{{#Wiki_filter:_                      _
{{#Wiki_filter:_
CORSum8f5 power mm                               l C0Mpany                                                 v,   ~ ,u,.,- ~ g<, u.e.<m ,
CORSum8f5 power l
and Construction General Offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 February 25, 1986 l     Director of Office of Inspection and Enforcement Att Mr James M Taylor t     US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 MONTHLY REPORT FOR JANUARY 1986 DOCKET NOS 50-329 AND 50-330 FILE 0.4.6         SERIAL 32581 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are five copies of the following documents written or closed during the month; Bechtel Nonconformance Reports, Quality Action Requests, Management Corrective Action Reports, Quality Audit Findings; Babcock & Wilcox Reports of Noncon-formity; Consumers Power Company Nonconformance Reports, Audit Finding Re-ports, Quality Action Requests, Corrective Action Reports, and Management Corrective Action Requests / Reports.
mm C0Mpany v,
                                                                                  !                  s           .
~,u,.,- ~ g<,
JWC/WRB/Ir CC   JGKeppler, USNRC Region III (w/ enc)
u.e.<m,
and Construction General Offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 February 25, 1986 l
Director of Office of Inspection and Enforcement Att Mr James M Taylor t
US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 MONTHLY REPORT FOR JANUARY 1986 DOCKET NOS 50-329 AND 50-330 FILE 0.4.6 SERIAL 32581 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are five copies of the following documents written or closed during the month; Bechtel Nonconformance Reports, Quality Action Requests, Management Corrective Action Reports, Quality Audit Findings; Babcock & Wilcox Reports of Noncon-formity; Consumers Power Company Nonconformance Reports, Audit Finding Re-ports, Quality Action Requests, Corrective Action Reports, and Management Corrective Action Requests / Reports.
s JWC/WRB/Ir CC JGKeppler, USNRC Region III (w/ enc)
CBechhoefer, Esq, ASLB (w/ene)
CBechhoefer, Esq, ASLB (w/ene)
ALAB-106 Service List (w/ enc) 8603100418 960225                                                                                    g\\
ALAB-106 Service List (w/ enc)
PDR     ADOCK 05000329                                                                             k R                         PDR OC0286-0018A-MP02
PDR ADOCK 05000329 k
g\\\\
8603100418 960225 R
PDR OC0286-0018A-MP02


r --
r --
1 ALAB-106 MONTHLY REPORT SERVICE LIST Mr Frank J Kelley, Esq                 Mr Steve Gadler Attorney General of the                 2120 Carter Avenue State of Michigan                     St Paul, MN 55108 Ms Carole Steinberg, Esq Assistant Attorney General             Mr William Clements (2)
1 ALAB-106 MONTHLY REPORT SERVICE LIST Mr Frank J Kelley, Esq Mr Steve Gadler Attorney General of the 2120 Carter Avenue State of Michigan St Paul, MN 55108 Ms Carole Steinberg, Esq Assistant Attorney General Mr William Clements (2)
Environemntal Protection Div           Docketing & Services 720 Law Building                       US Nuclear Regulatory Commission Lansing, MI 48913                       Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Cherry & Flynn                         Ms Mary Sinclair 3 First National Plaza                 5711 Summerset Street Suite 3700                             Midland, MI 48640 Chicago, IL 60602 Mr Joseph Rutberg Mr F C Williams, Esq                   Assistant Chief Hearing Council Isham, Lincoln & Beale                 US Nuclear Regulatory Commission 1120 Connecticut Ave, NW               Office of the Executive Legal Director Suite 325                               Washington, DC 20555 Washington, DC 20036 Ms Barbara Stamiris                     Mr P Robert Brown, Jr 5795 North River Road                   Clark, Klein & Beaumont Route 3                                 1000 First Federal Building Freeland, MI 48623                     1001 Woodward Avenue Detroit, 1H 48226 Mr John Demeester, Esq Dow Chemical Building                   Ms Lynne Bernabei Michigan Division                       Government Accountability Midland, MI 48640                         Project of the Institute for Policy Studies Mr Michael I Miller, Esq               1901 Q Street, NW Isham, Lincoln & Beale                 Washington, DC 20009 3 First National Plaza 52nd Floor                             Mr James E Brunner, Esq Chicago, IL 60602                       Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 OC0286-0018A-MP02
Environemntal Protection Div Docketing & Services 720 Law Building US Nuclear Regulatory Commission Lansing, MI 48913 Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Cherry & Flynn Ms Mary Sinclair 3 First National Plaza 5711 Summerset Street Suite 3700 Midland, MI 48640 Chicago, IL 60602 Mr Joseph Rutberg Mr F C Williams, Esq Assistant Chief Hearing Council Isham, Lincoln & Beale US Nuclear Regulatory Commission 1120 Connecticut Ave, NW Office of the Executive Legal Director Suite 325 Washington, DC 20555 Washington, DC 20036 Ms Barbara Stamiris Mr P Robert Brown, Jr 5795 North River Road Clark, Klein & Beaumont Route 3 1000 First Federal Building Freeland, MI 48623 1001 Woodward Avenue Detroit, 1H 48226 Mr John Demeester, Esq Dow Chemical Building Ms Lynne Bernabei Michigan Division Government Accountability Midland, MI 48640 Project of the Institute for Policy Studies Mr Michael I Miller, Esq 1901 Q Street, NW Isham, Lincoln & Beale Washington, DC 20009 3 First National Plaza 52nd Floor Mr James E Brunner, Esq Chicago, IL 60602 Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 OC0286-0018A-MP02


p
p
  - [,
- [,
4 INDEX OF ATTACHMENTS ALAB-106 MONTHLY REPORT.
4 INDEX OF ATTACHMENTS ALAB-106 MONTHLY REPORT.
JANUARY 1986 Bechtel Nonconformance Reports - None Bechtel Quality Action Requests - None Bechtel Management Corrective Action Reports - None Bechtel Quality Audit Findings - None Babcock & Wilcox Reports of Nonconformity - None Consumers Power Company Nenconformance Reports -
JANUARY 1986 Bechtel Nonconformance Reports - None Bechtel Quality Action Requests - None Bechtel Management Corrective Action Reports - None Bechtel Quality Audit Findings - None Babcock & Wilcox Reports of Nonconformity - None Consumers Power Company Nenconformance Reports -
Q-00053, opened 1/14/86                                                     c Q-00054,' Opened 1/21/86 Q-00018, Closed 1/14/86
Q-00053, opened 1/14/86 c
              ,Q-00035, closed 1/31/86
Q-00054,' Opened 1/21/86 Q-00018, Closed 1/14/86
              -Q-00036, Closed.1/2/86 Q-00040,. Closed 1/31/86 Q-00042, Closed 1/8/86 Q-00050, Closed 1/9/86 Q-00052, closed 1/31/86
,Q-00035, closed 1/31/86
              -Q-00055, closed 1/28/86 Q-00056, closed'1/31/86 Consumers Power Company Audit Finding Reports - None Consumers Power Company Quality Action Requests - None Consumers Power Company Corrective Action Reports - None Consumers Power Company Management Corrective Action' Request / Reports - None l
-Q-00036, Closed.1/2/86 Q-00040,. Closed 1/31/86 Q-00042, Closed 1/8/86 Q-00050, Closed 1/9/86 Q-00052, closed 1/31/86
            -0C0286-0018A-MP02
-Q-00055, closed 1/28/86 Q-00056, closed'1/31/86 Consumers Power Company Audit Finding Reports - None Consumers Power Company Quality Action Requests - None Consumers Power Company Corrective Action Reports - None Consumers Power Company Management Corrective Action' Request / Reports - None l
-0C0286-0018A-MP02


      - '-                            ,            ,,, ' ;                                  tMU.id Gyn
tMU.id Gyn
    . QUALITY                                                                   15 NCR NO.             17 REV
. QUALITY 15 NCR NO.
    ' ASSURANCE-                                                                     g . coa.fyJ5             0 DIVISICN                                                                     16 DATE ISSUED FORM QAD-1                                                                       1/14/86 NONCONFORMANCE REPORT 18 PAGE 1     0F 1 1 ITEM LOCATION Inactive M&TE storage 2 DRAWING OR PART NO. AND REV.                 3 PART NAME                     4 SERIAL NO.
17 REV
NA                                     M&TE items                       NA 5 ITEM DESCRIPTION Nonconforming M&TE                                 '
' ASSURANCE-g. coa.fyJ5 0
6 ITEM STARTUP SYSTEM NO.               7 REFERENCE DOCUMENT             8 ASME A.N.I. REQUIRED NA                                   NA                               NA 9 INSPECTION PLAN           REV           10 ACTION ORGANIZATION To be determined later A
DIVISICN 16 DATE ISSUED FORM QAD-1 1/14/86 NONCONFORMANCE REPORT 18 PAGE 1 0F 1 1 ITEM LOCATION Inactive M&TE storage 2 DRAWING OR PART NO. AND REV.
See block # 30                                             ~
3 PART NAME 4 SERIAL NO.
11 ACTIVITY HOLD REQUIRED:                         ACTIVITY HOLD CRDER NO.
NA M&TE items NA 5 ITEM DESCRIPTION Nonconforming M&TE 6 ITEM STARTUP SYSTEM NO.
YES       y     NO 12 REQUIREMENT See block 13, below.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA NA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION To be determined later A
13 NONCONFORMANCE The purpose of this NCR is to document all construction related M&TE items which were determined to have calibration problems at the final calibration check. This is a non-S&M related NCR.       It will remain open and be revised, as needed, to add any additional M&TE items found in the future.             In the event of a nuclear restart each of these items must be evaluated for its impact on past construction. Refer to the attached pages for the listing of M&TE items.                                             ,
See block # 30
                                                                              / 14' NC     R   ATED Og         lld
~
                                                                                  "    V         "
11 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD CRDER NO.
YES y
NO 12 REQUIREMENT See block 13, below.
13 NONCONFORMANCE The purpose of this NCR is to document all construction related M&TE items which were determined to have calibration problems at the final calibration check. This is a non-S&M related NCR.
It will remain open and be revised, as needed, to add any additional M&TE items found in the future.
In the event of a nuclear restart each of these items must be evaluated for its impact on past construction. Refer to the attached pages for the listing of M&TE items.
/ 14' NC R
ATED Og lld V
DATE
DATE
                                                                                / L Wood, Jr.
/ L Wood, Jr.
19 HOLD TAG APPLIED               YES   y   NO         20 LOCATIOVbFHOLDTAGSORSECREATEDAREA ITEMS SEGREGATED       y YES           NO             Inactive M&J(storage ,         ,m 21 NEED TO REVIEW FOR                         23 TREND CODE       24 NC REV EWED                 Wo   , Jr.
19 HOLD TAG APPLIED YES y
REPORTABILITY ,       YES     X NO                                                 g 22 DETERMINED TO BE REPORTABLE                     25 SECTIONHEAD,fSU           CE ENGINEERING       //
NO 20 LOCATIOVbFHOLDTAGSORSECREATEDAREA ITEMS SEGREGATED y YES NO Inactive M&J(storage,
YES           NO           NA                             N QA-006     Rev 2 l
,m 21 NEED TO REVIEW FOR 23 TREND CODE 24 NC REV EWED Wo
, Jr.
REPORTABILITY,
YES X NO g
22 DETERMINED TO BE REPORTABLE 25 SECTIONHEAD,fSU CE ENGINEERING
//
YES NO NA N
QA-006 Rev 2 l


                                                                                                                                    .        %,                t                                 .
t 26 CAUSE 35 PAGE 1 0F 1 Various 27 PROCESS CORRECTIVE ACTION REQUIRED l
26 CAUSE 35 PAGE 1 0F 1 Various 27 PROCESS CORRECTIVE ACTION REQUIRED                                                                                       l             lYES                   l X l NO 38 RECOMMENDED DISPOSITION To be determined in event of a nuclear restart l         l REWORK                                   l   l SCRAP / REJECT                                       l             l REPAIR
lYES l X l NO 38 RECOMMENDED DISPOSITION To be determined in event of a nuclear restart l
* l     l USE AS IS*
l REWORK l
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                                                             l           l YES                           I     l NO             CR NO:
l SCRAP / REJECT l
l REPAIR
* l l USE AS IS*
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
l YES I
l NO CR NO:
30 ADDITIONAL INFORMATION
(
(
30 ADDITIONAL INFORMATION
Disposition of each M&TE item and any impact on past safety related construction work will be made if there is a nuclear restart at a future dat r,
,                    Disposition of each M&TE item and any impact on past safety related construction work will be made if there is a nuclear restart at a future dat r,                                 -
l rb 1
1 rb        l tb (4 31 DISPOSITION CONCURRENCE                                                                                                                                         /
tb (4 31 DISPOSITION CONCURRENCE
ACTION ORGANIZATION                                                           DATE                           QAD CONCURRENCE                                           DATE ENGINEERING                                                                   DATE                           A.N.I. (ASME) IF REQUIRED l
/
32 DISPOSITION ACTION TAKEN 33 METHOD OF DISPOSITION ACTION VERIFICATION                                                                                                       34 NCR CLOSED BY
ACTION ORGANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I.
,                  RESULTS OF DISPOSITION ACTION VERIFICATION l ACCEPTABLE                               l   l UNACCEPTABLE                                                               -QAD                           DATE I
(ASME) IF REQUIRED l
IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR
32 DISPOSITION ACTION TAKEN 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION I
:                    NUMBER DATE j
l ACCEPTABLE l
lA.N.I. (ASME)
l UNACCEPTABLE
IF REQUIRED QA-006     Rev 2 i
-QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME)
  - - . - - . -          , - - , , -      ....--.,,_-n_,,         ~
DATE j
IF REQUIRED QA-006 Rev 2 i
....--.,,_-n_,,
n.
~


p                                                               -
p Attcchment PS. 1
Attcchment PS. 1
*M&TE CALIBRATION #
      *M&TE CALIBRATION #   DESCRIPTION:
DESCRIPTION:
8325-00250       Decade Resistor S/N 21544 8325-12657       Clark Hardness Block S/N 82675 8325-12639                             S/N 823812 8325-12634                             S/N 802017 8325-12636                             S/N 801984 8325-12637                             S/N 823770 8325-12638                             S/N 822757 8325-12633                             S/N 811726 8325-10390       Temperature Recorder (32"F to 110*F)
8325-00250 Decade Resistor S/N 21544 8325-12657 Clark Hardness Block S/N 82675 8325-12639 S/N 823812 8325-12634 S/N 802017 8325-12636 S/N 801984 8325-12637 S/N 823770 8325-12638 S/N 822757 8325-12633 S/N 811726 8325-10390 Temperature Recorder (32"F to 110*F)
(BPC-499) 8325-10390       Temperature Recorder (32*F to 110*F)
(BPC-499) 8325-10390 Temperature Recorder (32*F to 110*F)
(BPC-716) 8325-00243       Pressure Cage (0-300 psi)
(BPC-716) 8325-00243 Pressure Cage (0-300 psi)
(BPC-1494) 8325-00243       Pressure Gage (0-400 psi)
(BPC-1494) 8325-00243 Pressure Gage (0-400 psi)
(BPC-M150) 8325-00243             "    " (0-200 psi)
(BPC-M150) 8325-00243 (0-200 psi)
(BPC-1619) 8325-00243             "    "
(BPC-1619) 8325-00243 (0-200 psi)
(0-200 psi)
(BPC-1620) 8325-00243 (0-200 psi)
(BPC-1620) 8325-00243             "    "  (0-200 psi)
(BPC-1621) 8325-00243 (0-200 psi)
(BPC-1621) 8325-00243             "    "  (0-200 psi)
(BPC-1625) 8325-00243 (0-200 psi)
(BPC-1625) 8325-00243             "    "
(BPC-1626) 8325-00243 (0-200 psi)
(0-200 psi)
(BPC-1618) 8325-00821 Dial Thermometer (0-500*F)
(BPC-1626) 8325-00243             "    "  (0-200 psi)
(BPC-3823) 8325-10390 Pocket Thermometer (25-125*F)
(BPC-1618) 8325-00821       Dial Thermometer (0-500*F)
(BPC-3823) 8325-10390       Pocket Thermometer (25-125*F)
(BPC-4439)
(BPC-4439)


r
.m r
                                                        .m Attcchment Pg. 2 8325-00821   Dial Thermometer (50 to 500*F)
Attcchment Pg. 2 8325-00821 Dial Thermometer (50 to 500*F)
(BPC-4333) 8325-00821                   (50 to 500*F)
(BPC-4333) 8325-00821 (50 to 500*F)
(BPC-4332) 8325-00621                   (50 to 500*F)
(BPC-4332) 8325-00621 (50 to 500*F)
(BPC-4327) 8325-00821                   (50 to 500*F)
(BPC-4327) 8325-00821 (50 to 500*F)
(BPC-4318) 8325-00821                   (50 to 500*F)
(BPC-4318) 8325-00821 (50 to 500*F)
(BPC-4310) 8325-00821             d (50 to 500*F)
(BPC-4310) 8325-00821 (50 to 500*F) d (BPC-4298) 8325-00821 (50 to 500*F)
(BPC-4298) 8325-00821                   (50 to 500*F)
(BPC-4294) 8325-00821 (50 to 500*F)
(BPC-4294) 8325-00821                   (50 to 500*F)
(BPC-4286)
(BPC-4286)
O
O


                                                    .  ..                                      RE003 COPY QUALITY                                                                   15 NCR NO.               17 REV ASSURANCE                                                                       d. coo h               O DIVISION                                                                 16 DATE ISSUED FORM QAD-1                                                                         //.3/ //G                   ,
RE003 COPY QUALITY 15 NCR NO.
NONCONFORMANCE REPORT 18 PAGE / OF A 1 ITEM LOCATION NA 2 DRAWING OR PART NO. AND REV.                 3 PART NAME                   4 SERIAL NO.
17 REV ASSURANCE
: l. A                                   NA                               NA 5 ITEM DESCRIPTION Computer Program error, Program ME 101, Versions J4, J5, K1 and K2.
: d. coo h O
e ITEM STARTUP SYSTEM NO.               7 REFERENCE DOCUMENT           8 ASME A.N.I. REQUIRED NA                                     NA                                 NA 9 INSPECTION PLAN             REV           10 ACTION ORGANIZATION NA                                 Engineering Technical Support 11 ACTIVITY HOLD REQUIRED:                       ACTIVITY HOLD ORDER NO.
DIVISION 16 DATE ISSUED FORM QAD-1
YES           X   NO                               NA 12 REQUIREMENT Saction 4.2.2 of Procedure QA-6, revision 2 states in part:               "When a nonconformance     is reported to or detected by QAD personnel, QAD is responsible for: ...d. Documenting nonconformance on a NCR (Appendix A)."
//.3/ //G NONCONFORMANCE REPORT 18 PAGE
13 NONCONFORMANCE On January 15, 1986 Consumers Power Company received formal notification from Bechtel Power Corporation (ref. BPCo Letter COM 157157, 1/8/86) which identifies an error in a computer design program. The specific program is the ME 101, versions J4, J5, K1 and K2, and is used in static analysis of piping elements.               Incorrect data results when ME 101 analysis computer runs call out the EAL internal program solver instead of using the stan-dard SAP internal solver to perform static uniform design analysis. At this time, it has bsen established that design analyses performed for the Midland Enerry Center used the ME 101 program. However it has not been established 14 NCR0{.GINATEDBY whethe     ese design analyses used the EAL internal pro-
/
                                                                                      ~
OF A 1 ITEM LOCATION NA 2 DRAWING OR PART NO. AND REV.
MCButterfielf                 DATE 19 HOLD TAG APPLIED                 YES   X NO           20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED'             YES   X NO                               /L/M 21 NEED TO REVIEW FOR                         23 TREND CODE       24 NCR REVIEWED BY       gjo /g   '
3 PART NAME 4 SERIAL NO.
!.        REPORTABILITY         y YES         NO NA             DATE   /     /   /_[ N             /
: l. A NA NA 5 ITEM DESCRIPTION Computer Program error, Program ME 101, Versions J4, J5, K1 and K2.
22 DETERMINED TO BE REPORTABLE                     25 SECTION H                 E       EERING 1 YES                   NO O. M 9 / /
e ITEM STARTUP SYSTEM NO.
* gj, .             p   g l                                                                                       / /       QA-006 Rev 2 I
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA NA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION NA Engineering Technical Support 11 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
YES X
NO NA 12 REQUIREMENT Saction 4.2.2 of Procedure QA-6, revision 2 states in part:
"When a nonconformance is reported to or detected by QAD personnel, QAD is responsible for:
...d.
Documenting nonconformance on a NCR (Appendix A)."
13 NONCONFORMANCE On January 15, 1986 Consumers Power Company received formal notification from Bechtel Power Corporation (ref. BPCo Letter COM 157157, 1/8/86) which identifies an error in a computer design program. The specific program is the ME 101, versions J4, J5, K1 and K2, and is used in static analysis of piping elements.
Incorrect data results when ME 101 analysis computer runs call out the EAL internal program solver instead of using the stan-dard SAP internal solver to perform static uniform design analysis. At this time, it has bsen established that design analyses performed for the Midland Enerry Center used the ME 101 program. However it has not been established 14 NCR0{.GINATEDBY whethe ese design analyses used the EAL internal pro-
~
MCButterfielf DATE 19 HOLD TAG APPLIED YES X NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA
/L/M ITEMS SEGREGATED' YES X NO 21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR REVIEWED BY gj /g o
REPORTABILITY y YES NO NA DATE
/
/ /_[ N
/
22 DETERMINED TO BE REPORTABLE 25 SECTION H E
EERING 1 YES NO O. M 9 / /
* gj,.
p g
l
/ /
QA-006 Rev 2 I


                                                                                                                                                                ,                                  .=
.=
26 CAUSE
26 CAUSE 35 PAGE O OF 4 27 PROCESS CORRECTIVE ACTION REQUIRED l
* 35 PAGE O OF 4 27 PROCESS CORRECTIVE ACTION REQUIRED                                             l               ' LYES                                   I         l NO 28 RECOMMENDED DISPOSITION l     l REWORK           l         l SCRAP / REJECT                         l                 l REPAIR
' LYES I
* l         lUSE AS IS*
l NO 28 RECOMMENDED DISPOSITION l
CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                                     l         l YES               l               l NO                       CR NO:
l REWORK l
30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE ACTION ORGANIZATION                                       DATE             QAD CONCURRENCE                                                                                         DATE ENGINEERING                                               DATE             A.N.I.                 (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN l                                                                                                                                                 .
l SCRAP / REJECT l
33 METHOD OF DISPOSITION ACTION VERIFICATION                                                                           '34     NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION I     lACCEPTABLE           l           l UNACCEPTABLE                                                             QAD                                                               DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER A.N.I.           (ASME)                                         DATE IF REOUIRED QA-006                       Rev 2
l REPAIR
        ,    -  , - - - .-,      , - - - , , , + , - - - - -,n,   ----,,n     m ,.r..,,-,-n..         , - , , , . .    -- -. _ -.,,-            -~-,n-     . . - - - ,, - - , . - - - - -      -,n-
* l lUSE AS IS*
CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
l YES l
l NO CR NO:
30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE ACTION ORGANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I.
(ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN l
33 METHOD OF DISPOSITION ACTION VERIFICATION
'34 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION I
lACCEPTABLE l
l UNACCEPTABLE QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER A.N.I.
(ASME)
DATE IF REOUIRED QA-006 Rev 2
,,, +, - - - -
-,n,
----,,n m
,.r..,,-,-n..
-~-,n-
-,n-


