85C
  . TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,          M54549  B-83                                                06/28/85C 1: INTERPRETATION OF TECH SPEC REQUIREMENTS FOR OPERABILITY          M57977                                                      08/15/85C 1: REVISE T/S ADDING DESCRIPTION OF POST-ACCIDENT SAMPLING          M59350                                                      08/19/85C 1 REVISED T/S TO ELIMINATE SAMPLING OF CHLORIDES &                  M57922                                                      08/21/85C 1: REVISED TECH. SPEC. FOR MINIMUM DECAY TIME PRIOR TO FUEL          M57924                                                      08/21/85C PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M44319  F-05      08/13/84C 01/30/85    03/03/84C          08/23/85C
 
R-1208687-001                    REGULAT0RY        INF0RMATION                TRACKING              SYSTEN                        PAGE NO.*  116 C0NDENSED          MANAGEMENT                  REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: NORTH ANNA 2 PLANT LOCATION: 40 MI NH OF RICHMOND, VA          LICENSED PONER: 2775 MHT                        PROJECT MANAGER: L. ENGLE DOCKET NUMBER: 050-00339                          DESIGN P0HER:    0907 MHE                      BRANCH CHIEF:      E. BUTCHER ARCM/ ENGINEER: S&H                                NSSS VENDOR:      HEST                          LIC, ASSISTANT:    P. KREUTZER IE INSPECTOR:
RAI                      SE TAC      MPA          RAI      RESPONSE        TER        INPUT      LIC ACT TITLE                                                            NUMBER      H2.          RAlf        DATE        RAlf          DATE        DATE Muum ACTIVE ISSUES muun 2: REVISE TS FOR LEAKAGE INTEGRITY TESTS-CONT. PURGE LINES        M56348                                                                  06/30/85 REQUEST EXTENSION OF INTERIM RELIEF GRANTED FOR INSERVICE        M56920                                                                  08/30/85 2: REVISE TS TO REDUCE BORIC ACID CONCENTRATION                  M57241                                                                  09/15/85 REVISED TECH SPEC TO EXTEND ALLOHABLE TIME FOR INOPERABILITY      M57787                                                                  09/15/85 2: REVISE TS TO REFLECT CURRENT ORGANIZATION                      M56347                                                                  09/30/85 2: REVISE TECH. SPEC. TO REDUCE ROD B0H PENALTY                  M57917                                                                  09/31/85 2: REVISED TECH. SPEC. TO REDUCE MIN NBR OF THIMBLES FOR          M57927                                                                  10/01/85
: 2. REVISE TS 3.0.5 TO TAKE ACTION HITHIN 2 HRS                    M56357                                                                  10/30/85 2: REVISE TECH. SPEC. TO ALLOW POSITIVE MODERATOR                M57921                                                                  10/30/85 2: REVISED TECH. SPEC. TO DELETE SAMPLING OF FUEL DIL FROM        M57931                                                                  10/30/85 2: AMEND LICENSE FOR RECEIPT AND STORAGE OF SPENT FUEL FROM      M48867                                                                  10/31/85 2: APPENDIX R REAHALYSIS EXEMPTIOM REQUESTS                      M54833                                                                  11/30/85 28 INSERVICE TESTING - PUMPS AND VALVES                          M54858                                                                  11/30/85 2: REVISE TECH. SPEC. FOR PRESSURE / TEMPERATURE LIMIT CURVES    M57919                                                                  11/30/85 2: REVISE TECH. SPEC. NOMINAL INTERMEDIATE RANGE NEUTRON          M58008                                                                  11/30/85 2: REVISE TECH. SPEC. PER GENERIC LTR 83-28, LCO'S & SR'S        M58010                                                                  11/30/85 RV AND SV TESTING                                                M44599    F-14      04/26/85C 11/30/85                                12/30/85 REACTOR COOLANT PUMP TRIP                              .
M49666    G-01                                                        12/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52859    B-77                                                        12/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                    M52940    B-78                                                        12/30/85 REACiDR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53082    B-80                                                        12/30/85 2 REVISF TECH. SPEC. TO INDICATE VALVES TESTED ONLY FOR          M54834                                                                  12/30/85 2: TESTS & RESULTS - 20% OVERVOLTAGE CN CONTRACTOR COILS          M56356                            12/30/84                              12/30/85    '
2: REVISED TECH. SPEC. FOR CORE UPRATEC2893 MHT)                  M57929                                                                  12/31/85 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -      M56143 F-71                      08/31/85    09/30/85                  01/30/86 ITEM 3.t.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS      M53021    B-79                                                        04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53860 B-88                                                            04/30/86 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                    M45963    F-63                                                        06/30/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                  M46034    F-64                                                        06/30/86 NUREG-0737 III.A.t.2, EMERGENCY OPERATIONS FACILITY              M46106    F-65                                                        06/30/86 4            NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                M46322    F-68                                                        06/30/86 2 SERVICE HATER PIPING CORROSION & PRESERVATION PROGRAM          M56354                                                                  06/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53694    B-86                                                        12/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M54004    B-93      08/00/85                                          12/30/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54087    B-92                                                        12/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53777    B-87                                                        12/31/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP      M53922    B-89                                                        12/31/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                M48183    F-58                  06/15/85                              01/15/87 mm UNSCHEDULED ISSUES um CONTROL ROOM HUMAN FACTORS REVIEH                                M46921
 
R-1208687-001                      REGULAT0RY            INF0RMATION                    TRACKINC          SYSTEM                        PAGE N0.8    117 C0NDENSED            MANAGEMENT                  REPQRT                            RUN DATE: 09/17/85 (HEADQUARIERS)
FACILITY: NORTH ANNA 2 RAI                    SE TAC          MPA        RAI    RESPONSE            TER  INPUT      LIC ACT TITLE                                                                  NUMBER          &      Palf        DATE          SAIL    DATE        DATE nu UNSCHEDULED ISSUES hu          (CONTINUATION)
INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                M51111        A-17  12/30/84    11/30/85 STARTUP CERFIFICATION PROGRAM                                          M55540 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM            M58072 C-16                      06/17/85 10CFR50.62 OPERATING REACTOR REVIENS                                  M59118 A-20 huu COMPLETED ISSUES Muu 2 AMEND LIC FOR INCREASE RCS TAV TO 587.8 (PHASE 2- P0HER              M49523                                                                10/15/84C 2: REVISE TS BY CHANGING FRACTIONAL P0HER MULTIPLIER FROM              M52575                                                                10/15/84C NUREG-0737 11.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION          M45151        F-26                                                  11/06/84C ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGES                    M48331        B-48              05/30/84C                            11/13/84C 2 ADMIN CHANGES TO T.S. REORGANIZATION OF NUC OPS DEPT.                M52052                                                                11/13/84C CORE RELOAD METHODOLOGY AUDIT                                          M54846                                                                11/15/84C i                            2: REVISED CYCLE 5 RELOAD CORE DESIGN                                  M55479                                                                11/15/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN            M51181        F-08              04/22/84                            11/18/84C 2 FOLLCHUP DN JULY 3,      1981 TRANS FIRE RECURRING TRANS          M46734                                                                11/27/84C t
2: REVISE TS PER GEN. LTR. 83-30                                      M54501                                                                11/28/84C 2 AMEND TS BY REDUCING LENGTH OF TIME FOR CORE SURVEILLANCE          M52479                                                                12/05/84C 2: REVISE TS FOR REACTOR TRIPS SYS INTERLOCK SETPOINT P-7            M53523                                                                12/06/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL              M42540        B-60              09/03/81C 11/15/84                  12/12/84C 2: AMEND T.S. FOR AUGMENTED SPENT FUEL STORAGE                        M48869                                                                12/21/84C 2: AMEND T.S. BY ADDING EXEMPTION FOR ENGINEERING EVAL, FOR          M53253                                                                01/07/85C RELOAD DESIGN AUDIT                                                  M56082                                                                01/ 08/85C 2: REVISE TS FOR LCO FOR SURVEILLANCE IN MODES 3, 4 AND 5            M53525                                                                02/01/85C 2: REVISE TS FOR LER REPORTING PER 10CFR PART 50.72 &50.73            M54506        A-18              11/21/84C                          02/ 01/8 5C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                  M52778        B-76                              12/12/84            03/29/85C 2: SCHEDULAR EXEMPTION FOR ENVIRONMENTAL QUALIFICATION OF            M57264                                                                03/29/85C UTILITY VISIT - REVIEW OF RISK IMPORTANCE OF CURRENT                  M56922                                                                03/30/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR        M53135        B-81                                                  04/24/85C 2: TEST 1 SUBMITTAL (NATURAL CIRCULATION) To MEET BTP RSBS-1          M56 359                                                              04/24/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51261        F-09                                                  04/25/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55881        D-19                                                  04/25/85C REVISE EMERGENCY DIESEL TECH. SPEC.                                  M56872                                                                05/25/85C NUREG-0737 II.K.3.30, SB LOCA CUTLINE                                M45844 F-57                                                          06/04/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53611 B-85                                                          06/14/85C 2 - SMS MECHANICAL CLEANING PROGRAM DURING 72 HOUR LCO              M57902                                                                06/25/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPA8C-10)            M52249        C-15                                                  06/28/85C RCS VENTS TECHNICAL SPECIFICATIONS HUREG 073 ITEM II.B.1            M54401                                                                06/28/85C TECPHICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,          M54550        B-83                                                  06/28/85C 2: INTERPRETATION OF TECH SPEC REQUIREMENTS FOR OPERABILITY        M57978                                                                08/15/85C 2: REVISE T/S ADDING DESCRIPTION OF POST-ACCIDENT SAMPLING          M59349                                                                08/19/85C 2: REVISED T/S TO ELIMINATE SAMPLING OF CHLORIDES &                M57923                                                                08/21/85C 2: REVISED TECH. SPEC, FOR MINIMUM DECAY TIME PRIOR TO FUEL        M57925                                                                08/21/85C 4
PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)            M44320 F-05          08/13/84C 01/30/85          03/03/84C          08/23/85C 2: REVISE TS TO INCLUDE CONT. HOGGER AS PART OF GASEOUS            M56351                                                                08/30/85C 1
1
 
R-1208687-001                                REGULAT0RY          INF0RHATION                        TRACKING        SYSTEM                  PAGE NO.          118 C0NDENSED                MANAGEHENT              REPORT                      RUN DATE: 09/t7/85 (HEADQUARTERS)
FACILITY: NORTH ANNA 2 RAI                SE TAC      MPA      RAI    RESPONSE      TER    INPUT            LIC ACT TITLE                                                                                  11UM1B      &      DAIL      DATE      pflE    JAll                DATE num COMPLETED ISSUES Muu                    (CONTINUATICN)
MASCNARY HALL DESIGN RESPONSE TO 1E BULLETIN 80-11                                    MS6382                                                            09/03/85C
 
i                R-1208687-001                    REGULAT0RY            INF0RMATION                      TRACKING              SYSTEM                        PAGE NO.s      119 1
!                                                                C0NDENSED              MANAGEMENT                    REPORT                              RUN DATE: 09/17/85 (HEADQUARTERS) l                                                                        FACILITY: OCONEE 1 I                PLANT LOCATION: 30 MI H OF GREENVILLE, SC              LICENSED PONER: 2568 MHT                            PROJECT MANAGER: H. NICOLARAS l                DOCKET NUMBER: 050-00269                                DESIGN POWER:        0887 MHE                      BRANCH CHIEF:        J. STOLZ l                AiCM/ ENGINEER: DUKE /BECH                              NSSS VENDOR:          B&H                          LIC. ASSISTANT: R. INGRAM IE INSPECTOR:        J. BRYANT RAI                      SE TAC      MPA          RAI    RESPONSE        TER        INPUT      LIC ACT TITLE                                                                      NUMBER      fiL          DAIX        DATE      E6JJ.        DATE          DATE nuum ACTIVE ISSUES muum 02C8 FA                                                                    M57820              06/30/85  07/30/85                                08/31/85 EFH TORNADO PROTECTION                                                    M48225                                                                  09/30/85 REACTOR COOLANT PUMP TRIP                                                  M49659    G-01                            06/30/85                    09/30/85
: DISPOSAL METHOD FOR VERY LOW LEVEL RADHASTE                            M55056                                                                  09/30/85 DISPOSAL OF CONTAMINATED SAND IN CONTROLLED AREA                          M55509                                                                  09/30/85 l                                                                                                                                                                    09/30/85 C01E OPERATIONAL LIMITS REPORT REVIEH                                      M57483 DEFINITION OF "ACCESSIBL E/ ACCESSIBILITY"                                M57849                                                                  09/30/85 CONTAMINATED SEHAGE SLUDGE DISPOSAL                                        M57957                                                                  09/30/85 03C9 RLD REVIEW                                                            M57814                                                                  10/02/85 l                RELOAD DESIGN METHODOLOGY II, REPORT REVIEH                                M57477              06/04/85  07/05/85                                10/13/85 SEISMIC QUALTFICATION OF THE AUXILIARY FEEDHATER SYSTEM                    M43643 C-14          06/06/84  06/16/85                                10/31/85 f                NU2EG-07 37 III .D.3.4, CONTROL ROOM HABITABILITY                          M46463 F-70          04/15/85  06/24/85                                10/31/85 IST PROGRAM REVISION AND REQUEST FOR RELIEF                              M49234                07/30/84  08/30/84                                10/31/85 RCS LEAK TEST T.S. CHANGES                                                M49568                07/31/85  08/31/85                                10/31/85 OVERTIME LIMITS                                                          M54144                                                                  10/31/85 TECH. SPEC. CHANGE ON LOH TEMPERATURE OVERPRESSURIZATION                  M55680                                                                  10/31/85 CONFIRMATORY ORDER AMEND REQUEST                                          M52201                                                                  11/30/85 NUREG-0737 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM              M54402 B-83                                                            11/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                M54551 B-83                                06/30/85                    11/30/85 NUCLEAR EQUIPMENT OPERATORS                                              M57817                                                                  ft/30/85 M58035                09/10/85  10/10/85                                12/15/85 CEVIEW OF LLH INCINERATOR NUREG-0737 RV AND SV TESTING                                              M44600    F-14      06/05/85  09/16/85                                12/31/85 M52674                09/28/84  02/15/85                                12/31/85 FIRE PROTECTION EXEMPTION (BARRIER / CABLE)                                                                                                        12/31/85 REACTOR VESSEL MATERIAL SURVEILLANCE REQS.                                M55683 M55689                04/01/85  06/01/85                                12/31/85 CEACTOR BUILDING PURGE SYSTEM TECH. SPEC. CHANGE                                                                                                  12/31/85 CORE FLOOD TANK BORON CONCENTRATION                                      M55980                          07/30/85 M57036                07/22/85  09/20/85    09/31/85                    12/31/85 REVIEW OF ISI PROGRAM FOR SECOND TEN-YEAR INTERVAL                                                                                                12/31/85 TECH. SPEC. ON FIRE HOSE STATIONS                                        M57893 l                                                                                                                            07/17/85                                12/31/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM              M58073 C-16 l
INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                  M51112 A-17          07/11/85  09/30/85    10/31/85                  03/30/86 M52941 B-78                                                            03/30/86 IT EMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                          M53136 B-31                                                            03/30/86 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR              M53612 B-85                                                            03/30/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY              M55365 B-90                                                            09/30/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND              M55882 D-19                                                            09/30/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                      M45964 F-63                                                            12/31/86 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                            M46035    F-64                                                          12/31/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                                                                  12/31/86 NUREG-0737 III.A.t.2, EMERGENCY OPERATIONS FACILITY                      M46107    F-65 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                        M46323 F-68                                                            12/31/86
 
R-1208687-001                  REGULAT0RY          INF0RHATION                        TRACKING                  SYSTEM                    PAGE NO. 120 C0NDENSED          MANAGEMENT                                REP 0RT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITYs DCONEE I RAI                  SE TAC            MPA                  RAI    RESPONSE        TER  INPUT      LIC ACT TITLE                                                              NUMBER            NA              Mif,          DATE        MIf. DATE        DATE l                        Mutu ACTIVE ISSUES mamm        (CONTINUATION)
ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52860            B-77  06/10/85            08/09/85                        05/30/87 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY-VENDOR RELATED            M53083            B-80                                                        03/30/87 a
ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53695            B-86  06/10/85            08/09/85                        03/30/87 ITEMS 3.2.t & 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53778            B-87                                                        03/30/87 ITEtts 4.2.3 & 4.2.4-PREVENTATIVE MAINTANANCE PROGRAM FOR RX      M53923            B-89                                                        03/30/87 ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES        M5395s            B-91  06/10/85            08/09/85                        05/30/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54088            B-92                                                        03/30/87 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                  M45184            F-58  05/31/86            08/31/86                        03/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M54005            B-95  06/10/85C 09/09/85                                    12/31/87 mm UNSCHEDULED ISSUES *w to CFR 50.62 OPERATING REACTOR REVIENS                            M59119            A-20 APPL. OF POSTING REQUIREMENTS IN CTP NO. 3                        M59550 MMu COMPLETED ISSUES anw IST/IST EXEMPTION                                                  M53341                                                                        10/29/84C CYCLE 9 REVIEH                                                      M55815                                                                        11/23/84C FIRE PROTECTION EXEMPTION REQUEST (LIGHTING)                        M52649                                                                        12/27/84C SALP EVALUATION FROM 05/01/83 - 08/31/84                            M55826                                                                        01/ 08/85C TECH. SPEC. REVIEW OF " REPORTABLE DCCURRENCE" REQS                M55015 A-18                                                                    01/09 /85C REVIEH OF GUIDE LINES FOR DETERMINING CORE DAMAGE (II.B.3)          M57042                                                                        01/30/85C
,                      EOF LOCATION                                                        M57039                                                                        02/06/85C ISI RELIEF REQUEST OF 8/15/83                                      M52406                                                                        02/07/85C MARK BZ FUEL                                                        M56711                                                                        02/07/85C ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR        M53183            B-82  12/31/84                                              02/11/8 5C AIR LOCK TESTING FREQUENCY TECH. SPEC. CHANGE                      M55686                  01/31/85                                              02/11/85C STA BACHELOR'S DEGREE OR EQUIVALENT                                M49974                                        02/15/85                        03/07/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                  M42904            B-59  06/15/84            10/31/84    11/30/84            03/14/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL            M42509            B-60                        10/26/84                        03/20/85C REGULATORY EFFECTIVENESS PROGRAM                                    M57486                                                                        03/21/85C DISPOSAL OF FIVE FEEDHATER HEATERS ONSITE                          M55832                                                                        03/22/85C MINIMUM OPERATOR STAFFING REQUIRES TECH. SPEC. CHANGE              M55676                                                                        04/01/85C INTERPRETATION OF 10CFR20.203(E) AS RELATED TO POSTING              M55512                                                                        04/12/85C STARTUP PHYSICS REPORT REVISIONS                                    M57480                                                                        04/18/85C EMERGENCY TECHNICAL SPECIFICATION CHANGE FOR '3A' FAN COOLER        M57432                                                                        04/22/85C LICENSED OPERATORS REQUALIFICATIDH PROGRAM                          M57823                                                                        05/08/85C TECHNICAL SPECIFICATION IMPROVEMENT NTG                            F57663                                                                        05/10/85C ITEM t.t - POST TRIP REVIEW PROGRAM DESCRIPTION AND                M52779 B-76                                            01/31/85              0 5/15/85C INVERTER ALERT                                                      M59385                                                                        05/25/85C ADMIN. T.S. CHANGE OF 2/11/84                                      M54211                                                                        05/30/85C FSAR REF. AMDT                                                      M59382                                                                        05/30/85C NUREG - 0737 I.D.2 - SAFETY PARAMETER DISPLAY SYSTEM                M51262            F-09  09/28/84C 10/31/84C                N/A              06/04/85C HATURAL CIRCULATION COOLDOHN (GENERIC LTR 8t-21)                    M47183            B-66  04/23/84            09/04/84                        06/05/85C
 
R-1208687-001                        REGULAT0RY                INF0RHATION              TRACKING            SYSTEM                  PAGE NO.s  121 C0NDENSED          MANAGEMENT              REPORT                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: OCONEE 1 RAI                SE TAC    MPA        RAI      RESPONSE      TER  INPUT      LIC ACT TITLE                                                                        NUMBER    !!L        DME        DATE        DME    DATE        DATE Enn COMPLETED ISSUES man            (CONTINUATION)
PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 $UPP/t)                      M44321  F-05      06/13/84C 10/31/84      03/08/84C          06/07/85C NUREG-0737 I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEW                      H5t182  F-08                                                  06/10/85C EMERGENCY DRILL                                                              M59379                                                        06/20/85C HASTE GAS HOLUDP TANKS TECH. SPEC. REVIEW                                    M55012                                                        06/24/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA C-10)                      M52250  C-15                                                  06/28/85C NUREG-0737 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH                        M56144  F-71                  04/14/83    07/20/84            07/08/85C DCRDR PROGRAM PLAN                                                            M59370                                                        07/08/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                          M53022  B-79                                                  07/t1/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                      M53861  B-88                                                  07/11/8 5C KE0 HEE BATTERIES INOPERABILITY EXTENSION                                    M57319                                                        07/17/85C SPENT FUEL TO MCGUIRE                                                        M59373                                                        07/26/85C NUREG-0737 II.K.3.30, SS LOCA OUTLINE                                        M45845  F-57                                                  07/29/85C CONFIRMATORY ITEMS ON GL 83-28, ITEM 4.*                                      M59287                                                        07/29/85C RTB UVTA                                                                      M59376                                                        08/08/85C
 
R-1208687-00t                                REGULAT0RY          INF0RMATION                            TRACKING          SYSTEM                      PAGE NO. 122 C0NDENSED            MANAOEMENT                        REP 0RT                            RUN DATE: 09/f7/85 (HEADQUARTERS)
FACILITY: OCONEE 2 PLANT LOCATION: 30 MI H OF GREENVILLE, SC                          LICENSED POWER: 2568 MHT                                PROJECT MANAGER: H. NICOLARAS DOCKET NUMBER: 050-00270                                          DESIGN POWER:    0887 MNE                              BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: DUKE /BECH                                        NSSS VENDOR:    B8H                                    LIC. ASSISTANT: R. INGRAM IE INSPECTOR:              J. BRYANT RAI                    SE TAC                MPA      RAI      RESPONSE      TER      INPUT      LIC ACT TITLE                                                                            NUMBER                EL      Mlf          DATE        MIL        DATE        DATE unum ACTIVE ISSUES umuu ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR                      M53137              B-81                                                    05/31/85 C0t4TAMINATED SEHAGE SLUDGE DISPOSAL                                            M57958                                                                      08/07/85 CYCLE 8 FUEL ASSEMBLY                                                            M57821                                                                      08/31/85 EFH TORNADO PROTECTION                                                          M48226                                                                      09/30/85 REACTOR COOLANT PUMP TRIP                                                        M49660              G-Of                            06/30/85                09/30/85
: DISPOSAL METHOD FOR VERY LOH LEVEL RADHASTE                                  M55057                                                                      09/30/85 DISPOSAL OF C0t4TAMINATED SAND IN CONTROLLED AREA                                M55510                                                                      09/30/85 BACKUP EMERGENCY POWER TECH. SPEC. REVIEH                                        M56460                                                                      09/30/85 CORE OPERATIONAL LIMITS REPORT REVIEH                                            M57484                                                                      09/30/85 03C9 RLD REVIEH                                                                  M57815                                                                      10/02/85 RELOAD DESIGN METHODOLOGY II, REPORT REVIEH                                      M57478                      06/04/85  07/03/85                              10/13/85 RELOAD DESIGN METHODOLOGY II, REPORT REVIEW                                      M57479                                07/05/85                              10/13/85 SEISMIC QUALIFICATION OF THE AUXILI ARY FEEDHATER SYSTEM                          M43644              C-14  06/02/85  06/16/85                              10/31/85 NUAEG-0737 III.D.3.4. CONTROL ROOM HABITABILITY                                  M46464              F-70  04/15/85  06/24/85      10/31/85                10/31/85 IST PROGRAM REVISION AND REQUEST FOR RELIEF                                      M49235                      07/30/84  08/30/84      03/29/85                10/31/85 RCS iEAK TEST T.S. CHANGES                                                        M49569                      03/31/85  04/30/85                              10/31/85 CVERTIME LIMITS                                                                  M54145                      12/26/84  01/31/85                              10/31/85 TECH. SPEC. CHANGE ON LOW TEMPERATURE OVERPRESSURIZATION                          M55681                                                                      10/31/85 CONFIRMATORY ORDER AMEND. REQUEST                                                M52202                                                                      11/30/85
,  NU2EG-0737 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM                      M54403              E-83                                                    11/30/85 1  TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                        M54552              B-83            12/31/84                              11/30/85 NUCLEAR EQUIPMENT OPERATORS                                                      M57818                                                                      11/30/85
'  REVIEH OF LLH INCINERATOR                                                        M58u36                      08/15/85  09/10/85                              12/15/85 NUREG-0737 RV AND SV TESTING                                                      M44601              F-14  06/05/85  09/16/85                              12/31/85
]'
FIRE PROTECTION EXEMPTION (BARRIER / CABLE)                                      M52675                      09/28/84  02/15/85                              12/31/85 REACTOR VESSEL MATERIAL SURVEILLANCE REQS.                                        M55684                                                                      12/31/85 REACTOR PURGE SYSTEM TECH. SPEC. CHANGE                                          M55690                      04/01/85  06/01/85                              12/31/85 CORE FLOOD TANK BORON CONCEt4TRATION                                              M55981                                07/30/85                              12/31/85 REVIEW OF ISI PROGRAM FOR SECOND TEN-YEAR INTERVAL                                M57037                      06/30/85  07/22/85      09/31/85                12/31/85 DEFINITION OF " ACCESSIBLE / ACCESSIBILITY"                                      M57850                                                                      12/31/85 TECH. SPEC. 074 FIRE HOSE ST ATIONS                                              M57594                                                                      12/31/85 TECH. SPEC. ON FIRE HOSE STATIONS                                                M57895                                                                      12/31/85 UTILITY RE!'"JNSES TO STAFF RECOMt1ENDATIONS CONCERNING STEAM                    M58074              C-16            07/17/85                              12/31/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                          M51113              A-17  07/11/85  09/30/85                              03/30/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                    M52942              B-78                                                  03/30/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                      M53613 B-85                                          04/04/85              03/30/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                        M55366              B-90                                                  09/30/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                              M55883              D-19                                                  09/30/86 t:UREG-0737 III.A.t.2, TECHNICAL SUPPORT CENTER                                  M45965 F-63                                                                  12/31/86
 
l R-1208687-001                  REGULAT0RY            INF0RMATION                                    TRACKINO          SYSTEM                              PAGE NO.s        123 C0NDEN$ED                          MANAGEMENT                      REPORT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY OCONEE 2 RAI                            SE TAC    MPA          RAI  RESPONSE          TER          INPUT          LIC ACT TITLE                                                                                  NUMBER    HQ.      RAlf        DATE          R&lE          _DAJ1            DATE unum ACTIVE ISSUES umMM      (CONTINUATION)
NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                        M46036  F-64                                                              12/31/86 M46108 i
i NUREG-0737 III.A.1.2. EMERGENCY OPERATIONS FACILITY                                              F-65                                                              12/31/86 l NUREG-0737 III.A.2.2, METEOROLOGICAL DAIA UPGRADE                                      M46324  F-68                                                              12/31/86 l ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                              M52861  B-77  06/10/85    08/09/85                                        03/30/87 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY-VENDOR RELATED                                M53084  B-80                                                              03/30/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                              M53696  B-86  06/10/85    08/09/85                                        05/30/87 I ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                M53779  B-87                                                              03/30/87 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTANANCE PROGRAM FOR RX                            M53924  B-89                                                              05/30/87 ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES                              M53956  B-91  06/10/85    08/09/85                                        03/30/87 l
ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                M54089  B-92                                                              03/30/87 NUREG 0737 II.K 3.51 COMPLIANCE HITH to CFR 50.46                                      M48185  F-58  05/31/86    08/31/86                                        03/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                            M540a6  B-93  06/10/85C 09/09/85          09/30/87                        12/31/87 NE UNSCHEDULED ISSUES um 10 CFR 50.62 OPERATING REACTOR REVIEWS                                                M59120 A-20 APPL OF POSTING REQUIREMENTS IN CTP NO. 3                                              M59551 unu COMPLETED ISSUES uMM ISI/IST EXEMPTION                                                                      M53342                                                                      10/29/84C FIRE PROTECTION EXEMPTION REQUEST (LIGHTIt'G)                                          M52650                                                                      12/27/84C SALP EVALUATION FROM 05/01/85 - 08/31/84                                                M55827                                                                    01/ 08/85C TECH. SPEC. REVIEW OF " REPORTABLE OCCURRENCE REQS                                      M55016  A-18                                                              01/09/85C M57043                                                                    01/30/B5C REVIEH OF GUIDE LINES FOR DETERMINING CORE DAMAGE (II.B.3)                                                                                                        02/06/85C EXTENSION OF SURVEILLANCE FOR HYDRAULIC SNUBBER                                        M56328 EOF LOCATION                                                                            M57040                                                                    02/06/85C ISI RELIEF REQUEST OF 8/15/83                                                          M52407                                                                    02/07/85C M56712                                                                    02/07/85C REVIEN OF MARK BZ FUEL                                                                                                                                            02/11/85C ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                            M53184 B-82    12/31/84  01/31/85 AIR LOCK TESTING FREQUENCY TECH. SPEC. CHANGE                                          M55687        01/31/85                                                    02/11/85C ISI FLAW EVALUATIONS                                                                    M5516 0                                                                    02/14/85C STA BACHELOR'S DEGREE OR EQUIVALENT                                                    M49972                    02/15/85                                        03/07/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                      M42905  B-59  06/15/84    10/31/84        11/30/84                      03/14/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                M42510  B-60              10/26/84                                      03/20/85C REGULATORY EFFECTIVENESS PROGRAM                                                        M57487                                                                    03/21/85C    .
DISPOSAL OF FIVE FEEDUATER HEATERS ONSITE                                              M55833                                                                    03/22/85C M55677                                                                    04/01/85C MINIMUM OPERATOR STAFFING REQUIRES TECH. SPEC. CHANGE                                                                                                              04/12/85C INTERPRETATION OF 10CFR20,203(E) AS RELATED TO POSTING                                  M55513 M56599                                                                    04/18/8 5C REVIEH OF CYCLE 8 RELOAD                                                                                                                                          04/18/85C STARTUP PHYSICS REPORT REVISIONS                                                        M57481 M57482                                                                    04/18/85C STARTUP PHYSICS REPORT REVISIONS                                                                                                                                    04/22/85C EMERGENCY -TECHNICAL SPECIFICATION CHANGE FOR '3A' FAN COOLER                          M57453 M57824                                                                    05/08/85C LICENSED OPERATORS REQUALIFICATION PROGRAM                                                                                                                        05/10/85C ITECHNICAL SPECIFICATION IMPROVEMENT MTG                                                  M57664
 
R-1208687-001                  REGULAT0RY              INF0RHATION                TRACKING            SYSTEM                    PAGE NO.        124 C0NDEN$ED          MANAGEMENT                REPORT                        RUN DATE: 09/17/85 (HEA0 QUARTERS)
FACILITY: OCO'1EE 2 RAI                SE TAC    MPA        RAI    RESPONSE      TER    INPUT          LIC ACT TITLE                                                                NUMBER    EL        DAlf      DATE      DAlf    _jAlf              DATE mum COMPLET!D ISSUES muu      (CONTINUATION)
ITLA 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                  M52780  B-76                          01/31/85                  05/tS/85C INVERTER ALERT                                                        M59336                                                            05/25/85C ADMIN. T.S. CHANGE OF 2/13/84                                        M54212                                                            05/30/85C NUREG-0737 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM                      M51263 F-09      09/28/84  10/31/84                            06/04/85C
  ,  NEUTRON SOURCE DATA FOR FLUX REDUCTION VERDICATION                M55041            10/31/84  11/30/84                            06/04/85C NATURAL CIRCUL ATION COOL DONN (GENERIC LTR 81-21)                    M47184  B-66      04/23/84  09/04/84                            06/05/85C PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M44322  F-05      06/13/84C 10/31/84  03/08/84C                  06/07/85C NUREG-0737 I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEN              M51183 F-08                                                      06/10/85C REVISED PROCESS CONTROL PROGRAM (INTERIM APPROVAL)                    M57810                                                            06/11/85C EMERGENCY DRILL                                                      M59380                                                            06/20/85C HASTE GAS HOLDUP TANKS TECH. SPEC. REVIEH                            M55013                                                            06/24/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)              M52251  C-15                                                      06/28/85C I.D. t.2 DETAIL ED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        M56145 F-71                04/14/83  07/20/84                  07/08/85C DCRD2 PROGRAM PLAN                                                    M59371                                                            07/08/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                  M53023  B-79                                                      07/11/8 5C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53862 B-88                                                      07/11/85C KECHEE BATTERIES INOPERABILITY EXTENSION                              M57320                                                            07/17/85C a SPENT FUEL 10 MCGUIRE                                                M59374                                                            07/26/85C NUREG-0737 II.K.3.30 SB LOCA OUTLINE                                  M45846 F-57                                                      07/29/85C CONFIRMATORY ITEMS ON GL 83-28, ITEM 4.3                              M59288                                                            07/29/85C RTB UVTA                                                              M59377                                                            08/08/85C e
 
R-1208687-001                  REGULAT0RY              INF0RMATION                          TRACKING                    SY$ TEM                            PAGE NO. 125 C0NDENSED                MANAGEMENT                    REP 0RT                                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: OCONEE 3 PLANT LOCATION: 30 MI H OF GREENVILLE, SC              LICENSED P0HER: 2568 MHT                                        PROJECT MANAGER: H. NICOLARAS DOCKET NUMBER: 050-00287                                DESIGN PONER:        0887 MHE                                  BRANCH CHIEF:            J. STOLZ ARCH / ENGINEER: DUKE /BECH                            NSSS VENDOR:          B&H                                      LIC, ASSISTANT:          R. INGRAM IE INSPECTOR:        J. BRYANT RAI                          SE TAC          MPA        RAI              RESPONSE          TER          INPUT      LIC ACT TITLE                                ,
HMtLOLE          &        Mig                  DATE        MIE              DATE        DATE unnu ACTIVE ISSUES nuum CONTAMINATED SEHAGE SLUDGE DISPOSAL                                      M57959                                                                                08/07/85
: DISPOSAL METHOD FOR VERY LOH LEVEL RADHASTE                            M55058                                                                                08/31/85 02C8 FA                                                                  M57822                                                                                08/31/85 CYCLE 9 RELOAD REVIEW                                                    M51816                                                                                09/02/85 EFH TORNADO PROTECTION                                                    M48227                                                                                09/30/85 IST PROGRAM REVISION AND REQUEST FOR RELIEF                              M49236                07/30/84              08/30/84                                  09/30/85 REACTOR COOLANT PUMP TRIP                                                M49661 0-01                                                                            09/30/85 DISPOSAL OF CONTAMINATED SAND IN CONTROLLED AREA                        M55511                                                                                09/30/85 BACKUP EMERGENCY POWER TECH. SPEC. REVIEH                                M56461                                                                                09/30/85 C0!E OPERATIONAL LIMITS REPORT REVIEH                                    M57485                                                                                09/30/85 DEFINITION OF " ACCESSIBLE / ACCESSIBILITY"                              M57851                                                                                09/30/85 SEISMIC QUALIFICATION OF THE AUXILIARY FEEDHATER SYSTEM                  M43645 C-14            06/06/85              06/16/85                                  10/30/85 NU2EG-0737 III.D.3.4, CONTROL ROOM HABITABILITY                          M46465 F-70            04/15/85            06/24/85                                  10/31/85 RCS LEAK TEST T.S. CHANGES                                              M49570                  03/31/85            04/30/85                                  10/31/85 OVEATIME LIMITS                                                          M54146                  12/26/85            01/31/85                                  10/31/85 TECH. SPEC. CHANGE ON LOW TEMPERATURE OVERPRESSURIZATION                M55682                                                                                  10/31/85 CONFIRMATORY ORDER AMEND. REQUEST 8/26/83                                MS2203                                                                                  11/30/85 CUREG-0737 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM            M54404 B-83                                                                            11/30/85 NUCLEAR EQUIPMENT OPERATORS                                              M57819                                                                                  11/30/85 M58037                  08/15/85                                                        12/15/85 REVIEW OF LLH INCINERATOR NUREG-0737 RV AND SV TESTING                                              M44602        F-14    06/03/85            09/16/85                                  12/31/85 M52676                09/28/84            02/15/85                                  12/31/85 FIRE PROTECTION EXEMPTION (BARRIER / CABLE)                                                                                                                      12/31/85 REACTOR VESSEL MATERIAL SURVEILLANCE REQS.                                M55685 M55691                04/30/85            05/30/85                                  12/31/85 REACTOR PURGE SYSTEM TECH. SPEC. CHANGE                                                                                                                          12/31/85 l          CORE FLOOD TANK BORON CONCENTRATION                                      M55982                12/24/84C M57038                07/22/85            09/20/85    09/31/85                      12/31/85 l          CEVIEH OF ISI PROGRAM FOR SECOND TEN-YEAR INTERVAL                                                                    07/17/85                                  12/31/85 l          UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM              M58075 C-16 M51114        A-17    07/11/85            09/30/85    10/31/85                      03/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                                                                                                        03/30/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                          M52943          8-78 ITEM t.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY              M53614          B-85  09/30/85              11/30/85    04/04/85                      03/30/86      '
M55367          B-90    12/31/84                                                      09/30/86 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND              M55884          D-19                                                                  09/30/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                    M45966          F-63                                                                  12/31/86 NU2EG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                                                                  12/31/86 l          CU2EG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                        M46037          F-64 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                      M46109          F-65                                                                  12/31/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                        M46325          F-68                                                                  12/31/86 M52862 B-77            06/10/85              08/09/85                                  03/30/87 l          ITEM 2.1 - EQUIPMENT CLASSIFICATICH AND VENDOR INTERFACE -              M53085 B-80            09/30/86              10/31/86    11/30/86                      03/30/87 I
ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                M53138 B-81                                                                            03/30/87 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR
 
