JPN-97-013, Informs NRC of Change to Scope & Techniques of Core Spray Sys Piping & Sparger Insps Inside Rv at JAFNPP: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:__             -          .  .,  .  . _ .  -                        -  _ > .
{{#Wiki_filter:__
123 Main Sveet Whr.e P!ains, New Yoo.10001
123 Main Sveet Whr.e P!ains, New Yoo.10001 914 681 684')
  '          914 681 684')
914 287 3309 6AX)
914 287 3309 6AX)
      #> NewYorkPbwer                                                                         2"'"vMien-4# Authority                                                                             cw "***~
#> NewYorkPbwer 2"'"vMien-4# Authority cw "***~
March 24,1997 JPN-97-013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555 l
March 24,1997 JPN-97-013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333                                                                       I Core Spray Internals Inspection
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Core Spray Internals Inspection


==Reference:==
==Reference:==
EPRI Report (EPRI TR-106740), "BWR Vessel and Intemals Project - BWR Core Spray Intemals inspection and Flaw Evaluation Guidelines (BWRVIP-18),"             ,
EPRI Report (EPRI TR-106740), "BWR Vessel and Intemals Project - BWR Core Spray Intemals inspection and Flaw Evaluation Guidelines (BWRVIP-18),"
dated July 1996.
dated July 1996.
l


==Dear Sir:==
==Dear Sir:==
The purpose of this letter is to inform the NRC of a change to the scope and tshhniques of the Core Spray System piping and sparger inspections inside the reactor vessel at the James A. FitzPatrick Nuclear Power Plant. The Authority has performed an augmented visual examination of the piping and spargers during each refueling outage since 1980 as requested by lE Bulletin No. 80-13, " Cracking in Core Spray Spargers," dated May 12,1980.
The purpose of this letter is to inform the NRC of a change to the scope and tshhniques of the Core Spray System piping and sparger inspections inside the reactor vessel at the James A. FitzPatrick Nuclear Power Plant. The Authority has performed an augmented visual examination of the piping and spargers during each refueling outage since 1980 as requested by lE Bulletin No. 80-13, " Cracking in Core Spray Spargers," dated May 12,1980.
Effective with the next refuel outage (fall of 1998), the Authority is modifying its Core Spray System piping and sparger inspection program to confonn with the guidance developed by the BWR Vessel and Intemais Project (BWRVIP) Assessment Committee as presented in the referenced document.
Effective with the next refuel outage (fall of 1998), the Authority is modifying its Core Spray System piping and sparger inspection program to confonn with the guidance developed by the BWR Vessel and Intemais Project (BWRVIP) Assessment Committee as presented in the referenced document.
The revisions to this inspection program will focus more attention on the welds and heat affected zones, utilizing enhanced visual examination of the areas where degradation is more likely to occur. These revisions will eliminate the detailed examination of the piping base metal between tne welds. The inspections performed during the last refuel outage conform with the BWRVIP guidelines, in addition to Bulletin 80-13 guidance, and will serve as the baseline inspection specified in the guidelines.                                           i The BWRVIP Committee transmitted the referenced document to the NRC by                             l correspondence dated July 26,1996, and the inspection program described is currently pending NRC approval. The Authonty will incorporate necessary changes to the Core Spray         ;  /
The revisions to this inspection program will focus more attention on the welds and heat affected zones, utilizing enhanced visual examination of the areas where degradation is more likely to occur. These revisions will eliminate the detailed examination of the piping base metal between tne welds. The inspections performed during the last refuel outage conform with the BWRVIP guidelines, in addition to Bulletin 80-13 guidance, and will serve as %
System inspection program based on the NRC review and approval of the referenced               fj document.
the baseline inspection specified in the guidelines.
                                            ~~
i The BWRVIP Committee transmitted the referenced document to the NRC by l
9703280230 970324 PDR     ADOCK 05000333
correspondence dated July 26,1996, and the inspection program described is currently
                                                                                  %        h l
/
pending NRC approval. The Authonty will incorporate necessary changes to the Core Spray System inspection program based on the NRC review and approval of the referenced fj document.
~~
9703280230 970324 PDR ADOCK 05000333 h


              .The commitment made by the Authority in this letter is listed in Attachment 1. If you have any questions, please contact Ms. C. D. Faison.
.The commitment made by the Authority in this letter is listed in Attachment 1. If you have any questions, please contact Ms. C. D. Faison.
Very truly ours, i'''
Very truly ours, tL
tL J. Knubel                           ,
.i'''
Senior Vice President &'
J. Knubel Senior Vice President &'
Chief Nuclear Officer l
Chief Nuclear Officer l
cc:       Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 l             Ms. K. Cotton, Acting Project Manager l             Project Directorate I-1 l             Division of Reactor Projects-l/ll
cc:
;              U. S. Nuclear Regulatory Commission i
Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 l
Mail Stop 14 B2 Washington, DC 20555 l
Ms. K. Cotton, Acting Project Manager l
1 i                                                                                                     !
Project Directorate I-1 l
l I
Division of Reactor Projects-l/ll U. S. Nuclear Regulatory Commission i
i i
Mail Stop 14 B2 Washington, DC 20555 1
l l
i l
t l
I i
i l
l t
l


