ML20147E620: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
Entirgy OperItlon3,Inc. | Entirgy OperItlon3,Inc. | ||
W' | W' PO. Box 756 | ||
*g Port Gibson. MS 39150 Tel 601437 6408 Fax 601437 2795 Joseph J. Hagan Vice President March 11, 1997 | |||
*J* fC wcie,3 cn U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: | |||
Document Control Desk | |||
==SUBJECT:== | ==SUBJECT:== | ||
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00019 Gentlemen: | Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00019 Gentlemen: | ||
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for February | In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for February j | ||
1997. | |||
If you have any questions or require additionalinformation, please contact this office. | If you have any questions or require additionalinformation, please contact this office. | ||
Yours truly, h | Yours truly, h | ||
JJH/CWG attachments. | JJH/CWG attachments. | ||
Operating Status 2. | |||
Average Daily Power Level 3. | |||
cc: | Unit Shutdown and Power Reductions cc: | ||
(See Next Page) | |||
9703180044 970228 .I PDR | } O]'' (f ] | ||
9703180044 970228 | |||
.I PDR ADOCK 05000416i R | |||
PDRu h,I | |||
.I | |||
.. _ _.. _... _.. - _. ~. _ _. - _. _. | |||
l 4 | l 4 | ||
t | t March 11, 1997 GNRO-97/00019 Page 2 of 3 cc: | ||
March 11, 1997 GNRO-97/00019 Page 2 of 3 cc: | Mr. D. C. Hintz (w/a) | ||
Mr. R. B. McGehee (w/a) | |||
Mr. N. S. Reynolds (w/a) | |||
Mr. J. E. Tedrow (w/a) | Mr. J. E. Tedrow (w/a) | ||
Mr. H. L. Thomas (w/o) | Mr. H. L. Thomas (w/o) | ||
.i | .i Mr. Leonard J. Callan (w/a) | ||
Regional Administrator j .' | Regional Administrator j.' | ||
U.S. Nuclear Regulatory Commission | |||
~ | ~ | ||
Region IV 611 Ryan Plaza Drive Suite 400 3 | |||
611 Ryan Plaza Drive Suite 400 | |||
~ | ~ | ||
Arlington, TX 76011 i | Arlington, TX 76011 i | ||
Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission | Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 l-i I | ||
~ | |||
l t | l t | ||
i 0 | i 0 | ||
' to GNRO-97/00019 | |||
) | ) | ||
DOCKET NO 50-416 j | |||
DATE 03/07/97 COMPLETED BY S. D. Lin TELEPHONE (601)437-6793 OPERATING STATUS 1. | |||
Unit Name: GGNS UNIT 1 2. | |||
Reporting Period: FEBRUARY 1997 3. | |||
Licensed Thermal Power (MWt): 3833 MWT - | |||
4. | |||
Nameplate Rating (Gross MWe): 1372.5 MWE 5. | |||
Design Electrical Rating (Net MWe): 1250 MWE 6. | |||
Maximum Dependable Capacity (Gross MWe): 1250 MWE 7. | |||
Maximum Dependable Capacity (Net MWe): | |||
1200 MWE 8. | |||
If changes occur in Capacity Ratings (Items 3 i | |||
through 7) Since Last Report. Give Reason: | |||
N/A | |||
^ | ^ | ||
9. | |||
Power Level To Which Restricted, if Any (Net MWe): | |||
: 10. Reasons For Restrictions,if Any: | N/A 2 | ||
: 11. Hours in Reporting Period | : 10. Reasons For Restrictions,if Any: | ||
: 13. Reactor Reserve Shutdown Hours | N/A a | ||
: | i This Month Yr to Date Cumulative | ||
: 15. Unit Reserve Shutdown Hours | : 11. Hours in Reporting Period 672 1.416 108.376 | ||
: 12. Number of Hours Reactor was Critical 672.0 1.416.0 89.395.0 4 | |||
: 17. Gross Electrical Energy Generated (MWH) | : 13. Reactor Reserve Shutdown Hours 0 | ||
: 18. Net Electrical Energy Generated (MWH) | 0 0 | ||
: 19. Unit Service Factor | : 14. Hours Generator On-Line 672.0 1.416.0 86.292.9 | ||
: 20. Unit Availability Factor | : 15. Unit Reserve Shutdown Hours 0 | ||
: 21. Unit Capacity Factor (Using MDC Net) | 0 0 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 16. Gross Thermal Energy Generated (MWH) 2.573.644 5.415.744 308.534.780 | ||
: 23. Unit Forced Outage Rate | : 17. Gross Electrical Energy Generated (MWH) 882.286 1.860.620 99.132.551 | ||
: 18. Net Electrical Energy Generated (MWH) 849.003 1.790.528 95.014.873 | |||
: 19. Unit Service Factor 100.0 100.0 81.4 | |||
: 20. Unit Availability Factor 100.0 100.0 81.4 | |||
: 21. Unit Capacity Factor (Using MDC Net) 105.3 105.4 79.8 | |||
: 22. Unit Capacity Factor (Using DER Net) 101.1 101.2 72.9 _,,, | |||
: 23. Unit Forced Outage Rate 0.0 0.0 6.1 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
None | None | ||
: 25. If Shut Down At End of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End of Report Period. Estimated Date of Startup: | ||
N/A | |||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast | Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 i | ||
l | |||
'+ | |||
l | l to GNRO-97/00019 DOCKET NO 50-416 j | ||
COMPLETED BY | DATE 03/05/97 | ||
MONTH February 1997 | ) | ||
COMPLETED BY S. D. Lin i | |||
(MWe-Net) | TELEPHONE (601) 437-6793 1 | ||
l | MONTH February 1997 | ||
) | |||
14 | DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i | ||
