ML20151N478: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
OPERATING DATA REPORT | OPERATING DATA REPORT DOCKET NO. | ||
DOCKET NO. | 50-443 DATE 08/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078) | ||
OPERATING STATUS | OPERATING STATUS 1. | ||
Unit Name: | |||
Seabrook Station Unit 1 2. | |||
: 3. - Licensed Thermal Power (MWt): | Reporting Period: | ||
JULY 1988 | |||
: 3. - Licensed Thermal Power (MWt): | |||
3411 4. | |||
Nameplate Rating (Gross MWe): | |||
1197 5. | |||
Since Last Report, Give Reasons: | Design Ele (.trical Rating (Net MWe): | ||
1148 6. | |||
: 10. Reasons For Restrictions, If Any: | Maximum Dependable Capacity (Gross MWe): | ||
This Month | 1197 (Initial design value) 7. | ||
: 11. Hours In Reporting Feriod | Maximum Dependable Capacity (Net MWe): | ||
: 12. Number Of Hours Reactor Was Critical | 1148 (Initial design value) 8. | ||
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) | |||
: 15. Unit Reserve Shutdown Hours | Since Last Report, Give Reasons: | ||
: 16. Gross Thermal Energy Generated (MWH) | Not Applicable 9. | ||
Power Level To Which Restricted, If Any (Net MWe): | |||
Zero power | |||
: 10. Reasons For Restrictions, If Any: | |||
License issued on 10/17/86 is a zero power license which allows fuel loading and perfonnance of non-nuclear testing. | |||
This Month Yr.-to-Date Cumulative | |||
: 11. Hours In Reporting Feriod 744.0 5111.0 15696.0 | |||
: 12. Number Of Hours Reactor Was Critical | |||
: 13. Reactor Reserve Shutdown Hours | |||
- 0.0 0.0 0.0 0.0 0.0 0.0 l | |||
: 14. Hours Generator On-Line 0.0 0.0 0.0 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Generated (MWH) 0 0 | |||
0 | 0 | ||
: 18. Net Elcctrical Energy Generated (MWH) | : 17. Gross Elec. Energy Generated (MWH) 0 0 | ||
: 19. Unit Service Factor | 0 | ||
: 20. Unit Availability Factor | : 18. Net Elcctrical Energy Generated (MWH) 0 0 | ||
: 21. Unit Capacity Factor (Using MDC Net) | 0 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 19. Unit Service Factor 0.0 0.0 0.0 | ||
: 23. Unit Forced Outage Rate | : 20. Unit Availability Factor 0.0 0.0 0.0 | ||
: 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 0.0 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
Not Scheduled | Not Scheduled | ||
: 25. If Shut Down At End Of Report Period. Estimated Date Of Startup: Not Applicable l | : 25. If Shut Down At End Of Report Period. Estimated Date Of Startup: Not Applicable l | ||
: 26. Units In Test Status (Prior to Coninercial Operation): Forecast | : 26. Units In Test Status (Prior to Coninercial Operation): Forecast Achieved INITIAL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable COMMERCIAL OPERATION 1988 Not Applicable 1 of 5 8808090011 680731 8/ | ||
PDR | PDR ADOCK 05000443 R | ||
PDC | |||
't 6 | |||
MONTH JULY. 1988 DAY | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
17 | 50-443 UNIT Seabrook 1 OATE 08/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078) | ||
MONTH JULY. 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
[ | (MWe-Net) 1 0 | ||
16 0 | |||
2 0 | |||
17 0 | |||
3 0 | |||
18 0 | |||
4 0 | |||
19 0 | |||
5 | |||
'O 20 0 | |||
6 0 | |||
21 0 | |||
7 0 | |||
22 0 | |||
8 0 | |||
23 0 | |||
9 0 | |||
24 0 | |||
10 0 | |||
25 0 | |||
11 0 | |||
26 0 | |||
12 0 | |||
27 0 | |||
13 0 | |||
28 0 | |||
14 0 | |||
29 0 | |||
15 0 | |||
30 0 | |||
31 0 | |||
l | |||
[ | |||
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Het for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
l l | l l | ||
2 of 5 | 2 of 5 | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Stabrook 1 DATE 08/02/88 COMPLETED BY P. Nardone REPORT MONTH JULY, 1988 TELEPHONE (603) 474-9521 (Ext. 4078) | ||
No. Date Typel Duration Reason 2 Method of Licensee Cause & Corrective | |||
~ | |||
(Hours) | |||
Shutting Event Action to Down Reacter3 Report # | |||
Prevent Recurrence l | |||
1 NO ENTRIES FOR THIS MONTH 4 | 1 NO ENTRIES FOR THIS MONTH 4 | ||
I | I 1 | ||
2 3 | |||
H-Other (Explain) | l F: Forced Reason: | ||
Method: | |||
S: Scheduled A-Equipment Failure (Explain) 1-Manual l | |||
B-Haintenance or Test 2-Manual Scram C-Refueling 3-Autanatic Scram 0-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction j | |||
G-Operational Error (Explain) | |||
(Duration = 0) | |||
H-Other (Explain) 9-Other (Explain) 3 of 5 | |||
7 Dockot No. | 7 Dockot No. | ||
