ML20151X599: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
Z Pot Muwa PRELIMINARY NOTIFICATION | -. _ _ ~. | ||
June 29, 1977" J gg -f, PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-77 118 This preliminary notification constitutes EARLY notice of an event of | Z Pot Muwa PRELIMINARY NOTIFICATION C0(3Q %y'[ ' ~ | ||
Facility: Northeast Nuclear Energy Company | June 29, 1977" J | ||
Millstone Point Unit 2 Waterford, Connecticut (DN50-336) | gg - | ||
Sybject: | f, PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-77 118 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. | ||
the cause of the problem. Adverse findings could lead to an extended shutdown exceeding one month. There are no nuclear safety issues involved in this shutdown. | The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date. | ||
I Media interest is expected because of close attention given to operating | Facility: Northeast Nuclear Energy Company Millstone Point Unit 2 Waterford, Connecticut (DN50-336) | ||
NRC, Region I, (Philadelphia) received notification of this occurrence | Sybject: | ||
by telephone from the Unit Superintendent at 2:15 p.m., June 29, 1977. | UNPLANNED FACILITY SHUTDOWN The unit was shutdown from 96 percent power at 7:02.a.m., June 29, 1977, due to indications of gas in the main output transformer's oil cooling system. The shutdown will last for a minimum of four days to investigate the cause of the problem. Adverse findings could lead to an extended shutdown exceeding one month. There are no nuclear safety issues involved in this shutdown. | ||
I Media interest is expected because of close attention given to operating i | |||
problems at Millstone Point facilities. The State of Connecticut has been informed. A press release is being considered by the licensee. | |||
NRC, Region I, (Philadelphia) received notification of this occurrence by telephone from the Unit Superintendent at 2:15 p.m., June 29, 1977. | |||
==Contact:== | ==Contact:== | ||
GKlingler, IE x27451 FNolan, IE x27451 JSniezek, IE x27451 Distribution: | GKlingler, IE x27451 FNolan, IE x27451 JSniezek, IE x27451 Transmitted H St M'.Y O Distribution: | ||
Diairman Rowden | Diairman Rowden C. C Kammerer, CA G. F. Murphy, JCAE Comissioner Kennedy S. J. Chilk, SECY H. H. Whiteside, SCNR Commissioner Gilinsky H. R. Myers, HCEE Transmitted: MNBB h k P Bldg IO SS Bldg Y! V f L. V. Gossick, EDO E. G. Case, NRR C. V. Smith,l@ S S. H. Hanauer, EDO J. A. Harris, PA W. C. Mcdonald, MIPC Luge (MAIL) | ||
PDR | E.Volgenau$fla IE 1 | ||
R. G. Ryan, OSP T. J. McTiernan, OIA Region i H. K. Shapar, ELD PRELIMINARY NOTIFICATION 17'022 I | |||
9609170171 770629 TO)b e | |||
PDR I&E 1 | |||
PNO-77-118 PDR | |||
// | |||
~ | |||
.b | |||
.}} | |||
Latest revision as of 03:53, 11 December 2024
| ML20151X599 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/29/1977 |
| From: | Klingler G, Nolan F, Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNO-77-118, NUDOCS 9809170171 | |
| Download: ML20151X599 (1) | |
Text
-
-. _ _ ~.
Z Pot Muwa PRELIMINARY NOTIFICATION C0(3Q %y'[ ' ~
June 29, 1977" J
gg -
f, PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-77 118 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility: Northeast Nuclear Energy Company Millstone Point Unit 2 Waterford, Connecticut (DN50-336)
Sybject:
UNPLANNED FACILITY SHUTDOWN The unit was shutdown from 96 percent power at 7:02.a.m., June 29, 1977, due to indications of gas in the main output transformer's oil cooling system. The shutdown will last for a minimum of four days to investigate the cause of the problem. Adverse findings could lead to an extended shutdown exceeding one month. There are no nuclear safety issues involved in this shutdown.
I Media interest is expected because of close attention given to operating i
problems at Millstone Point facilities. The State of Connecticut has been informed. A press release is being considered by the licensee.
NRC, Region I, (Philadelphia) received notification of this occurrence by telephone from the Unit Superintendent at 2:15 p.m., June 29, 1977.
Contact:
GKlingler, IE x27451 FNolan, IE x27451 JSniezek, IE x27451 Transmitted H St M'.Y O Distribution:
Diairman Rowden C. C Kammerer, CA G. F. Murphy, JCAE Comissioner Kennedy S. J. Chilk, SECY H. H. Whiteside, SCNR Commissioner Gilinsky H. R. Myers, HCEE Transmitted: MNBB h k P Bldg IO SS Bldg Y! V f L. V. Gossick, EDO E. G. Case, NRR C. V. Smith,l@ S S. H. Hanauer, EDO J. A. Harris, PA W. C. Mcdonald, MIPC Luge (MAIL)
E.Volgenau$fla IE 1
R. G. Ryan, OSP T. J. McTiernan, OIA Region i H. K. Shapar, ELD PRELIMINARY NOTIFICATION 17'022 I
9609170171 770629 TO)b e
PDR I&E 1
PNO-77-118 PDR
//
~
.b
.