{{#Wiki_filter:*
{{#Wiki_filter:*'.
    ,
*
        *'.
b Ad4
          .                                                                                b Ad4
.
            ,
,
                        .
,
      .         .
.
                                                September 19, 1988
.
                  Docket No. 50-425
.
                  License No. CPPR-109
September 19, 1988
                                                                                                          I
Docket No. 50-425
              [GeorgiaPowerCompany
License No. CPPR-109
                  ATTN: Mr. W. G. Hairston, III                                                           L
I
                          Senior Vice President -
[GeorgiaPowerCompany
                            Nuclear Operations                                                           i
ATTN: Mr. W. G. Hairston, III
                  P. O. Box 4545
L
                  Atlanta, GA 33302
Senior Vice President -
                  Gentlemen:
Nuclear Operations
                  SUPJECT: NRC INSPECTION REPORT NO. 50-425/88-41
i
                  This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by           !
P. O. Box 4545
                  R. W. Wright on July 18-25 and August 1-5, 1988. The inspection included a
Atlanta, GA 33302
                  review of activities authorized for your Vogtle facility. At the conclusion
Gentlemen:
                  of the inspection, the findings were discussed with those members of your staff
SUPJECT: NRC INSPECTION REPORT NO. 50-425/88-41
                  identified in the enclosed inspection report.                                           (
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
                  Areas examined during the inspection are identified in the report. Within these
!
                  areas, the inspection consisted of selective examinations of procedures and             '
R. W. Wright on July 18-25 and August 1-5, 1988.
                  representative records, interviews with personnel, and observation of activities
The inspection included a
                  in progress.                                                                             t
review of activities authorized for your Vogtle facility. At the conclusion
                  Within the scope of the inspection, no violations or deviations were identified.         ;
of the inspection, the findings were discussed with those members of your staff
                  In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2               I
identified in the enclosed inspection report.
                  Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
(
                  will be placed in the NRC Public Document Room.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
'
representative records, interviews with personnel, and observation of activities
in progress.
t
Within the scope of the inspection, no violations or deviations were identified.
;
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
I
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
i
i
Should you have any questions concerning this letter, please contact us.
!
^
^
                  Should you have any questions concerning this letter, please contact us.                !
l
                                                                                                          l
                                                            Sincerely,
!
!
                                                                                                          (
Sincerely,
                                                            Ori91n:1 signed by C. Julian
Ori 1n:1 signed by C. Julian
                                                            Caudie A. Julian, Chief
9
                                                            Operations Branch
Caudie A. Julian, Chief
                                                            Division of Reactor Safety                     l
Operations Branch
                  Enclosure:
Division of Reactor Safety
                  NRC Inspection Report                                                                     l
l
                  cc w/ enc 1:   (See page 2)
Enclosure:
                                                                                                            i
NRC Inspection Report
i                     8910060089 830919                                                                     .
l
                      PDR     ADOCK 05000425                                                               '
cc w/ enc 1:
                      Q                   PDC                                                   I (
(See page 2)
                                                                                                    Z E c/
i
i
8910060089 830919
.
PDR
ADOCK 05000425
'
Q
PDC
I
(
Z E c/
. - -


