ML20195J178: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:~
    . ,' .   o
. ,'
                                                  JAN 8 ' 1989
.
            Docket No. 50-312
o
            Rancho Seco Nuclear Generating Station
JAN 8 ' 1989
            Sacramento Municipal Utility District
Docket No. 50-312
            14440 Twin Cities Road
Rancho Seco Nuclear Generating Station
Sacramento Municipal Utility District
14440 Twin Cities Road
,
,
            Herald, California 95638-9799
Herald, California 95638-9799
            Attention:       Mr. G. Carl Andognini
Attention:
                              Chief Executive Officer, Nuclear
Mr. G. Carl Andognini
            Gentlemen:
Chief Executive Officer, Nuclear
            SUBJECT:   NRC INSPECTION REPORT
Gentlemen:
            This letter refers to the routine inspection conducted by Mr. W. P. Ang of
SUBJECT:
            this office on December 7-11, 1987, of activities authorized by NRC License
NRC INSPECTION REPORT
            No. DPR-54, and to the discussions of our findings with Mr. R. Croley and
This letter refers to the routine inspection conducted by Mr. W. P. Ang of
            members of your staff at the conclusion of the inspection on December 11,
this office on December 7-11, 1987, of activities authorized by NRC License
            1987.
No. DPR-54, and to the discussions of our findings with Mr. R. Croley and
            Areas examined during this inspection are described in the enclosed inspection
members of your staff at the conclusion of the inspection on December 11,
            report.   Within these areas, the inspection consisted of selective
1987.
          -examinations of procedures and representative records, interviews with
Areas examined during this inspection are described in the enclosed inspection
            personnel, and observations by the inspectors.
report.
            No violations of NRC requirements were identified within the scope of this
Within these areas, the inspection consisted of selective
            inspection.
-examinations of procedures and representative records, interviews with
            In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
personnel, and observations by the inspectors.
            will be placed in the NRC Public Document Room.
No violations of NRC requirements were identified within the scope of this
            Should you have any questions concerning this inspection, we will be glad to
inspection.
            discuss them with you.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
                                                        Sincerely.,             ~
will be placed in the NRC Public Document Room.
                                                        h     f (,'k     h5hYb
Should you have any questions concerning this inspection, we will be glad to
                                                        R. Zim. rman, Chief U
discuss them with you.
                                                        Reactor Projects Branch
Sincerely.,
            Enclosure:
~
            Inspection Report No. 50-312/87-45
h
            cc w/ enclosure:
f (,'k
            R. Colombo, SMUD
h5hYb
            J. Vinquist, SMUD
R. Zim. rman, Chief U
            K. A. Meyer, SMUD
Reactor Projects Branch
                                      r
Enclosure:
                                                                                            \
Inspection Report No. 50-312/87-45
      8801260261 880108
cc w/ enclosure:
  '  PDR
R. Colombo, SMUD
      O
J. Vinquist, SMUD
              ADOCK 05000312
K. A. Meyer, SMUD
                          DCD                                                           [)'f  \
\\
[)'f
r
8801260261 880108
\\
PDR
ADOCK 05000312
O
DCD
'


      *
*
        .
.
            .
.
    ,
,
  .
.
                                                      .g.
.g.
          bcc w/ enclosure:
bcc w/ enclosure:
          State of California
State of California
          Project Inspector
Project Inspector
          Resident Inspector
Resident Inspector
          docket file
docket file
          G. Cook
G. Cook
          B. Faulkenberry
B. Faulkenberry
          J. Martin
J. Martin
          D. Persinko, NRR
D. Persinko, NRR
          bcc w/o enclosure:
bcc w/o enclosure:
          LFM8
LFM8
          M /Strkth
M /Strkth
              bOh               L               pf7:
bOh
            PA g/ dot         i   er       RZimmerman
L
          1     /88         1/ /88         1/J/88
pf7:
              QUIjST COPY ] REQUEST f,0PY ] REQUESTfQRY ]
PA g/ dot
          YES / / NO     ] YES / /N0/ ] YES /W ]
i
                                    v
er
                                              '
RZimmerman
                                                  TO PDR ]
1
                                            _Y E_S / N0   ]
/88
1/ /88
1/J/88
QUIjST COPY ] REQUEST f,0PY ] REQUESTfQRY ]
YES / / NO
] YES / /N0/ ] YES /W ]
v
TO PDR ]
'
_Y E_S / N0
]
!
!
i
i

Latest revision as of 18:09, 10 December 2024

Forwards Insp Rept 50-312/87-45 on 871207-11.No Violations Noted
ML20195J178
Person / Time
Site: Rancho Seco
Issue date: 01/08/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20195J181 List:
References
NUDOCS 8801260261
Download: ML20195J178 (2)


See also: IR 05000312/1987045

Text

~

. ,'

.

o

JAN 8 ' 1989

Docket No. 50-312

Rancho Seco Nuclear Generating Station

Sacramento Municipal Utility District

14440 Twin Cities Road

,

Herald, California 95638-9799

Attention:

Mr. G. Carl Andognini

Chief Executive Officer, Nuclear

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

This letter refers to the routine inspection conducted by Mr. W. P. Ang of

this office on December 7-11, 1987, of activities authorized by NRC License

No. DPR-54, and to the discussions of our findings with Mr. R. Croley and

members of your staff at the conclusion of the inspection on December 11,

1987.

Areas examined during this inspection are described in the enclosed inspection

report.

Within these areas, the inspection consisted of selective

-examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely.,

~

h

f (,'k

h5hYb

R. Zim. rman, Chief U

Reactor Projects Branch

Enclosure:

Inspection Report No. 50-312/87-45

cc w/ enclosure:

R. Colombo, SMUD

J. Vinquist, SMUD

K. A. Meyer, SMUD

\\

[)'f

r

8801260261 880108

\\

PDR

ADOCK 05000312

O

DCD

'

.

.

,

.

.g.

bcc w/ enclosure:

State of California

Project Inspector

Resident Inspector

docket file

G. Cook

B. Faulkenberry

J. Martin

D. Persinko, NRR

bcc w/o enclosure:

LFM8

M /Strkth

bOh

L

pf7:

PA g/ dot

i

er

RZimmerman

1

/88

1/ /88

1/J/88

QUIjST COPY ] REQUEST f,0PY ] REQUESTfQRY ]

YES / / NO

] YES / /N0/ ] YES /W ]

v

TO PDR ]

'

_Y E_S / N0

]

!

i

I

!

l