ML20149G964: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-      , .                      ,          .    . - -.-
{{#Wiki_filter:-
e-     ,
e-jp*%q UNITED STATES 4
jp*%q                                         UNITED STATES 34          k                       NUCLEAR REGULATORY COMMISSION j
k NUCLEAR REGULATORY COMMISSION 3
        $              8                                     REGION lit E*                                                                                                             i E                              801 WARRENVILLE ROAD
8 REGION lit j
      ~ %,           8                             UsLE. ILUNOls 60532-4351 i
E*
E i
801 WARRENVILLE ROAD
~ %,
8 i
UsLE. ILUNOls 60532-4351
{
{
            .....                                    July 17, 1997                                                   !
July 17, 1997 l
l Mr. D. R. Gipson Senior Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI- 48166
Mr. D. R. Gipson Senior Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI-48166


==SUBJECT:==
==SUBJECT:==
Line 29: Line 34:


==Dear Mr. Gipson:==
==Dear Mr. Gipson:==
 
~
  ~            On March 18,1997, NRC staff completed the semiannual Plant Performance Review (PPR) of Fermi Nuclear Station Unit 2. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Fermi 2 involved the participation of all Region 111 technical divisions as well as responsible NRR staff. in evaluating inspection results and safety               .
On March 18,1997, NRC staff completed the semiannual Plant Performance Review (PPR) of Fermi Nuclear Station Unit 2. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Fermi 2 involved the participation of all Region 111 technical divisions as well as responsible NRR staff. in evaluating inspection results and safety performance information for the period of October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
performance information for the period of October 1996 through March 1997. PPRs                         ;
provide NRC management with a current summary of licensee performance and serve as                     '
inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned update for the inspection effort resulting from the Fermi 2 PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our site focus group, may occur at any
This letter advises you of our planned update for the inspection effort resulting from the Fermi 2 PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our site focus group, may occur at any
              . time in support of the Core inspection program.
. time in support of the Core inspection program.
I I
I I
l 9707240148 970717                                            }}\\h}\\h}\\h}\$}}\I\\kkI PDR   ADOCK 05000341                                                       **
l
!                P                    PDR
}}\\\\h}\\\\h}\\\\h}\\$}}\\I\\\\kkI 9707240148 970717 PDR ADOCK 05000341 P
PDR


      .          .- - .            . . - . - . .          . . . .          .          .-            .            -              . . -      . = - -
. = -
* o N
o N
f       D. R. Gipson                                                                                                                             '
f D. R. Gipson '
We are interested in feedback on this program, including the need for any changes in the                                                     ,
We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments. If changes are necessary, you will be informed. If you have any questions or comments, please contact Mr. Michael Jordan at (630) 829-9637.
inspection plan, and we invite your questions or comments. If changes are necessary, you                                                     I will be informed. If you have any questions or comments, please contact Mr. Michael Jordan at (630) 829-9637.
Sincerely,
1 Sincerely,                                                                           '
/s/Stevie DuPont for Michael J. Jordan, Chief Reactor Projects Branch 5 i
                                                                /s/Stevie DuPont for Michael J. Jordan, Chief Reactor Projects Branch 5 i
Docket No. 50-341 License Nos. NPF-43
Docket No. 50-341 License Nos. NPF-43


==Enclosure:==
==Enclosure:==
Inspection Plan cc w/ encl:         N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate                                                                                             ,
Inspection Plan cc w/ encl:
Legal Department                                                                                                     l James R. Padgett, Michigan Public                                                                                       j Service Commission                                                                                                   !
N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public j
Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct                                     Project Manager, NRR w/enct                                                         I
Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct
        - PUBLIC IE-01 w/enci                                   DRP w/enci OC/LFDCB w/enct                                         Rlli PRR w/ encl                                                                   l SRI Fermi w/ encl                                     A. B. Beach w/ encl                                                                 I Rlli Enf Coordinator w/enci                             Deputy RA w/ encl DRS w/ encl (2)
- PUBLIC IE-01 w/enci DRP w/enci OC/LFDCB w/enct Rlli PRR w/ encl l
SEE PREVIOUS CONCURRENCES                                                                         1 DOCUMENT NAME: r:\ inspect.ptn\ fermi \insppin5.fer To wceive e copy of this document, indicate in the boa 'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
SRI Fermi w/ encl A. B. Beach w/ encl Rlli Enf Coordinator w/enci Deputy RA w/ encl DRS w/ encl (2)
        *N* = No copy OFFICE       Rlll               ,JF   Rlli               l   Rlli                     Rlli               l NAME         Jorda#@''b               Kozak                 Creed                   Ring DATE         07//V97                 07/ /97               07/ /97                 07/ /97 OFFICIAL RECORD COPY
SEE PREVIOUS CONCURRENCES DOCUMENT NAME: r:\\ inspect.ptn\\ fermi \\insppin5.fer To wceive e copy of this document, indicate in the boa 'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
*N* = No copy OFFICE Rlll
,JF Rlli l
Rlli Rlli l
NAME Jorda#@''b Kozak Creed Ring DATE 07//V97 07/ /97 07/ /97 07/ /97 OFFICIAL RECORD COPY


