{{Adams
#REDIRECT [[IR 05000285/1997016]]
| number = ML20198P972
| issue date = 11/06/1997
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/97-16 on 970803-0913
| author name = Johnson W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Gambhir S
| addressee affiliation = OMAHA PUBLIC POWER DISTRICT
| docket = 05000285
| license number =
| contact person =
| document report number = 50-285-97-16, NUDOCS 9711120072
| title reference date = 10-29-1997
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
}}
See also: [[see also::IR 05000285/1997016]]
 
=Text=
{{#Wiki_filter:.
                                                . . . .
  -  . .                                                                                                        .
    .        .
            p4 4"b y                                    UNIT E D STATES
            *
          3-            t                NUCLEAR REGULATORY COMMISSION
                        o
          g              g                                REGloN IV
                        /                      611 RYAN PLAZA DRIVE. SuliE 400
          (% * * * * * ,0                      AR LINGToN. TEXAS 760118064
                                                        NOV - 6 1997
                S. K. Gambhir, Division Manager
                Engineering & Operations Support
                Omaha Public Power District
                Fort Cathcun Station FC-2-4 Adm.
                P,0. Box 399
                Hwy. 75 - North of Fort Ca!houn
                Fort Calhoun, Nebraska 68023 0399
                SUBJECT:      NRC INSPECTION REP. ORT 50 285/97-16
                Dear Mr. Gambhir:
                        Thank you for your letter of October 29,1907,in response to our letter and Notice
                of Violation t'ated September 29,1997. We have reviewed your reply and find it
                responsive tr, the concerns raised in our Notice of V!olation. We will review the
                implementation of your corrective actiona during a future inspection to determine that full
                compliance has been tchieved and will be maintained.
.
                                                              Sincerely,
                                                                .
                                                              Project Branch B
                                                              Division of Reactor Projects
                Docket No.: 50-285
                License No.: DPR-40
_
                cc:
                James W. Tills, Manager                                                                    /
                Nuclear Licensing
                Omaha Public Power District
                Fort Calhoun Station FC-2 4 Adm.
                P.O. Box 399
                Hwy. 75 - North of Fort Calhoun
                Fort Calhoun, Nebraska 68023-0399
                                                                                                                    I:
                  9711120072 971106
                  PDR    ADOCK 05000285
                  G                    PDR
                                                                                          I!RIR!N!IIlgigg
                                                                                                                    ,
                                                                                                              _m
 
      .
            _
. .    .
    ,  ..
            Omaha Public Power Distinct              2-
          ' James W. Chase, Manager
            Fort Calhoun Station
              P.O. Box 399
              Fort Calhoun, Nebraska 68023
              Perry D. Robinson, Esq.
            Winston & Strawn
              1400 L. Street, N.W.
            Washington, D.C. 20005 3502
              Chairman                                  i
              Washington County Board of Supervisors
              Blair, Nebraska 68008
              Cheryl Rogers, LLRW Program Manager
              Environmental Protection Section
              Nebraska Department of Health
              301 Centennial Mall, South
              P.O. Box 95007
              Lincoln, Nebraska 68509 5007
                                                        i
4
w
 
    -
  .
      Omaha Public Power Distnct                              -3-                                          NOV - 61997
      bec to DCD (IE01)
      bec distrib, by RIV:
      Regional Administrator                      DRS-PSB
      DRP Director                                  MIS System
      Branch Chief (DRP/B)                          RIV File
      Project Engineer (DRP/B)                      Branch Chief (DRP/TSS)
      Resident inspector
      DOCUMENT NAME: R:\_FCS\FC716AK.WCW
        To receive copy of document, indicate in boa: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy
        RIV:PE:DRP/B                C:D'RP/B          6
        DNGraves;df- y
                          '
                                    WDJohnsor        gW
        11/ y /97                  11/(p/97 ',
                                                  0;FICIAL RECORD COI)Y
..
          .
                    .
                              ..
                                      ... ..
                                                                                                                            _u
                                                                        .
                                                                                -  . .            . . . ..            .
 
                                                                                                  _ - - - - -  --          .
                                                                                                                              - - - -
                                                                                                                                      _ __
,
        Omaha Public Power District                                  3-                                      NOV - 61997
    M N OCD #E01 0
        bec distrib. by RIV:
        Regional Administrator                              DRS PSB
        DRP Director
            -
                                                            MIS System
        Branch Chief (DRP/B)                                RIV File
        Project Engineer (DRP/B)                            Branch Chief (DRP/TSS)
    - Resident inspector
                                                                                                                                          1
        DOCUMENT NAME: R:\_FCS\FC716AK,WCW
        To receive copy of document, Ind6cate In box: "C" = Copy wdhout enclosures "E" = Copy wth enclosures "N" = No copy
          RIV:PE:DRP/B                            C:DRP/B    6
          DNGraves;df y
                            '
                                                  WDJohnsor    gW
          11/b /97                                11/ (p/97 -;
                                                          O':FICIAL RECORD COPY
  . - -          .      .
                                _ _ _ _ _ _ _ - -              -                                                                            i
 
