05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 21: Line 21:
| Mode =  
| Mode =  
| Docket = 05000423
| Docket = 05000423
| LER year = 2096
| LER year = 1996
| LER number = 37
| LER number = 37
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 31: Line 31:


=text=
=text=
{{#Wiki_filter:.     --          .    - - - . -                  -.        -.                  -- - - ..-                            .-          .--
{{#Wiki_filter:.
g.'                                                                               nope Ferry na. (nouie iso) waterrora, cT 00383 Northeast 4
g.'
[ NuclearEnergy                                                     mione sacar Power staiwn Northeas Nudear Energy Company P.O. Box 128                                         ,
Northeast nope Ferry na. (nouie iso) waterrora, cT 00383
Waterford, CF 06385-0128                             !
[ NuclearEnergy mione sacar Power staiwn 4
I-                                                                                     (860) 447 1791
Northeas Nudear Energy Company P.O. Box 128 Waterford, CF 06385-0128
>                                                                                      Fax (860) 444-4277 e
.I-(860) 447 1791 Fax (860) 444-4277 The Northeast Utihties System e
The Northeast Utihties System Docket No. 50-423                     -l B16497                 I
Docket No. 50-423
[                                                                                                             May 30.1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk
:- l B16497
:                  Washington, DC 20555                                                                                                     l l
[
I Millstone Nuclear Power Station, Unit No. 3 i
May 30.1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 i
j                                     Commitment Revision- Spent Fuel Pool (SFP) Cooling System                                               j
j Commitment Revision-Spent Fuel Pool (SFP) Cooling System j
:                                                    Establishment Of Database                                                               i The purpose of this letter is to revise a commitment previously submitted to the NRC in LER 96-037-00 "Sp.gnt Fuel Pool Coolina System Potentially inoperable Followina an                                       1
Establishment Of Database The purpose of this letter is to revise a commitment previously submitted to the NRC in LER 96-037-00 "Sp.gnt Fuel Pool Coolina System Potentially inoperable Followina an 1
                  - SSE Due to Failure of Non Seismic Connectina Pioina." regarding establishment of a                                       !
:- SSE Due to Failure of Non Seismic Connectina Pioina." regarding establishment of a
                  ' database linking licensing design basis to the component level for Maintenance Rule systems that are both safety related and risk significant. In the LER we stated that this
' database linking licensing design basis to the component level for Maintenance Rule systems that are both safety related and risk significant. In the LER we stated that this
                  . database would be completed prior to entry into mode 4 from the current outage.
. database would be completed prior to entry into mode 4 from the current outage.
i Independent of this commitment Northeast Utilities initiated a program to develop                                         1 Design Bases Summary documents for Millstone Point Unit 3 safety related and risk                                         j significant systems as determined by the Millstone Unit 3 Maintenance Rule evaluation process. Included in each system's Design Bases Summary document are the                                                 ,
i Independent of this commitment Northeast Utilities initiated a program to develop 1
regulatory design bases for the system and its components.                       The Design Bases                         ;
Design Bases Summary documents for Millstone Point Unit 3 safety related and risk j
Summary provides the link between the regulatory design bases and the                                                     !
significant systems as determined by the Millstone Unit 3 Maintenance Rule evaluation process.
system / components requirements in a cost effective manner within an achievable time                                     i frame. The Design Bases Summary documents for Maintenance Rule systems that are                                   ;      i both safety related and risk significant will be issued prior to August 13,1997.                                 /
Included in each system's Design Bases Summary document are the regulatory design bases for the system and its components.
The Design Bases Summary provides the link between the regulatory design bases and the system / components requirements in a cost effective manner within an achievable time i
frame. The Design Bases Summary documents for Maintenance Rule systems that are i
both safety related and risk significant will be issued prior to August 13,1997.
/
The revised commitment is provided in Attachment 1.
The revised commitment is provided in Attachment 1.
Should you have any questions regarding this matter, please contact Mr. D. A. Smith at                             6 (860)437-5840.
Should you have any questions regarding this matter, please contact Mr. D. A. Smith at 6
NORTHEAST NUCLEA ENERGY COMPANY 060031                 . G. D. s O
(860)437-5840.
D      r - Millstone Unit No. 3 9706060272 970530 O!$lllll5l$l$f!!!!
NORTHEAST NUCLEA ENERGY COMPANY 060031 O
PDR       ADOCK 0500o423 s                       PDR;
. G. D.
s D
r - Millstone Unit No. 3 O!$lllll5l$l$f!!!!
9706060272 970530 PDR ADOCK 0500o423 s
PDR;


