UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION


==Title:==
==Title:==
BRIEFING ON REACTOR LICENSING INITIATIVES PUBLIC MEETING Location:   Rockville, Maryland Date:       Wednesday, January 13,1999 i
BRIEFING ON REACTOR LICENSING INITIATIVES PUBLIC MEETING Location:
i Pages:       1 - 124 o
Rockville, Maryland Date:
s l l ggt 2}ggg"onPDR PT9.7 ANN RILEY & ASSOCIATES, LTD.                             '
Wednesday, January 13,1999 i
1025 Connecticut Avenue,NW, Suite 1014       -
i Pages:
                                                                              -    e Washington, D.C.20036                   [V   gb y (202) 842 4034                             g,%
1 - 124 o
l l
s ggt 2}ggg"on PDR PT9.7 ANN RILEY & ASSOCIATES, LTD.
1025 Connecticut Avenue,NW, Suite 1014 gb e
Washington, D.C.20036
[V y
g,%
(202) 842 4034


s DISCLAIMER This is an unofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on January 13, 1999, in the Commission's office at One White Flint North, Rockville, Maryland. The meeting was open to public attendance and observation. This transcript has not been reviewed, corrected or edited, and it may contain inaccuracies.
s DISCLAIMER This is an unofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on January 13, 1999, in the Commission's office at One White Flint North, Rockville, Maryland.
The transcript is intended solely for general informational purposes. As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed. Expressions of opinion in this transcript do not necessarily reflect final determination or beliefs. No pleading or other paper may be filed with the Commission in any proceeding as the result of, or addressed to, any statement or argument contained herein, except as the Commission may authorize.
The meeting was open to public attendance and observation.
This transcript has not been reviewed, corrected or edited, and it may contain inaccuracies.
The transcript is intended solely for general informational purposes.
As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed.
Expressions of opinion in this transcript do not necessarily reflect final determination or beliefs.
No pleading or other paper may be filed with the Commission in any proceeding as the result of, or addressed to, any statement or argument contained herein, except as the Commission may authorize.


    - ~ . -          . - - . - - . . . . - - . _                        - . - - . - - . - . . . _ -    . - . . . _ . - - . - -
- ~. -
4-1 1                                         UNITED STATES OF AMERICA i
4-1 1
2                                     NUCLEAR REGULATORY COMMISSION                                                 l 3                                                       ***
UNITED STATES OF AMERICA i
l l
2 NUCLEAR REGULATORY COMMISSION 3
4                                                 BRIEFING ON l                   5                                     REACTOR LICENSING INITIATIVES 6                                                       ***
4 BRIEFING ON l
7                                               PUBLIC MEETING 8
5 REACTOR LICENSING INITIATIVES 6
l                   9                                                 Nuclear Regulatory Commission 10                                                 One White Flint North 11                                                 Rockville, Maryland 12                                                 Wednesday, January 13, 1999 13 14                               The Commission met in open session, pursuant to 15     notice, at 10:10 a.m., Shirley A. Jackson, Chairman, 16     presiding.
7 PUBLIC MEETING 8
17 18     COMMISSIONERS PRESENT:
l 9
19                       SHIRLEY A. JACKSON, Chairman of the Commission 20                       GRETA J. DICUS, Commissioner 21                       EDWARD McGAFFIGAN, JR.,           Commissioner 22                       JEFFREY S. MERRIFIELD, Commissioner 23       STAFF PRESENT:                                                                                             )
Nuclear Regulatory Commission 10 One White Flint North 11 Rockville, Maryland 12 Wednesday, January 13, 1999 13 14 The Commission met in open session, pursuant to 15 notice, at 10:10 a.m.,
24                       ANNETTE L. VIETTI-COOK, Secretary of the Commission 25                       KAREN D. CYR, General Counsel 7dRJ RILEY & ASSOCIATES, LTD.
Shirley A. Jackson, Chairman, 16 presiding.
f I                                                               Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
17 18 COMMISSIONERS PRESENT:
19 SHIRLEY A.
JACKSON, Chairman of the Commission 20 GRETA J. DICUS, Commissioner 21 EDWARD McGAFFIGAN, JR., Commissioner 22 JEFFREY S. MERRIFIELD, Commissioner 23 STAFF PRESENT:
)
24 ANNETTE L. VIETTI-COOK, Secretary of the Commission 25 KAREN D.
CYR, General Counsel f
7dRJ RILEY & ASSOCIATES, LTD.
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