                                                                                        - - _ _ _ - - - _ _ _ - - - _ - - _ _ - _ _ _ _ - - _ _ _ _ -
    .          .
      *
          .      .
                    0998
      ~
-
                    Chaha Pshhc Power Ostnct
                    444 hovm 16m Snet Man                                            '
                                                                                      .
                    Onaha. Nobraska 68102D47      ,
                                                          j; ,
                                                          ~"'AjQ
                                                                                                                                                        .
                  October 29,1997
                                                kl                          >
                                                                                  '/
                  LIC-97-0164                                          '%      /
                                                                                  s
                  U.S. Nuclear Regulatory Commission
                  ATTN: Document Control Desk
                  Mail Station Pl-137
                  Washington, DC 20555
                    References:        1.      Docket No. 50-285
                                      2.      Letter from NRC (T. P. Gwynn) to OPPD (S. K. Gambhir) dated
                                              September 29,1997
                    SUBJECT:          NRC hspection P-n~r N<          ".285/97-16, Reply to a Notice of Violation
                    i:- subject :r. .; ansanned a reite o Vi'!rtien (N ' resulting from an NRC inspection
                    conducte * ucun s *!ogh &pta +:r 13, IN7 st 5.he Fe "alhoun Station (FCS). Attached
                    is the O- @ M .- m c DP: (O 2 ., - ' ' : Om ' JV.
                    If you noua hau e quac. Merse comact nie
                    .ig:rt
                        '
                                                    .
                    S. K. Garabh'r
                    Division Manager
                    Enginee ring and Operations Support
                    SKG/dild
                    Attachment
  '
                    c:      Winston and Strawn
                              E. W. Merschoff, NRC Regional Administrator, Region IV
                              L. R. Wharton, NRC Project Manager
                              W. C. Walker, NRC Senior Resident Inspector
                                                                      88-O188
        45 5 t2c
                                                              Employment w.tn Equalopportunity
-
    bSf/0 50 0'!
            _
                                    b/%2
                                            ~,                                                                                                        _
 
    .    .
    "
        .  .
      .
              Attachment
              LIC 97-0164
              Page 1
                                          REPLY TO A NOTICE OF VIOLATION
              Omaha Public Power District                                                      Docket: 50-285
              Fort Calhoun Station                                                            11mw:DPR-40
              Durlag an NRC inspection conducted on August 2 through September 13,1997, two
              violations of NRC requirements were identified. In accordance with the " General Statemen,
              of Policy and Procedure for NRC Enforcement Actions" NUREG 1600, the violations are
              listed below:
              A.      10 CFR Part 50, Appendix B Criterion V, and the Fort Calhoun Quality Assurance
                      Plan, Revision 4, Section 2.1, paragraph 4.2.1, state, in part, that activitics affecting
                      qualhy shall be prescribed by documented instructions or procedures and shall bc          )
                      accomplished in accordance with these instructions or procedures.
                      Standing Order S0-G-101, " Radiation Worker Practices," Revision 8, Section 5.6.2,
                      states, in part, that personnel are not to reach across contamination area boundaries.    !
                                                                                                                l
                      Radiation Protection Procedure RP-401, " Issue, Control, and Accountability-of
                      Radiation Protection Instrumentation," Revision 6, Step 7.4.5, states, in part, that
                      iadiation protection rsonnel shall be responsible for removing from service and
                      tagging out of service any out of calibration radiation protection equipment.
                      Contrary to the above, the inspectors identitled the following two instances of failure
                      to follow the requirements of radiation protection procedures:
                              On August 21, 1997, a maintenance helper located outside a contaminated
                              area, reached across a contamination area boundary and used a galtronics
                              phone inside the contaminated area.
'
                              On August 5,1997, radiation protection personnel did not remove an
                              uncalibrated electronic dosimeter from service.
              This is a Severity Level IV Violation (Supplement I) (285/97016-01)
              B.      Appendix B of 10 CFR Part 50, Criterion V, states, in part, tnat activities affecting
                      quality shall be prescribed by doenmented instructions, procedures, or drawings: of
                      a type appropriate to the circun. ; mee and shall be accomplished in accordance with
                      these instructions, procedures, or drewings.
  !
                                                                                                                  J
 
