ML20155J441: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:n
{{#Wiki_filter:n
                                                                                  - _ . . _ _ _
- _ . . _ _
                                                                                                '-----'-M '
_
  '         '
'-----'-M
            ,
'
              ,
00T 131988
                                            00T 131988
'
    .
'
          Docket Nos. 50-338, 50-339
,
          License Nos. NPF-4, NPF-7
,
          Virginia Electric and Power Company
.
        / ATTN:     Mr. W. R. Cartwright, Vice President,
Docket Nos. 50-338, 50-339
      V               Nuclear Operations
License Nos. NPF-4, NPF-7
          P. O. Box ?6666
Virginia Electric and Power Company
          Richmond, VA 23261
/ ATTN:
          Gentlemen:
Mr. W. R. Cartwright, Vice President,
          SUBJECT: NRC INSPECTION REPORT N05. 50-338/88-30 AND 50-339/88-30
V
          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Nuclear Operations
          N. Economes on September 12 - 16, 1988. The inspection included a review of
P. O. Box ?6666
          activities authorized for your North Anna facility.     At the conclusion of the
Richmond, VA 23261
            inspection, the findings were discussed with those members of your staff
Gentlemen:
            identified in the enclosed inspection report.
SUBJECT: NRC INSPECTION REPORT N05. 50-338/88-30 AND 50-339/88-30
          Areas examined during the inspection are identified in the reporc. Within
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
            these areas, the inspection consisted of selective examinations of procedures
N. Economes on September 12 - 16, 1988.
            and representative records, interviews with personnel, and observation of
The inspection included a review of
            activities in progress.
activities authorized for your North Anna facility.
          Within the scope of the inspection, no violations or deviations were
At the conclusion of the
            identified.
inspection, the findings were discussed with those members of your staff
            In accordance witF Section 2.790 of the NRC's "Rules of Practice," Part 2,
identified in the enclosed inspection report.
            Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
Areas examined during the inspection are identified in the reporc. Within
          will be placed in the NRC Public Document Room.
these areas, the inspection consisted of selective examinations of procedures
            Should you have any questions concerning this letter, please contact us.
and representative records, interviews with personnel, and observation of
                                                      Sincerely
activities in progress.
                                                      Alan R. ierdt, Chief
Within the scope of the inspection, no violations or deviations were
                                                      Engineering 3 ranch
identified.
                                                      Division of Reactor Safety
In accordance witF Section 2.790 of the NRC's "Rules of Practice," Part 2,
            Enclosure:
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
            NRC Inspection Report
will be placed in the NRC Public Document Room.
          ,cc w/ encl:
Should you have any questions concerning this letter, please contact us.
        V G. E. Kane, Station Manager
Sincerely
        v N. E. Hardwick, Manager - Nuclear
Alan R.
                Programs and Licensing
ierdt, Chief
            Commonwealth of Virginia
Engineering 3 ranch
            bec w/ encl:   (See page 2)
Division of Reactor Safety
              0010260139 001013
Enclosure:
              PDR     ADOCK 05000330
NRC Inspection Report
              0                   PNU                                                           gii
,cc w/ encl:
                                                                                                zeo,i
V G. E. Kane, Station Manager
N. E. Hardwick, Manager - Nuclear
v
Programs and Licensing
Commonwealth of Virginia
bec w/ encl:
(See page 2)
0010260139 001013
PDR
ADOCK 05000330
0
PNU
gii
zeo,i


                                                          00T 131888
00T 131888
    -
-
.     .           .
.
  .       *
.
    ,    Virginis electric and Power Company 2
.
          bec w/ enc 1:
.
        v(JRC Resident Inspector
*
          DRS Technical Assistant
Virginis electric and Power Company
          Document Control Room
2
                                                                      l
,
                                                                      l
bec w/ enc 1:
                *e                   ,
v(JRC Resident Inspector
              f                                 R11
DRS Technical Assistant
                              ]I
Document Control Room
            f4 c'nomos:ac           lake       FSCantrell
l
                  /88         ,  Il/SS       g Q/jj /88
*e
                                                                      !
,
f
]I
R11
f4 c'nomos:ac
lake
FSCantrell
/88
Il/SS
g Q/jj /88
,
- - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
--- --
}}
}}

Latest revision as of 21:00, 10 December 2024

Forwards Insp Repts 50-338/88-30 & 50-339/88-30 on 880912-16.No Violations or Deviations Noted
ML20155J441
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/13/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20155J446 List:
References
NUDOCS 8810260139
Download: ML20155J441 (2)


See also: IR 05000338/1988030

Text

n

- _ . . _ _

_

'-----'-M

'

00T 131988

'

'

,

,

.

Docket Nos. 50-338, 50-339

License Nos. NPF-4, NPF-7

Virginia Electric and Power Company

/ ATTN:

Mr. W. R. Cartwright, Vice President,

V

Nuclear Operations

P. O. Box ?6666

Richmond, VA 23261

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-338/88-30 AND 50-339/88-30

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

N. Economes on September 12 - 16, 1988.

The inspection included a review of

activities authorized for your North Anna facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the reporc. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance witF Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely

Alan R.

ierdt, Chief

Engineering 3 ranch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

,cc w/ encl:

V G. E. Kane, Station Manager

N. E. Hardwick, Manager - Nuclear

v

Programs and Licensing

Commonwealth of Virginia

bec w/ encl:

(See page 2)

0010260139 001013

PDR

ADOCK 05000330

0

PNU

gii

zeo,i

00T 131888

-

.

.

.

.

Virginis electric and Power Company

2

,

bec w/ enc 1:

v(JRC Resident Inspector

DRS Technical Assistant

Document Control Room

l

  • e

,

f

]I

R11

f4 c'nomos:ac

lake

FSCantrell

/88

Il/SS

g Q/jj /88

,

- - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

--- --