ML20154F097: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:. _ _ _ - _ _ _ _
{{#Wiki_filter:. _ _ _ - _ _ _ _
U$VERSITY wUTAH                                 r
U$VERSITY J'/
                                                                                              ./
wUTAH r
                                                                                                  /                                J'/
/
                                                                                                                /
./
                                                                                                            ./
/
                                                                                                          /
./
/
[
[
August 25,1988         / '
August 25,1988
6   .
/
Jaraes M. Taylor Deputy Executive Director for Regional Operations U. S. Nuclear Regulatory Commhsion Washington, D. C. 20355
6 Jaraes M. Taylor Deputy Executive Director for Regional Operations U. S. Nuclear Regulatory Commhsion Washington, D. C. 20355


==Dear Sir:==
==Dear Sir:==
 
Pursuant to the telephone conversation between NRC Region IV and the Licensee on 23 August 1988 the following additional information is provided regarding the University of Utah's response, dated 4 August 1938, to Notice of Violation and Deviation, Report 50-407/88 07, 50-0723/88-01, University of Utah Reactors (License R 25: AGN 201, Docket 50 072 and License R 126: TRIGA, Docket 50-407).
Pursuant to the telephone conversation between NRC Region IV and the Licensee on 23 August 1988 the following additional information is provided regarding the University of Utah's response, dated 4 August 1938, to Notice of Violation and Deviation, Report 50-407/88 07, 50-0723/88-01, University of Utah Reactors (License R 25: AGN 201, Docket 50 072 and License R 126: TRIGA , Docket 50-407).
Violation 2 (407/880102). In addition to the revised written procedure for insertion and I
Violation 2 (407/880102). In addition to the revised written procedure for insertion and I
removal of heavy water tanks, the Licensee has modified its checkout procedure for operation of the TRIGA reactor (see enclosed form NEL 001, Sheet 1) to require that the Maintenance Log be reviewed for any core operations which might affect reactivity. This action will ensure that the operator is apprised of such changes.
removal of heavy water tanks, the Licensee has modified its checkout procedure for operation of the TRIGA reactor (see enclosed form NEL 001, Sheet 1) to require that the Maintenance Log be reviewed for any core operations which might affect reactivity. This action will ensure that the operator is apprised of such changes.
Violation 3 (407/880103). Any component removed from the reactor core which may be radioactive and is not to be immediately placed in a shielded container will be surveyed for contact radiation levels and will be tagged with the maximum radiation reading. The
Violation 3 (407/880103). Any component removed from the reactor core which may be radioactive and is not to be immediately placed in a shielded container will be surveyed for contact radiation levels and will be tagged with the maximum radiation reading. The Facility Operations Manual will be revied by September 5,1988 to reflect this practice.
!          Facility Operations Manual will be revied by September 5,1988 to reflect this practice.
Further, the Radiation Saf:ty Officer has reviewed procedures to ensure that NEL staff are perfornung and documenting such radiation surveys in an acceptable manner.
Further, the Radiation Saf:ty Officer has reviewed procedures to ensure that NEL staff are perfornung and documenting such radiation surveys in an acceptable manner.
Sincerely,                                           ,
Sincerely, pk j 4)
pk j                       4)
Dietrich K. Gehmlich Reactor Administrator cy: NRC Region IV 8809190252 880025 PDR ADOCK 05000072 O
Dietrich K. Gehmlich Reactor Administrator cy: NRC Region IV
PNV t e of the an 2202 Merrdi Engincenng Bwkhng Salt ta' e Oty, l'tah $4112 3
,    8809190252 880025
a Teleptm,3e 901) 5814911 t
  -  PDR   ADOCK 05000072 O                     PNV t e of the an 2202 Merrdi Engincenng Bwkhng Salt ta'a e Oty, l'tah $4112
* 3 Teleptm,3e 901) 5814911                                   ,                  ,
t


