          .,a J'             Dave Morey
.,a J'
' "      *
Dave Morey S1uthern Nucl:at Ves President Operattg Company a
* S1uthern Nucl:at
Farley Project P.O. Box 1295 j
      *- '      ,    a Ves President           Operattg Company
Birmingham. Alabama 35201 Tel 205.992.5131 k
              .          Farley Project         P.O. Box 1295                                                                   j Birmingham. Alabama 35201                                                       1 Tel 205.992.5131 SOUTHERNk                h       l COMPANY                 1 l
SOUTHERN h COMPANY 1
3anuary 11, 1999                                                           Energyto ServeYourWorld" I
l 3anuary 11, 1999 Energyto ServeYourWorld" Docket Nos.
Docket Nos.         50-348 50-364                                                                                   l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk                                                                                   l Washington, D C 20555 Joseph M. Farley Nuclear Phnt Monthly Operating Report Ladies and Gentlemen:
50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Phnt Monthly Operating Report Ladies and Gentlemen:
                ,  Enclosed are the December 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.                             l If you have any questions, please advise.
Enclosed are the December 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
Respectfully submitted,
[ h h7/%#
[ h h7/%#
Dave Morey RWC:(mor)
Dave Morey RWC:(mor)
Enclosures El - December Monthly Operating Report for Plant Farley Unit 1 E2 - December Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager                                                             l Mr. T. P. Johnson, FNP Sr. Resident Inspector
Enclosures El - December Monthly Operating Report for Plant Farley Unit 1 E2 - December Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager l
                                                                                                                          \
Mr. T. P. Johnson, FNP Sr. Resident Inspector
f             Y 9901210045 981231 I PDR       ADOCK 05000348;
\\
  '                  R                        PM ,
f Y
9901210045 981231 I
PDR ADOCK 05000348; R
PM,


OPERATING DATA REPORT DOCKET NO.:           _
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:                 J. M. Farley - Unit 1 DATE:                         January _61 ,1999 COMPLETED BY:         _ A. H. Curlington TELEPHONE:               (334) 794-6431 ext. 3399 OPERATING STATUS
50-348 UNIT NAME:
: 1. Reporting Period:                         DECEMBER 1998
J. M. Farley - Unit 1 DATE:
: 2. Design Electrical Rating (Net MWe):                     8_29_
January _6,1999 1
: 3. Maximum Dependable Capacity (Net MWe):                   822_
COMPLETED BY:
This Month           Year to Date                   Cumulative
_ A. H. Curlington TELEPHONE:
: 4. Number Of Hours Reacter Was Critical:                 114.3               6,621.6                   1C 903.2
(334) 794-6431 ext. 3399 OPERATING STATUS 1.
: 5. Ilours Generator On-line:                               70.1               6,540.3_                   146,759.7_
Reporting Period:
: 6. Unit Reserve Shutdown Hours:                             0.0                   0.0                                       0.0
DECEMBER 1998 2.
: 7. Net Electrical Energy Generated (MWH):               9,586.0         5,233,989.0                 115,534,317.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date             i I ag No.         ! Event Desenption There were no challenges to Pressurizer PORV cr Pressurizer Safety Valves.
Design Electrical Rating (Net MWe):
8_29_
3.
Maximum Dependable Capacity (Net MWe):
822_
This Month Year to Date Cumulative 4.
Number Of Hours Reacter Was Critical:
114.3 6,621.6 1C 903.2 5.
Ilours Generator On-line:
70.1 6,540.3_
146,759.7_
6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
9,586.0 5,233,989.0 115,534,317.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i I ag No.
! Event Desenption There were no challenges to Pressurizer PORV cr Pressurizer Safety Valves.
El-1
El-1


