B16532, Application for Amend to License NPF-49,revising TS 3/4.7.1.3 & Bases Sections 3/4.7.1.2 & 3/4.7.1.3 to Increase Required Volume of Water When Condensate Storage Tank Is Used & Rewording TS 3/4.7.1.3 for Clarity: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.- | {{#Wiki_filter:.- | ||
~..-. | |||
n,g\\ | |||
Re: 10CFR50.90 U.S. Nuclear Regulatory Commission | Northeast nope rerry na. (noute 156), waterrorer 0o383 N | ||
Millstone Nuclear Power Station Unit No. 3 | Mdhtone Nuclear Power Station Northeut Nudear Energy Company P.O. Iks 128 Waterford. C f 06383-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitico System JUN 191997 Docket No. 50-423 B16532 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 l | ||
Proposed Revision to Technical Specification Demineralized Water Storaae Tank (PTSCR 3-18-97) | Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification 1 | ||
Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby i | Demineralized Water Storaae Tank (PTSCR 3-18-97) | ||
revision into the Millstone Unit No. 3 '!echniual Specification 3/4.7.1.3 and Bases | Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby i | ||
Descriotion of Proposed Revision Technical Specification 3/4.7.1.3 requires sufficient water to be available for the Auxiliary Feedwater System to maintain the reactor coolant system at Hot Standby for 10 hours before cooling down te Hot Shutdown in the next 6 hours. The proposed changes increase the required volume of water when the Condentie Storage Tank is | proposes to amend Operating License NPF d.9 by incorporating the attached prop. od i | ||
revision into the Millstone Unit No. 3 '!echniual Specification 3/4.7.1.3 and Bases Sections 3/4.7.1.2 and 3/4.7.1.3. | |||
Descriotion of Proposed Revision Technical Specification 3/4.7.1.3 requires sufficient water to be available for the Auxiliary Feedwater System to maintain the reactor coolant system at Hot Standby for 10 hours before cooling down te Hot Shutdown in the next 6 hours. The proposed changes increase the required volume of water when the Condentie Storage Tank is | |||
.I used, reword Tecnnical Specification 3/4.7.1.3 for clarity and expand the description in Bases Sectionc B3,4.7.1.2 and B3/4.7.1.3. | |||
Markuo of Proposed Revision A copy of the marked up Technical Specification pages is contained in Attachment 2. | Markuo of Proposed Revision A copy of the marked up Technical Specification pages is contained in Attachment 2. | ||
. The markup reflects the currently issued version of the Technical Specifications. | |||
Penfng TechnicM Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup. | Penfng TechnicM Specification revisions or Technical Specification revisions issued I | ||
subsequent to this submittal are not reflected in the enclosed markup. | |||
rl A(D''/l Retvoe of Proposed Revision A copy of the retyped Technical Specification pages is contained in Attachment 3. The retyped pages reflect the currently issued version of the Technical Specifications. | |||
Pending Technical Specification revisions or Technical Specification revisions issued | Pending Technical Specification revisions or Technical Specification revisions issued | ||
.7dnnom h(h(h($ | |||
7 62k g { | |||
3 | |||
U.S. Nucirr R!gulttory Commission B16532\Page 2 subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance. | U.S. Nucirr R!gulttory Commission B16532\\Page 2 subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance. | ||
Backaround. Safety Assessment. Sianificant Hazards Consideration and Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and | Backaround. Safety Assessment. Sianificant Hazards Consideration and Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and i | ||
Environmental Considerations that suppod this proposed revision are contained in Attachments 4 and 5. | |||
Plant Operations Review Committee and Nuclear Safety Assessment Board Revi33 The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations. | Plant Operations Review Committee and Nuclear Safety Assessment Board Revi33 The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations. | ||
State Notification | State Notification In accordance with 10CFR50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment to ensure their awareness of this request. | ||
In accordance with 10CFR50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment to ensure their awareness of this request. | |||
Schedule Reauest for NRC Acoroval NNECO requests NRC review and approval of this proposed revision by October 24, 1997, and that the license amendment be effective upon issuance with implementation within sixty (60) days. | Schedule Reauest for NRC Acoroval NNECO requests NRC review and approval of this proposed revision by October 24, 1997, and that the license amendment be effective upon issuance with implementation within sixty (60) days. | ||
If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. D. Smith at (860) 437-5840. | If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. D. Smith at (860) 437-5840. | ||
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY M. H. Brothers | Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY hlh -b M. H. Brothers Vice President - Millstone Unit No. 3 Subscribed and sworn to before me this J W day of | ||
f MD | // | ||
1997 f MD ds 1 | |||
I | Date Commission Expires: er vo 2,o / | ||
I wnL u r.6000SOM cc: See Page 3 NOTARY PUBUC Commission 9pires November 30,2001 | |||