                                                                                                                                                                                                      =
=
v                                                                                                                                                                                                       ,
v 2
2 l
l 1
1                PRESENTERS:                                                                                                                                   ;
PRESENTERS:
2                           WILLIAM TRAVERS, EDO                                                                                                             i
2 WILLIAM TRAVERS, EDO i
!                                          3                           ROY ZIMMERMAN, Deputy Director, NRR 4                           DAVE MATTHEWS, Director, Division of Regulatory 5                             Improvement Programs, NRR                                                                                                       l l                                           6                           CHRIS GRIMES, Project Director, License Renewal 7                             PD, NRR                                                                                                                         ;
3 ROY ZIMMERMAN, Deputy Director, NRR 4
8                            ROBERT WOOD, Generic Issues & Environmental                                                                                     ,
DAVE MATTHEWS, Director, Division of Regulatory 5
f                                          9                             Projects Branch, NRR                                                                                                           i t
Improvement Programs, NRR l
10 l                                       11                               RALPH BEEDLE, Senior Vice President, Nuclear                                                                                     l 12                               Generation and Chief Nuclear Officer, NEI l                                       13                               TONY PIETRANGELO, Director, Licensing, Nuclear                                                                                   ;
l 6
l 14                               Generation, NEI                                                                                                                 3 i
CHRIS GRIMES, Project Director, License Renewal 7
l                                      15                                                                                                                                                               j l                                                                                                                                                                                                         t
PD, NRR 8
:                                        16                                                                                                                                                               j l                                                                                                                                                                                                         !
ROBERT WOOD, Generic Issues & Environmental f
!                                        17                                                                                                                                                               !
9 Projects Branch, NRR i
l                                                                                                                                                                                                         :
t 10 l
l                                       18                                                                                                                                                               l i
11 RALPH BEEDLE, Senior Vice President, Nuclear l
19                                                                                                                                                              ,
12 Generation and Chief Nuclear Officer, NEI l
13 TONY PIETRANGELO, Director, Licensing, Nuclear l
14 Generation, NEI 3
i l
15 j
l t
16 j
l 17 l
l 18 l
i 19 i
i 20 21 22 23 i
i 24 25 t
i i
i i
20 21 22 23                                                                                                                                                              i i
ANN RILEY & ASSOCIATES, LTD.
24                                                                                                                                                              ;
Court Reporters l
25                                                                                                                                                              .
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
t i
20036 (202) 842-0034 i
i ANN RILEY & ASSOCIATES, LTD.
'                                                                                                  Court Reporters l                                                                     1025 Connecticut Avenue, NW, Suite 1014                                                                                           ;
!                                                                                            Washington, D.C. 20036
!                                                                                                    (202) 842-0034 i


i 3
i 3
1                             PROCEEDINGS 2                                                                     [10:10 a.m.]
1 PROCEEDINGS 2
3               CHAIRMAN JACKSON:           Good morning.       I'm pleased to 4 welcome members of the NRC staff and the Nuclear Energy 5 Institute here today to brief the Commission on the status 6 of reactor licensing initiatives, recent accomplishments in 7 this area, and any areas where difficulties, challenges or 8 limitations have arisen.
[10:10 a.m.]
9               A representative from the Union of Concerned 10 Scientists was not able to join us for this briefing this 11 morning.
3 CHAIRMAN JACKSON:
;      12                 Today's briefing is the second of three Commission 13 briefings scheduled to address major topics identified in 14 the staff's response to the August 7, 1998 tasking 15 memorandum.       This past Monday, the Commission was briefed on 16 risk-informed initiatives and next week, on Wednesday, 17 January 20, the Commission is scheduled to be briefed on 1
Good morning.
l       18 reactor inspection, enforcement and assessment initiatives.                     l 19                 The agency has many important activities underway
I'm pleased to 4
:      20   relating to reactor licensing, including the 50.59 i       21   rule-making, license renewal, FSAR update guidance, design l       22   basis definition, improved technical specifications, 23   confirmatory action letters, requests for additional 24 information, known as RAIs, 2.206 petitions, application of l
welcome members of the NRC staff and the Nuclear Energy 5
!        25 the back-fit rule, and license transfers.
Institute here today to brief the Commission on the status 6
                                ;JRJ RILEY & ASSOCIATES, LTD.
of reactor licensing initiatives, recent accomplishments in 7
this area, and any areas where difficulties, challenges or 8
limitations have arisen.
9 A representative from the Union of Concerned 10 Scientists was not able to join us for this briefing this 11 morning.
12 Today's briefing is the second of three Commission 13 briefings scheduled to address major topics identified in 14 the staff's response to the August 7, 1998 tasking 15 memorandum.
This past Monday, the Commission was briefed on 16 risk-informed initiatives and next week, on Wednesday, 17 January 20, the Commission is scheduled to be briefed on 1
l 18 reactor inspection, enforcement and assessment initiatives.
19 The agency has many important activities underway 20 relating to reactor licensing, including the 50.59 i
21 rule-making, license renewal, FSAR update guidance, design l
22 basis definition, improved technical specifications, 23 confirmatory action letters, requests for additional 24 information, known as RAIs, 2.206 petitions, application of l
25 the back-fit rule, and license transfers.
;JRJ RILEY & ASSOCIATES, LTD.
Court Reporters l
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 l
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C. 20036 l                                             (202) 842-0034 i
Washington, D.C.
20036 l
(202) 842-0034 i