15 NCR NO.                   17 REV 90ALITY ASSURANCE                                                            O - cod /A                       d DIVISION                                                           ) 16 DATE ISSUED FORM -QAD-1 i M /% /f8S~
15 NCR NO.
O N CE W ORT                         18 PAGE / OF 1 L ITEM LOCATION W"
17 REV 90ALITY O - cod /A d
* W $ / / L. S                       3 PART NAME                        4 SERIAL NO.
ASSURANCE DIVISION
2 DRAWING OR PART NO. AND REY.
) 16 DATE ISSUED i M /% /f8S~
Zb Y hS38~~00%$O                         WS                                 N 5 ITEM DESCRIPTION J t/0M l&OY 6 ITEM STARTUP SYSTEM NO.       7 REFERENCE DOCUMENT               8 ASME A.N. I. REQUIRED AM               31802.2585-2. Gw)                           ^4f 10 ACTION ORGANIZATION 9 INSPECTION PLAN       REV M/04A%10 W M                               NlW
FORM -QAD-1 O N CE W ORT 18 PAGE /
                /VA                       fMAured ,90/ As ACTIVITY HOLD ORDER NO.
OF 1 L ITEM LOCATION W"
11 ACTIVITY HOLD REQUIRED:
* W $ / / L. S 2 DRAWING OR PART NO. AND REY.
YES 1 NO                             g 12 REQUIREMENTZAlsnexxrztr massr/H w sg                                 re       gg as,awy
3 PART NAME 4 SERIAL NO.
      &&t'4hNro L.sHry
Zb Y hS38~~00%$O WS N
              ,                  Ftwt /0. O CM                   DEE2Allel2 a$r6P 9W Pmw^ce             e r' zs       n,. Is-f 42 Rev z.
5 ITEM DESCRIPTION t/0M l&OY J
I 13 NONCONFORMANCE                                                                                           ,
6 ITEM STARTUP SYSTEM NO.
Z;u.snrwwvxr?"     N+s ou.7 oe               cwaAs77& ou                       /0   0+ W DdeseRW W By           d o& tl M&M Ar                 sr~.1   WeALsr purJA./7~f3o. o m), l l        $W d4ks64 won mea'!~ #832S- eo2SD W2-2/-8C,                                                         .'
7 REFERENCE DOCUMENT 8 ASME A.N. I. REQUIRED AM 31802.2585-2.
t NCR ORIGINATED BY 5                                                                                     .
Gw)
l
^4f 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION M/04A%10 W M NlW
                                                                              , : = ; ==           --
/VA fMAured,90/ As 11 ACTIVITY HOLD REQUIRED:
YM fh L 2i m -LD
ACTIVITY HOLD ORDER NO.
:::1             i 19 HOLD TAG APPLIED          YES 1 NO            l20 LOCATION OF
YES 1 NO g
                                                      %1hR$k.sfhV           $ . f $'AGS       OR SEGREATQ lAREA E~A/Al*77V&
12 REQUIREMENTZAlsnexxrztr massr/H w sg re gg as,awy
i ITEMS SEGREGATED 1 YES           NO         j                   fg               g                 ,
&&t'4hNro L.sHry Ftwt
21 NEED TO REVIEW FOR                 123 TREND CODE     l24 N             Eh     SY -       (. & cOJC YES 1 NO                                               /v2 REPORTABILITY
/0. O CM DEE2Allel2 a$r6P 9W Pmw^ce e r' zs n,. Is-f 42 Rev z.
                                        ~
I 13 NONCONFORMANCE Z;u.snrwwvxr?"
5          i
N+s ou.7 oe cwaAs77& ou
                                                                '        E          V// 7 W                     ,
/0 0+ W DdeseRW WeALsr purJA./7~f3o. o m), l W By d o& tl M&M Ar sr~.1 l
22 DETERMINED TO BE REPORTABLE             25 SECTION HEAD. ASSURANCE 'DiGINEERING l                 YES     N0                                     g QA-6   Rev 1 L
$W d4ks64 won mea'!~ #832S-eo2SD W2-2/-8C, t
NCR ORIGINATED BY 5
, : = ;==
YM l
fh L 2i m - :::1 i
%1hR$k.sfhV $. f $'AGS OR SEGREATQ AREA l
l20 LOCATION OF LD i
19 HOLD TAG APPLIED YES 1 NO E~A/Al*77V&
ITEMS SEGREGATED 1 YES NO j
fg g
21 NEED TO REVIEW FOR 123 TREND CODE l24 N Eh SY -
(. & cOJC
/v2 REPORTABILITY YES 1 NO 5
i E
V// 7 W 22 DETERMINED TO BE REPORTABLE
~
25 SECTION HEAD. ASSURANCE 'DiGINEERING g
l YES N0 QA-6 Rev 1 L


l 26 CAUSE                                                                                   35 PAGE 1 0F ~2 MM J
l 26 CAUSE 35 PAGE 1 0F ~2 MM J
27 PROCESS CORRECTIVE ACTION REQUIRED                       l       l YES                 M NO 28 RECOMMENDED DISPOSITION REWORK         l     l SCRAP / REJECT       I       l REPAIR
27 PROCESS CORRECTIVE ACTION REQUIRED l
* l     lUSE AS IS*
l YES M NO 28 RECOMMENDED DISPOSITION REWORK l
CREQUIRES TECHNICAL JSUTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                     l   lYES       g NO                 CR NO:   -
l SCRAP / REJECT I
30 ADDITIONAL INFORMATION
l REPAIR
                                      .Z"A/.sTAL:u :='~r     /dtf 8diER.) &d6D lN M
* l lUSE AS IS*
          /A14Q1t/E OTMEl.s Ar. e AktcAt (,3EcccoN' G / .4 S .
CREQUIRES TECHNICAL JSUTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
N a.rr n a             Re-auswen                   ,o m a_ re                 x.rn w re na m WWw                         of m .s / W                     7awea.s/ w w r
lYES g NO CR NO:
        $4W/dd.4V?t:W Jh4ff NW M WND ,
30 ADDITIONAL INFORMATION.Z"A/.sTAL:u :='~r
31 DISPOSITION CONCURRENCE ACTION ORCANIZATION                         DATE     QAD CONCURRENCE                                 DATE I
/dtf 8diER.)
ENGINEERING                               DATE     A.N.I.     ( ASME) IF REQUIRED pm ~ G           dLMAO./VAJL             C/T-   44             A               5
&d6D lN M Ar. e AktcAt (,3EcccoN' G /.4 S.
    .          ,, w               -sps a                   me                 owsr 45f             au a L Mr o            m.smyad
/A14Q1t/E OTMEl.s N a.rr n a Re-auswen
              ,gg3g oJ&a, ^^                                l$    Y 0$A Ma+e.wsoup
,o m a_
                                                                                #mf i] JL L $ & .                   3                                               **
re x.rn w re na m WWw of m.s / W 7awea.s/ w w r
34 NCR' CLOSED BY 33 METHOD OF DISPOSITION ACTION VERIFICATION y                 c       32                                             O h[ M b . 0 0b RESULTS OF DISPOSITION ACTION VERIFICATION 7
$4W/dd.4V?t:W Jh4ff NW M WND,
b                           ' D AT E l ACCEPTABLE       l       l UNACCEPTABLE                     / QAD
31 DISPOSITION CONCURRENCE ACTION ORCANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I.
                                                                              !/
( ASME) IF REQUIRED I
l IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER                                                                                                             l A.N. I. (ASME)                 DATE IF REQUIRED                                 t QA-6     Rev i
pm ~ G dLMAO./VAJL C/T-44 A
5
,, w
-sps a me owsr 45f Mr
,gg3g oJ&a, Ma+e.wsoup m.smyad au a L o
^^ #mf i] JL L $ &.
3 l$
Y 0$A 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR' CLOSED BY y
c 32 O h[ M b.
0 0b RESULTS OF DISPOSITION ACTION VERIFICATION 7
b
/ QAD
' D AT E l
l ACCEPTABLE l
l UNACCEPTABLE
!/
IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR l
NUMBER A.N. I.
(ASME)
DATE IF REQUIRED t
QA-6 Rev i
-. ~. -.


                                                      ~
~
15 NCR NO.             17 REV ALITY                                                                                               O
15 NCR NO.
;SURANCE                                         KOp     (IOT/
17 REV ALITY
:a A vJ uaa d.ooase
;SURANCE KOp (IOT/
, VISION 16 DATE ISSUED
d.ooase O
                                                                            /o h//$
:a A vJ uaa 16 DATE ISSUED
)RM QAD-1 NONCONFORMANCE REPORT                     18 PAGE     i 0F     2 ITEM LOCATION Racetor Building, Containment #2, 640' Elevation 3 PART NAME                  4 SERIAL NO.                    i
, VISION
! DRAWING OR PART NO. AND REV.
/o h//$
Core Flood Tank System            NA M-411 Sh. A&B (Q) revision 0 i ITDi DESCRIPTION                                                 ,
)RM QAD-1 NONCONFORMANCE REPORT 18 PAGE i 0F 2
Caro Flood Tank System - Unit 2 7 REFERENCE DOCUMENT           8 ASME A.N.I. REQUIRED 5 ITEM STARTUP SYSTEM NO.
ITEM LOCATION Racetor Building, Containment #2, 640' Elevation
2-CFS                       WO 22500652                               Md 9 INSPECTION PLAN           REV           10 ACTION ORGANIZATION WO-500662           0                 0 & M Division 1 ACTIVITY HOLD REQUIRED:                       ACTIVITY HOLD ORDER NO.
! DRAWING OR PART NO. AND REV.
YES       x   NO                         - NA 2 REQUIREMENT
3 PART NAME 4 SERIAL NO.
: 1) WO 22500662 step 03: Verify that the balance of the CFS system is dry by opening system vent and drain valves. If moisture is present, blow dry with service air until no water comes from the drains.
i M-411 Sh. A&B (Q) revision 0 Core Flood Tank System NA i ITDi DESCRIPTION Caro Flood Tank System - Unit 2 5 ITEM STARTUP SYSTEM NO.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED Md 2-CFS WO 22500652 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500662 0
0 & M Division 1 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
YES x
NO
- NA 2 REQUIREMENT
: 1) WO 22500662 step 03: Verify that the balance of the CFS system is dry by opening system vent and drain valves.
If moisture is present, blow dry with service air until no water comes from the drains.
: 2) WO 22500662 step 05: Place an "X" through all valves that are shut and circle all valves that are open on the attached P&ID.
: 2) WO 22500662 step 05: Place an "X" through all valves that are shut and circle all valves that are open on the attached P&ID.
3 NONCONF0 g CE
3 NONCONF0 g CE
: 1) C,ntrary to requirement #1 a steady trickle of water was obtained from drain valves 2VCFS 083 and 2VCFS 084 when they were opened. Several drops of water were received from valves 2VCFSO49 and 2VCFS050 when they were opened.
: 1) C,ntrary to requirement #1 a steady trickle of water was obtained from drain valves 2VCFS 083 and 2VCFS 084 when they were opened.
Several drops of water were received from valves 2VCFSO49 and 2VCFS050 when they were opened.
: 2) Contrary to requirement #2 gageline valve 2VCFS016 is not circled to indicate an open valve even though the drawing has a statement indicating the valver. position.
: 2) Contrary to requirement #2 gageline valve 2VCFS016 is not circled to indicate an open valve even though the drawing has a statement indicating the valver. position.
14 NCR ORIGINATED BY d?#72W     /
14 NCR ORIGINATED BY d?#72W 44r
44r DRE D A Nott L9 HOLD TAG APPLIED             YES   X   NO           20 LOCATION OF HOLD TAGS OR SEGNED AREA YES   X   NO                           NA ITEMS SEGREGATED
/
                                                                                      - * "iL.uJoo        -J 21 NEED TO REVIEW FOR                       23 TREND CODE       24 N       I REPORTABILITY         YES   X NO             g y          ..-
DRE D A Nott L9 HOLD TAG APPLIED YES X
22 DETERMINED TO BE REPORTABLE                   25 SECTIONHEAD,f''           CE - s-5G YES         NO                             Md QA-006     Rav 2 dh g                            o              6 r/.d g M y cis Q =Mwv h M u ou ,,,2:2,_; h M
NO 20 LOCATION OF HOLD TAGS OR SEGNED AREA ITEMS SEGREGATED YES X
* W-                 ,
NO NA 21 NEED TO REVIEW FOR 23 TREND CODE 24 N I
[b           .
- * "iL.uJoo
: l. CAUSE r+cm) . Tka., a%d oQ Irnper.lico m q h c.h\ci b ke.d to Code.Awh ' e n in A de<- Qn6 dec'% D                                              35 PAGE      2    0F      2 sf t.m .                                                                                                                                         Me 7% g . - Tb., ope.edor urok open N mt to N NGht. So yde 9%ikien .
-J g
1 PROCESS CORRECTIVE ACTION REQUIRED                                                 I-             lYES                             N NO 4
y REPORTABILITY YES X
3 RECOMMENDE DISPOSITION l           jREWORK                         l     l SCRAP / REJECT             l             l REPAIR
NO CE - s-5G 22 DETERMINED TO BE REPORTABLE 25 SECTIONHEAD,f''
Md YES NO QA-006 Rav 2 6 r/.d g M dh g o
y cis Q =Mwv h M u ou,,,2:2,_; h M
* W-
[b
 
l.
CAUSE r+cm). Tka., a%d oQ de<- Qn6 dec'% D 35 PAGE 2
0F 2
Irnper.lico m q h c.h\\ci b ke.d to Code.Awh ' e n in A sf t.m.
7% g. - Tb., ope.edor urok open N mt to N NGht. So Me yde 9%ikien.
1 PROCESS CORRECTIVE ACTION REQUIRED I-lYES N NO 4
3 RECOMMENDE DISPOSITION i
l jREWORK l
l SCRAP / REJECT l
l REPAIR
* l >< I USE AS IS*
* l >< I USE AS IS*
Twww i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED ITES               l g l NO                         CR NO:
Twww i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 9 CONDITIONAL RELEASE NEE E I
9 CONDITIONAL RELEASE NEE E                                                I 0 ADDITIONAL INFORMATION t
ITES l g l NO CR NO:
1 DISPOSITION CONCURRENCE 3               . . $l - - >                           t/.50l7G             l                       d                             / 3df%
0 ADDITIONAL INFORMATION t
                                                                                                                                                  /     '
1 DISPOSITION CONCURRENCE 3df%
DATE ACTIG l 0                       IZATION                             DATE       QAD CONCURREl$CE Y                                     b               / 3/
3
I         ENGINEERING                                                         DATE       A.N.I. (ASME) IF LEQUIRED 12 DISPOSITION ACTION TAKEN iWt- %es                                       ? '%be;& /3 i C %.c\<b1             \t $te            os   Cos5t" N Is^- U* g*VN acxio n m b                                 To.L.
.. $l - - >
n%t                             $i sc.e           N Y TYs     g        Cee be ope.cobichs % e. , "                                            "
t/.50l7G l
ocas %                 un\ be Wh.
d
33 METHOD OF DISP ITI                                         ION VERIFICATION                               :34 NCR CLOSE BT                                           '
/
3 s2,. W '/ ( ".2-                             l Q
/
RESULTS OF DISPOSITION ACTION VERIFICATION
DATE ACTIG l 0 IZATION DATE QAD CONCURREl$CE Y
                                                                                                                                            /                .DATE I W ACCEPTABLE                               I         l UNACCEPTABLE                                 .QA9 IF UNACCEPTABLE, REFERENCE SUPERSEING NCR                                                           i                             /
b
NUMBER 4///,7 A.N.I. (ASlfE)                                 DATE
/ 3/
                                                                                                                'IF REQUIRE QA-006       Rev 2
I ENGINEERING DATE A.N.I.
(ASME) IF LEQUIRED
\\t $te Cos5t" N Is^- U* g*VN 12 DISPOSITION ACTION TAKEN iWt- %es
? '%be;& /3 i C %.c\\<b1 os acxio n m b To.L.
n%t
$i sc.e N Y TYs Cee be ope.cobichs % e., "
g ocas %
un\\ be Wh.
33 METHOD OF DISP ITI ION VERIFICATION
:34 NCR CLOSE BT Q
3 s2,. W '/ ( ".2-l RESULTS OF DISPOSITION ACTION VERIFICATION I W ACCEPTABLE I
l UNACCEPTABLE
.QA9
/
.DATE IF UNACCEPTABLE, REFERENCE SUPERSEING NCR i
/
4///,7 NUMBER A.N.I. (ASlfE)
DATE
'IF REQUIRE QA-006 Rev 2


I 1
1 l
            =                                                                                                                                                                       l i
=
                                                                                                                    ~7mern . :'. n.';n.me:sen~. t: . :-a.                         i
i
::'.w- ~~urs.w;,.~                 .: ' ~ -
.: ' ~ -
f O'V? m#                                                                                           DATE     !!          O
~7mern. :'. n.';n.me:sen~. t:. :-a.
                                                                                                                                                                        ,          1
i
                                                                                                      $UbitCT [vtsfee oE                             eh                 '
::'.w- ~~urs.w;,.~
M G E@ rte k CC                                                                                          braL!*,e$
O f O'V? m#
3 T Ck e.92&                                                                                                b r~ o't d         0VS I
DATE 1
                                                                                                                                                              * *+1s ! g           ,
$UbitCT [vtsfee oE eh 3 T Ck e.92&
                                                                                                                                        ' -* 3:,:Jn" .:>:. , ; .
braL!*,e$
                                                                                                                      .".L M.      -
b r~ o't d 0VS * *+1s !
M]CSAGE                         Jf .g,e             vo[v,+1 e           o'[           wa de r-         c.o Mee /e/                 d aeal          a       _
CC M G E@ rte k I
t d<.-               valve                 is       one.,J             ta             ta.n         6,               a,        ew           /     b t4 e i va lo ., .             af He                     JNEn             I.,, a           he La.,               Jh.         va Iv e                 J ik a *1 [C ! 39 [ W f. .               "[l1 e       #1_ tut es        pria v          be       cm 8.FlC!F#cI                                 b 2.
g
                                                                                    /
.".L M.
    ~ L : ).. '                                 .c       ,,,.... L .
-* 3:,:Jn".:>:., ;.
                                                                                      -    se       -.-
l M]CSAGE Jf.g,e vo[v,+1 e o'[
                                                                                                                    <~a                     :-        r s,. . ~ ,,.J w o.se . s                                       ,        d           ,        ; sica s,-                   .c i'      . n,-
wa de r-c.o Mee /e/
                                                                                                                                .                                 .i Yb's             Y iS nd                     amid v       '$t'       1032           e-$93       s.)     ed           ac     # l'f t       & V 0 ****1 US                    J JLe                m...,          a v a. h , N ( v a.e ' t. ,
d aea a
ts         in eem efale -
t d<.-
n,                                   .
valve is one.,J ta ta.n 6,
ew
/
b t4 e i a,
va lo.,.
af He JNEn I.,, a he La.,
Jh.
va Iv e J
ik a *1 [C ! 39 [ W f..
"[l1 e be cm 8.FlC!F#cI b 2.
#1_ tut es pria v
/
~ L : ).. '.c
,,,.... L.
se
<~a r
w o.se. s d
; sica s,-
.c
. n,-
s,.. ~,,.J i'
.i Yb's Y iS nd amid v
'$t' 1032 e-$93 s.)
ed ac
# l'f t
& V 0
****1 a v a. h, N ( v a.e ' t.,
ts in eem efale US n,
J JLe m...,
r
r
, apua d A ch ak                                         &         asa J.             .                                                                                  3 I                                                                                                                                                                       i 4
, apua d A
l L Tl1e enNacbestn$$ mive                                 -
ch ak &
                                                                          $e             e .^* c, Yv a          r in     -
asa J.
poun als             of ea &
3 I
j0W             c'*At*Lh
i 4
* e ~ Varie u t;.-
L Tl1e enNacbestn$$
:s .~.
mive
                                                                                                                  $fm e.             ty.t 1, . P ee w =-vmen."Jd2Aws%T.'            e~m .k ,e.^.A'.        I L u *,.c!i;.h.*a s "s-%'. ':. .4 : 'T.L.r f                 --    "-n '*:.%     . ^ ^ ::                                                                         _
$e e.^* c, Yv in poun als of ea &
Cf' l en . C, c.. din
l a
  ;                              t-     a* O r tntr~
r j0W c'*At*Lh e ~ Varie u 1,
                                                        ~
$fm e.
pide             $$ a m e he +-
ty.t e~m k I
n                 .
L u *,.c!i;.h.*a s "s-%'. ':..4 : 'T.L.r f
f         .              .
"-n '*:.%. ^ ^ ::
I OT       Fl e on t en n t             e t be.         3 I m e..
:s.~. t;.-. P ee w =-vmen."Jd2Aws%T.'.
W h f.                       -
,e.^.A'.
iff}-8 9V                                   l l
. C, c.. din
I L
$$ a m e he +-
lK,NED                                                       DATE                                     i *
Cf' l en
                                                                * ~~ *'    . :. '
~
                                                                                                                    '** -*" r'-'-~-~1rs
t-a* O r tntr~
                                                                                                                          . ,                ~ - - YAr s*m v ~ ~
pide n
                        =.....'
f I
                                      .. . .. i.2. .
OT Fl e on t en n t e t be.
* J .         . _ r&CilJJ3                       Ese PAaTS 1 Age 3 wme CAE30em INT ACT . PAaf 3 WM M RETUSNED URTH MPLY.                             gy g g g
3 I m e.. W h f.
 