Completed By | 50-443 Date 08/02/88 Unit Name Seabrook 1 Completed By P. Nardone Telephone (603) 474-9521 (Ext. 4078) | ||
(Ext. 4078) | ~ | ||
CORRECTIVE MAINTENANCE | CORRECTIVE MAINTENANCE | ||
==SUMMARY== | ==SUMMARY== | ||
FOR SAFETY RELATED EQUIPMENT | FOR SAFETY RELATED EQUIPMENT Page 1 of 1 REPORT MONTH JULY, 1988 DATE SYSTEM COMP 0NENT MAINTENANCE ACTION 07/01/88 Containment 1-CBS-V-2 Motor operated valve experiencing high Building Train A open run current. Replaced motor on Spray RWST To valve. | ||
REPORT MONTH | Spray Pump 9A Isolation 07/08/88 Control 1-CBA-FN-36A Fan outboard bearing worn. Replaced Building Train A inboard and outboard bearings on fan. | ||
Building | Air Control Room Air Conditioning Condenser Fan 07/12/88 Various Auxiliary Relay Magnetic block overheating problem with Magnetic Block ITE type J-10 relays. Replaced magnetic blocks on all safety related J-10 relays. | ||
Spray Pump 9A | 07/22/88 Chemical and 1-CS-P-2B Outboard mechanical seal failed. | ||
Isolation | Volume Control Train B Reworked inboard and outboard seals on Centrifugal pump. | ||
07/08/88 | |||
Air | |||
07/22/88 | |||
Volume Control | |||
Charging Pump 4 of 5 | Charging Pump 4 of 5 | ||
r- | r-1 Docket No. | ||
1 | 50-443 Date: | ||
08/07/88 | |||
Docket No. | ^ | ||
Canpleted By: | |||
(Ext. 4078) | P. Nardone Telephone: | ||
(603) 474-9521 (Ext. 4078) | |||
REFUELING INFORMATION REQUEST 1 | REFUELING INFORMATION REQUEST 1 | ||
: 1. Name of facility: | |||
: 1. Name of facility: | Seabrook Unit 1 | ||
: 2. Scheduled date for next refueling shutdown: | : 2. Scheduled date for next refueling shutdown: | ||
: 3. Scheduled date for restart following refueling: | Not Scheduled | ||
: 3. Scheduled date for restart following refueling: | |||
Not Scheduled | |||
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | : 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | ||
Unknown at this time. | Unknown at this time. | ||
| Line 103: | Line 160: | ||
None | None | ||
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | : 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | ||
(a) | (a) | ||
In Core: | |||
193 (b), | |||
0 | |||
: 8. The present licensed spent fuel pool storage capaci;y and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | : 8. The present licensed spent fuel pool storage capaci;y and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | ||
Present licensed capacity: | Present licensed capacity: | ||
1236 No increase in storage capacity requested or planned. | |||
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | : 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | ||
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | ||
| Line 111: | Line 172: | ||
5 of 5 | 5 of 5 | ||
f | f George S. Th7mos Vice President Nuclear Production t | ||
PubHc Service of Now Hampshire New Hampshire Yankee Division NYN- 88106 August 3, 1988 United States Nuclear Regulatory Com:nission Washington, DC 20555 Attention: | PubHc Service of Now Hampshire New Hampshire Yankee Division NYN-88106 August 3, 1988 United States Nuclear Regulatory Com:nission Washington, DC 20555 Attention: | ||
Document Control Desk | |||
==Reference:== | ==Reference:== | ||
| Line 121: | Line 183: | ||
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-07 covering the operation and shutdown experience relating to Seabrook Statica Unit 1. | In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-07 covering the operation and shutdown experience relating to Seabrook Statica Unit 1. | ||
Very truly yours, C | Very truly yours, C | ||
George S. Thomas Enclosure cc: | George S. Thomas Enclosure cc: | ||
Regional Administrator United States Nuclear Regulatory Commission Region 1 425 Allendale Road King of Prussia, PA 19406 Mr. A. | |||
C. Cerne NRC Senior Resident Inspector Seabrook Station Seabrook, NH 03874 l | |||
t l | t l | ||
l l | l l | ||
P.O. Box 300 . Seabrook. NH 03874 . Telephone (603) 474-9574 | P.O. Box 300. Seabrook. NH 03874. Telephone (603) 474-9574 I l l | ||
t | |||
,}} | |||
Latest revision as of 05:45, 11 December 2024
| ML20151N478 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/31/1988 |
| From: | Nardone P, George Thomas PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NYN-88106, NUDOCS 8808090011 | |
| Download: ML20151N478 (6) | |
Text
-
OPERATING DATA REPORT DOCKET NO.