i D. R. Gipson                                                                                                                                     l I
i D. R. Gipson.
We are interested in feedback on this program, including the need for any changes in the                                                             '
We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments, if changes are necesrsry, you will be informed if you have any questions or comments, please contact Mr. Michael l
inspection plan, and we invite your questions or comments, if changes are necesrsry, you will be informed if you have any questions or comments, please contact Mr. Michael l         Jordan at (630) 829-9637.                                                                                                                             l
Jordan at (630) 829-9637.
,                                                                Sincerely,                                                                                     ;
Sincerely, i
i Geoffrey 5. Grant, Direete                         ic A4             .
A")
dP   A")
Geoffrey 5. Grant, Direete ic A4 dP Divisica-af4eact-or-Frojects
4                                                                Divisica-af4eact-or-Frojects                       .jp p         /, %                     j Docket No. 50 341 5          N License Nos. NPF-43 i
.jp p
/, %
4 j
5 N
Docket No. 50 341 License Nos. NPF-43 i


==Enclosure:==
==Enclosure:==
Inspection Plan i
Inspection Plan i
cc w/ encl:           N. Peterson, l
l cc w/ encl:
Supervisor of Compliance P. A. Marquardt, Corporate Legal Department                                                                                                             !
N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct PUBLIC IE-01 w/ encl DRP w/ encl OC/LFDCB w/encI Rill PRR wienci SRI Fermi w/ encl A. B. Beach w/enct Rlli Enf Coordinator w/enct Deputy RA w/enct DRS w/ encl (2)
James R. Padgett, Michigan Public                                                                                             ;
DOCUMENT NAME: r:\\ inspect. pin \\ fermi \\insppin5.fer To receive a copy of this document, indicate in the box *C* = Copy without attachment' enclosure *E' a. Copy with attachment / enclosure
Service Commission Michigan Department of                                                                                                         ;
*N* = No copy OFFICE Rlll 3 Rlli l6 Rill,l /
Public Health                                                                                                               l Monroe County, Emergency                                                                                                       1 Management Division Docket File w/enct                                     Project Manager, NRR w/enct PUBLIC IE-01 w/ encl                                   DRP w/ encl OC/LFDCB w/encI                                       Rill PRR wienci SRI Fermi w/ encl                                     A. B. Beach w/enct Rlli Enf Coordinator w/enct                           Deputy RA w/enct DRS w/ encl (2)
k Hlli
DOCUMENT NAME: r:\ inspect. pin \ fermi \insppin5.fer To receive a copy of this document, indicate in the box *C* = Copy without attachment' enclosure *E' a. Copy with attachment / enclosure
( %
          *N* = No copy OFFICE           Rlll               3     Rlli           l6 Rill ,l /           k       Hlli                 (   %             ,e NAME             Jordan:dpd j9>mC6     i Cfe$$'                   Ring-g                     erm1T/) g
,e NAME Jordan:dpd j9>mC6 Cfe$$'
                                            ''d DATE             07/l(/97                 07/II/97             0 @ 97                   07/I'J/97                 0)f" /9 A OFFICIAL RECORD COPY
Ring-g erm1T/) g i
DATE 07/l(/97 07/II/97 0 @ 97 07/I'J/97 0)f" /9 A
''d OFFICIAL RECORD COPY


                                                              -                                                                                                                    -. . . . -.. ..-_.- ~ ~. - ,.- -                                                           ......-. _. .        .
-.... -....-_.- ~ ~. -,.- -
                                                                                                                                                                                                    ~
~
:i
: i
                                                                                                                                                                                                                                                                                                        +
+
j FERMI 2                                                                                                                                                                   j t
j FERMI 2 j
INSPECTION PLAN                                                                                                                                                                   .i PLANNED TITLE /                                     NUMBER OF                 INSPECTION                                             TYPE OF INSPECTION -
t INSPECTION PLAN
INSPECTION .           PROGRAM AREA                                       INSPECTORS                             DATES                                                       COMMENTS Tl 2515/132         Vehicle Barrier System                                     1                               8/4-5/97                                                     Tl inspection Engineering & Technical                                     2-5                       '8/4-15/97                                                   Core inspection Support                                                                   ~ 9/8-12/97 IP - Inspection Procedure Tl - Temporary Instructica Core inspection - Minimum NRC Program (mandatory all plants)
.i PLANNED TITLE /
  . _ _ _ _ . _ . _ _ . , - . . _ _ _ _ . .-      = m   ._  _m.__    - - - --      -  u-- >------_a-1-----2---------u---_            _ _ _ . _ - _ . - - - - .      is----   - > - . -m--                     - : . nn. - -     _ - _ - - - - -- ' - _ - - - - - _ - - -          ----'._2----       u}}
NUMBER OF INSPECTION TYPE OF INSPECTION -
INSPECTION.
PROGRAM AREA INSPECTORS DATES COMMENTS Tl 2515/132 Vehicle Barrier System 1
8/4-5/97 Tl inspection Engineering & Technical 2-5
'8/4-15/97 Core inspection Support
~ 9/8-12/97 IP - Inspection Procedure Tl - Temporary Instructica Core inspection - Minimum NRC Program (mandatory all plants)
=
m m.
u--
>------ a-1-----2---------u---
is----
- > -. -m--
nn. - -
----'. 2----
u
.}}

