ML20155H986: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
                                                                                                                    _
_
*
*
        - -
-
    -
-
                                                                                                                      ;
' '
              .
y,6
  -
;
    ' '
-
                                                                                                              y,6
.
                                            JUN 0 71988
-
                                                                                                                        i
JUN 0 71988
          Docket Nos. 50-348, 50-364                                                                                   ~t
i
          License Nos. NPF-2 and NPF-8
Docket Nos. 50-348, 50-364
          Alabama Power Company
~ t
          ATTN:     Mr. R. P. Mcdonald
License Nos. NPF-2 and NPF-8
                    Senior Vice President
Alabama Power Company
          P. O. Box 2641
ATTN:
          Birmingham, AL 35291-0400
Mr. R. P. Mcdonald
          Gentlemen:
Senior Vice President
          SUBJECT:     NRC INSPECTION REPORT NOS. 50-348/88-18 AND 50-364/88-18
P. O. Box 2641
          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
Birmingham, AL 35291-0400
          by J.. J. Lenahan on May 9-13, 1988.     The inspect. ion included a review of
Gentlemen:
          activities authorized for your Farley facility.       At the conclusion of the
SUBJECT:
          inspection, the findings were discussed with those members of your staff
NRC INSPECTION REPORT NOS. 50-348/88-18 AND 50-364/88-18
          identified in the enclosed inspection report.                                                     '
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
          Areas examined during the inspection are identified in the report. Within
by J.. J. Lenahan on May 9-13, 1988.
          these areas, the inspection consisted of selective examinations of procedures
The inspect. ion included a review of
          and representative records, interviews with personnel, and observation of
activities authorized for your Farley facility.
          activities in nrogress.
At the conclusion of the
          Within the scop + of the inspection, no violations or deviations were identi-
inspection, the findings were discussed with those members of your staff
          fied.
identified in the enclosed inspection report.
          In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
'
          Title 10, Code of Feaeni Regulations, a copy of this letter and its enclosure
Areas examined during the inspection are identified in the report. Within
          will be placed in the NRL .N511c Document Room.
these areas, the inspection consisted of selective examinations of procedures
          Should you have any questions concerning this letter, please contact us.
and representative records, interviews with personnel, and observation of
                                                    Sincerely,
activities in nrogress.
                                                      OPICINAL SIGNfD Dy
Within the scop + of the inspection, no violations or deviations were identi-
                                                      Al.AN R. HERDT
fied.
                                                    Alan R. Herdt, Chief
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
                                                    Engineering Branch
Title 10, Code of Feaeni Regulations, a copy of this letter and its enclosure
                                                    Division of Reactor Safety
will be placed in the NRL .N511c Document Room.
          Enclosure:
Should you have any questions concerning this letter, please contact us.
          NRC Inspection Report
Sincerely,
          cc w/ encl:   (See page 2)
OPICINAL SIGNfD Dy
                                                                                                                \\
Al.AN R. HERDT
                8806200407 880607
Alan R. Herdt, Chief
                PDR   ADOCK 05000348
Engineering Branch
                0                 nnn                                                                         2Ect
Division of Reactor Safety
                                                                  _                             _
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
\\\\
8806200407 880607
PDR
ADOCK 05000348
0
nnn
2Ect
_
_


-
-
  ,.     .
,.
            ,
.
    ..
,
                                                                      l
..
                                                          JUN 0 71988
JUN 0 71988
        Alabama Power Company                   2
Alabama Power Company
        cc w/ enc 1:
2
        B. M. Guthrie, Executive Vice President
cc w/ enc 1:
        J. 0. Woodard, General Manager -
B. M. Guthrie, Executive Vice President
          Nuclear Plant
J. 0. Woodard, General Manager -
        W. G. Hairston, III, Vice President -
Nuclear Plant
          Nuclear Support
W. G. Hairston, III, Vice President -
        J. W. McGowan, Manager-Safety Audit
Nuclear Support
          and Engineering Review
J. W. McGowan, Manager-Safety Audit
        S. Fulmer, Supervisor-Safety
and Engineering Review
          Audit and Engineering Review
S. Fulmer, Supervisor-Safety
        bec w/ encl:
Audit and Engineering Review
        NRC Resident Inspector
bec w/ encl:
        DRS Technical Assistant
NRC Resident Inspector
        E. Reeves, Project Manager, NRR
DRS Technical Assistant
        Document Control Desk
E. Reeves, Project Manager, NRR
        State of Alabama
Document Control Desk
                                                                      l
State of Alabama
                                                                      l
A/)/
                                                                      l
RII
                                                                      ;
RII
                                                                      1
RII
                                                                      1
QV
        RII  A/)/           RII               RII
y'd
              QV                                 y'd
JLenahan:ser
        JLenahan:ser         FJa               HDance
FJa
        OD //88               OI/   88
HDance
                                                06/) /88
OD //88
L                                                                     J
OI/
88
06/) /88
L
J
}}
}}

Latest revision as of 21:05, 10 December 2024

Forwards Insp Repts 50-348/88-18 & 50-364/88-18 on 880509-13.No Violations or Deviations Noted
ML20155H986
Person / Time
Site: Farley  
Issue date: 06/07/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20155H988 List:
References
NUDOCS 8806200407
Download: ML20155H986 (2)


See also: IR 05000348/1988018

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -

_

-

-

' '

y,6

-

.

-

JUN 0 71988

i

Docket Nos. 50-348, 50-364

~ t

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN:

Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-348/88-18 AND 50-364/88-18

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by J.. J. Lenahan on May 9-13, 1988.

The inspect. ion included a review of

activities authorized for your Farley facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

'

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in nrogress.

Within the scop + of the inspection, no violations or deviations were identi-

fied.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Feaeni Regulations, a copy of this letter and its enclosure

will be placed in the NRL .N511c Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OPICINAL SIGNfD Dy

Al.AN R. HERDT

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

\\\\

8806200407 880607

PDR

ADOCK 05000348

0

nnn

2Ect

_

_

-

,.

.

,

..

JUN 0 71988

Alabama Power Company

2

cc w/ enc 1:

B. M. Guthrie, Executive Vice President

J. 0. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, Vice President -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

NRC Resident Inspector

DRS Technical Assistant

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

A/)/

RII

RII

RII

QV

y'd

JLenahan:ser

FJa

HDance

OD //88

OI/

88

06/) /88

L

J