{{#Wiki_filter:l                                                                 j7 pg]4 April 25,1983 Docket Nos. 50-277 and 50-278 FACILITY: Peach Bottom Atomic Power Station, Units 2 and 3 LICENSEE: Philadelphia Electric Company (PECo)
{{#Wiki_filter:l j7 pg]4 April 25,1983 Docket Nos. 50-277 and 50-278 FACILITY: Peach Bottom Atomic Power Station, Units 2 and 3 LICENSEE: Philadelphia Electric Company (PECo)


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 5,1983 MEETING WITH PHILADELPHIA ELECTRIC COMPANY PERTAIriING TO STATUS OF REVIEW 0F APPENDIX R MODIFICATIONS Members of the NRC staff met with representatives of Philadelphia Electric Company (the licensee) on April 5,1983. A list of the meeting attendees is provided as Enclosure 1. The purpose of the meeting was to discuss the status of Appendix R. Fire Protection Program, modifications at the licensee's Peach Bottom facility. The licensee confirmed three areas of Appendix R (10 CFR Part 50, Appendix R) where additional work, design and modifications still were required; namely, Section III G. Safe Shutdown capability Section M. Cable Penetration Seal Qualification, and Section III F Automatic Fire Detection. Presentations on these three areas by the licensee included a general description of modifications to be performed and target dates for submittal of design descriptions and completion of modifications. The licensee was asked to submit to the NRC within a short time period (approximately two weeks) a summary of its Peach Bottom's Appendix R status highlighting the three areas discussed at this meeting.
OF THE APRIL 5,1983 MEETING WITH PHILADELPHIA ELECTRIC COMPANY PERTAIriING TO STATUS OF REVIEW 0F APPENDIX R MODIFICATIONS Members of the NRC staff met with representatives of Philadelphia Electric Company (the licensee) on April 5,1983. A list of the meeting attendees is provided as Enclosure 1.
The purpose of the meeting was to discuss the status of Appendix R. Fire Protection Program, modifications at the licensee's Peach Bottom facility. The licensee confirmed three areas of Appendix R (10 CFR Part 50, Appendix R) where additional work, design and modifications still were required; namely, Section III G. Safe Shutdown capability Section M. Cable Penetration Seal Qualification, and Section III F Automatic Fire Detection. Presentations on these three areas by the licensee included a general description of modifications to be performed and target dates for submittal of design descriptions and completion of modifications. The licensee was asked to submit to the NRC within a short time period (approximately two weeks) a summary of its Peach Bottom's Appendix R status highlighting the three areas discussed at this meeting.
4:183?
4:183?
Gerald E. Gears, Project Manager Operating Reactors Branch No. 4 Division of Licensing
Gerald E. Gears, Project Manager Operating Reactors Branch No. 4 Division of Licensing


==Enclosure:==
==Enclosure:==
As stated 8305040716 830425 PDR ADOCK 05000277 F
PDR omce>
B # 4..:.D.. L...
45.1...
.- n.
NAC FORM 318 00-80)NRCM ON3 OFFICIAL RECORD COPY usceo:mi moco


As stated 8305040716 830425 PDR ADOCK 05000277 F                                PDR omce>        B # 4. .:.D. . L. .... . . . . . . . . . . . . . . . . . .
?
45.1.. .
    .- n .        . . . . . . .      . . . . . . . . . . . . . . . . . .  .. ... ..
NAC FORM 318 00-80)NRCM ON3                                                  OFFICIAL RECORD COPY                                                                                                                            usceo:mi moco
 
                                                                                                        ?
MEETING  
MEETING  


==SUMMARY==
==SUMMARY==
DISTRIBUTION       -
DISTRIBUTION Licensee: Philadelphia Electric Company
Licensee: Philadelphia Electric Company
* Copies also sent to those people on service (cc') 1,1,st. for subject plant (s).,
* Copies also sent to those people on service (cc') 1,1,st. for subject plant (s). ,
Docket File NRC PDR L PDR ORBi4 Rdg I
Docket File NRC PDR                                                                             -
Project Manager-GGears JStolz Glainas Licensing Assistant-RIngram OELD JHeltames, AE0D ELJordan, IE JHTaylor, IE ACRS- (10)
L PDR                                                     *'
ORBi4 Rdg                                                                             I Project Manager-GGears JStolz Glainas                         .',
Licensing Assistant-RIngram OELD JHeltames, AE0D ELJordan, IE JHTaylor, IE ACRS- (10)
NSIC NRC Meeting
NSIC NRC Meeting


==Participants:==
==Participants:==
WJohns ton TWamEach                                                 -
WJohns ton TWamEach RFerguson BShields-KCyr JStang RVollmer ABlough LWhitney t
RFerguson BShields-KCyr JStang                               .
RVollmer ABlough LWhitney t
e w
e w
                                                                                        ~
~


MEETING WITH PHILADELPHIA ELECTRIC COMPANY                         .*
MEETING WITH PHILADELPHIA ELECTRIC COMPANY APRIL 5, 1983
APRIL 5, 1983