iff}-8 9V l
  .  *l o             ntsutterrasic, nec                             g g gr From           JTChristy/RGBudrick, ME                                         CONSUMERS
l I
                  .                                                    QI                POWER November 27, 1985                                               COMPANY Date MAREED UP P& IDS ASSOCIATED                                     Internal Subject WITH LAYUP WORK ORDERS                                         Correspondence HPLeonard, NEC                                                  RGB 40-85 CC JLWood, NEC SFGreve, MEC Currently layup work orders contain a step which requires the worker in the field to note on an attached P&ID all piping or equipment that is not installed and place an             "X" through all valves that are left in the shut position. The purpose of this letter is to assure a uniform understanding as to what this step is for.
L lK,NED DATE i
This line item in the work order process is not an engineering mandated requirement, or needed by engineering for layup activities. Instead, this activity serves as an aid to the O&M department while performing their layup work operations in the field, and is in excess of that required. Therefore, this activity is deleted per this letter.
'** -*" r'-'-~-~1rs
~ - - YAr *m v ~ ~
s
* ~~ *'
=..... '
..... i.2..
* J.
. r&CilJJ3 Ese PAaTS 1 Age 3 wme CAE30em INT ACT. PAaf 3 WM M RETUSNED URTH MPLY.
gy g g g
* l o ntsutterrasic, nec g
g gr CONSUMERS From JTChristy/RGBudrick, ME Q I POWER Date November 27, 1985 COMPANY Subject MAREED UP P& IDS ASSOCIATED Internal WITH LAYUP WORK ORDERS Correspondence RGB 40-85 CC HPLeonard, NEC JLWood, NEC SFGreve, MEC Currently layup work orders contain a step which requires the worker in the field to note on an attached P&ID all piping or equipment that is not installed and place an "X" through all valves that are left in the shut position. The purpose of this letter is to assure a uniform understanding as to what this step is for.
This line item in the work order process is not an engineering mandated requirement, or needed by engineering for layup activities.
Instead, this activity serves as an aid to the O&M department while performing their layup work operations in the field, and is in excess of that required. Therefore, this activity is deleted per this letter.
IC1185-0027A-AD01
IC1185-0027A-AD01


15 NCR NO.                         17 REV
/l' 15 NCR NO.
~dUALITT ASSURANCE                                                                                                         o-00036                           v/             /l' DIVISION                                                                                                    16 DATE ISSUED                                             J FORM QAD-1' 10/30/85 NONCONFORMANCE REPORT                                       18 PAGE               1   0F   2
17 REV
                                                                                                                                                                        \
~dUALITT ASSURANCE o-00036 v/
1   ITEM LOCATION 674'-6" Elevation of Auxiliary Bldg.                               Rooms 700 and 701                                                                   l g 9f 4/c, 4 SERIAL NO.
16 DATE ISSUED J
2 DRAWING OR PART NO. AND REV.                                       3 PART NAME M-7 Sh. 2 revision 19                                             1B-91         ,    2   di $,W #                          NA
DIVISION FORM QAD-1' 10/30/85 NONCONFORMANCE REPORT 18 PAGE 1
,5         ITEM DESCRIPTION l89thfC,184 mfd,389/ A/C M AA 4=1 YO Centrol Rod Drive Breakers !!-?1 ^,3,C,0 0 23 01.".,2,0,D in Electrical Equipment                                                                         j 6- '
0F 2
Roome 700 and 701.                         ,
\\
;6 ITEM STARTUP SYSTEM NO.                                       7 REFERENCE DOCUMENT                       8 ASME A.N.I. REQUIRED P-F10-160 rev. 1 CP-F10-
1 ITEM LOCATION 674'-6" Elevation of Auxiliary Bldg.
!                            NA                                 2024 rev. O ANSI N45.2.2--1972                                       NA REV               10 ACTION ORGANIZA7.' ION l9 INSPECTION PLAN l
Rooms 700 and 701 l
NA                                                 Operations & Maintenance Division 11 ACTIVITY HOLD REQUIRED:                                               ACTIVITY HOLD ORDER NO.
2 DRAWING OR PART NO. AND REV.
YES       r                 NO                                       NA
3 PART NAME g 9f 4/c, 4 SERIAL NO.
.12 REQUIREMENT
di $,W#
;        Pcragraph 6.1.2(1) of ANSI N45.2.2-1972 states:                                     " Level A items shall be stored under special conditions similar to those described for Level B items but with additional rsquirements such as temperature and humidity control within specified limits, a ventila-tion system with filters to provide an atmosphere free of dust and harmful vapors, and any other appropriate requirements."
NA M-7 Sh. 2 revision 19 1B-91 2
  ,        gP-{g -1 g vg,1 & CP-F10-2024 rev. O require the Control Rod Drive Breaker Equipment be
,5 ITEM DESCRIPTION l89thfC,184 mfd,389/ A/C M AA 4=1 YO Centrol Rod Drive Breakers !!-?1 ^,3,C,0 0 23 01.".,2,0,D in Electrical Equipment j
  ;13 NONCONFORMANCE Centrary to the above requirement, rooms 700 & 701 do not have filtered ventilation.
6-Roome 700 and 701.
;6 ITEM STARTUP SYSTEM NO.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED P-F10-160 rev. 1 CP-F10-NA 2024 rev. O ANSI N45.2.2--1972 NA l9 INSPECTION PLAN REV 10 ACTION ORGANIZA7.' ION l
NA Operations & Maintenance Division 11 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
YES r
NO NA
.12 REQUIREMENT Pcragraph 6.1.2(1) of ANSI N45.2.2-1972 states:
" Level A items shall be stored under special conditions similar to those described for Level B items but with additional rsquirements such as temperature and humidity control within specified limits, a ventila-tion system with filters to provide an atmosphere free of dust and harmful vapors, and any other appropriate requirements."
gP-{g -1 g vg,1 & CP-F10-2024 rev. O require the Control Rod Drive Breaker Equipment be
;13 NONCONFORMANCE Centrary to the above requirement, rooms 700 & 701 do not have filtered ventilation.
I 1
I 1
14 NCR ORIGINATED BY l
14 NCR ORIGINATED BY l
lo-30.e5 y      NO            20 LOCATION 0
lo-30.e5
                                                                                                              %dlET       -
%dlET d%c 19 HOLD TAG APPLIED YES y
d%c TAGS OR SEGREATED' JiREf f '
NO 20 LOCATION 0 TAGS OR SEGREATED' JiREf f '
19 HOLD TAG APPLIED                                YES ITEMS SEGREGATED                             YES     X     NO                                         ,
g ITEMS SEGREGATED YES X
g 12 1 NEED TO REVIEW FOR                                               23 TREND CODE             24 NCR I     REPORTABILITY                           YES       x NO                                                                             -/d 5 5             !    DAT .                           T                   y     ;,
NO 12 1 NEED TO REVIEW FOR 23 TREND CODE 24 NCR I
22 DETERMINED TO BE REPORTABLE
REPORTABILITY YES x
                                                                      ~
NO
25 SECTION HEAD. AS                             CE ENGINEER:.NG                 j 7[4 YES     1 NO                   M d
-/d 5 5
e M                                              QA-006     Rev 2
DAT.
T y
j 7[4 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD. AS CE ENGINEER:.NG
~
M YES 1 NO M
e d
QA-006 Rev 2


26 CAUSE                                                                                                                               35 PAGE           2     0F             2 g yte                 W         370Zjc                 7Ey s''
26 CAUSE 35 PAGE 2
C" A p cye,$dl        bJ      & o.s        ~/Bew eme~dM'$ b d NW **                                         -
0F 2
            ,vn ' AfyME-             due       p         CMn A e"~d~"                                                       b'3 'm%c J o u c 8 -Yo z o & V.
C" A g yte W
27 PROCESS CORRECTIVE ACTION REQUIRED                                               l             l YES                                           NO 28 RECOMMENDED DISPOSITION                                                                                                                                                           J REWORK           l       l SCRAP / REJECT                               l             l REPAIR
370Zjc 7Ey s''
* l         l USE AS IS*
p cye,$d b
i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                           l       lYES                                       NO                       CR NO:
& o. ~/Bew eme~dM'$ b d NW **
30 ADDITIONAL INFORMATION
l s
[A) , aee v ..yt      hJ5              20 b -00 ~8S                               e#ferk                     /12775u1
,vn ' AfyME-due p
              , 4w ~ ~f3     /917A* vc       o37~ ] N/*MJ - (&b ,                                                                                                                  ,
CMn A e"~d~"
A                                                                                                                     --
b'3 'm%c J J
31 DISPOSI ON CONCURRENCE                                                                                 ,
o u c 8 -Yo z o & V.
E                                    /t. -2 * ' $                                                           '8 N' $[
27 PROCESS CORRECTIVE ACTION REQUIRED l
AC ON ORGANIZATI                                 DATE                       Q             ' CONCURRENCE                                                               DATE f)f;fpgQ/                                 f l ~ 2 0 ~S~
l YES NO 28 RECOMMENDED DISPOSITION J
                        ~
REWORK l
AITGINEERING                //                   DATE                       A.N.I. (ASME) IF REQUIRED 32   ISPOSITION ACTION TAKEN A h gpD
l SCRAP / REJECT l
          }{g(jfj oJ         of C/-flu -ZOW ((ofy sff7sidO) wni' de                                                                           o.**         tu ss
l REPAIR
            ~E) I d'c K '( ((ux f                                                                            sA.n N fs /km3                                       / 700 V' A <:7at Maa z .u u c. c/na.tw < m L f)
* l l USE AS IS*
                            /
i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
33 METHOD OF DISPOSITION ACTION.VERIF CATION                                                       -            34 NCR CLOSED BY 4;' v     -
lYES NO CR NO:
iMn mb . s n                                       I                                                                         l syg , L .. -       L   >>-..J               - 4 ,,s/gjg RESULTS OF DISPOSITION ACTION VERIFICATION
30 ADDITIONAL INFORMATIONhJ5 20 b -00 ~8S e#ferk
                                                                                                                                            '                                DATE l4  ~'T ACCEPTABLE       l       l UNACCEPTABLE                                                         QAD                                                                   !
/12775u1
i IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER DATE f
[A), aee v..yt
A.N.I.       (ASME)                                                 j
, 4w ~ ~f3
:IF REQUIRED                                                             ;
/917A* vc o37~ ] N/*MJ - (&b,
QA-006                   Rev 2   )
A 31 DISPOSI ON CONCURRENCE E
/t. -2 * ' $
'8 N $[
DATE AC ON ORGANIZATI DATE Q
' CONCURRENCE f)f;fpgQ/
f l ~ 2 0 ~S~
AITGINEERING
~
//
DATE A.N.I.
(ASME) IF REQUIRED 32 ISPOSITION ACTION TAKEN ss A hgpD
}{g(jfj oJ of C/-flu -ZOW ((ofy sff7sidO) wni' de o.**
tu
~E) I d'c K '(
((ux sA.n N fs
/km3
/ 700 f
< m L f)
V' A <:7at Maa z.u u c.
c/na.tw
/
34 NCR CLOSED BY 33 METHOD OF DISPOSITION ACTION.VERIF CATION 4;' v iMn mb. s n I
syg, L.. -
L
>>-..J
- 4,,s/gjg RESULTS OF DISPOSITION ACTION VERIFICATION DATE l 4
~'T ACCEPTABLE l
l UNACCEPTABLE QAD i
IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR f
NUMBER A.N.I.
(ASME)
DATE j
:IF REQUIRED QA-006 Rev 2
)


To             JLW sd, Midicnd En agy venc           j
To JLW sd, Midicnd En agy venc j
                                                ~/lntar From           JGB31cz2r, Mid1 cad En2rgy                                 CONSUMERS POWER December 20, 1985                                           COMPANY Date Subject       MIDIAED ENERGY CENTER -                                     Internal Correspondence NCR Q-00036 CC             RGBudrick, MEC                                             JGB 08-85
~/l From JGB31cz2r, Mid1 cad En2rgy ntar CONSUMERS POWER Date December 20, 1985 COMPANY Subject MIDIAED ENERGY CENTER -
                      ,  a.. ..                  /2ll4l0f Jag ;;%Jecanis.1 E;; st a ld d:rlsrr it                 1- 'if_--
Internal NCR Q-00036 Correspondence JGB 08-85 CC RGBudrick, MEC
                                                                ^8"    f* i: "-i'**"j
/2ll4l0f a..
                                                                      ""T' i r -- it -
Jag ;;%Jecanis.1 E;; st a ld d:rlsrr it 1-
v d-inn .a-ettrih & d ich i: an               crit:ris ^" =a ANSI N45.2.2-1972, paragraph 6.1.2, subparagraph 1, does not require filtered ventilation fe- rooms but does say that Level A items shall be stored under special conditiins similar to those of Level B items but with additional requirements such as       . . . . and other appropriate requirements.
'if_-- f* i: "-i'**"j v
d-inn.a-ettrih & d ich i: an crit:ris ^"
=a
^8"
""T' i r -- it -
ANSI N45.2.2-1972, paragraph 6.1.2, subparagraph 1, does not require filtered ventilation fe-rooms but does say that Level A items shall be stored under special conditiins similar to those of Level B items but with additional requirements such as
. and other appropriate requirements.
Engineering Technical Support does recognize special conditions which may include temperature, dust and humidity considerations as appropriate for the circumstances and as recommended by the vendor.
Engineering Technical Support does recognize special conditions which may include temperature, dust and humidity considerations as appropriate for the circumstances and as recommended by the vendor.
Dust control can be achieved in several ways appropriate for the circumstances.
Dust control can be achieved in several ways appropriate for the circumstances.
: 1. A filtered ventilation system is inappropriate due to the room arrangement (open stairwell) and the difficulty and expense of isolating the room and installing a temporary filtered HVAC unit.
1.
: 2. Very frequent vacuuming / dusting is labor intensive and, therefore, inappropriate.
A filtered ventilation system is inappropriate due to the room arrangement (open stairwell) and the difficulty and expense of isolating the room and installing a temporary filtered HVAC unit.
: 3.     Bechtelcoveredthepanelstominimizedustintrus/ionwhichproved effective and appropriate during construction.
2.
An inspection today would reveal that the panels remain covered and have filter material installed to reduce dust entry. The dust presently on interior surfaces is minimal and does not threaten the integrity of the switchgear, especially in a low humidity environment. ANSI N45.2.2, 1972,                     .
Very frequent vacuuming / dusting is labor intensive and, therefore, inappropriate.
paragraph 2.7.2, item 6, even suggests that switchgear be stored in a Level B                 l environment. The Level A attributes in this circumstance are temperature and                   l
3.
                                                                                                      )
Bechtelcoveredthepanelstominimizedustintrus/ionwhichproved effective and appropriate during construction.
humidity.                                                                                     l To minimize concern for the panels, Engineering issued ENFC-1 on 11-25-85,                     )
An inspection today would reveal that the panels remain covered and have filter material installed to reduce dust entry.
which specifies that these breaker panels remain covered. Similiarly F10-160                   ;
The dust presently on interior surfaces is minimal and does not threaten the integrity of the switchgear, especially in a low humidity environment.
is currently being reinitiated to check and maintain the integrity of the                     1 cover (requirement deleted in April, 1985).                                                   l
ANSI N45.2.2, 1972, paragraph 2.7.2, item 6, even suggests that switchgear be stored in a Level B environment.
                                                                                        ~    A f jl Z e r yase-invitation to Ope ra tions--on-WednesdWr-December- 18, 1985-r                 Jd EngineednttTechnical Support 1ould Ilke to be extended ~the opportuBTt'y t             /
The Level A attributes in this circumstance are temperature and
review-draft NCRs wallow consideration for-technical correct. ness.and prompt re perri"-na g IC1285-0022A-AD02 l
)
* i Pasa 1 cf 1       ,
humidity.
PREVENTIVE MAINTENANCE REQUIREMENTS Item (s): Control Room, Safety Related Rooms,                   XQ        NQ Equipseet Rooms, Computer Room (NQ) and Programming Room (NQ)
l To minimize concern for the panels, Engineering issued ENFC-1 on 11-25-85, which specifies that these breaker panels remain covered.
Equipment Number (s): NA                                       P.O. No: J-207 M-1.5 Location (s): Control Room AX625, El 659'                       Storage Level: A Safety Related Room AX624, El 659' Safety Related Room AX626, El 659' Equipment Rooms AX700, AX701, El 674'-6" Computer Room T752, El 675' Programming Room T639, El 659' DESCRIPTION Requirements:
Similiarly F10-160 is currently being reinitiated to check and maintain the integrity of the cover (requirement deleted in April, 1985).
: 1. Temperature shall be maintained between 50' and 110*F and shall be checked and recorded weekly.
A f jl
: 2. a. Relative humidity should be maintained at 50% or less and shall not exceed 60%. Check and record humidity weekly. Notify Engineering if humidity exceeds 50%.
~
: b. Check dehumidifiers for proper operation as needed.
Z e r yase-invitation to Ope ra tions--on-WednesdWr-December-18, 1985-r Jd EngineednttTechnical Support 1ould Ilke to be extended ~the opportuBTt'y t
: 3. Except for Rooms AX700 and AX701, provide filtered ventillation.
/
review-draft NCRs wallow consideration for-technical correct. ness.and prompt re perri"-na g IC1285-0022A-AD02
 
i Pasa 1 cf 1 PREVENTIVE MAINTENANCE REQUIREMENTS Item (s): Control Room, Safety Related Rooms, X Q NQ Equipseet Rooms, Computer Room (NQ) and Programming Room (NQ)
Equipment Number (s): NA P.O. No: J-207 M-1.5 Location (s): Control Room AX625, El 659' Storage Level: A Safety Related Room AX624, El 659' Safety Related Room AX626, El 659' Equipment Rooms AX700, AX701, El 674'-6" Computer Room T752, El 675' Programming Room T639, El 659' DESCRIPTION Requirements:
1.
Temperature shall be maintained between 50' and 110*F and shall be checked and recorded weekly.
Relative humidity should be maintained at 50% or less and shall not 2.
a.
exceed 60%. Check and record humidity weekly. Notify Engineering if humidity exceeds 50%.
b.
Check dehumidifiers for proper operation as needed.
3.
Except for Rooms AX700 and AX701, provide filtered ventillation.
Quarterly check for significant file of dust on HVAC equipment air filters and change as necessary.
Quarterly check for significant file of dust on HVAC equipment air filters and change as necessary.


==References:==
==References:==
: 1. ENFC-1
1.
: 2. Vendor File J-207
ENFC-1 2.
: 3. Vendor File M-1.5
Vendor File J-207 3.
: 4. CP-F10-2024, Rev 0
Vendor File M-1.5 4.
: 5. CP-F10-160, Rev 2 TECHNICAL SUPPORT ENGINEER         DATE REVIEW AND APPROVAL           DATE MI1285-0018A-AD01
CP-F10-2024, Rev 0 5.
CP-F10-160, Rev 2 TECHNICAL SUPPORT ENGINEER DATE REVIEW AND APPROVAL DATE MI1285-0018A-AD01


                                                                                                                    ~'
Pcg2 1 of 1
Pcg2 1 of 1 PREVENTIVE MAINTENANCE REQUIREMENTS                                                                     1 l
~'
Ites(s): Control Rod Drive Breakers                                             XQ              NQ Equipment Number (s):   IB-91A, C                 IB-92B, D                   PO No:     M-1.5 2B-91A, C                 2B-928, D Storage Level:                     A Location (s): Auxiliary Building, El 674, Rooms 700 & 701 DESCRIPTION Requirements:
PREVENTIVE MAINTENANCE REQUIREMENTS 1
Ites(s): Control Rod Drive Breakers X Q NQ Equipment Number (s):
IB-91A, C IB-92B, D PO No:
M-1.5 2B-91A, C 2B-928, D Storage Level:
A Location (s): Auxiliary Building, El 674, Rooms 700 & 701 DESCRIPTION Requirements:
Note: Refer to CP-F10-2024 for temperature and humidity requirements.
Note: Refer to CP-F10-2024 for temperature and humidity requirements.
: 1. Yearly check integrity of cover taking care to keep seams closed (such as with duct tape). Covers need not be airtight, however, as dehumidi-fied air shall be allowed to infiltrate equipment at or near floor level.
1.
Yearly check integrity of cover taking care to keep seams closed (such as with duct tape).
Covers need not be airtight, however, as dehumidi-fied air shall be allowed to infiltrate equipment at or near floor level.


==References:==
==References:==
: 1. CP-F10-2024
1.
: 2. CP-F10-160, Rev 2
CP-F10-2024 2.
: 3. ENFC-1 TECHNICAL SUPPORT ENGINEER                 DATE REVIEW AND APPROVAL               DATE MIO485-0071A-AD01
CP-F10-160, Rev 2 3.
ENFC-1 TECHNICAL SUPPORT ENGINEER DATE REVIEW AND APPROVAL DATE MIO485-0071A-AD01