U.S. Nucl:ar R:gulitory Commission B16532\Page 3 | U.S. Nucl:ar R:gulitory Commission B16532\\Page 3 cc-H. J. Miller, Region i Admiriistrator j | ||
W. D. Travers, PhD., Director, Special Projacts Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 Mr. Kevin T. A. McCarthy, Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street l | |||
Monitoring and Radiation Division | Hartford, CT 06106-5127 4 | ||
Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 | 4 i | ||
4 | |||
4 | |||
i | |||
4 l | 4 l | ||
I. | I. | ||
Docket No. 50423 B16532 | Docket No. 50423 B16532 j | ||
1 i | |||
i i | i i | ||
a i | |||
i | |||
l | l | ||
\, . | \\ | ||
\\,. | |||
l | l | ||
) | |||
NNECO's Commitments | l Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Demineralized Water Storaae Tank (PTSCR 3-18-97) | ||
NNECO's Commitments 3 | |||
I l | I l | ||
1 i | |||
\\ | |||
h 4 | h 4 | ||
June 1997 | June 1997 | ||
U.S. Nucl:tr R:gulatory Commission B16532%ttachment 1\Page 1 | U.S. Nucl:tr R:gulatory Commission B16532%ttachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. | ||
Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. | Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments. | ||
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory | u Commitment Committed Date or Outage NONE N/A i | ||
u Commitment | |||
0 4 | 0 4 | ||
1 1 | 1 1 | ||
Latest revision as of 15:55, 11 December 2024
| ML20141B681 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/19/1997 |
| From: | Brothers M NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141B686 | List: |
| References | |
| B16532, NUDOCS 9706240098 | |
| Download: ML20141B681 (5) | |
Text
.-
~..-.
n,g\\
Northeast nope rerry na. (noute 156), waterrorer 0o383 N
Mdhtone Nuclear Power Station Northeut Nudear Energy Company P.O. Iks 128 Waterford. C f 06383-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitico System JUN 191997 Docket No. 50-423 B16532 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 l
Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification 1
Demineralized Water Storaae Tank (PTSCR 3-18-97)
Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby i
proposes to amend Operating License NPF d.9 by incorporating the attached prop. od i
revision into the Millstone Unit No. 3 '!echniual Specification 3/4.7.1.3 and Bases Sections 3/4.7.1.2 and 3/4.7.1.3.
Descriotion of Proposed Revision Technical Specification 3/4.7.1.3 requires sufficient water to be available for the Auxiliary Feedwater System to maintain the reactor coolant system at Hot Standby for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> before cooling down te Hot Shutdown in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The proposed changes increase the required volume of water when the Condentie Storage Tank is
.I used, reword Tecnnical Specification 3/4.7.1.3 for clarity and expand the description in Bases Sectionc B3,4.7.1.2 and B3/4.7.1.3.
Markuo of Proposed Revision A copy of the marked up Technical Specification pages is contained in Attachment 2.
. The markup reflects the currently issued version of the Technical Specifications.
Penfng TechnicM Specification revisions or Technical Specification revisions issued I
subsequent to this submittal are not reflected in the enclosed markup.
rl A(D/l Retvoe of Proposed Revision A copy of the retyped Technical Specification pages is contained in Attachment 3. The retyped pages reflect the currently issued version of the Technical Specifications.
Pending Technical Specification revisions or Technical Specification revisions issued
.7dnnom h(h(h($
7 62k g {
3
U.S. Nucirr R!gulttory Commission B16532\\Page 2 subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance.
Backaround. Safety Assessment. Sianificant Hazards Consideration and Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and i
Environmental Considerations that suppod this proposed revision are contained in Attachments 4 and 5.
Plant Operations Review Committee and Nuclear Safety Assessment Board Revi33 The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations.
State Notification In accordance with 10CFR50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment to ensure their awareness of this request.
Schedule Reauest for NRC Acoroval NNECO requests NRC review and approval of this proposed revision by October 24, 1997, and that the license amendment be effective upon issuance with implementation within sixty (60) days.
If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. D. Smith at (860) 437-5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY hlh -b M. H. Brothers Vice President - Millstone Unit No. 3 Subscribed and sworn to before me this J W day of
//
1997 f MD ds 1
Date Commission Expires: er vo 2,o /
I wnL u r.6000SOM cc: See Page 3 NOTARY PUBUC Commission 9pires November 30,2001
U.S. Nucl:ar R:gulitory Commission B16532\\Page 3 cc-H. J. Miller, Region i Admiriistrator j
W. D. Travers, PhD., Director, Special Projacts Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 Mr. Kevin T. A. McCarthy, Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street l
Hartford, CT 06106-5127 4
4 i
4 l
I.
Docket No. 50423 B16532 j
1 i
i i
a i
l
\\
\\,.
l
)
l Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Demineralized Water Storaae Tank (PTSCR 3-18-97)
NNECO's Commitments 3
I l
1 i
\\
h 4
June 1997
U.S. Nucl:tr R:gulatory Commission B16532%ttachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
u Commitment Committed Date or Outage NONE N/A i
0 4
1 1
1 I
A j
,