==SUBJECT:==
==SUBJECT:==
APPENDIX R NAME                                       ORGANIZATION
APPENDIX R NAME ORGANIZATION
        - Gerald E. Gears                             Project Manager, DL, NRR         ,
- Gerald E. Gears Project Manager, DL, NRR Victor Benaroya CMEB, DE, NRR William V. Johnston DE NRR T. V. Wambach ORB #S, DL, NRR R. L. Ferguson CMEB, DL, NRR Bill Shields ELD, NRC I
Victor Benaroya                             CMEB, DE, NRR William V. Johnston                         DE NRR T. V. Wambach         -                    ORB #S, DL, NRR R. L. Ferguson                               CMEB, DL, NRR                 ,
Karen Cyr -
Bill Shields                           .. ELD, NRC I
ELD, NRC A. R. Blough Resident Inspector, Region I, NRC Leon E. Whitney IE, DQASIP, ORPB, Section I W. T. Ullrich PECo, Supt. Nuc. Services S. A. Spitis.,
Karen Cyr -                                 ELD, NRC A. R. Blough                                 Resident Inspector, Region I, NRC Leon E. Whitney           ,,
PECo, PBAPS Staff G. Morley PECo, Supv. Eng. Mech. Engineering
IE, DQASIP, ORPB, Section I W. T. Ullrich             , .                PECo, Supt. Nuc. Services S. A. Spitis . ,                             PECo, PBAPS Staff G. Morley                                   PECo, Supv. Eng. Mech. Engineering       ~
~
Gary J. Reid                                 PECo, Mechanical Engineering Douglas M. Groves                           PECo, Mechanical Engineering Troy B. Conner, Jr.                         Conner & Wetterhahn, P.C.
Gary J. Reid PECo, Mechanical Engineering Douglas M. Groves PECo, Mechanical Engineering Troy B. Conner, Jr.
Eugene J. Bradley                           PECo R. J. Lees                                   PECo, Electrical Engineering V. S. Boyer                                 PEco, Senior VP Nuclear Power W. J. Mindick                               PECo, Electrical Engineering W. C. Birely                                 PECo, Nuclear Section John Stang                           -
Conner & Wetterhahn, P.C.
CHEB, DE, NRR R. Vollmer                                   Director, DE, NRR O
Eugene J. Bradley PECo R. J. Lees PECo, Electrical Engineering V. S. Boyer PEco, Senior VP Nuclear Power W. J. Mindick PECo, Electrical Engineering W. C. Birely PECo, Nuclear Section John Stang CHEB, DE, NRR R. Vollmer Director, DE, NRR O
F}}
F v}}

Latest revision as of 07:26, 11 December 2024

Summary of 830405 Meeting W/Util in Bethesda,Md Re Status of App R Concerning Fire Protection Program Mods at Facility
ML20151H628
Person / Time
Site: Peach Bottom  
Issue date: 04/25/1983
From: Gears G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8305040716
Download: ML20151H628 (3)


Text

l j7 pg]4 April 25,1983 Docket Nos. 50-277 and 50-278 FACILITY: Peach Bottom Atomic Power Station, Units 2 and 3 LICENSEE: Philadelphia Electric Company (PECo)

SUBJECT:

SUMMARY

OF THE APRIL 5,1983 MEETING WITH PHILADELPHIA ELECTRIC COMPANY PERTAIriING TO STATUS OF REVIEW 0F APPENDIX R MODIFICATIONS Members of the NRC staff met with representatives of Philadelphia Electric Company (the licensee) on April 5,1983. A list of the meeting attendees is provided as Enclosure 1.

The purpose of the meeting was to discuss the status of Appendix R. Fire Protection Program, modifications at the licensee's Peach Bottom facility. The licensee confirmed three areas of Appendix R (10 CFR Part 50, Appendix R) where additional work, design and modifications still were required; namely,Section III G. Safe Shutdown capability Section M. Cable Penetration Seal Qualification, and Section III F Automatic Fire Detection. Presentations on these three areas by the licensee included a general description of modifications to be performed and target dates for submittal of design descriptions and completion of modifications. The licensee was asked to submit to the NRC within a short time period (approximately two weeks) a summary of its Peach Bottom's Appendix R status highlighting the three areas discussed at this meeting.

4:183?

Gerald E. Gears, Project Manager Operating Reactors Branch No. 4 Division of Licensing

Enclosure:

As stated 8305040716 830425 PDR ADOCK 05000277 F

PDR omce>

B # 4..:.D.. L...

45.1...

.- n.

NAC FORM 318 00-80)NRCM ON3 OFFICIAL RECORD COPY usceo:mi moco

?

MEETING

SUMMARY

DISTRIBUTION Licensee: Philadelphia Electric Company

  • Copies also sent to those people on service (cc') 1,1,st. for subject plant (s).,

Docket File NRC PDR L PDR ORBi4 Rdg I

Project Manager-GGears JStolz Glainas Licensing Assistant-RIngram OELD JHeltames, AE0D ELJordan, IE JHTaylor, IE ACRS- (10)

NSIC NRC Meeting

Participants:

WJohns ton TWamEach RFerguson BShields-KCyr JStang RVollmer ABlough LWhitney t

e w

~

MEETING WITH PHILADELPHIA ELECTRIC COMPANY APRIL 5, 1983

SUBJECT:

APPENDIX R NAME ORGANIZATION

- Gerald E. Gears Project Manager, DL, NRR Victor Benaroya CMEB, DE, NRR William V. Johnston DE NRR T. V. Wambach ORB #S, DL, NRR R. L. Ferguson CMEB, DL, NRR Bill Shields ELD, NRC I

Karen Cyr -

ELD, NRC A. R. Blough Resident Inspector, Region I, NRC Leon E. Whitney IE, DQASIP, ORPB,Section I W. T. Ullrich PECo, Supt. Nuc. Services S. A. Spitis.,

PECo, PBAPS Staff G. Morley PECo, Supv. Eng. Mech. Engineering

~

Gary J. Reid PECo, Mechanical Engineering Douglas M. Groves PECo, Mechanical Engineering Troy B. Conner, Jr.

Conner & Wetterhahn, P.C.

Eugene J. Bradley PECo R. J. Lees PECo, Electrical Engineering V. S. Boyer PEco, Senior VP Nuclear Power W. J. Mindick PECo, Electrical Engineering W. C. Birely PECo, Nuclear Section John Stang CHEB, DE, NRR R. Vollmer Director, DE, NRR O

F v