{{#Wiki_filter:w 0 Public Service-                                                 Eh 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 l
{{#Wiki_filter:w 0 Public Service-Eh 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 l
February 11, 1988   j Fort St. Vrain       i Unit No. 1           l P-88032 U. S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-267
February 11, 1988 j
Fort St. Vrain i
Unit No. 1 l
P-88032 U. S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.
20555 Docket No. 50-267


==SUBJECT:==
==SUBJECT:==
Line 23: Line 27:


==REFERENCE:==
==REFERENCE:==
: 1)   NRC       Letter Gagliardo     to Walker     dated 07/25/86     (G-86407).
1)
: 2)   PSC Letter Gahm to     Gagliardo dated 09/10/86 (P-86543).
NRC Letter Gagliardo to Walker dated 07/25/86 (G-86407).
2)
PSC Letter Gahm to Gagliardo dated 09/10/86 (P-86543).
Gentlemen:
Gentlemen:
As a result of a notice of ri_olation (Reference 1) PSC committed to an indepth review of design accuments (Reference 2) to ensure set i
As a result of a notice of ri_olation (Reference 1) PSC committed to an indepth review of design accuments (Reference 2) to ensure set point information is current on approximately 2400 drawings.
point information is current on approximately 2400 drawings. PSC had I
PSC had i
originally planned to have this project completed by January 31, l       1988. The backfit process of updating hard copy design documents has l
originally planned to have this project completed by January 31, I
been slower than originally         envisioned. Extensive   resources dedicated to plant restart following the circulator failure and fire have impacted the review of the design documents.           Documentation change notices have been approved to encompass all needed changes, but drafting work is not complete. PSC will have all drawing changes complete by October 31, 1988, thus closing out this issue.
l 1988. The backfit process of updating hard copy design documents has l
8802170264 880211 PDR   ADOCK 05000267 G                 PDR I
been slower than originally envisioned.
Extensive resources dedicated to plant restart following the circulator failure and fire have impacted the review of the design documents.
Documentation change notices have been approved to encompass all needed changes, but drafting work is not complete.
PSC will have all drawing changes complete by October 31, 1988, thus closing out this issue.
8802170264 880211 PDR ADOCK 05000267 G
PDR I
0
0


        .P-88032-                           /                   February 11 1988 Until .the project is complet[' procedure revisions have been implemented which specify that setpoints. on drawings'.are            for
.P-88032- /
        'information only and may not refle{ct curre,,nt setpoint values.
February 11 1988 Until
Should you have any questions concerning this issue, please contact Mr.1M. H. Holmes at (303) 480-6960 jor further information.                      .
.the project is complet[' procedure revisions have been
Very.,truly yours, f 9 H.L.$ rey Manager, fluclear Licensing and Fuels Division HLB /DCG:brc cc:   Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell                                                       '
'information only and may not refle{ct curre,,nt setpoint values.
Senior Resident Inspector Fort St. Vrain                                                           ,
implemented which specify that setpoints. on drawings'.are for Should you have any questions concerning this issue, please contact Mr.1M. H. Holmes at (303) 480-6960 jor further information.
t 4
Very.,truly yours, f 9 H.L.$ rey Manager, fluclear Licensing and Fuels Division HLB /DCG:brc cc:
f r
Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain t
f
4 f
r f
_m.}}
_m.}}

Latest revision as of 10:49, 11 December 2024

Advises That Due to Extensive Resources Dedicated to Plant Restart,Review of Design Documents to Ensure Current Setpoint Info on Approx 2,400 Drawings Will Not Be Completed Until 881031,per Util 860910 Commitment Re Violation
ML20149F579
Person / Time
Site: Fort Saint Vrain 
Issue date: 02/11/1988
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
P-88032, NUDOCS 8802170264
Download: ML20149F579 (2)


Text

w 0 Public Service-Eh 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 l

February 11, 1988 j

Fort St. Vrain i

Unit No. 1 l

P-88032 U. S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.

20555 Docket No. 50-267

SUBJECT:

NRC Inspection 86-09

REFERENCE:

1)

NRC Letter Gagliardo to Walker dated 07/25/86 (G-86407).

2)

PSC Letter Gahm to Gagliardo dated 09/10/86 (P-86543).

Gentlemen:

As a result of a notice of ri_olation (Reference 1) PSC committed to an indepth review of design accuments (Reference 2) to ensure set point information is current on approximately 2400 drawings.

PSC had i

originally planned to have this project completed by January 31, I

l 1988. The backfit process of updating hard copy design documents has l

been slower than originally envisioned.

Extensive resources dedicated to plant restart following the circulator failure and fire have impacted the review of the design documents.

Documentation change notices have been approved to encompass all needed changes, but drafting work is not complete.

PSC will have all drawing changes complete by October 31, 1988, thus closing out this issue.

8802170264 880211 PDR ADOCK 05000267 G

PDR I

0

.P-88032- /

February 11 1988 Until

.the project is complet[' procedure revisions have been

'information only and may not refle{ct curre,,nt setpoint values.

implemented which specify that setpoints. on drawings'.are for Should you have any questions concerning this issue, please contact Mr.1M. H. Holmes at (303) 480-6960 jor further information.

Very.,truly yours, f 9 H.L.$ rey Manager, fluclear Licensing and Fuels Division HLB /DCG:brc cc:

Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain t

4 f

r f

_m.