_ ___ _ ____.. _ - _                                      - . _.            ._.        _ . _ . . . _ - .        . ~ . .      _ - .          --.. _
R-1208687-001                      REGULAT0RY                INF0RMATION                            TRACKING          SYSTEM                  PAGE NO.s  126 i~                                                                      C0NDENSED                        MANAGEMENT                    REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: OCONEE 3 RAI                SE TAC      MPA          RAI  RESPONSE      TER  INPUI      LIC ACT TITLE                                                                                t{WJQ      &          MIX      DATE        MIX    DATE      ___DAIE_
unum ACTIVE ISSUES Muum          (CONTINUATION)
ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M53697    B-86    06/10/85    08/09/85                        03/30/87 ITEMS 3.2.t 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                              M53780    B-87                                                03/30/87 ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTANANCE PROGRAM FOR RX                          M53925    B-89                                                03/30/87 ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES                            M53957    B-91    06/10/85    08/09/85                      03/30/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54090    B-92                                                03/30/87 NUREG 0737 II .K.3.31 COMPLI ANCE HITH 10 CFR 50.46                                  M48186  F-58    05/31/86    08/31/86                      03/31/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                          H54007  B-93    06/10/85C 09/09/85                          12/31/87 mu UNSCHEDULED ISSUES **
PRA REVIEH                                                                            M57580 10 CFR 50.62 OPERATING REACTOR REVIEWS                                              M59121  A-20                                                      '
APPL. OF POSTING REQUIREMENTS IN CTP NO. 3                                            M59552 muu COMPLETED ISSUES MMu ISI/IST EXEMPTION                                                                    M53343                                                        10/29/84C FIRE PROTECTION EXEMPTION REQUEST (LIGHTING)                                          M52651                                                        12/27/84C SALP EVALUATION FROM 05/01/83 - 08/31/84                                              M55828                                                        01/08/85C TECH. SPEC. REVIEW OF " REPORTABLE OCCURRENCE" REQS                                    M55017 A-18                    09/30/85                      01/09/85C REVIEH OF GUIDE LINES FOR DETERMINING CORE DAMAGE (II.B.3)                            M57044                                                        01/30/85C EOF LOCATION                                                                          M57041                                                        02/06/85C ISI RELIEF REQUEST OF 8/15/83                                                          M52408                                                        02/07/85C REVIEH OF MARK BZ FUEL                                                                M56713                                                        02/07/85C l                      ITEM 4.3 - AUTOMATIC AUTUATION OF SHUNT TRIP ATTACHMENT FOR                            M53185 B-82      12/31/84    01/31/85                      02/11/85C I
AIR LOCK TESTING FREQUENCY TECH. SPEC. CHANGE                                          M55688            01/31/85                                    02/11/8 5C STA BACHELOR'S DEGREE OR EQUIVALENT                                                    M49978                        02/15/85                      03/07/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                    M42906  B-59    10/31/84    11/30/84    11/30/84          03/14/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                              M42511  B-60                  10/26/84                      03/20/85C REGULATORY EFFECTIVENESS PROGRAM                                                      M57488                                                        05/21/85C DISPOSAL OF FIVE FEEDNATER HEATERS ONSITE                                              M55834                                                        03/22/85C MINIMUM OPERATOR STAFFING REQUIRES TECH. SPEC. CHANGE                                  M55678                                                        04/01/85C INTERPRETATION OF 10CFR20.203(E) AS RELATED TO POSTING                                M55514                                                        04/12/85C EMERGENCY TECHNICAL SPECIFICATION CHANGE FOR '3A' FAN COOLER                          M57434                                                        04/22/85C LICENSED OPERATORS REQUALIFICATION PROGRAM                                            M57825                                                        05/08/85C TECHNICAL SPECIFICATION IMPROVEMENT NTG                                                M57665                                                        05/10/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                    M52781  B-76                              01/31/85          05/15/85C INVERTER ALERT                                                                        M59387                                                        05/25/85C ADMIN. T.S. CHANGE OF 2/13/84                                                          M54213                                                        05/30/85C FSAR REF. AMDT                                                                        M59383                                                        05/30/85C FSAR REF. AMDT                                                                        M59384                                                        05/30/85C NUREG-0737 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM                                      M51264  F-09      09/28/84    10/31/84                      06/04/85C NATURAL CIRCULATION C00LDOWN (GENERIC LTR 81-21)                                      M47185  B-66      04/23/84    09/04/84                      06/05/85C PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)                              M44323  F-05      06/13/84C 10/31/84      03/08/84C          06/07/85C INUREG-0757 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW                              M51184  F-08                                                  06/10/85C
 
_.          . . -              .                    -    _ ._          _ - _ - -          _- .  -  .=. _                  -    -- .
l R-1208687-001                  REGULAT0RY          INF0RHATION                  TRACKING                SYSTEM                        PAGE NO. 127 l
i C0NDENSED          MANAGEMENT                REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)                                                                                  '
FACILITY: OCONEE 3 RAI                      SE TAC      MPA        RAI            RESPONSE          TER    INPUT      LIC ACT TITL E                                                          NUMBErt    (([L      Dalg              DATE            p]RE    .DATE        nATE umu COMPLETED ISSUES umu      (CONTINUATION)
EMERGENCY DRILL                                                  M59381                                                                    06/20/85C HASTE GAS HOLDUP TANKS TECH. SPEC. REVIEW                        M55014              N/A                                                  06/24/85C HEAVY LDADS (C-10) (FOLLONUP OF MPA8C-10)                        M52252 C-15                                                              06/28/85C NUREG-0737 I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEN          M56146    F-71                    04/14/83          07/20/84              07/08/85C DCRDR PROGRAM PLAN                                              M59372                                                                    07/08/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH            M53024    B-79                                                            07/11/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53863    B-88                                                            07/11/85C KE0 HEE BATTERIES INOPERABILITY EXTENSION                        M57318                                                                    07/17/85C SPENT FUEL TO MCGUIRE                                            M59375                                                                    07/26/85C NU2EG-0737 II.K.3.30. SB LOCA OUTLINE                            M45847    F-57                                                            07/29/85C CONFIRMATORY ITEMS ON GL 83-28. ITEM 4.3                        M59289                                                                    07/29/85C RTB UVTA                                                        M59378                                                                    08/08/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC L ETTERS 83-36,      M54553 B-83                        12/31/84                              08/14/85C PROBALISTIC RISK ASSESSMENT REVIEH 0.L 47                        M55979                                                                    08/14/85C NUREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES        M44253 F-04        09/28/84        10/31/84                              09/07/85C i
l
 
R-1208687-001                    REGULAT0RY          INF0RHATION              TRACKING        SYSTEM                      PAGE NO. 128 C0NDENSED              MANAGEMENT            REPORT                          RUN DATE: 09/17/85 (HEADQUARIERS)
FACILITY: OYSTER CREEK 1 PLANT LOCATION: 9 MI S OF TDMS RIVER, NJ              LICENSED POWER: 1930 MHT              PROJECT MANAGER: J. DON 0HEH DOCKET NUMBER: 050-00219                              DESIGN P0HER:    0650 MWE              BRANCH CHIEF:      J. ZHOLINSKI ARCH / ENGINEER: B&R                                  HSSS VENDOR:    GE                    LIC, ASSISTANT:    C. JAMERSON IE INSPECTOR:      H. BATEMAN RAI                    SE TAC    MPA      RAI  RESPONSE      TER        INPUT      LIC ACT TITLE                                                              NUMBER    &      MIX      DATE      DM1          DATE        DATE munw ACTIVE ISSUES nunu HIND LOADS                                                          M49392                              ;0/31/84C                04/01/85 TURBINE MISSILE                                                    M49395                                                      04/01/85 EMERGENCY CONDENSER ISOLATION                                      M49397                                N/A                    04/01/85 DESIGN CODES AND STANDARDS                                          M49399                                                      04/15/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG            M51115 A-17            07/31/85                            05/01/85 SEISMIC DESIGN                                                      M49398                  06/11/8 5C                          06/30/85 LICENSEE'S PROPOSED CHANGES TO THE APPROVED ALTERNATE SAFE          M56740                  04/03/85C                            07/01/85 RESPONSE TO IE BULLETIN 82 REACTOR COOLANT SYSTEM              M56754                                                      07/15/85 BATTERY STATUS ALARMS                                              M49410                  06/07/85C                            07/30/85 I.D.t.2 DETAILED CONTPOL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        M56147  F-71          04/08/85C 05/28/85                  07/30/85 EXEMPTIONS TO APPENDIX R - FIRE PROTECTION PROGRAM                  M56786                  04/03/85C                            07/30/85 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)            M44324 F-05            06/30/85  0S/30/86                  08/15/85 HATER PURITY SPECIFICATION                                          M49404                                                      08/15/85 PRIMARY COOLANT ACTIVITY                                            M49412                                                      08/15/85 EXTENSION TO CONF. ORDER DATED 3/14/83 - CONTROL ROOM              M57905                                                      08/15/85 TORNADO MISSILE DAMAGE                                              M49394                  07/03/85C                            08/30/85 LEAKAGE DETECTION                                                  M49401                  10/22/84C                            08/30/85 NEUTRON MONITORING ISOLATION                                        M49408                  06/30/85C                            08/30/85 MAIN STEAM ISOLATION VALVE MAINT.                                    M49413                  06/30/85                            08/30/85 Rett 0TE MANUAL VALVES (VI-4)                                        M56951                  06/30/85                            08/30/85 EXTENSION TO 10CFR50.44(C)(3)(II)(B) - TMI ITEM II.E.4.1            M57758                                                      08/30/85 GL 84 EXEMPTION REQUEST TO 50.44(C)(3)-RECOMBINER RULE          M58018  A-19          07/05/85                            08/30/85 SALP MEETING FOR SEPTEMBER 1985                                      M57492                                                      09/02/85 APPENDIX I TECH SPEC IMPLEMENTATION REVIEW                          M08100 A-02            10/22/84C                            09/30/85 LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)                  M42613  B-24                                                09/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                  M42914  B-59  08/01/85                                      09/30/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM        M43717  B-65                                                09/30/85 NUREG-0737 III.D.3.4, CONTROL ROOM HABITABILITY                      M46466  F-70  06/30/85 07/15/85                            09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52863 B-77            07/05/85                            09/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                      M52944 B-78                                                  09/30/85
                  ' FEBRUARY 11, 1985 CHANGES TO ISI/IST                                M56800                                                      09/30/85 CHANGES FOR CLARIFICATION AND CONSISTENCY AMONG ACCIDENT            M56918                  07/31/85                            09/30/85 DISCREPANCY IN DRAHINGS USED IN SEP REVIEW                          M58004 A-19            07/01/85C 08/30/85                  09/30/85 NEW ANALYSIS OF MAXIMUM DRYNELL TEMPERATURE PRIOR TO LOCA            M59052                  08/ 01/85C                          09/30/85 POST ACCIDENT SAMPLING SYSTEM TECHNICAL SPECIFICATIONS              M59281                                                      09/30/85 INSERVICE TESTING (IST)                                              Mit270                                                      10/01/85 MARK 1 DRYHELL VACUUM BREAKERS. LICENSEE RESPONSE TO GENERIC        M57161  D-20          08/11/85                            10/11/85
                  'REVIEH FINAL ENVIRONMENTAL STATEMENT (FES) FOR POL /FTL              M52336                                                      10/15/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54091  B-92                                                10/30/85
 
R-1208687-001                        REGULAT0RY          INF0RMATION                                      TRACKING              SYSTEM                              PAGE NO.              129 C0NDENSED              MANAGEMENT                                  REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: OYSTER CREFK 1 RAI                        SE TAC                  MPA.          RAI    RESPONSE          TER          INPUT                  LIC ACT TITLE                                                                    HUMBER                    &            DAI{          DATE        DAIE          DATE                    DATE unun ACTIVE ISSUES NMMW          (CONTINUATION)
REVIEN OF DELAMINATION OF COATING FROM PIPING IN EMERGENCY              M59282                                                                                                10/30/85 SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA                                M52482 T007                                                                                          11/15/85 MECHANICAL SNUBBERS                                                    N08439 B-22                                    04/15/85C                                            11/30/85 HYDRAULIC SNUBBERS                                                      M08440 B-17                                    04/tS/85C                                            11/30/85 I.D 2. SAFETY PARAMETER DISPLAY SYSTEM                                  M51265                  F-09                  07/t5/85          N/A                                12/30/85 ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS                M53025 B-79                        04/05/85    07/05/85                                              12/30/85 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53698 B-86                                    07/05/85                                              12/30/85 s TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                      M54554 B-83                        08/30/85    09/30/85                                              12/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                    M55885 D-19                                                                                          03/31/86 NUREG-0737    III.A.1.2, TECHNICAL SUPPORT CENTER                      M45967                  F-63                                                                        04/01/86 NUREG-0737    III.A.1.2, OPERATIONAL SUPPORT CENTER                    M46038                  F-64                                                                        04/01/86 HUREG-0737    III.A.1.2, EMERGENCY OPERATIONS FACILITY                  M46110                  F-65                                                                        04/01/86 NUREG-0737    III.A.2.2, METEOROLOGICAL DATA UPGRADE                    M46326                  F-68                                                                        04/01/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY            M53615                  B-85                                                                        04/01/86 10 CFR 50.62 OPERATING REACTOR REVIEWS                                M59122 A-20                                    10/13/85                                              04/15/86 NUREG-0737 II.K.3.19. INTERLOCK RECIRC PUMP MODIFICATION                M45720                  F-49                                                                        06/01/86            l
          . ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING              M54008                  B-93      04/05/85C 06/12/85C                                              06/30/86 FULL TERM OPERATING LICENSE                                            M11268                                                                                                09/01/86
            ' ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                  M53781                  B-87                                                                        09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                M53864 B-88                        04/05/85    07/05/85                                              12/30/86 um UNSCHEDULED ISSUES MM I
LIMITATION ON OVERTIME AS IDENTIFIED IN GL83-02                        M59340 EXEMPTION OF 10CFR50.44(C)(3)(III) - ISOLATION CONDENSER                M59342 DEFERMEhT OF NRC REQUIRED MODIFICATIONS FROM CYCLE IIR TO              M59400 unu COMPLETED ISSUES nux I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN            M51185 F-08                                    07/01/83                                              10/10/84C NUREG-0737 II .K.3.16, CHALLENGES AND FAILURES OF RELIEF                M45600 F-46                                                                                          10/23/84C REVIEH TECH. SPEC. CHANGES REQUEST TO REMOVE HEIGHT                    M55648                                                                                                10/29/84C BUS TRANSFERS                                                          M49406                                                                                                11/16/84C REVIEH TECH. SPEC.- CHANGE REQUEST TO THE PLANT ENGINEERING            M55655                                                                                                12/27/84C NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                              M45696                  F-48                                                                        01/04/85C
              ,REVIEH TS CHANGE REQUEST FOR HIGH DRYNELL PRESSURE TRIP                M52518                                                                                                01/11/85C REVIEW TS CHANGE REQUEST FOR GRID UNVERVOLTAGE PROTECTITON              M52516                                                                                                02/tt/85C REQUEST.FOR SCHEDULAR EXTENSION OF EQUIPMENT ENVIRONMENT                M57115                                                                                                03/30/85C EXPANDED SAFETY SYSTEM FACILITY                                        M56970                                                                                                04/16/85C PLANT SHIELDING MODIFICATIONS (II.B.2.2)                                M47960                  F-11                                                                        04/19/8 5C          <
EXTENSION TO CONFIRMATORY ORDER DATED JUNE 17, 1983 GL                M57491                                                                                                04/29/85C REVISION TO II.K.3.21 SUBMITTALS - RESTART OF CORE SPRAY              M57418                                                                                                05/08/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                    M52782 B-76                                                      12/02/84                            05/14/85C
              ,BNR VENT HEADER CRACKING - IE BULL. 84-01                              M56952                                                                                                05/14/85C REVIEH TS CHANGE REQUEST FOR ISI                                      M52549                                                                                                05/22/85C
 
R-1208687-001                REGULAT0RY            INF0RHAT ION              TRACKING        SYSTEM            PAGE NO.s  130 C0NDENSED            MANAGEMENT            REP 0RT              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 RAI          SE TAC    MPA      RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                            NUMBER    11      DAlf      DATE  DAlf  DATE        DATE DOM COMPLETED ISSUES Muu    (CONTINUATION)
REVIEW OF TS CHANGE REQUEST FOR IST, JUNE 8, 1984                M55657                                            05/22/85C REVISION TO ISI SE DATED JUNE 28, 1983 BECAUSE STAFF DID NOT      M57600                                            05/22/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42524  B-60            02/22/85C                05/28/85C 737 TECH SPECS                                                    M51687  B-72                                      05/30/85C REVIEH T/S CHANGE REC. TO APP. B. MARINE HOODBORER EXPOSURE      M55658                                          05/30/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55726  A-18                                      05/30/85C DELETION OF SPRINKER S) STEM 813                                  M56752                                            05/30/85C OF FAILED FUEL FROM HEST VALLEY TO PLANT HITHOUT CANISTERS        M57759                                            05/31/85C REVIEW TECH. SPEC. CHANGE REQUEST TO REDUCE THE PRIMARY          M55656                                            06/07/85C REQUEST FOR SCHEDULAR EXTENSION OF SURVEILLANCE CAPSULE          M57353                                          06/12/85C REVISION TO II.F.1.5 SUBMITTALS - CONT. HATER LEVEL MONITOR      M57414 F                                          06/19/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA8C-10)          M52253 C-15              02/15/85C                06/28/85C EMERGENCY CONDENSER LOGIC TESTING                                M49405                                          07/01/85C UENTILATION SYSTEFa                                              M49411                                          07/01/85C BACKUP THERMOCOUPLE TO THE RELIEF VALVE POSITION INDICATOR        M59009                                          07/ 01/85C RELAX FREQUENCY OF AUDITING FIRE PROTECTION PROGRAM              M56753                                          (,7/02/85C RELAX FREQUENCY OF AUDITING QUALITY ASSURANCE PROGRAM            M56755                                          07/02/85C REVIEW ADMINISTRATIVE TS CHANGE REQUEST FOR CLARITY 8 FORMAT      M53411                  08/30/85                07/10/85C RPS TESTING                                                      M49407                                          97/15/85C INSPECTION OF BWR STAINLC S STEEL PIPING ACCORDING TO            M55605  B-84                                    08/05/85C NUREG-0737 II.F.2.3, IMADEQUATE CORE COOLING INSTRUMENTATION      M45155 F-26              05/17/85C              08/09/85C DELETE DRYHELL SUPPRESSION CHAMBER DIFFERENTIAL PRESSURE          M57272                                          08/21/85C REVIEN T/C CHANGE REQ. TO REVISE ACCEPTANCE CRITERIA FOR          M55988                  07/31/85                08/26/85C
 
_ _ _ _ _ _ _ , _ . _ _ _ _ . _ _ _                                  _ _ _ _ _ _ _ _ _ _ _ . . _                . _ _ _          ____              ._ _ _ _            _ . .          - _. _ _          _  ___m      _ . . _ _ - .
i R-1208687-001'                                            REGULAT0RY                          INF0RMATION                        TRACKINO                    SYSTEM                              PAGE NO.8      131 C0NDENSED                          MANAGEMENT                          REPn          P. T                              RUN DATE: 09/17/85                  i (HEADQUARTERS) i e
FACILITY 8 PALISADES A                                                                                                                                                                                                                                                  :
PLANT LOCATION: 5 MI S OF SOUTH HAVEN, MI                                                      LICENSED POWER: 2530 MHT                                      PROJECT MANAGER: T. HAMBACH                                            '
DOCKET NUMBER: 050-00255                                                                        DESIGN POWER          0805 MHE                              BRANCH CHIEfr          J. ZHOLINSKI
* ARCH / ENGINEER: BECH                                                                          NSSS VENDOR:          COMB                                  LIC. $$5ISTANT: C. JAMERSON IE INSPECTOR                                  B. JORGENSEN                                                                                                                                                                          ;
I RAI                            SE TAC      MPA              RAI          RESPONSE            TER          INPUT        LIC ACT H]lg                                                                                                            NUMBER          &              DAlf,            DATE            PAIL            DATE          DATE MMMM ACTIVE ISSUES MMMM ADDITIONAL FIRE PROTECTION TECH. SPECS.                                                                        M57255                                                                                    09/15/85 3              REVIEH OF ASYMMETRIC LOCA LOADS SUBMITTAL                                                                      N08621        D-10                            06/01/79C                                    09/30/85 i            REACTOR COOLANT PUMP TRIP                                                                                      M49700        G-01                                                                        09/31/85 j              MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                                                            N42915 B-59                                                                                10/30/85 i            TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY                                                      M43052 D-17                                  07/30/85                                    10/30/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                                      M54405 l                                                                                                                                                                                                                      10/30/85                  t POST ACCIDENT SAMPLING T.S. CHANGE                                                                            M55469                                                                                    10/30/85 ADMINISTRATIVE CONTROLS TECHNICAL SPECIFICATICH CHANGE                                                        M56797                      04/15/85        06/15/85                                    10/30/85 CONTROL ROOM HABITABILITY TECH. SPECS. AND ADDITIONAL FIRE                                                    M56867                                                                                    10/30/85 ALLEGATION OF INADEQUATE CABLE TRAY SUPPORTS                                                                  M58030                                                                                    10/30/85 DELETE' TECH. SPEC. FOR HPSI FLON IND.                                                                        M59310                                                                                    10/30/85                  t
            . TECH. SPEC. CHANGE D/S SURVEILLANCE FREQUENCY                                                                  M59333                                                                                    10/30/85 HYDROGEN RECOMBINER TESTING REQUIREMENTS                                                                      M07733                                                                                    10/31/85 ADDITION OF 408V DISTRIBUTION BUSES - TECH SPEC. CHANGE                                                        M54795                                                                                    11/15/85 2
AFH SYSTEM TECHNICAL SPECIFICATIONS - II.E.1.1                                                                  M55942                                        06/30/85                                    11/15/85
.            DECAY HEAT REMOVAL CAPABILITY TECH SPECS                                                                      M42130 B-57                  06/26/84        05/31/85                                    11/30/85 i              PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                                                      M44325 F-05                  07/30/85        06/30/85      02/28/85C                    11/30/85 i              SEISMIC REVIEH OF PIPING <2 1/2" & ELECTRICAL CO.1PONENTS                                                      M48725                                        09/30/82C                                    11/30/85 TECH. SPEC. CHANGE OPERABILITY OF LEAKAGE M53545                                                                                    11/30/85 i
TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                    M54555 B-83                                  07/15/84                                    11/30/85 APP R EXEMPTION: LOCAL TENDING OF EMERG DIESEL GENERATORS                                                      M55617                                        09/30/85                                    11/30/85 TECH. SPEC. CHANGE TO ALLOW 15 MINS. TO CORRECT REACTOR                                                        M57256                                                                                    12/15/85
!            APP. H INTEGRATED SURVEILLANCE PROGRAM                                                                          M57973                                                                                    12/30/85 RELIEF REQUEST FOR INSERVICE PUMP TESTING PROGRAM                                                              M42320                                        04/25/80C                                    12/31/85 i
i NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                M45968        F-63                                                                        12/31/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                              M46039        F-64                                                                        12/31/85 HUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                            M46111        F-6 5                                                                        12/31/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                              M46327        F-68                                                                        12/31/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                    M52864        B-77                                                                        12/31/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                                          M53026        B-79                                                                        12/31/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                                        M53865        B-88                                                                        12/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                          M55886        D-19                                                                        12/31/85 SEP TOPIC III.5. A EFFECTS OF PIPE BREAK CHARGING AND LETDOHN                                                  M59300                                                                                    12/31/85 DESIGN CODE ASSESSMENT                                                                                        M48726                                        05/31/85C                                    01/15/86                  i I.D.2.' SAFETY PARAMETER DISPLAY SYSTEM                                                                        M51266      F-09            04/23/85                          N/A                        01/30/86 MSIV COST /BEBEFIT ANALYSIS OF TH0 STEAM GENERATOR BLOHDOWN                                                    M52490                                        05/15/85                                    01/30/86 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                                                        M51116      A-17            06/10/85                                                      01/31/86 STEAM GENERATOR AUGUMENTED ISI PROGRAM                                                                        M56365                                                                                    02/28/86                  !
RV AND SV TESTING                                                                                              M44604        F-14          07/19/85        10/00/85                                    03/31/86 j
I
 
_ - _ _ _ _ _ _ _ _ _ _ _                - - .  - - . - - -        . . -  . - - -    .~          .--.- --        __              ..        _ -      . . _ . _ - .        .-      ~      __    _
i R-1208687-001                    REGULAT0RY            INF0RMATION                        TRACKINO            SYSTEM                              PAGE NO.8      132 C0NDENSED            MANAGENENT                        REPQRT                                RUN DATE8 09/17/85 (HEADQUARTERS)
FACILITY: PALISADES RAI                            SE TAC    MPA            RAI  RESPONSE              TER      INPUT      LIC ACT TITLE                                                                      NUMBER    &            MIf,      DATE              DME          DATE          DATE MMMM ACTIVE ISSUES MMMM          (CONTINUATION)
* ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                M53616  B-85                                                                04/15/86 FULL TERM OPERATING LICENSE                                                Mit218                                                                      07/30/86          '
ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                M53926  B-89      05/15/85                                                10/15/86
,                              ITEMS 4.5.2 3 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING              M54009  B-93                    07/01/85C                                  10/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -              M56148  F-71                    08/30/86      10/15/86                    12/00/86 ITEM 2.2 - EQUIFMENT CLASSIFICATION AND VENDOR VENDOR                      M53699  B-86                                                                12/31/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                M45156  F-26                                                                01/31/87 i                                                                                                                                                                                                        '
MN UNSCHEDULED ISSUES MM a
TECHNICAL SPECIFICATIONS FOR CONTAINMENT PURGE AND                        M55299                                          02/01/85C HYDROGEN CONTROL                                                            M55953 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                M58076  C-16                    07/31/85 10 CFR 50.62 OPERATING REACTOR REVIENS                                    M59123 A-20                                                                                    ;
muu COMPLETED ISSUES MMM I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                  M51186  F-08                    06/07/83                                    10/24/84C APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                                  M08148  A-02      07/31/84    07/31/84                                    11/09/84C REPORTING REQUIREMENTS TECH. SPEC.                                          M55534                                                                      11/09/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                        M55727  A-18                                                                11/09/84C i                            PRC APPROVAL TECH. SPEC.                                                    M55555                                                                      12/10/84C PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST: SECTION 6                  M49327                                                                      O t/11/8 5C i
ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                    M42517  B-60                                                                01/31/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS                  M44463  F-12      01/23/84    06/30/84                                    01/31/85C DISCONNCTION OF BOTH REDUNDANT BATTERIES FROM DC BUSES                      M46574                                                                      02/22/85C
!                            EQ EXTENSION                                                                M56321                                                                      02/22/85C RETS MODIFICATION                                                          M56364                                                                      04/25/85C NUREG 0737. II.K.3.25 P0HER ON PUMP SEALS                                  M48448  F-53                                                                05/02/85C CORE HEIGHT F(Q)                                                            M57259                                                                      05/03/85C EMERGENCY TECH. SPEC. CHANGE DIESEL GENERATOR 7 DAY LCO.                  M57765                                                                        06/05/85C ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR                  M53139  *-81 06/19/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                  M52254 C-15                                                                  06/28/85C SUPPL. 1 NUREG-0737 CONFIRMATORY ORDER                                    M57798                                                                      07/01/85C NUREG-0737 II.K.3.30, SB LOCA'0UTLINE                                      M45849 F-57                                                                  07/03/85C
                            .NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                          M48188 F-58                                                                  07/03/85C APPENDIX R EXEMPTION REQUEST                                              M54844                                                                      07/12/85C          ,'
APPENDIX R EXEMPTION: SEPARATION INSIDE CONTAINMENT                        MS5586                                                                      07/23/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                        M52783    B-76                                                              08/08/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                            M52945    B-78                                                              08/15/85C REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                        'M53086 B-80                                                                    08/15/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                    M53782 B-87                                                                  08/15/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                  M54092 B-92                                                                  08/15/85C T.S. CHANGE REACTOR VESSEL PRESSURE / TEMPERATURE LIMITS                  M57972                                                                      08/21/85C          i
                            . DELETE TECH. SPEC. 4.13 REACTOR INTERNA *.S VIBRATION                    M57254                                                                      09/05/85C
 
R-1208687-001                                                                                                      REGULAT0RY            INF0RMATION              TRACKING          SYSTEM                        PAGE NO.        133 C0NDENSED            MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PALO VERDE 1 PLANT LOCATION: 36 MI H OF PHOENIX, AZ                                                                                                    LICENSED P0HER: 3800 MHT                  PROJECT MANAGER: E. LICITRA DOCKET NUMBER: 050-00528                                                                                                                  DESIGN P0HER:    1270 MHE                  BRANCH CHIEF:      G. KNIGHTON ARCH / ENGINEER: BECH                                                                                                                    NSSS VENDOR:    COMB                      LIC. ASSISTANT:    J. LEE IE INSPECTOR:
RAI                      SE TAC    MPA        RAI    RESPONSE      TER        INPUT          LIC ACT TITLE                                                                                                                                                  NVMBER    &        Mlf        DATE        MIL          DATE            DATE umMu ACTIVE ISSUES MMMM FOLLDH-UP DN PASS SYSTEM HITH REGION                                                                                                                  M59244                                                            09/15/85 CONTROL OF HEAVY LOADS                                                                                                                                M59246                                                            09/15/85 REVIEH OF APPENDIX "R" AUDIT ISSUES                                                                                                                    M59247                                                            09/15/85 REVIEH OF SPRAY POND PIPING CORROSION                                                                                                                  M57419        05/21/85C 05/30/85C                                09/30/85 DNE-TIME EXCEPTION TO TECH. SPECS., NATURAL CIRCULATION TEST                                                                                          M59189                                                              10/01/85 DCRDR
 
==SUMMARY==
REPORT                                                                                                                                  M56656        11/27/84C 08/31/85C 09/30/85                          11/01/85    '
REVIEH OF SPDS                                                                                                                                        M566 54        06/18/85C 08/19/85C                                  12/01/85 LOOSE PARTS MONITORING SYSTEM REPORT                                                                                                                  H56658                    09/01/85                                  12/01/85 SALEM ATHS - ITEMS 3.1.1 & 3.1.2 POST MAINT. TEST PROCEDURES                                                                                          M5916 5  B-78                                                        12/01/85 SALEM ATHS - ITEMS 3.1.3. POST MAINT. TESTING                                                                                                          M59166  B-79                                                        12/01/85 SALEM ATHS - ITEM 4.1. TRIP SYSTEM RELIABILITY                                                                                                        M59169 B-80                                                          12/01/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEl.M                                                                                          M58077 C-16                06/21/85C                                12/30/85 REACTOR COOLANT PUMP TRIP (0660-II.K.3.5)                                                                                                              M59412 G-01                                                          12/31/85    -
NATURAL CIRCULATION COOLDOHN TEST                                                                                                                      M56647                    01/31/86                              01/01/86 REVISED CHAPTER 15 ANALYSES                                                                                                                          M56652                      10/15/85                              01/01/86 SALEM ATHS - ITEMS 4.2.1 8 4.2.2, PREVENT MAINT, & TRENDING                                                                                            M59170  B-81  04/19/85                                            01/01/86 SALEM ATHS - ITEMS 4.2.3 8 4.2.4, PREVENT MAINT, LIFE TEST,                                                                                          M59171  B-89                                                      01/01/86 PIPING VIBRATION TESTING RESULTS                                                                                                                      M56657                      12/01/85                              03/01/86 SALEM ATHS - ITEM 2.1,                                                                                      EQUIP. CLASS. AND VENDOR INTERFACE        M59163 B-77                                                        05/01/86 SALEM ATHS - ITEM 2.2,                                                                                      EQUIP. CLASS. AND VENDOR INTERFACE,      M59164 B-86                                                        09/01/86 SALEM ATHS - ITEM 3.2.3, POST MAINT. TESTING TECM. SPECS.                                                                                            M59168 B-88                                                        09/30/86 SALEM ATHS - ITEM 4.5.1,                                                                                      REACTOR TRIP SYSTEM FUNCTIONAL        M59172  B-92                                                        12/01/86 SALEM ATHS - ITEMS 4.5.2 & 4.5.3, TRIP SYSTEM FUNCTIONAL                                                                                              M59173  B-93                                                        12/01/86 SALEM ATHS - ITEMS 3.2.1 8 3.2.2, POST MAINT. TEST                                                                                                    M59167  B-87                                                        12/31/86 UPGRADE PROCEDURE GENERATION PACKAGE                                                                                                                  M56659          ft/15/84C 12/31/86      N/A                        07/01/87 ISI PROGRAM                                                                                                                                          M56661                    08/26/85C 04/01/87                      07/01/87 GUIDE TUBE HEAR SURVEILLANCE PROGRAM                                                                                                                  M56662                      12/01/86                                07/01/87 FUEL ROD GROHTH EVALUATION                                                                                                                          M56663                    06/01/87                                08/01/87 10 CFR 50.62 OPERATING REACTOR REVIENS                                                                                                            M59124 A-20                                                          12/30/87 MM UNSCHEDULED ISSUES MM SETTLEMENT MONITORING PROGRAM                                                                                                                        M56646                      02/28/85C MMM COMPLETED ISSUES MMM CPC SOFTWARE MODIFICATIONS                                                                                                                          M56680          01/31/85C 03/08/85C                                  05/15/85C CHEMISTRY CONTROL AND SAMPLING SYSTEMS                                                                                                              M56645                      04/15/85C                                05/31/85C PERIODIC LEAK TESTING OF CONTAINMENT ISOLATION VALVES                                                                                                M56649                                                              05/31/85C
 
R-1208687-001              REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                PAGE NO. 134 C0NDENSED          MANAOEMENT            REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PALO VERDE 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                        flyti}J3  &      DAlf.      DATE    Dall    DATE        DATE D00 COMPLETED ISSUES WM4    (CONTINUATION)
FEMA REVIEW OF OFFSITE EMERGENCY PLANS                        M56650                              03/15/85C          05/31/85C OPERATING STAFF EXPERIENCE REQUIREMENTS                        H56651                    04/19/85C                    05/31/85C INCREASED BLOND 0HN OF PRESSURIZER SAFETY VALVES              M56653        03/12/85C 04/tS/85C                      05/31/85C REtf!EH OF FSAR AMENDMENT NO. 14                              M57420        05/31/85C                                05/31/85C REVIEN OF REGULATORY GUIDE 1.97                                M56822        12/01/83C 12/05/84C                      06/18/85C SALEM ATHS EVENT REVIEH (ITEMS 1.1 & 1.2)                      M56660                    04/19/85C                    07/05/85C EMERGENCY TECH. SPEC. CHANGE, ITEM 3.4.5.2                    H59245                                                08/05/85C INCENTIVE PLANS                                                M56666                                                08/09/85C TMI ACTION ITEMS II.K.3.30 & II.K.3.31                        M59188 F-57              07/16/85C                    08/27/85C ICCI IMPLEMENIATION LETTER                                    M56655                    05/29/85C                    08/30/85C PRESSURIZER AUXILIARY SPRAY SYSTEM TEST                        M56648                    01/31/85C                    01/31/86C 1
J l
 
R-1208687-001                    REGULAT0RY          INF0RMATION                TRACKINO              SYSTEM                        PAGE NO.                135 C0NDENSED            MANAGEMENT              REPORT                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 2 PLANT OCATION: 19 MI S OF LANCASTER, PA              LICENSED PONER: 3293 MHT                      PROJECT MANAGER: G. GEARS DOCKEl HUMBER: 050-00277                              DESIGN P0HER:    1065 MHE                    BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: BECH                                NSSS VENDOR:    GE                            LIC. ASSISTANT: R. INGRAM IE INSPECTOR:      A. BLOUGH RAI                      SE TAC      MPA        RAI        RESPONSE      TER        INPUT      LIC ACT TITLE                                                              NUMBER    ML      DAlf.          DATE        DAlf.        DATE        DATE muum ACTIVE ISSVES MMMM FUEL DIL SYSTEMS FOR STANDBY DIESEL GENERATORS                      M47379                          11/15/84C                            08/30/85 TECH. SPEC. CHANGE INVOLVING THE OFF-GAS SYSTEM                    M57807                                                              09/06/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,          M54556    B-83                  04/18/85C                            09/13/85 TS CHANGES ON REACTOR HATER LEVEL AND II.K.3.16                    M54828          10/05/84      10/02/84C                            09/13/85 3
TECH. SPEC. CHANGE ON AUDIT OF EMERG. PLAN PROCEDURES              M54830            N, A                                              09/13/85 TECHNICAL SPECIFICATIONS ON II.K.3.13 AND II.K.3.22                M56560                                                              09/15/85 REACTOR HATER LEVEL INSTRUMENTATION LCO TECH SPEC. CHANGE          M56942                                                              09/15/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM        M43728    B-65    N/A                                              09/30/85 NUREG-0737 II.E.4.2. CONTAINMENT ISOLATION DEPENDABILITY            M44874    F-19                  11/30/84C                            09/30/85 TECH. SPEC. CHANGE REFLECTING APP. R MODIFICATIONS                  M56953                                                              09/30/85 CONTROL ROOM UPGRADE - APPENDIX 'R'                                M59446                                                              09/30/85 REVIEW OF ENERGY ABSORBERS                                          M59448                                                              10/04/85
: REVIEW OF PENETRATION SEAL TEST REPORTS AND PROGRAM              M55059            N/A          09/20/85                            10/30/85
: TECH. SPEC. CHANGES RELATED TO PURGE / VENT VALVES              M55161          02/26/85C 08/30/85                                  10/30/85 TECH. SPEC. CHANGES INVOLVING BYPASSING SCRAM SIGNALS              M59291                                                              10/30/85 JUSTIFICATION FOR ' INTERIM SPDS' AND REV. TO NRC ORDERS          M59490                                                              10/30/85 TECH SPEC CHANGE RELATED TO VERIF. OF DRYHELL-TO-TORUS VAC        M46787          02/26/85C 08/30/85                                  10/31/85 ENVIRONM TECH SPEC CHANGE RELATED TO A REPORTING PERIOD            M46789            N/A                                              10/31/85 l        ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54093    B-92    N/A                                                10/31/85 TS CHANGE TO DELETE DRYHELL AIR MONITORING SYSTEM                  M54367                          05/23/85C                            11/15/85 TS CHANGES INVOLVING MANAGEMENT REORGANIZATION                    M55157          03/18/85C 04/24/85C                                  11/15/85 TECH. SPEC. CHANGES TO APPROVED RETS (REV. 1)                      M56949                          08/22/85C                            11/15/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46328    F-68    N/A                                                11/29/85 50.12 EXEMPTION REQUEST-DAMPERS                                    M59283                                                              11/29/85 50.12 EXEMPTION REQUEST-DAMPERS                                    M59284                                                              11/29/85 REVIEH OF THE SECOND 10 YEAR ISI/IST PROGRAM                      M55400          10/22/84      02/01/85C                            12/28/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                    M52946    B-78    N/A                                                12/30/85
: REVIEW OF STRUCTURAL STEEL                                      M54359                          03/29/85C                            12/30/85 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                    M45969    F-63  09/14/84      11/19/ 84C                            12/31/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                  M46040    F-64    N/A                                                12/31/85 NUREG-0757 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46112 F-65                    07/24/84C                            12/31/85
: REVISED APP. J. TECH. SPECS. REQUEST                            M54823          09/10/b5        10/26/85                            12/31/85 SPENT FUEL POOL EXPANSION                                          M59012          08/30/85      09/06/85C                            12/31/85 INSTRUMENT ATION 10 FOLLON THE COURSE OF #H ACCIDENT (RG          M51117    A-17  0 5/15/8 5C 08/05/85C                              01/10/86 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56149    F-71  12/13/84C 06/30/85                                  01/31/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)          M44326    F-05  07'30/85        12/13/ 84C 05/30/85                03/28/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M54010    B-93  03/14/85C 05/29/85C                                07/30/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53783 B-87                                                          12/31/86 MM UNSCHEDULED ISSVES MM ITEM 2.t - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52865  B-77  03/14/85C 05/29/85C
 
