ML20148K519: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:< | {{#Wiki_filter:< | ||
g | g | ||
.~y w | |||
i MI'SSISSIPPl. POWER & LIGHT COMPANY | i MI'SSISSIPPl. POWER & LIGHT COMPANY | ||
'7 Helping -Build Mississippt | |||
,s P. 0, - B O X 16 4 0, J A C K S O N, M I S SI S S I P PI 3 9 2 0 5 | |||
,1 NORRIS L STAMPLEY' ' | |||
1 NORRIS L STAMPLEY' ' | _ ~ | ||
via m imt | via m imt November 13, 1978 l | ||
l U. S.' Nuclear Regulatory Commission | l U. S.' Nuclear Regulatory Commission | ||
Washington, D. C. . 20555 | -l Office of. Nuclear Reactor Regt.lation | ||
) | |||
Washington, D. C.. 20555 j | |||
Attention: | |||
Mr. Harold R. Denton, Director | |||
==Dear Sir:== | ==Dear Sir:== | ||
t | t | ||
==SUBJECT:== | ==SUBJECT:== | ||
Grand Gulf Nuclear Station Units 1 and 2 | Grand Gulf Nuclear Station Units 1 and 2 j | ||
Docket Nos. 50-416 and 50-417 i | |||
In our submittal dated May 2, 1977, Revision 1 to PSAR, Sect, ion 17.1.1.1.2 | File 0260/0277/L-860.0 PSAR Quality Assurance Comittee AECM-78/85 | ||
the date of this letter have dissolved it. | ~ | ||
If you have any questions on this matter, please call. | In our submittal dated May 2, 1977, Revision 1 to PSAR, Sect, ion 17.1.1.1.2 j | ||
we discussed the Quality Assurance Comittee. | |||
: t. j~ ,' | The present Quality Assurance organization ~ handles all review, surveillancesand audit functions which were once assigned to.the Quality Assurance Committee. Additio.nally, the require-ments in 100FR50 Appendix B for regular review of status and adequacy of the Quality Assurance Program is covered ~by presentations and or reports submitted i | ||
to the Vice President of Production & Engineering semi-annually.. | |||
j nE/dwe cc: | Therefore; | ||
'l we no longer feel the Quality Assurance Committee to be necessa'ry and as of the date of this letter have dissolved it. | |||
l l | |||
If you have any questions on this matter, please call. | |||
l Sincerely, Y | |||
/ /.., L I | |||
: t. j~,' | |||
(_ | |||
j nE/dwe cc: | |||
Mr. R. B. McGehee. | |||
Mr. T. B. Conner o | Mr. T. B. Conner o | ||
- 7 D | |||
b | b | ||
\\ | |||
I Member Middle South Utilities System | I Member Middle South Utilities System i | ||
l E | |||
E | |||
m- | |||
", GQ.*:% | |||
.,]~: | |||
~. | |||
MISSISSIPPI POWER & LIGHT COMPANY | ns. | ||
W | p | ||
t | ,'N AlSE'.ChRi$lI[AS SEQ - | ||
P. o. B o x 1s 40. J AC K S ON. MISSISSIPPI 39205 | MISSISSIPPI POWER & LIGHT COMPANY ff ' ',' | ||
l | W | ||
; bkf-f hp c C,7:; -- | |||
i | *t Helping Bustd Mis sis sippi P. o. B o x 1s 40. J AC K S ON. MISSISSIPPI 39205 | ||
\\, | |||
l 'l l\\ | |||
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director l, | t (:j g.;j r,. 3 i | ||
J | 'es | ||
~ | |||
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. | |||
20555 Attention: | |||
Mr. Harold R. Denton, Director l, | |||
J | |||
,}} | |||
Latest revision as of 12:11, 11 December 2024
| ML20148K519 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/13/1978 |
| From: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7811170198 | |
| Download: ML20148K519 (1) | |
Text
<
g
.~y w
i MI'SSISSIPPl. POWER & LIGHT COMPANY
'7 Helping -Build Mississippt
,s P. 0, - B O X 16 4 0, J A C K S O N, M I S SI S S I P PI 3 9 2 0 5
,1 NORRIS L STAMPLEY' '
_ ~
via m imt November 13, 1978 l
l U. S.' Nuclear Regulatory Commission
-l Office of. Nuclear Reactor Regt.lation
)
Washington, D. C.. 20555 j
Attention:
Mr. Harold R. Denton, Director
Dear Sir:
t
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 j
Docket Nos. 50-416 and 50-417 i
File 0260/0277/L-860.0 PSAR Quality Assurance Comittee AECM-78/85
~
In our submittal dated May 2, 1977, Revision 1 to PSAR, Sect, ion 17.1.1.1.2 j
we discussed the Quality Assurance Comittee.
The present Quality Assurance organization ~ handles all review, surveillancesand audit functions which were once assigned to.the Quality Assurance Committee. Additio.nally, the require-ments in 100FR50 Appendix B for regular review of status and adequacy of the Quality Assurance Program is covered ~by presentations and or reports submitted i
to the Vice President of Production & Engineering semi-annually..
Therefore;
'l we no longer feel the Quality Assurance Committee to be necessa'ry and as of the date of this letter have dissolved it.
l l
If you have any questions on this matter, please call.
l Sincerely, Y
/ /.., L I
- t. j~,'
(_
j nE/dwe cc:
Mr. R. B. McGehee.
Mr. T. B. Conner o
- 7 D
b
\\
I Member Middle South Utilities System i
l E
E
m-
", GQ.*:%
.,]~:
~.
ns.
p
,'N AlSE'.ChRi$lI[AS SEQ -
MISSISSIPPI POWER & LIGHT COMPANY ff ' ','
W
- bkf-f hp c C,7
- ; --
- t Helping Bustd Mis sis sippi P. o. B o x 1s 40. J AC K S ON. MISSISSIPPI 39205
\\,
l 'l l\\
t (:j g.;j r,. 3 i
'es
~
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
20555 Attention:
Mr. Harold R. Denton, Director l,
J
,