50-443 DATE 08/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078)
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
JULY 1988
- 3. - Licensed Thermal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Ele (.trical Rating (Net MWe):
1148 6.
Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Maximum Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any (Net MWe):
Zero power
- 10. Reasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power license which allows fuel loading and perfonnance of non-nuclear testing.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Feriod 744.0 5111.0 15696.0
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 0.0 0.0 0.0 0.0 0.0 0.0 l
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Elec. Energy Generated (MWH) 0 0
0
- 18. Net Elcctrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. Unit Forced Outage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Not Scheduled
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startup: Not Applicable l
- 26. Units In Test Status (Prior to Coninercial Operation): Forecast Achieved INITIAL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable COMMERCIAL OPERATION 1988 Not Applicable 1 of 5 8808090011 680731 8/
PDR ADOCK 05000443 R
't 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-443 UNIT Seabrook 1 OATE 08/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078)
MONTH JULY. 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5
'O 20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
l
[
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Het for each day in the reporting month.
Compute to the nearest whole megawatt.
l l
2 of 5
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Stabrook 1 DATE 08/02/88 COMPLETED BY P. Nardone REPORT MONTH JULY, 1988 TELEPHONE (603) 474-9521 (Ext. 4078)
No. Date Typel Duration Reason 2 Method of Licensee Cause & Corrective
~
(Hours)
Shutting Event Action to Down Reacter3 Report #
Prevent Recurrence l
1 NO ENTRIES FOR THIS MONTH 4
I 1
2 3
l F: Forced Reason:
Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual l
B-Haintenance or Test 2-Manual Scram C-Refueling 3-Autanatic Scram 0-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction j
G-Operational Error (Explain)
(Duration = 0)
H-Other (Explain) 9-Other (Explain) 3 of 5
7 Dockot No.
50-443 Date 08/02/88 Unit Name Seabrook 1 Completed By P. Nardone Telephone (603) 474-9521 (Ext. 4078)
~
CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Page 1 of 1 REPORT MONTH JULY, 1988 DATE SYSTEM COMP 0NENT MAINTENANCE ACTION 07/01/88 Containment 1-CBS-V-2 Motor operated valve experiencing high Building Train A open run current. Replaced motor on Spray RWST To valve.
Spray Pump 9A Isolation 07/08/88 Control 1-CBA-FN-36A Fan outboard bearing worn. Replaced Building Train A inboard and outboard bearings on fan.
Air Control Room Air Conditioning Condenser Fan 07/12/88 Various Auxiliary Relay Magnetic block overheating problem with Magnetic Block ITE type J-10 relays. Replaced magnetic blocks on all safety related J-10 relays.
07/22/88 Chemical and 1-CS-P-2B Outboard mechanical seal failed.
Volume Control Train B Reworked inboard and outboard seals on Centrifugal pump.
Charging Pump 4 of 5
r-1 Docket No.
50-443 Date:
08/07/88
^
Canpleted By:
P. Nardone Telephone:
(603) 474-9521 (Ext. 4078)
REFUELING INFORMATION REQUEST 1
- 1. Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
Not Scheduled
- 3. Scheduled date for restart following refueling:
Not Scheduled
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Unknown at this time.
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
193 (b),
0
- 8. The present licensed spent fuel pool storage capaci;y and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
The current licensed capacity is adequate until at least the year 2007.
5 of 5
f George S. Th7mos Vice President Nuclear Production t
PubHc Service of Now Hampshire New Hampshire Yankee Division NYN-88106 August 3, 1988 United States Nuclear Regulatory Com:nission Washington, DC 20555 Attention:
Document Control Desk
Reference:
Facility Operating License No. NPF-56, Docket No. 50-443
Subject:
Monthly Operating Report Gentlemen:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-07 covering the operation and shutdown experience relating to Seabrook Statica Unit 1.
Very truly yours, C
George S. Thomas Enclosure cc:
Regional Administrator United States Nuclear Regulatory Commission Region 1 425 Allendale Road King of Prussia, PA 19406 Mr. A.