R-1208687-001                REGULAT0RY          INF0RMATION                TRACKING          SYSTEM            PAGE NO.*                        136 C0NDENSED          MANAGEMENT              REP 0RT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 2 RAI          SE TAC    MPA        RAI    RESPONSE  TER INPUT        LIC ACT TITLE                                                            NUMBER    li(L.      MIL        DATE  MIf  DATE                          DATE uw UNSCHEDULED ISSUES MM      (CONTINUATION)
ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M53700  B-86    03/14/85C 05/29/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)            M55887  D-19      N/A TECH. SPEC. CHANGES RELATED TO HYDROGEN CHEM. TEST              M55962 STAFFING FOR PLANT EMERGENCIES (0737, SUPP. 1)                  M56791 10 CFR 50.62 OPERATING REACTOR REVIENS                          M59125 A-20 PURGE AND VENT VALVE STOPS                                      M59444 mum COMPLETED ISSUES MMM EMERGENCY PREPAREDNESS EXERCISE EXEMPTION REQUEST                H54617                                                10/03/84C I.D.t.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN        M51187  F-08                10/31/83                  10/10/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL        M42503  B-60                                          10/18/84C
                .16 FAILURES OF RELIEF VALVES                                    M45601  F-46                06/19/84C TS CHANGE ON REQUIREMENTS FOR TESTING EMERGENCY BATTERIES        M54793            N/A 10/23/84C CHANGE IN CYCLE TIME ON OPER. REQUAL. PROGRAM                    M57056                                                11/09/84C TS CHANGE RELATED TO SDV AND RHCU INSTRUMENTATION                M53273                                                11/28/84C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION      M45157 F-26                                          02/07/85C MODIFICATIONF OF COMMISSION ORDERS (6/14/84) 10/26/85C 12/05/84C                  02/11/85C M56685                                                02/11/85C OPERABILITY OF PURGE / VENT VALVES                                M54766                      05/23/84 ALARA PROJECTIONS FOR PIPE REPLACEMENT                            M56536 02/20/85C TS CHANGE FOR COOLANT LEAKAGE AND I-131 LIMITS                    M52681 02/25/85C 11/10/83                  02/27/85C TECH. SPEC. FOR II.K.3.18 REQUIREMENTS                            M55947                                                03/05/85C REVIEH OF APP R. III F AND III M EXEMPTION REQUESTS              M51741            N/A                                03/13/85C CYCLE 7 RELOAD                                                    M55807            N/A TECH. SPEC. TO REMOVE SNUBBER TABLE (GL84-13)                                                                            03/19/85C M55944            N/A                                03/19/85C HETHELL/DRYHELL VAC. BREAKER                                      M51017          01/30/85C 05/10/85 SCHEDULAR EXEMPTIONS CONCERNING EQ MODS.                          M56758                                                03/20/85C ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                                                                    03/29/85C M52784  B-76        N/A                                04/15/85C JET PUMP INSTRUMENT N0ZZLE CRACKS                              M55174                      12/10/84C CRACKS IN RECIRC. RISERS' SAFE ENDS                              M55576 06/05/85C 12/10/84C                06/05/85C INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO            M55606  B-84                05/14/85C                06/05/85C SUPPRESSION CHAMBER HIGH LEVEL TRIP SETTING                      M47375              N/A                                06/10/85C SURVEILLANCE REQS FOR THE PCIS/LPC1 INTERLOCK PRESSURE            M47377              N/A                                06/10/85C CORE SPRAY PUMP DISCHARGE PRESSURE INTERLOCK                      M47537              N/A                                06/10/85C REACTOR LEVEL SURVEILLANCE INSTRUMENTS                            M47539              N/A                                06/10/85C
              . ADDITIONAL RELIEF REQUEST FOR 1ST 10 YEARS ISI                  M56940                                                06/14/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42922  B-59    09/27/84C 01/09/85C                  06/20/85C MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC      M57162  D-20    01/30/85C 05/14/85C RECOMBINER CAPABILITY                                                                                                    06/20/85C M56538                      05/0t/85C                  06/26/85C CONTROL OF HEAVY LDADS - PHASE II (FOLLOHUP OF MPA8C-10)          M52255 C-15        N/A                                06/28/85C EMERGENCY PREPAREDNESS-SCHEDULAR CHANGE                          M57886                                                07/01/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53617  B-85    05/15/85C 05/28/85C                  07/10/85C TECH. SPEC. CHANGE - REPORTING REQ. (GL 33-43)                    M55728  A-18      N/A                                07/17/85C ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS          M53027  B-79      N/A                                07/22/85C
              . ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53866  B-88      N/A                                07/22/85C
 
R-1208687-001                REGULAT0RY          INF0RMATION              TRACKINO        SYSTEM            PAGE NO.*  137 C0NDENSED          MANA0EMENT            REPORT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 2 RAI          SE TAC    MPA      RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                          JElliDIR  &      DAIE      DATE    DAll _DATE        DATE u"u COMPLETED ISSUES MMM    (CONTINUATION)
MODIFICATION OF COMMISSION ORDERS (6/14/84) REV. 2              M57897                                            08/05/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51267  F-09  06/28/85 08/09/85C  N/A            08/09/85C
 
R-1208687-001                          REGULAT0RY          INF0RHATION                TRACKING          SYSTEM                      PAGE NO. 138 C0NDENSED              MANAGEMENT              REP 0RT                            RUN DATES 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 3 PLANT LOCATION: 19 MI S OF LANCASTER, PA                  LICENSFD POWER: 3295 MHT DOCKET NUMBER: 050-00278                                                                              PROJECT MANAGER: G. GEARS DESIGN POWER:      1065 MNE                BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: BECH                                      NSSS VENDOR:      GE IE INSPECTOR:    A. BLOUGH                                                                            LIC. ASSISTANT 8  R. INGRAM RAI                      SE TAC    MPA        RAI    RESPONSE      TER        INPUT TITLE                                                                                                                                      LIC ACT NUMBER    &        DAlf,    DATE        RME          DATE        DATE unum ACTIVf, ISSUES MMMM APP.R - SCHEDULAR EXEMPTION REFUND                                        M56596 FUEL OIL SYSTEMS FOR STANDBY DIESEL GENERATORS                            M47580          08/30/84  11/15/84C 05/30/85 INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO                      M55607  B-84                                                  08/30/85 12/10/84C                            08/30/85
,    PIPING INSPECTION PROGRAM FOR 1985 REFUELING OUTAGE                        M56679 TS CHANGES ON REACTOR HATER LEVEL AND II.K.3.16                            M54829                                                          09/06/85 10/05/84  10/02/84C                            09/13/85 TECH. SPEC. CHANGE ON AUDIT OF EMERG. PLAN PROCEDURES                      M54831            N/A TECHNICAL SPECIFICATIONS ON II.K.3.13 8 II.K.3.22                          M56 561                                                        09/13/85 REACTOR HATER LEVEL INSTRUMENTATION LCO TECH. SPEC. CHANGE                M56943                                                          09/15/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BHR SCRAM                M43732 B-65                                                    09/15/85 NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY                    M44875 F-19                                                    09/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                            11/30/84C                            09/30/85 M54557 B-83              04/18/85C TECH. SPEC. CHANGE REFLECTING APP. R MODIFICATIONS                          M56954                                                          09/30/85 TECH. SPEC. CHANGE INVOLVING THE OFF-GAS SYSTEM                            N57808                                                          09/30/85 CONTROL ROOM UPGRADE - APPENDIX 'R'                                        M59447                                                          09/30/85 REMIEH OF ENERGY ABSORBERS                                                M59449                                                          09/30/85
: REVIEH OF PENETRATION SEAL TFST REPORTS AND PROGRAM                                                                                      10/04/85 M35060            N/A    09/20/85                              10/30/85
: VECH. SPEC. CHANGES RELATED PURGE / VENT VALVES                        M55162          02/26/85C JUSTIFICATION FOR ' INTERIM SPDS' AND REV. TO NRC ORDERS                  M59491                                                          10/30/85 TECH SPEC CHANGE RELATED TO VERIF 0F DRYHELL-TO-TORUS VAC.                                                                                  10/30/85 M46788          02/26/85C 08/30/85                              10/31/85 ENVIRONM TECH SPEC CHANGE RELATED TO A REPORTING PERIOD                    M46790                                                          10/31/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                  M54094 B-92                                                      10/31/85 PURGE AND VENT VALVE STOPS                                                M59445 T/S CHANGE TO DELETE DRYHEL L AIR MONITORING SYSTEM                        M54368                                                          11/08/85 05/23/85C                            11/15/85 TS CHANGES INVOLVING MANAGEMENT REORGANIZATION                            M55158          03/18/85C 04/24/85C CRACKS IN RECIRC. RISERS' SAFE ENDS                                                                                                          11/15/85 M55577                    12/14/84                              11/15/85 TECH. SPEC. CHANGES TO APPROVED RETS (REV. t)                              M56950                    08/22/85C                            11/15/85 TECH. SPEC. CHANGES INVOLVING BYPASSING SCRAM SIGNALS                      M59292                                                          11/29/85 REUTEH OF THE SECOND 10 YEAR ISI/IST FROGRAM                                M55401          10/22/84  02/01/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                                                              12/28/85 M52947 B-78                                                    12/30/85
: REVIEW OF STRUCTURAL STEEL                ,                              M54360          12/14/84  03/28/85C NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                                              12/30/85 M45970 F-63    09/14/84  11/19/84C                            12/31/85 NU3EG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                            M46041 F-64 NUREG-0737 III.A.I.2, EMERGENCY OPERATIONS FACILITY                                                                                        12/31/85 M46113 F-65                07/24/84C                            12/31/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                          M46329 F-68
: REVISED APP. J TECH. SPECS. REQUEST                                                                                                      12/31/85 M54824          09/10/85C 10/26/85                              12/31/85 SPENT FUEL POOL EXPANSION                                                  M59013          08/16/85  08/27/85                            12/31/85 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                    M5ft18 A-17    05/15/85C 08/05/85C                            01/10/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -                M56t$0  F-71  12/13/84C 06/30/85                              01/31/86 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP, 1)                  M44327  F-05  07/30/85  12/13/84C 05/30/85                  03/28/86
 
I R-1208687-001                      REGULAT0RY                  INF0RHATION                  TRACKING          SYSTEM                  PAGE NO.      139 C0NDENSED                MANAGEMENT                REPORT                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 3 RAI                SE TAC    MPA        RAI      RESPONSE    TER    INPUT      LIC ACT TITLE                                                                        HUMALE      HL        MIL        DATE      MIf. DATE        DATE MMMM ACTIVE ISSUES munu          (CONTINUATION)
ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                  M54011    B-93    03/14/85C 05/29/85C                        07/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                      M53784    B-87                                                12/31/86 MM UNSCHEDULED ISSUES kN ITEM 2.t - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M52866    B-77    03/14/85C 05/29/85C ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M53701    B-86    03/14/85    05/29/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING CHANGES TO TECH.                        M53867    B-88 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                          M55888    D-19      N/A STAFFING FOR PLANT EMERGENCIES (0737, SUPP. 1)                                M56792 10 CFR 50.62 OPERATING REACTOR REVIENS                                      M59126    A-20 Muu COMPLE ED ISSUES NWM EMERGENCY PREPAREDNESS EXERCISE EXEMPTION REQUEST                              M54618                                                      10/03/84C I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                      M51188  F-08                                                10/10/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                      M42504  B-60                                                10/18/24C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                        M45602  F-46                06/19/84C                      10/23/84C TECH. SPEC. CHANGES RELATED TO HYDROGEN CHEM. TEST                            M55963            10/26/84                                  11/05/84C TS CHANGE ON REQUIREMENTS FOR TESTING EMERGENCY BATTERIES                      M54794                                                        11/09/84C TS CHANGE TO PERMIT OPERATION HITH INCREASED CORE FLON                        M55123                        09/27/84C                      12/03/84C TS CHANGE RELATED TO SDV AND RHCU INSTRUMENTATION                            M53274                                                      02/07/85C NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION                  M45158 F-26      10/26/84    12/05/85C                      02/11/85C MODIFICATION OF COMMISSION ORDERS (6/14/84)                                  M56686                                                      02/11/8 5C DPERABILITY OF PURGE / VENT VALVES                                            M54767                        10/10/84C                      02/20/85C ALARA PROJECTIONS FOR PIPE REPLACEMENT                                        M56537                                                      02/25/85C TS CHANGE FOR COOLANT LEAKAGE AND I-131 LIMITS                                MS2682                      11/10/85                      02/27/85C REVIEW OF APP R, III F AND III M EXEMPTION REQUESTS                            M51742                                                      0 5/13/8 5C TECH. SPEC. TO REMOVE SNUBBER TABLE (GL84-13)                                  M55945            N/A                                      03/19/85C TECH. SPEC. FOR II.K.3.18 REQUIREMENTS                                        M55946                                                      03/19/85C HETHELL/DRYHELL VACUUM BREAKERS                                                M51018          01/30/85C                                  03/20/85C SCHEDULAR EXEMPTIONS CONCERNING EQ MODS.                                      M56759                                                      03/29/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                            M52785 B-76                            12/12/84            04/15/85C SUPPRESSION CHAMBER HIGH LEVEL TRIP SETTING                                    M47376                                                      06/10/85C SURVEILLANCE REQS FOR THE PCIS/LPC1 ;NTERLOCK PRESSURE                        M47378                                                      06/10/85C CORE SPRAY PUMP DISCHARGE PRESSURE INTERLOCK                                  M47538                                                      06/10/85C REACTOR LEVEL SURVEILLANCE INSTRUMENTS                                        M47540                                                      06/10/85C MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                            M42923 B-59      09/27/84C 01/ 09/ 8 5C                      06/14/85C ADDITIONAL RELIEF REQUEST FOR IST 10 YEARS ISI                                M56941                                                      06/18/85C MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC                  M5716 3  D-20  01/50/85C 0 5/14/85C                        06/20/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA8C-10)                      M52256    C-15                                              06/28/85C RECOMBINER CAPABILITY                                                        M56539                      05/01/85C                      06/28/85C M57887                                                      07/01/85C EMERGENCY PREPAREDNESS-SCHEDUL AR CHANGE ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                  M53618    B-85  05/15/85C 05/28/85C 04/04/85                07/10/85C M55729    A-18    N/A                                      07/17/85C TECH. SPEC CHANGE - REPORTING REQ. (GL 83-45)
 
R-1208087-001                      REGULAT0RY          INF0RMATION              TRACKINO      SYSTEM            PAGE NO. 140 C0NDENSED            MANAGEMENT            REPQRT              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PEACH BOTTOM 3 RAI          SE TAC    MPA      RAI  RESPONSE  TER INPUT      LIC ACT TITLE                                                                EMt!12    E      DAII    DATE  DAlf  DATE        DATE DMD COMPLETED ISSUES MMM        (CONTINUATION)
ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS              M53028  B-79                                    07/22/85C MODIFICATION OF COMMISSION ORDERS (6/14/84) - REV. 2                  M57898                                          08/02/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51268  F-09  06/28/85 08/09/85C CYCLE 7 RELOAD                                                        M56687 08/09/85C ADDITION TO CYCLE 7 RELOAD                                                                                            08/23/85C M57337                                          08/23/85C 1
s
 
R-1208687-001                        REGULAT0RY          INF0RHATION                TRACKING          SYSTEM                          PAGE NO.        141 C0NDENSED          MANAGENENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PILGRIM 1 PLANT LOCATION: 4 MI SE OF PLYMOUTH, MASS                LICENSED POWER: 1998 MHT                    PROJECT MANAGER: P. LEECH DOCKET NUMBER: 050-00293                                DESIGN POWER:    0655 MHE                  BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: BECH                                    NSSS VENDOR:    GE                        LIC. ASSISTANT    S. NORRIS IE INSPECTOR:          J. JOHNSON RAI                      SE TAC    MPA        RAI      RESPONSE      TER        INPUT        LIC ACT TITLE                                                                  NUMBER    11(L      MIX          DATE      Mlf          DATE            DATE MMMM ACTIVE ISSLES Munu NUREG-0737 II.E.4.2          CONTAINMENT ISOLATION DEPENDABILITY      M44876  F-19  09/26/84    11/13/84C                                09/30/85 NUREG-0737 II . K . 3.18, ADS ACTUATION STUDY                          M45699  F-48              07/28/83C                                09/30/85 CORRECT PERFORMANCE OF OPERATING ACTIVITIES (API.C.6)                  M47313  F-07  04/11/85  08/03/84C                                09/30/85 1ECH. SPEC. CHANGE OF CALIBRATION FREQUENCY FOR REACTOR                M57510                                                              09/30/85 TECH. SPEC. CHANGE OF K-EFFECTIVE LIMIT AND ADDITION OF                M57511                                                              09/30/85 SUPPLEMENT RESPONSE TO IEB 79-08 AND NUREG-0737 ITEM                  M56317                                                              10/18/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                    M42885  B-59  01/10/85  02/21/85C                                10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52867  B-77      N/A                                              10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M52948  B-78      N/A                                              10/30/85 ANNUAL TIME LIMITATION PURGING / VENTING CONTAINMT                    M57857          08/29/85    10/04/85                                10/30/85 NUREG 0737 II.K.3.28. VERIFY QUALIFICATION OF ACCUMULATORS            M48271  F-55              07/31/85C                                10/31/85 RECOMBINER CAPABILITY RESPONSE TO G.L. 84-09                          M55644 A-19                05/21/85C                                10/31/85 REACTOR HATER LOW LEVEL TRIP SETTINGS TECH. SPEC. CHANGE              M59065                                                              10/31/85 TS CHANGE REMOVING DETAILS OF SECTION XI ISI PROGRAM                  M54609            N/A    04/17/85C                                11/15/85 APPENDIX "J" TECHNICAL SPECIFICATION CHANGES                          M59190                                                              11/15/85 APRM HIGH FLUX SCRAM SETPOINT. TABLE 3.1.1 CORRECTIONS                M59511                                                              11/29/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE              M54095 B-92                                                          12/30/85 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                        M45971  F-63              07/31/85                                  12/31/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                      M46042  F-64              07/31/85                                  12/31/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                      M46330  F-68                                                        12/31/85 INSERVICE TESTING PROGRAM AND REQUESTS FOR RELIEF - 2ND TEN          M52032                      10/14/85                                12/31/85 TECH. SPEC. CHANGES RELATIVE TO SBGT AND CRHEAF SYSTEMS                M55571                      08/09/85C                                01/31/86 BHR SINGLE LOOP OPERATION                                            M10825  E-04                12/ 31/ 80C                            03/30/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                    M46114  F-65              09/30/85                                03/31/86 TECH. SPEC. CHANGE LIMITING REACTOR COOLANT LEAKAGE INTO              M56835                                                              O!/31/86 ADDITIONAL INFORMATION RE SAFETY PARAMETER DISPLAY SYSTEM              M58014                                                              05/31/86 DCRDR SUPPLEMENTAL
 
==SUMMARY==
REPORT                                    M59329                                                              03/31/86 INSTRUMENTATION 10 FOLLOW THE COURSE OF AN ACCIDENT (RG              M51119  A-17                11/ 01/84C                              04/30/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS          M53029  B-79  04/23/85                                            04/30/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53619  B-85                                                        05/01/86
' MARK I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE 10 GENERIC          M57164  D-20                05/13/83C                              05/02/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M44328  F-05  02/19/85    12/31/85    07/23/84C                  05/30/86 to CFR 50.62 OPERATING REACTOR REVIENS                              M59127  A-20                                                        06/30/86 APPENDIX R EXEMPTION REQUESTS 811-15                                  M53416                      12/27/84C                              09/30/86 TS CHANGES RELATIVE TO FIRE PROTECTION                                M54610                                                              09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53785  B-87                                                        12/31/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53868  B-88  06/28/85C                                            12/31/86
, ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M53702  B-86                                                        01/30/87
. ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M54012  B-93    04/23/85C 08/23/85C                                01/30/87
 
R-1208687-001                  REGULAT0RY        INF0RHATION                TRACKING              SYSTEM                  PAGE NO.s    142 C0NDEDSED            MANAGEMENT                  REP 0RT                      RUN DATE: 09/17/85 (HEt.DQUARTERS)
FACILITY: PILGRIM 1 RAI                SE TAC    MPA            RAI    RESPONSE        TER INPUT      LIC ACT TITLE                                                            HiltQf8  &              DMX        DATE      DMf      DATE        DATE MMMM ACTIVE ISSUES mwMM      (CONTINUATION)
NN UNSCHEDULED ISSUES MM DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)            M55889  D-19    07/02/84      01/28/85C REVISED CORE DAMAGE ASSESSMENT PROCEDURE              .
M59636 REQUEST FOR HEARING ON K-EFFECTIVE OF SPENT FUEL POOL            M59637 unu COMPLETED ISSUES M*M AMENDMENT DELETING LICENSING CONDITION 3.D. " EQUALIZER VALVE    M55427                N/A                                      10/09/84C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN      M51189  F-08                  08/14/84C                      10/10/84C TS CHANGE RE RPV THERMAL AND PRESSURIZATION LIMITS                M55485                                                          10/10/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54558  B-83 TECH. SPEC. CHANGES RE TORUS TEMPERATURE MONITORING              M55538                                                          11/07/84C NUREG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF                                                                          11/ 07/84C M45603 F-46            N/A      06/20/84                        11/14/84C RECIRCULATION SYSTEM INSPECTION AND REPAIR                        M53218                          10/26/84 LICENSE AMENDMENT EXTENDING COMPLETION OF II.B.3 AND              M56464                                                          12/04/84C NUREG 0737 TECH SPECS RE GL 83-02                                                                                                12/17/84C M51690  B-72                                                    12/20/84C INSPECTION OF BNR STAINLESS STEEL PIPING ACCORDING TO            M55608  B-84                    06/04/84C                      01/15/85C MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION                M07948  D-01          N/A                                    01/30/8SC HEAVY LDADS (NUREG 0612)                                          M10817  C-10                    01/25/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51269  F-09 03/06/85C N/A      08/10/84C    N/A              03/21/85C ENVIRONMENTAL QUALIFICATIONS OF SAFETY RELATED ELECTRICAL        M42477  B-60    08/14/84        01/21/85C                      03/26/85C SCHEDULAR EXTENSION TO C0t1PLETE ENVIRONMENTAL QUALIFIC G N      M56821                                                        03/28/85C REQUEST FOR SHON CAUSE ORDER RELATIVE TO EQ DEFICIENC7 G          M56197                                                        04/05/85C TECH. SPEC. CHANGE OF MAIN STEAM LINE HIGH RADIATION              M56820                                                        04/05/85C PRIMARY CONTAINMENT OXYGEtt CONCENTRATION TECH. SPEC. CHAldGE      M56551                                                        04/22/85C TEMPORARY RELIEF FROM TECHNICAL SPECIFICATION 3.7.D.2 FOR          M57288                                                        05/06/85C I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56151  F-71                              04/10/85            05/16/85C RELIEF FROM II.B.3 AND II.F.1(6) CRITERIA REF. H2/02              M56994  F-12                                                  05/16/85C SUPPLEMENTAL REQUESTS FOR EXEMPTION ERGARDING 10CFR 50.48        M51643  B-41                                                  06/10/85C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION      M45159  F-26          N/A      11/28/84C                      06/11/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS        M44466  F-12                  05/30/85C                      06/18/8 5C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)          M52257  C-15          N/A                                      06/28/85C INSERVICE INSPECTION - 2ND TEN YEAR INTERVAL                      M51581          10/01/84      02/12/85C 04/23/85C            08/13/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55730  A-18                  02/08/85C                      08/14/85C T/S RELATIVE TO ORGANIZATION & RESPONSIBILITY RESPONSIBILITY      M56384                                                          08/14/85C RELIEF FROM IMPLEMENTATION OF II.K.3.22 AUTOMATIC SHITCHOVER      M57796                                                          08/20/85C APPENDIX I TECH SPEC It1PLEMENTATION REVIEH                      M08123 A-02            N/A      05/14/85C                      08/30/85C 15 CHANGE REQUEST TO ALLOH CONTROLLED EFFLUENT RELEASE FROM      M48767                          05/14/85C                      08/30/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52786  B-76    06/17/85C 08/13/85C                            09/11/85C TECH. SPEC. CHANGE CONCERNING SURVEILLANCE REQUIREMENTS FOR      M55570                                                          09/30/85C NUREG - 0737 II. 3.22B, RCIC SUCTION MODIFICATI0HS                M47858  F-51                                                  06/26/86C
 
_ _ _ . - - - - - _ _ - - - - _- .. ~            ,    ,,    -  m.,      _ _ .. _ - _ _ _ . - .                          . .,    -,-
R-1208687-001                      REGULAT0RY          INF0RMATION                        TRACKING        SYSTEM                        PAGE N0.8    143 C0NDENSED                MANAGEMENT                REPQRT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: POINT BEACH 1 PLANT LOCATION: 15 MI N OF MANITOHOC, HISC              LICENSED POWER: 1518 MHT                          PROJECT MANAGER: T. COLBURN DOCKET NUMBER: 050-00266                                DESIGN P0HER8            0497 MHE                BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: BECH                                  NSSS VENDOR 8            HEST                    LIC. ASSISTANT    P. KREUTZER IE INSPECTOR:              R. HAGUE RAI                      SE TAC      MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                                        NUMBER      E        D111      DATE      DAIL        DATE        DATE mumm ACTIVE ISSUES WMum
;            REACTOR COOLANT PUMP TRIP                                                    M49656    G-01                                                  06/30/85 i            STEAM GENERATOR LEAKAGE LIMIT TECH. SPEC.                                    M56868                                                          07/30/85 HUREG-0737 III.A.2.2. METEOROLOGICAL DATA UPGRADE                            M46331    F-68                                                  07/31/85 APPENDIX R FIRE PROTECTION REVIEH                                            M48247    B-41  02/01/85  04/28/83      N/A                    07/31/85 INSERVICE TESTING                                                          M51301                      05/19/83C                            07/31/85 CAPSULE T
 
==SUMMARY==
REPORT EXTENSION EXTENSION REQUEST                        M57557                                                          07/31/85 APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                                  N07712 A-02                05/15/80C 05/15/85C                  08/30/85 FIRE PROTECTION TECH SPECS                                                  M51550                      04/19/83C                            08/30/85 SINGLE FAILURE PROOF CRANE TECH. SPECS.                                    M57641                                                          08/30/85 CONTAINMENT TYPE A TESTING (APPENDIX J)                                      M52665                      02/07/84C                            08/31/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                  M55368    B-90                                                  08/31/85 APPENDIX R EXEMPTION                                                        M55292                                                          09/30/85 2ND TEN YEAR INTERVAL ISI RELIEF                                            M55500                                                          09/30/85 EXTENSION OF NUREG-0737 SUPPLEMENT 1 ORDER DATES (SAS, REG.                M56869                                                          09/30/85 EXTENSION OF NUREG-0737 SUPPLEMENT 1 ORDER DATES (SAS, REG.                M56870                                                          09/30/85 NUREG-0737 ORDER EXTENSION DCRDR
 
==SUMMARY==
REPORT                            M57793                                                          09/30/85 GDC-04 EXEMPTION REQUEST                                                    M57864                                                          09/30/85 1              REACTOR VESSEL CAPSULE SURVEILLANCE TECH. SPEC. CHANGE                      M59061                                                          09/30/85 SEISMIC QUALIFICATION OF THE AUXILIARY FEEDHATER SYSTEM                    M43669    C-14            04/22/85C                            10/30/85 RV AND SV TESTING                                                            M44608    F-14  01/17/85C 05/16/85C                            10/30/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS                  M58078    C-16            06/17/85                            10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                  M52868    B-77            11/07/83C                            11/01/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                              M52949    B-78            11/07/83C                            11/01/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                M53030    B-79            11/07/83C                            11/01/85 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                    M53087    B-50            11/07/83C                            11/01/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                M53140    B-81            11/07/83C                            11/01/85 ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                  M53186    B-82            02/28/85C                            11/01/85 REACTOR COOLANT PUNP LCO'S TECHNICAL SPECIFICATION CHANGE                    M57555                                                          11/30/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                    M51120    A-17  12/05/84  09/01/85                            12/05/85 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                              M45972    F-63                                                  12/31/85 l            NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                            M46043    F-64                                                  12/31/85 l            NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                          M46115    F-65              11/18/83C                          12/31/85 1
DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                        M55890    D-19                                                  12/31/85 FACILITY OPERATING LICENSE EXPIRATION DATE EXTENSION                        N59174                                                          12/31/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                      M51270    F-09                                                  04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                    M53869    B-88                                                  04/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                M56152    F-71            03/31/86    04/30/86                06/30/86 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION                M45160    F-26            03/21/83C                            07/30/86 NUREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46                          M48192    F-58            06/30/86                              10/31/86 L
8
 
R-1208687-001                                        REGULAT0RY              INF0RMATION                TRACKING        SYSTEM                PAGE N0.8  144 C0NDENSED              MANAGEMENT            REPQRT                      RUN DATE: 09/17/85 (HEADQUARTERS) rACILITY: POINT BEACH 1 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                                                      IfuMBER  lt(L    DAIE      DATE      DAlf    DATE      _ ,A'?f_
DMuu ACTIVE ISSUES MMMM                            (CONTINUATION)
ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                    M53786  B-87                                            11/01/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                M53927  B-89    05/15/85                                11/01/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                              M54013  B-95    03/13/85C                                11/01/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                  M54096  B-92                                            11/01/86 PROCEDURES GENERATION PACKAGE RFVIEH (NUREG 0737 SUPP/1)                                  M44329  F-05    02/28/86            01/30/86            11/30/86 UPI ECCS INJECTION                                                                        M06828  D-05    02/13/85  04/30/85                      12/10/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                M53620  B-85                                            12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                M53703  B-86                                            11/01/87 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                                        M52787  B-76    07/28/85  09/25/85                      12/31/87 cm UNSCHEDULED ISSUES mm STEAM GENERATOR ISI                                                                        M56316 10 CFR 50.67 OPERATING REACTOR REVIENS                                                    M59128 A-20 HISCONSIN'S ENVIRONMENTAL DECADE 2.206 PETITION RE: EQ                                      M59367 Muu COMPLETED ISSUES Mum HESTINGHOUSE OPTIMIZED FUEL DESIGN                                                          M49969                    09/06/83C                    10/05/84C REPEAL OF CONFIRMATORY ORDERS                                                              M54253                                                  10/12/84C NUREG-0737 ORDER MODIFICATION                                                              M54596                                                  10/12/84C EQUIPMENT QUALIFICATION DEADLINE EXTENSION                                                  M55558                                                  11/05/84C SEAL RING REPOSITIONING                                                                    M57063                                                  11/05/84C TECH. SPEC. EFFECTIVE DATE CHANGE                                                          M55984                                                  12/27/84C CORE DAMAGE METHODOLOGY                                                                    M57058                                                  01/07/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                                  M51190 F-08              08/09/84  11/08/84C          01/22/85C SUPPLEMENT 1 NUREG-0737 ORDER MODIFICATION (EOP'S)                                          M56311                                                  02/05/85C SUPPLEMENT 1 NUREu 0737 ORDER MOD, TSC EMERGENCY POWER                                      M56602                                                  02/05/85C CONTAINMENT TENDON SURVEILLANCE                                                            M54989                                                  03/07/85C CONTROL ROD INSERTION LIMITS T.S.                                                          M55330                                                  03/07/85C 00ERP0HER AND DVERTEMPERATURE DELTA T TECH SPECS                                            M56309                                                  04/04/85C HEAVY LOADS HANDLING T.S.                                                                  M54591                                                  04/08/85C HYDRAULIC. SNUBBER T.S.                                                                    M54592                                                  04/08/85C ADMIN T.S.                                                                                  M54595                                                  04/08/85C REACTOR VESSEL HOT LEG N0ZZLE SL AG INCLUSIONS                                              M54446                    03/23/84C                    04/24/85C
*NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                      M45853 F-57                                            06/26/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)                                    M52258 C-15                                            06/23/85C EQUIPMENT QUALIFICATION EXTENSION REQUEST                                                  M57627                                                  07/15/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                  M54559  B-83                                            07/18/85C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                    M54406                                                  07/22/85C REVISED REACTOR COOLANT PUMP UNDER FREQUENCY. TRIP SETPOINT                "
M5684 5                                                07/22/85C Al'Y. FW LCO TECH SPECS                                                                    M56313                                                  07/26/85C
 
                  .- . .- -.                      .-. . _ ..  . _ _ -      _          _            .~-      . - .            --              . . - . - - - - - - _ . _ - - - - - - - - - _ . . - -
II R-1208687-001                    REGULAT0RY            INF0RMATION                TRACKINO          SYSTEM                                                    PAGE NO.                  145 C0NDENSED            MANAGENENT              REPORT                                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: POINT BEACH 2 PLANT LOCATION: 15 MI N OF MANITOHOC, HISC              LICENSED POWER: 1518 MHT                  PROJECT MANAGER: T. COLBURN DOCKET NUMBER: 050-00501                                DESIGN P0HER:    0497 MHE                BRANCH CHIEF        E. BUTCHER ARCH / ENGINEER: BECH                                  NSSS VENDOR:      HEST                    LIC. ASSISTANT:      P. KREUTZER IE INSPECTOR:      R. HAGUE RAI                                    SE TAC    MPA        RAI    RESPONSE        TER                INPUT                                      LIC ACT TITLE                                                                  NUMBER    E        MIX        DATE        MIf                      DATE                                    DATE munu ACTIVE ISSUES muun REACTOR COOLANT PUMP TRIP                                            M49657  G-01                                                                                              06/30/85 NUREG-0737 III.A.2.2. METEOROLOGICAL DATA UPGRADE                    M46332  F-68                                                                                              07/31/85 APPENDIX R FIRE PROTECTION REVIEN                                      M48246  B-41  02/01/85  04/28/83C      N/A                                                              07/31/85 INSERVICE TESTING                                                    M51302                    0 5/19/8 3C                                                                      07/31/85 GENERIC - APPENDIX I                                                  M08150 A-02                0 5/15/80C                                                                      08/30/85 FIRE PROTECTION TECH SPECS                                            M51551                    04/19/83C                                                                        08/31/85 CONTAINMENT TYPE A TESTING (APPENDIX J)                              M52666                                                                                                      08/31/85 B-90 8
ITEM 4.3(TS) - AUTOMATIC ACTUA1 ION OF SHUNT TRIP FOR H AND          M55369                                                                                                      08/31/85 SEISMIC QUAL. OF THE AFH SYSTEM                                      M43670  C-14  03/11/85  04/22/85C                                                                        09/01/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY          M53621  B-85  09/30/85  11/30/85      04/04/85                                                          09/30/85
,                      APPENDIX R EXEMPTION REQUEST                                          M55293                                                                                                      09/30/85 2ND TEN YEAR INTERVAL ISI RELIEF                                      M55501                                                                                                      09/30/85    '
SINGLE FAILURE PROOF CRANS TECH. SPECS.                              M57642                                                                                                      09/30/85 NUREG-0731 ORDER EXTENSIGN DCRDR
 
==SUMMARY==
REPORT                      M57794                                                                                                      09/30/85 GDC-04 EXEMPTION REQUEST                                              M57865                                                                                                      09/30/85 REACTOR VESSEL CAPSULE SURVEILLANCE TECH. SPEC. CHANGE                M59060                                                                                                      09/30/85 RV AND SV TESTING                                                    M44609  F-14  01/17/85C 05/16/85C                                                                        10/30/85 l
STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS            M58079  C-16              06/17/85                                                                        10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52869  B-77              11/07/83C                                                                        11/01/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                        M52950  B-78              11/07/83C                                                                        11/01/85 REACTOR TRIP SYSTEM RELIAoILITY - VENDOR RELATED                      M53088  B-80              11/07/83C                                                                        11/01/85
.                        ITEMS 4.1.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR        M53141  B-81              11/07/83C                                                                        11/01/85 i
REACTOR COOLANT PUMP LOC'S TECH. SPEC. CHANGE                        M57556                                                                                                      11/30/85 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG              M51121  A-17    12/05/84  09/01/85                                                                        12/05/85 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                        M45973  F-63                                                                                              12/31/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                      M46044  F-64                                                                                              12/31/85 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                  M46116  F-65              11/18/83C                                                                        12/31/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                  M52788  B-76  07/28/85  09/25/85                                                                        12/31/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55891  D-19                                                                                              12/31/85
                      , FACILITY OPERATING LICENSE EXPIRATION DATE EXTENSION                M59175                                                                                                      12/51/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                              M51271  F-09                                                                                              04/30/86 ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS            M53031  B-79              11/07/83C                                                                      04/30/36 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53870  B-88                                                                                              04/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -        H56153  F-71              03/31/86      04/30/86                                                          06/30/86 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION        M45161  F-26              02/21/8 3C                                                                      07/30/86 ITEMS 3.2.1 3 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53787  B-87                                                                                              11/01/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP          M53928  B-89                                                                                              11/01/86 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING        M54014  B-93    03/13/85C                                                                                  11/01/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE            M54097  B-92                                                                                              11/01/86
 
R-1208687-001                                                          REGULAT0RY                INF0RMATION              TRACKING        SYSTEM                  PAGE N0.8      146 C0NDENSED                MANA0EMENT            REPORT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY POINT BEACH 2 RAI              SE TAC    MPA      RAI  RESPONSE      TER  INPUT          LIC ACT TITLE                                                                                                          NUMBEll  HL      M        DATE      DAIX    DATE            DATE CMMu ACTIVE ISSUES unu4                                              (CONTINUATION)
PC10CEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)                                                      M44330  F-05  02/28/86            01/30/86                11/30/86 UPI ECCS INJECTION                                                                                            M08349  D-05  02/13/85 04/30/85                          12/10/86 NUREG 0737 II.K.3.51 COMPLIANCE WITH 10 CFR 50.46                                                              M48193  F-58            06/30/86                          01/31/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND vet 4 DOR INTERFACE -                                                  M53704  B-86                                              11/01/87 ND UNSCHEDULED ISSUES Nu to CFR 50.62 OPERATING REACTOR REVIENS                                                                        M59129 A-20 HISCONSIN'S ENVIRONMENTAL DECADE 2.206 PETITION RE: EQ                                                          M59368 004 COMPLETED ISSVES MmM HESTINGHOUSE OPTIMIZED FUEL DESIGN                                                                              M49970                  09/06/83C                        10/05/84C NUREG-0737 ORDER MODIFICATION                                                                                  M54597                                                    10/12/84C EQUIPMENT QUALIFICATION DEADLINE EXTENSICN                                                                      M55557                                                    11/05/84C SEAL RING REPOSITIONING                                                                                        H57064                              11/30/84              11/05/84C OUERPOWER AND OVERTEMPERATURE DELTA T TECM SPECS                                                                M56310                                                    11/16/84C TECH. SPEC. EFFECTIVE DATE CHANGE                                                                              M55983                                                    12/27/84C EQUIPMENT QUALIFICATION DEADLINE EXTENSION                                                                      M57389                                                    01/03/85C CORE DAMAGE METHODOLOGY                                              .                                          M57059                                                    01/07/85C I.D.1.1 - DETAILED CONTROL R00M DESIGN REVIEW PROGRAM PLAN                                                      M51191  F-08            08/09/84  11/08/84C              01/22/85C SUPPLEMENT 1 NUREG-0737 ORDER MODIFICATION (EOP'S)                                                              M56 312                                                    02/05/85C SUPPLEMENT 1 NUREG-0737 ORDER MOD, TSC EMERGENCY P0HER                                                          M56603                                                    02/05/85C CONTAlt4 MENT TENDON SURVEILLANCE                                                                              M54990                                                    03/07/85C CONTROL ROD INSERTION LIMITS                                                                                    M55331                                                    03/07/85C HEAVY LOADS HANDLING T.S.                                                                                      M54590                                                    04/08/85C HYDRAULIC SNUBBER T.S.                                                                                          M54593                                                    OG/08/85C 2DMIN T.S.                                                                                                      M54594                                                    04/08/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                                          M45854 F-57                                                06/26/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPAtC-10)                                                        M52259 C-15                                                06/28/85C EQUIPMENT QUALIFICATION EXTENSION REQUEST                                                                      M57628                                                    07/15/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                      H54560  B-83                                              07/18/85C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                                        M54407                                                    07/22/85C REVISED REACTOR COOLANT PUMP UNDER FREQUENCY TRIP SETPOINT                                                      M56844                                                    07/22/85C AUX FH LCO TECH SPECS                                                                                          M56314                                                    07/26/85C STEAM GENERATOR ISI                                                                                            M56315                                                    07/26/85C
 
t R-1208687-001 '                                                        REGULAT0RY        INF0RMATION                                          TRACKINO                          SYSTEM                                  PAGE NO. 147    [
i i
'                                                                                            C0NDENSED            MANAGEMENT                                                      REP 0RT                                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY 8 PRAIRIE ISLAND 1
.        PLANT LOCATION: 28 MI SE OF MINNEAPOLIS, MINN                                            LICENSED PONER: 1650 MHT                                                              PROJECT MANAGER: D. DIIANNI
  !        DOCKET NUMBER: 050-00282                                                                  DESIGN P0HER:                    0530 MHE                                            BRANCH CHIEF:            E. BUTCHER ARCH / ENGINEER: FPI                                                                      NSSS VENDOR:                      HEST                                                LIC. ASSISTANT 8        P. KREUTZER                          -
IE INSPECTORt                          C. FEIERABEND                                                                                                                                                                                        !
;                                                                                                                                                                                            RAI                              SE                        .
TAC                MPA                          RAI      RESPONSE            TER          INPU1        LIC ACT        !
TITLE                                                                                                          HUMBER                    ML                        Mig            DATE              A RAJE          DATE          DATE i                                                                                                                                                                                                                                                        t EMuu ACTIVE ISSUES nunu                                                                                                                                                                                                                      !
4 R0D CLUSTER CONTROL GUIDE THIMBLE PLUGS                                                                        M57544                                                                                                        09/20/85 x          AUTHORIZING STEAM GENERATOR TUBE SLEEVING                                                                      M57847                                    06/24/85                                                          10/01/85
.          INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                                                        M51122 A-17                                11/15/84                                                          10/15/85        i
-        ITEMS 4.2.1 & 4.2,2- PREVENTATIVE MAINT PROGRAM FOR REACTOR                                                    M53142 B-81                                                                                                  10/15/85
,          NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                    M45162 F-26                                                                                                  12/15/85 4          REACTOR COOLANT PUMP TRIP                                                                                      M49663 G-01                                                                                                  12/15/85 ECCS ERROR AND CORE HEIGHT F(Q) (KZ CURVE VERIFICATION ONLY)                                                    M57250                                                                                                        12/15/85 REVIEH OF ASYMMETRIC LOCA LOADS SUBMITTAL                                                                      M08731                D-10                                                                                  12/20/85 RV AND SV TESTING                                                                                              M44680                F-14                01/17/85C 08/15/85                                                12/30/85      i ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                                    M53929                B-89                                                                                  01/31/86 REVIEW RELOAD S.E. METHODS REV. 3 VIPRE-01 CODE                                                                M57644                                                                                                        02/15/86        l PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 $UPP/1)                                                        M44331                F-05                10/30/85                            09/30/85                    03/01/86 i        -I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                                    M56154                F-71                        N/A      01/01/86            02/03/86                    04/10/86
.        NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                                                  M45974 F-63                                                                                                  08/31/86      '!
NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                                M46045 F-64                                                                                                  08/31e86 i        NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                                                            M46117                F-65                                                                                  08/31/86        I L        NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                              M46333                F-68                                                                                  08/31/86 4          WESTINGHOUSE UPPER PLENUM ECCS INJECTION - LONG RANGE                                                          M08351                D-05                02/12/85                                                          09/15/86        !
NUREG 0737 II.K.3.51 COMPLI ANCE HITH to CFR 50.46                                                              M48194                F-58                                  06/15/86                                        01/15/87        ,
um UNSCHEDULED ISSUES Ma i"                                                                                                                                                                                                                                                      1 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                    M58080                C-16                                  06/19/85                                                        l 10 CFR 50.62 OPERATING REACTOR REVIENS                                                                        M59130 A-20 unu COMPLETED ISSUES Muu I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                                                    M51192 F-08                                                  05/27/83            09/19/83C                    10/10/84C      i STEAM GENERATOR LEAK .015 GPM SE                                                                              M55237                                                                                                        10/18/84C      i 1 ROD SHAP METHODOLOGY                                                                                        M55767                                                                                                        10/24/84C i          RELOAD SAFETY EVALUATE METHOD FOR CONTROL ROD DROP ANA.                                                        M55817                                                                                                        12/11/84C ISI/IST; 2ND to YEAR PROGRAM                                                                                  M53456                                                                          06/25/84                    12/28/84C      i 3
'          AMENDMENT REQUEST COOLING H2O NEADER OPERABILITY                                                              M56738                                                                                                        02/15/85C
            ,    EVALUATION OF SUPPLEMENTARY SUBMITIAL REGARDING CONTROL                                                  M55476                                                                                                        03/04/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                                      M42500 B-60                                                                                                  03/25/85C      i SCHEDULAR EXEMPTION REQUEST FOR THE REQIPEMENTS OF APPENDIX                                                    M56779                                                                                                        05/07/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                        M53788                  B-87                                01/31/85                                        05/13/85C      '
i        ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                      M54098                  B-92                                                                                  05/13/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                                M52951                  B-78                                                                                  06/01/85C i
6
                          - . _ _          m-        , . . . _ , _ , ._ , , _ _          _          ,r_._  ,,m              _,,_,m.                  ,                _.            .
 
