ML20155D021: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.    .
{{#Wiki_filter:.
,          VERMONT YANKEE NTICLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HU.VT ROAD VERNON. VERMONT 05354                               15  ,
VERMONT YANKEE NTICLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HU.VT ROAD fY 1 5 VERNON. VERMONT 05354 June 6, 1988 U.S. Nuclear Regulatory Commission Washington, D.C.
fY June 6, 1988 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn       Document Control Desk
20555 Attn Document Control Desk


==References:==
==References:==
a)   License No. DPR-28 (Docket No. 50-271)
a)
License No. DPR-28 (Docket No. 50-271)


==Dear Sir:==
==Dear Sir:==
==Subject:==
==Subject:==
Revision 15 to the Vermont Yankee Physical Security Plan The purpose of this letter is to provide you with Revision No. 15 to the Vermont Yankee Physical Security Plan.       This revision reflects enhancements recently made to our Security Program.
Revision 15 to the Vermont Yankee Physical Security Plan The purpose of this letter is to provide you with Revision No. 15 to the Vermont Yankee Physical Security Plan.
We have reviewed this revision and have determined that the changes do not decrease the safeguards effectiveness of the Plan. Therefore, in accordance with 10 CFR 50.54(p), prior NRC approval of this revision is not required.
This revision reflects enhancements recently made to our Security Program.
This revision to our Physical Security Plan is submitted as Attachment A to this letter and is considered SAFEGUARDS INFORMATION which is to be withheld from public disclosure in accordance with the provisions of 10 CFR 73.21.                 '
We have reviewed this revision and have determined that the changes do not decrease the safeguards effectiveness of the Plan.
We have enclosed our standard Document Custody Form and Change Transmittal Form for each copy of the Plan revision required by the NRC.           Please sign and return these forms.
Therefore, in accordance with 10 CFR 50.54(p), prior NRC approval of this revision is not required.
This revision to our Physical Security Plan is submitted as Attachment A to this letter and is considered SAFEGUARDS INFORMATION which is to be withheld from public disclosure in accordance with the provisions of 10 CFR 73.21.
We have enclosed our standard Document Custody Form and Change Transmittal Form for each copy of the Plan revision required by the NRC.
Please sign and return these forms.
We trust that the enclosed information is deemed acceptable however, should you have any questions, please contact Mr. Thomas Linn, Security Supervisor, at our plant site.
We trust that the enclosed information is deemed acceptable however, should you have any questions, please contact Mr. Thomas Linn, Security Supervisor, at our plant site.
Very truly yours, VERM NT YANKEE NUCLEAR POWER CORPORATION Warr     P   u           -
Very truly yours, VERM NT YANKEE NUCLEAR POWER CORPORATION Warr P
Vice President     '
u Vice President Manager of Ope ns
Manager of Ope       ns


==Enclosure:==
==Enclosure:==
: 1) Attachment A, Revision 15 to the Physical Security Plan
: 1) Attachment A, Revision 15 to the Physical Security Plan
        /dm DOCUMENT TRANSHITTED HEREWITH CONTAINS SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURES HANDLE THIS DOCUMENT AS DECONTROLLED
/dm DOCUMENT TRANSHITTED HEREWITH WHEN SEPARATED FROM ENCLOSURES [
[
CONTAINS SAFEGUARDS INFORMATION HANDLE THIS DOCUMENT AS DECONTROLLED l
l
$$8"$$Uc!$$$kp F}}
      $$8"$$Uc!$$$kp F}}

Latest revision as of 22:02, 10 December 2024

Forwards Rev 15 to Physical Security Plan Re Recent Enhancements to Plant Security Program.Prior NRC Approval Not Required for Rev.Rev Withheld (Ref 10CFR73.21)
ML20155D021
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/06/1988
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
FVY-88-37, VYV-88-105, NUDOCS 8806140443
Download: ML20155D021 (1)


Text

.

VERMONT YANKEE NTICLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HU.VT ROAD fY 1 5 VERNON. VERMONT 05354 June 6, 1988 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn Document Control Desk

References:

a)

License No. DPR-28 (Docket No. 50-271)

Dear Sir:

Subject:

Revision 15 to the Vermont Yankee Physical Security Plan The purpose of this letter is to provide you with Revision No. 15 to the Vermont Yankee Physical Security Plan.

This revision reflects enhancements recently made to our Security Program.

We have reviewed this revision and have determined that the changes do not decrease the safeguards effectiveness of the Plan.

Therefore, in accordance with 10 CFR 50.54(p), prior NRC approval of this revision is not required.

This revision to our Physical Security Plan is submitted as Attachment A to this letter and is considered SAFEGUARDS INFORMATION which is to be withheld from public disclosure in accordance with the provisions of 10 CFR 73.21.

We have enclosed our standard Document Custody Form and Change Transmittal Form for each copy of the Plan revision required by the NRC.

Please sign and return these forms.

We trust that the enclosed information is deemed acceptable however, should you have any questions, please contact Mr. Thomas Linn, Security Supervisor, at our plant site.

Very truly yours, VERM NT YANKEE NUCLEAR POWER CORPORATION Warr P

u Vice President Manager of Ope ns

Enclosure:

1) Attachment A, Revision 15 to the Physical Security Plan

/dm DOCUMENT TRANSHITTED HEREWITH WHEN SEPARATED FROM ENCLOSURES [

CONTAINS SAFEGUARDS INFORMATION HANDLE THIS DOCUMENT AS DECONTROLLED l

$$8"$$Uc!$$$kp F