ML20149G964
| ML20149G964 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/17/1997 |
| From: | Jordan M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| References | |
| NUDOCS 9707240148 | |
| Download: ML20149G964 (4) | |
Text
-
e-jp*%q UNITED STATES 4
k NUCLEAR REGULATORY COMMISSION 3
8 REGION lit j
E*
E i
801 WARRENVILLE ROAD
~ %,
8 i
UsLE. ILUNOls 60532-4351
{
July 17, 1997 l
Mr. D. R. Gipson Senior Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI-48166
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - FERMI 2
Dear Mr. Gipson:
~
On March 18,1997, NRC staff completed the semiannual Plant Performance Review (PPR) of Fermi Nuclear Station Unit 2. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Fermi 2 involved the participation of all Region 111 technical divisions as well as responsible NRR staff. in evaluating inspection results and safety performance information for the period of October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned update for the inspection effort resulting from the Fermi 2 PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our site focus group, may occur at any
. time in support of the Core inspection program.
I I
l\\\\h}\\\\h}\\\\h}\\$}}\\I\\\\kkI 9707240148 970717 PDR ADOCK 05000341 P PDR
. = - o N f D. R. Gipson ' We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments. If changes are necessary, you will be informed. If you have any questions or comments, please contact Mr. Michael Jordan at (630) 829-9637. Sincerely, /s/Stevie DuPont for Michael J. Jordan, Chief Reactor Projects Branch 5 i Docket No. 50-341 License Nos. NPF-43
Enclosure:
Inspection Plan cc w/ encl: N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public j Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct - PUBLIC IE-01 w/enci DRP w/enci OC/LFDCB w/enct Rlli PRR w/ encl l SRI Fermi w/ encl A. B. Beach w/ encl Rlli Enf Coordinator w/enci Deputy RA w/ encl DRS w/ encl (2) SEE PREVIOUS CONCURRENCES DOCUMENT NAME: r:\\ inspect.ptn\\ fermi \\insppin5.fer To wceive e copy of this document, indicate in the boa 'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
- N* = No copy OFFICE Rlll
,JF Rlli l Rlli Rlli l NAME Jorda#@b Kozak Creed Ring DATE 07//V97 07/ /97 07/ /97 07/ /97 OFFICIAL RECORD COPY
i D. R. Gipson. We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments, if changes are necesrsry, you will be informed if you have any questions or comments, please contact Mr. Michael l Jordan at (630) 829-9637. Sincerely, i A") Geoffrey 5. Grant, Direete ic A4 dP Divisica-af4eact-or-Frojects .jp p /, % 4 j 5 N Docket No. 50 341 License Nos. NPF-43 i
Enclosure:
Inspection Plan i l cc w/ encl: N. Peterson, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Monroe County, Emergency Management Division Docket File w/enct Project Manager, NRR w/enct PUBLIC IE-01 w/ encl DRP w/ encl OC/LFDCB w/encI Rill PRR wienci SRI Fermi w/ encl A. B. Beach w/enct Rlli Enf Coordinator w/enct Deputy RA w/enct DRS w/ encl (2) DOCUMENT NAME: r:\\ inspect. pin \\ fermi \\insppin5.fer To receive a copy of this document, indicate in the box *C* = Copy without attachment' enclosure *E' a. Copy with attachment / enclosure
- N* = No copy OFFICE Rlll 3 Rlli l6 Rill,l /
k Hlli ( % ,e NAME Jordan:dpd j9>mC6 Cfe$$' Ring-g erm1T/) g i DATE 07/l(/97 07/II/97 0 @ 97 07/I'J/97 0)f" /9 A d OFFICIAL RECORD COPY
-.... -....-_.- ~ ~. -,.- - ~
- i
+ j FERMI 2 j t INSPECTION PLAN .i PLANNED TITLE / NUMBER OF INSPECTION TYPE OF INSPECTION - INSPECTION. PROGRAM AREA INSPECTORS DATES COMMENTS Tl 2515/132 Vehicle Barrier System 1 8/4-5/97 Tl inspection Engineering & Technical 2-5 '8/4-15/97 Core inspection Support ~ 9/8-12/97 IP - Inspection Procedure Tl - Temporary Instructica Core inspection - Minimum NRC Program (mandatory all plants) = m m. u-- >------ a-1-----2---------u--- is---- - > -. -m-- nn. - -
'. 2----
u .}}