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ . - . .      .  .- -.            . - - - - - . . . _ - ..-....- -.~. - . . . . . - _ _ . -                                      . . - -          . . . .      --              .~ . - .. .
b r I I                      R-1208687-001                REGULAT0RY                                        INF0RMATION                            TRACKING            SYSTEM                              PAGE NO,8          148 C0NDEN$ED                                              MANAGEMENT            REP 0RT                                  RUN DATES 09/17/85-                ,
,                                                                                                                            (HEADQUARTERS) i FACILITY: PRAIRIE ISLAND 1                                                                                                    f RAI                            SE TAC    MPA        RAI    RESPONSE            TER          INPUT            LIC ACT TITL E                                                                                                      NUMBER  &        R&J1        DATE            j)AIf          DATE              DATE uun COMPLETED ISSUES MMM    (CONTINUATION)
REACTOR TRIP SYSTEM RELIABILITY- VEND;R RELATED                                                              M530'89 B-80                                                                06/01/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINf                                                                        M45855 F-57                                                                  06/06/85C
~
T.S. CHANGES REL ATED TO HOT CHANNEL FACTORS                                                                M55445                                                                      06/25/85C 1ECH. SPECS. AFFECTED BY 50.72 AND 50.73(GL 83-43)                                                            M55731  A-18                                                                06/25/85C          '
ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                                  M55370 B-90                                                                  06/26/85C SPENT FUEL POOL CRANE USE OVER POOL NO 1                                                                      M56614                                                                      06/26/85C          i CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPASC-10)                                                      M52260 C-15                                                                  06/28/85C          ;
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                      M51272  F-09    02/14/85  04/17/85            N/A                            07/15/85C            L DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                          M55892 D-19              11/15/84                                          09/06/85C            f s
d                                                                                                                                                                                                                                    h 3
,                                                                                                                                                                                                                                    I 1
j I-l
 
R-1208687-001                                REGULAT0RY        INF0RHATION                  TRACKIN0            SYSTEM                        PAGE NO.*  149 C0NDEN$ED          MANAGEMENT              REPORT                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PRAIRIE ISLAND 2 PLANT LOCATION: 28 MI SE OF MINNEAPOLIS, MINN                  LICENSED P0HER: 1650 MHT                        PROJECT MANAGER: D. DIIANNI DOCKET NUMBER: 050-00506                                      DESIGN POWER:    0530 MHE                      BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: FPI                                          HSSS VENDOR:    HEST                          LIC. ASSISTANT:    P. KREUTZER IE INSPECTOR:            C. FEIERABEND RAI                      SE TAC      MPA      RAI        RESPONSE      TER        INPUT      LIC ACT TITLE                                                                        NUMBER      HD.      Dalf          DATE        Dale        DATE        DATE unum ACTIVE ISM f3 munu ROD CLUSTER CCNTROL GUIDE THIMBLE PLUGS                                      M57545                                                                09/20/85    I AUTHORIZING STEAM GENERATOR TUBE SLEEVING                                    M57848            06/24/85                                            10/01/85 INSTRUMENTATION TO FOLLDH THE COURSE OF AN ACCIDENT (RG                    M51123 A-17      11/15/84                                            10/15/85 ITEMS 4.2.1 & 4.2.2- PREVENTATIVE MAINT PROGRAM FOR REACTOR                M53143 B-81                                                          10/15/85 NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION                M45163  F-26                                                        12/15/85 REACTOR COOLANT PUMP TRIP                                                  M49664  G-01                                                        12/15/85 ECCS ERROR AND CORE HEIGHT F(Q)                                            M57251                                                                12/15/85 REVIEN OF ASYMMETRIC LOCA LOADS SUBMITTAL                                  M08732  D-10                                                        12/20/85 RV AND SV TESTING                                                          M44611  F-14    01/17/85C 08/15/85                                  12/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                M53623  B-85                                                        12/31/85 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                M53930  B-89                                                        01/05/86 REVIEH RELOAD S.E. METHODS REV. 3 VIPRE-01 CODE                            M57645                                                                02/15/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)                    M44332 F-05      10/30/85                  09/30/85                03/01/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -              M56155 F-71        N/A          01/01/86    02/03/86                04/10/86    t HUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                              M45975    F-63                                                        08/31/86 NUREG-0737 III.A.1.2, OPERATI3NAL SUPPORT CENTER                            M46046    F-64                                                        08/31/86 NUREG-0737 III. A.1.2, EMERGENCY OPERATIONS FACILITY                      M46118    F-65                                                        08/31/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                          M46334    F-68                                                        08/31/86 HESTINGHOUSE UPPER PLENUM ECCS INJECTION - LONG RANGE                      N08471    D-05    02/12/85                                            09/15/86 j                        NUREG 0737 II.K.3.51 COMPLIANCE HITH 10 CFR 50.46                          M48195    F-58                  06/15/86                            01/15/87 un UNSCHEDULED ISSUES Mu UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                M58081    C-16                  06/19/85 to CFR 50.62 OPERATING REACTOR REVIEHS                                  M59131    A-20 TWO ISI PROPOSED RELIEF REQUESTS NOS. 29 AND 66                            M59523 unu COMPLETED ISSUES muu 4                        I.D.1.1 - DETAILED CONTROL R30M DESIGN REVIEN PROGRAM PLAN                M51193    F-08                  05/27/83    09/19/83C                10/10/84C
                      ,2 : ROD SHAP METHODOLOGY                                                    M55768                                                                10/24/84C RELOAD SAFETY - EVALUATE METHOD FOR CONTROL ROD DROP ANA.                  M55816                                                                12/11/84C ISI/ISTs 2ND 10 YR PROGRAM                                                M53457                                      06/25/84                12/28/84C AMENDMENT REQUEST ON COOLING H2O HEADER OPERABILITY                      M56739                                                                02/15/85C
                          ,      EVALUATION OF SUPPLEMENTARY SUBMITTAL REGARDING CONTROL          M55477                                                                03/04/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                  M42501    B-60                                                        03/25/85C SCHEDULAR EXEMPTION REQUEST FOR THE REQIREMENTS OF APPENDIX              M56780                                                                05/07/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                  M53789    B-87                                                        05/13/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                  M54099    B-92                                                        05/13/ 85C
 
R-1208687-001                        REGULAT0RY              INF0RMATION            TRACKINO        SYSTEM            PAGE NO.      150 C0NDENSED        MANAGEMENT            REP 0RT              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: PRAIRIE ISLAND 2 RAI          SE TAC  MPA      RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                                    IMM)18    E      DAlf      DATE  plJE  DATE        DATE num COMPLETED ISSUES muu            (CONTINUATION)
ITEMS 3.1.1 & 3.1.2 - POST ftAINTENANCE TESTING                          M52952  B-78                                    06/01/850 REACTOR TRIP SYSTEM RELIABILITY- VENDOR RELATED                            M53090  B-80                                    06/01/850 NUREG-0737 II.K.3.30. SB LOCA OUTLINE                                      M45856  F-57                                    06/06/85;
                              . - T.S. CHANGES RELATED TO HOT CHANNEL FACTORS                          M55446                                            06/25/850 TECH. SPECS. AFFECTED BY 50.72 AND 50.73(GL 83-43)                        M55732  A-18                                      06/25/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                M55371  B-90                                      06/26/85 SPENT FUEL POOL CRANE                                                      M56615                                            06/26/85:
CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                    M52261  C-15                                      06/28/85C I.D.2. SAFETY PARAMETER DISFLAY SYSTEM                                    M51273  F-09  02/14/85  04/17/85                07/tS/85; DIESEL GENERATER RELIABILITY TECH. SPECS. (GL 84-15)                      M55893  D-19            11/15/84                09/06/85; I
I
 
R-1208687-001                      REGULAT0RY            INF0RHATION                    TRACKING                  SYSTEM                      PAGE NO. 151 e CDNDENSED                MANAGEMENT                REP 0RT                                  RUN DATE: 09/17/85 (HEADQUARTERS) l                                                                      FACILITY: QUAD CITIES 1 PLANT LOCATION: 20 MI NE OF MOLINE. ILL                  LICENSED P0HER: 2511 MHT                                PROJECT MANAGER: R. BEVAN DOCKET NUMBER: 050-00254                                  DESIGN PONER:        0789 MHE                          BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: S&L                                      NSSS VENDOR:          GE                                LIC. ASSISTANT    S. NORRIS IE INSPECTOR:        A. MADISON RAI                    SE TAC      MPA        RAI            RESPONSE      TER      INPUT      LIC ACT TITLE                                                                        EMd1LR    ED.        RAIL              DATE        DATL        DATE        DATE nMuu &CTIVE ISSUES WhMM
]
l CHANGE TO TS ON CTMT VAC BKRS AND DG TEST RQMTS                              M51744                                                                  09/15/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                          M42886    B-59                                                          09/30/85 NUREG 0737 II.K.3.28, VERIFY QUALIFICATION OF ACCUMULATORS                  M48272    F-55                      07/31/85                            09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                  M52872    B-77                                                          09/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                M53624    B-85                                                          09/30/85 TECH SPEC CHANGE ON CTMT PRESS SET POINT AND MSIV                          M56507                                                                  09/30/85 FIRE PROTECTION - INT 5PIM COMPENSATORY MEASURES                            M57284                                                                  09/30/85 REVIEW OF TOPICAL REPORT ON OPERATOR TRAINING (NUREG 0737                  M57541                                                                  09/30/85 M56514                                                                    10/20/85 TECH SPECS FOR NEW EQPT IN RESPONSE TO GL 83-36                                                                                                      10/30/85 PROPOSED TS CHANGES RE APP. H AND G METAL SURVEILLANCE & MIN                M48301 M49196                                                                    10/30/85 CONTAINMENT OXYGEN CONTENT TS CHANGE                                                                                                                  10/30/85 TECH. SPEC. CHANGE ON RHR VAULT EQPT & FLOOR DRAIN SYSTEM                  M57878 M57879                                                                    10/30/85 TECH. SPEC. CHANGE ON RHR VAULT EQPT 8 FLOOR DRAIN SYSTEM TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                        M55733 A-18                                                              11/15/85 ADMINISTRATIVE CONTROLS CHANGES TO SECTION 6 0F TECH. SPECS,                M57015                                                                    11/29/85 M52302                                                                    11/30/85 1 INSERVICE INSPiCTION PROGRAM - 2ND DECADE                                                                                                        11/30/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS              M53034    B-79 HYDROGEN RECOMBINER, G.L.84-9 RESPONSE                                M55148    A-19  07/30/85            09/15/85                            12/01/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -              M56156    F-71                      05/01/85C 06/01/85                  12/01/85 M42580 B-24      06/17/85            10/01/85                            12/20/85 LONG TERM REVIEH CONT AINMENT PURGE AND VENT (B-24)                                                                                                  12/30/85 ECONOMIC GENERATION CONTROL                                                M51520 M51746                                                                    12/30/85 CRD SCRAM TIME TESTING - TS CHANGE                                                                                                                  12/30/85 INSERVICE TESTING PROGRAM, PUMPS AND VALVES, 2ND DECADE                    M52304 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                M54561    B-83                                                            12/30/85 M55894    D-19                                                            12/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                                01/15/86 FIRE PROTECTION        SCHEDULAR AND TECHNICAL EXEMPTION REQUESTS        M57282 M57006                                                                    01/30/86 SPDS - CONFIRMATORY ITEM RE ISOLATION DEVICES                                                                                                      08/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENIER                            M45976    F-63 NU2EG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                          M46047    F-64                                                            08/30/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                          M46335  F-68                                                            08/30/86 M53873    B-88                                                          09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                  M54017    B-93  04/23/85C                                                09/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING              M53707    B-86                                                          01/01/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                M44333    F-05  04/30/86                        03/30/86                03/28/87 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 $UPP/1)                            A-17                                                          09/01/87 IN3TRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG                  M51124 un UNSCHEDULED ISSUES wu MARK I DRYHELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC              M57150 D-20
 
R-1208687-001                REGULAT0RY          INF0RMATION                TRACKING        SYSTEM            PAGE NO. 152 C0NDEN$ED          MANAGEMENT              REPQRT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: QUAD CITIES 1 RAI          SE TAC      MPA        RAI  RESPONSE  TER INPUT      LIC ACT TITLE                                                          NUMBER                Dalg HQ.                  DATE  DAlg _RAlf        DATE M3 UNSCHEDULED ISSUES WM    (CONTINUATION) 10 CFR 50.62 OPERATING REACTOR REVIENS                        M59132 A-20 DIESEL GENERATOR TESTING REQUIREMENTS TECH. SPEC.              M59523 unu COMPLETED ISSUES muu I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN NUZEG-0737 II.K.3.16, CHALLENGES AND FAILURES OF RELIEF M51194 F-08                                          10/10/84C M45604    F-46                                        11/14/84C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51274    F-09 ENVIRONMENTAL QUALIFICATIONS OF SAFETY RELATED ELECTRICAL                                                              11/22/84C M42478    B-60                                      01/11/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS        M44471    F-12 NUREG-0737 II.K.3.18. ADS ACTUATION STUDY                                                                            01/14/85C M45700 F-48                                          01/24/85C CONTAINMENT AIRLOCK TESTING DRAFT PROPOSED TECH. SPECS,          M57013 REQUEST TO RESCIND ORDER REL ATED TO IEB 80-17-SDV              M54616                                              02/06/85C NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING            M44192 F-05                                          02/11/85C NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE                M44542 F-13                                          04/12/85C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION      M45164 F-26                                          04/12/85C TIA-TS 48 VOLT D.C.                                              M49939                                              05/01/85C T/A DN INSERVICE INSPECTION PROGRAM REQUIREMENTS                  MS2080 05/13/85C TECH SPPECS ON USE OF JAFNIUM ABSORBER AMTERIAL IN CONTROL        M56512 05/21/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                    M52953    B-78                                      05/30/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53790    B-87                                      05/31/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                              05/31/85C M54100    B-92                                      05/31/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA8C-10)          M52262 C-15                                          06/28/85C EVALUATION OF PLANT SPECIFIC CORE DAMAGE ESTIMATE PROCEDURE      M57942                      05/06/85                07/23/85C EXIGENT TECH. SPEC. CHANGE ON RHR PUMP OPERABILITY                M59206                                              07/27/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52791    B-76    04/03/85                          07/2n/85C
 
R-1208687-001                    REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                        PAGE NO. 153 C0NDENSED        MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILI1Y QUAD CITIES 2 PLANT LOCATION: 20 MI NE OF MOLINE, ILL                LICENSED POWER: 2511 MHT                  PROJECT MANAGER: R. BEVAN DOCKET NUMBER: 050-00265                              DESIGN PONER:    0789 MWE                  BRANCH CHIEF:      D. VASSALLO ARCH / ENGINEER: SSL                                  NSSS VENDOR:    GE                        LIC, ASSISTANT: S. NORRIS IE INSPECTOR:        A. MADISON                                                                                              SE RAI TAC    MPA      RAI      RESPONSE      TER        INPUT      LIC ACT NUMBLR    IHL      Mlf.        DATE        Mlf.          DATE        DATE TITLE Ehum ACTIVE ISSUES Muun SPDS - CONFIRMATORY ITEM RE ISOLATION DEVICES                        M57007                                                          01/30/85 REQUEST FOR EXEMPTION FROM REQMT TO PERFORM ILRT (TYPE A            M56696                                                          06/15/85 INSPECTIONS OF BNR STAINLESS STEEL FIPING (GENERIC LETTER            M56913  B-84                                                    06/30/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                  M42887  B-59                                                    08/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M53625 B-85                                                      08/30/85 CHANGE TO TS ON CTMT VAC BKRS AND DG TEST RQMTS                      M51745                                                          09/15/85 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN THE BWR SCRAM        M43725  5-65                                                    09/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52873 B-77                                                      09/30/85 M56508                                                          09/30/85 TECH SPEC CHANGE ON CTMT PRESS SET POINT AND MSIV                                                                                    09/30/85 FIRE PROTECTION - INTERIM COMPENSATORY MEASURES                    M57285 H57542                                                          09/30/85 REVIEN OF TOPICAL REPORT ON OPERATOR TRAINING (NUREG 0737                                                                            10/30/85 PROPOSED TS CHANGES RE APP. H & G, METAL SURVEILLANCE AND          M48302 CONTAINMENT OXYGEN CONTENT TS CHANGE                                M49197                                                            10/30/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55734 A-18                                                      11/15/85 ADMINISTRATIVE CONTROLS CHANGES TO SECTION 6 0F TECH. SPECS,        M57016                                                            11/29/85 M52303                                                            f t/30/85 INSERVICE INSPECTION PROGRAM - 2ND DECADE ITEM 3. t.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS      M53035  B-79                                                    11/30/85 HYDROGEN RECOMBINER, G.L. 84-9 RESPONSE                    M55149  A-19  07/30/85    09/15/85                              12/01/85 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -        M56157  F-71              05/ 01/85C C6/ 01/85                  12/01/85 M42581  B-24  06/17/85    10/01/85                              12/20/85 LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)                                                                                    12/30/85 ECONOMIC GENERATION CONTROL                                        M51521 INSERVICE TESTING PROGRAM, PUMPS AND VALVES, 2ND DECADE            M52305                                                            12/30/85 M55895  D-19                                                    12/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                                12/30/85 TECH SPECS FOR NEW EQPT IN RESPONSE TO GL 83-36                    M56515 M57283                                                            01/15/86 FIRE PROTECTION - SCHEDULAR AND TECHNICAL EXEMPTION REQUESTS                F-63                                                    08/30/86 NOREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                    M45977 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                  M46048  F-64                                                    08/30/86 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46356  F-68                                                    08/30/86 M53874  B-88                                                    09/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M54018  B-93  04/23/85C                                        09/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      H53708  B-86                                                    01/Ot/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR TNTERFACE -                                                                          03/28/87 PROCEDURES GENERATION PACKAGE REVIEH (HUREG u,27 SUPP/1)          M44334 F-05    04/30/86                03/30/86 M51125  A-17                                                    09/01/87 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG C3 UNSCHEDULED ISSUES un MARK I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE TO GENERIC        M57151  D-20 M57943                    05/06/85 EVALUATION OF PLANT SPECIFIC CORE DAMAGE ESTIMATE PROCEDURE        M59135 A-20 to CFR 50.62 OPERATING REACTOR REVIENS
 
_._ -                    .                                            . . .        .--    ~.          _                    ..
R-1208687-001                    REGULAT0RY            INF0RMATION                      TRACKING      SYSTEM            PAGE N0.8    154 C D N D E N S E 'D  MANAGEMENT                  REPORT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: QUA) CITIES 2 RAI          SE TAC  MPA          RAI  RESPONSE  TER INPUT        LIC ACT TITLE                                                                  NUMBER      &          DAIX    DATE  DAIX  DATE          DATE MM UNSCHEDULED ISSUES MM          (CONTINUATION) -
DIESEL GENERATOR TESTING REQUIREMENTS TECH. SPEC.                      M59324 PREPARE SER ON PIPE CRACK REPAIR / INSPECTION DURING RELOAD            M59625 MMM COMPLETED ISSUES uww I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN            M51195 F-08                                            10/10/84C NU2EG-0 7 37 II . K . 3.16. CHALLENGES AND FAILURES OF RELIEF          M45605 F-46 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51275 F-09                                            11/14/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                                                      ft/22/84C M42479 B-60                                            Ot/tt/85C NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS              M44472 F-12 NUREG-0737 II.K.3.18, ADS ACTUATION STUDY                                                                                    01/14/85C M45701 F-48                                            Ot/24/85C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,            M54562 B-83 LICENSEE PROPOSED INTEGRATED LEAK RATE TEST SCHEDULE                  M55019                                                Ot/25/85C CONTAINMENT AIRLOCK TESTING DRAFT PROPOSED DTECH. SPECS.                                                                      02/04/85C M57014                                                02/06/85C TECH SPEC CHANGE IN LHGR LIMIT FOR FOR BARRIER FUEL TESTS              M56509                                                02/25/85C TIA-TS 48 VOLT D.C.                                                    M49940 T/A ON INSERVICE INSPECTION PROGRAM REQUIREMENTS                                                                              05/13/85C M52081                                                05/21/85C TECH SPEC ON USE OF HARNIUM ABSORBER MATERIAL IN CONTROL                M56513                                                05/30/85C REQUESTED CHANGE IN MAPLHGR TECH. SPEC.                                M56891 ANALOG TRIP UNIT TECH. SPEC. CHANGE                                    M57495                                                05/30/85C SCRAM DISCHARGE VOLUME SYSTEM TECH. SPECS.                            M57496                                                  05/30/85C ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M52954 B-78                                            05/30/85C ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                M53791 B-87 05/31/85C ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE              M54101 B-92 05/31/85C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                                  05/31/85C M45165 F-26                                            06/05/85C 125V DC BATTERY OPERABILITY                                            M55007 CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)              Ph ? .13 C-15 06/13/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                    fB2192                                                  06/28/85C B-76      04/03/85                          07/30/85C NUREG 0737 II.K.3.51 COMPLIANCE HITH to CFR 50.46                      M48197      F-58                                        12/28/85C
 
J R-1208687-001                    REGULAT0RY            INF0RHATION                TRACKING          SYSTEM                      PAGE N0.8  155 C0NDENSED          MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: RANCHO SECO 1 PLAT 4T LOCATION: 25 MI SE OF SACRAMENTO. CA          LICENSED POWER 2772 MHT                    PROJECT mat 4AGER: S. MINER DOCKET NUMBER:      050-00312        -
DESIGN POWER:    0918 MWE                  BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: BECH                                  NSSS VENDOR:      88H                      LIC. ASSISTANT: R. INGRAM IE INSPECTOR:      J. ECKHARD RAI                    SE TAC    MPA      RAI      RESPONSE      TER      INPUT      LIC ACT TITLE                                                                NUMBER    &        DAlf        DATE        DAlf        DATE        DATE MuMu ACTIVE ISSUES unnu HUREG 0737 TECH SPEC - GL83-37 (AMMEND 8100)                        M54352                      04/15/85                            07/30/85 SALP REPORT PREPARATION                                              M57955                                                          09/16/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR        M53144    B-81  12/06/84C 05/03/85C                            09/27/85 NUREG-0737 II.K.3.30. SB LOCA OUTLINE                                M45859    F-57  07/22/85    09/05/85C                            09/30/85 APPENDIX R EXEMPTION REQUEST FOR AUX BUILDING                        M53444                      03/06/85C                            09/30/85 NRR INVESTIGATION OF REPORTED DOSES IN EXCESS OF APPENDIX I          M56033                                  06/01/85                09/30/85 SPDS ISOLATION DEVICES                                              M56525                      10/02/84C                          09/30/85 EXEMPTION REQUEST FOR REACTOR HEAD VENTS                            M57558                                                          09/30/85 SEISMIC ASSESSMENT OF FOOTHILLS FAULT SYSTEM                        M13099          06/15/85  08/15/85                            10/30/85 SNUBBER INSERVICE SURVEILLANCE TECHNICAL SPECIFICATIONS              M43606    B-17  03/15/85  04/09/85C                            10/30/85 NATURAL CIRCUL ATION COOLDONN (GENERIC LTR 81-21)                    M47170    B-66              08/23/85                            10/30/85 ISI LICENSE AMENDMENT (REGION V)                                    M51007                      02/19/85C                            10/30/85 ALTERNATE SHUTDOHN CAPABILITY                                        M52291                      07/08/85                            10/30/85 NUCLEAR INSTRUMENT CALIBRATION (REGION V)                            M52607          10/05/84  03/08/85C                            10/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55896    D-19              04/01/85                            10/30/85 DELETION OF REMAINING APPENDIX B TECH SFEC (AMEND 8102)            M56688                                                          10/30/85
    $UPPLEMENTARY CONFIRMATORY ORDER - EMERGENCY RESPONSE              M57969                      10/01/85                            11/01/85 STEAM GENERATOR GENERIC REVIEW RECOMMENDATIONS CONCERNING          M58082    C-16              06/11/85                            11/01/85 SURVEILLANCE OF ONCE THROUGH STEAM GENERATOR TECHt4ICAL            M57292                      08/09/85                            11/02/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHAT 4GES TO TECH              M53036    B-79  03/28/85C 05/23/85C                            11/30/85
  - ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.            M53875    B-88  03/28/85C  05/23/85C                            11/30/85 SPDS PLANT VARIABLES                                                N 56 526        07/16/85C  08/30/85C                            11/30/85 REVISED TOPICAL REPORTS ON OPERATOR TRAINING (TI-80) AND            M57407          06/07/85C  08/08/85C                            11/30/85 INTEGRATED SCHEDULES                                                M54349          04/15/85    08/12/85C 09/01/85                  11/31/85 BORON CONCENTRATION WHILE LOADING AND UNLOADING FUEL (8126)        M57293          06/13/8 5C 08/02/85                            12/15/85 SPENT FUEL POOL COOLING SYSTEM T.S AMEND ( 8112)                    M56689                      08/30/85                            12/30/85 REACTOR VESSEL MATERIAL SURVEILLANCE TECHNICAL SPECIFICATION        M55794                      04/15/85                            12/31/85 RV AND SV TESTING                                                  M44615    F-14  11/21/84C 04/12/85C                            01/15/86
    $UPPLEMENT NO. 2 TO NUREG 0737 TECH SPECS (AMMEND 883 SUPPL        M54351                      04/15/85                            01/30/86 REACTOR COOLANT PUMP TRIP                                          M49680    G-01                                                  01/31/86 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1            M54410                      04/15/85                            01/31/86 EMERGENCY POWER TESTING ( 8128)                                    M57587          07/15/85C 09/20/85                              01/31/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                      M45978    F-63                                                  02/01/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                    M46049    F-64                                                  02/01/86 NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46121    F-65                                                  02/01/86 NdREG-U737 III . A.2.2. METEOR 08 9GICAL DATA UPGRADE              M46337    F-68                                                  02/01/86 IMSTRUMENTATION TO FOLLOH THE 0URSE OF AN ACCIDENT (RG            M51126    A-17  08/19/85C 11/01/85                              02/15/86 i PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)              M44335 F-05    09/30/85    12/ 21/84C 01/21/8 5C              03/28/86 LOH TEMPERATURE OVERPRESSURE PROTECTION TECHNICAL                  M59325                                                          04/07/86 f
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                PAGE NO. 156 C0NDEN$ED          MANAGEMENT            REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: RANCHO SECO 1 RAI              SE TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                            H131113  &      RAlf,      DATE      DAlf. DATE        DATE MMMM ACTIVE ISSUES MMMM      (CONTINUATION)
ITEM 1.2 - POST TRIP REVIEW-DATA AND INFORMATION CAPABILITY      M53626  B-85  11/14/83C 12/28/85C                      04/15/86 ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES        M53958  B-91                                            04/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -      M56158  F-71              12/31/85  01/31/86            04/30/86 FIRE PROTECTION TECHNICAL SPECIFICATIONS CHANGES (8137)          M59510                                                  05/30/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX      M53931  B-89  04/01/86  06/15/86                      10/15/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52874  5-77              05/23/85C                      10/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M53709  B-86  03/28/85C 05/23/85C                      10/30/86 ITEM 4.5)TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55372  B-90              09/30/85                      11/30/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING      M54019  B-93  03/28/85C 05/23/85C                      01/30/87 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION      M45166  F-26                                            01/31/87 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                M48198  F-58  04/30/86  08/31/86                      04/31/87 MM UNSCHEDULED ISSUES MM ADDITIONAL APPENDIX "R" EXEMP1 ION REQUESTS                        M58032 to CFR 50.62 OPERATING REACTOR REVIEHS                            M59134  A-20 MMM COMPLETED ISSVES MMM I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                            M51276  F-09  07/27/84C 10/02/84C                      10/10/84C LON TEMPERATURE OVERPRESSURE PROTECTION MINIMUM TEMP              M55993                                                  10/12/84C I.D.I.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN        M53196  F-08              04/30/84  06/15/84C          10/29/84C ALLOHABLE LEAKAGE FOR REACTOR BUILDING SPRAY AND DECAY HEAT        M51695                                                  10/30/84C REACTOR BUILDING POST TENSIONING TENDON St'RVEILL ANCE            M49574                                                  11/16/84C CYCLE 7 RELOAD REPORT VOLUME 1                                    H53510                    08/28/84C                      11/16/84C REACTOR VESSEL HEAD VENT                                          M54835                                                  ft/26/84C 12 " REACTOR BUILDING EQUALIZING VALVES OPERABILITY              M53388                                                  12/04/84C III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE                      M46265 F-67                                              12/11/84C ATMOSPHERIC DUMP VALVE CIRCUITRY MODIFICATION                      M42933                                                  12/28/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55735  A-18                                            12/28/84C NEUTRON DOSIMETRY                                                  M57029                                                  01/tt/85C RANCHO SECO: REFUELING INTERVAL DEFINITION TECH. SPEC. AMEND      M56206                                                  01/22/85C NNI FAILURE INVESTIGATION                                          M54487                                                  02/06/85C PHR MSLB HITH CONT'D FEEDHATER ADDITION                            M46855  B-69              09/17/84C                    02/15/85C INSTRUMENT SURVEILLANCE REQUIREMENTS (REGION V)                    M52605                    10/01/84C                    02/21/85C
                              'LON TEMPERATURE PORV SETPOINT JUSTIFICATION                        M55416                                                  02/25/85C
,                              TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY          M43042  D-17  10/12/84  10/30/84C                    03/04/85C ORGANIZATIONAL CHANGES (REGION V)                                  M51697                                                  03/07/85C LER TECH. SPEC. AMEND (8105) (REGION V)                            M55805                    12/24/84C                    03/08/85C SECURITY PL AN AMENDMENT ( 812)                                    M54836                                                  03/18/85C PRESSURIZED THERMAL SHOCK                                          M55033                                                  03/28/85C CORE DAMAGE ASSESSMENT PROCEDURE                                  M57030                    03/12/85C                    03/28/85C AFH SYSTEM INTERNAL MISSLES                                        M52656                    01/31/85C                    04/01/85C
                              *IAEA INSPECTION TECH. SPEC. AMEND                                  M56213                                                  04/01/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42507  B-60              12/19/84C                    04/25/85C
 
R-1208687-001                  REGULAT0RY        INF0RMATION              TRACKINO            SYSTEM                  PAGE N0.8  157 CDNDENSED        MANA0EMENT            REPORT                        RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: RANCHO SECO 1 RAI                SE TAC    MPA      RAI      RESPONSE    TER    INPUT      LIC ACT TITLE                                                            HUMBER    HD2      DAll        DATE    DALE      DATE        DATE DON COMPLETED ISSUES MMK      (CONTINUATION)
CONTROL HABIT CHANGES                                            M55468          03/01/85                                  04/30/85C REACTOR COOLANT PUMP SEAL INTEGRITY                              M56397                      11/13/84C          ,1 05/06/85C AUX FEEDWATER HEADER INSPECTION                                  M52307                      12/28/84C                      05/28/85C SCHEDULAR EXTENSION FOR CONTROL ROOM HABITABILITY III.D.3.4      M55647                    03/14/85C                      05/50/85C SUPPLEMENT NOT TO NUREG 0737 TECH SPEC AMEND (REGION V)          H52606          07/12/84C 03/18/8 5C                      06/04/85C CYCLE 7 RELOAD TECH SPEC AMEND (8124)                            M56732                      04/05/85                      06/04/85C
: 35)                                                              M56975                        '
06/07/85C ISI RELIEF REQUEST FOR REACTOR COOLANT PUMPS                    M57126                                                    06/17/85C CONTROL OF HEAVY LDADS - PHASE II (FOLLONUP OF MPASC-10)        M52764 C-15                                                06/28/85C DECAY HEAT REMOVAL CAPABILITY TECH SPECS                        M42126 B-57                05/30/84C                      07/03/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND              M52793 B-76    04/05/85    05/31/85C 01/31/85            07/03/85C CLOSitRE TIMES OF CONTAINMENT ISOLATION VALVES (AMEND 109)      M55532                      02/15/85C                      07/30/85C REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                M53091  B-80    04/26/85C  06/14/85                        08/02/85C ITEMS 3.1.1/3.1.2 - POST MAINTENANCE TESTING                    M52955  B-78    04/26/85C  06/21/85C                      08/19/85C ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES & VENDOR    M53792  B-87    04/26/85C  06/21/85C                      08/19/85C ITEM 4.5.1-REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP      M54102 B-92    04/26/85C  06/14/85                        08/19/85C EXEMPTION FROM THE INSTALLATION OF A REACTOR VESSEL LEVEL        M57802                                                    08/20/85C RADIDACTIVE GAS EFFLUENT MONITORING INSTRUMENTATION              M57074                                                    08/30/85C NUREG 0630 IMPLEMENTATION                                        MS3509        '12/07/84    03/18/85C 05/31/85            09/09/85C PRESSURIZER HEATERS OPERABILITY TECH SPEC (8113) (F.EGION V)    M56366                                                    09/09/85C MISC CORRECTION TO THE TECH SPECS REGARDING FIRE HOSES AND      M57127                                                    09/09/85C
 