                                                            __-_____                                    _ _ _ _ _ _ - _ _ _ _ _
l .      .
    '
      .
    .
              Attachment
              LIC 97-0164
              Page 2
                        Contrary to the above, on July 11,1997, the inspectors identified that Maintenance
                        -Procedure GM RM-FP A01, " Fire Door Lockset Inspection and Repetitive
                        Maintenance," Revision 5, Step 7, did not contain appropriate instructions for
                        ensuring that the locked fire doors would open using a key following maintenance on
                        the doors. As a result ofimproperly performed maintenance and failure to perform
                        postn:alntenance testing, two locked fire doors could not be opened using keys.
              This is a Severity Level IV Violation (285/97016-04) (Supplement IV)
i
              OPPD_Res ponse _to3'iola tionJLExample_1
              1,        The Reason for the Violation
                        The reason for this violation was a failure to follow the procedural requirements of
                        Standing Order S0-G-101, " Radiation Worker Practices," which states, in part, "that
                        personnel are not to reach across contamination area boundaries." This violation occurred
                        when a maintenance worker, newly assigned to work at Fort Calhoun Station, under the
c                        direction of a journey person, reached across a contamination area boundary to use a
                        gaitronics phone located inside of a contaminated area.
              2.        Corrective Steps Which Have Been Taken and the Results Achieved
                          a.      The individuals involved were counseled by the Supervisor of Radiological
                                  Operations.
                          b.      This event was reviewed with site personnel during the September 24,1997 Human
                                  Performance Day.
                3.        Corrective Steps Which Will Be Taken to Avoid Further Violations
                          A work practice improvement plan for radiation workers is being developed. Part of this
                          plan is to develop a knowledge based questionnaire which will be used to evaluate radiation
                          worker skills and knowledge. The results will be used to improve processes, training, and
                          better define and enforce management expectations. The work practice improvement plan
                          is scheduled to be completed by September 30,1998.
                4.        Date When Full Compliante Will Be Achieved
                          OPPD is currently in full compliance.
              . - . -..
        -  .
                                .    .
                                                  ... ..    . ...          .
                                                                                      .    .
                                                                                                    ..
                                                                                                                                  _ . . _ _ . .
 
:
  .    .
    '
      ,  ..
                                                                                                                    .
  -.
'
              Attachment
              LIC 97-0164
              Page 3
              OPfD_Responselo3'iolatiorLA Examplel
              1.    The Reason for the Violation
                    The reason for this violation is a failure to follow the procedural requirements of RP-401,
                    "Isine, Control and Accountability of Radiation Protection lastrumentation." This
                    violation occurred when radiation protection personnel failed to remove one electronic
                    dosimeter from the active inventory for calibration before its due date.
              2.    Corrective Steps Which Have Been Taken and the Results Achieved
                    a.      Immediate corrective action was taken to verify that there were no other in-service    >
                            electronic dosimeters that were out of calibration. No other electronic dosimeters
                            were found with expired calibration dates,
                    b.      The subject electronic dosimeter was demonstrated to be operating properly by
                            exposing it to a known source of radiation.
              3.    Corrective Steps Which Will Be Taken to Avoid Further Violations
                    a.      A Request for Training (RFT) was generated to include in General Employee
                            Radiation Worker Training the requirement to validate the calibration due date by
                            the user prior to entry into the RCA. This will be incorporated into Level II
                            General Employee Radiation Worker Training by December 1,1997,
                    b.-    A system problem report was generated and submitted to the electronic dosimeter
                            vendor, the developers of the personnel access control program used at Fort
                            Calhoun Station. This request tasks that the software revision will include the
                            ability to test against the electronic dosimeter data base and prevent the issue of an
                            out of calibration electronic dosimeter. The software change has been accepted by
                            the vendor and is scheduled to be delivered to OPPD by April 30, 1998.
                              Following Quality Assurance (QA) software acceptance testing the revised software
                            will be implemented by December 31,1998.
              4.    Date When Full Compliance Will Be Achieved
                                                                                                                      :
                    OPPD is currently in full compliance.
                                                                                                                      I
 
                                              _ _ - _ _ _ _ - _ - - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . _
  ,    .
    '
      ,  ..
    '
;
            Attachment
            LIC 97-0164
            Page 4
                                                                                                                          *
            OPED. Response _to_Yiolation.B
            1.    The Reason for the Violation
                    a.    The reason for the violation was a deficient procedure, in that, the procedure did
                          not include steps to perform a functional check of the door locks after repairs were
                          completed.
            2.    Corrective Steps Which Have Been Taken and the Results Achieved
                    a.    An investigation was performed to determine which doors in the Radiologically
                          Protected Area had incorrectly installed locksets. Eight doors were determined to
                          have locksets installed incorrectly and would have prevented access if locked.
                    b.    The incorrectly installed locksets of all eight doors were repaired and fuctionally
                          tested for operability under a maintenance work order.
                    c.    Procedures for fire door maintenance were reviewed and revised to address
                          identified weaknesses. Specific areas reviewed included function checks of the
                          Radiologically Controlled Area doors, quality verification, Radiation Protection
                          requirements, and Secuity requirements.
            3.    Corrective Steps Which Will Be Taken to Avoid Further Violations
                    No further corrective actions are required.
            4.    Date When Full Compliance Will Be Achieved
                    OPPD is currently in full compliance.
                                                                                                                            .
                                                                                                                              o
}}