                                                    '                                          UOes C/C7 0 < c/ C/U/T U--- ~ ~
UOes C/C7 0 < c/ C/U/T U--- ~ ~
15 NCR NO.               17 REV
15 NCR NO.
  !UALITY                                                                         d-COO W                         d SSURANCE IVISION
17 REV
                  -                                                j y W        16 DATE ISSUED
!UALITY d-COO W d
                                                                                    //ddb ORM QAD-1 NONCONFORMANCE REPORT                           18 PAGE     / OF 2 1 ITEM LOCATION                   ,
SSURANCE W
Auxiliary bids.     568' Elevation, Rooms 25 and 27 3 FART NAME                      4 SERIAL NO.
16 DATE ISSUED IVISION j y
2 DRAWING OR PART NO. AND REV.                                           '
//ddb ORM QAD-1 NONCONFORMANCE REPORT 18 PAGE
Drain Valves                          NA 1VDHR-102: 1VDHR-144 5 ITEM DESCRIPTION Drcin Valve                                                                                                     .
/ OF 2 1 ITEM LOCATION Auxiliary bids.
7 REFERENCE DOCUMENT               8 ASME A.N.I. REQUIn m 6 ITEM STARTUP SYSTEM NO.
568' Elevation, Rooms 25 and 27 2 DRAWING OR PART NO. AND REV.
WO-22500035                             NA 1-DHR 9 INSPECTION PLAN           REV             10 ACTION ORGANIZATION WO-500035               1                       operationu & Maintenance ACTIVITY HOLD ORDER NO.
3 FART NAME 4 SERIAL NO.
L1 ACTIVITY HOLD REQUIRED:
1VDHR-102: 1VDHR-144 Drain Valves NA 5 ITEM DESCRIPTION Drcin Valve 6 ITEM STARTUP SYSTEM NO.
X NO                                     NA TES 12 REQUIREMENT WO-22500035 step 01 states:
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIn m 1-DHR WO-22500035 NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500035 1
operationu & Maintenance L1 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
TES X NO NA 12 REQUIREMENT WO-22500035 step 01 states:
Blow "Vorify that Unit il DHR system is dry by opening system vent and drain valves.
Blow "Vorify that Unit il DHR system is dry by opening system vent and drain valves.
cut with instrument air if moisture is present."
cut with instrument air if moisture is present."
Line 380: Line 648:
C:ntrary to the above upon checking drain valves IVDHR-102 on 3"-1FCB-28 and IVDHR-144 cn 12"-1GCB-25 both pipe lines were found to have water in them.
C:ntrary to the above upon checking drain valves IVDHR-102 on 3"-1FCB-28 and IVDHR-144 cn 12"-1GCB-25 both pipe lines were found to have water in them.
14 NCR ORIGINATED BY M A Af
14 NCR ORIGINATED BY M A Af
(                     DATE D A Nott I
(
:19 HOLD TAG APPLIED               YES     X   NO           20 LOCATION OF HOLD TAGS OR SEGREATED AREA YES     X   NO                             NA                                         s ITEMS SEGREGATED i
DATE D A Nott I
23 TREND CODE         '24   NCR REVI     BY @                 ~9dr' lll NEED TO REVIEW FOR                                                                                                      ,}
:19 HOLD TAG APPLIED YES X
REPORTABILITY         YES     y   NO           j f
NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED YES X
22 DETERMIN       TO nE -         LE             25 SECTI N HEAD. ASSURANCA EN p ERING YE    N       NO
NO NA s
                                            / /
lll NEED TO REVIEW FOR 23 TREND CODE
l t
'24 NCR REVI BY @
QA-006       Rev 2 jM                   M                     _o w u                           g kW s " ~>-                               ~.M ya v ,.
~9dr' i
j
, }
f REPORTABILITY YES y
NO 22 DETERMIN TO nE -
LE 25 SECTI N HEAD. ASSURANCA EN p ERING N
NO YE
/ /
l QA-006 Rev 2 t
jM M
g
_o w u kW s " ~>-
~.M ya v,.
3 i
3 i
: e. nose of v u swohte 6 35 PAGE A 0F O 6 CAUSE .nssa \ - 3 " s pe.6 - te - A.,
 
g;% ,
6 CAUSE.nssa \\ - 3 " s pe.6 - te - A.,
U"5 M O 09 N'% Condtvs soMon i% A
: e. nose of v u swohte 6 35 PAGE A 0F O U"5 M O 09 N'% Condtvs soMon i% A g;%,
  .s, c~ t -                           rz." - io,c.s - ts - %2, toas,- e s h voed '^ L \% by. o                                                                                                                                                                                             .
.s, c~ t -
pb.r,W. M pbg. T L epe.cchoe- oWerk A deca nh o.c4                                                                                                                                                                                                         tbre.eweoeA
rz." - io,c.s - ts - %2, toas,- e s h voed '^
                                                                                                                                                                                                                                                                    \A w%          A dek m              yd-Ah                         W                                       \ wha by A                 e\% %d h%                                                                                                             .N 17 PROCESS CORRECTIVE ACTION REQUIRED I                               lYES                                                                         W NO 18 RECOMMEND O DISPOSITION l       l SCRAP / REJECT                                 l                               l REPAIR
L \\% by. o pb.r,W. M pbg. T L epe.cchoe-oWerk A deca n o.c4 re.eweoeA A Ah W
\\ wha by A e\\% %d h%
.N tb
\\A w%
h d yd-ek m 17 PROCESS CORRECTIVE ACTION REQUIRED I
lYES W NO 18 RECOMMEND O DISPOSITION l
l REWORK l
l SCRAP / REJECT l
l REPAIR
* I ><. I USE AS IS*
* I ><. I USE AS IS*
l              l REWORK CREQUIRES TECHNICAL JUSTIFICATION ATTACHED                                                     '
CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEE l
29 CONDITIONAL RELEASE NEEE                                                                                     l       lYES                                             l W l NO                                                                         CR NO:
lYES l W l NO CR NO:
, 30 ADDITIONAL INFORMATION l
30 ADDITIONAL INFORMATION l
31 DISPOSITION CONCURRENCE w                 ..
31 DISPOSITION CONCURRENCE w
GL                                           /ffof8C,                                         jkY                                                                                                         / Jo ff, DATE ACTION O G                                 ZATION                                             DATE                             QAD CONCURRSCE
GL
                        ~7             p                                                                 /   %fd INGim m ING                                                                                   DATE                             A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN                                                                                                                                                                                                                                                       \
/ffof8C, jkY
ZA\ - % .=. J\ C,het.,q                                                                           / E.T$ ode;c.k.                               \d* e                                                       C o^W ^\ ^$ CoAde w%. i m W ppi ncy rwz- TL- pi pe. pWS sac.s e moved                                                                                                                                         c wd                                             n >-                       p'i vi$   EN xd c.d dg <.4 ) a.4 A 9o.\c. e. hse.d .
/ Jo ff, ACTION O G ZATION DATE QAD CONCURRSCE DATE
33 METHOD OF DISPOSITIOh ACTION VERIFICATION                                                                                                                                                                               34 NCR CLOSE BY
~7 p
                                                                                                                                                                                                                          ?
/
                  && ftA.                                                                           '
%fd INGim m ING DATE A.N.I.
(ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN C,het.,q / E.T$ ode;c.k.
\\d* e C o^W ^\\ ^$ CoAde w%. i m
\\
ZA\\ - %.=.
J\\
W ppi ncy EN xd rwz-TL-pi pe. pWS sac.s e moved c wd n >-
p'i vi$
c.d dg <.4 ) a.4 A 9o.\\c.
: e. hse.d.
34 NCR CLOSE BY 33 METHOD OF DISPOSITIOh ACTION VERIFICATION
?
&& ftA.
e/
e/
T             TI N VERIFICATION RES                      F b                             &N       l' 3/ Plo     i s                                                                                                                                                                                                                                  /                D' ATE I M ACCEPTABLE                                                               l       l UNACCEPTABLE                                                                                                         QAD IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER A)l2 A.N.I. (ASME)                                         DATE
RES F
                                                                                                                                                                                                                            'IF REQUIRE QA-006     Rev 2 l
T TI N VERIFICATION b
&N l 3/ Plo i
I M ACCEPTABLE l
l UNACCEPTABLE QAD
/
D' ATE s
IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A)l2 NUMBER A.N.I. (ASME)
DATE
'IF REQUIRE QA-006 Rev 2 l
l
l
    -e   - . , - . -        . _ - , _ . - _ _ _ ___-___,.,_,.,,,_,_,____,____,,..,,.,,___,,y   _
-e
. _ -, _. - _ _ _ ___-___,.,_,.,,,_,_,____,____,,..,,.,,___,,y


                                                                                                                                                                          .                                . .~ .                 .
..~.
l 1
y
1 2 .n ,2::Pcaw u~.2                             :.-                          -
:z.
:.              _ - e me,. , ; , n;, , ,n m, , .-
2.n,2::Pcaw u~.2
y          :z.
_ - e me,., ;, n;,,,n m,,.-
y          Y                                             COYl W Y                                                                                                                       pggg                  0             0 SUBJECT          [nspe M,h e[
Y COYl W Y 0
GC                  M G Bsdriek
0 pggg y
                                        ;r T ek < ste                                                                                                        Dru.;.,aJb6,-ted Sys/eN,                                          ,
[nspe M,h e[
y                                                                                                                                                           . . .      .. m .=.= w =:a= = : =
SUBJECT Dru.;.,aJb6,-ted Sys/eN GC M G Bsdriek
      ._MZ88ASE                                                     Jf           2/,e       vo /c,,,, e             o -[           w./e ,-                       e dee./e./ all , .,                                           a           _
;r T ek < ste y
,   t d_.ra i.,                                   v-lve                         is         onexa           d       I .:,..                   Ies.s..           iha-,             ar-               eyo            /           b H,e i r
.. m.=.= w =:a= = : =
h',3 er                            4.J a. d a?             M         pain, yd                     ceg                     y, l/d desi #                                      6                Ii*    d Fta 6        1,                        .h le                                                                                                3, fan k /eise .                                                       41.e           a fe.<-               .vt a v                  he           een s k!we d                                 &                b e.                 tI 3
._MZ88ASE Jf 2/,e vo /c,,,, e o -[ w./e,-
e dee./e./
all,.,
a eyo
/
b H,e i t d_.ra i.,
v-lve is onexa d I.:,..
Ies.s..
iha-,
ar-r l/d desi #
6 Ii*
d Fta 6 h',3 e
.h le 4.J a. d a?
M pain, yd ceg 3,
y, r
1, fan k /eise.
41.e a fe.<-
he een s k!we d b e.
tI
.vt a v 3
h
h
                                  -                      -                <                                                  /
/
        ,f ?n                RC av                    .
fhe CR- [V' W ad,pt eY s'*A W
:,rr n       3           Wla e' O C t.!/4               9 91               fhe          CR- [V'          W ad,pt eY s'*A          W                  ,
v
                                                                                        ~
:,rr n 3
e                                                    rtR t'n t'rt,ar a0           FT& Y       <%*1 '         vt             I C.es L o a 61                       rn 20 M,p o t'
Wla e' O C t.!/4 9 91
                                    .nO t'h0t MM                                                       .A ss                                                                                                              .                                                  ,
,f ?n RC a rn 20 M,p o t' rtR t'n t'rt,ar
ty                    Y&tS                      ytg' y,f,d/y   ,
~
b           t0$e                 cMes                   g       M             g, p l'f t 8 yL1 em m Md              ene          eg          t(C                     ^t 4 t 'y y     y y> r, e g+m               sta.fye ,$                  j.)                  j iS       fk1/*t%e4'r406 e.
O t'h0t
f                                                                                                                                                                                                                                           l
.A ss a0 FT& Y
        ;( Af **                                                                O'           .        .. e !*! ". f 4                             ;.
<%*1 '
f.
vt I C.es L o a 61 e
MM
.n y,f,d/y b t0$e cMes g
M g,
p l'f t 8 yL1 em m ty Y&tS ytg' sta.fye,$
j.)
j t(C
^t 4 t 'y y y y> r, e g+m e.
Md ene eg iS fk1/*t%e4'r406 f
l f.
O'
.. e !*! ". f 4
; Af **
(
__w..~-~~,--r.+~
__w..~-~~,--r.+~
h t-                       CL                 A         re ,t os                 AtVt                 e         C.a/JACtYV                          t'o1        joe UV1 dt S                   9         l'a.J O                   vat'[d U 3                       A+.1 e               J               h
C.a/JACtYV t'o1 h t-CL A
re,t os AtVt e
joe UV1 dt S 9
l'a.J 8 *1 W 8'L h 60 8
O vat'[d U 3 A+.1 e J
h
' ~..'
1 [:...' -C'i& *L.
: -., i '. *.."'. : ~%- - r i M'*% S ~~%R**:
[W...
[W...
8 *1 W 8'L h 60 8
L=
                                                                                        ' . ~..'      1 [: ...' -C'i& *L .                      : -. , i '. * .."'..    : ~%-  - r i M'*% S ~~%R**:L=                                     .
;M dLe-e>dorter-
          ;M                                               dLe-             e>dorter-                   ,o te e         di               .
,o te e di
                                                                                                                                                  ~-, e b e               $1 -         i<le n [ Ec a Wi%
~-, e b e
O                    f1 O *+1                      91 A            nO 5 JO6             3 4 9 C. e Q
$1 -
f                                                     $$ N SV l
i<le n [ Ec a Wi%
nO 5 JO6 3 4 9 C. e Q
O f1 O *+1 91 A f
$$ N SV l
i r
i r
i SIGNED                                                                                 DATE
i DATE SIGNED
                                                                                                                      .                                                                . . + -, . .m--
.. + -,..m
                                                                                                                                                                                                                      - ~gs p..
- ~gs p..
No 45 475                                                             see PaaTs Ase a WiTH CAmeONS INT ACT . PAaT 3 WILL 35 *FTutNMI WITH MPLY.                                                                   ypg       g,
No 45 475 see PaaTs Ase a WiTH CAmeONS INT ACT. PAaT 3 WILL 35 *FTutNMI WITH MPLY.
ypg g,


15 NCR NO.                     17 REV
15 NCR NO.
  ;QUA;, M 0-00042                           0 ASSURANCE DIVISION                                                                          16 DATE ISSUED 11-??-R9 FORM QAD                                         NONCONFORMANCE REPORT                       18 PAGE     1   0F 2 1   ITEM LOCATION 584' elev. Aux. bidg - Room 130 and 131 2 DRAWING OR PART NO. AND REV.                   3 PART NAME                     4 SERIAL NO.                             j iP-232A/B and 2P-232A/B                       Pump & motor protective                     NA closure                         a g .g s
17 REV
  ,5       ITEM DESCRIPTION
;QUA;, M ASSURANCE 0-00042 0
                                                                                                                    . ,An44 R;cire. Air Cooling Unit Booster Pumps                                                   , ,,-          ."
16 DATE ISSUED DIVISION 11-??-R9 FORM QAD NONCONFORMANCE REPORT 18 PAGE 1
:\
0F 2 1
  .6       ITEM STARTUP SYSTEM NO.               7 REFERENCE DOCUMENT             8 ASME A.N.I. REQUIRED             ,
ITEM LOCATION 584' elev. Aux. bidg - Room 130 and 131 2 DRAWING OR PART NO. AND REV.
l                                                MWo. #22500536 and                           NA j                         NA                    wo #??9nn914
3 PART NAME 4 SERIAL NO.
  "!        INSPECTION PLAN               REV         10 ACTION ORGANIZATION                                   ,
j iP-232A/B and 2P-232A/B Pump & motor protective NA closure s
W.G. - 500536                    0
a
            ' 'c.
,5 ITEM DESCRIPTION g.g
                      -  3o0535             0               nM&c Dennrement 11 ACTIVITY HOLD REQUIRED:                           ACTIVITY 110LD ORDER NO.
.,An44 R;cire. Air Cooling Unit Booster Pumps
ICS         A   k'                           NA
:\\
    .12 REQUIREMENT Step 5 of MWO #22500535 and MWO #22500536 requires the protective closure to be sealed up cs part of the layup for the pumps /:tster:. This W.O. was signed by Maintenance as being completed and QAD was notified on 10/15/89 *%r 9e post orocams inspection could be ecccaplishea.
.6 ITEM STARTUP SYSTEM NO.
_    --,, mm, . o l       Both oump/ motor enclosures for iP-232A/B and 2P-232A/B are not sealed up as required.                             Pro-tective visqueen and/or rubber is not secured, and the lids are not secured or sealed.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED l
j       NOTE 1: Motors on W.O. #22500535 have some fungi formed on them.
MWo. #22500536 and NA NA j
    ,                      oh yg .&   /Hwoiq
wo #??9nn914 INSPECTION PLAN REV 10 ACTION ORGANIZATION 500536 0
    ,      NOTE 2: The)Hf indicators have turned white on all four units.
W.G.
I                                                                               14 NCR ORIGINATED BY d
3o0535 0
                                                                                                              ~
nM&c Dennrement
1 )) W DATE Zimmerman l
'c.
I9 HOLD TAG APPLIED                     YES x   NO         20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SECREGATED                 YES X   NO                 Same as #1                   ,                        t 21 NEED TO REVIEW FOR                           23 TREND CODE     '24   NCR R   IE ED B     d                   v     JK
11 ACTIVITY HOLD REQUIRED:
      !      REPORTABILITY               YES     NO                               //             ,                        (
ACTIVITY 110LD ORDER NO.
5        i DATE      6     ,                      " /T 22 DETERMINED TO BE REPORTABLE                       25 SECTION HEAD, ASSURANCE ENg1 ERING YES             NO         y          g QA-006         Rev 2
ICS A
k' NA
.12 REQUIREMENT Step 5 of MWO #22500535 and MWO #22500536 requires the protective closure to be sealed up cs part of the layup for the pumps /:tster:. This W.O. was signed by Maintenance as being completed and QAD was notified on 10/15/89 *%r 9e post orocams inspection could be ecccaplishea.
--,, mm,. o l
Both oump/ motor enclosures for iP-232A/B and 2P-232A/B are not sealed up as required.
Pro-tective visqueen and/or rubber is not secured, and the lids are not secured or sealed.
j NOTE 1: Motors on W.O. #22500535 have some fungi formed on them.
oh yg.&
/Hwoiq NOTE 2: The)Hf indicators have turned white on all four units.
I 14 NCR ORIGINATED BY d
1 )) W
~
DATE l
Zimmerman I9 HOLD TAG APPLIED YES x
NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SECREGATED YES X
NO Same as #1 t
21 NEED TO REVIEW FOR 23 TREND CODE
'24 NCR R IE ED B d
v JK REPORTABILITY YES NO
//
(
6
" /T 5
i DATE 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD, ASSURANCE ENg1 ERING y
g YES NO QA-006 Rev 2


26 CAUSE                                                                                   35 PAGE         2       0F   s.       2 During layup operations, piping systems are drained and dried. ' ater was inadvartantly drained on 2P-232 A&3 pump and motors making the temporary enclosures a hindrance to proper layup. The primary function of the wooden enclosures was to avoid damage during construction. They are no longer needed and are not required by the layup or preventative maintenance program.
26 CAUSE 35 PAGE 2
In the performance of '.Jork Orders 22500535 and 22500535 the repairmen did not recover the pumps / motors because of the wet conditions found. This should have been (see attached) 27 PROCESS CORRECTIVE ACTION REQUIRED                     l     l YES                   l       l NO 28 REC 0ffMENDED DISPOSITION N REWORK             l     l SCRAP / REJECT         l     l REPAla*               l       lUSE AS IS*
0F s.
CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                 l     l YES           - NO                 CR NO:
2 During layup operations, piping systems are drained and dried. ' ater was inadvartantly drained on 2P-232 A&3 pump and motors making the temporary enclosures a hindrance to proper layup. The primary function of the wooden enclosures was to avoid damage during construction. They are no longer needed and are not required by the layup or preventative maintenance program.
30 ADDITIONAL INFORMATION                                                                                     ,
In the performance of '.Jork Orders 22500535 and 22500535 the repairmen did not recover the pumps / motors because of the wet conditions found. This should have been (see attached) 27 PROCESS CORRECTIVE ACTION REQUIRED l
t      Al-
l YES l
                                                                                                'u%-
l NO 28 REC 0ffMENDED DISPOSITION N REWORK l
g,,', f. .y
l SCRAP / REJECT l
                                                                                                            .A
l REPAla*
                                                                      .          .                    /_
l lUSE AS IS*
v C2 H     ' L. -               "%
CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
31 D      OSITION CONCURRENCE id          li)0                 iz/s/gf                     ,
l YES
f.s'E '
- NO CR NO:
ll5   '
30 ADDITIONAL INFORMATION t
C      j ACTION ORG IZATION DATE       QAD     CURRE11CE                                         'DATE
Al-
        ~
'u%-
              /                         /2/ucthf DATE       A.N.I.   (ASME) IF REQUIRED ENGINEERING 32 DISPOSITION ACTION TAKEN Corrective work orders 22501005 and 22501008 have been written to renove the enclosures, wipe clean 1/2P-232 A&3 pumps / motors and reapply Techyl 502C uhere necessary on the machine surfaces. The repairmen have been instructed to document the work they perform in the summary of work performed section of work orders and supervisors have been instructed they must physically check jobs prior to signing the Admin. *leview block of work orders.
g,,', f..A
33 METHOD OF DISPOSITION ACTIO VERIFICATION                               34 NCR CLOSED BY d44 0,
.y
  .pSdLTS RE 4m          &ui=        /     A*) A R rp' 0 OF DISPOSITION AC ION VERIFICATION duaauwa .
/_
                                                                                    /) ev                           / /
31 D OSITION CONCURRENCE v C2 H
Bf. /                           //f/f6 l M ACCEPTABLE         l       l UNACCEPTABLE                       QAD                 /                     'DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER                                                                                ///[
' L. -
A.N.I.       (ASMB)                         DATE         j IF REQUIRED QA-006           Rev 2       l 1
li)0 iz/s/gf f.s'E '
ll5 C
j id ACTION ORG IZATION DATE QAD CURRE11CE
'DATE
~
/
/2/ucthf ENGINEERING DATE A.N.I.
(ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN Corrective work orders 22501005 and 22501008 have been written to renove the enclosures, wipe clean 1/2P-232 A&3 pumps / motors and reapply Techyl 502C uhere necessary on the machine surfaces. The repairmen have been instructed to document the work they perform in the summary of work performed section of work orders and supervisors have been instructed they must physically check jobs prior to signing the Admin. *leview block of work orders.
33 METHOD OF DISPOSITION ACTIO VERIFICATION 34 NCR CLOSED BY
/
A*) A R rp' 0 d44 0,
&ui=
duaauwa.
4m
.pSdLTS OF DISPOSITION AC ION VERIFICATION RE
/) ev
/ /
Bf. /
//f/f6 l M ACCEPTABLE l
l UNACCEPTABLE QAD
/
'DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR
///[
NUMBER A.N.I.
(ASMB)
DATE j
IF REQUIRED QA-006 Rev 2 l
1


                                        -                      NCR NO.                       tLM.
NCR NO.
i QLLALITY                                         .
tLM.
n
i QLLALITY
' ASSURANCE                                                     0-00042 DIVISION                                              DATE ISSUED FORM QAD-3 11-22-85 NOHCONFORMANCE REPORT CONTINUATION SHEET           PAGE   3   0F 3
' ASSURANCE 0-00042 n
: 26. documented in the sununary of work performed section of the work orders instead of being signed off as completed.
DATE ISSUED DIVISION 11-22-85 FORM QAD-3 NOHCONFORMANCE REPORT CONTINUATION SHEET PAGE 3
3- '51       ,
0F 3 26.
                                                                                      .c,.,,.;gi
documented in the sununary of work performed section of the work orders instead of being signed off as completed.
                                                                                            .,,a
3- '51
                                                                                              ?j l                                                                                             1 I
.c,.,,.;gi
.,,a
?j l
1 I
i i
i i
                                                                                                            !  i i
i i
l I                                                                                                       !
l I
l I
l I
i 1
i 1
QA-006       Rev 2
QA-006 Rev 2
                                                                                                              )
)
I


e     ,
e m
m UALITY                                                           15 NCR NO.                     41 7 REVy pASSURANCE                                                               d - coogo               l / #w h1 VISION                                                         16 DATE ISSUED l FORM QAD-1                                                             A.2 /f c /As-NONCONTORMANCE REPORT                   18 PAGE         / OF       2-1 ITEM LOCATION Warehouse II 2 DRAWING OR PART NO. AND REV.           3 PART NAME                   4 SERIAL NO.
UALITY 15 NCR NO.
NA                              NA C:t. # 7700-1-109 Delaval 5 ITEM DESCRIPTION Major Repair Kit 6 ITEM STARTUP SYSTEM NO.         7 REFERENCE DOCUMENT         8 ASME A.N.I. REQUIRED NA                 P.O. 5009-8131-QA                           NA 9 INSPECTION PLAN         REV         10 ACTION ORGANIZATION RE-00027               1             Site Engineering 11 ACTIVITY HOLD REQUIRED:                 ACTIVITY HOLD ORDER NO.
41 7 REVy pASSURANCE d - coogo l / #w h1 VISION 16 DATE ISSUED l FORM QAD-1 A.2 /f c /As-NONCONTORMANCE REPORT 18 PAGE
YES     X   NO                             NA 12 REQUIREMENT                                                                                         '
/ OF 2-1 ITEM LOCATION Warehouse II 2 DRAWING OR PART NO. AND REV.
P.O. 5009-8131QA requires Major Repair kits.to contain 1 each of the following item:
3 PART NAME 4 SERIAL NO.
C:t. # 7700-1-109 Delaval NA NA 5 ITEM DESCRIPTION Major Repair Kit 6 ITEM STARTUP SYSTEM NO.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA P.O. 5009-8131-QA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION RE-00027 1
Site Engineering 11 ACTIVITY HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
YES X
NO NA 12 REQUIREMENT P.O. 5009-8131QA requires Major Repair kits.to contain 1 each of the following item:
002, 004, 005, 006, 007, 008, 009, 011, 013, 015, 019, 021, 023, 024, 025, 046, 047 and 051.
002, 004, 005, 006, 007, 008, 009, 011, 013, 015, 019, 021, 023, 024, 025, 046, 047 and 051.
13 NONCONFORMANCE Contrary to the P.O. the Major Repair kits were each missing the following items:
13 NONCONFORMANCE Contrary to the P.O. the Major Repair kits were each missing the following items:
002, 009, 019, 046, 047 and 051.
002, 009, 019, 046, 047 and 051.
b       R ORIGINATED BY i       k                       12. Wk F       nds 19 HOLD TAG APPLIED 1 YES               NO         20 LOCATION OF HOLD TAGS OR SECREATED AREA ITEMS SECREGATED 1 YES           NO         [/?   / !d.//73 g
b R ORIGINATED BY i
21 NEED TO REVIEW FOR                   23 TREND CODE     24 NCR         EW     Y REPORTABII.ITY     YES     NO         gjfp          D TE                                 I u M b/
k
                                                                                                        '    /
: 12. Wk F
22 DETERMINED TO BE REPORTABLE               25 SECTION HEAD, AS         NC2' ENGINEERf)lG YES         N0         [fN QA-006         Rev 2
nds 19 HOLD TAG APPLIED 1 YES NO 20 LOCATION OF HOLD TAGS OR SECREATED AREA ITEMS SECREGATED 1 YES NO
[/?
/ !d.//73 g
21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR EW Y
gjfp I u M b/
REPORTABII.ITY YES NO D TE
/
22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD, AS NC2' ENGINEERf)lG
[fN YES N0 QA-006 Rev 2