R-1208687-001                    REGULAT0RY          INF0RHATION              TRACKING          SYSTEM                        PAGE NO. 158 C0NDENSED              MANAGEMENT            REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTLRS)
FACILITY: ROBINSON 2 PLANT LOCATION: 5 MI NH OF HARTSVILLE, SC              LICENSED POWER: 2300 MHT                  PROJECT MANAGER: G. REQUA DOCKET NUMBER: 050-00261                              DESIGN POWER:    0700 MHE                  BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: EBASCO                                NSSS VENDOR:    HEST                      LIC. ASSISTANT:    C. PARRISH IE INSPECTOR:    H. KRUG RAI                      SE TAC    MPA      RAI      RESPONSE        TER      INPUT      LIC ACT TITLE                                                                NUMBER    11      Elg          DATE        MIE          DATE        DATE Muum ACTIVE ISSUES wmMn 2 - EXEMPTION TO 10CFR APP.R.III G                                    M55441                                                          08/30/85 2 - EXEMPTION FROM to CFR 50 APP.R III.G.3, FIXED                    M56638                                                          08/30/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,            H54563  B-83            01/00/85                              09/15/85
          'liUREG 0737 TECH SPECS (GENERIC LETTER 82-16 82-16 OR                M49753  B-72                                                    09/20/85 2 - EXEMPTION FROM 10CFR50 APP.R.III J                                M55440                                                          09/20/85 INSERVICE TESTING - FUMPS AND VALVES                                  M11215                                                          09/22/85 MSCB 8 SCRAM SHUTDOHN MARGIN - CYCLE to                                M56999                                                          12/05/85 NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS              M44474  F-12              06/24/85                              12/30/85 CYCLE 10 SCOTRAX INFO                                                  M56998                                                          12/31/85 CYCLE to RCS FLON                                                      M57356                                                          12/31/85 VENT T/S CHANGE CONTAINMENT PURGE                                      M52697                                                          01/00/86 CYCLE 10 - FUEL MISLOADING EVENT                                        M57355                                                          01/00/86 DEDICATED / ALTERNATE SAFE SHUTDOHN TECHNICAL SPECIFICATIONS          M57408                                                          01/30/86 RV AND SV TESTING                                                      M44616  F-14  04/22/85C 06/14/85C                              01/31/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51277  F-09              12/31/84C                              02/28/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                  M53037  B-79                                                    04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                M53876  B-88                                                    04/30/86 PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)              M44336  F-05  11/30/85                10/30/85                08/30/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -          M56159  F-71                            06/30/86                09/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                M53793  B-87                                                    12/31/86 NUREG 0737 II.K.3.51 COMPLIANCE WITH 10 CFR 50.46                      M48199  F-58              07/15/86                              02/15/87 un UNSCHEDULED ISSUES um ENVIRONMENTAL TECHNICAL SPECIFICATIONS                                  M13024                    08/27/81 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION            M45167  F-26              02/ 01/8 5C                                        '
NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                          M45979  F-63              12/31/84C NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                        M46050  F-64              12/ 31/84C NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                      M46122  F-65              12/ 31/84C NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                        M46338  F-68 REACTOR COOLANT PUMP TRIP (GL 83 10D)                                    M49690  G-01 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                M51127  A-17  04/14/87  12/ 31/84C ITEM 2.1 - EQUIPMENT CL ASSIFICATION AND VENDOR INTERFACE -            M52875  B-77 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                          M52956  B-78 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                        M53092  B-80 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR            M53145  B-81 APPENDIX J TEST PROGRAM EXEMPTIONS                                      M53336 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53710  B-86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX              M53932  B-89
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING      SYSTEM            PAGE N0.8  159 l
CDNDENSED          MANAGEMENT          REPORT              RUN DATE: n9/17/85 (HEADQUARTERS)
FACILITY: ROBINSON 2 l                                                                                              RAI          SE TAC    MPA      RAI  RESPONSE  TER INPUT      LIC ACT l
TITLE                                                                      HL NUMBER            DAlf    DATE  DAIX E T1        DATE us UNSCHEDULED ISSUES MM      (CONTINUATION)
ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M54020  B-93  08/00/85 l
ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE        M54103 B-92 ABT FOR AFH INITIATION /FLON                                    M54896                  05/00/85
!  MECH. DES. REPORT XN-NF-85-55                                    M55156 l
ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND      M55373  B-90 2 - INTEGRATED LEAKAGE RATE TEST DURATION - CONTI ANMENT        M55760 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)            M55897  D-19 CYCLE 10 SENSITIVITY STUDIES                                      M56997 ENVIRONMENTAL APPRAISAL FOR INDEPENDENT SPENT FUEL STORAGE      M57918 STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS      M58083 C-16            06/17/85 10 CFR 50.62 OPERATING REACTOR REVIENS                          M59135 A-20 REVISED K(Z) CURVE FOR TECH. SPEC.                              M59280 Cn2 COMPLETED ISSUES Muu APPENDIX I TECH SPEC IMPLEMENTATION REVIEH                      M08126 A-02            08/22/83                10/04/84C T/S ORGANIZATION CHANGE                                          M52696                                          10/04/84C AFH INITIATION T/S REVISION                                      M53482                                          10/12/84C EXEMPTION TO APPENDIX R,    III.G.2                              M51339 i
MECH DES REPORT XN-NF-85-71                                                                                      10/25/84C l
M55155                                          11/05/84C ANALYSIS XN-NF-82-20(P)                                          M55630                                          11/05/84C 2 PTS FLUX REDUCTION PROGRAM                                    M52615                                          11/06/84C CYCLE to OPERATIONS                                              M52695                                          11/07/84C l
CONTROL ROD DRIVE EVOLUTIONS TECH. SPEC. CHANGE                  M55654                                          11/07/84C 2 HASTE DISPOSAL PROCEDURE                                        M54484                                          11/ 08/84C BACKFEEDING SR BUSSES THRU TRANSFORMERS                          M55303                                          01/ 02/85C SECOND 10 YR ISI PROGRAM                                          M52440                                          01/11/85C l
RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1        M54411                                          01/31/85C SEISMIC QUALIFICATION OF THE AUXILI ARY FEEDHATER SYSTEM          M43636  C-14                                    02/05/85C QA PROGRAMS FOR RADI0 ACTIVE MATERIAL PACKAGES                  M57053                                          02/07/85C SCALING FACTORS - RADHASTE                                      M54192                                          03/05/85C EXEMPTION FOR FIRE PROTECTION OIL COLLECTION SYSTEM              M43381  B-41            10/05/83                03/07/85C 2 - PTS MATERIAL PROPERTIES                                      M55323                                          03/11/85C QA PROGRAM CLARIFICATION                                        M56037                                          03/11/85C REPORTING REQUIREMENT TEC. SPECS. (6C 83-43)                    M54619  A-18                                    03/15/85C ENVIRONMENTAL QUALIFICA1 ION GF SAFETY RELATED ELECTRICAL        M42466  B-60            09/20/83                03/19/85C CONTAINMENT COOLING & IODINE REMOVAL TECH. SPEC.                  M56925                                          03/20/85C DISPOSAL OF SLIGHTLY CONTAMINATED SOIL AMT. TO EIA              M56992                                          03/20/85C CHANGE TECH SPECS - DEDICATED SHUTDOWN SYSTEM                    M51962                  07/20/84                04/29/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52794  B-76                                    05/01/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN      M51197  F-08            12/31/84C              05/02/85C STATION BATTERIES TECH. SPEC.                                    M55769                                          05/13/85C STEAM GENERATOR PRESSURE / TEMP T.S.                              M56019                                          05/14/85C
  ' TECH SPECS ORGANIZATION CHANGES                                  M56621                                          05/17/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53627  B-85                                    06/17/85C l
l l
 
R-1208687-001                REGULAT0RY          INF0RMATI0N                TRACKING        SYSTEM                  PAGE N0.8  160 C0NDEN$ED          MANAGEMENT              REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ROBINSON 2 RAI                SE TAC    MPA        RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                            MUMBER    &        DAlg      DATE        PAdf  DATE        DATE umu COMPLETED ISSUES MMM    (CONTINUATION)
CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA8C-10)        M52265 C-15                                              06/28/85C 2 - DEDICATED SHUTDOHN SYSTEM TECHNICAL SPECIFICATIONS          M55326                                01/00/85          06/29/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                            M45860  F-57              06/08/82                      07/10/85C H. B. ROBINSON CONT. RM T0XIC GAS PRO. HABITABILITY              M46478  F-70    12/00/84  12/28/84    07/01/85          07/30/85C ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR      M53191  B-82                                              08/05/85C REVIEH AFH PROTECTION FROM TORNADO MISSLES                      M49223                    05/00/85                      08/19/85C TECH. SPEC. REVISE SETPOINTS FOR 480V UNDERVOLTAGE RELAYS        M57738                                                    08/20/85C e
3
 
R-1208687-001                                  REGULAT0RY                      INF0RMATION                          TRACKING              SYSTEM                                PAGE NO. 161 C0NDENSED                                MANAGEMENT              REP 0RT                                        RUN DATE: 09/17/85
,                                                                                                              (HEADQUARTERS)
FACILITY: SALEM 1 PLANT LOCATION: 20 MI S OF HILMINGTON, DEL                                    LICENSED POWER: 3338 MWT                                PROJECT MANAGER: D. FISCHER COCKET NUMBER: 050-00272                                                      DESIGN P0HERt              1090 MHE                      BRANCH CHIEF:            S. VARGA ARCH / ENGINEER: PUBSERVE                                                      NSSS VENDOR:              HEST                          LIC. ASSISTANT: C. PARRISH IE INSPECTOR:                L. NORRHOLM RAI                              SE TAC      MPA      RAI          RESPONSE        TER              INPUT      LIC ACT      ,
TITLE                                                        -
RQtiKR    li(L    Mig            DATE        DATI                DATE        DATE j              nMuu ACTIVE ISSUES MMMM                                                                                                                          <
s              ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND                                            M55374 B-90                                                                  06/30/85 REVISES TECHNICAL SPECIFICATION REGARDING SAFETY INJECTION                                            M57170                                                                        09/15/85 REVISE POST ACCIDENT SAMPLING TECH. SPEC.                                                            M59040                                                                        09/15/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                            M52876    B-77                                                                09/30/85 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                                          M53933    B-89                                                                09/30/85 CORRECT. TABLE 3.3-3                                                                                  M59038                                                                        09/30/85
                & 2 - REVISED REPORTING REQUIRMENTS                                                                  M56422                                                                        10/15/85 REVISE RCS PRESSURE / TEMPERATURE LIMITS                                                              M56771                                                                        10/21/85      .
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                                            M51198    F-08                08/01/84                                        10/30/85 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                                                        M52957    B-78                                                                10/30/85 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                                      M53093    B-80                                                                10/30/85 ITEMS 4.2.1 & 4.2.2 - PREVENTA1IVE MAINTENANCE PROGRAM FOR                                            M53146    B-81                04/19/85C                                      10/30/85-      .
ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                              M53794    B-87                                                                10/30/85      !
ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                                                    M54104    B-92                                                                10/30/85 MODIFY SAMPLE GAS CONCENTRATIONS FOR SURVEILLANCE TESTING OF                                          M56588                                                                        10/30/85 SAFETY VALVE OPERABILITY HHILE SHUTDOHN                                                              M58023                                                                        10/30/85 COOLANT LOOP OPERABILITY HHILE IN MODE 3                                                              M58025                                                                        10/31/85 AUTO SHITCHOVER MODIFICATION                                                                          M51570      -
11/01/85 REACTOR COOLANT PUMP TRIP                                                                            M49669    G-01                                                                11/07/85 F-14                02/13/85C RV AND SV TESTING                                  -                                                  M44618                                                                        11/30/85 ADDITIONAL APPENDIX R EXEMPTIONS                                                                      M53539                                                                        11/30/85 TECHNICAL SPECIFICATION CHANGES DI RESPONSE TO ICC MOD                                              M56209                                                                        11/30/85 FIRE PROTECTION EQUIPMENT ADDITIONS & CORRECTIONS                                                    M58027                                                                        11/30/85
;              STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS                                            M58084 C-16                  06/17/85                                        11/30/85 RELIEF FROM PUMP AND VALVE TESTING REQ'TS                                                            M57177                                                                        12/01/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36.                                            M54564 B-83                                                                  12/30/85 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                                  M52795 B-76                                                                  12/31/85 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                                            M54412                                                                        01/01/86 CEVIEW OF ASYMMETRIC LOCA LOADS SUBMITTAL                                                            N08824    D-10                08/31/84                                        01/15/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                                          M53628    B-85                                                                01/31/86
,                I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                              M51278    F-09  06/30/85                                                    02/01/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                                M55038    B-79                                                                04/30/86 3                ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                              M53877    B-88                                                                04/30/86        >
ITEM 2.2 - EQUIPMENT CLASSIFICAIION AND VENDOR INTERFACE -                                        - M53711    B-86                                                                01/01/87 4                NUREG 0737 II.K.3.51 COMPLI ANCE HITH 10 CFR 50.46                                                  M48201    F-58                06/15/86                                      01/15/87 1                ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                        M54C21    B-93  08/00/85                                                    04/31/87        :
NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                                                    M46340    F-68                                                                06/30/87 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                                                      M45981    F-63                                                                12/30/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                                    M46052 F-64                                                                  12/30/87 2
?
 
  - _  __      _ _      . _ ___            . _ . _ . . _                      __ ._          ____._. .__                _ _ _ _        _      _ _ _ - -            _ ._. . _ , .          __  m__ _ .
R-1208687-001'                    REGULAT0RY                              INF0RMATION                              TRACKING            SYSTEM                                  PAGE N0.8    162 C0NDENSED                            MANAGEMENT                          REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITYs SALEM-1 RAI                      SE i                                                                                                              TAC      MPA          RAI  RESPONSE            .TER  INPUT              LIC ACT TITLE                                                                                              NUMBER        H2.        Dalg      DATE            R&Ig    DATE                DATE uMuu ACTIVE ISSUES EMMM          (CONTINUATION)
NUREG-0737 III.A.1.2. EMERGENCY OPERATIONS FACILITY                                                M46124 F-65                                                                      12/30/87 7
PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)                                            M44338 F-05        07/06/84C                      05/18/84C                      12/30/88 4
un UNSCHEDULED ISSUES NM ENVIRONMENTAL PROTECTION PLAN                                                                      M47122
,      ATHS EVENT FOLLONUP                                                                                M49908
;      I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                        M56160    F-71                  01/11/84C 02/28/84 10 CFR 50.62 OPERATING REACTOR REVIENS                                                            M59136 A-20        Sci CHANGE CONTAINMENT AIR LOCKS TESTING                                                                M59527 CHANGE SURVEILLANCE TESTING OF BATTERIES                                                        .M59529 INCREASE RATED THERMAL P0HER                                                                      M59645 nMM COMPLETED ISSUES MMM MSIV SOLENDID VALVES                                                                              M48991                                                                            10/15/84C RCS INVENTORY BALANCE                        .                                                    M48993                                                                            10/15/84C NUREG-0737 II.F.2.5, INADEGUATE CORE COOLING INSTRUMENTATION                                      M45169 F-26                                                                      10/24/84C 108 PRESSURE / VACUUM VALVE FOR CONTAINMENT VENTING VENTING                                      M51881                                            08/30/84                      10/30/84C APPENDIX I TECH SPEC IMPLEMENTATION REVIEW                                                        M08154    A-02.                  01/15/79C                                      12/05/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                          M42467    B-60                  11/16/84                                        12/05/84C CUCLEAR DEPARTMENT REORGANIZATION                                                                  M47102                            09/21/84                                        12/05/84C ADO SURVEILLANCE TESTING ON RTB'S                                                                  M52710 B-76                                                                      12/05/84C i    MODIFY TECH. SPEC. TABLES 3.3-1 AND 3.3-3                                                          M56368                                                                          03/08/85C
:    REVISE RESPONSE TIME REQUIREMENT FOR OVERTEMPERATURE DELTA                                        M56370                                                                          03/08/85C EXTENSION OF IMPLEMENTATION TIME FOR RETS                                                          M56700                                                                          04/09/85C TECH. SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                                M55736 A-18                                                                      05/13/85C NUCLEAR DEPARTMENT ORGANIZATION UPDATE                                                            M56583                                                                          05/13/85C ADMINISTRATIVE REVISIONS TO RETS                                                                  M56931                                                                          05/30/85C
'      TECHNICAL REVISIONS TO RETS                                                                        M56933                                                                          05/30/85C REVIEW JUSTIFICATION FOR LOCATION OF HIGH-RANGE MONITORS                                          M56987                                                                          06/14/85C
]
NU2EG-0737 II.K.3.30. SB LOCA DUTLINE                                                              M45862 F-57                                                                      06/17/85C l      INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                                            M51128 A-17        05/04/84      08/15/84                                      06/17/85C j      TECHNICAL SPECIFICATIONS FOR 10-INCH VENT VALVES                                                  M56211                                                                          06/25/85C CONTROL OF HEAVY LDADS - PHASE II (FDLLONUP OF MPASC-10)                                          M52266 C-15                      02/15/85                                      06/28/85C          i DIESEL GENERATOR RELIABILITY TECH, SPECS. (GL 84-15)                                              M55898    D-19                                                                  09/12/85C i
I b
i
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING        SYSTEM                      PAGE N0.8    163 C0NDENSED          MANAGEMENT            REP 0RT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SALEM 2 PLANT LOCATION: 20 MI S OF HILMINGTON, DEL          LICENSED P0HER: 3411 MHT                PROJECT MANAGER: D. FISCHER DOCKET NUMBER:      050-00311                      DESIGN POWER:    1115 MHE                BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: PUBSERVE                          HSSS VENDOR:      HEST                    LIC. ASSISTANT:    C. PARRISH IE INSPECTOR:
RAI                    SE TAC    MPA      RAI    RESPONSE      TER      INPUT      LIC ACT TITLE                                                            NUMBER    &      DAlf,      DATE        DATE        DATE        DATE cCr3 ACTIVE ISSUES mumm CONTROL ROOM HUMAN FACTORS REVIEH                                M46922                                                        06/30/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55375 B-90                                                  06/30/85 REVISES TECHNICAL SPECIFICATION REGARDING SAFETY INJECTION        M57171                                                        09/15/85 REVISE TECH. SPEC. SECTION 3.1.2.1                                M59039                                                        09/15/85 REVISE POST ACCIDENT SAMPLING TECH. SPEC.                        M59041                                                        09/15/85 ITEM 2.1 - EQUIPMENT CL ASSIFICATION AND VENDOR INTERFACE -      M52877  B-77                                                09/30/85 REVISE REPORTING REQUIREMENTS                                    M56424        09/05/85                                      1C/15/85 REVISE RCS PRESSURE / TEMPERATURE LIMITS                          M56772                                                        10/21/85 I.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN        M51199  F-08            08/01/84                            10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                    M52958  B-78                                                10/30/85 LEACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53094  B-80                                                10/30/85 ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR        M53147  B-81            04/19/85C                            10/30/85 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53795  B-87                                                10/30/85 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                M54105 B-92                                                  10/30/85 MODIFY SAMPLE GAS CONCENTRATIONS FOR SURVEILLANCE TESTING OF      M56589                                                        10/30/85 SAFETY VALVE OPERABILITY HHILE SHUTDONN                          M58024                                                        10/30/85 COOLANT LOOP OPERABILITY HHILE IN MODE 3                          M58026                                                        10/31/85 AUTO SHITCHOVER MODIFICATION                                      M51571                                                        11/01/85 REACIOR COOL ANT PUMP TRIP                                        M49670  G-01                                                11/07/85 RV AND SV TESTING                                                M44619  F-14            02/13/85C                            11/30/85 ADDITIONAL APPENDIX R EXEMPTIONS                                  M53540
* 11/30/85 TECHNICAL SPECIFICATION CHANGES IN RESPONSE TO ICC MOD            M56210                                                        11/30/85    ,,
FIRE PROTECTION EQUIPMENT ADDITIONS & CORRECTIONS                M58028                                                        11/30/85 STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS        M58085 C-16              06/17/85                            11/30/85        3 C3 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54565  B-83                                                12/.30/85 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52796  B-76                                                12/31/85 ITEMS 4.2.3 4 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX      M53934  B-89                                                12/31/85 RCS VENTS TELHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1          M54413                    08/15/84                            01/01/86 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPA5ILITY      M53629  B-85                                                01/30/86 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                          M51279  F-09  06/30/85  06/30/85                            02/01/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH            M53039  B-79                                                04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.          M53878  B-88                                                04/30/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -      M53712  B-86                                                01/01/87 NUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46                M48202  F-58            06/15/86                            01/15/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING    M54022  B-93  06/00/85                                      04/31/87 NUREG-0737 III.A.t.2. EMERGENCY OPERATIONS FACILITY              M46125  F-65                                                06/30/87      , , '
HUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                M46341  F-68                                                06/30/87 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                  M45982  F-63                                                  12/30/87 NUREG-0737 III.A.t.2, OPERATIONAL SUPPORT CENTER                M46053  F-64                                                  12/30/87
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING        SYSTEM                  PAGE N0.8  164 C0NDENSED          MANAGEMFNT            REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SALEM 2 RAI                SE        s TAC    MPA      RAI    RESPONSE      TER  INPUT      LIC ACT TITLE                                                            NUMBER    E      MIE      DATE      JMIE    DATE        DATE c5:w ACTIVE ISSUES Mumm      (CONTINUATION)
PROCECURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)          M44339  F-05  07/06/84C            05/18/84C          12/30/88 un UNSCHEDULED ISSUES mu ENVIRONMENTAL PROTECTION PLAN                                    M47123 CONTROL ROOM I.D.1.2 DETAILED REVIEW
 
==SUMMARY==
REPORT - F-71        M56161  F-71            01/11/84C 02/28/84 to CFR 50.62 OPERATING REACTOR REVIENS                          M59137 A-20 CHANGE CONTAINMENT AIR LOCKS TESTING                              M59528 CHANGE SURVEILLANCE TESTING OF BATTERIES                          M59530 t=u COMPLETED ISSUES muu SUMPT TEST REPORT                                                M47887                                                  10/12/84C M31V SOLENDID VALVES                                              M48992                                                  10/15/84C RCS INVENTORY BALANCE                                            M48994                                                  10/17/84C NUREG-0737 II.F.2.3. INADEQUATE CORE COOLING INSTRUMENTATION      M45170 F-26                                            10/24/84C 108 PRESSURE / VACUUM VALVE FOR CONTAINMENT VENTING              M51882                            08/30/84            10/30/84C CUCLEAR DEPARTMENT REORGANIZATION                                  M47103                  09/21/84                      12/05/84C APPENDIX I TECHNICAL SPECIFICATIONS REVIEW                        M48327 A-02                                            12/05/84C ADD SURVEILLANCE TESTING ON RTB'S                                  M52711                                                  12/05/84C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL          M42533 B-60              11/16/84                      01/14/85C REMOVE LICENSE CONDITION REQUIRING S.G. INSPECITON PARTS          M56208                                                02/07/85C REVISED FQ(Z) AS A FUNCTION OF CORE HEIGHT                        M56207                                                02/22/85C REVISE RESP 0aSE TIME REQUIREMENT FOR OVERTEMPERATURE DELTA        M56371                                                03/08/85C CORRECT TYPO IN TECH. SPEC. 4.8.1.1.2.C.7                          M56369                                                03/09/85C EXTENSION OF IMPLEMENTATION TIME FOR RETS                        M56701                                                04/09/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55757 A-18                                            05/13/85C NUCLEAR DEPARTMENT ORGANIZATION UPDATE                            M56584                                                05/13/85C REVISION TO TECHNICAL SPECIFICATIONS SECTION 3.2.3 PONER          M56801                                                05/17/85C TECHNICAL REVISIONS TO RITS                                        M56934                                                05/28/85C CHANGE CONTROL ROOM POSITIVE PRESSURE TEST VALVE                  M53541                                                05/30/85C ADMINISTRATIVE REVISIONS TO RETS                                  M56932                                                05/30/85C REVISE NADH FLOW RATE FOR TEST                                    M57294                                                06/13/85C REVIEH JUSTIFICATION FOR LOCATION OF HIGH-RANGE MONITORS          M56988                                                06/14/85C INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG            M51129 A-17    05/04/84  08/15/84                      06/17/85C TECHNICAL SPECIFICATIONS FOR 10-INCH VENT VALVES                  M56212                                                06/25/85C
  ' CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA8C-10)          M52267 C-15              02/15/85                      06/28/85C LIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M55899 D-19                                            09/06/85C
 
R-1208687-001                  REGULAT0RY            INF0RHATION                TRACKING          SYSTEM                        PAGE NO.      165 C0NDENSED          HANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 1 PLANT LOCATION: 5 MI S OF SAN CLEMENTE, CA            LICENSED POWER: 1347 MHT                  PROJECT MANAGER: H. PAULSON DOCKET NUMBER: 050-00206                              DESIGN POWER:    0436 MHE                BRANCH CHIEF:      J. ZHOLINSKI AiCH/ ENGINEER: BECH                                  NSSS VENDOR:    HEST                      LIC. ASSISTANT    C. JAMERSON IE INSPECTOR:        A. DANGELO RAI                      SE TAC      MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                              NUMBER    HR.      Ralf      DATE        RALE          DATE        DATE c= u ACTIV E 112!13 m u u n 0 GANIZATION CHANGE                                                M54893                                                          09/30/85 M56906                                                          09/30/85 RESPONSE TO UCS COMMENTS ON PROPOSED EQ RULE (2.206 INSERVICE TESTING (IST)                                            M11231    A-14              01/24/84                            10/15/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                  M42916    B-59              12/20/84C                            10/15/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -          M52878    B-77                                                    10/30/85 M52959    B-78  04/22/85    07/24/85C                            10/30/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                    M51739                      08/31/85                              10/31/85
: STATION DIST. VOLTAGE VERIF. TEST                                M55027          12/28/84C                                        10/31/85 HEATUP/COOLDOWN CURVES UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM        M58086 C-16                06/26/85                              11/01/85 RV AND SV TESTING - NUREG-0737 II.D.1                              M44620    F-14              08/31/85                              11/30/85 M54376                      08/29/85C                            11/30/85 INTEGRATED LIVING SCHEDULE                                                  D-19                                                    11/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55900 M57658                                                            12/01/85 CONTAINMENT ISOLATION VALVES TECHNICAL SPECIFICATION CHANGE        M57868                      07/11/85                              12/01/85 EXEMPTION FROM PART 20 - RESPIRATORS                                                          09/30/85                              12/15/85 DEDICATED SHUTDOHN SYSTEM FOR APPENDIX R                          M54880 M45983 F-63                                                      12/31/85 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                      M46054  F-64                                                    12/31/85 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER NUREG-0737 III.A.t.2, EMERGENCY OPERATIONS FACILITY                M46126  F-65                                                    12/31/85 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                  M46342  F-68                                                    12/31/85 M53630  5-85                                                    12/31/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY        M57686                                                          01/08/86 LEVIEH OF REGULATORY EFFECTIVENESS REVIEH (RER) REPORT              M55408                    08/31/85                              01/15/86 TECH. SPEC. FOR PURGE / VENT OPERATION                              M56408                    09/01/85                              01/15/86 CONT. ROOM N'MITABILITY (ITEM III.D.3.4)                            M59138  A-20                                                    01/15/86 to CFR 50.62 OrCRATING REACTOR REVIENS                            M08082  C-10  06/01/85  08/29/85C                            01/31/86 CONTROL OF HEAVY LOADS (HUREG 0612)                                M44340  F-05  08/30/85              07/30/85                  03/31/86 PLOCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)          M51200  F-08              12/16/85  01/16/86                  03/31/86 I.D.I.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN        M51130  A-17                                                    04/30/86 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG            M59406                                                          04/30/86 STEAM GNERATOR INSPECTION (1985)                                  M53148  B-81                                                    05/30/86 ITEMS 4.2.1 5 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR      M465t8                      01/31/86                            06/30/86 FIRE PROTECTION TECH SPECS                                        M44478  F-12  07/15/85    07/17/85C                            08/01/86 NUREG-0737 II.B.3.2. POST ACCIDENT SAMPLING MODIFICATIONS          M54991                                                          09/30/86 OVERPRESSURE MITIGiTION SYSTEM TECHNICAL SPECIFICATION            M53796    B-87  04/22/85    07/24/85C                            10/30/r ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING TEST - ALTERN &          M53935    B-89                                                    10/30/    ,
ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP        M48203    F-58              05/30/86                              12/ 31e '.6 CUREG 0737 II .K.3.51 COMPLI ANCE WITH 10 CFR 50.46                M45171    F-26                                                  01/31/87 NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                                        01/31/87 M53713    B-86
' ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M54106    B-92                                                  01/31/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE 4
 
                                                                                                                                                                                              .-n -
4 R-1208687-001                                                REGULAT0RY        INF0RMATION                      TRACKINO                    SYSTEM                      PAGE NO.s    166 C0NDEN$ED              MANAGEMENT                        REP 0RT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 1 RAI                    SE TAC    MPA                    RAI    RESPONSE        TER      INPUT      LIC ACT TITLE                                                                                            NUMBER    &                    DAIK        DATE    jl81E          DATE          DATE n==u ACTIVE ISSUES muuN                                  (CONTINUATION)
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                            M51280 F-09                                                                04/15/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                      M54023 ~B-93            03/11/85C                                          05/01/87          i FULL TERM OPERATING LICENSE                                                                      Mit232                                                                      07/31/87 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                      M56162 F-71                            05/01/87  06/01/87                  08/01/87 DM UNSCHEDULED ISSUES um CERTIFICATION OF POLLUTION CONTROL FACILITIES                                                      M59468                                                                                        i 120V AC BUS DESIGN DETAILS                                                                        M59554 cnN COMPLETED ISSUES Num SNUBBERS TECH. SPEC. CHANGE                                                                        M55407 "NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 OR 83-02)"                                                                                                                        10/15/84C M49756 B-72                            06/30/84                            11/02/84C OPERABILITY OF VENT VALVES                                                                        M54126 RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.t                                          M54414                                                                      11/02/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36, 06/30/84                            11/02/84C M54566  B-83                          06/30/84                            11/02/84C CHANGE TESTING OF STATION BATTERY SYSTEM                                                          M10853                                  10/20/78C REVISIONS TO TECHNICAL SPECIFICATIONS 3.7, 4.4.B, 4.4.E AND                                      M533!2                                                                      11/14/84C 06/30/84                              11/14/84C INVESTIGATION OF POTENTIAL DIESEL GENERATOR CRANKSHAFT                                            M52166                                07/06/84                            11/19/84C AUXILIARY SALT WATER COOLING PUMPS TS                                                              M55179                                                                      11/23/84C LICENSE CONDITION FOR PASS (PC140)                                                                M55761                                                                      11/23/34C PEAKING FACTOR ANALYSIS M56067                                                                      11/23/84C          '
1 - ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H                                        M55376 B-90                                                                11/28/84C SCHEDULAR EXTENSION FOR ENVIRONMENTAL QUALIFICATION                                                M55492                                                                      12/18/84C REVIEW OF RADIATION SURVEILLANCE CAPSULE F ANALYSIS                                                M56429                                                                      Ot/31/85C APPENDIX J TECHNICAL SPECIFICATIONS                                                                M52350                                  11/21/84C                          02/08/85C          '
ECVIRONMENTAL QUALIFICATION SCHEDULE EXTENSION REQUEST                                            M56576                                                                      02/12/85C AUXILIARY OPERATOR REQUIREMENTS                                                                    M54127                                  11/30/84C                          03/06/85C          '
ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                          M42516  B-60                          Ot/16/85C                            03/11/85C          !
' ENVIRONMENTAL QUALIFICATION SCHEDULAR EXTENSION REQUEST                                            M57181                                                                      03/27/85C P%0 CESS CONTROL PROGRAM                                                                          M56241 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                                M52797  B-76 04/22/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                                                                                                                          05/09/85C M45864 F-57                                                                05/30/85C STEAM GENERATOR TUBE INSPECTION                                                                    M57167                                                                      06/05/85C 1
CONTROL OF HEAVY LOADS - PHASE II (FDLLOWUP OF MPASC-10)                                                                                                                                          i M52268 C-15                            02/15/85                            06/28/85C 4  ITEM 4.1 - REACTOR TRIP SYSTEM RECIABILITY - VENDOR                                                M53095  B-80                                                              07/ 01/85C CORRECTIONS TO RADIOLOGICAL EFFLUENT TS'S & DELETION OF                                            M56339                                                                                        !'
03/31/85                            08/05/85C ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                                      M53040 B-79                                                                08/19/85C ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                            M53879  B-88                                                              08/19/85C CEVIEN REVISED ODCM                                                                                M59403                                                                      08/30/85C 1
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKINO        $YSTEM                        PAGE NO. 167 C0NDENSED            MANAGEMENT            REPORT                            RUN DATE: 09/t7/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 2 PLA%T LOCATION: 5 MI S OF SAN CLEMENTE, CA          LICENSED P0HER: 3410 MHT                PROJECT MANAGER: H. ROOD DOCKET NUMBER: 050-00361                            DESIGN P0HER:    1070 MHE                BRANCH CHIEF:      G. KNIGHTON l ARCH / ENGINEER: BECH                                HSSS VENDOR:    COMB                    LIC. ASSISTANT: J. LEE IE INSPECTOR:    D. KIRSCH RAI                      SE TAC    MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                              NUMBER    &        Elf,      DATE        DATE        DATE        DATE C::n ACTIVE ISSUES unum SBLOCA MODEL & ANALYSIS - LIC. COND. 2.C.19(R) - (TMI              M51666  F-58                                                  04/30/85 SECTION 4.2.1, " CULTURAL RESOURCES DATA RECOVERY PROGRAM -        M57612                                                        07/15/85 FUEL SHOULDER GAP CLEARANCE                                        M57736                                                        07/15/85 l REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                  M53096  B-80                                                  07/30/85 i REACTOR COOLANT PUMP TRIP                                          M49691  G-01                                                  07/31/85 I PCN 139 - CHANGE $NUBBER TECHNICAL SPECIFICATION                  M57295                                                        08/01/85 l LUBE DIL COND. 2.C(25)                                            M51847                                                        08/15/85
, EVALUATE CPC THERMAL POWER DECALIBRATION                          M54257                                                        08/15/85 l PCN 8 - REVISE TECH. SPEC. 3. CONT . 150. V ALVES            M54694                    07/24/85                            08/15/85 PCN 91 - DELETE TECH. SPEC. 4.8.t.2.D.6 PER 83-30                  M54708                                                        08/15/85 PCC 98 - F.P. LIC. COND. 2.C.C14)                                  M54712                                                        08/15/85 PCN 131 - TECH. SPEC. 3.3.3.8 - SALT HATER DILUTION                M54728                                                        08/15/85 PCD 125 - TECH. SPEC. 3.6.2.2 - SPRAY CHEMICAL REQUIRMENTS        M54870                                                        08/15/85 PC3 142 - 0FFSITE PCHER SOURCES                                    M56214                                                        08/25/85 PCN 188 - TGIS                                                    M57301                                                        08/31/85 PCa 114 - TECHNICAL SPECTFICATION 4.6.1.6 - CONTAINMENT            M54864                                                        09/01/85 PCH-130 - L.C.2.C(4) - CSdTAINMENT TENDON SURVEILLANCE            M54876                                                        09/01/85 PCU 149 - T COLD AT LESS THAN 70 PCT POWER                        M57297                                                        09/10/85 INSTRUMENTS FOR DETECTION ON INADEC'JATE CORE COOLING            M49463 F-26                                                    09/15/85 13 SERVICE INSPECTION, SER INPUT                                  M54148          12/12/84C                                      09/15/85 l
PC3 103 - TECH. SPEC. 3/4.11 - NUREG 0472 CHANGES                  M54722                                                        09/15/85 l  PCM 109 - TECH. SPEC. 4.2.3.C - BURNUP - 31 DAYS                  M54724                                                        09/15/85 l  REVIEW FISSION GAS PRESSURE ANALYSIS                              M54812                                                        09/21/85 l  PC3 96-MSN AND AFH RESPONSE TIME TESTS                            M57277                                                        09/21/85 l  PCN 137- T.S. 5/4.8.1.2- CHG LCD                                  M55113                                                        10/01/85
!  IN-CONTAINMENT H2 MONITORS                                        M51424                                                        10/15/85 EVALUATE EMERGENCY PROCEDURES / GUIDELINES-LICENSE CONDITION      M51659                                  N/A                    10/15/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,        M54567  B-83                                                  10/15/85 PCN 97 - TECH. SPEC. 1/4.6.4-H2 MONITOR SURV.                    M54710                    07/24/85                            10/15/85 PCN 110 - TECH. SPEC. 4.3.3.2.4.A - CHANNEL CHECK                M54726                                                        10/15/85 PCN 155 VENTS - TECH. SPEC. 3/4.4.10                              M54738                                                        10/15/85 t  AMEND. LIC. PER IAEA FACILITY AGREEMENT                          M54816                                                        10/15/85 I  PCC 108 - TECHNICAL SPECIFICATION 3.8-t(TBL) CONTAINMENT          M54860                                                        10/15/85 PCN 111 - TECH. SPEC. 3.11.2 - AUX. BOILER RADRASTE,              M54862                                                        10/15/85 PCN 165 - PRESSURIZER SPRAY LINE                                  M57299                                                        10/22/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)              M55738  A-18                                                  11/01/85 PC3 83 - TECH. SPEC. FIG. 6.2.1 - SCE ORGN CHART                  M54700                                                        11/t5/85 NPF 119 - TECH. SPEC. B 3.2.3 - AZIMUTHAL PCHERTILT              M54866                                                          11/15/85 l  *CN 145 - CHG. F.P. LIC. COND. 2.C.(14)                          M54733                                                          12/15/85 o
 