  -    '
'
i         .
i
    '
.
          .
-
'
.
,
,
      ,        .
                Georgia Power Company                    2                  September 19, 1988
.
.
l                cc w/ enc 1:
1            v'R. P. Mcdonald, Executive Vice 7
                    President, Nuclear Operations
            /P. D. Rice, Vice President, Project /
                    Director
            vt. W. Hayes, Vogtle Qualitye
                  . Assurance Manager
,
,
              vt. Bockhold, Jr. , General Manager,s
Georgia Power Company
l                   Nuclear Operations
2
i             vt'. Gucwa, Manager, Nuclear Safety /
September 19, 1988
l                   and Licensing
.
i             /J. A. Bailey, Project Licensing-
l
l                   Manager
cc w/ enc 1:
              VB. W. Churchill, Esq., Shaw,-
7
                  , Pittman, Potts and Trowbridge
1
v'R. P. Mcdonald, Executive Vice
President, Nuclear Operations
/P. D. Rice, Vice President, Project /
Director
vt. W. Hayes, Vogtle Qualitye
. Assurance Manager
,
vt. Bockhold, Jr. , General Manager,s
l
Nuclear Operations
i
vt'. Gucwa, Manager, Nuclear Safety /
l
and Licensing
i
/J. A. Bailey, Project Licensing-
l
Manager
VB. W. Churchill, Esq., Shaw,-
, Pittman, Potts and Trowbridge
vD. Kirkland, III, Counsel,-
,
,
              vD. Kirkland, III, Counsel,-
i
i                  Office of the Consumer's Utility
Office of the Consumer's Utility
I
l
/6. Council
Feig, Georgians Against-
!
Nuclear Energy
l
bec w/ enc 1:
vE. Reis, OGC '
JJ. Hopkins, NRR '
i M. Sinkule, RII
%DRS, Technical Assistant
gNRC Resident Inspector /
@ccument Control Desk
i
4tateofGeorgia
'
;
I
I
l            /6. Council
!
                    Feig, Georgians Against-
!                   Nuclear Energy
l
l
                bec w/ enc 1:
RII
              vE. Reis, OGC '
RII
              JJ. Hopkins, NRR '
RII
              i M. Sinkule, RII
RII
              %DRS, Technical Assistant
RII
              gNRC Resident Inspector /
/
              @ccument Control Desk                                                            i
7.mr
              4tateofGeorgia                                                                    '
4/
                                                                                                ;
Ge w
                                                                                                I
'" xaFS
                                                                                                !
n
                                                                                                l
RWright:tj
                RII                    RII          RII        RII      RII  /
7.,LMoore
                  7.mr
GBelisle
                RWright:tj
MSinkule
                                          4/
CJul an
                                    7.,LMoore
p81 M/88
                                                    Ge w
01//i/S8
                                                      GBelisle
S8/N /OS
                                                              '" xaFS
W//G/8S
                                                                  MSinkule
09/j.j/88
                                                                                n
of
                                                                          CJul an
VI
                p81 M/88               01//i/S8     S8/N /OS     W//G/8S   09/j.j/88
09
                09                   eq           of          VI
eq
-
-
.
.
.
.
}}
}}

Latest revision as of 22:32, 10 December 2024

Forwards Insp Rept 50-425/88-41 on 880718-25 & 0801-05.No Violations or Deviations Noted
ML20155A817
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/19/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20155A821 List:
References
NUDOCS 8810060089
Download: ML20155A817 (2)


See also: IR 05000425/1988041

Text

  • '.

b Ad4

.

,

,

.

.

.

September 19, 1988

Docket No. 50-425

License No. CPPR-109

I

[GeorgiaPowerCompany

ATTN: Mr. W. G. Hairston, III

L

Senior Vice President -

Nuclear Operations

i

P. O. Box 4545

Atlanta, GA 33302

Gentlemen:

SUPJECT: NRC INSPECTION REPORT NO. 50-425/88-41

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

!

R. W. Wright on July 18-25 and August 1-5, 1988.

The inspection included a

review of activities authorized for your Vogtle facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

(

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

'

representative records, interviews with personnel, and observation of activities

in progress.

t

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

I

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

i

Should you have any questions concerning this letter, please contact us.

!

^

l

!

Sincerely,

Ori 1n:1 signed by C. Julian

9

Caudie A. Julian, Chief

Operations Branch

Division of Reactor Safety

l

Enclosure:

NRC Inspection Report

l

cc w/ enc 1:

(See page 2)

i

i

8910060089 830919

.

PDR

ADOCK 05000425

'

Q

PDC

I

(

Z E c/

. - -

'

i

.

-

'

.

,

.

,

Georgia Power Company

2

September 19, 1988

.

l

cc w/ enc 1:

7

1

v'R. P. Mcdonald, Executive Vice

President, Nuclear Operations

/P. D. Rice, Vice President, Project /

Director

vt. W. Hayes, Vogtle Qualitye

. Assurance Manager

,

vt. Bockhold, Jr. , General Manager,s

l

Nuclear Operations

i

vt'. Gucwa, Manager, Nuclear Safety /

l

and Licensing

i

/J. A. Bailey, Project Licensing-

l

Manager

VB. W. Churchill, Esq., Shaw,-

, Pittman, Potts and Trowbridge

vD. Kirkland, III, Counsel,-

,

i

Office of the Consumer's Utility

I

l

/6. Council

Feig, Georgians Against-

!

Nuclear Energy

l

bec w/ enc 1:

vE. Reis, OGC '

JJ. Hopkins, NRR '

i M. Sinkule, RII

%DRS, Technical Assistant

gNRC Resident Inspector /

@ccument Control Desk

i

4tateofGeorgia

'

I

!

l

RII

RII

RII

RII

RII

/

7.mr

4/

Ge w

'" xaFS

n

RWright:tj

7.,LMoore

GBelisle

MSinkule

CJul an

p81 M/88

01//i/S8

S8/N /OS

W//G/8S

09/j.j/88

of

VI

09

eq

-

-

.

.

.

.