              A444-                                                                       UNITED STATES                                 '
. ~ _ .
                                                                NUCLEAR REGULATORY COMMISSION
_ _ . _ - - _ . . . _ _ _ - . - - . - - . - .~. -
l _'   [                      o                                                             REGION lil
. - . - . - - . -
j     g                     -y                                                 801 WARRENVILLE ROAD
_ - . .
t                             t                                                USLE, ILLINOIS 60532-4351
_
A444-
UNITED STATES
'
NUCLEAR REGULATORY COMMISSION
[
REGION lil
l _'
o
j
g
-y
801 WARRENVILLE ROAD
t
USLE, ILLINOIS 60532-4351
t \\...../
l
l
      \...../                                                                December 9,1998
December 9,1998
l
l
;               Mr. John'K. Wood .
;
                Vice President - Nuclear
Mr. John'K. Wood .
Vice President - Nuclear
l
l
                Davis-Besse Nuclear Power Station
Davis-Besse Nuclear Power Station
L             _ Centerior Service Company .
L
l               5501 North State Route 2
_ Centerior Service Company .
              - Oak Harbor, OH 43449
l
                SUBJECT:           DAVIS-BESSE INSPECTION REPORT 50-346/98017(DRP) AND
5501 North State Route 2
                                    NOTICE OF VIOLATION
- Oak Harbor, OH 43449
                Dear Mr. Wood:
SUBJECT:
DAVIS-BESSE INSPECTION REPORT 50-346/98017(DRP) AND
NOTICE OF VIOLATION
Dear Mr. Wood:
i
i
                On November 9,1998, the NRC completed an inspection at the Davis-Besse reactor facility.
On November 9,1998, the NRC completed an inspection at the Davis-Besse reactor facility.
                During that inspection, plant operators were challenged by several events which led to manual -
During that inspection, plant operators were challenged by several events which led to manual -
                reactor trips from approximately full power on September 24 and October 14, an automatic
reactor trips from approximately full power on September 24 and October 14, an automatic
reactor trip from 4 percent power on October 18, and a plant runbcck from 100 percent to
,
,
                reactor trip from 4 percent power on October 18, and a plant runbcck from 100 percent to
i-
i-               60 percent power on October 21. The circumstances surrounding the October 14 manual
60 percent power on October 21. The circumstances surrounding the October 14 manual
L               reactor trip were described in Inspection Report 50-346/98019._ The circumstances surrounding                         'i
L
                the other events are described in the enclosed repoit                                                                     l
reactor trip were described in Inspection Report 50-346/98019._ The circumstances surrounding
' i
the other events are described in the enclosed repoit
'
I
; Operators responded promptly and effectively to the events to ensure the plant was in a stable
' condition following each event. While each of these events were reviewed and individual causes
were identified and addressed, it is of concern that the processes in place were not effective in
- preventing these events from occurring. It is our understanding that a collective significance
i
review has been initiated to assess the various events that have occurred over the past several
months and to develop actions to improve overall performance at the facility. A management
'
'
                                                                                                                                          I
meeting to discuss the initial results of the review has been scheduled for December 16,1998,
I              ; Operators responded promptly and effectively to the events to ensure the plant was in a stable
at the NRC Region lli Office in Lisle, Illinoisc
              ' condition following each event. While each of these events were reviewed and individual causes
,
                were identified and addressed, it is of concern that the processes in place were not effective in
One' violation of NRC requirements was identified during this inspection conceming an
              - preventing these events from occurring. It is our understanding that a collective significance
. inadequate maintenance work order (MWO) which was used by an electrician during the
i                review has been initiated to assess the various events that have occurred over the past several
,
                                                                                                                                          '
removal of a primary water storage tank temperature indicator. The MWO contained incorrect
                months and to develop actions to improve overall performance at the facility. A management
                meeting to discuss the initial results of the review has been scheduled for December 16,1998,
                at the NRC Region lli Office in Lisle, Illinoisc                                                                         ,
                One' violation of NRC requirements was identified during this inspection conceming an
                . inadequate maintenance work order (MWO) which was used by an electrician during the
,               removal of a primary water storage tank temperature indicator. The MWO contained incorrect
'~
'~
                instructions concerning a fuse removal from an instrumentation panel and, when the work was
instructions concerning a fuse removal from an instrumentation panel and, when the work was
                performed, the plant runback mentioned above occurred.
performed, the plant runback mentioned above occurred.
                The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
                = surrounding it are described in detail in the enclosed report. The NRC has concluded that
= surrounding it are described in detail in the enclosed report. The NRC has concluded that
                information regarding the reason for the violation, and the corrective actions taken and planned
information regarding the reason for the violation, and the corrective actions taken and planned
.
.
                to correct the violation and prevent recurrence, are already adequately addressed in the
to correct the violation and prevent recurrence, are already adequately addressed in the
:               enclosed report. Therefore, you are not required to respond to this letter unless the description
:
enclosed report. Therefore, you are not required to respond to this letter unless the description
,
,
                therein does'not accurately reflect your correct lve actions or your position, in that case, or if you
therein does'not accurately reflect your correct lve actions or your position, in that case, or if you
:               choose to provide additional information, you should follow the instructions specified in the
:
                enclosed Notice.-                                                                                                     'i
choose to provide additional information, you should follow the instructions specified in the
enclosed Notice.-
'i
o
o
                                                                            a
a
                      9812210006 981209
9812210006 981209
                      PDR ADOCK 05000346
PDR
L                     e                             PDR
ADOCK 05000346
L
e
PDR
l
l
l
l
        .     uu               a_,                         , _.               _ . ~ . ,               _
.
uu
a_,
, _.
_ . ~ . ,
_
_ ,_
.