Form NEL 001 Sheet 1 RSC Approval:5/25/88
Form NEL 001 Sheet 1 RSC Approval:5/25/88 B.1 TRIG A PRELIMINARY CIIECK SIIFET NO.
.    ''                                                                B.1 TRIG A PRELIMINARY CIIECK SIIFET NO.                                                 DATE, OPERATOR
: DATE, OPERATOR
: 1. Door Closed:               (V)           Front door closed:       (V)               Rad Dose Log:       (V)
: 1. Door Closed:
: 2. Visual inspection of reactor tank and area: _(V) Source & D2 O reflector in core: _ (V)*
(V)
Derraneralizer:             (on-off) Flow rate: _ gal / min Check and date Air Monitor: _(V)
Front door closed:
Deactivate Security System: _(V)                   Deactivate Radiation Alarm Damper:             (V)         j
(V)
: 3. Auxiliary Survey Meter: Make                                   Serial Number                     On _(V)       i Console Power On:               (V)   Source Light On:       (V)   Recorder On:         (V)               l Paper Checked and Dated:                 (V)   Chart Speed Standby:           (V)                             '
Rad Dose Log:
Review Maintenance Log for any core alterations since the last operation which may possibly affect core reactivity:           (V)
(V)
Record Checkout in Operations leg: _(V)                     Log Number:
: 2. Visual inspection of reactor tank and area: _(V) Source & D O reflector in core: _ (V)*
Ventilation System On:               (V)     Damper Lights Checked:           (V) off
2 Derraneralizer:
: 4. Calibrate Radiation Monitor: _(V)                  
(on-off) Flow rate: _ gal / min Check and date Air Monitor: _(V)
Deactivate Security System: _(V)
Deactivate Radiation Alarm Damper:
(V) j
: 3. Auxiliary Survey Meter: Make Serial Number On _(V) i Console Power On:
(V)
Source Light On:
(V)
Recorder On:
(V)
Paper Checked and Dated:
(V)
Chart Speed Standby:
(V)
Review Maintenance Log for any core alterations since the last operation which may possibly affect core reactivity:
(V)
Record Checkout in Operations leg: _(V)
Log Number:
Ventilation System On:
(V)
Damper Lights Checked:
(V) off
: 4. Calibrate Radiation Monitor: _(V)


==Background:==
==Background:==
mR/hr                               ;
mR/hr lon Chamber Voltages LV21: _(14) LVx10:
lon Chamber Voltages                     LV21: _(14) LVx10:             (34) IIVx10:         (74)           !
(34) IIVx10:
Fuel Temperature                         TC#1:       'C TC#2:         'C TC#3:             'C             I Water Conductivity;                 pmho'em (< 5) Water Temperature:                   'C                     i Compare Fuel and Water Temperatures:(NOTE                   0US READINGS TO       ANDSRO)REPORT ANY ANMIX1    !
(74)
Rods Down:               (V)             Shim Position:               Reg Position:                           !
Fuel Temperature TC#1:
: 5. Reactor Room Pressurc.                     1205 E/ outside,           iwg(> .01) 1205 E/1205 D:             iwg(> .01)
'C TC#2:
Radiation Monitor Set Point Check:                         TRIGA Tank:     Low:         (V) liigh:     (V)
'C TC#3:
Ceiling:       low:     (4) liigh:     (V)       Vent:     Low:       (V) liigh: _(4)
'C I
: 6. Recorder to Low Speed:                 (V)   Recorder Pens Down: _(V)
Water Conductivity; pmho'em (< 5)
Linear Power Switch to 1x100: _ (V)                       Log Power Switch to 101: _(V) low leg Cal to "LO" (6x10-3 W) Meter:                             Red Pen:   _            (-10)
Water Temperature:
Low leg Cal to "Ill" (1x100 W)                 Meter:             Red Pen:               (-50 80)
'C i
: 7. Key On:             (V)       LICENSED OPERATOR AND ONE OTiiER PERSON MUST BE PRESENT.
Compare Fuel and Water Temperatures:(NOTE AND REPORT ANY ANMIX 0US READINGS TO SRO)
Rods Down:
(V)
Shim Position:
Reg Position:
: 5. Reactor Room Pressurc.
1205 E/ outside, iwg(>.01) 1205 E/1205 D:
iwg(>.01)
Radiation Monitor Set Point Check:
TRIGA Tank:
Low:
(V) liigh:
(V)
Ceiling:
low:
(4) liigh:
(V)
Vent:
Low:
(V) liigh: _(4)
: 6. Recorder to Low Speed:
(V)
Recorder Pens Down: _(V)
Linear Power Switch to 1x100: _ (V)
Log Power Switch to 101: _(V) low leg Cal to "LO" (6x10-3 W)
Meter:
Red Pen:
(-10)
Low leg Cal to "Ill" (1x100 W)
Meter:
Red Pen:
(-50 80)
: 7. Key On:
(V)
LICENSED OPERATOR AND ONE OTiiER PERSON MUST BE PRESENT.
Additional Personnel:
Additional Personnel:
: 8. Scram Reset:               (V)             WAIT 1 MINUTE BEFORE READING CURRENT.
: 8. Scram Reset:
Magnet Current                             Safety: .     (37)   Shim:       (33)
(V)
          *1f source or D2 O not in core inform R: actor Supervisor before startup.
WAIT 1 MINUTE BEFORE READING CURRENT.
e to            I a r:                                    ec/[t             Date: May 25.1988
Magnet Current Safety:.
_}}
(37)
Shim:
(33)
*1f source or D O not in core inform R: actor Supervisor before startup.
2 ec/[t Date: May 25.1988 e to I a r:
,}}