UNIT SHUTDOWNS DOCKET NO.:               50-348 UNIT NAME:         J. M. Farley - Unit 1 DATE:                 January 6,1999 _
UNIT SHUTDOWNS DOCKET NO.:
COMPLETED HY:         A. I1. Curlington REPORTING PERIOD: DECEMBER.1998                                                         TELEPilONE:     (334) 794-6431 ext. 3399 l
50-348 UNIT NAME:
Type                               Method of F: Forced Duration   Reason   Shutting Down                 Cause/ Corrective Actions No.         Date       S: Scheduled (Hours)       (1)             (2)         .
J. M. Farley - Unit 1 DATE:
Comments 3       981017             S           673.9       C             1             iThe fiftenth refueling outage was completed on 981228.
January 6,1999 _
I I                                 I t!) KLAx m.                                                     v) MLilivu.
COMPLETED HY:
A Equipment railure (Explain)                                   1 - Manual D - Maintenance or Test                                         2 ManualTrip/ Scram C. Rcfueling                                                     3 - Automatic Tnp/ scram D Regulatory Restriction                                         4 Continuation E - operator Training / License Examination                     5 - Other (Explain)
A. I1. Curlington REPORTING PERIOD: DECEMBER.1998 TELEPilONE:
F- Administrative G OperationalError(Explain) 11 - Other (Explain)
(334) 794-6431 ext. 3399 l
Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments 3
981017 S
673.9 C
1 iThe fiftenth refueling outage was completed on 981228.
I I
I t!) KLAx m.
v) MLilivu.
A Equipment railure (Explain) 1 - Manual D - Maintenance or Test 2 ManualTrip/ Scram C. Rcfueling 3 - Automatic Tnp/ scram D Regulatory Restriction 4 Continuation E - operator Training / License Examination 5 - Other (Explain)
F-Administrative G OperationalError(Explain) 11 - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities were completed:
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities were completed:
: 1) Steam Generator eddy current testing and sleeving
: 1) Steam Generator eddy current testing and sleeving
Line 62: Line 95:
El-2
El-2


~             *
~
                      .              OPERATING DATA REPORT DOCKET NO.:                               50-364 UNIT NAME:                         J. M. Farley - Unit 2 DATE:                                 January 6,1999 COMPLETED BY:                         A.11. Curlington TELEPilONE:                       (334) 794-6431 ext. 3399     [
OPERATING DATA REPORT DOCKET NO.:
OPERATING. STATUS
50-364 UNIT NAME:
: 1. Reporting Period:                         DECEMBER 1998
J. M. Farley - Unit 2 DATE:
: 2. Design Electrical Rating (Net MWe):                     829
January 6,1999 COMPLETED BY:
: 3. Maximum Dependable Capacity (Net MWe):                   852_
A.11. Curlington TELEPilONE:
i This Month           Year to Date                       Cumulative
(334) 794-6431 ext. 3399
: 4. Number Of Hours Reactor Was Critical:                 744.0                   7,551.4 132,468.4     -
[
: 5. Hours Generator On-line:                               744.0                   7,514.5                       130,645.4
OPERATING. STATUS 1.
: 6. Unit Reserve Shutdown Hours:                             0.0                     0.0                                 0.0
Reporting Period:
: 7. Net Electrical Energy Generated (MWH):           640,970.0                 6,267,922.0                   104,099,286.0 1
DECEMBER 1998 2.
i CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date             i I ag No.         i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
Design Electrical Rating (Net MWe):
l l
829 3.
Maximum Dependable Capacity (Net MWe):
852_
i This Month Year to Date Cumulative 4.
Number Of Hours Reactor Was Critical:
744.0 7,551.4 132,468.4 5.
Hours Generator On-line:
744.0 7,514.5 130,645.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
640,970.0 6,267,922.0 104,099,286.0 1
i CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i I ag No.
i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
l 1
l 1
i E2-1
i E2-1


UNIT SHUTDOWNS DOCKET NO.:             _
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:                 L M. FarJey - Unit 2_   '
50-364 UNIT NAME:
DATE:                   _ January _6,1999 COMPLETED BY:_ A. II. Curlington REPORTING PERIOD: DECEMBER 1998                                                                         TELEPilONE:             (334) 794-6431 cxt. 3399 Type                                     Method of I F: Forced   Duration         Reason   Shutting Down                                 Cause/ Corrective Actions           '
L M. FarJey - Unit 2_
No.           Date       s: scheduled   (Hours)             (1)             (2)                                       Comments i
DATE:
_ January _6,1999 COMPLETED BY:_ A. II. Curlington REPORTING PERIOD: DECEMBER 1998 TELEPilONE:
(334) 794-6431 cxt. 3399 Type Method of I F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date s: scheduled (Hours)
(1)
(2)
Comments i
There were no unit shutdowns during the month.
There were no unit shutdowns during the month.
(1) KLAhUN.                                                           (4) ML &llVI).
(1) KLAhUN.
A- Equiprnent raiture (Explain)                                       1 - Manual B Maintenance or Test                                                 2 - Manual Trip / Scram                                                           ,
(4) ML &llVI).
C- Refueling                                                           3 Automatic 1 rip / Scram D Regulatory Restriction                                               4 - Continuation E Operator Training / License Examination                             5 - Other (Explain)
A-Equiprnent raiture (Explain) 1 - Manual B Maintenance or Test 2 - Manual Trip / Scram C-Refueling 3 Automatic 1 rip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 - Other (Explain)
E- Administrative G- operational Error (Explain)                                                                                                                           ,
E-Administrative G-operational Error (Explain) 11-Other (Explain)
11-Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS t
CAUSE/ CORRECTIVE ACTION / COMMENTS t
NARRATIVE REPORT                                                                                                                                         l There were no significant power reductions this period.
NARRATIVE REPORT l
There were no significant power reductions this period.
i b
i b
1 E2-2
1 E2-2
                          .}}
.}}