      -. . .                 . -.         . . _. -           -.     . - _ _ - . - . , . _ . ... .-
-. .
.
.
-.
. . _. -
-.
. - _ _ - .
-
. ,
.
_ .
...
.-
,
,
' J. Wood                                               -2-
' J. Wood
  In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
-2-
  enclosures, and your response, if any, will be placed in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
                                                      Sincerely,
enclosures, and your response, if any, will be placed in the NRC Public Document Room.
                                                                    (b.>
Sincerely,
                                                      ThoQas . Kozak, Chief
(b.>
                                                      Reactor Projects Branch 4
ThoQas . Kozak, Chief
  Docket No.: 50-346
Reactor Projects Branch 4
  License No.: NPF-3                                                                                   ;
Docket No.: 50-346
  Enclosures:   1.       Notice of Violation                                                           j
License No.: NPF-3
                2.       Inspection Report                                                             ,
Enclosures:
                            50-346/98017(DRP)                                                           ]
1.
                                                                                                        l
Notice of Violation
  cc w/encls:   J. Stetz, Senior Vice President - Nuclear
j
                J. Lash, Plant Manager
2.
                J. Freels, Manager, Regulatory Affairs
Inspection Report
                M. O'Reilly, First Energy
,
                State Liaison Officer, State of Ohio
50-346/98017(DRP)
                R. Owen, Ohio Department of Health
]
                C. Glazer, State of Ohio Public
l
                  Utilities Commission
cc w/encls:
                                                                                                        i
J. Stetz, Senior Vice President - Nuclear
J. Lash, Plant Manager
J. Freels, Manager, Regulatory Affairs
M. O'Reilly, First Energy
State Liaison Officer, State of Ohio
R. Owen, Ohio Department of Health
C. Glazer, State of Ohio Public
Utilities Commission
i