  - _ - - . _ - - . - - _ - ~ - . -_                                  ~ _ _ _    .. . - . -    . -      - - - - - - ~ - - - - -                        - -  _      ~ . -      - . -      --      .
R-1208687-001                          REGULAT0RY                      INF0RMATION                          TRACK!NO          SYSTEM                        PAGE NO.8      168
'                                                                                C0NDENSED              MANAGEMENT                        REPQRT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 2 RAI                        SE TAC            MPA        RAI    RESPONSE          TER      INPUT        LIC ACT TITL E                                                                                NUMBER            &          PAlg      DATE          DAIf        DATE          DATE pumu ACTIVE ISSUES unum ~      (CONTINUATION)
,                    PCN 146 - CHG. F.P. TECH. SPECS.                                                      M54735                                                                          12/15/85 REVIEH REVISED FHA - ISSUE SER                                                        M54814                                                                          12/15/85 PC3 123 - TECH. SPEC. 2.0 - DNBR LOW-BASIS                                            M54868                                                                          12/15/85 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                            M51201            F-08                                                        12/31/85      !
I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                M51281            F-09                                N/A                      12/31/85      i HIGH FREQUENCY OF NUISANCE ALARMS                                                      M51316                    06/14/84  03/28/84C                                12/31/85 EVALUATE OPERATING EXPERIENCE                                                        M54817                                                                        12/31/85      '
]                      I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                          M56163 F-71                10/23/84  10/31/85      11/30/85                  01/15/86        '
LON TEMPERATURE OVERPRESSURE PROTECTION - LICENSE CONDITION                            M51651                                                                        02/15/86 j                    CONTROL SYSTEM FAILURES DUE TO HELBA OR EQPT.. FAILURES. LIC,                          M51653                    08/27/84  12/17/84C                                02/15/86 4                    DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                  M55901            D-19                                                        02/15/86      l
,                    PCM 75 - TECH. SPEC. 4.8.1.1.2.C - FUEL DIL RETEST                                    M54699                                                                        02/28/86      -
PCN 84 - REVISE E.9. LIC. COND. 2.C.(5)                                                M54702                                                                        02/28/86      t
;                    ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M52879            B-77                                                        04/15/86
?                    ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                        M52960            B-78                                                        04/15/86 2
ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS                          M53041            B-79                                                        04/15/E5
,                    ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                          M53149            B-81                                                        04/15/86 1
ITEM 1.2 - POST TRIP REVIEM-DATA AND INFORMATION CAPABILITY                            MS3631            B-85                                                        04/15/86 i                    ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                            M53714            B-86                                                        04/15/86 a                    ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                M53797            B-87    06/01/85C 07/15/85                                  04/15/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                M53880            B-88                                                        04/15/86      -
ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                            M53936            B-89                                                        04/15/86      l ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                          M54024 B-93                05/08/85C                                          04/15/86      s PRDCEDURES GENERATION PACKAGES (SUPPLEMENT 1 NUREG-0737)                                M55541                    08/30/85                05/30/85                  04/15/86 MPA A-17tR.G.t.97) REVIEW RESPONS                                                      M55116                    02/17/84                                            06/01/86 INSERVICE TESTING PER 10CFR50.55A                                                      M55120                                                                        06/01/86      :
1                    ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                              M54107 B-92                                                                    01/30/87 TURSINE DISC INSPECTION - LICENSE CONDITION 2.C.(15)                                    M51655                                                                        06/01/89 I
I:5 UNSCHEDULED ISSUES un                                                                                                                                                            ,
EXEMPTION FROM PART 20 - RESPIRATORS                                                    M57869                              07/11/85                                                !
PCN 193 - FHBPACFS OPERABILITY                                                          M57875 I
PCN 184 - SPECIAL TEST EXCEPTION FOR SHUTDOHN MARGIN                                    M57885 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                            M58087          C-16                06/26/85
.                    to CFR 50.62 OPERATING REACTOR REVIENS                                                M59139 A-20                                                                                  ,
!                    $2UBBER REDUCTION PROGRAM                                                              M59278 CERTIFICATION OF POLLUTION CONTROL FACILITIES                                          M59469 muu COMPLETED ISSUES uns SALP EVALUATION                                                                        M51773                      N/A                                              10/10/84C PCN 141 - 5/G TUBE THINNING CRITERIA                                                    M55785                                                                        10/26/84C i                  PCN 180-FUEL HANDLING BLDG FILTERS                                                      M56216                                                                          10/26/84C PCN 179-REFUELING HATER LEVEL                                                          M56217                                                                          10/26/84C      ,
t t
4
                                                    . , _ - .-,.- - . .        m-          +      r            r+-        m--
: m. _ - _ _ _ . _ - _ _ _ _ _ _ - - - - _ . . _ . - - - - .
                                                                                                                                                                                                                      ~
l i
i
!                                                                                                                                                                                                                                              I l              R-1258687-001                          REGULAT0RY                                                INF0RMATION                          TRACKING                      $YSTEM                                  PAGE NO.*    169 1
;                                                                                      C0NDENSED                                  MANAGEMENT                        REP 0RT                                            RUN DATE: 09/17/85 (HEADOUARTERS) l FACILITY SAN ONOFRE 2 f                                                                                                                                                                                      RAI                                SE LIC ACT TAC  MPA            RAI          RESPONSE                      TER    INPUT NUMBER    11          DAlf.                DATE                  RAlf,        DATE        DATE TITLE c u COMPLETED ISSUES muu            (CONTINUATION)
PC:3 50-REFUELING MACHINE                                                                                                  M56218                                                                                  10/26/84C    !
M51616                                                                                st/09/84C CMG. T.S.3.4.1.4.1. ALLON BOTH TRAINS SDCS TO BE OUT IF DNE                                                                M55ft?                                                                                  ft/C9/84C 1984 SALP EVALUATION                                                                                                                                                                                              12/19/84C    i PC3 127 - TECH. SPEC. 3.7.to - LCO FOR EMERGENCY CHILLED                                                                    M54872 PC3 16 t-INCREASE SHUTDOWN MARGIN                                                                                          M55999                                                                                12/19/84C PC3 163-REVISE BORON TANK CONCENTRATION                                                                                    M56001                                                                                12/19/84C PCM 126-REMOTE SDCS ALIGNMENT                                                                                              M56215                                                                                12/19/84C M54730                                                                                01/ 09/8 5C PC3 135 - TECH. SPEC. TABLE 3.5 TGIS SETPOINTS                                                                        M54819                                                                                01/09/85C PC3 135 - TECH. SPEC. 3.1.3.1/6/7 - CHANGE TECH SPEC. PER                                                                  M54714                                                                                Ot/ft/85C PCN 99 - TECH. SPEC. TABLE 3.5 CPIS ACTION                                                                            M54716                                                                                01/11/85C PCM 100 - TECM. SPEC. 3/4.3.3.1 - RAD. MON. ALARM                                                                          M54718                                                                                01/11/85C PC3 101 - TECH. SPEC. 3/4.3.3.6 - ACC. MON. INST. TIME                                                                    M54720                                                                                Of/ft/85C    l PCM 102 - TECH. SPEC. 3/4.3.3.9 - EFFLUENT MON                                                                            M54705                                                                                03/01/85C    '
PC3 85 - TECH. SPEC. TABLE 3.5-2 RPIS RESP. TIME                                                                          M55997                                                                                03/01/85C PCD-52 DNBR MARGH WITH COLS$ OUT OF SERVICE                                                                                                                                                                      03/01/85C PC3148, 152. 162, 164 - RELOAD-CPC ADDRESSABLE CONSTANTS                                                                  M56005 M56008                                                                                03/01/85C PC3 ISS RELOAD AXIAL SHAPE INDEX BOUNDARIES                                                                                M56009                                                                                03/01/85C PC3 151 RELOAD - REGULATING CEA INSERTION LIMITS                                                                          M56011                                                                                03/ 01/85C PCM 153 RELOAD - MODERATOR TEMPERATURE COEFFICIENT LIMITS                                                                  M56013                                                                                03/01/85C PCM 160 RELOAD - CHANGE DNBR LIMIT TO 1.31                                                                                M560 IS                                                                                03/0t/85C PCM 168 RELOAD - TEMPERATURE CHANGE CEA MISALIGNMENT TECH.                                                                M56017                                                                                03/01/85C PC3 169 RELOAD - INCREASE MAXIMUM HT. URANIUM IN FUEL ROD                                                                  M56264                                                                                03/01/85C RELOAD ANALYSIS                                                                                                            M56267                                                                                03/01/85C CELOAD. STATISTICAL COMBINATION OF UNCERTAINTIES                                                                          M52798 B-76                                                                            05/08/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                                                                      M578tt                                                                                06/10/85C REVISED PCP - INTERIM APPROVAL                                                                                            M54697                                                                                06/14/85C 2-PCN 41 - TECM. SPEC. 3/4.2.1 - PRESSURIZER                                                                              M54706                                                                                06/14/85C PC3 89 - TECH. SPEC. 3/4.4.4 - S.G. INSPECTION                                                                            M54874                                                                                06/t4/85C PC3 134 - TECH. SPEC. 2.2.2 - CPC ADDRESSABLE CONSTANTS                                                                    M52269 C-15                                                                          06/28/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPASC-10)
 
__ _ _ _ _ . _ _ . _                                  _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ __                                .__ ._.                __m    _          . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _
Q-120'A 87-003                                    REGULATGRY                                      INF0RMATI0N                      TRACKING                        SYSTEM                                                    PAGE NO.s  170 i C0NDENSED                  MANAGEMENT                      REPORT                                                                    RUN DATE: 09/97/85 (HEADQUARTERS) 4 i
FACILITY: SAN ONOFRE 3 PLANT LOCATION: 5 MI 5 0F SAN CLEMENTE, CA                                                      LICENSED POWER: 3390 MNT DOCKET NUMBER: 050-00362                                                                                                                                      PROJECT MANAGER: H. ROOD DESIGN POWER:          1080 MHE                            BRANCH CHIEFS                            G. KNIGHTON ARCH / ENGINEER: BECH                                                                            NSSS VENDORS          COMB IE INSPECTOR:    H. CANTER                                                                                                                                  LIC. ASSISTANT 8                        J. LEE a
RAI                                                  SE TAC        MPA          RAI            RESPONSE                              TER                INPUT      LIC ACT TITLE                                                                                                                            &
NUMBER                      DATE                  DATE                          ])Alf                  DATE        DATE cMu ACTIVE ISSUES uMuu l
                      $5LOCA MODEL AND ANALYSIS - LIC. COND. 2.C.(17)! - (TMI                                                          M51667 F-58                                                                                                    04/30/85 SECTION 4.2.t. ' CULTURAL RESOURCES DATA RECOVERY PROGRAM -                                                      M57633 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                                                                                                                                                                07/15/85
;                                                                                                                                      M53097        B-80                                                                                              07/30/85 i                    REACTOR COOLANT PUMP TRIP                                                                                        M49692 0-01 PCN 139 - CHANGE SNUBBER TECHNICAL SPECIFICATIONS                                                                                                                                                                                07/31/85 M57296                                                                                                          08/01/85 i                    AFW LUBE DIL COOLERS - LIC COND. 2.C.(20)                                                                        M51848                                                                                                          08/15/85 EVALUATE CPC THERMAL PDHER DECALIBRATION                                                                        M54256 i
PCN 8 - REVISE TECH. SPEC. 3.6.1 - CONT. ISO. VALVES                                                              M54695                                                                                                          08/15/85 07/24/85                                                            08/15/85 l                  PCN 99 - DELETE TECH. SPEC. 4.8. t.2.D.6 PER 83-30                                                                M54709                                                                                                          08/15/85 PCN 98 - F.P. LIC. COND. 2.C.(14)                                                                                M54713                                                                                                          08/15/85 PCN 131 - TECH SPEC. 3.3.3.8 - SALT HATER DILUTION                                                                M54729                                                                                                          08/15/85 PCN 125 - TECH. SPEC. 3.6.2.2 - SPRAY CHEMICAL REQUIRMENTS                                                        M54871                                                                                                          08/15/85 PCQ 142-OFFSITE POWER SOURCES                                                                                    M56219 PC3 188 - TGIS                                                                                                    M57302                                                                                                          08/25/85 j                    PCQ 114 - TECH. SPEC 4.6.1.6 - CONTAINMENT TENDON                                                                                                                                                                                08/31/85 M54865                                                                                                          09/01/85 PCD-130 - L .C.2.C(4 ) - CONTAINMENT TENDON SURVEILLA'8CE                                                        M54877                                                                                                          09/01/85 1
P2 PARE REPORT TO C079tISSION ON AFHS RELIABILITY                                                                M55808                                                                                                          09/01/85
{                    PCN 149 - T COLD AT LESS THAN 70 PCT POWER                                                                      M57298                                                                                                          09/10/85 i                    PC3 103 - TECH. SPEC. 3/4.11 - NUREG 0472 CHANGES                                                                M54723                                                                                                          09/15/85
.i                  PCC 109 - TECH. SPEC. 4.2.3.C - BURNUP - 31 DAYS                                                                M54725                                                                                                          09/15/85 4                    PC3 83 - TECH. SPEC. FIG. 6.2 SCE ORG. CHART                                                                M54701                                                                                                          09/21/85 l                  REVIEW FISSION GAS PRESSURE ANALYSIS                                                                              M54813                                                                                                          09/21/85 l                  PC2 96-MSN AND AFW RESPONSE TIME TESTS                                                                            M57276                                                                                                          09/21/85 i                  FUEL SHOULDER GAP CLEARANCE                                                                                      M57737                                                                                                          09/21/85 l
ITEM 1.2 - POST TRIP REVIEW-DATA AND INFORMATION CAPABILITY                                                      M53652        B-8 5                                                                                            09/30/85
!                  PCN 137- T.S. 3/4.8.1.2 - CHG LCO                                                                                M55tt4                                                                                                          10/01/85 i                  ID-CONTAINMENT M2 MONITORS                                                                                        M51425                                                                                                          10/15/85 4'                  EMECGENCY PROCEDURES / GUIDELINES-LICENSE CONDITION 2.C.(17)A                                                    M51660                                                                          N/A                            10/15/85 I.C.C. INSTRUMENTATION - LIC. COND. 2.C.(17)H - (TMI II.F.2)                                                      M51663 F-26                                                                                                      10/15/85
,                  TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                                                        M54568 B-83                                                                                                      10/15/85 i                  PCN 97 - TECH. SPEC. 3/4.6.4 - H2 NONITOR SURV.                                                                  M54711                                    07/24/85                                                              10/15/85 PCN 110 - TECH. SPEC. 4.3.3.2.4.A - CHANNEL CHECK                                                                M54727                                                                                                          10/15/85
'                  PCN 140 - TECH. SPEC. 4.5.2 - DELETE HV-0396                                                                      M54732                                                                                                          10/15/85 PCM 155 VENTS - TECH. SPEC. S/4.4.10                                                                              M54737                                                                                                          10/15/85 i                  PCN 108 - TECHNICAL SPECIFICATION 3.8-t(TBL) CONTAINMENT                                                          M54861
'                                                                                                                                                                                                                                                      10/15/85 PCs tt - TECHNICAL SPECIFICATION 3.I1.2 - AUX. BOILER                                                              M54863                                                                                                          10/15/85 PC3 165 - PRESSURIZER SPRAY LINE                                                                                  M57300                                                                                                          10/22/85 4
TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                                                M55739 A-18                                                                                                      11/01/85 l                  NPF 119 - TECH. SPEC. 33.2.3 - AZIMUTHAL POWER TILT                                                                M54867                                                                                                          11/15/85 I
 
    - _ - . - -                  _-    -                -. . -        . . - - -                    - - - - - . . _ - . - - . . .                    _- - -                  .~ -- -. __                      . _-~.--                    _-
i j
i i
i R-1208687-801                                    REGULAT0RY                                INF0RMATION                            TRACKING                    SYSTEM                                          PAGE NO. 17 1 5
C0NDEN5ED                            MANAGEMENT                  REP 0RT                                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 3
'l                                                                                                                                                                              RAI                                  SE
.                                                                                                                                      TAC      MPA          RAI            RESPONSE        TER                INPUT              LIC ACT 4                TITLE                                                                                                                NUMBER      &          Elf.              DATE        DATE                    DATE              DATE l
nceu ACTIVE ISSUES unum                        (CONTINUATION)
PCM 145 - CMG. F.P. LIC. COND. 2.C.(12)                                                                              M54734                                                                                        12/15/85 l              PCM 146 - CMG. F.P. TECH. SPECS.                                                                                    M54736                                                                                        12/15/85 i              CEVIEW REVISED FHA - ISSUE SER                                                                                      M54815                                                                                        12/15/85        -
PCU 123 - TECH. SPEC. 2.0 - DNBR L DH-BASIS                                                                          M54869                                                                                        12/15/85        f j              I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                                                          M51202 F-08                                                                                    12/31/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                                                              M51282 F-09                                            N/A                                    12/31/85 HIGN FREGUENCY OF NUISANCE ALARMS                                                                                    M5t317                                                                                        12/31/85
.d EVALUATE OPERATING EXPERIENCE                                                                                        M54818                                                                                        12/31/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                                                        M56164    F-71    10/23/84            10/31/85      11/30/85                                  01/15/86 LOW TEMPERATURE OVERPRESSURE PROTECTION - LICENSE CONDITION                                                          P51652                                                                                        02/15/86 l              CONTROL SYS. FAILURES DUE TO HELBA OR EGPT. FAILURES - LIC.                                                          M51654            08/27/84            12/17/84C                                              02/15/86
!                DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                                M55902 D-19                                                                                    02/15/86 PCU 7 5 - T ECH . SPEC. 4.8.t.t.2.C - FUEL OIL RETEST                                                                M54698                                                                                        02/28/86 PC3 84 - REVISE E.G. LIC. COND. 2.C.(5)                                                                              M54703                                                                                        32/28/86        i l                ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                          M52880    B-77                                                                                04/15/86        '
i                ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                                      M52961    B-78                                                                                04/15/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHNGS TO TECM SPECS-RTS                                                        M53042    3-79                                                                                04/15/86
;                ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                                                        M53150    B-88                                                                                04/15/86        l ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                                          M53715    B-86                                                                                04/15/86        '
'                                                                                                                                    M53798    B-87 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                                                06/01/85C 07/15/85                                                          04/15/86
  ,              ITEM 3.2.3 - POST-MAINTENANCE TESTING -CMANGES TO TECH.                                                            M53881    B-88                                                                                04/15/86 j              ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT. PROGRAM FOR RX TRIP                                                          M53937    B-89                                                                                04/15/86 i                ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                                        M54025 B-93        05/08/85C                                                                  04/15/86 j                POOCEDURES GENERATION PACKAGES (SUPPLEMENT 1 NUREG-0737)                                                            M55542            08/30/85                          05/30/85                                  04/15/86 J                MPA A-17(R.G. 1.97) REVIEW RESPONSE                                                                                  M55115            02/17/84                                                                    06/0t/86
:                I' 2SERVICE TESTING PER 10CFR 50.550                                                                                M55121                                                                                        06/01/86 13 SERVICE INSPECTION - SER INPUT                                                                                  M54149              12/12/84C                                                                  09/15/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                                                            M54108 B-92                                                                                    01/30/87 TURBINE DISC INSPECTION - LICENSE CONDITION 2.C.(13)                                                                M51656                                                                                        06/01/89        ;
)                cu UNSCHEDULED ISSUES un EXEMPTION FROM PART 20 - RESPIRATOR $                                                                              M57870                                07/11/85 f                PC3 193 - FMSPACFS OPERABILITY                                                                                      M57876 PC3 163 - BORATED WATER SOURCE REQUIREMENT                                                                          M57883 i                                                                                                                                    M57884 PC3 184 - SPECIAL TEST EXCEPTION FOR SHUTDOWN MARGIN 1
UTILITY RESP 3NSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                                                        M58088    C-16                        06/26/85 i              18 CFR 58.62 CPERATING REACTOR REVIEWS                                                                              M59140 A-20 i                SNURBER REDUCTION PROGRAM                                                                                          M59279 j                CE2TIFICATION OF POLLUTION CONTROL FACILITIES                                                                        M59470 u=u COMPLETED ISSUES man I              CONTROL OF HEAVY LOADS (PHASE I)                                                                                    M52374 C-10                                        08/27/84                                  10/15/84C
  ;              PCM 141 - 5/G TUBE THINNING CRITERI A                                                                                M55786                                                                                        10/26/84C I
4 6
I
                                ,. _ , _ . _ . , . _-          _.      ,. , , , , , - _    __y  _.n_                -                  -
                                                                                                                                                                  - - - - ~          ~_ -      - . _ _ _ . , ,    r      - _,
 
    -        - .      -    -  _ _ .      .        .      -.    -        --.      - - _ - -    - -- _ - -              . - -- -      -    -.      ~-    .
0-1208687-001                      R E G U L. A T 0 R Y    INF0RMATION                      TRACKING                SYSTEM                      PAGE NO.8    172 C0NDEN5ED            MANAGEMENT                            REPORT                        RUN DATE8 09/17/85 (HEADQUARTERS)
FACILITY: SAN ONOFRE 3 RAI                  SE TAC    MPA                    RAI    RESPONSE        TER INPUT          LIC ACT TITLE                                                                        NUMBER  !!L                DATE        DATE          DATE    DATE          DATE n:n CCMPLETED ISSUES umu          (CONTINUATION)
PCM 180-FUEL HANDLING BLDG FILTERS                                          M56221                                                                    10/26/84C PCN 179-REFUELING HATER LEVEL                                                M56222                                                                    10/26/84C PCN 50-REFUELING MACHINE                                                    M56223                                                                    10/26/84C CHG T.S.3.4.1.4.1. ALLOH BOTH TRAINS SDCS TO BE OUT IF CNE                  M51617                                                                    st/09/84C 1984 SALP EVALUATION                                                        M55tt8                                                                    11/09/84C PCN 126-REMOTE SDCS ALIGNMENT                                                M56220                                                                    11/15/84C I
PCN 127 - TECH. $PEC. 3.7.10 - LCO FOR EMERGENCY CHILLED                    M54873                                                                    12/19/84C PCM 16t-INCREASE SHUTDcHN MARGIN                                            M56000                                                                    12/19/84C PCN 163-REVISE BORON TANK CONCENTRATION                                      M56002                                                                    12/19/84C PCN 935 - TECH. SPEC. TABLE 3.5 TGIS SETPOINTS                          M54738                                                                    01/09/85C PCN 138 - TECH. SPEC. 3.1.3.1/6/7 - CHANGE TECH. SPEC. PER                  M54820                                                                    01/09/85C PCu 99 - TECH. SPEC. TABLE 3.3 CPIS ACTION                              M54715                                                                    Ot/11/85C 1
PCU 10 0 - T ECH. SPEC. 3/4.3.3.1 - RAD. MON. ALARMS                        M54717                                                                    Ot/11/85C PCM 101 - TECH. SPEC. 5/4.3.3.6 - ACC. MON. INST. TIME                      M54719                                                                    01/11/85C PCN 102 - TECH. SPEC. 3/4.3.3.9 - EFFLUENT MON                              M54721                                                                    01/tt/85C PCN 85 - TECH. SPEC. TABLE 3.3-2. RPIS RESP. TIME                          M54704                                                                    03/01/85C PCD-52 CNBR MARGH HITH COLSS OUT OF SERVICE                                M55998                                                                    03/01/85C PCHt48. 152. 162. 164 - RELOAD-CPC ADDRESSABLE CONSTANTS                    H56006                                                                    03/01/85C PCN150 - RELOAD-AXI AL SHAPE INDEX BOUNDARIES                              M56007                                                                    03/01/85C 3
PCM 151 RELCAD - REGULATING CEA INSERTION LIMITS                          M56010                                                                    03/01/85C PCM 153 RELCAD - MODERATOR TEMPERATURE COEFFICIENT LIMITS                  M56012                                                                    03/01/85C PCN 160 RELCAD - CHANGE DNBR LIMIT TO 1.31                                M56014                                                                    03/01/85C PCN 168 RELCAD - TEMPERATURE CHANGE CEA MISALIGNMENT TECH,                H56016                                                                    03/01/8 5C PCN 169 RELOAD - INCREASE MAXIMUM HT. URANIUM IN FUEL ROD                  M56018                                                                    03/01/85C RELCAD ANALYSIS                                                            M56265                                                                    03/01/85C
'l RELCAD. STATISTICAL COMBINATION OF UNCERTAI:' TIES                        M56266                                                                    03/01/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                        M52799 B-76                                                                05/08/85C
. CEVISED PCP - INTERIM APPROVAL                                            M57812                                                                    06/tD/85C i
PCU 41 - TECH. SPEC. 3/4.2.8 PRESSURI2ER                                  M54696                                                                    06/14/85C l FCN 89 - TECH. SPEC. 3/4.4.4 - S.G. INSPECTION                            M54707                                                                    06/14/85C PCN 134 - TECH. SPEC. 2.2.2 - CPC ADDRESSABLF CONSTANTS                    M54875 06/14/85C CD': TROL OF HEAVY LOACS - PHASE II (FDLLC&suP OF MPASC-10)                M52270 C-15                                                                06/28/85C 4
l.
 
Q-12G3687-001                                                    REGULAT0RY            INF0RMATION                TRACKING              SYSTEM                                      PAGE NO. 173 C0NDEN$ED              MANAGEMENT                  REPORT                                            RUN DATE: 09/17/85 (HEADQUARTERS)                                                                                          :
1 FACILITY: SEQUOYAH 1                                                                                              i PLANT E0 CATION: 9.5 MI NE OF CHATTANOOGA TN                                            LICENSED P0HERt 3411 MNT                        PROJECT MANAGER: C. STAHLE                                        l DOCKET NUMBER: .050-00327                                                              DESIGN POWER:      1848 MWE                    BRANCH CHIEF:                  E. ADENSAM                        t ARCM/ ENGINEER: TVA                                                                    NSSS VENDOR:      HEST                          LIC. ASSISTANT 8 M. DUNCAN                                        '
IE INSPECTOR:                          K. JEMISON
* RAI                                    SE                      I TAC      MPA          RAI      RESPONSE                TER            INPUT TITLE                                                                                                Elf!!LR    &          R M f.      DATE                pale              DATE        A nun ACTIVE ISSUES unnu B-6 0                                                                    09/00/85        I ENVIRONMENTAL QUALIFICATION OF SAFETY REL ATED ELECTRICAL                                            M42535            t1/20/84                      12/20/84 NUREG-0737 III.A.1.2. TECHNICAL SUPPORT CENTER                                                        M45984    F-63                                                                    09/00/85        f MUREG-0737 III.A.1.2. OPERATIONAL SUPPORT CENTER                                                      M46055    F-64                                                                    09/00/85        ,
NUREG-0737 III.A.1.2. EMERGENCY OPERATIONS FACILITY                                                  M46127    F-65                                                                    09/00/85        t
            *NUREG 0737 TECM SPECS (GENERIC L ETTER 82-16 82-16 OR                                                M49758 B-72                                                                        09/00/85' RCS VENTS TECHNICAL SPECIFICATIONS MUREG 073 ITEM II.R.1                                              M54415                                                                              09/00/85 TEChMICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36.                                            M54569    B-83                                                                    09/00/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                  M55903    D-19                                                                    09/00/85 CHANGES TO RADIOLOGICAL EFFLUENT SPECIFICATIONS                                                      M56055                                                                              09/00/85 REVISED TABLE ON OVERCURRENT DEVICES                                                                  M56412                                                                              09/00/85 REVISED TABLE ON PENETRATIONS                                                                        M56414                                                                              09/00/85 DELETE FLOM RATE MONITORS FROM TABLES                                                                M56416                                                                              09/00/85 E1UIPMENT GUALIFICATION - STEAM VALVE ROOM                                                            M56419                                                                              09/00/85        l REVIEW 0F NON-CONFORMANCE REPORTS                                                                    M57287                                                                              09/00/85 DELETION OF 3 LOOP OPERATIONS                                                                        M57934                                                                              09/00/85 ITEM 1.2 - PCST TRIP REVIEM-DATA AND INFORMATION CAPA5ILITY                                          M53633 5-85                                                                        09/30/85 RV AND SV TESTING                                                                                    M44621    F-14  03/tt/85C 07/18/85            09/00/85                            10/00/85 CCD DROP PROTECTION                                                                                  M51463                                                                              10/00/85 M52132            01/01/85                                                          10/00/85      i M2 IGNITER SURVEILLANCE                                                                                                                                                                                  1 CDNTAIMMENT PLRGE LINES                                                                              M53494                                                                              10/00/85 TECM. SPECS. AFFECTED BY 58.72 AND 58.73 (GL 83-43)                                                  M55740    A-18                                                                      10/00/85 CHANGES TO PLANT ORGANIZATION                                                                        M56053            08/01/85                                                          10/00/85      ,
TEST FOR CONTAINMENT AIR LOCK DODR SEALS                                                              M56716                                                                              10/00/85        .
REVIEM OF TAYC0 IGNITOR TEST RESULTS                                                                  M56718                                                                              10/00/85      !
USE CF FIFTH STANDBY DIESEL GENERATOR                                                                M56979                                                                              10/00/85 ACOUSTIC MONITORING SYSTEM                                                                            M57936                                                                              10/00/85 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS                                            M58089 C-16                      06/17/85                                          11/00/85      [
            /2 - FIRE PROTECTION                                                                                  M47064 5-41      01/15/85                                                          12/00/85      '
            /2 TASIL INTERFACE AGREEMENT (81-15)                                                                  M41065            02/15/85                                                          12/00/85 kEACTOR COOLANT PUMP TRIP                                                                            M49694    G-Ot    06/01/85                                                          12/00/85 ITEM 2.1 - EGUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                          M52881    B-77                                                                      01/00/86.      ,
ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                                      M52962    B-78                                                                      01/00/86 REACTOR TRIP SYSTEM RELI ABILITY - VENDOR RELATED                                                    M53098    B-80                                                                    01/00/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                                          M53716    B-86                                                                    01/00/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                                          M53938    B-89                                                                      (st/00/86 ITEMS 4.5.2 4 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                                        M54026    B-93                                                                      01/00/86 INSTRUMENTATICM TO FOLLOW THE COURSE OF AN ACCIDENT (RG                                              M5tt33 A-17      04/13/84C                                                        02/01/86 ITEM 3 1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECM                                                M53043 3-79                                                                        04/30/86        i i            ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                                              M53882 5-88                                                                        04/30/86        ;
l                                                                                                                                                                                                                      .
i I
 
R-1208687-001                  REGULAT0RY          INF0RMATION                TRACKINO            5Y$ TEM                PAGE NO.s  174 C0NDEN$ED        MANAGEMENT                  REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SEQUOYAH 1 RAI                SE TAC    MPA            RAI    RESPONSE        TER INPUT      LIC ACT TITLE                                                              NUMSER  &            DAIX      C'TE        RAIL  DATE        DATE c:su ACTIVE ISSUES mene        (CONTINUATION)
I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEM
 
==SUMMARY==
REPORT -      M56165  F-71                  11/01/86    12/01/87          07/01/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE          M54109  B-92                                                11/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53799  B-87                                                12/31/86 NUREG 0737 II.K.3.51 COMPLIANCE WITH 10 CFR 50.46                M48204 F-58                    07/01/86                      02/01/87 c:2 UntSCHECUt ED ISSUES en EQUIPMENT GUALIFICATION                                          M56517 to CFR 50.62 CPERATING REACTOR REVIENS                            M59141 A-20 ISt REVIEW                                                        M59457 cru Co-PLETED ISSUES num PEES $URIZER SPRAY N0ZZLE                                        M52128 RELIEF FROM SECTION XI 0F ASME CODE                              M55764                                                        tt/01/84C LELIEF FROM SECTION'XI 0F ERCH PIPING                              M55995 11/01/84C USE OF THERMAL FIRE CETECTORS                                                                                                    12/01/84C M55933                                                      Ot/00/85C CCNTAINMENT ISCLATION VALVES                                      M52154 USE OF FIFTH VITAL BATTERY                                        M55931 Ot/01/85C USE CF FIFTH VITAL BATTERY                                        M55932 01/ 01/85C USE OF THERMAL FIRE DETECTORS                                      M55934 OS/01/85C STEAM GENERATOR HATER LEVEL                                        M55935 01/01/85C NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION                                                                    01/ 01/85C M*5172 F-26                                                  03/00/85C CCMTROL OF HEAVY LOADS AT NUCLEAR POWER PLANTS (NUREG 0612)        M47130 C-10                                                  03/00/85C SALP REVIERS                                                      M54274 IST REVIEW                                                                                                                      03/00/85C M54275              02/15/85                                03/00/85C IST PROGRAM                                                        M54276              02/15/85 EMERGENCY EXERCISE EXEMPTION REQUEST                              M54884 03/00/85C 03/00/85C ITEM 4.5 - AUTCAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR        M53195 B-82                                                  04/30/85C PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 $UPP/1)          M44341  F-05        05/28/85C            03/21/85C          05/00/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR      M53151  B-81                                                03/00/85C ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        M55377  B-90                                                05/00/85C ITEM t.1 - POST TRIP RtVIEW PROGRAM DESCRIPTION AND              M52600 B-76                                                  05/21/85C NUREG-0737 II.K.3.1, AUTO PORV ISOLATION                          M45250 F-36 SUSC00 LING MARGIN MONITOR 06/00/85C M52195              01/01/85                                06/00/85C
^F IEE HOSE STATIONS                    .
M57184                                                        06/00/85C CONTROL OF HEAVY LCADS - PHASE II (FDLLOWUP 0F MPASC-10)          M52271  C-15                                                06/28/85C NLREG-0737 II.K.3.30, SB LOCA CUTLINE                            M45865 F-57                                                  07/01/85C
 
_ _      ~_    ___    __      _      -        _  _  - ._ _ _ _ _ _ . _                                __        . . _ _ _ _ _          .        _    _      __    _
D-1204687-001                      REGULAT0RY      ZNF0RMATION                            TRACKING          SYSTEM                                PAGE N0.8    175 C0NDEN$ED                    MANAGEMENT              REP 0RT                                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SEQUOYAH 2 PL ANT LOCATION: 9.5 MI NE OF CHATTANDOGA, TN      LICENSED PCHER8 3411 MHT DOCKET NUMBER: 050-00328                          DESIGN POWER                                            PROJECT MANAGER: C. STAHLE ARCM/ ENGINEER    TVA                                                          1148 PN4E                  BRANCH CHIEF:              E. ADENSAM NS$$ VENDOR:                HEST                      LIC. ASSISTANT: M. DUNCAN IE INSPECTCRs      K. JE*4ISCN I                                                                                                                  RAI                              SE TAC    MPA      RAI      RESPONSE                TER TITLE                                                                                                                                        INPUT      LIC ACT NUMBER    EL      MIf.        DATE                DATE        DATE          DATE I
cc a ACTIVE 1114E3 unum
      *NUREG 0737 TECM SPECS (GENERIC LETTER 82-16 82-16 OR                      M49759 B-72 CMAhuES TO PLANT CRGANIZATION                                                M56054                                                                      06/00/85 i      ICDINE/ PARTICULATE (II.F.t.2)                                              M5:452 F-21                                                                  08/00/85 RCS VENTS TEchMICAL SPECIFICATIONS NUREG 073 ITEM 11.B.1                    M54416                                                                      09/00/85 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                  M54570 B-83                                                                  09/00/85 CELETE FLCH RATE MONITORS FROM TABLES                                      M56417                                                                      09/00/85 DELETICN OF 3 LOCP CPERATIONS                                              M57935                                                                      09/00/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                M53634 B-85                                                                  09/00/85 TECH. SPEC. CHANGES ON PLANT CRGANIZATION                                    M48254                                                                      09/30/85 R 8 D H2 CCNTROL                                                            M51441                                                                      10/00/85 TECHNICAL SUPPCRT CENTER-(III.A.t.2)                                        M5 454    F-63                                                              10/00/85 H2 IGNITER SURVEILL ANCE                                                    M52133                                                                      10/00/85 CONTAINMENT PURGE LINES                                                      M53495                                                                      10/00/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-45)                          M55741 A-18                                                                  10/00/85 CHANGES TO RADIOLOGICAL EFFLUENT SPECIFICATIONS                              M56056                                                                      10/00/85 REVISED TABLE ON OVERCURRENT DEVICES                                        M56413                                                                      10/00/85 CEVISED TABLE CM PENETRATIONS                                                M56415                                                                      10/00/85 TEST FOR CONTAINMENT AIR LOCK D00R SEALS                                    M56717                                                                      10/00/85 CEVIEW CF TAYC0 IGNITCR REST RESULTS                                        M567t9                                                                      10/00/85 U3E OF FIFTtt STANCBY DIESEL GENERATOR                                      M56980                                                                      10/00/85 ACCUSTIC MONITCRING SYSTEM                                                  M57957                                                                      10/00/85 RV AND SV TESTING                                                            M51451                                                                      10/00/85 EQUIPMENT GUALIFICATION - STEAM VALVE ROOM                                  M56 418 F-14  03/11/85C 07/18/85                09/00/85                  st/00/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                      M51284 F-09                                                                  11/00/85 08/20/84                                                    12/00/85 REACTCR CCOL ANT PUMP TRIP (II.K.3.5)                                        M51528    G-Ot ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                  M52882 B-77                                                                01/00/86 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                              M52963 B-78                                                                01/00/86 CEACTCR TRIP SYSTEM RELIABILITY - VENDOR RELATED                            M53099 B-80                                                                01/00/86 ITEM 2.2 - EQUIPMENT CL ASSIFICAT!DN AND VENDOR INTERFACE -                  M53717    B-86                                                              01/00/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FCR RX                  M53939    B-89                                                              01/00/86 ITEMS 4.5.2 3 4.5.3 - REACTCR ikIP SYSTEM FUNCTIONAL TESTING                                                                                            01/00/86 M54027    B-93                                                              01/00/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                        M55904    D-19                                                              01/00/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                        M53044    B-79                                                            04/30/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CMANGES TO TECH.                      M53883    B-88                                                            04/30/86 I.D.t.2 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                  M51204    F-71                                                            07/01/86 I.D.t.2 DETAILED CCNTROL R00M DESIGN REVIEW
 
==SUMMARY==
REPORT -                M56166    F-71                11/01/86            12/01/87                07/01/86 CCMPLIANCE WITH 80CFR 58.46 (II.A.3.31)                                      M51445 F-58 ITEM 4.5.1 - REACTOR SYSTEM FUNCTICNAL TESTING - DIVERSE                    M54110    B-92 10/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                                                                                                  11/30/86 M53800    B-87                                                                12/31/56
 
                                                ~-        -- .              -              -  ._-      -.      .-- -  .        --.. .-- _ -
R-1208687-001                    REGULAYORY            INF0RMATION                TRACKING            SY$ TEM                      PAGE NO.      176 C0NDEN5ED          MANAGEMENT                REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY; SEQUDYAH 2 RAI                      SE TAC      MPA        RAI    RESPONSE              TER INPUT      LIC ACT TITLE                                                                NUMBER      &          DATE      DATE            DALE    DATE          DATE umEu ACTIVE ISSUES maam        (CONTINUATION)
INSTRUMENTATION 10 FOLLOW THE COURSE OF AN ACCIDENT (RG              M51134  A-17        04/13/84                                        01/00/87 EUREG 0737 II.K.3.31 COMPLIANCE HITH to CFR 50.46                      M48205 F-58                    07/01/86  06/01/86                  02/01/87 nu U*iSCHEDtJt ED 155t!ES **
HEAVY' LOADS                                                          M51442 C-10 POST ACCIDENT SAMPLING (II.B.3)                                        M51450 F-12 STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM GENERATORS            M58090  C-16                  06/17/85 to CFR 50.62 CPERATING REACTOR REVIENS                                M59142 A-20 Ist REVIEW                                                            M59458 uma CO*PLETED ISSUES men EXTENSION TO CCMPLETE QUAL. OF EQUIPMENT                              M564st                                                              11/00/84C        ;
PRESSURIZER SPRAY N0ZZLE                                              M52t29                                                              12/01/84C        !
STEAM GENERATOR WATER LEVEL                                            M55936                                                              12/01/84C EELIEF FRCM SECTION XI ON ERCH PIPING                                  M55995                                                              12/01/84C CONTAINMfNi ISOLATION VALVES                                          M52135                                                              01/00/85C CONTAINMENT AIR TEMPERATURE AND PURGE LINES                            M49172                                                              01/ 01/85C POTENTIAL FCR VOIDING IN RCS (II.K.2.17)                              M51444 F-33                                                        03/00/85C
!                INSTRUMENTS FCR DETECTION ON INADEQUATE CORE COOLING                  M49458  F-26        12/21/84-                                      04/00/85C REVIEW OF NON-CONFORMANCE REPORTS                                      M57286                                                              04/00/85C ITEM 4.3 - AUTDAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR            M53196 B-82                                                        05/00/85C ITEM 4.3(TS) - AUTCMATIC ACTUATION OF SHUNT TRIP FOR H AND            M55378  B-90                                                        05/00/85C ITEM t.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                    M52801  B-76                                                        05/21/85C PCOCEDURES GENERATION PACKAGE REVIEW (HUREG 0737 $UPP/1)              M51448 F-05        05/28/85C            04/30/85                  06/00/85C
                  >U300 CLING MARGIN MONITOR                                            M52196                                                              06/00/85C sNU55ER SPECIFICATIONS                                                M52660                                                              06/00/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR          M53152  B-81                                                        06/00/85C FIRE HSSE STATIONS                                                    M57183                                                              06/00/85C CONTROL OF HEAVY LCADS - PHASE II (FDLLCHUP OF MPASC-10)              M52272 C-15                                                        06/28/85C SS LOCA CUTLINE (II.K.3.30)                                            M51453 F-57                                                        07/01/85C
                                      ~    .                    --    .
 