26 CAUSE                                                                                                 35 PAGE a OF                               :>
26 CAUSE 35 PAGE a OF 7pll$,7/4 0 sfM'3 st T) Noved w sw V ht{
7pll$,7/4 0               sfM'3           st T) Noved w ht{           '
27 PROCESS CORRECTIVE ACTION REQUIRED l
sw V l        l YES                                  o 27 PROCESS CORRECTIVE ACTION REQUIRED
l YES o
                                                    .A 28 RECOMMENDED DISPOSITION l      l REWORK                          RAP /     ECT           l         l REPAIR *           @ USE AS IS*
.A 28 RECOMMENDED DISPOSITION RAP /
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED l     lYES                   NO           CR NO:
ECT l
29 CONDITIONAL RELEASE NEEDED 30 ADDITIONAL INFORMATION $tf.?     N       I               I     E/4 fus'~ of 3080 h f4cd f()m
l REPAIR *
                  /2R /CT, Q^*'c"dVLC t4& c) 80                 (07]vede4 A oa 7<cla vi cis< +<
@ USE AS IS*
[osu oncX o f N / <t                     C 76 /st{ W f'/'G ON
l l REWORK
                                                          ,        ,1                                L, , I s. k s in                                   e 31 DISPOS TI              CURRENCE              fj f ' c @                                           ,
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
j                   ~ /J
lYES NO CR NO:
                                                                                                                              /
30 ADDITIONAL INFORMATION
                                    ~        /'                                /' h !                1.,
$tf.?
N I
I E/4 fus'~
of 3080 h f4cd
/2R /CT, Q^*'c"dVLC U
7<cla vi cis< +<
t4&
c) 80 (07]vede4 A oa f()m N / <t 76 /st{ W f'/'G ON C
oncX o f
[osu L,, I
: s. k s in e
,1 fj f ' c @
j
~ /J 31 DISPOS TI CURRENCE
/
(
(
ACT             I ATIO                         j                        CONCURRENCE           L'/ '                   / [ ATE j
~
ENGINEERING                                         DATE         A.N.I. (ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN 5           l       " ' ' - ^ ^       ''~     %-^ "                                                       &
/'
_ h .., s i ^ /Ml,.
/' h !
    'y- ~ ~ ' ,' ' .5
1.,
                    -.      u
ACT I ATIO CONCURRENCE L'/ '
                              / ,A --
/ [ ATE j
                                      /O
j ENGINEERING DATE A.N.I.
_ / . ,~ l'~~y    '& ; "J. -       J /]i/th ,
(ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN 5
d' A       .                          ,;,,, ,,                    ., ,,a wez75-                 wn~ivec                     C'Q                               ' ! U"'''
l
4'
" ' ' - ^ ^
            !"'55 ''&           -        ~
''~
p gia,9                   .3 e G Astee, s , 0 -it * ~f ,^^"k0
%-^ "
                                                                ,<re v Y h/t ff & c J rsr M E / Y n
_ h.., s i ^ /Ml,.
                      '(       ehe           vdo.ed, cmc e sea. uu o n.
'y- ~ ~ ',' '.5
33 METHOD OF DISPOSITION ACTION VERIFICATION                                                 34 NCR CLOSED BY DISPOS 8 Tf 0M R Gl/l G W ED .                                                                                                                       l f
/,A _ /.,~ l' '& ; "J. - J /]i/th
RESULTS OF DISPOSITION ACTION VERIFICATION ACCEPTABLE       l         l UNACCEPTABLE                                   QAD                           [                     DAT E UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME)                                         DATE
/O A
                                                                                            'IF REOUIRED QA-006                   Rev 2
.,,,a
~~y u
wez75-wn~ivec d'
C'Q
' ! U"'''
4' G Astee, s, 0 -it * ~f,^^"k0
!"'55 ''&
p gia,9
.3 e
~
rsr M E / Y n
'(
ehe vdo.ed,
,<re v Y /t ff & c J h
cmc e sea. uu o n.
33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR CLOSED BY DISPOS 8 Tf 0M R Gl/l G W ED.
f RESULTS OF DISPOSITION ACTION VERIFICATION ACCEPTABLE l
l UNACCEPTABLE QAD
[
DAT E UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME)
DATE
'IF REOUIRED QA-006 Rev 2


11S'A*RATVAari ng 15 NCR NO.               17 RET /
11S'A*RATVAari ng QUALITT 15 NCR NO.
QUALITT ASSURANCE                                                                               d . c o o_er s                 Of /g DIVISION     .
17 RET /
16 DATE ISSUED                 /
ASSURANCE d. c o o_er s Of /g DIVISION 16 DATE ISSUED
                                                                                          //y /pc FORM-QAD-1 NONCONYORMANCE REPORT 18 PAGE       / OF o 1 ITEM LOCATION Auxiliary Bldg., Unit #1, 599' and 584' elevation 2 DEAWING OR PART NO. AND REV.                         3 PART NAME                       4 SERIAL NO.
/
M-403 Sh 2A (Q) revision 8                           1FCB-16 1FCB-21                                    NA M-410 (Q) revision 15 5 ITEM DESCRIPTION 6" - IFCB-16 and 6" - IFCB-21 are sections of S/S pipe in the Make-up and Purifica-tion Systems.
FORM-QAD-1
6 ITEM STARTUP SYSTEM NO.                     7 REFERENCE DOCUMENT               8 ASME A.N.I. REQUIRED 1-MUP                               WO-22400853                               yes 9 INSPECTION PLAN               REV                 10 ACTION ORGANIZATION WO-400853                     3                       O&M Division 11 ACTIVITY HOLD RtQUIRED:                               ACTIVITY HOLD ORDER NO.
//y /pc NONCONYORMANCE REPORT 18 PAGE
TES     2 NO                                   NA 12 REQUIREMENI WO-22400853 Step #2:
/ OF o 1 ITEM LOCATION Auxiliary Bldg., Unit #1, 599' and 584' elevation 2 DEAWING OR PART NO. AND REV.
        "If water is evident at any drain, blow that portion of piping dry with instrument air, then close the drain."
3 PART NAME 4 SERIAL NO.
                                                                                                              ^               $
M-403 Sh 2A (Q) revision 8 1FCB-16 M-410 (Q) revision 15 1FCB-21 NA 5 ITEM DESCRIPTION 6" - IFCB-16 and 6" - IFCB-21 are sections of S/S pipe in the Make-up and Purifica-tion Systems.
13 NONCONFORMANCE                                                                                             y'        '
6 ITEM STARTUP SYSTEM NO.
I neaN     u-1"-   l'.""'"' 0 ', o u v. u iu   ,.vu. 22f*-           u^m (^) ::cici : 15 :: :::           y. ...J :: -
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED 1-MUP WO-22400853 yes 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-400853 3
A-'     f--   t': p:::r-- ^' etc.                 Pipeline section 1FCB-21 to which this valve is attached and that portion of 1*CB-16 up to and including check valve ICKMUP050B shown in zone A-4 of Dwg. M-403 Sh 2A (Q) revision 8 was found full of water. This is approximately 30' of 6" pipes. The water in this line is also the subject of open NCR 4879 dated 3/7/83.
O&M Division 11 ACTIVITY HOLD RtQUIRED:
NOTE:     Check valve ICKMUP050B has no cover installed the too is covered with tape.                             -
ACTIVITY HOLD ORDER NO.
TES 2 NO NA 12 REQUIREMENI WO-22400853 Step #2:
"If water is evident at any drain, blow that portion of piping dry with instrument air, then close the drain."
^
13 NONCONFORMANCE y'
I neaN u-1"-
l'.""'"' 0 ', o u v. u iu 22f*-
u^m (^) ::cici : 15 :: :::
: y....J
,.vu.
A-'
f-- t': p:::r-- ^' etc.
Pipeline section 1FCB-21 to which this valve is attached and that portion of 1*CB-16 up to and including check valve ICKMUP050B shown in zone A-4 of Dwg. M-403 Sh 2A (Q) revision 8 was found full of water.
This is approximately 30' of 6" pipes. The water in this line is also the subject of open NCR 4879 dated 3/7/83.
NOTE:
Check valve ICKMUP050B has no cover installed the too is covered with tape.
14 NCR ORIGINATED BY SQ7m/
14 NCR ORIGINATED BY SQ7m/
D'A Nott' ihkD'TE A
ihk D'TE D'A Nott' A
19 HOLD TAG APPLIED                 YES         y NO           20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED                 YES         y NO                               NA                                   g 21 NEED TO REVIEW FOR                                 23 TREND CODE         24 NCR       EWED BY     Chu a L,.lD ocQ J fL     r REPORTABILITY             YES       X N0 DAT          y 7, (PW A_l )
19 HOLD TAG APPLIED YES y NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED YES y NO NA g
[A/62' j
21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR EWED BY Chu a L,.lD ocQ J fL r
o 22 DETERMINED TO BE REPORT               p               25 S             HEAD, ASSU       E EllCINEERING
REPORTABILITY YES X N0 7, (P _l )
                                                                                                                ]
j DAT y
YES             NO                                           j           v QA-006     Rev 2
[A/62' W A o
22 DETERMINED TO BE REPORT p
25 S HEAD, ASSU E EllCINEERING ]
YES NO j
v QA-006 Rev 2


1 g- Ponible, m ch M d l~ li% lm .16                                                                                                       A        A 0F o be.* wee p sT h as w A ,w m p sqckem+a      bete%ooP*W bwa        M +=Qt%1oe is ao 3                  k Qc d e.c in A s \1 % G4 Rase d                                                                           l 27 PROCESS CORRECTIVF, ACTION REQUIRED                                                             l                 lYES                 W NO 28 RECOMMENDED DISPOSITION l           l SCRAP / REJECT                                     l                 l REPAIR
A A 0F o g-Ponible, m ch M d l~ li% lm.16 is ao
* I       lUSE AS IS*
+a e o W bwa Q %1oe be.* wee p sT h as w A,w m p sqckem bet % oP* M
W REWORK                                                                                                                                                                  l CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                                   l       lYES                                       W NO                   CR NO:
+= t k Qc d e.c in A s \\1 % G4 Rase d 3
30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE r        a                                      / 3/       -
27 PROCESS CORRECTIVF, ACTION REQUIRED l
l                                           If3/ F4 I) ATE                                                                                                 'DATE ACTIDN ORGANIZATION                                                                          QAD CONCURRENCE                       /
lYES W NO 28 RECOMMENDED DISPOSITION W REWORK l
ENGINEERING                                               DATE                               A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN mmmg             -N g; % m Md                                               o,) $                                 IfDHQ. 12 4 M 11.9 . N g               gdoe. ic.Y Mu9 oSos ux.s Prop d CPC5                                                                             Yo
l SCRAP / REJECT l
* Q w \;.)c.k . el q i$ o9 A U + -                                                                       N                ^
l REPAIR
M                 c \oseA .                                                                                                .
* I lUSE AS IS*
34 NCR CLOSED BY 33 ME OD OF DISPOSJTION ACTION VERIFI ATI N l
l CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
                                                        &A4.eY3a .
lYES W NO CR NO:
RESULTS OF DISPOSITION ACTION VERIFICATION QAD ~               /                 ' D.C E Z ACCEPTABLE                  l                l UNACCEPTABLE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER                                                                                                                                                           DATE lA.N.I.
30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE
IF REQUIRED(ASME)
/ 3/
QA-006     Rev 2 e
l If3/ F4 a
            ,  .  .- - , - - -      -,.,--,,--n--                   - , - - - . - - - - - - - . , , - - - - - -                ~ ---            - - - -
ACTIDN ORGANIZATION I) ATE QAD CONCURRENCE
/
'DATE r
ENGINEERING DATE A.N.I.
(ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN IfDHQ. 12 4 M 11.9. N mmmg
-N g; % m Md o,) $
g gdoe. ic.Y Mu9 oSos ux.s Prop d CPC5 Yo N
^
Q w \\;.)c.k. el q i$ o9 A U + -
M c \\oseA.
34 NCR CLOSED BY 33 ME OD OF DISPOSJTION ACTION VERIFI ATI N
&A4.eY3a.
l RESULTS OF DISPOSITION ACTION VERIFICATION Z ACCEPTABLE l
l UNACCEPTABLE QAD ~
/
' D.C E IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME)
DATE IF REQUIRED QA-006 Rev 2 e
-,.,--,,--n--
~ ---


QUALITY                                                                 15 NCR NO.             17 REV ASSURANCE                                                                   0-00055                   0 DIVISION .                                                               16 DATE ISSUED FORM QAD-1                                                                   1/23/86 NONCONFORMANCE REPORT 18 PAGE     1   0F A 1 ITEM LOCATION Warehouse #2 QA Hold Area 2 DRAWING OR PART NO. AND REV.               3 PART NAME                     4 SERIAL NO.
QUALITY 15 NCR NO.
V1095 (210920)                     SCI Control Board Card           S/N #1346 and S/N #1337 5 ITEM DESCRIPTION Card, Solid State Controls Inc., Control Board for Model BCS-12-300 Battery Charger 6 ITEM STARTUP SYSTEM NO.             7 REFERENCE DOCUMENT             8 ASME A.N.I. REQUIRED NA                         P.O. 2001-9961-Q                         NA 9 INSPECTION PLAN         REV             10 ACTION ORGANIZATION RE-00030             0                     Material Services 11 ACTIVITT HOLD REQUIRED:                     ACTIVITY HOLD ORDER NO.
17 REV ASSURANCE 0-00055 0
YES       X   NO                               NA 12 REQUIREMENT P.O. 2001-9961-Q with CPC Specification AC (Quality Assurance) requires a Certificate of Compliance be received with each shipment.of material on this order.
DIVISION.
16 DATE ISSUED FORM QAD-1 1/23/86 NONCONFORMANCE REPORT 18 PAGE 1
0F A 1 ITEM LOCATION Warehouse #2 QA Hold Area 2 DRAWING OR PART NO. AND REV.
3 PART NAME 4 SERIAL NO.
V1095 (210920)
SCI Control Board Card S/N #1346 and S/N #1337 5 ITEM DESCRIPTION Card, Solid State Controls Inc., Control Board for Model BCS-12-300 Battery Charger 6 ITEM STARTUP SYSTEM NO.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA P.O. 2001-9961-Q NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION RE-00030 0
Material Services 11 ACTIVITT HOLD REQUIRED:
ACTIVITY HOLD ORDER NO.
YES X
NO NA 12 REQUIREMENT P.O. 2001-9961-Q with CPC Specification AC (Quality Assurance) requires a Certificate of Compliance be received with each shipment.of material on this order.
13 NONCONFORMANCE During receipt inspection of referenced item, on 1/22/86, a Certificate of Compliance was unavailable as required.
13 NONCONFORMANCE During receipt inspection of referenced item, on 1/22/86, a Certificate of Compliance was unavailable as required.
1   NCR ORIGINATED BY
1 NCR ORIGINATED BY
                                                                              - a'       -
- a' f.u/e, Zimmerman
f.u/e,
'DAT E 19 HOLD TAG APPLIED YES y NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA YE{
                                                                                                          'DAT E Zimmerman 19 HOLD TAG APPLIED           YES       y NO           20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SECREGATED    r                NO                 Warehouse #2 QA Hold Area YE{                                                                            f 21 NEED TO REVIEW FOR                        23 TREND CODE       24 NR       I WED' BY     @ (.,   (A) cP       .
NO Warehouse #2 QA Hold Area f
REPORTABILITY      YES    ('
ITEMS SECREGATED r
A    NO                                             (f 4             DA           V84cL/11     '
23 TREND CODE 24 NR I WED BY
z3 22 DETERMINED TO BE REPORTABLE                   25 SECTION HEAD ASS RANCE ENGINEE16fNG '               j f YES         NO QA-006     Rev 2
@ (., (A) cP
(' NO 21 NEED TO REVIEW FOR (f
REPORTABILITY YES A
4 DA V84cL/11 z3 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD ASS RANCE ENGINEE16fNG '
fj YES NO QA-006 Rev 2


                    /    Vf//    , SbYJ~ sft b & c f.s', ));ig , d y                           3$ PAGE   2   0F 2 a/ amof wh a, ydae swa ,,p-~/ /s' pde .
, SbYJ~ sft b & c f.s', ));ig, d y 3$
a /;</AsA s / ea                     s 4 a< n d x< fn e d a ,<< sng s/ /Ar compm*>lo,'se eresy/ J,y' +fs /ms / .G we.s- uur
PAGE 2
  <c.rder/e/ x? srca a/s,srs w//A. ,crestdww/ srfo's mm 4.
0F 2
27 PROCESS CORRECTIVE ACTION REQUIRED                       l           l YES                 W NO 28 RECOMMENDED DISPOSITION l       l REWORK       l     l SCRAP / REJECT         l           l REPAIR
/
Vf//
a/ amof wh a, ydae swa,,p-~/ /s' pde.
a /;</AsA s / ea 4 a< n d x< fn e d a,<< sng s
s/ /Ar compm*>lo,'se eresy/ J,y' +fs /ms /.G we.s-uur
<c.rder/e/ x? srca a/s,srs w//A.,crestdww/ srfo's mm 4.
' 27 PROCESS CORRECTIVE ACTION REQUIRED l
l YES W NO 28 RECOMMENDED DISPOSITION l
l REWORK l
l SCRAP / REJECT l
l REPAIR
* IY lUSE AS IS*
* IY lUSE AS IS*
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED                     l   l YES         I XX l NO                 CR NO:
* REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l
l YES I XX l NO CR NO:
30 ADDITIONAL INFORMATION Nonconforming item will be used as an emergency measure to restore station battery bank to required capacity.
30 ADDITIONAL INFORMATION Nonconforming item will be used as an emergency measure to restore station battery bank to required capacity.
                                                                                    ' I f$ h 31 DISPOSITION CONCURR CE
' I f$ h 31 DISPOSITION CONCURR CE
                                          }.Jh[4r                     __
}.Jh[4r
                                                                                                        /-20 -8(o DATE              CONCURRENCE                                  DATE ACT       ORGA p TI
/-20 -8(o ACT ORGA p TI DATE CONCURRENCE DATE
            &        .)                 /'Z0 OS ENGINEERING                                DATE       A.N.I. (ASME) IF REOUIRED 32 DISPOSITION ACTION TAKEN Tk/ y&ykr su'o f r&7 f                                 d A'           d       b'/ be f df 6..ydsae 4 /se <-vn,n / wa .,m ,/ /s wo 6 4/ s #bs b h the r ./ c^ /L;r see,i . p 4< . d' d sh' e p r/srs secde /NA.
.)
33 METHCD OF DISPOSITION ACTION VERIFICATION                                   i34 NCR CLOSED BY K RESULTS a'esuOFdo s                $ S '- M DISPOSITION ACTION VERIFICATION                           I l     Ec       ,          /-26-8 6 ACCEPTABLE     l     l UNACCEPTABLE                                                             DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER DATE l'IFA.REQUIRED N . I . (ASME)
/ Z0 OS DATE A.N.I.
QA-006   Rev 2
(ASME) IF REOUIRED ENGINEERING 32 DISPOSITION ACTION TAKEN Tk/ y&ykr su'o f r&7 f
d A' d
b'/ be df f
6..ydsae 4
/se <-vn,n / wa
.,m,/
/s wo 6 4/ s #bs b h the r./ c^
/L;r see,i
. p 4<. d' d
sh' e p r srs secde /NA.
/
33 METHCD OF DISPOSITION ACTION VERIFICATION i34 NCR CLOSED BY K a'esu do $ S '- M s
RESULTS OF DISPOSITION ACTION VERIFICATION I
l Ec
/-26-8 6 ACCEPTABLE l
l UNACCEPTABLE DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER l' A. N. I. (ASME)
DATE IF REQUIRED QA-006 Rev 2


P. O. UUX 1416, LULynuud, ut t r u -a i o   i t.uc.r nu.m o w o w o , .s .
')
  ')
P.
        '' A MEMBER OF THE MARMON GROUF OF COMPANIES" GEs LEIC8IE_QE,,CQ[E M_ mag g DATE:     J         23, 1986 TO:   Cons       s Power Company Midland Plant Operations
O.
UUX 1416, LULynuud, ut t r u -a i o i t.uc.r nu.m o w o w o,
.s.
'' A MEMBER OF THE MARMON GROUF OF COMPANIES" GEs LEIC8IE_QE,,CQ[E M_ mag g DATE:
J 23, 1986 TO:
Cons s Power Company Midland Plant Operations