(MWe-Net) | |||
(MWe-Net) 1 1252 17 1269 2 | |||
1237 18 1262 l | |||
3 1239 19 1252 4 | |||
1242 20 1245 l | |||
l 5 | |||
1263 21 1253 l | |||
6 1266 22 | |||
-1263 7 | |||
1268 23 1274 8 | |||
1263 24 1271 9 | |||
1282 25 1269 10 1281 26 1250 11 1278 27 1267 l | |||
12-1277 28 1247 l | |||
l 13 1276 29 N/A 14 1280 30 N/A 15 1276 31 N/A j | |||
16 1272 l | |||
l E | l E | ||
I r | I r | ||
*. to GNRO-97/00il19 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
Reactor (3) | 50-416 UNIT NAME GGNS Unit 1 DATE 03/07/97 COMPLETED BY S.D.Un TELEPHONE (6011437-6793 REPORT MONTH February 1997 No. | ||
None 1 | Date Type (1) 8 'uration Reason Method Of 8;censee System Code Componen Cause & Corrective Action To Hours (2) | ||
C-Refueling | Shutting Down Event Report (4) t Code (5) | ||
H-Other (Explain) | Prevent Recurrence (C&CA) | ||
Reactor (3) | |||
None 1 | |||
2 3 | |||
4 5 | |||
F: Forced Reason: | |||
Method: | |||
Exhibit G - Instructions for Preparation of Exhibit 1 ' dame Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Ucensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161) | |||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training & | |||
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) t | |||
..}} | |||
Latest revision as of 13:06, 11 December 2024
| ML20147E620 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/28/1997 |
| From: | Hagan J, Lin S ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-97-00019, GNRO-97-19, NUDOCS 9703180044 | |
| Download: ML20147E620 (5) | |
Text
-
Entirgy OperItlon3,Inc.
W' PO. Box 756
- g Port Gibson. MS 39150 Tel 601437 6408 Fax 601437 2795 Joseph J. Hagan Vice President March 11, 1997
- J* fC wcie,3 cn U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00019 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for February j
1997.
If you have any questions or require additionalinformation, please contact this office.
Yours truly, h
JJH/CWG attachments.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page)
} O] (f ]
9703180044 970228
.I PDR ADOCK 05000416i R
PDRu h,I
.I
.. _ _.. _... _.. - _. ~. _ _. - _. _.
l 4
t March 11, 1997 GNRO-97/00019 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
.i Mr. Leonard J. Callan (w/a)
Regional Administrator j.'
U.S. Nuclear Regulatory Commission
~
Region IV 611 Ryan Plaza Drive Suite 400 3
~
Arlington, TX 76011 i
Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 l-i I
~
l t
i 0
' to GNRO-97/00019
)
DOCKET NO 50-416 j
DATE 03/07/97 COMPLETED BY S. D. Lin TELEPHONE (601)437-6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: FEBRUARY 1997 3.
Licensed Thermal Power (MWt): 3833 MWT -
4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1250 MWE 7.
Maximum Dependable Capacity (Net MWe):
1200 MWE 8.
If changes occur in Capacity Ratings (Items 3 i
through 7) Since Last Report. Give Reason:
N/A
^
9.
Power Level To Which Restricted, if Any (Net MWe):
N/A 2
- 10. Reasons For Restrictions,if Any:
N/A a
i This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 672 1.416 108.376
- 12. Number of Hours Reactor was Critical 672.0 1.416.0 89.395.0 4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 672.0 1.416.0 86.292.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.573.644 5.415.744 308.534.780
- 17. Gross Electrical Energy Generated (MWH) 882.286 1.860.620 99.132.551
- 18. Net Electrical Energy Generated (MWH) 849.003 1.790.528 95.014.873
- 19. Unit Service Factor 100.0 100.0 81.4
- 20. Unit Availability Factor 100.0 100.0 81.4
- 21. Unit Capacity Factor (Using MDC Net) 105.3 105.4 79.8
- 22. Unit Capacity Factor (Using DER Net) 101.1 101.2 72.9 _,,,
- 23. Unit Forced Outage Rate 0.0 0.0 6.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 i
l
'+
l to GNRO-97/00019 DOCKET NO 50-416 j
DATE 03/05/97
)
COMPLETED BY S. D. Lin i
TELEPHONE (601) 437-6793 1
MONTH February 1997
)
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 1252 17 1269 2
1237 18 1262 l
3 1239 19 1252 4
1242 20 1245 l
l 5
1263 21 1253 l
6 1266 22
-1263 7
1268 23 1274 8
1263 24 1271 9
1282 25 1269 10 1281 26 1250 11 1278 27 1267 l
12-1277 28 1247 l
l 13 1276 29 N/A 14 1280 30 N/A 15 1276 31 N/A j
16 1272 l
l E
I r
- . to GNRO-97/00il19 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit 1 DATE 03/07/97 COMPLETED BY S.D.Un TELEPHONE (6011437-6793 REPORT MONTH February 1997 No.
Date Type (1) 8 'uration Reason Method Of 8;censee System Code Componen Cause & Corrective Action To Hours (2)
Shutting Down Event Report (4) t Code (5)
Prevent Recurrence (C&CA)
Reactor (3)
None 1
2 3
4 5
F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 ' dame Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Ucensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) t
..