l R-1208687-001                                REGULAT0RY      INF0RMATION                                TRACKING                  SYSTEM                          PAGE NO. 177 C0NDEN$ED                  MANAGEMENT                      REP 0RT                                      RUN DATE: 09/t7/85 (HEADQUARTERS)
FACILITY: SHOREHAM PLA",T LCCATION: BROOKHAVEN, NY (LI)                          LICENSED P0HER: 000 MHT                                          PROJECT MANAGER: R. CARUS 0 DCCKET NUMBER: 050-00122                                      DESIGN P0HER:                      0820 MHE                      BRANCH CHIEF 8            H. BUTLER ARCM/ ENGINEER: 58W                                          NS$$ VENDOR:                      GE                            LIC ASSISTANT: E. HYLTON IE INSPECTCR2          R. CARLSON RAI                                                  }
i
'                                                                                                                                                                              SE TAC        MPA      RAI          RESP 0 HSE        TER          INPUT      LIC ACT IIILE                                                                                  NUMBER          &        DATE                DATE      DATE            DATE        DATE nunu ACTIVE ISSUES unum CROUND6 TATER MONITORING PLAN                                                          M56751                                                                            04/30/85 CRouM:: HATER MONITORING PROTECTION RUN                                                M56978                                                                            04/30/85 FICE PROTECTION                                                                        M56520                              Ot/29/85C                                    05/30/85 SALEM ATWS ITEM 3.2.3, CHANGES TO TECHNICAL SPECIFICATION                              M57530 B-88                                                                      09/30/86 SALEM ATHS ITEM 3.2.1 3 3.2.2, POST MAINTENANCE TEST                                  M57551 B-87                                                                      12/31/86 zu UNSC?*EPttL ED ISSUES um SEISMIC CUALIFICATICN CF MECNANICAL 1 ELECTRICAL EQUIPMENT                            M56518 PRA REVIEW                                                                            M56690 101 tug 5                                                                            M56691 I.D.t.2 DETAILED CCNIROL ROOM DESIGN REVIEW
 
==SUMMARY==
REPORT -                          M57142 F-71                          08/15/86      09/15/86 I.D.t.t - DETAILED CCNTROL ROOM DESIGN REVIEW PROGRAM PLAN                            M57143 F-71 SHCCEHAM ADS ACCUM. TEST                                                              M57252 UPGRADE EMERGENCY CPERATING PACCEDURES                                                M57529 F-05 SALEM ATHS ITEM 11 (POST-TRIP REVIEH)                                                M57808 B-76 ISI/IST                                                                              M27889 PEAKING SERVICE FCR EMD EDG AND 20MW GT                                              M57890 BACKUP STA QUALIFICATIONS                                                            M57891 CCLT EDG INSTALLATION                                                                M57892 SPDS REVIEW - TMI I.O.2                                                              M58002                                                                                            '
POST ACCIDEM' SAMPLING PROCEDURES-TMI II.B.3.2                                        M58003 EXEP'PTION FC4 10CFR50.44(C)(3)(I)                                                    M59032 10 CFR 50.62 CPERATING REACTOR REVIEWS                                              M59143 A-20 IMPLEMENTATIONS OF R.6. 1.97                                                          M59261          A-17 II.B.3 H2 ANALYSIS METHODOLOGY                                                        M59395 LIMITS CF CPERATION                                                                  M59396 num CC"PLETED ISSUES nu PCLLUTICM CONTROL FACILITY CERTIFICATE                                                M56589                                                                            12/26/84C PCP                                                                                  M56521                                                                            02/12/85C
 
R-1208487-001                    REGULAT0RY                INF0RMATION                            TRACKING              SYSTEM                                PAGE N0.8  178 C0NDEN5ED                    MANAGEMENT                      REPORT                                RUN DATE: 09/t7/85 (HEADQUARTERS)
FACILITY: ST LUCIE 1 PLANT LOCATION: 12 MI SE OF FT. PIERCE. FLA                  LICENSED POWER: 2700 MHT                                PROJECT MANAGER: D. SELLS COCKET NUMSER: 050-00335                                    DESIGN POWERS        0830 MHE                          BRANCH CHIEF:        E. BUTCHER AICH/ ENGINEER      EBASCO                                  NSSS VENDOR:          COMB                              LIC. ASSISTANT: P. KREUTZER IE INSPECTORr      R. CRLENJAK RAI                    SE TAC          MPA            RAI      RESPONSE        TER        INPUT              LIC ACT TITLE                                                                        HUMEER        &              DATL            DATE      DATE        DATE                DATE menu ACTIVE ISSUES meme STATION BLACKOUT                                                              M43241                                05/14/82C                                      09/01/85 FCCCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/t)                      M44337    F-05          11/26/84C 04/12/85        08/20/84C                        09/30/85 to CFR 50.55 A(6) - INSERVICE INSPECTION                                    M48622                                09/22/81C                                      09/30/85 ITEM t.2 - TOST TRIP REVIEN-DATA AND INFORMATION CAPABILITY                  M53635 B-85                                                                          09/30/85 ADDITICNAL FIRE PROTECTION EXEMPTIONS                                          M56433                                                                                10/01/85 REVIEH OF AS1 METRIC LOCA LCADS SUBMITTAL                                      N08923    D-10                        08/08/80C                                      10/15/85 AMENDS TECHNICAL SPECIFICATIONS TO MAKE THEM MORE CONSISTENT                  M55046                                                                                10/15/85 TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                            H55742    A-18          12/07/84                                                    10/15/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                          M55905    D-19                                                                        10/15/85 DIESEL GENERATCR SURVEILLANCE REQ.                                            M48924                                                                                10/30/85 SODIUM HYDROXIEE FLOH RATE AND PRESSURE TEST                                  M55986                                                                                10/30/85 REANALYSES OF RCP SEIZED ROTOR AND LOSS OF ALL NON-EMER6ENCY                  M48795                    02/13/84                                                    10/31/85 REACTCR C00iANT PUMP TRIP                                                      M49693 G-01                                                                            10/31/85 M3VABLE CCNTROL ASSEMBLIES                                                    M59355                                                                                11/15/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                          M53045 B-79                                                                            18/30/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                      M53884    B-88                                                                        11/30/85 ITEM 2.1 - EGUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M52883 B-77                                                                            12/01/85
:.                  ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                                M52964 B-78                                                                            12/01/85 I
REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                              M53100    B-80                                                                        12/01/85
)                  ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR                  M53153    B-81          01/07/85                                                    12/01/85 j                  I . D 1.2 CET AILED CC'4 TROL ROCM DESIGN REVIEH
 
==SUMMARY==
REPORT -              M56167    F-78          11/06/84    10/20/85    11/01/85                          12/15/85 ITEM 1.t - POST TRIP REVIEH PROGRAM DESCRIPTION AND                            M52802 B-76              04/11/85                                                    12/31/85 INSTRUMENTATION TO FOLLCH THE COURSE OF AN ACCIDENT (RO                        M5tt35    A-17            04/05/85                                                    01/02/86
{                  NUCEG-0737 III.A.t.2. TECHNICAL SUPPORT CENTER                                N45980    F-63                        07/02/82C                                      01/15/86
!                  NUCEG-0737 III. A. t.2. OPERATIDMAL SUPPORT CENTER                            M46051    F-64                        07/02/82C                                      01/15/86 NUCEG-0737 III.A.t.2 EMERGENCY CPERATIONS FACILITY                            M46123 F-65                            07/02/82C                                      01/15/86 NUCEG-0737 III.A.2.2. METEOROLOGICAL DATA UPGRADE                              M46339    F-68                        07/02/82C                                      01/15/86 13CFR50.62 CPERATING REACTOR REVIEWS                                          M59144    A-20                                                                        01/15/86 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                    M58091    C- 16                        06/18/85                                      01/31/86        .
a                  CV AND SV TESTING                                                              M44617    F-14            06/07/A5C 09/30/85                                          02/15/86 NUIEG-0737 TECH. SPECS. GENERIC LETTER 83-37                                  M59356                                                                                11/15/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M53718    B-86                                                                        12/01/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                    M53940    B-89                                                                        12/01/86 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                  M54028    B-93            08/00/85                                                    12/01/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                      M541st    B-92                                                                        12/01/86 ITEMS 3.2.1 & 3.2.2 - POSI-MAINT Tt; STING PROCEDURES AND                      M53801 B-87                                                                            12/31/86 ncis CML ETED JSSUES num 1.D.t.1 - DEY*iLED CCNTROL R00M DESIGN REVIEW PROGRAM PLAN                    M51205 F-08                                                                            10/10/84C
 
    - ----. - . . - --._ .-- - - -. .                                                            -- - - .                  -.--- - .- -- - - _ . --- _ _ ~                                            - - -                    - - - - ~                            . .-- - -
Q-1298687-881                                        REGULAT0RY                                      INF0RMATION                                          TRACKING          SY5 TEM                                            PAGE NO.                        179 l C0NDEN5ED                            MANAGEMENT                                  REPORT                                                  RUN DATE: 09/17/85 l                                                                                                                                    (NEADGUARTERS)
FACILITY: ST LUCIE 1 RAI                                            SE TAC          MPA        RAI    RESPONSE              TER                    INPUT                        LIC ACT        ,
TITLE                                                                                                                              jty!!)H              &        E        DATE                E                          DATE                          DATE CC"J COMPLETED ISSUES mee                          (CONTINUATION)
M52031                              08/06/84                                                                    ft/09/84C      l CONTAIINEENT PURGE VALVE OPERABILITY ENVIRONMENTAL SUALIFICATION OF SAFETY RELATED ELECTRICAL                                                                          M42492 B-60                          07/12/84C                                                                    11/15/84C CREEP CotL APSE CALCUL ATIONS                                                                                                      M55987                                                                                                            02/19/85C      i i
EXEMPTION FROM APP. R SECT. tt1G                                                                                                  M43852              5-41            06/10/82C                                                                    02/21/85C EXEM TI0tt FROM APPENDIX R SECT. tttA                                                                                              M43853              B-41            06/10/82C                                                                    02/21/85C EXEMFTION FROM APPENDIX R. III G SCHEDULAR                                                                                    M48641                                                                                                            02/21/85C CaesTROL OF MEAVY LOABS OVER SPENT FUEL POOL (NUREG 8612)                                                                          Me8083 C-18                          10/12/82C                                                                  03/04/85C      '
10CFFR 58.55 A(6) INSERVICE TESTING                                                                                              M08292 A-14              04/12/84  04/21/82C                                                                    04/02/85C      :
Det9ERGRoussa CAttE INSULTIstG MATERIAL                                                                                            M56383                                                                                                            05/08/85C-      l I.B.2 SAFETY PARAMETER SISPLAY SYSTEM                                                                                            M51285 F-89              89/14/84                          N/A                                                  06/tt/85C leUREG-8737 II.F.2.3. IMADE00 ATE CORE COOLING INSTRUMENTATION                                                                    M45168 F-26                          03/10/43C                                                                    06/20/85C      i TECnftICAL SPECIFICATI0ess COVERED BY GENERIC LETTERS 43-36.                                                                        M54571 B-83                                                                                                      06/21/85C ECCS ERROR AND CORE seEIGNT F(4)                                                                                                  M57258                                                                                                            06/25/85C MASOIIRY MALL DESIGN. RESPONSE TO IE BULLETIN 40-11                                                                                M42900 3-59                          10/04/82C                                                                  06/26/85C      ,
leUREG-8737 II.K.3.30, SS LOCA OUTLIIsE                                                                                            M45861 F-57                          07/02/82C                                                                    06/26/85C      "-
NUREG 8737 II.K.3.31 COMPLIABICE WITH 18 CFR 58.44                                                                                M48200 F-58                        06/13/80C                                                                    06/26/85C seeBIFICATION TO CafetI5510N ORDER TO EXTEND E0P                                                                                    M57872                                                                                                          06/27/85C COIITROL OF MEAVY LOA 35 - PetASE II (FDLLOMUP OF MPASC-IS)                                                                        M52273 C-15                                                                                                      06/28/85C i
I I
l l
k
  .,,,,.v..--..,.w,.-
m---. -- ,--,-,y-.r----..-e        . . . . -- - - - - -            _ _ - -  --..-.m          - - - - - - - - .    - - - .          -              - - - - +            _ - , - - . . . ,          - - - - . , . - . -
 
R-1208687-001                  REGULAT0RY                INF0RMATION                                  TRACKING                SYSTEM                            PAGE NO.8          180 C0NDEN$ED                        M*NAGEMENT                                REP 0RT                              RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ST LUCIE 2 PLANT LOCATION: 12 MI SE OF FT. PIERCE. FLA              LICENSED PONER: 2700 MHT                                          PROJECT MANAGER      D. SELLS DCCKET NUM3ER: 050-80389                                  DESIGN POWER:            0830 MHE                                  8 RANCH CHIEFS        E. BUTCHER ARCM/ ENGINEER: EBASCO                                    NSSS VENDORS            CCMB                                      LIC, ASSISTANTS      P. KREUTZER IE INSPECTCRt    R. CRLENJAK RAI                        SE TAC              MPA                RAI    RESPONSE          TER        INPUT          LIC ACT TYTLE                                                                          M!MILR            NJL                DATE      DATE          DATE      _DATE            DATE n=ce ACTIVE ISSUES mean A". ENDS TECHNICAL SPECIFICATICNS TO EXTEND SUBGROUP TEST                      M55063                                                                                07/15/85 ENVIRONMENTAL GUAL OF MECH. & ELECT. EQUIP                                    M5:488                                                                                09/15/85 CEVIEN AND APPROVED REVISED PHYS. SECURITY PL AN                                M51489                                                                                09/15/85 i          ITEM t.2 - POST TRIP REVIEW-EATA AND INFORMATION CAPABILITY                    M53636 B-85                                                                            09/30/85 PCCCEOURES GENERATION PACKAGES (SUPPLEMENT 1 NUREG-0737)                        M55343                            11/26/84C            08/20/84C                    09/30/85 FICE PROTECTICM, CcMPLIAkCE WITH AFPENDIX R                                    M53428                                                                                10/01/85 AMENDS TECM SPECS TO REFLECT CHANGES IN CEG AND MEET THE                        M55064                                                                                10/15/85 TECM. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-45)                            M55743 A-18                        12/07/84                                            10/15/85 AMENDS TECHNICAL SPECIFICATICNS TO PERMIT CONTINUOUS PURGE                      M55784                                                                                10/15/85
: 2. BORCN MIXING TEST REPORT - CEN-259                                          M54485                                                                                10/30/85 C.EACTCR CCCLANT PtrP T RIP ( 066 0-II.K.3.5)                                  M594tt          G-01                                                                  10/31/85 E%LUATE FP & L REPCRT ON CCLD SHUTDCHN REGR.                                    M51474                                                                                11/15/85 CEVIEW ANAL. OF CCNTINUCUS CONT. PURGE SYST.                                    M51492                                                                                11/15/85 I-'5ERVICE INSPECTICN AND TESTING FOR CLASS 1,2, AND 3                          M52559                            08/08/83  1t/19/84C                                11/15/85 ADDITICNAL FIRE FROTECTICN DEVI ATICNS                                          M56421                                                                                11/15/85 NUREG-0737 TECH. SPECS. GENERIC LETTER 53-37                                    M59357                                                                                81/15/85 1          ITEM 3.1.3 -PCST-MAINTENANCE TESTING-CMANGES TO TECH                            M53046          5-79                                                                  11/30/85 l
ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                        M53885 5-88                                                                            11/30/85 FICE PROTECTICM FEATURES                                                        M54746                                                                                11/30/85 I;' SERVICE TEST PROGRAM FCR PUMPS AND VALVES                                  M56707 1
11/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                      M52884          B-77                                                                  12/01/85 ITEMS 3.1.1 4 3.1.2 - POST MAINTENANCE TESTING                                  M52965          B-78                                                                  12/01/85 CEACTCR TRIP SYSTEM RELI ABILITY - VENCCR REL ATED                              M55 tot          B-80                                    06/05/86                      12/0t/85 7        ITEMS 4.2.1 1 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTCR                    M55tS4          B-81            01/07/85                                            12/01/85 TS ADMINISTRATICN AND EDITORIAL CNANGES - I L-83-349,                            M5tS64                                                                                12/15/85 DIESEL GENERATCR RELIABILITY TECH. SPECS. (GL 84-15)                            M55906          D-19                                                                12/15/85 i'        I.D.1.2 CETAILED CCNTROL RCOM DESIGN REVIEW
 
==SUMMARY==
REPCRT -                    M56168          F-71            11/06/84  10/20/85    11/01/85                    12/15/85 LICENSE AMENDMENT TO DtLETE CERTAIN LICENSE CONDITIONS                          M5686 0                                                                                12/15/85 ITEM 1.1 - PCST TRIP REVIEW PROGRAM DESCRIPTION AND                            M52803 B-76                        04/11/85                                            12/3t/a5 I":STRL*MENTATICN TO FCLLCW THE COURSE CF AN ACCIDENT (RG                      M51136 A-17                        04/05/85C                                          01/02/86 EMERGENCY RESPCNSE CAPABILITY                                                  M51530                                                                                0t/15/86
,        ITEMS 4.2.3 A 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                    M53941            3-89                                                                01/15/86 l          TCCFR50.62 CPERATING REACTCR REVIEWS                                          M59845 A-20                                                                            08/15/86 1
METECROLOGICAL DATA UPGRADE                                                      M59275            F-68                                                                01/15/86 UTILITY RESPONSES *O STAFF RECCNr*ENDATIONS CCNCERNING STEAM                    M58092 C-16                                                                            01/31/86 CV AND SV TESTINJ                                                                M51605            F-14            06/27/85C 09/30/85                                  02/15/86 ITEM 2.2 - EQUIPMENT CL ASSIFICATICN AND VENDCR INTERFACE -                    M53719            B-86                        10/30/84                                12/01/86 ITL% 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                    M54029            B-93            08/00/85                                            12/01/86 ITEM 4.5.1 - REACTCR SYSTEM FUNCTIONAL ifSTING - DIVERSE                        M54112 B-92                                                                            12/01/86
 
C-1208687-001                  REGULAT0RY          INF0RMATION                  TRACKING        SYSTEM            PAGE NO.s  181 C0NDEN5ED          MANAGEMENT                  REPQRT                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: ST LUCIE 2 RAI          SE TAC  MPA        RAI    RESPONSE  TER INPUT      LIC ACT TITLE                                                            NUMBER      &        DAIX      DATE  DAIX    DATE      DATE cc a ACTIVE ISSUES nuum      (CONTINUATION)
ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND          M53802 B-87                                            12/31/86 C3 L'NSCHEDULED IS3UES em AMENDMENT TO DIESEL GENERATOR TECHNICAL SPECIFICATIONS            M59634 c a CcwPLETED IS3UES num I.D.t.1 - DETAILED C3NTROL R00*t DESIGN REVIEW PROGRAM PLAN      M51206      F-08                                        10/10/84C SPE'',T FUEL PCCL TO INCREASE THE SPENT FUEL STROAGE CAPACITY    M54463                                                  10/16/84C AXIAL GRCHTH                                                      M51533                                                  tt/08/84C POSS CCRE DAMAGE EST. PRCCEDURE                                  M51529                                                  11/09/84C HEAVY LCADS                                                      M58531                                                  11/09/84C
: AMENDS TECNNICAL SPECIFICATIONS AS A RESULT OF CYCLE 2        M55551                                                  1t/09/84C PCkER INCREASE FROM 2560 fWTH TO 2700 MHTH                        M56395                                                  03/01/85C AXIAL GRCHTM REPORT                                              M56381                                                  03/05/85C POSS CCRE DAMAGE PROCEDURE. LICENSE CONDITION 2.C.17.D            M56361                                                  03/08/85C TECH. SPEC. AMENOMENT TO CHANGE NOMENCLATURE ON VALVES IN        M56078                                                  03/15/85C CONTROL CF HEAVY LCADS - PHASE 1                                  M56385                                                  04/02/85C I.D.2 SAFETY PARAMETER DISPLAY SYSTEM                            M51286 F-09        11/02/84            N/A            06/tt/85C REVIEW IMADEQUATE CCRE CCOL. REPT.                                M5 490                                                  06/20/85C TECHNICAL SPECIFICATICMS COVERED BY GENERIC LETTERS 83-36,        M54572 B-83                                            06/21/85C NUREG 0737. II.K.3.31. CCMPLIANCE WITH to CFR 50.46              M57574 F-58                                            06/26/85C l MCDIFICATION TO CCMMISSION CRDER TO EXTEND EDP                    M57875                                                  06/27/85C CCMIROL OF HEAVY LDADS - PHASE II (FDLLOHUP OF MPA8C-10)          M52274 C-15                                            06/28/85C I
l
 
Q-1208687-001                  REGULAT0RY              INF0RMATION                        TRACKING              SY$ TEM                      PAGE N0.8  182 CDNDEN$ED        MANAGFMENT                      REP 0RT                                RUN DATE: 09/17/85 (NEADQUART[RS)
FACILITY: SUMMER 1 PLANT LOCATION: 26 MI NH OF COLUMBI A.        SC        LICENS'D E POWER: 2775 MHT                              PROJECT MANAGER: J. HOPKINS COCKET NUMBER: 050-00395                                DESIGN POWER:            0900 MHE                    BRANCH CHIEF:      E. ADENSAM ARCM/ ENGINEER 2 GIL                                    NSSS VENDOR:              HEST                        LIC. ASSISTANTS M. DUNCAN IE INSPECTOR    C. HEHL RAI                      SE TAC          MPA        RAI        RESPONSE        TER        INPUT      LIC ACT TITLE                                                                NUMBER            !!L      DAIL          DATE        RAlf          DATE        DATE c:mu ACTIVE ISSUES unnu THERTAL DESIGN FLDH REDUCTION, t.9%                                    M57105 ADMIN. TECH. SPEC. CHANGES                                                                                                                          09/30/85 M57273                                                                      09/30/85 A5ME SECTION XIs NYDRO RELIEF - FH SYSTEM                              M57312                                                                      09/30/85 S/G MANIFOLD INSP./FH SYS. HYDRO RELIEF                                M59301                                                                      09/30/85 10CFR50.54(I-1)                                                      M59328 SH INTAKE STRUCTURE                                                                                                                                  09/30/85 M49203                                                N/A                    10/28/85 TYPE C TESTS                                                            M49209                                                N/A SHUTDOHN MARGIN - MODES 3. 4. & 5                                                                                                                    10/28/85 M57104                                                                      10/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                    M55907            D-19                                                        10/31/85 TECHNICAL SPECIFICATION CHANGE - D/G'S                                M59451                                                                        10/31/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51287            F-09    10/04/84  04/18/85                                12/30/85 ICSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                M51137            A-17                                                        12/31/85 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND                    M52804            B-76    06/25/85                                            12/31/85 RCP TRIP CRITERIA                                                      M56935            G-1                                                        12/31/85 TECHNICAL SPECIFICATION TABLE 3.8.1 - CPCOPD TEST SETPT.                M57567                                                                        12/31/85 TECH. SPEC. 6.5.3 - TECHNICAL REVIEW AND CONTROL                        M59401                                                                        12/31/85 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                          M52966            B-78                                                        01/31/86 LEACTOR TRIP SYSTEM RELIABILITY- VENDOR RELATED                          M53102 B-80                                                                  01/31/86 STEAM GENERATOR GENERIC REVIEW CONCERNING STEAM GENERATORS              M58093            C-16              06/14/85                                01/31/86 RV AND SV TESTING                                                        M51606            F-14    06/28/85C                                          02/28/86 APPENDIX "R* REANALYSIS                                                  M57853                                                                        03/31/86 ITEM t.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY            M53637            B-85                                                        04/01/86 II.K.3.31 - COMPLIANCE WITH 10 CFR 50.46                                M57616            F-58                                                        06/30/86
. ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                  M53886            B-88                                                        09/30/86 SEISMIC MONITCRING PROGRAM                                              M52413                    05/23/85                    N/A                    12/31/86 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M52885 B-77                                                                  12/31/86 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                    M53047 B-79                                                                  12/31/86 ITEMS 4.2.1 1 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR              M53155 B-81              08/02/85  10/02/85                                12/31/86 AUTO SHUT TRIP TECH SPECS                                                M53406                                                                        12/31/86 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -              M53720 B-86                                                                  12/31/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND                  M53803 B-87                                                                  12/31/86 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX              M53942            B-89                                                        12/31/86 ITEMS 4.5.2 3 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING            M54030            B-93  03/21/85C                                            12/31/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE                M54tt3 B-92                                                                  12/31/86 PZOCEDURES GENERATION PACKAGES (SUPPLEMENT 1. NUREG-0737)                M55544 F-05              01/30/86  01/15/85        12/30/85                12/31/86 1.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -              M56169            F-71  06/21/85                                            12/31/86 10CFR50.62 CPERATING REACTOR REVIEMS                                    M59146 A-20                                                                  12/31/86 40 YEAR OL AMENCMENT                                                      M59402                                                                        12/31/86 ISI/ PUMP RELIEF REQUESTS                                                M49976                                                                        12/31/88
 
R-1208687-001                  REGULAT0RY          INF0RMATION              TRACKING          SYSTEM                PAGE NO. 183 C0NDEN$ED          MANAGEMENT            REPORT                      RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SUMMER 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER    R(L      DAlf,      DATE      DAll    DATE        DATE t*za ACTIVE ISSUES MUMM      (CONTINUATION) t s COMPLETED ISSUES mMM l
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN      M51207  F-08              10/28/83                      10/10/84C l CVERPOWER & OVERTEMP. DELTA T SETPTS                            M52056                                N/A              10/12/84C l RHR SYS. P0HER LOCKOUTS (L.C. 15)                                M54467                                N/A              10/15/84C ASME SECTION XI HYDRO. RELIEF, 9/84                              M55503                                N/A              10/23/84C l RBCU FAN MOTORS EDDY CURRTENT BRAKE- CONT. PENET COND. OVER      M53283                                N/A              10/24/84C
! MOV THERMAL OVERLOADS                                            M55314                                N/A              10/24/84C DIESEL GENERATORS - L.C.2.C.(19)                                M55216                                N/A              11/08/84C SEISMIC MONITORING INSTRUMENTATION TECHNICAL SPECIFICATION      M55502                                N/A              11/08/84C RX BLDG SUMP ISO VALVES-CONT. PLNET. COND. OVERCURRENT PROT. M53550                                N/A              11/13/84C TURBINE /RX TRIPS P-9 INTERLOCK                                  M55095                                N/A              11/30/84C RADIAL PEAKING FACTOR LIMIT (TECH. SPEC. 6.9.1.14)              M56043                                N/A              12/11/84C GL 83-43 (50.72 & 50.73)                                        M55390 A-18                            N/A              01/02/85C DIESEL GEN. TESTING                                              M56402                                                  01/07/85C TECH. SPEC. 6.3. SRO QUALS.                                      M55535                                N/A              01/24/85C NATURAL CIRCULATION TESTS                                        M56598                                                  01/30/85C i RCS FLOW                                                        M55298                                N/A              01/31/85C l GL84-24; EQ                                                      M56834                                                  02/22/85C I CABLE TRAY SEPARATION                                            M56394          01/08/85              N/A              04/01/85C l CONT. RADI0 ACTIVITY PURGE EXHAUST MONITOR                      M56400                                                  04/01/85C FULL LOAD REJECTION CAPABILITY                                  M55811                                N/A              04/30/85C STM GEN LVL TRIPsFULL LOAD REG.                                M56605                                                  04/30/85C T.S. MICH. SNUBBERS                                            M53282                                N/A              05/06/85C SEP VENTILATION SYSTEM                                          M56528                                                  05/14/85C CONTROL OF HEAVY LOADS PHASE I MPA C-10                        H52376  C-10              01/25/85                      05/23/85C II.K.3.30s REVISED SBLOCA                                      M56897  F-57                                            06/10/85C DIESEL GEN. SURV. FREQ.                                        M57345                                                  06/10/85C NUREG-0737. II.D.3.51, COMPLIANCE HITH 10 CFR 50.46            M57577  F-58              06/15/86                      06/10/85C TECH. SPEC. 5/4.1.3s RCD CONTROL SYSTEM                        M57347                                                  06/24/85C TECH. SPEC. 6.2.2.F.D - INDIVIDUAL OVERTIME                    M57570                                                  06/27/85C CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)        M52275 C-15                01/25/85                      06/28/85C BIT TANK REMOVAL                                                M57346                                                  08/26/85C l
l 1                                    ,
                                                                                                  ' ,          ,                j
                                                                                                ,J v
1 I                            t' l
 
                                                                            .e Y                                                                    d A
                    .~
                                                                              'T, R-1208687-001 i                  RERULAT0RY      INF0RMATION                    TRACKING                SYSTEM                        PAGE'Fp.:          184
                ?                              C0NDENSED          MANAGEMENT                    REP 0RT                                RUN DATE: 09/17/85
              ,                                    j              (HEADQUARTERS)
{.
* FACILITY: SURRY 1 PL ANT .LCCRTION : 17 MI NH OF NENPORT NEWS, VA  LICENSED P0HER: 2441 MHT PROJECT MANAGER: D. NEIGHBORS
    + DOCKET NUMBERr 050-00280              -
DESIGN PONER:      0788 MHE                      BRANCH CHIEF:      S. VARGA ARCH / ENGINEER : S8W                  =
NSSS VENDOR:      HEST                            LIC. ASSISTANT:    C. PARRISH IE INSPECTOR:      D. PURKE RAI                      SE TAC        MPA          RAI    RESPONSE      TER            INPUT      LIC ACT TITLE                                                              NUMBER      HQ.        R&lf          DATE    R&lE            DATE          DATE i
munu ACTIVE ISSUES mmww STARTUP CERTIFICATION PROGRAM .                                  M55541                                                                    08/31/85 REVISE 0737 SUPPL. 1 ORDER FOR DCRDR                              M59230                                                                    08/31/85 IST SECOND TEN YEAR INTERVAL                                      M49144                06/22/84C                                          09/30/85 DRY CASK INDEPENDENT SPENT FUEL STORAGE INSTALLATION              M49148                                                                    09/30/85 ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES          M53533                                                                    09/30/85 EXEMPTIONS TOT APPENDIX R (7/6/84)                                M55352                                                                      10/04/85 j    MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                M42867      B-59      08/31/84  09/30/84                                10/30/85 REACTOR COOLANT PUMP TRIP                                        M49681      G-01                                                          10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52886 B-77                                                                10/30/85 ASME XI RELIEF - BORIC ACID TRANSFER SYSTEM                        M57525                                                                    10/30/85 EXEMP. REQ FOR SRO CANDIDATES; ELIGIBILITY RQMTS                  M59251                                                                    10/30/85 HIGH ENERGY BREAK INSPECTION PROGRAM T.S. 4.15-A                  M43115                            09/15/84                                10/31/85 REORGANIZATION                                                    M48118                                                                    10/31/85 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR        M53198      B-82                04/01/85C                                10/31/85 ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND        MS$380      B-90      05/23/85                                            10/31/85 ORGANIZATION CHANGES REQUESTED 11/2/84                            M56769                                                                    10/II/85
  -RE UCE3 NU;1BER OF THIMBLES                                        M57471                                                                    10/31/85 AMENDMENT-DELETTON OF BIT SURVEILLANCE                -
M59285                                                                    10/It/85 UTILITY RESPONS.' TO STAFF RECOMMENDATIONS CONCERNING STEAM        M58094 C-16                      06/17/85                                11/01/85 TECH. SPEC. AMEND. FOR SURVEILLANCE OF SNUBBERS                    M59466                                                                    11/15/85 TECH. SPEC. AMEND. FOR SURVEILLANCE OF SNUBBERS                    M59467                                                                    11/15/85 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG            M5tt38 A-17            01/29/85C 04/30/85                                  12/31/85 TECHNICAL SPECIFICATIONS FOR ISI/IST                              M56910                                                                    12/31/85 RESPIRATORY PROTECTION                                            M57473                                                                    12/31/85 RV AND SV TESTING                                                  M44622      F-14    07/31/85                                            01/31/86 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                    M52967      B-78                                                          01/31/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                    M53103      B-80                                                          01/31/86 I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
. REPORT -      M56170      F-71                10/31/85    11/3D/85                    01/31/86 ITEM 3.1.3 -POST-MAINTENANCE TcSTING-CHANGES TO TECH              M53048      B-79                                                          02/28/86 ITEM 3.2.3 - POST-MAINTENAN: ' TESTING -CHANGES TO TECH.          M53887      B-88                                                          02/28/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                M55908      D-19                                                          07/01/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/t)            M44342 F-05          08/13/84C                05/31/85                    10/31/86 l  TECHNICAL SPECIFICATIONS AFFECTED BY 50.72 AND 50.73 (GL            M56490      A-18                                                          10/31/86 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIOr%L CAPABILITY                  M54114      B-92                                                          11/01/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46'                  M48206      F-58                05/31/86                                12/31/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND            M53804 B-87                                                                12/31/86 NUREG-0737 III.A.t.2. TECHNICAL SUPPORT CENTER                      M45985 F-63                                                                01/01/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                    M46056      F-64                                                          0*/01/87
* NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY                M46128      F-65                                                          01/01/87
)
1
 
R-1208687-001                        REGULAT0RY              INF0RMATION                TRACKING        SYSTEM                PAGE NO. 185 C0NDENSED              MANAGEMENT            REPQRT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SURRY t
                                                                                                  .                              RAI              SE TAC      MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                                      NUMBER    &      DATE      DATE    DAlf. DATE        DATE tu M ACTIVE ISSUES MMMM            (CONTINUATION)
NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                        M46344 F-68                                            01/01/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                M53721 ,B-86    02/28/85                              01/31/87 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX              M53943, B-89                                          01/3t/87 ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING              M54031    B-93  03/13/85C                              01/31/87 n2 UNSCHEDULED ISSUES MM AMEND. - MIN. RCS CRITICALITY TEMPERATURE                                M59563 uxu COMPLETED ISSUES 'MMM I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN                M51208    F-08            08/30/85                    10/10/84C M49493
                                                                                ~'
CHARGING PUMP TfrM 3PECS                                        '
10/12/84C AFHS - CHMfGE OPERABLE TO AVAIL ABLE                                      M54742                                                10/12/84C GFACTOR VESSEL COOLANT LEVEL MONITOR                                      M51371                                                10/15/84C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                  M54418                                                10/15/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                M54573 B-83                                            1G/15/84C LIFT ORDER TO SHON CAUSE DATED MARCN 13, 1979                            M53492                                                10/31/84C EMERGENCY EXERCISE EXEMPTION                                              M55065                                                ft/27/84C ASME XI RELIEF REQUEST (12/83)                                            M53359          06/06/84C 07/12/84C                    11/30/84C    -
EXTENSION TO ENVIRONMENTAL QUALIFICATION OF ELECTRICAL                  M56389                                                12/14/84C      a' RELOAD DESIGN AUDIT                                                      M56079                                                01/ 08/85C FUEL HANDLING ACCIDENT INSIDE CONTAINMENT                                M08620 C-07                                            01/16/85C DELETE ROD DROP TIMES AT COLD SHUTDONN                                  M55938                                                01/24/85C
                      -TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                          M55745 A-18                                            02/27/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                M42468. B-60                                          03/12/85C EXTENSION FOR ENVIRONMENTAL QUALIFICATION                                M57101                                                03/26/85C EQ SCHEDULE EXTENSIION (3/8/85)                                          M57208                                                03/26/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                      M52805 B-76                        12/12/84          04/01/85C RELIEF REQUEST (2-8-85)                      .                          M56887                                                04/11/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                  M51288    F-09                                        05/02/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR              HS3156    B-81                                        05/03/85C RELIEF REQUEST (2/8/83)                                                  M57185                                                05/07/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                    M45866    F-57                                        05/24/85C ITEM t.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY              M53658    B-85                                        06/12/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                M52276    C-15                                        06/28/85C FUEL ASSEMBLY RECONSTITUTION                                            M57734                                                08/26/85C
                        -10CFR50.62 OPERATING REACTOR REVIEHS                                      M59847    A-20                                        08/30/85C
 
R-1208687-001                                  REGULAT0RY      INF0RMATION                TRACKING        SYSTEM                      PAGE NO. 186 C0NDENSED          MANAGEMENT              REP 0RT                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SURRY 2 PLANT LOCATION: 17 MI NH OF NEHPORT NEWS, VA                    LICENSED P0HER: 2441 MHT                  PROJECT MANAGER: D. NEIGHBORS DOCKET NUMBER: 050-00281                                        DESIGN PONER      0788 MHE                BRANCH CHIEF:      S. VARGA ARCH / ENGINEER: S8H                                            NSSS VENDOR:    HEST                    LIC. ASSISTANT:    C. PARRISH IE INSPECTOR:                        D. BURKE RAI                    SE TAC      MPA      RAI    RESPONSE      TER      IMPG      tic AcT TITLE                                                                        HUMBER    &        RAll      DATE        DAIX        DATE        DATE DDDM ACTIVE ISSUES MMMM ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES                      M53534                                                        12/31/84 ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP ATTACHMENT FOR                  MS3199    B-82            04/01/85C                          07/30/85 STARTUP CERTIFICATION PROGRAM                                                  M55542                                                        08/31/85 ISI - SECOND TEN YEAR INTERVAL                                                M49143                                                        09/30/85 IST - SECOND TEN YEAR INTERVAL                                                M49145          06/22/84C                                      09/30/85 DRY CASK INDEPENDENT SPENT FUEL STORAGE INSTALLATION                          M49149                                                        09/30/85 ASME XI RELIEF - BORIC ACID TRANSFER SYSTEM                                    M57526                                                        09/30/85 10CFR50.62 OPERATING REACTOR REVIEHS                                          M59148 A-20                                                    09/30/85 EXEMPTIONS TO APPENDIX R (7/6/84)                                              M55333                                                        10/04/85 MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11                              M42868 B-59    08/31/84  09/30/84                            10/30/85 HIGH ENERGY BREAK INSPECTION PROGRAM TECH SPEC 4.15-A                          M43114                    09/15/84                            10/30/85 REACTOR COOLANT PUMP TRIP                                                      M49682 G-01                                                    10/30/85 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                    M52887 B-77                                                    10/30/85 ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                          M53049 B-79                                                    10/30/85 REORGANIZATION                                                                M48119                                                        10/31/85 TECHNICAL SPECIFICATIONS AFFECTED BY 50.72 AND 50.73 (GL                        M56491  A-18                                                  10/31/85 ORGANIZATION CHANGES REQUESTED 11/2/84                                          M56770                                                        10/31/85 REDUCED NUMBER OF THIMBLES                                                      M57472                                                        10/31/85 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM                    M58095 C-16                06/17/85                            11/01/85 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG                        M5tt39 A-17    01/ 29/85C 04/30/85                            12/31/85 TECHNICAL SPECIFICATIONS FOR ISI/IST                                            M56911                                                        12/31/85 RESPIRATORY PROTECTION                                                          M57474                                                        12/31/85 RV AND SV TESTING                                                              M44623  F-14  07/31/85                                      01/31/86 ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING                                  M52968  B-78                                                01/31/86 REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                M53104  B-80                                                  01/31/86 I.D.t.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                    M56171  F-71              10/31/85    11/30/85              01/31/86 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                        M53888  B-88                                                02/28/86 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                            M55909  D-19                                                07/01/86 PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)                        M44343  F-05  08/13/84C 05/31/85C 03/08/84C                  10/31/86 NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46                              M48207  F-58              05/31/86                            12/31/86 ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                        M53805  B-87                                                  12/31/86 NUREG-0737 III.A.I.2 TECHNICAL SUPPORT CENTER                                  M45986  F-63                                                01/01/87 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                M46057  F-64                                                01/01/87 NUREG-0737 III.A.1.2. EMERGENCY OPERATIONS FACILITY                            M46129  F-65                                                01/01/87 NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE                              M46345  F-68                                                01/01/87 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -                      M53722  B-86                                                01/31/87 ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                    M53944  B-89  05/15/85                                      01/31/87 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                              M54115  B-92                                                01/31/87 ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING                    M54032  B-93  03/13/8SC                                    04/30/87
 