==REFERENCE:==
==REFERENCE:==
l PURCHASE ORDER NO.s       20019961
l PURCHASE ORDER NO.s 20019961
                      ' SCI JOB NO.: 27294 SOLIDSTATE CONTROLS, INCORPORATED HEREBY CERTIFIES THAT THE COMPONENT PARTS, LISTED BELOW, FURNISHED PURSUANT 10 THE ABOVE REFERENCED PURCHASE ORDER ARE IN FULL COMPLIANCE WITH PROVISIONS OF SAID PURCHASE ORDER AND SOLIDSTATE CONTROLS, INCORPORATED QUALITY ASSURANCE AND WOREMANSHIP'. STANDARDS. SOLIDSTATE CONTROLS, INCORPORATED FURTHER CERTIFIES THAT THE ITEMS FURNISHED ARE QUALIFIED IN ACCORDANCE WITH THE ORIGINAL EQUIPMENT PURCHASE ORDER BY BEING THE SAME PART NUMDER AND MANUFACTURER, OR SUBSTITUTED WITH PART(S) OF EQUAL OR SUPERIOR CONFIGURATIdN, MATERIAL AND OUALITY, MADE TO PERFORM THE SAME SERVICE AS CORRESPONDING ITEMS FURNISHED WITH THE ORIGINAL EQUIPMENT.
' SCI JOB NO.:
27294 SOLIDSTATE CONTROLS, INCORPORATED HEREBY CERTIFIES THAT THE COMPONENT PARTS, LISTED BELOW, FURNISHED PURSUANT 10 THE ABOVE REFERENCED PURCHASE ORDER ARE IN FULL COMPLIANCE WITH PROVISIONS OF SAID PURCHASE ORDER AND SOLIDSTATE CONTROLS, INCORPORATED QUALITY ASSURANCE AND WOREMANSHIP'. STANDARDS.
SOLIDSTATE CONTROLS, INCORPORATED FURTHER CERTIFIES THAT THE ITEMS FURNISHED ARE QUALIFIED IN ACCORDANCE WITH THE ORIGINAL EQUIPMENT PURCHASE ORDER BY BEING THE SAME PART NUMDER AND MANUFACTURER, OR SUBSTITUTED WITH PART(S) OF EQUAL OR SUPERIOR CONFIGURATIdN, MATERIAL AND OUALITY, MADE TO PERFORM THE SAME SERVICE AS CORRESPONDING ITEMS FURNISHED WITH THE ORIGINAL EQUIPMENT.
THE SUDSTITUTE PARTS ARE COMMERCIAL GRADE WITH NO QUALIFICATION IMPLIED EXCEPT FOR THEIR SIMILARITY TO PARTS AS FURNISHED WITH THE ORIGINAL.
THE SUDSTITUTE PARTS ARE COMMERCIAL GRADE WITH NO QUALIFICATION IMPLIED EXCEPT FOR THEIR SIMILARITY TO PARTS AS FURNISHED WITH THE ORIGINAL.
EQUIPMENT.
EQUIPMENT.
GOLIDSTATC CONTROLS, INC.
GOLIDSTATC CONTROLS, INC.
                          .'11)c.
.'11)c.
RICHARD J.       CLUNG OUALITY ASSURANCE P.O. ITEM NO. QUANTITY DESCRIPTION                               SCI F' ART NO.
RICHARD J.
1               2     PC Peard, Dattery Charger 130V               21'.S970 0
CLUNG OUALITY ASSURANCE P.O.
ITEM NO.
QUANTITY DESCRIPTION SCI F' ART NO.
1 2
PC Peard, Dattery Charger 130V 21'.S970 0


r-mr:rvznrer varu 15 NCR NO.               17 REV QUALITT                                                                   d -oco yc,                   o ASSURANCE DIVISION    .
r-mr:rvznrer varu 15 NCR NO.
16 DATE ISSUED
17 REV QUALITT d -oco yc, o
                                                                                  //r///c,
ASSURANCE 16 DATE ISSUED DIVISION
    ' FORM -QAD- 1 NONCONFORMANCE REPORT                       18 PAGE       / OF J 1 ITEM LOCATION Midland Energy Center 2 DRAWING OR PART NO. AND REV.             3 FART NAME                     4 SERIAL NO.
' FORM -QAD-1
M457 Sh 3A(Q) Revision 12                       oe                               one M457 Sh '3B(0) Ravialan 15 5 ITEM DESCRIPTION Chilled water-safeguards equipment-unit 2 6 ITEM STARTUP SYSTEM NO.           7 REFERENCE DOCUMENT           8 ASME A.N.I. REQUIRED SCH                       WO 22500101                             NA 9 INSPECTION PLAN       REV           10 ACTION ORGANIZATION WO-500101-01       4                   Operation department 11 ACTIVITY HOLD REQUIRED:                   ACTIVITY EOLD ORDER NO.
//r///c, NONCONFORMANCE REPORT 18 PAGE
YES     x   NO                             NA 12 REQUIREMENT Layup work order #22500101 and job plan step #10 required the system to be isolated by shutting all vents and drains and capping and taping all other openings.
/ OF J 1 ITEM LOCATION Midland Energy Center 2 DRAWING OR PART NO. AND REV.
3 FART NAME 4 SERIAL NO.
M457 Sh 3A(Q) Revision 12 one oe M457 Sh '3B(0) Ravialan 15 5 ITEM DESCRIPTION Chilled water-safeguards equipment-unit 2 6 ITEM STARTUP SYSTEM NO.
7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED SCH WO 22500101 NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500101-01 4
Operation department 11 ACTIVITY HOLD REQUIRED:
ACTIVITY EOLD ORDER NO.
YES x
NO NA 12 REQUIREMENT Layup work order #22500101 and job plan step #10 required the system to be isolated by shutting all vents and drains and capping and taping all other openings.
13 NONCONFORMANCE Inspection of Post Process activities to verify accomplishment of Block 12 require-ments generated list of open vent, drain and instrument valves that were to be closed.
13 NONCONFORMANCE Inspection of Post Process activities to verify accomplishment of Block 12 require-ments generated list of open vent, drain and instrument valves that were to be closed.
The Operations and Quality Assurance Departments jointly inspected all open valves and at the same time, the valves were closed and openings taped shut by an operator.
The Operations and Quality Assurance Departments jointly inspected all open valves and at the same time, the valves were closed and openings taped shut by an operator.
This NCR is to document the original non-conformance condition and is issued closed.
This NCR is to document the original non-conformance condition and is issued closed.
No further action necessary.
No further action necessary.
bNCRORIGINATEDBY b/w 7 DATE
bNCRORIGINATEDBY b/w fJ/ %'Zimmerman 7 DATE
                                                              .              fJ/ %'Zimmerman
'7D1M cr % V'kM3 DiLT & Attaf 300 V/SVslHi (MNN,*
        '7D1M cr % V'kM3 DiLT & Attaf 300 V/SVslHi (MNN,*                 i ll 19 HOLD TAG APPLIED           YES     x NO           20 LOCATION (1 MOLD TAGS OR SEGREATED AREA ITEMS SECREGATED         YES     x NO                               NA 21 NEED TO REVIEW FOR                     23 TREND CODE         >gNCR REVIEWED BY REPORTABILITY      YES    N NO                          { g4           [A Mag i         d  DATE . / /, he- A(,
i ll 19 HOLD TAG APPLIED YES x NO 20 LOCATION (1 MOLD TAGS OR SEGREATED AREA ITEMS SECREGATED YES x NO NA NCR REVIEWED BY REPORTABILITY YES N NO
22 DETERMINED TO BE REPORTABLE               25 SECTIOh @, ASSURAN#5 ENGINEERING YES       NO QA-006         Rev 2
{
>g 21 NEED TO REVIEW FOR 23 TREND CODE d g4
[A Mag i
DATE.
/
/, he-A(,
22 DETERMINED TO BE REPORTABLE 25 SECTIOh @, ASSURAN#5 ENGINEERING YES NO QA-006 Rev 2


35 PAGE A 0F L AT GiE. TIME T44. L.AY-up w% cospd.TU>) TAL D A L c rec e ts TA wo AA olt.bEA. 40 NcT cuiLMt. , it.iE.5ULTiN(r Iw tim. i4T 4 T of TM Welt.A OLbsut_ tact 30 90 ut.r.
35 PAGE A 0F L AT GiE. TIME T44. L.AY-up w% cospd.TU>) TAL D A L c rec e ts TA wo AA olt.bEA. 40 NcT cuiLMt., it.iE.5ULTiN(r Iw tim. i4T 4 T of TM Welt.A OLbsut_ tact 30 90 ut.r.
27 PROCESS CORRECTIVE ACTION REQUIRE                   l           l TES               l X l NO 28 RECol0GNDE DISPOSITION l SCRAP / REJECT       l           l REPAIR
27 PROCESS CORRECTIVE ACTION REQUIRE l
* l     lUSE AS IS*
l TES l X l NO 28 RECol0GNDE DISPOSITION W REWORK l
W REWORK              l
l SCRAP / REJECT l
* REQUIRES TECHNICAL JUSTIFICATION ATTACHE
l REPAIR
  ! 29 CONDITIONAL RELEASE NEED                   l   l TES             W NO                 CR NO:
* l lUSE AS IS*
* REQUIRES TECHNICAL JUSTIFICATION ATTACHE 29 CONDITIONAL RELEASE NEED l
l TES W NO CR NO:
30 ADDITIONAL INFORMATION 4
30 ADDITIONAL INFORMATION 4
4    31 DISPOSITION CONCURRENCE 4fA A hw ACTION ORGANIZATION sh sles DATE L           CONCURRENCE
31 DISPOSITION CONCURRENCE 4
                                                                                          -                Ad'n
4fA A hw sh sles L
                                                                                                          '  ' DATE ENGINEERING                           DATE       A.N.I.           (ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN Joint inspection by OPS and QA with operator closing open valves.
Ad'n
i 33 METHM OF DISPOSITION ACTION VERIFICATION                               '34   NCR CLOSED BY 7Lbed l'        RESULTS OF DISPOSITION ACTION VERIFICATION                             ,        s
' DATE ACTION ORGANIZATION DATE CONCURRENCE ENGINEERING DATE A.N.I.
                                                                                        .. a                 1/31/L ACCEPTABLE     I   IUNACCEPTABLE                                                       / ' DATE FI iACCEPTABLE, REFERENCE SUPERSEDING NCR                           ,
(ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN Joint inspection by OPS and QA with operator closing open valves.
HUMBER                                                                 ;
i 33 METHM OF DISPOSITION ACTION VERIFICATION
DATE lA.N.I. (ASME)
'34 NCR CLOSED BY 7Lbed l
IF REOUIRED QA-006     Rev 2 l
RESULTS OF DISPOSITION ACTION VERIFICATION 1/31/L s
.. a ACCEPTABLE I
IUNACCEPTABLE
/
' DATE FI iACCEPTABLE, REFERENCE SUPERSEDING NCR HUMBER lA.N.I. (ASME)
DATE IF REOUIRED l
QA-006 Rev 2


NCR NO.                     REV.             )
. QUAI.ITY NCR NO.
    . QUAI.ITY                                                                                        C i
REV.
ASSURANCE d- 00 oS 6 DIVISION                                                        DATE ISSUED
d- 00 oS 6 C
                                                                              //J / /pc FORM QAD-3' NONCONFORMANCE REPORT CONTINUATION SHEET                     PAGE   A 0F 3 p/ro Hi,67 ds/3A (40 b'' /A posa V4t Ve*:                             Acar!* VA.v f                               Insrnauenr*
i ASSURANCE DATE ISSUED DIVISION
2 y wt188           a vseg og4                 2 VSW 398               2VatM 303         syscM 189 o    %      I43    *
//J / /pc FORM QAD-3' NONCONFORMANCE REPORT CONTINUATION SHEET PAGE A 0F 3 p/ro Hi,67 ds/3A (40 b'' /A posa V4t Ve*:
* 25.2            =
Acar!* VA.v f Insrnauenr*
* 37/           "
2 y wt188 a vseg og4 2 VSW 398 2VatM 303 syscM 189
                                                                                      * #ff         *
=
* I40 i
37/
        *
* #ff I40 I43 25.2 o
* I42-  u ~      S IB               *"        Jo9         OVMH3S1           u ~       19G
i 19G S IB Jo9 OVMH3S1 I42-u ~
              ~              - *                      *    ~
u ~
        ~              l 9I           5 00                         2e3                         u     ~     19 7 k    u I46     ~ s     24C
19 7 l 9I 5 00 2e3 u
* 353                          u     ~    14C
~
              %                                        a    ~      3S*/                               u    gig l*                2.91. cWscu 357s                                                           .
~
i l*        "
~
Sil     OVMNA 32-                 *   "      397                            .
~
* A69 0 t/SCM 2.90                         e2fef                          u     "  229 s         Mo
353 14C 24C I46
                                                                                                =    "    4.6 3
~ s u
                                                                                              .s    ~
~
k u
3S*/
2.91.
cWscu 357s l*
gig a
~
u i
Sil OVMNA 32-397 A69 l*
229 e2fef 0 t/SCM 2.90 u
Mo s
4.6 3
=
gQ(
gQ(
pizo H MS7 GU38 (Q) by /S nu,a sw er                 kr ike:             nw_mr                       nocuba unea nr 1 VSCH 004 e           DVscM //B             avSCW 2.41L                 A "OLASG" MW o   **      A1       *6       2%           .1V CCM i M A                   9 VSC H       \09 A
.s
            *'          t&34
~
* 8    //4d.       A VSCH         t 3.s 6
pizo H MS7 GU38 (Q) by /S nu,a sw er kr ike:
            "'          /A3       * %    //9A             VEL *r Oacs -             D V.SC H l2.2.D o~          3d         s s    /2 M                                       24/SW /3G                       \
nw_mr nocuba unea nr 1 VSCH 004 e DVscM //B avSCW 2.41L A "OLASG" MW o
          ~ .AYS- 57// B i d Arv D (M3bithe) seems                                   rweD .
A1
1;urrnaue JY       t! Rect       .seccy /374 l
*6 2%
    ,                                      paut /5 74 9 l'sCW   N/A                                                         l t                                                                                                             l QA-006       Rev 2 l
.1V CCM i M A 9 VSC H
                                                                                                                      .}}
\\09 A t&34 8
//4d.
A VSCH t 3.s 6
/A3
//9A VEL *r Oacs -
D V.SC H l2.2.D 3d
/2 M 24/SW /3G
\\
o~
s s
~.AYS-57// B d Arv D (M3bithe) seems i
rweD.
1;urrnaue JY t! Rect
.seccy /374 l
paut /5 74 9 l'sCW N/A l
t l
QA-006 Rev 2
.}}

Latest revision as of 00:34, 11 December 2024

Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106
ML20154H965
Person / Time
Site: Midland
Issue date: 02/25/1986
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
32581, ALAB-106, NUDOCS 8603100418
Download: ML20154H965 (36)


Text

{{#Wiki_filter:_ CORSum8f5 power l mm C0Mpany v, ~,u,.,- ~ g<, u.e.<m, and Construction General Offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 February 25, 1986 l Director of Office of Inspection and Enforcement Att Mr James M Taylor t US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 MONTHLY REPORT FOR JANUARY 1986 DOCKET NOS 50-329 AND 50-330 FILE 0.4.6 SERIAL 32581 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are five copies of the following documents written or closed during the month; Bechtel Nonconformance Reports, Quality Action Requests, Management Corrective Action Reports, Quality Audit Findings; Babcock & Wilcox Reports of Noncon-formity; Consumers Power Company Nonconformance Reports, Audit Finding Re-ports, Quality Action Requests, Corrective Action Reports, and Management Corrective Action Requests / Reports. s JWC/WRB/Ir CC JGKeppler, USNRC Region III (w/ enc) CBechhoefer, Esq, ASLB (w/ene) ALAB-106 Service List (w/ enc) PDR ADOCK 05000329 k g\\\\ 8603100418 960225 R PDR OC0286-0018A-MP02

r -- 1 ALAB-106 MONTHLY REPORT SERVICE LIST Mr Frank J Kelley, Esq Mr Steve Gadler Attorney General of the 2120 Carter Avenue State of Michigan St Paul, MN 55108 Ms Carole Steinberg, Esq Assistant Attorney General Mr William Clements (2) Environemntal Protection Div Docketing & Services 720 Law Building US Nuclear Regulatory Commission Lansing, MI 48913 Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Cherry & Flynn Ms Mary Sinclair 3 First National Plaza 5711 Summerset Street Suite 3700 Midland, MI 48640 Chicago, IL 60602 Mr Joseph Rutberg Mr F C Williams, Esq Assistant Chief Hearing Council Isham, Lincoln & Beale US Nuclear Regulatory Commission 1120 Connecticut Ave, NW Office of the Executive Legal Director Suite 325 Washington, DC 20555 Washington, DC 20036 Ms Barbara Stamiris Mr P Robert Brown, Jr 5795 North River Road Clark, Klein & Beaumont Route 3 1000 First Federal Building Freeland, MI 48623 1001 Woodward Avenue Detroit, 1H 48226 Mr John Demeester, Esq Dow Chemical Building Ms Lynne Bernabei Michigan Division Government Accountability Midland, MI 48640 Project of the Institute for Policy Studies Mr Michael I Miller, Esq 1901 Q Street, NW Isham, Lincoln & Beale Washington, DC 20009 3 First National Plaza 52nd Floor Mr James E Brunner, Esq Chicago, IL 60602 Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 OC0286-0018A-MP02

p - [, 4 INDEX OF ATTACHMENTS ALAB-106 MONTHLY REPORT. JANUARY 1986 Bechtel Nonconformance Reports - None Bechtel Quality Action Requests - None Bechtel Management Corrective Action Reports - None Bechtel Quality Audit Findings - None Babcock & Wilcox Reports of Nonconformity - None Consumers Power Company Nenconformance Reports - Q-00053, opened 1/14/86 c Q-00054,' Opened 1/21/86 Q-00018, Closed 1/14/86 ,Q-00035, closed 1/31/86 -Q-00036, Closed.1/2/86 Q-00040,. Closed 1/31/86 Q-00042, Closed 1/8/86 Q-00050, Closed 1/9/86 Q-00052, closed 1/31/86 -Q-00055, closed 1/28/86 Q-00056, closed'1/31/86 Consumers Power Company Audit Finding Reports - None Consumers Power Company Quality Action Requests - None Consumers Power Company Corrective Action Reports - None Consumers Power Company Management Corrective Action' Request / Reports - None l -0C0286-0018A-MP02

tMU.id Gyn . QUALITY 15 NCR NO. 17 REV ' ASSURANCE-g. coa.fyJ5 0 DIVISICN 16 DATE ISSUED FORM QAD-1 1/14/86 NONCONFORMANCE REPORT 18 PAGE 1 0F 1 1 ITEM LOCATION Inactive M&TE storage 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. NA M&TE items NA 5 ITEM DESCRIPTION Nonconforming M&TE 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA NA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION To be determined later A See block # 30 ~ 11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD CRDER NO. YES y NO 12 REQUIREMENT See block 13, below. 13 NONCONFORMANCE The purpose of this NCR is to document all construction related M&TE items which were determined to have calibration problems at the final calibration check. This is a non-S&M related NCR. It will remain open and be revised, as needed, to add any additional M&TE items found in the future. In the event of a nuclear restart each of these items must be evaluated for its impact on past construction. Refer to the attached pages for the listing of M&TE items. / 14' NC R ATED Og lld V DATE / L Wood, Jr. 19 HOLD TAG APPLIED YES y NO 20 LOCATIOVbFHOLDTAGSORSECREATEDAREA ITEMS SEGREGATED y YES NO Inactive M&J(storage, ,m 21 NEED TO REVIEW FOR 23 TREND CODE 24 NC REV EWED Wo , Jr. REPORTABILITY, YES X NO g 22 DETERMINED TO BE REPORTABLE 25 SECTIONHEAD,fSU CE ENGINEERING // YES NO NA N QA-006 Rev 2 l

t 26 CAUSE 35 PAGE 1 0F 1 Various 27 PROCESS CORRECTIVE ACTION REQUIRED l lYES l X l NO 38 RECOMMENDED DISPOSITION To be determined in event of a nuclear restart l l REWORK l l SCRAP / REJECT l l REPAIR

  • l l USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l

l YES I l NO CR NO: 30 ADDITIONAL INFORMATION ( Disposition of each M&TE item and any impact on past safety related construction work will be made if there is a nuclear restart at a future dat r, l rb 1 tb (4 31 DISPOSITION CONCURRENCE / ACTION ORGANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I. (ASME) IF REQUIRED l 32 DISPOSITION ACTION TAKEN 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION I l ACCEPTABLE l l UNACCEPTABLE -QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME) DATE j IF REQUIRED QA-006 Rev 2 i ....--.,,_-n_,, n. ~

p Attcchment PS. 1

  • M&TE CALIBRATION #

DESCRIPTION: 8325-00250 Decade Resistor S/N 21544 8325-12657 Clark Hardness Block S/N 82675 8325-12639 S/N 823812 8325-12634 S/N 802017 8325-12636 S/N 801984 8325-12637 S/N 823770 8325-12638 S/N 822757 8325-12633 S/N 811726 8325-10390 Temperature Recorder (32"F to 110*F) (BPC-499) 8325-10390 Temperature Recorder (32*F to 110*F) (BPC-716) 8325-00243 Pressure Cage (0-300 psi) (BPC-1494) 8325-00243 Pressure Gage (0-400 psi) (BPC-M150) 8325-00243 (0-200 psi) (BPC-1619) 8325-00243 (0-200 psi) (BPC-1620) 8325-00243 (0-200 psi) (BPC-1621) 8325-00243 (0-200 psi) (BPC-1625) 8325-00243 (0-200 psi) (BPC-1626) 8325-00243 (0-200 psi) (BPC-1618) 8325-00821 Dial Thermometer (0-500*F) (BPC-3823) 8325-10390 Pocket Thermometer (25-125*F) (BPC-4439)

.m r Attcchment Pg. 2 8325-00821 Dial Thermometer (50 to 500*F) (BPC-4333) 8325-00821 (50 to 500*F) (BPC-4332) 8325-00621 (50 to 500*F) (BPC-4327) 8325-00821 (50 to 500*F) (BPC-4318) 8325-00821 (50 to 500*F) (BPC-4310) 8325-00821 (50 to 500*F) d (BPC-4298) 8325-00821 (50 to 500*F) (BPC-4294) 8325-00821 (50 to 500*F) (BPC-4286) O

RE003 COPY QUALITY 15 NCR NO. 17 REV ASSURANCE

d. coo h O

DIVISION 16 DATE ISSUED FORM QAD-1 //.3/ //G NONCONFORMANCE REPORT 18 PAGE / OF A 1 ITEM LOCATION NA 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

l. A NA NA 5 ITEM DESCRIPTION Computer Program error, Program ME 101, Versions J4, J5, K1 and K2.

e ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA NA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION NA Engineering Technical Support 11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES X NO NA 12 REQUIREMENT Saction 4.2.2 of Procedure QA-6, revision 2 states in part: "When a nonconformance is reported to or detected by QAD personnel, QAD is responsible for: ...d. Documenting nonconformance on a NCR (Appendix A)." 13 NONCONFORMANCE On January 15, 1986 Consumers Power Company received formal notification from Bechtel Power Corporation (ref. BPCo Letter COM 157157, 1/8/86) which identifies an error in a computer design program. The specific program is the ME 101, versions J4, J5, K1 and K2, and is used in static analysis of piping elements. Incorrect data results when ME 101 analysis computer runs call out the EAL internal program solver instead of using the stan-dard SAP internal solver to perform static uniform design analysis. At this time, it has bsen established that design analyses performed for the Midland Enerry Center used the ME 101 program. However it has not been established 14 NCR0{.GINATEDBY whethe ese design analyses used the EAL internal pro- ~ MCButterfielf DATE 19 HOLD TAG APPLIED YES X NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA /L/M ITEMS SEGREGATED' YES X NO 21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR REVIEWED BY gj /g o REPORTABILITY y YES NO NA DATE / / /_[ N / 22 DETERMINED TO BE REPORTABLE 25 SECTION H E EERING 1 YES NO O. M 9 / /

  • gj,.

p g l / / QA-006 Rev 2 I

.= 26 CAUSE 35 PAGE O OF 4 27 PROCESS CORRECTIVE ACTION REQUIRED l ' LYES I l NO 28 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • l lUSE AS IS*

CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l l YES l l NO CR NO: 30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE ACTION ORGANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN l 33 METHOD OF DISPOSITION ACTION VERIFICATION '34 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION I lACCEPTABLE l l UNACCEPTABLE QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER A.N.I. (ASME) DATE IF REOUIRED QA-006 Rev 2 ,,, +, - - - - -,n,


,,n m

,.r..,,-,-n.. -~-,n- -,n-

15 NCR NO. 17 REV 90ALITY O - cod /A d ASSURANCE DIVISION ) 16 DATE ISSUED i M /% /f8S~ FORM -QAD-1 O N CE W ORT 18 PAGE / OF 1 L ITEM LOCATION W"

  • W $ / / L. S 2 DRAWING OR PART NO. AND REY.