  .       . _ _ _                 ___ _ _._ ._ _                                       _.__                                 _ _ . _ __
.
. _ _ _
___ _ _._ ._ _
_.__
_
_
. _
__
,
J. Wood
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
enclosures, and your response, if any, will be placed in the NRC Public Document Room.
Sincerely,
/s/ T. J. Kozak
Thomas J. Kozak, Chief
Reactor Projects Branch 4
Docket No.: 50-346
License No.: NPF-3
Enclosures:
1.
Notice of Violation
2.
Inspection Report
,
,
    J. Wood                                                                      -2-
50-346/98017(DRP)
    In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
cc w/encis:
    enclosures, and your response, if any, will be placed in the NRC Public Document Room.
J. Stetz, Senior Vice President - Nuclear
                                                                              Sincerely,
J. Lash, Plant Manager
                                                                              /s/ T. J. Kozak
J. Freels, Manager, Regulatory Affairs
                                                                              Thomas J. Kozak, Chief
M. O'Reilly, First Energy
                                                                              Reactor Projects Branch 4
State Liaison Officer, State of Ohio
    Docket No.: 50-346
R. Owen, Ohio Department of Health
    License No.: NPF-3
C. Glazer, State of Ohio Public
    Enclosures:              1.          Notice of Violation
Utilities Commission
                            2.          Inspection Report                                                                                ,
DOCUMENT NAME: G:\\DAVi\\DAV98017.DRP
                                            50-346/98017(DRP)
To receive a copy of thle document, Indicate in the box 'C's Copy without attacNencl *E's Copy with attachtenci *N" a No copy
    cc w/encis:             J. Stetz, Senior Vice President - Nuclear
OFFICE
                            J. Lash, Plant Manager
Rill
                            J. Freels, Manager, Regulatory Affairs
Rlli
                            M. O'Reilly, First Energy
D
                            State Liaison Officer, State of Ohio
NAME
                            R. Owen, Ohio Department of Health
DuPontM
                            C. Glazer, State of Ohio Public
Kozak Y
                              Utilities Commission
DATE
    DOCUMENT NAME: G:\DAVi\DAV98017.DRP
n/9 / fr
    To receive a copy of thle document, Indicate in the box 'C's Copy without attacNencl *E's Copy with attachtenci *N" a No copy
17J 9 / D
      OFFICE             Rill                             Rlli                     D
OFFICIAL RECORD COPY
      NAME               DuPontM                           Kozak Y
      DATE               n/9 / fr                           17J 9 / D
                                                              OFFICIAL RECORD COPY


  -.. .
-..
          J. Wood                   -3-
.
J. Wood
-3-
$
$
          Distribution:
Distribution:
          RPC. (E-Mail) -
RPC. (E-Mail) -
          Project Mgr., NRR w/encls
Project Mgr., NRR w/encls
        : J. Caldwell, Rill w/encls
: J. Caldwell, Rill w/encls
          C. Pederson, Rill w/encls
C. Pederson, Rill w/encls
          B. Clayton, Rlli w/encls
B. Clayton, Rlli w/encls
        SRI Davis-Besse w/encls
SRI Davis-Besse w/encls
        DRP w/encls
DRP w/encls
        TSS w/encls
TSS w/encls
        DRS (2) w/encls
DRS (2) w/encls
        Rlli PRR w/encls
Rlli PRR w/encls
        ~PUBLIC lE-01 w/encls
~PUBLIC lE-01 w/encls
        Docket File w/encls
Docket File w/encls
        GREENS
GREENS
        LEO (E-Mail)
LEO (E-Mail)
        DOCDESK (E-Mail)
DOCDESK (E-Mail)
                                        \
\\
                                          l
l
                    180040
180040
}}
}}

Latest revision as of 11:59, 10 December 2024

Forwards Insp Rept 50-346/98-17 on 980918-1109 & NOV Re Inadequate Maint Work Order Used by Electrician During Removal of Primary Water Storage Tank Temp Indicator
ML20198B539
Person / Time
Site: Davis Besse, 03000346
Issue date: 12/09/1998
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20198B542 List:
References
50-346-98-17, NUDOCS 9812210006
Download: ML20198B539 (4)


See also: IR 05000346/1998017

Text

.

-._

. ~ _ .

_ _ . _ - - _ . . . _ _ _ - . - - . - - . - .~. -

. - . - . - - . -

_ - . .

_

A444-

UNITED STATES

'

NUCLEAR REGULATORY COMMISSION

[

REGION lil

l _'

o

j

g

-y

801 WARRENVILLE ROAD

t

USLE, ILLINOIS 60532-4351

t \\...../

l

December 9,1998

l

Mr. John'K. Wood .