Latest revision as of 10:28, 11 December 2024

Discusses Semiannual Plant Performance Review of Unit 2, Completed on 970318.Staff Conducts Reviews for All Operating NPPs to Develop Integrated Understanding of Safety Performance.Advises of Planned Update for Insp Effort
ML20149G964
Person / Time
Site: Fermi 
Issue date: 07/17/1997
From: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
References
NUDOCS 9707240148
Download: ML20149G964 (4)


Text

-

e-jp*%q UNITED STATES 4

k NUCLEAR REGULATORY COMMISSION 3

8 REGION lit j

E*

E i

801 WARRENVILLE ROAD

~ %,

8 i

UsLE. ILUNOls 60532-4351

{

July 17, 1997 l

Mr. D. R. Gipson Senior Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI-48166

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - FERMI 2

Dear Mr. Gipson:

~

On March 18,1997, NRC staff completed the semiannual Plant Performance Review (PPR) of Fermi Nuclear Station Unit 2. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Fermi 2 involved the participation of all Region 111 technical divisions as well as responsible NRR staff. in evaluating inspection results and safety performance information for the period of October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned update for the inspection effort resulting from the Fermi 2 PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our site focus group, may occur at any

. time in support of the Core inspection program.

I I

l\\\\h}\\\\h}\\\\h}\\$}}\\I\\\\kkI 9707240148 970717 PDR ADOCK 05000341 P PDR

. = - o N f D. R. Gipson ' We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments. If changes are necessary, you will be informed. If you have any questions or comments, please contact Mr. Michael Jordan at (630) 829-9637. Sincerely, /s/Stevie DuPont for Michael J. Jordan, Chief Reactor Projects Branch 5 i Docket No. 50-341 License Nos. NPF-43

Enclosure:

Inspection Plan cc w/ encl: N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public j Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct - PUBLIC IE-01 w/enci DRP w/enci OC/LFDCB w/enct Rlli PRR w/ encl l SRI Fermi w/ encl A. B. Beach w/ encl Rlli Enf Coordinator w/enci Deputy RA w/ encl DRS w/ encl (2) SEE PREVIOUS CONCURRENCES DOCUMENT NAME: r:\\ inspect.ptn\\ fermi \\insppin5.fer To wceive e copy of this document, indicate in the boa 'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

  • N* = No copy OFFICE Rlll

,JF Rlli l Rlli Rlli l NAME Jorda#@b Kozak Creed Ring DATE 07//V97 07/ /97 07/ /97 07/ /97 OFFICIAL RECORD COPY

i D. R. Gipson. We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments, if changes are necesrsry, you will be informed if you have any questions or comments, please contact Mr. Michael l Jordan at (630) 829-9637. Sincerely, i A") Geoffrey 5. Grant, Direete ic A4 dP Divisica-af4eact-or-Frojects .jp p /, % 4 j 5 N Docket No. 50 341 License Nos. NPF-43 i

Enclosure:

Inspection Plan i l cc w/ encl: N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct PUBLIC IE-01 w/ encl DRP w/ encl OC/LFDCB w/encI Rill PRR wienci SRI Fermi w/ encl A. B. Beach w/enct Rlli Enf Coordinator w/enct Deputy RA w/enct DRS w/ encl (2) DOCUMENT NAME: r:\\ inspect. pin \\ fermi \\insppin5.fer To receive a copy of this document, indicate in the box *C* = Copy without attachment' enclosure *E' a. Copy with attachment / enclosure

  • N* = No copy OFFICE Rlll 3 Rlli l6 Rill,l /

k Hlli ( % ,e NAME Jordan:dpd j9>mC6 Cfe$$' Ring-g erm1T/) g i DATE 07/l(/97 07/II/97 0 @ 97 07/I'J/97 0)f" /9 A d OFFICIAL RECORD COPY

-.... -....-_.- ~ ~. -,.- - ~

i

+ j FERMI 2 j t INSPECTION PLAN .i PLANNED TITLE / NUMBER OF INSPECTION TYPE OF INSPECTION - INSPECTION. PROGRAM AREA INSPECTORS DATES COMMENTS Tl 2515/132 Vehicle Barrier System 1 8/4-5/97 Tl inspection Engineering & Technical 2-5 '8/4-15/97 Core inspection Support ~ 9/8-12/97 IP - Inspection Procedure Tl - Temporary Instructica Core inspection - Minimum NRC Program (mandatory all plants) = m m. u-- >------ a-1-----2---------u--- is---- - > -. -m-- nn. - -


'. 2----

u .}}