3 PART NAME 4 SERIAL NO. Zb Y hS38~~00%$O WS N 5 ITEM DESCRIPTION t/0M l&OY J 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N. I. REQUIRED AM 31802.2585-2. Gw) ^4f 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION M/04A%10 W M NlW /VA fMAured,90/ As 11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES 1 NO g 12 REQUIREMENTZAlsnexxrztr massr/H w sg re gg as,awy &&t'4hNro L.sHry Ftwt /0. O CM DEE2Allel2 a$r6P 9W Pmw^ce e r' zs n,. Is-f 42 Rev z. I 13 NONCONFORMANCE Z;u.snrwwvxr?" N+s ou.7 oe cwaAs77& ou /0 0+ W DdeseRW WeALsr purJA./7~f3o. o m), l W By d o& tl M&M Ar sr~.1 l $W d4ks64 won mea'!~ #832S-eo2SD W2-2/-8C, t NCR ORIGINATED BY 5 , : = ;== YM l fh L 2i m - :::1 i %1hR$k.sfhV $. f $'AGS OR SEGREATQ AREA l l20 LOCATION OF LD i 19 HOLD TAG APPLIED YES 1 NO E~A/Al*77V& ITEMS SEGREGATED 1 YES NO j fg g 21 NEED TO REVIEW FOR 123 TREND CODE l24 N Eh SY - (. & cOJC /v2 REPORTABILITY YES 1 NO 5 i E V// 7 W 22 DETERMINED TO BE REPORTABLE ~ 25 SECTION HEAD. ASSURANCE 'DiGINEERING g l YES N0 QA-6 Rev 1 L

l 26 CAUSE 35 PAGE 1 0F ~2 MM J 27 PROCESS CORRECTIVE ACTION REQUIRED l l YES M NO 28 RECOMMENDED DISPOSITION REWORK l l SCRAP / REJECT I l REPAIR

  • l lUSE AS IS*

CREQUIRES TECHNICAL JSUTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l lYES g NO CR NO: 30 ADDITIONAL INFORMATION.Z"A/.sTAL:u :='~r /dtf 8diER.) &d6D lN M Ar. e AktcAt (,3EcccoN' G /.4 S. /A14Q1t/E OTMEl.s N a.rr n a Re-auswen ,o m a_ re x.rn w re na m WWw of m.s / W 7awea.s/ w w r $4W/dd.4V?t:W Jh4ff NW M WND, 31 DISPOSITION CONCURRENCE ACTION ORCANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A.N.I. ( ASME) IF REQUIRED I pm ~ G dLMAO./VAJL C/T-44 A 5 ,, w -sps a me owsr 45f Mr ,gg3g oJ&a, Ma+e.wsoup m.smyad au a L o ^^ #mf i] JL L $ &. 3 l$ Y 0$A 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR' CLOSED BY y c 32 O h[ M b. 0 0b RESULTS OF DISPOSITION ACTION VERIFICATION 7 b / QAD ' D AT E l l ACCEPTABLE l l UNACCEPTABLE !/ IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR l NUMBER A.N. I. (ASME) DATE IF REQUIRED t QA-6 Rev i -. ~. -.

~ 15 NCR NO. 17 REV ALITY

SURANCE KOp (IOT/

d.ooase O

a A vJ uaa 16 DATE ISSUED

, VISION /o h//$ )RM QAD-1 NONCONFORMANCE REPORT 18 PAGE i 0F 2 ITEM LOCATION Racetor Building, Containment #2, 640' Elevation ! DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. i M-411 Sh. A&B (Q) revision 0 Core Flood Tank System NA i ITDi DESCRIPTION Caro Flood Tank System - Unit 2 5 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED Md 2-CFS WO 22500652 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500662 0 0 & M Division 1 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES x NO - NA 2 REQUIREMENT

1) WO 22500662 step 03: Verify that the balance of the CFS system is dry by opening system vent and drain valves.

If moisture is present, blow dry with service air until no water comes from the drains.

2) WO 22500662 step 05: Place an "X" through all valves that are shut and circle all valves that are open on the attached P&ID.

3 NONCONF0 g CE

1) C,ntrary to requirement #1 a steady trickle of water was obtained from drain valves 2VCFS 083 and 2VCFS 084 when they were opened.

Several drops of water were received from valves 2VCFSO49 and 2VCFS050 when they were opened.

2) Contrary to requirement #2 gageline valve 2VCFS016 is not circled to indicate an open valve even though the drawing has a statement indicating the valver. position.

14 NCR ORIGINATED BY d?#72W 44r / DRE D A Nott L9 HOLD TAG APPLIED YES X NO 20 LOCATION OF HOLD TAGS OR SEGNED AREA ITEMS SEGREGATED YES X NO NA 21 NEED TO REVIEW FOR 23 TREND CODE 24 N I - * "iL.uJoo -J g y REPORTABILITY YES X NO CE - s-5G 22 DETERMINED TO BE REPORTABLE 25 SECTIONHEAD,f Md YES NO QA-006 Rav 2 6 r/.d g M dh g o y cis Q =Mwv h M u ou,,,2:2,_; h M

  • W-

[b

l. CAUSE r+cm). Tka., a%d oQ de<- Qn6 dec'% D 35 PAGE 2 0F 2 Irnper.lico m q h c.h\\ci b ke.d to Code.Awh ' e n in A sf t.m. 7% g. - Tb., ope.edor urok open N mt to N NGht. So Me yde 9%ikien. 1 PROCESS CORRECTIVE ACTION REQUIRED I-lYES N NO 4 3 RECOMMENDE DISPOSITION i l jREWORK l l SCRAP / REJECT l l REPAIR

  • l >< I USE AS IS*

Twww i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 9 CONDITIONAL RELEASE NEE E I ITES l g l NO CR NO: 0 ADDITIONAL INFORMATION t 1 DISPOSITION CONCURRENCE 3df% 3 .. $l - - > t/.50l7G l d / / DATE ACTIG l 0 IZATION DATE QAD CONCURREl$CE Y b / 3/ I ENGINEERING DATE A.N.I. (ASME) IF LEQUIRED \\t $te Cos5t" N Is^- U* g*VN 12 DISPOSITION ACTION TAKEN iWt- %es ? '%be;& /3 i C %.c\\<b1 os acxio n m b To.L. n%t $i sc.e N Y TYs Cee be ope.cobichs % e., " g ocas % un\\ be Wh. 33 METHOD OF DISP ITI ION VERIFICATION

34 NCR CLOSE BT Q

3 s2,. W '/ ( ".2-l RESULTS OF DISPOSITION ACTION VERIFICATION I W ACCEPTABLE I l UNACCEPTABLE .QA9 / .DATE IF UNACCEPTABLE, REFERENCE SUPERSEING NCR i / 4///,7 NUMBER A.N.I. (ASlfE) DATE 'IF REQUIRE QA-006 Rev 2

1 l = i .: ' ~ - ~7mern. :'. n.';n.me:sen~. t:. :-a. i

'.w- ~~urs.w;,.~

O f O'V? m# DATE 1 $UbitCT [vtsfee oE eh 3 T Ck e.92& braL!*,e$ b r~ o't d 0VS * *+1s ! CC M G E@ rte k I g .".L M. -* 3:,:Jn".:>:., ;. l M]CSAGE Jf.g,e vo[v,+1 e o'[ wa de r-c.o Mee /e/ d aea a t d<.- valve is one.,J ta ta.n 6, ew / b t4 e i a, va lo.,. af He JNEn I.,, a he La., Jh. va Iv e J ik a *1 [C ! 39 [ W f.. "[l1 e be cm 8.FlC!F#cI b 2.

  1. 1_ tut es pria v

/ ~ L : ).. '.c ,,,.... L. se <~a r w o.se. s d

sica s,-

.c . n,- s,.. ~,,.J i' .i Yb's Y iS nd amid v '$t' 1032 e-$93 s.) ed ac

  1. l'f t

& V 0

        • 1 a v a. h, N ( v a.e ' t.,

ts in eem efale US n, J JLe m..., r , apua d A ch ak & asa J. 3 I i 4 L Tl1e enNacbestn$$ mive $e e.^* c, Yv in poun als of ea & l a r j0W c'*At*Lh e ~ Varie u 1, $fm e. ty.t e~m k I L u *,.c!i;.h.*a s "s-%'. ':..4 : 'T.L.r f "-n '*:.%. ^ ^ ::

s.~. t;.-. P ee w =-vmen."Jd2Aws%T.'.

,e.^.A'. . C, c.. din $$ a m e he +- Cf' l en ~ t-a* O r tntr~ pide n f I OT Fl e on t en n t e t be. 3 I m e.. W h f. iff}-8 9V l l I L lK,NED DATE i '** -*" r'-'-~-~1rs ~ - - YAr *m v ~ ~ s

  • ~~ *'

=..... ' ..... i.2..

  • J.

. r&CilJJ3 Ese PAaTS 1 Age 3 wme CAE30em INT ACT. PAaf 3 WM M RETUSNED URTH MPLY. gy g g g

  • l o ntsutterrasic, nec g

g gr CONSUMERS From JTChristy/RGBudrick, ME Q I POWER Date November 27, 1985 COMPANY Subject MAREED UP P& IDS ASSOCIATED Internal WITH LAYUP WORK ORDERS Correspondence RGB 40-85 CC HPLeonard, NEC JLWood, NEC SFGreve, MEC Currently layup work orders contain a step which requires the worker in the field to note on an attached P&ID all piping or equipment that is not installed and place an "X" through all valves that are left in the shut position. The purpose of this letter is to assure a uniform understanding as to what this step is for. This line item in the work order process is not an engineering mandated requirement, or needed by engineering for layup activities. Instead, this activity serves as an aid to the O&M department while performing their layup work operations in the field, and is in excess of that required. Therefore, this activity is deleted per this letter. IC1185-0027A-AD01

/l' 15 NCR NO. 17 REV ~dUALITT ASSURANCE o-00036 v/ 16 DATE ISSUED J DIVISION FORM QAD-1' 10/30/85 NONCONFORMANCE REPORT 18 PAGE 1 0F 2 \\ 1 ITEM LOCATION 674'-6" Elevation of Auxiliary Bldg. Rooms 700 and 701 l 2 DRAWING OR PART NO. AND REV. 3 PART NAME g 9f 4/c, 4 SERIAL NO. di $,W# NA M-7 Sh. 2 revision 19 1B-91 2 ,5 ITEM DESCRIPTION l89thfC,184 mfd,389/ A/C M AA 4=1 YO Centrol Rod Drive Breakers !!-?1 ^,3,C,0 0 23 01.".,2,0,D in Electrical Equipment j 6-Roome 700 and 701.

6 ITEM STARTUP SYSTEM NO.

7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED P-F10-160 rev. 1 CP-F10-NA 2024 rev. O ANSI N45.2.2--1972 NA l9 INSPECTION PLAN REV 10 ACTION ORGANIZA7.' ION l NA Operations & Maintenance Division 11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES r NO NA .12 REQUIREMENT Pcragraph 6.1.2(1) of ANSI N45.2.2-1972 states: " Level A items shall be stored under special conditions similar to those described for Level B items but with additional rsquirements such as temperature and humidity control within specified limits, a ventila-tion system with filters to provide an atmosphere free of dust and harmful vapors, and any other appropriate requirements." gP-{g -1 g vg,1 & CP-F10-2024 rev. O require the Control Rod Drive Breaker Equipment be

13 NONCONFORMANCE Centrary to the above requirement, rooms 700 & 701 do not have filtered ventilation.

I 1 14 NCR ORIGINATED BY l lo-30.e5 %dlET d%c 19 HOLD TAG APPLIED YES y NO 20 LOCATION 0 TAGS OR SEGREATED' JiREf f ' g ITEMS SEGREGATED YES X NO 12 1 NEED TO REVIEW FOR 23 TREND CODE 24 NCR I REPORTABILITY YES x NO -/d 5 5 DAT. T y j 7[4 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD. AS CE ENGINEER:.NG ~ M YES 1 NO M e d QA-006 Rev 2

26 CAUSE 35 PAGE 2 0F 2 C" A g yte W 370Zjc 7Ey s p cye,$d b & o. ~/Bew eme~dM'$ b d NW ** l s ,vn ' AfyME-due p CMn A e"~d~" b'3 'm%c J J o u c 8 -Yo z o & V. 27 PROCESS CORRECTIVE ACTION REQUIRED l l YES NO 28 RECOMMENDED DISPOSITION J REWORK l l SCRAP / REJECT l l REPAIR

  • l l USE AS IS*

i CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l lYES NO CR NO: 30 ADDITIONAL INFORMATIONhJ5 20 b -00 ~8S e#ferk /12775u1 [A), aee v..yt , 4w ~ ~f3 /917A* vc o37~ ] N/*MJ - (&b, A 31 DISPOSI ON CONCURRENCE E /t. -2 * ' $ '8 N $[ DATE AC ON ORGANIZATI DATE Q ' CONCURRENCE f)f;fpgQ/ f l ~ 2 0 ~S~ AITGINEERING ~ // DATE A.N.I. (ASME) IF REQUIRED 32 ISPOSITION ACTION TAKEN ss A hgpD }{g(jfj oJ of C/-flu -ZOW ((ofy sff7sidO) wni' de o.** tu ~E) I d'c K '( ((ux sA.n N fs /km3 / 700 f < m L f) V' A <:7at Maa z.u u c. c/na.tw / 34 NCR CLOSED BY 33 METHOD OF DISPOSITION ACTION.VERIF CATION 4;' v iMn mb. s n I syg, L.. - L >>-..J - 4,,s/gjg RESULTS OF DISPOSITION ACTION VERIFICATION DATE l 4 ~'T ACCEPTABLE l l UNACCEPTABLE QAD i IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR f NUMBER A.N.I. (ASME) DATE j

IF REQUIRED QA-006 Rev 2

)

To JLW sd, Midicnd En agy venc j ~/l From JGB31cz2r, Mid1 cad En2rgy ntar CONSUMERS POWER Date December 20, 1985 COMPANY Subject MIDIAED ENERGY CENTER - Internal NCR Q-00036 Correspondence JGB 08-85 CC RGBudrick, MEC /2ll4l0f a.. Jag ;;%Jecanis.1 E;; st a ld d:rlsrr it 1- 'if_-- f* i: "-i'**"j v d-inn.a-ettrih & d ich i: an crit:ris ^" =a ^8" ""T' i r -- it - ANSI N45.2.2-1972, paragraph 6.1.2, subparagraph 1, does not require filtered ventilation fe-rooms but does say that Level A items shall be stored under special conditiins similar to those of Level B items but with additional requirements such as . and other appropriate requirements. Engineering Technical Support does recognize special conditions which may include temperature, dust and humidity considerations as appropriate for the circumstances and as recommended by the vendor. Dust control can be achieved in several ways appropriate for the circumstances. 1. A filtered ventilation system is inappropriate due to the room arrangement (open stairwell) and the difficulty and expense of isolating the room and installing a temporary filtered HVAC unit. 2. Very frequent vacuuming / dusting is labor intensive and, therefore, inappropriate. 3. Bechtelcoveredthepanelstominimizedustintrus/ionwhichproved effective and appropriate during construction. An inspection today would reveal that the panels remain covered and have filter material installed to reduce dust entry. The dust presently on interior surfaces is minimal and does not threaten the integrity of the switchgear, especially in a low humidity environment. ANSI N45.2.2, 1972, paragraph 2.7.2, item 6, even suggests that switchgear be stored in a Level B environment. The Level A attributes in this circumstance are temperature and ) humidity. l To minimize concern for the panels, Engineering issued ENFC-1 on 11-25-85, which specifies that these breaker panels remain covered. Similiarly F10-160 is currently being reinitiated to check and maintain the integrity of the cover (requirement deleted in April, 1985). A f jl ~ Z e r yase-invitation to Ope ra tions--on-WednesdWr-December-18, 1985-r Jd EngineednttTechnical Support 1ould Ilke to be extended ~the opportuBTt'y t / review-draft NCRs wallow consideration for-technical correct. ness.and prompt re perri"-na g IC1285-0022A-AD02

i Pasa 1 cf 1 PREVENTIVE MAINTENANCE REQUIREMENTS Item (s): Control Room, Safety Related Rooms, X Q NQ Equipseet Rooms, Computer Room (NQ) and Programming Room (NQ) Equipment Number (s): NA P.O. No: J-207 M-1.5 Location (s): Control Room AX625, El 659' Storage Level: A Safety Related Room AX624, El 659' Safety Related Room AX626, El 659' Equipment Rooms AX700, AX701, El 674'-6" Computer Room T752, El 675' Programming Room T639, El 659' DESCRIPTION Requirements: 1. Temperature shall be maintained between 50' and 110*F and shall be checked and recorded weekly. Relative humidity should be maintained at 50% or less and shall not 2. a. exceed 60%. Check and record humidity weekly. Notify Engineering if humidity exceeds 50%. b. Check dehumidifiers for proper operation as needed. 3. Except for Rooms AX700 and AX701, provide filtered ventillation. Quarterly check for significant file of dust on HVAC equipment air filters and change as necessary.

References:

1. ENFC-1 2. Vendor File J-207 3. Vendor File M-1.5 4. CP-F10-2024, Rev 0 5. CP-F10-160, Rev 2 TECHNICAL SUPPORT ENGINEER DATE REVIEW AND APPROVAL DATE MI1285-0018A-AD01

Pcg2 1 of 1 ~' PREVENTIVE MAINTENANCE REQUIREMENTS 1 Ites(s): Control Rod Drive Breakers X Q NQ Equipment Number (s): IB-91A, C IB-92B, D PO No: M-1.5 2B-91A, C 2B-928, D Storage Level: A Location (s): Auxiliary Building, El 674, Rooms 700 & 701 DESCRIPTION Requirements: Note: Refer to CP-F10-2024 for temperature and humidity requirements. 1. Yearly check integrity of cover taking care to keep seams closed (such as with duct tape). Covers need not be airtight, however, as dehumidi-fied air shall be allowed to infiltrate equipment at or near floor level.

References:

1. CP-F10-2024 2. CP-F10-160, Rev 2 3. ENFC-1 TECHNICAL SUPPORT ENGINEER DATE REVIEW AND APPROVAL DATE MIO485-0071A-AD01

UOes C/C7 0 < c/ C/U/T U--- ~ ~ 15 NCR NO. 17 REV !UALITY d-COO W d SSURANCE W 16 DATE ISSUED IVISION j y //ddb ORM QAD-1 NONCONFORMANCE REPORT 18 PAGE / OF 2 1 ITEM LOCATION Auxiliary bids. 568' Elevation, Rooms 25 and 27 2 DRAWING OR PART NO. AND REV. 3 FART NAME 4 SERIAL NO. 1VDHR-102: 1VDHR-144 Drain Valves NA 5 ITEM DESCRIPTION Drcin Valve 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIn m 1-DHR WO-22500035 NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500035 1 operationu & Maintenance L1 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. TES X NO NA 12 REQUIREMENT WO-22500035 step 01 states: Blow "Vorify that Unit il DHR system is dry by opening system vent and drain valves. cut with instrument air if moisture is present." 13 NONC0qtFORMANCE 1 C:ntrary to the above upon checking drain valves IVDHR-102 on 3"-1FCB-28 and IVDHR-144 cn 12"-1GCB-25 both pipe lines were found to have water in them. 14 NCR ORIGINATED BY M A Af ( DATE D A Nott I

19 HOLD TAG APPLIED YES X

NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED YES X NO NA s lll NEED TO REVIEW FOR 23 TREND CODE '24 NCR REVI BY @ ~9dr' i j , } f REPORTABILITY YES y NO 22 DETERMIN TO nE - LE 25 SECTI N HEAD. ASSURANCA EN p ERING N NO YE / / l QA-006 Rev 2 t jM M g _o w u kW s " ~>- ~.M ya v,. 3 i

6 CAUSE.nssa \\ - 3 " s pe.6 - te - A.,

e. nose of v u swohte 6 35 PAGE A 0F O U"5 M O 09 N'% Condtvs soMon i% A g;%,

.s, c~ t - rz." - io,c.s - ts - %2, toas,- e s h voed '^ L \\% by. o pb.r,W. M pbg. T L epe.cchoe-oWerk A deca n o.c4 re.eweoeA A Ah W \\ wha by A e\\% %d h% .N tb \\A w% h d yd-ek m 17 PROCESS CORRECTIVE ACTION REQUIRED I lYES W NO 18 RECOMMEND O DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • I ><. I USE AS IS*

CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEE l lYES l W l NO CR NO: 30 ADDITIONAL INFORMATION l 31 DISPOSITION CONCURRENCE w GL /ffof8C, jkY / Jo ff, ACTION O G ZATION DATE QAD CONCURRSCE DATE ~7 p / %fd INGim m ING DATE A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN C,het.,q / E.T$ ode;c.k. \\d* e C o^W ^\\ ^$ CoAde w%. i m \\ ZA\\ - %.=. J\\ W ppi ncy EN xd rwz-TL-pi pe. pWS sac.s e moved c wd n >- p'i vi$ c.d dg <.4 ) a.4 A 9o.\\c.

e. hse.d.

34 NCR CLOSE BY 33 METHOD OF DISPOSITIOh ACTION VERIFICATION ? && ftA. e/ RES F T TI N VERIFICATION b &N l 3/ Plo i I M ACCEPTABLE l l UNACCEPTABLE QAD / D' ATE s IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A)l2 NUMBER A.N.I. (ASME) DATE 'IF REQUIRE QA-006 Rev 2 l l -e . _ -, _. - _ _ _ ___-___,.,_,.,,,_,_,____,____,,..,,.,,___,,y

..~. y

z.