i i
i i
4 i                       cc:       H. J. Miller, Region l Administrator J. W. Andercen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, PhD, Director, Special Projects Office
4 i
cc:
H. J. Miller, Region l Administrator J. W. Andercen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3
]
]
i 4
W. D. Travers, PhD, Director, Special Projects Office i
l l
4 l
                                                                                                                        +
l
+
a W
a W
f I
f I
i f
i f
I i
I i
i                                                                                                                         ,
i f
5 f
5
)
)
i 4
i 4
Line 73: Line 84:
4 i
4 i
4 i
4 i
i f   s
i f
  .4 4s g 1
s
                                                                                  -.-g--
.4 4s g 1
-.-g--


e         -
e Docket No. 50-423 B16497 E
Docket No. 50-423 B16497 E
ii a
i                                                                                                                                l i                                                                                                                                >
i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i
a i                                                           Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i
I i
I i
.i i
.i i
Line 87: Line 98:
5 May 1997
5 May 1997


,      U,S. Nucirr R:gul:: tory Commission
U,S. Nucirr R:gul:: tory Commission B16497\\ Attachment 1\\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
  .. B16497\ Attachment 1\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No 3 of any questions regarding this document or any associated regulatory
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No 3 of any questions regarding this document or any associated regulatory commitments.
 
Number                           Commitment                           Due B15963-07         Issue the Design Bases Summary                   August 13,1997 documents for Maintenance Rule systems that are both safety related and risk significant.
==commitments==
Number
 
==Commitment==
Due B15963-07 Issue the Design Bases Summary August 13,1997 documents for Maintenance Rule systems that are both safety related and risk significant.
I i
I i
l l
l
l 1
l I
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 17:21, 11 December 2024

Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
ML20140B617
Person / Time
Site: Millstone 
Issue date: 05/30/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16497, NUDOCS 9706060272
Download: ML20140B617 (4)


LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
Event date:
Report date:
4231996037R00 - NRC Website

text

.

g.'

Northeast nope Ferry na. (nouie iso) waterrora, cT 00383

[ NuclearEnergy mione sacar Power staiwn 4

Northeas Nudear Energy Company P.O. Box 128 Waterford, CF 06385-0128

.I-(860) 447 1791 Fax (860) 444-4277 The Northeast Utihties System e

Docket No. 50-423

- l B16497

[

May 30.1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 i

j Commitment Revision-Spent Fuel Pool (SFP) Cooling System j

Establishment Of Database The purpose of this letter is to revise a commitment previously submitted to the NRC in LER 96-037-00 "Sp.gnt Fuel Pool Coolina System Potentially inoperable Followina an 1

- SSE Due to Failure of Non Seismic Connectina Pioina." regarding establishment of a

' database linking licensing design basis to the component level for Maintenance Rule systems that are both safety related and risk significant. In the LER we stated that this

. database would be completed prior to entry into mode 4 from the current outage.

i Independent of this commitment Northeast Utilities initiated a program to develop 1

Design Bases Summary documents for Millstone Point Unit 3 safety related and risk j

significant systems as determined by the Millstone Unit 3 Maintenance Rule evaluation process.

Included in each system's Design Bases Summary document are the regulatory design bases for the system and its components.

The Design Bases Summary provides the link between the regulatory design bases and the system / components requirements in a cost effective manner within an achievable time i

frame. The Design Bases Summary documents for Maintenance Rule systems that are i

both safety related and risk significant will be issued prior to August 13,1997.

/

The revised commitment is provided in Attachment 1.

Should you have any questions regarding this matter, please contact Mr. D. A. Smith at 6

(860)437-5840.

NORTHEAST NUCLEA ENERGY COMPANY 060031 O

. G. D.

s D

r - Millstone Unit No. 3 O!$lllll5l$l$f!!!!

9706060272 970530 PDR ADOCK 0500o423 s

PDR;

i i

4 i

cc:

H. J. Miller, Region l Administrator J. W. Andercen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3

]

W. D. Travers, PhD, Director, Special Projects Office i

4 l

l

+

a W

f I

i f

I i

i f

5

)

i 4

4 4

4 i

4 i

i f

s

.4 4s g 1

-.-g--

e Docket No. 50-423 B16497 E

ii a

i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i

I i

.i i

n d

2 4

5 May 1997

U,S. Nucirr R:gul:: tory Commission B16497\\ Attachment 1\\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No 3 of any questions regarding this document or any associated regulatory

commitments

Number

Commitment

Due B15963-07 Issue the Design Bases Summary August 13,1997 documents for Maintenance Rule systems that are both safety related and risk significant.

I i