  .....  -        - - -        - . - - - - . - _ . - . . . ~ - - - - - . . - . - . . . . - . . . . - . - . . - - . . - - . ~
-. - - - -. - _. -... ~ - - - - -.. -. -.... -.... -. -.. - -.. - -. ~
r                                                                                                                                                   i l
i r
i
l i
      '. 4                                                                                                                                           !,
'. 4 L
L                          .  '.                                       Attachment 1 to JPN-97-013 i
'. to JPN-97-013 i
l                                                                           Summary of Commitment                                                   :
l Summary of Commitment i
i l
l Number Commitment Due Date I
I Number                                                 Commitment                                         Due Date     I n
I n
JPN-97-013-01               Perform inspections of the Core Spray System                                 Future FitzPatrick piping and spargers inside the reactor vessel in                             refuel outages.
JPN-97-013-01 Perform inspections of the Core Spray System Future FitzPatrick piping and spargers inside the reactor vessel in refuel outages.
accordance with the BWRVIP-18 guidelines,
accordance with the BWRVIP-18 guidelines, including necessary changes based on NRC l
,                                                including necessary changes based on NRC l
review and approval of BWRVIP-18.
review and approval of BWRVIP-18.
l l-l l
l l-l l
l t
t I
I
i l
!'                                                                                                                                                    i l                                                                                                                                                      l l                                                                                                                                                      l i                                                                                                                                                     l l
l l
l l
i l
l l
l l
1 l
l 1
4 i
l 4
f l
i f
4
l 4
                                                . . , . . - . .}}
-}}

Latest revision as of 12:50, 11 December 2024

Informs NRC of Change to Scope & Techniques of Core Spray Sys Piping & Sparger Insps Inside Rv at JAFNPP
ML20147G690
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/24/1997
From: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-97-013, JPN-97-13, NUDOCS 9703280230
Download: ML20147G690 (3)


Text

__

123 Main Sveet Whr.e P!ains, New Yoo.10001 914 681 684')

914 287 3309 6AX)

  1. > NewYorkPbwer 2"'"vMien-4# Authority cw "***~

March 24,1997 JPN-97-013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Core Spray Internals Inspection

Reference:

EPRI Report (EPRI TR-106740), "BWR Vessel and Intemals Project - BWR Core Spray Intemals inspection and Flaw Evaluation Guidelines (BWRVIP-18),"

dated July 1996.

Dear Sir:

The purpose of this letter is to inform the NRC of a change to the scope and tshhniques of the Core Spray System piping and sparger inspections inside the reactor vessel at the James A. FitzPatrick Nuclear Power Plant. The Authority has performed an augmented visual examination of the piping and spargers during each refueling outage since 1980 as requested by lE Bulletin No. 80-13, " Cracking in Core Spray Spargers," dated May 12,1980.

Effective with the next refuel outage (fall of 1998), the Authority is modifying its Core Spray System piping and sparger inspection program to confonn with the guidance developed by the BWR Vessel and Intemais Project (BWRVIP) Assessment Committee as presented in the referenced document.

The revisions to this inspection program will focus more attention on the welds and heat affected zones, utilizing enhanced visual examination of the areas where degradation is more likely to occur. These revisions will eliminate the detailed examination of the piping base metal between tne welds. The inspections performed during the last refuel outage conform with the BWRVIP guidelines, in addition to Bulletin 80-13 guidance, and will serve as %

the baseline inspection specified in the guidelines.

i The BWRVIP Committee transmitted the referenced document to the NRC by l

correspondence dated July 26,1996, and the inspection program described is currently

/

pending NRC approval. The Authonty will incorporate necessary changes to the Core Spray System inspection program based on the NRC review and approval of the referenced fj document.

~~

9703280230 970324 PDR ADOCK 05000333 h

.The commitment made by the Authority in this letter is listed in Attachment 1. If you have any questions, please contact Ms. C. D. Faison.

Very truly ours, tL

.i

J. Knubel Senior Vice President &'

Chief Nuclear Officer l

cc:

Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 l

Ms. K. Cotton, Acting Project Manager l

Project Directorate I-1 l

Division of Reactor Projects-l/ll U. S. Nuclear Regulatory Commission i

Mail Stop 14 B2 Washington, DC 20555 1

i l

I i

i l

l t

l

-. - - - -. - _. -... ~ - - - - -.. -. -.... -.... -. -.. - -.. - -. ~

i r

l i

'. 4 L

'. to JPN-97-013 i

l Summary of Commitment i

l Number Commitment Due Date I

I n

JPN-97-013-01 Perform inspections of the Core Spray System Future FitzPatrick piping and spargers inside the reactor vessel in refuel outages.

accordance with the BWRVIP-18 guidelines, including necessary changes based on NRC l

review and approval of BWRVIP-18.

l l-l l

t I

i l

l l

i l

l l

l 1

l 4

i f

l 4

-