Latest revision as of 07:55, 10 December 2024

Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20199E659
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901210045
Download: ML20199E659 (5)


Text

-

.,a J'

Dave Morey S1uthern Nucl:at Ves President Operattg Company a

Farley Project P.O. Box 1295 j

Birmingham. Alabama 35201 Tel 205.992.5131 k

SOUTHERN h COMPANY 1

l 3anuary 11, 1999 Energyto ServeYourWorld" Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Phnt Monthly Operating Report Ladies and Gentlemen:

Enclosed are the December 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

[ h h7/%#

Dave Morey RWC:(mor)

Enclosures El - December Monthly Operating Report for Plant Farley Unit 1 E2 - December Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager l

Mr. T. P. Johnson, FNP Sr. Resident Inspector

\\

f Y

9901210045 981231 I

PDR ADOCK 05000348; R

PM,

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

January _6,1999 1

COMPLETED BY:

_ A. H. Curlington TELEPHONE:

(334) 794-6431 ext. 3399 OPERATING STATUS 1.

Reporting Period:

DECEMBER 1998 2.

Design Electrical Rating (Net MWe):

8_29_

3.

Maximum Dependable Capacity (Net MWe):

822_

This Month Year to Date Cumulative 4.

Number Of Hours Reacter Was Critical:

114.3 6,621.6 1C 903.2 5.

Ilours Generator On-line:

70.1 6,540.3_

146,759.7_

6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

9,586.0 5,233,989.0 115,534,317.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i I ag No.

! Event Desenption There were no challenges to Pressurizer PORV cr Pressurizer Safety Valves.

El-1

UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

January 6,1999 _

COMPLETED HY:

A. I1. Curlington REPORTING PERIOD: DECEMBER.1998 TELEPilONE:

(334) 794-6431 ext. 3399 l

Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments 3

981017 S

673.9 C

1 iThe fiftenth refueling outage was completed on 981228.

I I

I t!) KLAx m.

v) MLilivu.

A Equipment railure (Explain) 1 - Manual D - Maintenance or Test 2 ManualTrip/ Scram C. Rcfueling 3 - Automatic Tnp/ scram D Regulatory Restriction 4 Continuation E - operator Training / License Examination 5 - Other (Explain)

F-Administrative G OperationalError(Explain) 11 - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities were completed:

1) Steam Generator eddy current testing and sleeving
2) Baffle former bolt inspection and replacement
3) Power uprate design change
4) Incore thimble replacement On 981228 at 2223 the UlRF15 outage was corapleted and the unit was synchronized to the grid.

On 981228 at 2313 the main condenser lost vacuum and tripped the turbine.

Condenser vacuum was restored and the unit was sychronized to the grid on 981229 at 0245.

El-2

~

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

January 6,1999 COMPLETED BY:

A.11. Curlington TELEPilONE:

(334) 794-6431 ext. 3399

[

OPERATING. STATUS 1.

Reporting Period:

DECEMBER 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

852_

i This Month Year to Date Cumulative 4.

Number Of Hours Reactor Was Critical:

744.0 7,551.4 132,468.4 5.

Hours Generator On-line:

744.0 7,514.5 130,645.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

640,970.0 6,267,922.0 104,099,286.0 1

i CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i I ag No.

i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

l 1

i E2-1

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

L M. FarJey - Unit 2_

DATE:

_ January _6,1999 COMPLETED BY:_ A. II. Curlington REPORTING PERIOD: DECEMBER 1998 TELEPilONE:

(334) 794-6431 cxt. 3399 Type Method of I F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date s: scheduled (Hours)

(1)

(2)

Comments i

There were no unit shutdowns during the month.

(1) KLAhUN.

(4) ML &llVI).

A-Equiprnent raiture (Explain) 1 - Manual B Maintenance or Test 2 - Manual Trip / Scram C-Refueling 3 Automatic 1 rip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 - Other (Explain)

E-Administrative G-operational Error (Explain) 11-Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS t

NARRATIVE REPORT l

There were no significant power reductions this period.

i b

1 E2-2

.