Latest revision as of 01:01, 11 December 2024

Responds to NRC 880823 Telcon Re Violations Noted in Insp Rept 50-407/88-01 & 50-072/88-01.Corrective Actions:Licensee Modified Checkout Procedure for Operation of Triga Reactor
ML20154F097
Person / Time
Site: 05000072, University of Utah
Issue date: 08/25/1988
From: Gehmlich D
UTAH, UNIV. OF, SALT LAKE CITY, UT
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
NUDOCS 8809190252
Download: ML20154F097 (2)


Text

. _ _ _ - _ _ _ _

U$VERSITY J'/

wUTAH r

/

./

/

./

/

[

August 25,1988

/

6 Jaraes M. Taylor Deputy Executive Director for Regional Operations U. S. Nuclear Regulatory Commhsion Washington, D. C. 20355

Dear Sir:

Pursuant to the telephone conversation between NRC Region IV and the Licensee on 23 August 1988 the following additional information is provided regarding the University of Utah's response, dated 4 August 1938, to Notice of Violation and Deviation, Report 50-407/88 07, 50-0723/88-01, University of Utah Reactors (License R 25: AGN 201, Docket 50 072 and License R 126: TRIGA, Docket 50-407).

Violation 2 (407/880102). In addition to the revised written procedure for insertion and I

removal of heavy water tanks, the Licensee has modified its checkout procedure for operation of the TRIGA reactor (see enclosed form NEL 001, Sheet 1) to require that the Maintenance Log be reviewed for any core operations which might affect reactivity. This action will ensure that the operator is apprised of such changes.

Violation 3 (407/880103). Any component removed from the reactor core which may be radioactive and is not to be immediately placed in a shielded container will be surveyed for contact radiation levels and will be tagged with the maximum radiation reading. The Facility Operations Manual will be revied by September 5,1988 to reflect this practice.

Further, the Radiation Saf:ty Officer has reviewed procedures to ensure that NEL staff are perfornung and documenting such radiation surveys in an acceptable manner.

Sincerely, pk j 4)

Dietrich K. Gehmlich Reactor Administrator cy: NRC Region IV 8809190252 880025 PDR ADOCK 05000072 O

PNV t e of the an 2202 Merrdi Engincenng Bwkhng Salt ta' e Oty, l'tah $4112 3

a Teleptm,3e 901) 5814911 t

Form NEL 001 Sheet 1 RSC Approval:5/25/88 B.1 TRIG A PRELIMINARY CIIECK SIIFET NO.

DATE, OPERATOR
1. Door Closed:

(V)

Front door closed:

(V)

Rad Dose Log:

(V)

2. Visual inspection of reactor tank and area: _(V) Source & D O reflector in core: _ (V)*

2 Derraneralizer:

(on-off) Flow rate: _ gal / min Check and date Air Monitor: _(V)

Deactivate Security System: _(V)

Deactivate Radiation Alarm Damper:

(V) j

3. Auxiliary Survey Meter: Make Serial Number On _(V) i Console Power On:

(V)

Source Light On:

(V)

Recorder On:

(V)

Paper Checked and Dated:

(V)

Chart Speed Standby:

(V)

Review Maintenance Log for any core alterations since the last operation which may possibly affect core reactivity:

(V)

Record Checkout in Operations leg: _(V)

Log Number:

Ventilation System On:

(V)

Damper Lights Checked:

(V) off

4. Calibrate Radiation Monitor: _(V)

Background:

mR/hr lon Chamber Voltages LV21: _(14) LVx10:

(34) IIVx10:

(74)

Fuel Temperature TC#1:

'C TC#2:

'C TC#3:

'C I

Water Conductivity; pmho'em (< 5)

Water Temperature:

'C i

Compare Fuel and Water Temperatures:(NOTE AND REPORT ANY ANMIX 0US READINGS TO SRO)

Rods Down:

(V)

Shim Position:

Reg Position:

5. Reactor Room Pressurc.

1205 E/ outside, iwg(>.01) 1205 E/1205 D:

iwg(>.01)

Radiation Monitor Set Point Check:

TRIGA Tank:

Low:

(V) liigh:

(V)

Ceiling:

low:

(4) liigh:

(V)

Vent:

Low:

(V) liigh: _(4)

6. Recorder to Low Speed:

(V)

Recorder Pens Down: _(V)

Linear Power Switch to 1x100: _ (V)

Log Power Switch to 101: _(V) low leg Cal to "LO" (6x10-3 W)

Meter:

Red Pen:

(-10)

Low leg Cal to "Ill" (1x100 W)

Meter:

Red Pen:

(-50 80)

7. Key On:

(V)

LICENSED OPERATOR AND ONE OTiiER PERSON MUST BE PRESENT.

Additional Personnel:

8. Scram Reset:

(V)

WAIT 1 MINUTE BEFORE READING CURRENT.

Magnet Current Safety:.

(37)

Shim:

(33)

  • 1f source or D O not in core inform R: actor Supervisor before startup.

2 ec/[t Date: May 25.1988 e to I a r:

,