ML20148H920: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:c J.. | {{#Wiki_filter:c J.. 3 T | ||
3 | In-Reply Refer To: | ||
' Dockets: | |||
50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell | |||
.Vice President, Nuclear Operations-P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen: | |||
This documents the meeting between our staffs on March 22, 1988. We appreciated the opportunity to meet with your eneineering managers. | This documents the meeting between our staffs on March 22, 1988. We appreciated the opportunity to meet with your eneineering managers. | ||
The exchange of views on general technical areas was beneficial. | |||
A copy of tiie list of attendees is attached. | A copy of tiie list of attendees is attached. | ||
Sincerely, L. J. Callan, Director Division of Reactor Projects | Sincerely, L. J. Callan, Director Division of Reactor Projects | ||
| Line 27: | Line 28: | ||
==Attachment:== | ==Attachment:== | ||
As stated cc: | As stated cc: | ||
Arkansas Nuclear One ATTN: | Arkansas Nuclear One ATTN: | ||
J. M. Levine, Director Site Nuclear _ Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec: | |||
bec to DMB (IE01) bec distrib. by RIV: | bec to DMB (IE01) bec distrib. by RIV: | ||
RRI | RRI R. D. Martin, RA RPSB-DRSS SectionChief(DRP/A) | ||
Lisa Shea, RM/ALF | Lisa Shea, RM/ALF RIV File DRP MIS System RSTS Operator Project Engineer, DRP/A G. Dick NRR Project Manager DRS O | ||
DRP | Rb', | ||
G. Dick NRR Project Manager DRS | /DRS RS C:PSA D:DRP JJau n/cgj J Milhoan DChamberlain LJCallan | ||
% /[/ /88 7 6 /88 | |||
/ /88 | |||
/ /88 8803300117 880323 DR ADOCK 05000313 | |||
- LIST ~0F ATTENDEES AP&L | |||
~ | |||
D. Howard, Manager, Licensing G. T. Jones, General Manager, Design Engineering R. K.-Lane, Manager, Engineering (ANO) | D. Howard, Manager, Licensing G. T. Jones, General Manager, Design Engineering R. K.-Lane, Manager, Engineering (ANO) | ||
USNRC L. J. Callan, Director, Division of Reactor Projects J. L. Milhoan,. Director, Division of Reactor Safety J. P. Jaudon, Deputy Director, Division of Reactor Safety J. E. Gagliardo,-Chief, Operations Programs Section W. E. Seidle, Chief, Test Programs Section W. M. McNeill, Reactor Inspector R. C. Haag, Reactor Inspector I | USNRC L. J. Callan, Director, Division of Reactor Projects J. L. Milhoan,. Director, Division of Reactor Safety J. P. Jaudon, Deputy Director, Division of Reactor Safety J. E. Gagliardo,-Chief, Operations Programs Section W. E. Seidle, Chief, Test Programs Section W. M. McNeill, Reactor Inspector R. C. Haag, Reactor Inspector I | ||
I r | I r | ||
~ | |||
-e y, | |||
r-.c, | |||
---mene-van.m-r,w-v v-e- | |||
a r | |||
,w, | |||
,,-n,.,-,,r-1----- | |||
n | |||
.-.r-, | |||
r}} | r}} | ||
Latest revision as of 11:26, 11 December 2024
| ML20148H920 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/23/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8803300117 | |
| Download: ML20148H920 (2) | |
Text
c J.. 3 T
In-Reply Refer To:
' Dockets:
50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell
.Vice President, Nuclear Operations-P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
This documents the meeting between our staffs on March 22, 1988. We appreciated the opportunity to meet with your eneineering managers.
The exchange of views on general technical areas was beneficial.
A copy of tiie list of attendees is attached.
Sincerely, L. J. Callan, Director Division of Reactor Projects
Attachment:
As stated cc:
Arkansas Nuclear One ATTN:
J. M. Levine, Director Site Nuclear _ Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec:
bec to DMB (IE01) bec distrib. by RIV:
RRI R. D. Martin, RA RPSB-DRSS SectionChief(DRP/A)
Lisa Shea, RM/ALF RIV File DRP MIS System RSTS Operator Project Engineer, DRP/A G. Dick NRR Project Manager DRS O
Rb',
/DRS RS C:PSA D:DRP JJau n/cgj J Milhoan DChamberlain LJCallan
% /[/ /88 7 6 /88
/ /88
/ /88 8803300117 880323 DR ADOCK 05000313
- LIST ~0F ATTENDEES AP&L
~
D. Howard, Manager, Licensing G. T. Jones, General Manager, Design Engineering R. K.-Lane, Manager, Engineering (ANO)
USNRC L. J. Callan, Director, Division of Reactor Projects J. L. Milhoan,. Director, Division of Reactor Safety J. P. Jaudon, Deputy Director, Division of Reactor Safety J. E. Gagliardo,-Chief, Operations Programs Section W. E. Seidle, Chief, Test Programs Section W. M. McNeill, Reactor Inspector R. C. Haag, Reactor Inspector I
I r
~
-e y,
r-.c,
---mene-van.m-r,w-v v-e-
a r
,w,
,,-n,.,-,,r-1-----
n
.-.r-,
r