R-1208687-001                    REGULAT0RY            INF0RMATION                            TRACKING        SYSTEM                        PAGE NO.s    187 C0NDENSED                  MANAGEMENT                REPORT                              RUN DATE: 09/17/8S (HEADQUARTERS)
FACILITY: SURRY 2 RAI                      SE TAC    MPA      RAI    RESPONSE    TER          INPUT        LIC ACT TITLE                                                                              NUMBER  &      Dalf.      DATE    RAIE            DATE          DATE DOOM ACTIVE ISSUES MMMM        (CONTINUATION)
ITEM 4.3(TS) - AUTDMATIC ACTUATION OF SHUNT TRIP FOR H AND                        M55381  B-90  05/23/85                                          10/31/87 00 UNSCHEDULED ISSUES MM EXEMP. REQ FOR SRO CANDIDATES: ELIGIBILITY RQMTS                                  M59252 AMENDMENT-DELETION OF BIT SURVEILLANCE                                            M59286 AMEND. - MIN. RCS CRITICALITY TEMPERATUPE                                        M59564 DOM COMPLETED ISSUES MMM I.D.1.1 - DETAILED CONTRDL ROOM DESIGN REVIEW PROGRAM PLAN                      M51209 F-08  08/10/84  08/30/85                              10/10/84C CHARGING PUMF TECH SPECS-                                                        M49494                                                          10/12/84C AFHS - CNANGE OPERABLE TO AVAILABLE                                              M54743                                                          10/12/84C    ,
REACTOR VESSEL COOLANT LEVEL MONITOR                                            M51372                                                          10/15/84C RCS VENTS TECHNICAL SPECIFICATIONS NUREG 073 ITEM II.B.1                        M54419                                                          10/15/84C TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36,                      M54574 P-83                                                      10/15/84C EMERGENCY EXERCISE EXEMPTION                                                    M55066                                                          11/27/84C ASME XI RELIEF REQUEST (12/83)                                                  M53350        06/06/84C 07/21/84                                11/30/84C RELOAD DESIGN AUDIT                                                              M56080                                                        01/ 08/85C FUEL. HANDLING ACCIDENT INSIDE CONTAINMENT                                      M08619 C-07              03/07/77C                            01/16/85C DELETE ROD DROP TIMES AT COLD SHUTDOHN                                          M55939                                                          01/24/85C    '
SNUBBER INSPECTION INTERVAL                                                      M56600                                                        02/01/85C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                              M55746                                                          02/27/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                        M42469  B-60                                                    03/12/85C ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND                              M52806  B-76                      12/12/84                    04/01/85C I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                          M51289  F-09                                                    05/02/85C ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM FOR                      M53157  B-81                                                    05/05/85C RELIEF REQUEST (2/8/83)                                                          M57186                                                          05/07/85C NUREG-0737 II.K.3.30, SB LOCA OUTLINE                                            M45867  F-57                                                    05/24/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY                      M53639  B-85                                                    06/12/85C CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPASC-10)                        M52277  C-15                                                    06/28/85C A3ME RELIEF FROM INSERVICE TEST CODE REQUIREMENTS                                M57586                                                          08/12/85C FUEL ASSEMBLY RECONSTITUTION                                                    M57735                                                          08/26/85C REVISE 0737 SUPPL. 1 FOR DCRDR                                                  M59231                                                          08/30/85C 4
i
 
i R-1208687-001                    REGULAT0RY          INF0RHATION                  TRACKING        SYSTEM                        PAGE NO.s  188 C0NDENSED            MANAGEMENT              REP 0RT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SUSQUEHANNA 1 PLANT LOCATION: 7 MI NE OF BERHICK, PA                LTCEN5ED POWER: 3293 MHT                    PROJECT MANAGER    M. CAMPAGNONE DOCKET NUMBER:    050-00387                          DESIGN POWER:      1065 MHE                BRANCH CHIEF:      H. BUTLER ARCH / ENGINEER: BECH                                NSSS VENDOR:      GE                        LIC. ASSISTANT:    E. HYLTON IE INSPECTOR:      R. JACOBS RAI                      SE TAC      MPA        RAI    RESPONSE      TER        INPUT      LIC ACT IIILE                                                                NUMBER    HR.      DAIE      DATE        DAIE        DATE        DATE RODN ACTIVE ISSVES MMMM FH BYPASS LEAKAGE                                                    M56585                                                          08/01/85 CLOSURE OF L.C. 2.C.(27) - DIESEL AIR DRYERS                          M57982                                                          08/01/85 CLOSURE OF L.C. 2.C.(32) - ESH SINGLE FAILURE                        M57984                                                          08/01/85 CL OSURE OF L .C. 2.C. ( 16 ) HETHELL/DRYWELL MODS                    M57987                                                          08/01/85 CLOSURE OF L.C. 2.C.(17)(B) SDV VALVE MODS                            M57988                                                          08/01/85 CLOSURE OF L.C. 2.C.(24) - CONT. PURGE SYSTEM                        M57989                                                          08/01/85 1.D.t.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN            M51210    F-08                                                  09/01/85 I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                M51290    F-09                                                  09/01/85 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM - HITHDRAHAL            M51508                      06/28/85                            10/01/85 INSERVICE INSPECTION PROGRAM                                          M51982          08/08/84C                                      10/01/85 MAIN STEAM LINE RADIATION - HIGH SETPOINT                              M52048                                                          10/01/85 SPDS CONFIRMATORY ITEM ISOLATION DEVICES                              M56367                                                          10/01/85 L.C. 2.A/2.B.(2)                                                      M56399                                                          10/01/85 CORE DAMAGE ESTIMATION                                                M56430                      07/01/85                            10/01/85 CLOSURE OF L .C.2. C .126 ) IE BULLETIN 79-26 REV. 1                  M57981                                                          10/01/85 CLOSURE OF L.C. 2.C.(23)(F) SQRT QUALIFICATION                        M57986                                                          10/01/85 OBSURE OF L.C. 2.C.C31) DISPLAY CONTROL SYSTEM                        M57990                                                          10/01/85 TECH. SPEC. INTERPRETATION ON SRV INDICATION EQUIPMENT                M59475                                                          10/01/85 INSTALLATION OF STH DIESEL                                            M56760                                                          11/01/85 SPRAY POND VALVES                                                      M59392                                                          11/01/85 SPRAY POND VALVES                                                      M59393                                                          11/01/85 ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS              M53050  B-79                                                  11/30/85 ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHANGES TO TECH.              M53889  B-88                                                  11/30/85 SINGLE LOOP OPERATION                                                  M57669                                                          12/01/85 IYEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE              M54116  B-92                                                  12/30/85 SUSQUEHANNA IST                                                        M56756                                                          01/01/86 II.D.1 - RV 8 SV TESTING                                              M54584  F-14    07/18/84C 12/31/85                            01/31/86 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING                        M52969  B-78                                                  04/01/86 PROCEDURES GENERATION PACKAGES (SUPPLEMENT      1, NUREG-0737)      M55545    F-05    10/30/85  10/30/86  08/30/85                10/30/86 ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND              M53806    B-87                                                  12/31/86 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -          M56172    F-71              11/16/83  11/15/84                06/01/87 a0 UNSCHEDULED ISSUES MM CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)              M52278    C-15 ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M52888    B-77 ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -            M53723    B-86 ITEMS 4.5.2 3 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING          MS4033 B-95      03/19/85C BWR SCRAM SOLENDID VALVES                                            M56069
 
R-1208687-001                  REGULAT0RY          INF0RHATION                TRACKING      SYSTEM                PAGE NO.s'  189 C0NDENSED            MANAGEMENT            REPQRT                  RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SUSQUEHANNA 1 RAI              SE TAC    MPA      RAI  RESPONSE    TER  INPUT      LIC ACT TITLE                                                              NVMBER    &      MIf. DATE    MIL    _DATE        DATE DM UNSCHEDULED ISSUES MM      (CONTINUATION)
PROCEDURES GENERATION PACKAGE                                      M57991 PROCEDURES GENERATION PACKAGE                                      M57992 10CFR50.62 OPERATING REACTOR REVIEWS                              M59149 A-20 METEOROLOGICAL DATA UPGRADE                                        M59276 F-68 NIVROGEN MAKE-UP SYSTEM                                            M59595 FIRE PROTECTION REPORT                                            M59647 00* COMPLETED ISSVES mum REVIEW SER INPUTS PER DLOP-232                                    M55664                                              10/01/84C MOLDED CASE CIRCUIT BREAKERS                                      M49137                                              10/09/84C THERMAL HYDRAULIC STABILITY                                        M55021                                              10/D9/84C SDM VENT AND DRAIN VALVE TECH. SPEC.                              M56068                                              10/24/84C 300 START TEST FOR FIFTH DIESEL                                    M55804                                              11/08/84C 1 - SPRAY POND OPERATING LIMITS                                  M54755                                              11/14/84C SPECIAL REPORTING REQUIREMENTS - PROPOSED AMENDMENT 41            M55124                                              11/14/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                M55747  A-18                                        11/14/84C REVISION 32 TO FSAR                                                M49597                                              11/26/84C ADMIN CHANGES TO TECH SPECS PROPOSED AMENDMENT 42                  M55125                                              11/26/84C 1 FEEDHATER BYPASS LEAKAGE                                        M54967                                              12/18/84C PERMANENT RADIATION MONITORS                                      M55923                                              01/ 01/85C INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG            M51360  A-17                                        02/06/85C 125 VOLT BATTERIES                                                M56531                                              02/07/85C IN-VESSEL FUEL RACK                                                M55777                                              02/15/8 5C ENUIRONMENTAL QUALIFICATION TO MEET L.C. OF 3/31/85                M56830                                              03/30/85C PHYSICAL SECURITY PLAN - CHANGE S                                  M54949                                              04/01/85C EMERGENCY DIESEL GEN. REVIEH                                      M56824                                              04/01/85C DEFINITIONS - PROPOSED AMENDMENT 43                                M55126                                              04/12/85C SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS - PROPOSED      M55127                                              04/12/85C REACTIVITY CONTROL SYSTEMS - PROPOSED AMENDMENT 43                M55128                                              04/12/85C INSTRUMENTATION - PROPOSED AMENDMENT 43                            M55129                                              04/12/85C REACTOR COOLANT SYSTEM - PROPOSED AMENDMENT 43                    M55130                                              04/12/85C EMERGENCY CORE COOLING SYSTEMS - PROPOSED AMENDMENT 43            M55131                                              04/12/85C CONTAINMENT SYSTEMS - PROPOSED AMENDMENT 43                        M55132                                              04/12/85C PLANT SYSTEMS - PROPOSED AMENDMENT 43                              M55133                                              04/12/85C ELECTRICAL POWER SYSTEMS PROPOSED AMENDMENT 43                    M55134                                              04/12/85C
' REFUELING OPERATIONS - PROPOSED AMENDMENT 43                      M55135                                              04/12/85C SPECIAL TEST EXCEPTIONS - PROPOSED AMENDMENT 43                    M55136                                              04/12/85C RADI0 ACTIVE EFFLUENTS - PROPOSED AMENDMENT 43                    M55137                                              04/12/85C RADIOLOGICAL ENVIRONMENTAL MONITORING - PROPOSED AMENDMENT        M55138                                              04/12/85C DESIGN FEATURES - PROPOSED AMENDMENT 43                          M55139                                              04/12/85C CONTAINMENT PURGE VALVES                                          M55801                                              04/12/85C REACTOR RECIRC PUMP OVERCURRENT RELAYS                            M55823                                              04/12/85C RELOCATION OF DRYHELL ATMOSPHERE TEMPERATURE ELEMENTS            M55922                                              04/12/85C L.C. 2.C.(28)(D)(I) INADEQUATE CORE COOLING                      M56889                                              04/12/85C
 
R-1208687-001                  REGULAT0RY        INF0RHATION                TRACKING        SYSTEM                PAGE NO. 190 C0NDENSED          MANAGENENT            REP 0RT                    RUN DATE 09/17/85 (HEADQUARTERS)
FACILITY: SUSQUEHANNA 1 RAI              SE TAC    MPA      RAI    RESPONSE    TER  INPUT      LIC ACT TITLE                                                            NUMBER    &      DA((    _ DATE      PALE    DATE        DATE uMu COMPLETED ISSUES MMM      (CONTINUATION)
INSTRUMENTS FOR DETECTION ON INADEQUATE CORE COOLING              M49461  F-26                                            04/23/85C EQUIPMENT QUALIFICATION FOR SDV PIPE BREAK ENVIRONMENT            M52149                                                  04/23/85C MCPR OPERATIONAL LIMIT                                            M55803                                                  04/23/85C CLOSURE OF LICENSE CONDITION 2.C.(4)(0)                          M56229                                                  04/23/85C REGULATORY GUIDE 1.97 REQUIRMENTS                                M56230        12/16/83                                04/23/85C RX VESSEL LEVEL                                                  M56322                                                  04/23/85C MODIFICATIONS TO SUPPORT L.C. 2.C.(17)(B)(2)                      M56362                                                  04/23/85C RELOAD PACKAGE                                                    M56702                                                  04/23/85C FUEL LOADING CHAMBERS                                            M57327                                                  04/26/85C CHUGGING LOADS FOLLONUP                                          M55424                                                  05/01/85C HEPA FILTERS AND CHARCOAL ABSDRBER UNITS                          M56058                                                  05/01/85C ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52807  B-76                                            05/13/85C PROPOSED 61 ADS MODS                                              M56959                                                  05/15/85C TESTABLE SPECTACLE FLANGE DESIGN                                  M57045                                                  05/20/85C PROP 65 ORGANIZATION STRUCTURE                                    M56957                                                  05/28/85C PROPOSED AMEND 62 CONTAINMENT PENETRATION BREAKERS AND B/H        M56958                                                  05/28/85C PROPOSED 63 ADMINISTRATIVE CONTROLS                              M56961                                                  05/28/85C REVISION 51 TO FSAR                                              M49596                                                  06/04/85C ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53640 B-85                        04/04/85            06/10/85C FIRE PROTECTION REPORT REV. 3                                    M56831                              05/29/85C          06/tt/85C 480 VOLT SHING BUSSES                                            M56039                                                  07/08/85C FIRE PROTECTION AUDIT H/ REGION I SUPPORT SUSQUEHANNA 1          M57179                                                09/01/85C CHUGGING LOADS                                                    M57858                                                09/01/85C CHUGGING LOADS                                                    M57859                                                09/01/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)              M5S910 D-19                                            09/09/85C 1; REPORTING REQUIREMENTS L/C 2.G.                                M53324                                                  11/20/85C EMERGENCY SERVICE HATER MODIFICATIONS                            M55779                                                  12/28/85C
 
R-1208687-001                                                              REGULAT0RY        INF0RHATION                TRACKING                    SYSTEM                            PAGE N0.8      191 S                                                                                                        C0NDENSED          MANAGEMENT              REP 0RT                                          RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: SUSQUEHANNA 2 PLANT LOCATION: 7 MI NE OF BERNICK, PA                                                      LICENSED POWER: 3293 MHT                              PROJECT MANAGER: M. CAMPAGNONE DOCKET NUMBER ' 050-00388                                                                  DESIGN POWER:      1065 MHE                          BRANCH CHIEF:            H. BUTLER ARCH / ENGINEER: BECH                                                                      NSSS VENDOR:      GE                                LIC ASSISTANT: C. JAMERSON IE INSPECTOR:                                                  L. PLISCO RAI                          SE TAC    MPA      RAI              RESPONSE            TER      INPUT      LIC ACT TITLE                                                                                                      NUMBER    &        DAJE                DATE          PAlf.          DATE        DATE muum ACTIVE ISSUES unum FH BYPASS LEAKAGE                                                                                          M56586                                                                        08/01/85 CLOSURE OF L.C. 2.C.(27) - DIESEL AIR DRYERS                                                              M57983                                                                        08/01/85 CLOSURE OF L.C. 2.C.(32) - ESH SINGLE FAILURE                                                              M57985                                                                        08/01/85 I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                              M56173 F-71                          11/16/83      11/15/84                  09/01/85 CORE DAMAGE ESTIMATION                                                                                    M56431                              07/01/85                                  10/01/85 INSTALLATION OF STH DIESEL                                                                                M56761                                                                        11/01/85 T/S CHANGES FOR POST MAINTENANCE TESTING ITEM 3.2.3                                                        M57581  B-88                                                                  11/30/85 SUSQUEHANNA IST                                                                                            M56757                                                                        12/01/85 SINGLE LOOP OPERATION                                                                                      M57670                                                                        12/01/85 II.D.1 - RV a SV TESTING                                                                                  M54585  F-14  07/18/84C 12/31/85                                              01/31/86 PROCEDURES GENERATION PACKAGES (SUPPLEMENT                                          1, NUREG-0737)        M55346  F-05  10/30/86                            08/30/85                  10/30/86 POST MAINTENANCE TESTING ITEM 3.2.1 3.2.2                                                                  M57582  B-87                                                                  12/31/86 I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN                                                M55275 F-08                                                                    06/01/87 un UNSCHEDULED lih&E um ISI PROGRAM                                                                                              M57102 10CFR50.62 OPERATING REACTOR REVIEWS                                                                    M59150 A-20 TECH. SPEC. INTERPRETATION ON SRV INDICATION EQUIPMENT                                                    M59476 ITEM 3.1.3 - PAST-MAINT TESTING CHANGES TO TECH, SPECS.-RTS                                              M59512  B-79 11tMS 4.5.224.5.3 REACTOR TRIP SYSTEM FUNCTIONAL TESTING -                                                M59513  B-93 ITEM 2.1 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS                                              M59514 B-77 ITEM 2.2 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS                                              M59515 B-77 FIRE PROTECTION REPORT                                                                                    M59648 unu COMPLETED ISSUES unu REVIEW SER INPUTS PER DLOP-232                                                                            M55665                                                                        10/01/84C 2 - NITROGEN MAKEUP SYSTEM                                                                                M54756                                                                          10/09/84C THERMAL HYDRAULIC STABILITY                                                                              M55022                                                                          10/09/84C VHS HEAT LOAD                                                                                            M54754                                                                          11/14/84C TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                                      M55748 A-18                                                                    11/14/84C FEEDWATER BYPASS LEAKAGE                                                                                M54968                                                                          12/18/84C CTMT INERTING                                                                                            M56323                                                                          12/24/84C PHYSICAL SECURITY PLAN - CHANGE S                                                                        M54950                                                                          12/31/84C ASME CLASS E CODE CASE                                                                                  M56324                                                                          12/31/84C IN-VESSEL FUEL RACK                                                                                      M55778                                                                        01/15/85C EMERGENCY SERVICE HATER MODIFICATIDNS                                                                    M55780                                                                        02/07/85C 125 VOLT BATTERIES                                                                                      M56532                                                                        02/07/85C
 
f R
R-1208687-001                                REOULAT0RY                          INF0RMATION                            TRACKING                          $ Y S T'E M                                            PAGE NO. 192 MANAGEMENT. REP 0RT'                                                                                RUN DATE: 09/17/85 C 0 N D E N S E D_(HEADQUARTERS)                                                              ~
FACILITY: SUSQUEHANNA 2 RAI                                              SE TAC  MPA                      RAI      RESPONSE                          TER            INPUT        LIC ACT.
TITLE                                                                                                        NUMBER  BL.                    DAJJ          DATE                          DAJf,              DATE        DATE
                  - DOM COMPLETED ISSUES mnN                (CONTINUATION)
ENVIRONMENTAL QUALIFICATION' TO MEET L.C. OF 3/31/85                                                          M56829                                                                                                    03/30/85C l
'                  EMERGENCY DIESEL GEN. REVIEH                                                                                  M56823                                                                                                    04/01/85C HEPA FILTERS AND CHARCOAL ABSORBER UNITS                                                                      M56059                                                                                                    04/12/85C MCPR OPERATIONAL LIMIT                                                                                        M55802                                                                                                    04/23/85C L.C. 2.C.(12)(E) INADEGUATE CORE COOLING                                                                      M56890                                                                                                  .04/23/85C        -
SALEM ATHS ITEM 1.1                                                                                          M57351 B-76                                                                                              05/13/85C PROPOSED 15 ADS MODS                                                                                                                                                                                                                      i i                                                                                                                                M56960                                                                                                    05/14/85C        ;
                  ~ TESTABLE SPECTACLE FLANGE DESIGN                                                                              M57046                                                                                                    05/20/85C        !
PROP 18 ORGANIZATION STRUCTURE                                                                                M56956                                                                                                    05/28/85C          r PROPOSED 17 ADMINISTRATIVE CONTROLS                                                                            M56965                                                                                                    05/28/85C 4
SALEM ATHS ITEM 1.2                                                                                            M57350 B-85                                                                                              06/10/85C FIRE PROTECTION REPORT REV. 3                                                                                M56832                                                                                                    06/11/85C        i FROPOSED 16 RCIC TRIP FUNCTION.                                                                                M56964                                                                                                    07/05/85C        !
480 VOLT.SHING BUSSES                                                                                          M56040                                    06/14/85                                                        07/26/85C i
FIRE PROTECTION AUDIT W/ REGION I SUPPORT SUSQUEHANNA 2                                                        M57180                                                                                                    09/01/85C ESH MOTOR OPERATED VALVES                                                                                      M55985                                                                                                    09/04/85C
                  - FUEL LOADING CHAMBERS                                                                                        M57328                                                                                                    09/04/85C DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                                          H5d911 D-19                                                                                              09/09/85C r
4 l
i i                                                                                                                                                                                                                                                            .
k I
f k
4
                              .n
.t
                                                                                                                                                                                                                                                          - f.
 
R-1208687-001                            RC0ULAT0RY                        INF0RMATION              TRACKING        SYSTEM                        PAGE N0.8  193 CDHDENSED        MANAGENENT            REPQRT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: THREE MILE ISLAND 1 PLANT LOCATION: to MI SE OF HARRISBURG, PA                                  LICENSED POWER: 2535 MHT                PROJECT MANAGER: J. THOMA DOCKET NUMBER: 050-00289                                                    DESIGN P0HER:    0819 MHE                BRANCH CHIEF:      J. STOLZ ARCH / ENGINEER: GIL                                                        NSSS VENDOR:    B&H                    LIC, ASSISTANT:    R. INGRAM IE INSPECTOR:                    R. CONTE RAI                      SE TAC    MPA      RAI    RESPONSE        TER      INPUT      LIC ACT TITLE                                                                                    NUMBER    &      DAIX      DATE        DAlf.        DATE        DATE MuuN ACTIVE ISSUES MMMM TSCR 105, REV. 1 - ADMIN. CHANGES TO SNUBBER TECH. SPEC.                                  M57098                                                        09/30/85 1 UCS EQ CONTENTIONS CONCERNING FINAL RULE                                              M59330                                                        09/30/85 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY                                    M54tt7  B-92                                                  10/30/85 REVIEW OF BEYEA REPORT CRITIQUE                                                          M56768                                                        11/30/85 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM                                              M51291  F-09    N/A      06/30/85    09/15/85                12/30/85 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE                            M52889  B-77  04/05/85  08/05/85C                            12/30/85 1 - ITEMS 3.1.t & 3.1.2 - POST MAINTENANCE TESTING                                      M52970  B-78                        12/30/86                12/30/85 1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED                                      M53105  B-80                                                  12/30/85 1 - ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINTENANCE PROGRAM                                M53158  B-81  12/04/84  06/24/83                              12/30/85 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL                                M54034  B-93  04/05/85C                                      12/30/85 1 - II.E.1.2 ASSISTANCE TO ICSB AUTO-INITIATION (II.E.1.2                                M54600        06/21/84  04/29/85C    N/A                    12/30/85
_REVIEH OF NUREG-0737. ITEM I.C.1 CONFINMATORY ITEMS                                      M55421          N/A      10/30/85      N/A                    12/30/85 1 - TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)                                  M55750  A-18            09/30/85                            12/30/85 DIESEL GENERATOR RELIABILITY TECH. SPECS. (GL 84-15)                                      M55912  D-19  07/02/84  10/17/84C                            12/30/85 INSERVICE TESTING PROGRAM UPDATE -- SECOND 10 YEAR INTERVAL                              M55959        03/15/85  06/15/85    03/30/85                12/30/85 STAFF SUPPORT FOR 01 INQUIRIES INTO EQ IMPROPRIETIES                                      M56529          N/A                    N/A                    12/30/85 DAMPING FOR CONDUIT / CABLE TRAY SUPPORTS                                                M57121                                                        12/30/85 1 - AIRCRAFT CRASH DATA-LICENSE CONDITION 2.C(7)                                          M57666                                                        12/30/85 1: TSCR 144 - REVISE FIGURE 6-2 0F TECH. SPEC. TO IMPROVE                                M57952                                                        12/30/85 1 - STEAM GENERATOR GENERIC REVIEH CONCERNING STEAM                                      M58096  C-16            06/20/85                            12/30/85 FIRE BRIGADE TRAINING TECHNICAL SPECIFICATIONS: LICENSEE                                  M59216                                                        12/30/85 1: TSCR145 FIRE PROTECTION TECH. SPEC. REVISION                                          M59434                                                        12/30/85 1 - ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION                                    M53641  B-85                                                  01/30/86 ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX                              M53945  B-89                                                  01/30/86 DECAY HEAT REMOVAL CAPABILITY TECH SPECS                                                  M42127  B-57  09/30/85  09/30/85      N/A                    03/30/86 CONTROL RM. HABIT. FMEA EFFECTS ANALYZIS                                                  M56506        01/30/85C 11/30/85C      N/A                    03/30/86 1 - REACTOR COOLANT PUMP TRIP                                                            M49698  G-01  10/30/85  01/30/86    06/30/85                04/30/86 1- ITEM 4.4 - IMPROVEMENTS IN MAINTENANCE AND TEST                                      M53959  B-91                                                  04/30/86 NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER                                            M45987  F-63    N/A                    N/A                    09/30/86 NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER                                          M46058  F-64    N/A                    N/A                    09/30/86 NUREG-0737 III.A.I.2, EMERGENCY OPERATIONS FACILITY                                      M46130  F-65    N/A                    N/A                    09/30/86 NUREG-0737 II.F.2 INST. TO DETECT ICC                                                    M47048  F-26  09/15/85  11/15/85    01/01/86                09/30/86 NUREG-0737 III.A.2.2 METER 0 LOGICAL DATA UPGRADE                                        M48287  F-68    N/A                    N/A                    09/30/86 1: TSCR 8XXX - REVISED SG REPAIR LIMITS                                                  M59062                                                        09/30/86 1 - INSTRU?iENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG                            M51361  A-17  10/30/85  01/30/86    06/30/86                12/30/86 1- ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND                              M53807  B-87                                                  12/31/86 NUREG 0737 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46                                        H48208  F-58    N/A                    N/A                    03/30/87 10CFR50.62 OPERATING REACTOR REVIENS                                                    M59151  A-20                                                  09/30/87 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE                            M53724  B-86  04/03/85  08/05/85C                            12/30/87
 
R-1208687-001                                REGULAT0RY                            INF0RMATION              TRACKING            SYSTEM                      PAGE NO.s    194 C0NDENSED                  MANAGEMENT              REP 0RT                    RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: THREE MILE ISLAND 1 RAI              SE TAC    MPA          RAI    RESPONSE      TER  INPUT              LIC ACT TITLE                                                                                            NUMBER    E          RAIZ      DATE      RAIZ  DATE                DATE U 2M ACTIVE ISSUES MMMM                      (CONTINUATION) un UNSCHEDULED ISSUES MM                                                                                                                                                          i la STEAM GENERATOR LONG TERM CONV0SION TEST PROGRAM                                            M59435                                                                          !
MMM COMPLETED ISSUES MMM                                                                                                                                                          ,
TSCR NO. 114 - POST-ACCIDENT MONITORING INSTRUMENTATION                                            M49619              N/A                  N/A                      10/01/84C TSCR 97. REV 1 FIRE PROTECTION CHANGES                                                            M53585              N/A                  N/A                      10/05/84C 1984 ILRT REVIEW                                                                                M55504              N/A                  N/A                      10/09/84C LICENSED OPERATOR REQUALIFICATION PROGRAM REVIEH                                                  M55399              N/A                  N/A                      10/19/84C IST REVIEH                                                                                        M47050              N/A                  N/A                      10/23/84C STEA:1 GENERATOR HEARINGS                                                                          M53295              N/A                  N/A                      10/31/84C 1 - TSCR-115 ADMIN.. CHANGES, CRD BREAKER SHUNT TRIP                                            M55310              N/A                  N/A                      10/31/84C METHODOLOGY FOR ESTIMATIN'J CORE DAMAGE _                                                          M55781              N/A                  N/A                      11/20/84C EFH 2.206 DECISION COMMISSION BRIEF                                                                M56073                                                              11/26/84C TSCR-123 STEAM GENERATOR REPAIR TECHNICAL SPECIFICATIONS                                          M49831              N/A                  N/A                      12/21/84C DECAY HEAT REMOVAL PLANT SHIELDING (OPTION 3)                                                      M55515              N/A                  N/A                      12/26/84C IODINE SAMPLING PROGRAM FOR MAIN CONDENSER OFF GAS                                                M55311              N/A                  N/A                    01/02/85C 1 - CONTROL OF HEAVY LOADS AT NUCLEAR PONER PLANTS (NUREG                                        M47131 C-10          N/A                  N/A                    01/11/85C QUALIFICATION OF NDE PERSONNEL                                                                    M55107              N/A                  N/A                    01/15/85C TMIA 2.206 PETITION ON MANAGEMENT                                                                  M55629              N/A                  N/A                    01/15/85C STEAM GENERATOR ROLLED PLUG PROBLEMS                                                              M55621              N/A                  N/A                    01/23/85C 1 - TSCR 8135 - HASTE GAS HOLDUP - HYDROGEN /0KYGEN LIMITS                                      M55234              N/A                  N/A                    02/04/85C OFF-SITE T0XIC GAS AND CONTROL ROOM HABITABILITY                                                  M55553              N/A      02/15/85C    N/A                    02/11/85C TSCR 104 REV 2, SURVEILLANCE CAPSULES                                                              M56231                                                            02/20/85C 4    BACK-UP INCORE THERMOCOUPLE OPERABILITY (TSCR 130)                                                M54504              N/A                  N/A                    03/05/85C REACTOR COOLANT PUMP SHAFT CRACK                                                                  M55614              N/A                  N/A                    03/05/85C 1, NEUTRON SOURCE DATA FOR FLUX REDUCTION VERIDICATION                                          M55040              N/A                  N/A                    03/14/85C DELIAN REPORT (RISK OF UNIT 2 CLEANUP DN UNIT 1)                                                  M55965              N/A                                          03/14/85C LONG TERM REVIEH CONTAINMENT PURGE AND VENT (B-24)                                                M42602 'B-24      02/04/85C 03/25/85C    N/A                    03/25/85C TSCR 110 AUX' BLDG /FHB EXHAUST FLOH                                                                M51412              N/A      04/30/85    N/A                    03/25/85C 10CFR50.49 SCHEDULAR EXTENSION REQUEST                                                          M56892                                                            03/30/85C STAFF ACTION ON FEMA FINDINGS (1983 EXERCISE)                                                      M55111              N/A      01/15/85C    N/A                    04/02/85C I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVEIH PROGRAM PLAN                                        M51211 F-08                                                        04/08/85C I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -                                      M56174 F-71                                                        04/08/85C REVISED ERROR ANALYSIS FOR SUBC00 LING MARGIN.                                                      M56232    -
N/A      03/30/85    N/A                    04/16/85C ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL                                            M42513 B-60        05/25/84C 03/25/85C    N/A                    04/23/85C
,    HIGH RADIATION AREA REQUIREMENTS (TSCR 140)                                                        M55972                                                            04/24/85C RESPONSE TO UCS APRIL 12, 1985 LETTER                                                              M57469                                                            04/30/85C REOPENED MANAGEMENT HEARING                                                                        M55763              N/A                  N/A                    05/03/85C AAMODT MOTION TO RECONSIDER HEALTH MATTERS                                                          M57459                                                            05/06/85C TSCR 116, REV                  1. CONTAINMENT PURGING                                              M53399            02/04/85C 03/25/85C    N/A                    05/08/85C SAFETY RING SETTING (II.D.I ADDITIONAL)                                                            M57122                                                            05/14/85C 1 - RESPONSE TO UCS 4/5/85 LETTER ON STEAM GENERATORS                                            M57400                                                            05/17/85C
 
I l                            R-1208687-001                                REGULAT0RY                  INF0RMATION              TRACKING          SYSTEM                        PAGE NO.        195
;                                                                                                C0NDENSED          MANA0EMENT            REPORT                            RUN DATE: 09/t7/85 (HEADQUARTERS) l FACILITY: THREE MILE ISLAND 1 RAI                      SE TAC  MPA        RAI    RESPONSE              TER  INPUT        LIC ACT TITLE                                                                                      NUMBER  &        DAIZ      DATE              DAIX  DATE          DATE    +
umu COMPLETED ISSUES MMM                    (CONTINUATION) 1 - UCS MAY 3,    1985 LETTER CONCERNING LESSONS LEARNED ITEMS                            M57583                                                            05/24/85C CLI-84-11 ENVIRONMENTAL QUALIFICATION REVIEH                                              M55516          N/A    03/08/85            N/A                05/28/85C RESPONSE TO UCS FILING ON SUBC00 LING CRITERIA                                            M5706            N/A                          N/A                05/28/85C REVIEW OF MARRIN LEHIS LETTER TO COMMISSION                                                M57554                                                            05/30/85C 1 - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND                                    M52808 B-76                                05/10/85              05/31/85C 1 - OPERATION HITH 3000 OTSG TUBES PLUGGED                                                M57651                                                            06/10/85C EVALUATION PLAN FOR JOB PERFORMANCE EVALUATION PER PID OF                                  M57755                                                            06/17/85C RESPONSE TO MARVIN LEHIS 5/20/85 LTR. ON HYDROGEN PURGE                                    M57792                                                            06/27/85C 1 - CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)                              M52279 C-15      N/A                          N/A                06/28/85C ADDITIONAL INFORMATION ON PARKS BY RICHARDSON AND STIER                                    M57457                                                            07/01/85C 1 OTSG ECT INDICATIONS                                                                    M56505          N/A    02/01/85C            N/A                07/03/85C NUREG-0737 II.K.3.30 SBLOCA METHODS                                                        M48286 F-57      N/A                        12/30/84              07/12/85C  ,
M57458                                                            07/t5/85C REVIEH ARNOLD /HALLACE REQUEST FOR HEARING                                                                                                                  07/15/85C 1: RESPONSE TO UCS APRIL 18 LETTER ON CLARK STATEMENTS TO                                M59051 FIRE RATED CABLE - SAMPLE EXEMPTION REQUEST                                                M53586          N/A                          N/A                07/22/85C T3CR 38 - FUEL CASK DROP                                                                  M52588                  03/05/85C            N/A                07/30/85C 1 - ITEM 3.2.5 - POST-MAINTENANCE TESTING -CHANGES TO TECH.                              M53890 B-88                                                      08/02/85C M55051 B-79                                                      08/05/85C t-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH                                    M57999                                                            08/06/85C 1: EMERGENCY PLAN UPDATING                                                                                                                                  08/09/85C UCS MAY 16 LETTER CONCERNING CLI-84-11 REPSONSE                                            M57756 M57188                                                            08/16/85C APPEAL OF IST RELIEF DENIALS                                                              M57795                                                            08/27/85C 1 - AFFIDAVITS                                                                                            N/A                          N/A                08/30/86C 1 TSCR 104 SURVEILLANCE CAPSULES                                                          M46948 i                                                                          1 M
s
 
R-1208687-001                                        REGULAT0RY                              INF0RMATION                          TRACKING                      SYSTEM                                PAGE K0.8          196 C0NDENSED                          MANAGEMENT                    REPORT                                                RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: THREE MILE ISLAND 2 PLANT LOCATION: 10 MI SE OF HARRISBURG, PA                                                      LICENSED POWER: 2772 MHT t
DOCKET NUMBER: 050-00320                                                                                                                                          PROJECT MANAGER: T. POINDEXTER DESIGN POWER:            0906 MHE                                BRANCH CHIEF            B. SNYDER
                          -ARCH / ENGINEER: B&R                                                                              NSSS VENDOR              88H                                      LIC. ASSISTANT:
IE INSPECTOR:                R. CONTE                                                                                                                                                  M. SERVICE-RAI                              SE TAC        MPA        RAI                RESPONSE            TER            INPUT    LIC ACT TITLE                                                                                                                NUMBER        &        DAlf,                DATE            DAlg            JAlg                DATE I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
 
==SUMMARY==
REPORT -                                                        M56175                    -
12/05/84C o
,                                                                                                                                                                                                                                                              I y
i
                                        --- .-- - - --- - __          1 _ _ _ _ - - -                  ,,_1    w, ,                ,      n      ,                        -7_                  _,,    - _ _    ,
 
R-1208687-001                  REGULAT0RY          INF0RMATION                TRACKING          SYSTEM                        PAGE NO.:  197 C0NDENSED          MANAGEMENT              REPORT                            RUN DATE: 09/17/85 (HEADQUARTERS)
FACILITY: TROJAN 1
PLANT LOCATION: 32 MI N OF PORTLAND, ORE            LICENSED P0HER: 3411 MHT                  PROJECT MANAGER: L. LAZO DOCKET NUMBER: 050-00344                            DESIGN P0HER:    1130 MHE                  BRANCH CHIEF:      E. BUTCHER ARCH / ENGINEER: BECH                              NSSS VENDOR:    HEST                      LIC. ASSISTANT:    P. KREUTZER IE INSPECTOR:      G. JOHNSTON RAI                      SE TAC      MPA      RAI    RESPONSE      TER        INPUT      LIC ACT TITLE                                                            NUMBER    &        DAll      DATE        PAlf        .DATE        DATE nuum ACTIVE ISSUES unum PROCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)          M44344    F-05  06/20/85C              02/22/85C                09/01/85 TROJAN NUCLEAR PLANT DEPARTMENT OF THE ARMY INUNDATION            M57971                                                          09/15/85 ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX      M53946    B-89                            N/A                    09/27/85 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION AND              M52809    B-76  06/26/85C              01/31/85                09/30/85 l          ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE -        M52890    B-77                                                  09/30/85 l          I.D.I.2 DETAILED CONTROL ROOM DESIGN REVIEH
 
==SUMMARY==
REPORT -      M56176    F-71  07/30/85    12/31/84    04/30/85                09/30/85 ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY      M53642    B-8}}

Latest revision as of 19:22, 11 December 2024

Operating Reactors Licensing Actions Summary.Data as of August 31,1985. (Orange Book)
ML20138P367
Person / Time
Issue date: 10/31/1985
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0748, NUREG-0748-V05-N08, NUREG-748, NUREG-748-V5-N8, NUDOCS 8511070084
Download: ML20138P367 (365)


Text