ML20148F770: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-                           _      .
{{#Wiki_filter:-
DD                   ;
DD i.
-                                                                                                                                    i.
cf l
cf                   -
T i
l T                                                                                                                                                   ,
O UNITED STATES t
i O       %                                                  UNITED STATES
NUCLEAR REGULATORY COMMISSION
            ., e              t                                    NUCLEAR REGULATORY COMMISSION f
., ef
,.j
,.j P
                              't REGION ill 799 MooSEVELT RoAo
REGION ill
* GLEN ELLYN. !LLINots 60137 SEP 2 2 .378                                                         i Michigan Testing Engineers, Inc.                                         License No. 21-14810-01                             l ATTN:   Mr. T. S. LeDonne                                                                                                     ,
't 799 MooSEVELT RoAo GLEN ELLYN. !LLINots 60137 SEP 2 2.378 i
Corporate Safety Officer Suite 34 1000 Jorie Boulevard Oak Brook, IL 60521 Gentlemen:
Michigan Testing Engineers, Inc.
i This refers to the inspection conducted by Mr. J. A. Finn of this office on August 21 and 22, 1978, of activities authorized by NRC                                                             ,
License No. 21-14810-01 l
Byproduct Material License No. 21-14810-01 and to the discussion                                                             i of our findings with Mr. James D. k'i11enberg of your staff at the                                                           ;
ATTN:
conclusion of the inspection.
Mr. T. S. LeDonne Corporate Safety Officer Suite 34 1000 Jorie Boulevard Oak Brook, IL 60521 Gentlemen:
The inspection was an examination of activities conducted under your                                                         -
i This refers to the inspection conducted by Mr. J. A. Finn of this office on August 21 and 22, 1978, of activities authorized by NRC Byproduct Material License No. 21-14810-01 and to the discussion i
licens* as they relate to radiation safety and to compliance with the Commission's rules and regulations and with the conditions of                                                             ,
of our findings with Mr. James D. k'i11enberg of your staff at the conclusion of the inspection.
your license. The inspection consisted of a selective examination                                                           ,
The inspection was an examination of activities conducted under your licens* as they relate to radiation safety and to compliance with the Commission's rules and regulations and with the conditions of your license. The inspection consisted of a selective examination of procedures and representative records, observations, independent measurements, and interviews with personnel.
of procedures and representative records, observations, independent measurements, and interviews with personnel.                                                                                   ,
l During this inspection, certain of yeur activities appeared to be in noncompliance with NRC requirements, as described in the enclosed Appendix A.
l During this inspection, certain of yeur activities appeared to be in                                                         '
Note that item 4 is a repeat item in that survey records I
noncompliance with NRC requirements, as described in the enclosed Appendix A.                   Note that item 4 is a repeat item in that survey records                                     !
are still incomplete.
I are still incomplete.
This notice is sent to you pursuant to the provisions of Section l'
This notice is sent to you pursuant to the provisions of Section                                                             l' 2.201 of the NRC's " Rules of Practice," Part'2, Title 10, Code of Federal Regulations. Section 2.2M requires you to submit to this                                                           -;
2.201 of the NRC's " Rules of Practice," Part'2, Title 10, Code of Federal Regulations. Section 2.2M requires you to submit to this office within twenty days of your a sceipt of this notice a written statement or explanation in reply, u cluding for each item of non-compliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
office within twenty days of your a sceipt of this notice a written statement or explanation in reply, u cluding for each item of non-compliance: (1) corrective action taken and the results achieved;                                                             .
7 WlO& d l
(2) corrective action to be taken to avoid further noncompliance;                                                             !
and (3) the date when full compliance will be achieved.                                                                       >
7 WlO& d                                   l


t eP f
t eP f
Michigan Testing                                                         SEP 2 2 .378 Engineers, Inc.
Michigan Testing SEP 2 2.378 Engineers, Inc.
We' will gladly discuss any. questions you have concerning this inspection.
We' will gladly discuss any. questions you have concerning this inspection.
Sincerely, A. B. Davis, Chief' Fuel Facility and' Materials Safety Branch
Sincerely, A. B. Davis, Chief' Fuel Facility and' Materials Safety Branch
Line 51: Line 48:
==Enclosure:==
==Enclosure:==
Appendix A, Notice of Violation ec w/ enc 1:
Appendix A, Notice of Violation ec w/ enc 1:
Central Files Reproduction Unit NRC 20b PDR NSIC 1
Central Files Reproduction Unit NRC 20b PDR NSIC
I
)
                                                                                                                                      )
. _. _..,._ _ _.._..., _...,.}}
_ _ . . _ _ .    . _ _ _ _ _ . _ _ . . ._ . . _ . . _ , , _ , , . _ . .    . _ . _ . . ,._ _ _ .._ ..., _ .. .,. _}}

Latest revision as of 12:45, 11 December 2024

Forwards Notice of Violation of Byproduct Matl Lic 21-14810- 01.Requests Written Explanation of Items of Noncompliance
ML20148F770
Person / Time
Issue date: 09/22/1978
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Ledonne T
MICHIGAN TESTING ENGINEERS, INC.
Shared Package
ML20148F775 List:
References
NUDOCS 7811090164
Download: ML20148F770 (2)


Text

-

DD i.

cf l

T i

O UNITED STATES t

NUCLEAR REGULATORY COMMISSION

., ef

,.j P

REGION ill

't 799 MooSEVELT RoAo GLEN ELLYN. !LLINots 60137 SEP 2 2.378 i

Michigan Testing Engineers, Inc.

License No. 21-14810-01 l

ATTN:

Mr. T. S. LeDonne Corporate Safety Officer Suite 34 1000 Jorie Boulevard Oak Brook, IL 60521 Gentlemen:

i This refers to the inspection conducted by Mr. J. A. Finn of this office on August 21 and 22, 1978, of activities authorized by NRC Byproduct Material License No. 21-14810-01 and to the discussion i

of our findings with Mr. James D. k'i11enberg of your staff at the conclusion of the inspection.

The inspection was an examination of activities conducted under your licens* as they relate to radiation safety and to compliance with the Commission's rules and regulations and with the conditions of your license. The inspection consisted of a selective examination of procedures and representative records, observations, independent measurements, and interviews with personnel.

l During this inspection, certain of yeur activities appeared to be in noncompliance with NRC requirements, as described in the enclosed Appendix A.

Note that item 4 is a repeat item in that survey records I

are still incomplete.

This notice is sent to you pursuant to the provisions of Section l'

2.201 of the NRC's " Rules of Practice," Part'2, Title 10, Code of Federal Regulations. Section 2.2M requires you to submit to this office within twenty days of your a sceipt of this notice a written statement or explanation in reply, u cluding for each item of non-compliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

7 WlO& d l

t eP f

Michigan Testing SEP 2 2.378 Engineers, Inc.

We' will gladly discuss any. questions you have concerning this inspection.

Sincerely, A. B. Davis, Chief' Fuel Facility and' Materials Safety Branch

Enclosure:

Appendix A, Notice of Violation ec w/ enc 1:

Central Files Reproduction Unit NRC 20b PDR NSIC

)

. _. _..,._ _ _.._..., _...,.