Vice President - Nuclear

l

Davis-Besse Nuclear Power Station

L

_ Centerior Service Company .

l

5501 North State Route 2

- Oak Harbor, OH 43449

SUBJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/98017(DRP) AND

NOTICE OF VIOLATION

Dear Mr. Wood:

i

On November 9,1998, the NRC completed an inspection at the Davis-Besse reactor facility.

During that inspection, plant operators were challenged by several events which led to manual -

reactor trips from approximately full power on September 24 and October 14, an automatic reactor trip from 4 percent power on October 18, and a plant runbcck from 100 percent to

,

i-

60 percent power on October 21. The circumstances surrounding the October 14 manual

L

reactor trip were described in Inspection Report 50-346/98019._ The circumstances surrounding

' i

the other events are described in the enclosed repoit

'

I

Operators responded promptly and effectively to the events to ensure the plant was in a stable

' condition following each event. While each of these events were reviewed and individual causes

were identified and addressed, it is of concern that the processes in place were not effective in

- preventing these events from occurring. It is our understanding that a collective significance

i

review has been initiated to assess the various events that have occurred over the past several

months and to develop actions to improve overall performance at the facility. A management

'

meeting to discuss the initial results of the review has been scheduled for December 16,1998,

at the NRC Region lli Office in Lisle, Illinoisc

,

One' violation of NRC requirements was identified during this inspection conceming an

. inadequate maintenance work order (MWO) which was used by an electrician during the

,

removal of a primary water storage tank temperature indicator. The MWO contained incorrect

'~

instructions concerning a fuse removal from an instrumentation panel and, when the work was

performed, the plant runback mentioned above occurred.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

= surrounding it are described in detail in the enclosed report. The NRC has concluded that

information regarding the reason for the violation, and the corrective actions taken and planned

.

to correct the violation and prevent recurrence, are already adequately addressed in the

enclosed report. Therefore, you are not required to respond to this letter unless the description

,

therein does'not accurately reflect your correct lve actions or your position, in that case, or if you

choose to provide additional information, you should follow the instructions specified in the

enclosed Notice.-

'i

o

a

9812210006 981209

PDR

ADOCK 05000346

L

e

PDR

l

l

.

uu

a_,

, _.

_ . ~ . ,

_

_ ,_

.

-. .

.

.

-.

. . _. -

-.

. - _ _ - .

-

. ,

.

_ .

...

.-

,

' J. Wood

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the

enclosures, and your response, if any, will be placed in the NRC Public Document Room.

Sincerely,

(b.>

ThoQas . Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-346

License No.: NPF-3

Enclosures:

1.

Notice of Violation

j

2.

Inspection Report

,

50-346/98017(DRP)

]

l

cc w/encls:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

i

.

. _ _ _

___ _ _._ ._ _

_.__

_

_

. _

__

,

J. Wood

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the

enclosures, and your response, if any, will be placed in the NRC Public Document Room.

Sincerely,

/s/ T. J. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No.: 50-346

License No.: NPF-3

Enclosures:

1.

Notice of Violation

2.

Inspection Report

,

50-346/98017(DRP)

cc w/encis:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

DOCUMENT NAME: G:\\DAVi\\DAV98017.DRP

To receive a copy of thle document, Indicate in the box 'C's Copy without attacNencl *E's Copy with attachtenci *N" a No copy

OFFICE

Rill

Rlli

D

NAME

DuPontM

Kozak Y

DATE

n/9 / fr

17J 9 / D

OFFICIAL RECORD COPY

-..

.

J. Wood

-3-

$

Distribution:

RPC. (E-Mail) -

Project Mgr., NRR w/encls

J. Caldwell, Rill w/encls

C. Pederson, Rill w/encls

B. Clayton, Rlli w/encls

SRI Davis-Besse w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rlli PRR w/encls

~PUBLIC lE-01 w/encls

Docket File w/encls

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

\\

l

180040