2.n,2::Pcaw u~.2 _ - e me,., ;, n;,,,n m,,.- Y COYl W Y 0 0 pggg y [nspe M,h e[ SUBJECT Dru.;.,aJb6,-ted Sys/eN GC M G Bsdriek

r T ek < ste y

.. m.=.= w =:a= = : = ._MZ88ASE Jf 2/,e vo /c,,,, e o -[ w./e,- e dee./e./ all,., a eyo / b H,e i t d_.ra i., v-lve is onexa d I.:,.. Ies.s.. iha-, ar-r l/d desi # 6 Ii* d Fta 6 h',3 e .h le 4.J a. d a? M pain, yd ceg 3, y, r 1, fan k /eise. 41.e a fe.<- he een s k!we d b e. tI .vt a v 3 h / fhe CR- [V' W ad,pt eY s'*A W v

,rr n 3

Wla e' O C t.!/4 9 91 ,f ?n RC a rn 20 M,p o t' rtR t'n t'rt,ar ~ O t'h0t .A ss a0 FT& Y <%*1 ' vt I C.es L o a 61 e MM .n y,f,d/y b t0$e cMes g M g, p l'f t 8 yL1 em m ty Y&tS ytg' sta.fye,$ j.) j t(C ^t 4 t 'y y y y> r, e g+m e. Md ene eg iS fk1/*t%e4'r406 f l f. O' .. e !*! ". f 4

Af **

( __w..~-~~,--r.+~ C.a/JACtYV t'o1 h t-CL A re,t os AtVt e joe UV1 dt S 9 l'a.J 8 *1 W 8'L h 60 8 O vat'[d U 3 A+.1 e J h ' ~..' 1 [:...' -C'i& *L.

-., i '. *.."'. : ~%- - r i M'*% S ~~%R**:

[W... L=

M dLe-e>dorter-

,o te e di ~-, e b e $1 - i<le n [ Ec a Wi% nO 5 JO6 3 4 9 C. e Q O f1 O *+1 91 A f $$ N SV l i r i DATE SIGNED .. + -,..m - ~gs p.. No 45 475 see PaaTs Ase a WiTH CAmeONS INT ACT. PAaT 3 WILL 35 *FTutNMI WITH MPLY. ypg g,

15 NCR NO. 17 REV

QUA;, M ASSURANCE 0-00042 0

16 DATE ISSUED DIVISION 11-??-R9 FORM QAD NONCONFORMANCE REPORT 18 PAGE 1 0F 2 1 ITEM LOCATION 584' elev. Aux. bidg - Room 130 and 131 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. j iP-232A/B and 2P-232A/B Pump & motor protective NA closure s a ,5 ITEM DESCRIPTION g.g .,An44 R;cire. Air Cooling Unit Booster Pumps

\\

.6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED l MWo. #22500536 and NA NA j wo #??9nn914 INSPECTION PLAN REV 10 ACTION ORGANIZATION 500536 0 W.G. 3o0535 0 nM&c Dennrement 'c. 11 ACTIVITY HOLD REQUIRED: ACTIVITY 110LD ORDER NO. ICS A k' NA .12 REQUIREMENT Step 5 of MWO #22500535 and MWO #22500536 requires the protective closure to be sealed up cs part of the layup for the pumps /:tster:. This W.O. was signed by Maintenance as being completed and QAD was notified on 10/15/89 *%r 9e post orocams inspection could be ecccaplishea. --,, mm,. o l Both oump/ motor enclosures for iP-232A/B and 2P-232A/B are not sealed up as required. Pro-tective visqueen and/or rubber is not secured, and the lids are not secured or sealed. j NOTE 1: Motors on W.O. #22500535 have some fungi formed on them. oh yg.& /Hwoiq NOTE 2: The)Hf indicators have turned white on all four units. I 14 NCR ORIGINATED BY d 1 )) W ~ DATE l Zimmerman I9 HOLD TAG APPLIED YES x NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SECREGATED YES X NO Same as #1 t 21 NEED TO REVIEW FOR 23 TREND CODE '24 NCR R IE ED B d v JK REPORTABILITY YES NO // ( 6 " /T 5 i DATE 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD, ASSURANCE ENg1 ERING y g YES NO QA-006 Rev 2

26 CAUSE 35 PAGE 2 0F s. 2 During layup operations, piping systems are drained and dried. ' ater was inadvartantly drained on 2P-232 A&3 pump and motors making the temporary enclosures a hindrance to proper layup. The primary function of the wooden enclosures was to avoid damage during construction. They are no longer needed and are not required by the layup or preventative maintenance program. In the performance of '.Jork Orders 22500535 and 22500535 the repairmen did not recover the pumps / motors because of the wet conditions found. This should have been (see attached) 27 PROCESS CORRECTIVE ACTION REQUIRED l l YES l l NO 28 REC 0ffMENDED DISPOSITION N REWORK l l SCRAP / REJECT l l REPAla* l lUSE AS IS* CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l l YES - NO CR NO: 30 ADDITIONAL INFORMATION t Al- 'u%- g,,', f..A .y /_ 31 D OSITION CONCURRENCE v C2 H ' L. - li)0 iz/s/gf f.s'E ' ll5 C j id ACTION ORG IZATION DATE QAD CURRE11CE 'DATE ~ / /2/ucthf ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN Corrective work orders 22501005 and 22501008 have been written to renove the enclosures, wipe clean 1/2P-232 A&3 pumps / motors and reapply Techyl 502C uhere necessary on the machine surfaces. The repairmen have been instructed to document the work they perform in the summary of work performed section of work orders and supervisors have been instructed they must physically check jobs prior to signing the Admin. *leview block of work orders. 33 METHOD OF DISPOSITION ACTIO VERIFICATION 34 NCR CLOSED BY / A*) A R rp' 0 d44 0, &ui= duaauwa. 4m .pSdLTS OF DISPOSITION AC ION VERIFICATION RE /) ev / / Bf. / //f/f6 l M ACCEPTABLE l l UNACCEPTABLE QAD / 'DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR ///[ NUMBER A.N.I. (ASMB) DATE j IF REQUIRED QA-006 Rev 2 l 1

NCR NO. tLM. i QLLALITY ' ASSURANCE 0-00042 n DATE ISSUED DIVISION 11-22-85 FORM QAD-3 NOHCONFORMANCE REPORT CONTINUATION SHEET PAGE 3 0F 3 26. documented in the sununary of work performed section of the work orders instead of being signed off as completed. 3- '51 .c,.,,.;gi .,,a ?j l 1 I i i i i l I l I i 1 QA-006 Rev 2 )

e m UALITY 15 NCR NO. 41 7 REVy pASSURANCE d - coogo l / #w h1 VISION 16 DATE ISSUED l FORM QAD-1 A.2 /f c /As-NONCONTORMANCE REPORT 18 PAGE / OF 2-1 ITEM LOCATION Warehouse II 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. C:t. # 7700-1-109 Delaval NA NA 5 ITEM DESCRIPTION Major Repair Kit 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA P.O. 5009-8131-QA NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION RE-00027 1 Site Engineering 11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES X NO NA 12 REQUIREMENT P.O. 5009-8131QA requires Major Repair kits.to contain 1 each of the following item: 002, 004, 005, 006, 007, 008, 009, 011, 013, 015, 019, 021, 023, 024, 025, 046, 047 and 051. 13 NONCONFORMANCE Contrary to the P.O. the Major Repair kits were each missing the following items: 002, 009, 019, 046, 047 and 051. b R ORIGINATED BY i k

12. Wk F

nds 19 HOLD TAG APPLIED 1 YES NO 20 LOCATION OF HOLD TAGS OR SECREATED AREA ITEMS SECREGATED 1 YES NO [/? / !d.//73 g 21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR EW Y gjfp I u M b/ REPORTABII.ITY YES NO D TE / 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD, AS NC2' ENGINEERf)lG [fN YES N0 QA-006 Rev 2

26 CAUSE 35 PAGE a OF 7pll$,7/4 0 sfM'3 st T) Noved w sw V ht{ 27 PROCESS CORRECTIVE ACTION REQUIRED l l YES o .A 28 RECOMMENDED DISPOSITION RAP / ECT l l REPAIR * @ USE AS IS* l l REWORK

  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l

lYES NO CR NO: 30 ADDITIONAL INFORMATION $tf.? N I I E/4 fus'~ of 3080 h f4cd /2R /CT, Q^*'c"dVLC U 7<cla vi cis< +< t4& c) 80 (07]vede4 A oa f()m N / <t 76 /st{ W f'/'G ON C oncX o f [osu L,, I

s. k s in e

,1 fj f ' c @ j ~ /J 31 DISPOS TI CURRENCE / ( ~ /' /' h ! 1., ACT I ATIO CONCURRENCE L'/ ' / [ ATE j j ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN 5 l " ' ' - ^ ^ ~ %-^ " _ h.., s i ^ /Ml,. 'y- ~ ~ ',' '.5 /,A _ /.,~ l' '& ; "J. - J /]i/th /O A .,,,a ~~y u wez75-wn~ivec d' C'Q ' ! U" 4' G Astee, s, 0 -it * ~f,^^"k0 !"'55 & p gia,9 .3 e ~ rsr M E / Y n '( ehe vdo.ed, ,<re v Y /t ff & c J h cmc e sea. uu o n. 33 METHOD OF DISPOSITION ACTION VERIFICATION 34 NCR CLOSED BY DISPOS 8 Tf 0M R Gl/l G W ED. f RESULTS OF DISPOSITION ACTION VERIFICATION ACCEPTABLE l l UNACCEPTABLE QAD [ DAT E UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME) DATE 'IF REOUIRED QA-006 Rev 2

11S'A*RATVAari ng QUALITT 15 NCR NO. 17 RET / ASSURANCE d. c o o_er s Of /g DIVISION 16 DATE ISSUED / FORM-QAD-1 //y /pc NONCONYORMANCE REPORT 18 PAGE / OF o 1 ITEM LOCATION Auxiliary Bldg., Unit #1, 599' and 584' elevation 2 DEAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. M-403 Sh 2A (Q) revision 8 1FCB-16 M-410 (Q) revision 15 1FCB-21 NA 5 ITEM DESCRIPTION 6" - IFCB-16 and 6" - IFCB-21 are sections of S/S pipe in the Make-up and Purifica-tion Systems. 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED 1-MUP WO-22400853 yes 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-400853 3 O&M Division 11 ACTIVITY HOLD RtQUIRED: ACTIVITY HOLD ORDER NO. TES 2 NO NA 12 REQUIREMENI WO-22400853 Step #2: "If water is evident at any drain, blow that portion of piping dry with instrument air, then close the drain." ^ 13 NONCONFORMANCE y' I neaN u-1"- l'.""'"' 0 ', o u v. u iu 22f*- u^m (^) ::cici : 15 :: :::

y....J

,.vu. A-' f-- t': p:::r-- ^' etc. Pipeline section 1FCB-21 to which this valve is attached and that portion of 1*CB-16 up to and including check valve ICKMUP050B shown in zone A-4 of Dwg. M-403 Sh 2A (Q) revision 8 was found full of water. This is approximately 30' of 6" pipes. The water in this line is also the subject of open NCR 4879 dated 3/7/83. NOTE: Check valve ICKMUP050B has no cover installed the too is covered with tape. 14 NCR ORIGINATED BY SQ7m/ ihk D'TE D'A Nott' A 19 HOLD TAG APPLIED YES y NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA ITEMS SEGREGATED YES y NO NA g 21 NEED TO REVIEW FOR 23 TREND CODE 24 NCR EWED BY Chu a L,.lD ocQ J fL r REPORTABILITY YES X N0 7, (P _l ) j DAT y [A/62' W A o 22 DETERMINED TO BE REPORT p 25 S HEAD, ASSU E EllCINEERING ] YES NO j v QA-006 Rev 2

A A 0F o g-Ponible, m ch M d l~ li% lm.16 is ao +a e o W bwa Q %1oe be.* wee p sT h as w A,w m p sqckem bet % oP* M += t k Qc d e.c in A s \\1 % G4 Rase d 3 27 PROCESS CORRECTIVF, ACTION REQUIRED l lYES W NO 28 RECOMMENDED DISPOSITION W REWORK l l SCRAP / REJECT l l REPAIR

  • I lUSE AS IS*

l CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l lYES W NO CR NO: 30 ADDITIONAL INFORMATION 31 DISPOSITION CONCURRENCE / 3/ l If3/ F4 a ACTIDN ORGANIZATION I) ATE QAD CONCURRENCE / 'DATE r ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 32 DISPOSITION ACTION TAKEN IfDHQ. 12 4 M 11.9. N mmmg -N g; % m Md o,) $ g gdoe. ic.Y Mu9 oSos ux.s Prop d CPC5 Yo N ^ Q w \\;.)c.k. el q i$ o9 A U + - M c \\oseA. 34 NCR CLOSED BY 33 ME OD OF DISPOSJTION ACTION VERIFI ATI N &A4.eY3a. l RESULTS OF DISPOSITION ACTION VERIFICATION Z ACCEPTABLE l l UNACCEPTABLE QAD ~ / ' D.C E IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER lA.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 2 e -,.,--,,--n-- ~ ---

QUALITY 15 NCR NO. 17 REV ASSURANCE 0-00055 0 DIVISION. 16 DATE ISSUED FORM QAD-1 1/23/86 NONCONFORMANCE REPORT 18 PAGE 1 0F A 1 ITEM LOCATION Warehouse #2 QA Hold Area 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO. V1095 (210920) SCI Control Board Card S/N #1346 and S/N #1337 5 ITEM DESCRIPTION Card, Solid State Controls Inc., Control Board for Model BCS-12-300 Battery Charger 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED NA P.O. 2001-9961-Q NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION RE-00030 0 Material Services 11 ACTIVITT HOLD REQUIRED: ACTIVITY HOLD ORDER NO. YES X NO NA 12 REQUIREMENT P.O. 2001-9961-Q with CPC Specification AC (Quality Assurance) requires a Certificate of Compliance be received with each shipment.of material on this order. 13 NONCONFORMANCE During receipt inspection of referenced item, on 1/22/86, a Certificate of Compliance was unavailable as required. 1 NCR ORIGINATED BY - a' f.u/e, Zimmerman 'DAT E 19 HOLD TAG APPLIED YES y NO 20 LOCATION OF HOLD TAGS OR SEGREATED AREA YE{ NO Warehouse #2 QA Hold Area f ITEMS SECREGATED r 23 TREND CODE 24 NR I WED BY @ (., (A) cP (' NO 21 NEED TO REVIEW FOR (f REPORTABILITY YES A 4 DA V84cL/11 z3 22 DETERMINED TO BE REPORTABLE 25 SECTION HEAD ASS RANCE ENGINEE16fNG ' fj YES NO QA-006 Rev 2

, SbYJ~ sft b & c f.s', ));ig, d y 3$ PAGE 2 0F 2 / Vf// a/ amof wh a, ydae swa,,p-~/ /s' pde. a /;</AsA s / ea 4 a< n d x< fn e d a,<< sng s s/ /Ar compm*>lo,'se eresy/ J,y' +fs /ms /.G we.s-uur <c.rder/e/ x? srca a/s,srs w//A.,crestdww/ srfo's mm 4. ' 27 PROCESS CORRECTIVE ACTION REQUIRED l l YES W NO 28 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • IY lUSE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 29 CONDITIONAL RELEASE NEEDED l

l YES I XX l NO CR NO: 30 ADDITIONAL INFORMATION Nonconforming item will be used as an emergency measure to restore station battery bank to required capacity. ' I f$ h 31 DISPOSITION CONCURR CE }.Jh[4r /-20 -8(o ACT ORGA p TI DATE CONCURRENCE DATE .) / Z0 OS DATE A.N.I. (ASME) IF REOUIRED ENGINEERING 32 DISPOSITION ACTION TAKEN Tk/ y&ykr su'o f r&7 f d A' d b'/ be df f 6..ydsae 4 /se <-vn,n / wa .,m,/ /s wo 6 4/ s #bs b h the r./ c^ /L;r see,i . p 4<. d' d sh' e p r srs secde /NA. / 33 METHCD OF DISPOSITION ACTION VERIFICATION i34 NCR CLOSED BY K a'esu do $ S '- M s RESULTS OF DISPOSITION ACTION VERIFICATION I l Ec /-26-8 6 ACCEPTABLE l l UNACCEPTABLE DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR NUMBER l' A. N. I. (ASME) DATE IF REQUIRED QA-006 Rev 2

') P. O. UUX 1416, LULynuud, ut t r u -a i o i t.uc.r nu.m o w o w o, .s. A MEMBER OF THE MARMON GROUF OF COMPANIES" GEs LEIC8IE_QE,,CQ[E M_ mag g DATE: J 23, 1986 TO: Cons s Power Company Midland Plant Operations

REFERENCE:

l PURCHASE ORDER NO.s 20019961 ' SCI JOB NO.: 27294 SOLIDSTATE CONTROLS, INCORPORATED HEREBY CERTIFIES THAT THE COMPONENT PARTS, LISTED BELOW, FURNISHED PURSUANT 10 THE ABOVE REFERENCED PURCHASE ORDER ARE IN FULL COMPLIANCE WITH PROVISIONS OF SAID PURCHASE ORDER AND SOLIDSTATE CONTROLS, INCORPORATED QUALITY ASSURANCE AND WOREMANSHIP'. STANDARDS. SOLIDSTATE CONTROLS, INCORPORATED FURTHER CERTIFIES THAT THE ITEMS FURNISHED ARE QUALIFIED IN ACCORDANCE WITH THE ORIGINAL EQUIPMENT PURCHASE ORDER BY BEING THE SAME PART NUMDER AND MANUFACTURER, OR SUBSTITUTED WITH PART(S) OF EQUAL OR SUPERIOR CONFIGURATIdN, MATERIAL AND OUALITY, MADE TO PERFORM THE SAME SERVICE AS CORRESPONDING ITEMS FURNISHED WITH THE ORIGINAL EQUIPMENT. THE SUDSTITUTE PARTS ARE COMMERCIAL GRADE WITH NO QUALIFICATION IMPLIED EXCEPT FOR THEIR SIMILARITY TO PARTS AS FURNISHED WITH THE ORIGINAL. EQUIPMENT. GOLIDSTATC CONTROLS, INC. .'11)c. RICHARD J. CLUNG OUALITY ASSURANCE P.O. ITEM NO. QUANTITY DESCRIPTION SCI F' ART NO. 1 2 PC Peard, Dattery Charger 130V 21'.S970 0

r-mr:rvznrer varu 15 NCR NO. 17 REV QUALITT d -oco yc, o ASSURANCE 16 DATE ISSUED DIVISION ' FORM -QAD-1 //r///c, NONCONFORMANCE REPORT 18 PAGE / OF J 1 ITEM LOCATION Midland Energy Center 2 DRAWING OR PART NO. AND REV. 3 FART NAME 4 SERIAL NO. M457 Sh 3A(Q) Revision 12 one oe M457 Sh '3B(0) Ravialan 15 5 ITEM DESCRIPTION Chilled water-safeguards equipment-unit 2 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED SCH WO 22500101 NA 9 INSPECTION PLAN REV 10 ACTION ORGANIZATION WO-500101-01 4 Operation department 11 ACTIVITY HOLD REQUIRED: ACTIVITY EOLD ORDER NO. YES x NO NA 12 REQUIREMENT Layup work order #22500101 and job plan step #10 required the system to be isolated by shutting all vents and drains and capping and taping all other openings. 13 NONCONFORMANCE Inspection of Post Process activities to verify accomplishment of Block 12 require-ments generated list of open vent, drain and instrument valves that were to be closed. The Operations and Quality Assurance Departments jointly inspected all open valves and at the same time, the valves were closed and openings taped shut by an operator. This NCR is to document the original non-conformance condition and is issued closed. No further action necessary. bNCRORIGINATEDBY b/w fJ/ %'Zimmerman 7 DATE '7D1M cr % V'kM3 DiLT & Attaf 300 V/SVslHi (MNN,* i ll 19 HOLD TAG APPLIED YES x NO 20 LOCATION (1 MOLD TAGS OR SEGREATED AREA ITEMS SECREGATED YES x NO NA NCR REVIEWED BY REPORTABILITY YES N NO { >g 21 NEED TO REVIEW FOR 23 TREND CODE d g4 [A Mag i DATE. / /, he-A(, 22 DETERMINED TO BE REPORTABLE 25 SECTIOh @, ASSURAN#5 ENGINEERING YES NO QA-006 Rev 2

35 PAGE A 0F L AT GiE. TIME T44. L.AY-up w% cospd.TU>) TAL D A L c rec e ts TA wo AA olt.bEA. 40 NcT cuiLMt., it.iE.5ULTiN(r Iw tim. i4T 4 T of TM Welt.A OLbsut_ tact 30 90 ut.r. 27 PROCESS CORRECTIVE ACTION REQUIRE l l TES l X l NO 28 RECol0GNDE DISPOSITION W REWORK l l SCRAP / REJECT l l REPAIR

  • l lUSE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHE 29 CONDITIONAL RELEASE NEED l

l TES W NO CR NO: 30 ADDITIONAL INFORMATION 4 31 DISPOSITION CONCURRENCE 4 4fA A hw sh sles L Ad'n ' DATE ACTION ORGANIZATION DATE CONCURRENCE ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 33 DISPOSITION ACTION TAKEN Joint inspection by OPS and QA with operator closing open valves. i 33 METHM OF DISPOSITION ACTION VERIFICATION '34 NCR CLOSED BY 7Lbed l RESULTS OF DISPOSITION ACTION VERIFICATION 1/31/L s .. a ACCEPTABLE I IUNACCEPTABLE / ' DATE FI iACCEPTABLE, REFERENCE SUPERSEDING NCR HUMBER lA.N.I. (ASME) DATE IF REOUIRED l QA-006 Rev 2

. QUAI.ITY NCR NO. REV. d- 00 oS 6 C i ASSURANCE DATE ISSUED DIVISION //J / /pc FORM QAD-3' NONCONFORMANCE REPORT CONTINUATION SHEET PAGE A 0F 3 p/ro Hi,67 ds/3A (40 b /A posa V4t Ve*: Acar!* VA.v f Insrnauenr* 2 y wt188 a vseg og4 2 VSW 398 2VatM 303 syscM 189 = 37/

  • #ff I40 I43 25.2 o

i 19G S IB Jo9 OVMH3S1 I42-u ~ u ~ 19 7 l 9I 5 00 2e3 u ~ ~ ~ ~ 353 14C 24C I46 ~ s u ~ k u 3S*/ 2.91. cWscu 357s l* gig a ~ u i Sil OVMNA 32-397 A69 l* 229 e2fef 0 t/SCM 2.90 u Mo s 4.6 3 = gQ( .s ~ pizo H MS7 GU38 (Q) by /S nu,a sw er kr ike: nw_mr nocuba unea nr 1 VSCH 004 e DVscM //B avSCW 2.41L A "OLASG" MW o A1

  • 6 2%

.1V CCM i M A 9 VSC H \\09 A t&34 8 //4d. A VSCH t 3.s 6 /A3 //9A VEL *r Oacs - D V.SC H l2.2.D 3d /2 M 24/SW /3G \\ o~ s s ~.AYS-57// B d Arv D (M3bithe) seems i rweD. 1;urrnaue JY t! Rect .seccy /374 l paut /5 74 9 l'sCW N/A l t l QA-006 Rev 2 .}}