4 1                                         Over the past several months, the staff has made 2                               quite significant progress in these areas, working with 3                               various stakeholders, as appropriate, but I'll mention -- I 4                             will highlight a few. One is completion of the scheduled 5                               license renewal milestones for Calvert Cliffs and Oconee; 6                               issuance of a final rule to streamline the license transfer 7                             hearing process; issuance for public comment of a proposed 8                             rule to provide flexibility and clarity to 10 CFR 50.59; 9                             and, issuance of a Commission paper, SECY-99-001, proposing 10                               revisions to guidance on the information required to be 11                               included in the updated final safety analysis reports or 12                               FSARs.
4 1
13                                         Although numerous issues will be discussed today, 14                               I would, in particular, and you will hear this from me, like 15                               to delve a little deeper into a few of the issues 16                               surrounding the next major rule change that will be 17                               forwarded for Commission deliberation of 10 CFR 50.59, 18                               changes, tests and experiments.
Over the past several months, the staff has made 2
19                                         As you know, in the fall of 1995, I directed the 20                               staff to perform a systematic reconsideration and 21                               reevaluation of the regulatory framework that authorizes 22                               licensees to make changes to their facilities without prior 23                               NRC. approval. 10 CFR 50.59, issued in 1962, is a               l i
quite significant progress in these areas, working with 3
24                               fundamental regulation, the application of which has               l 25                               expanded over the years.
various stakeholders, as appropriate, but I'll mention -- I 4
will highlight a few.
One is completion of the scheduled 5
license renewal milestones for Calvert Cliffs and Oconee; 6
issuance of a final rule to streamline the license transfer 7
hearing process; issuance for public comment of a proposed 8
rule to provide flexibility and clarity to 10 CFR 50.59; 9
and, issuance of a Commission paper, SECY-99-001, proposing 10 revisions to guidance on the information required to be 11 included in the updated final safety analysis reports or 12 FSARs.
13 Although numerous issues will be discussed today, 14 I would, in particular, and you will hear this from me, like 15 to delve a little deeper into a few of the issues 16 surrounding the next major rule change that will be 17 forwarded for Commission deliberation of 10 CFR 50.59, 18 changes, tests and experiments.
19 As you know, in the fall of 1995, I directed the 20 staff to perform a systematic reconsideration and 21 reevaluation of the regulatory framework that authorizes 22 licensees to make changes to their facilities without prior 23 NRC. approval.
10 CFR 50.59, issued in 1962, is a l
i 24 fundamental regulation, the application of which has l
25 expanded over the years.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters                             ;
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l . ..
20036 (202) 842-0034 l


    +                                                                         \
+
i 5      l l
\\
1           Given the importance of this rule to both the l
i l
l     2 staff and the licensee and the fact that we have a slightly l     3 modified Commission at this time that will be reviewing 4 recommendations on the final rule language next month, I 5 would request that both the NRC staff and NEI provide l     6 sufficient coverage of what they believe to be on this topic 7 in today's briefing, highlighting any differences of 8 position on wording or concepts between the staff and the 9 nuclear power industry. I think it's important that the 10 Commission understand.
5 1
11           I understand the copies of the viewgraphs are 12 available at entrances to this room.     I also would like to 13 note that many of the agencies' reactor licensing t
Given the importance of this rule to both the l
l 2
staff and the licensee and the fact that we have a slightly l
3 modified Commission at this time that will be reviewing 4
recommendations on the final rule language next month, I 5
would request that both the NRC staff and NEI provide l
6 sufficient coverage of what they believe to be on this topic 7
in today's briefing, highlighting any differences of 8
position on wording or concepts between the staff and the 9
nuclear power industry.
I think it's important that the 10 Commission understand.
11 I understand the copies of the viewgraphs are 12 available at entrances to this room.
I also would like to 13 note that many of the agencies' reactor licensing t
14 initiatives and milestones are included in what is termed l
14 initiatives and milestones are included in what is termed l
15 the staff's update to the tasking memorandum response, which
15 the staff's update to the tasking memorandum response, which 16 is issued monthly and is available on the NRC's home site.
;    16 is issued monthly and is available on the NRC's home site.
17 Unless my colleagues have any opening comments, 18 Dr. Travers, please proceed.
17           Unless my colleagues have any opening comments, 18 Dr. Travers, please proceed.
19 DR. TRAVERS:
19           DR. TRAVERS:   Good morning, Chairman.     You've 20 already highlighted he focus of today's meeting.       I would l     21 point out that each one of the initiatives that you've I
Good morning, Chairman.
22 mentioned are, in fact, included in our response to the 23 Chairman's tasking memorandum. There are some 11 under the 24 category of reactor licensing initiatives and just 25 yesterday, for those who are interested, I signed out the ANN RILEY & ASSOCIATES, LTD.
You've 20 already highlighted he focus of today's meeting.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
I would l
i Washington, D.C. 20036 i
21 point out that each one of the initiatives that you've I
(202) 842-0034 l
22 mentioned are, in fact, included in our response to the 23 Chairman's tasking memorandum.
There are some 11 under the 24 category of reactor licensing initiatives and just 25 yesterday, for those who are interested, I signed out the ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 (202) 842-0034 i
l


6 1 most recent status report on our progress in addressing                                                                         ,
6 1
i 2 those issues,                                                                                                                   i i
most recent status report on our progress in addressing i
3                I am encouraged by the progress we are making.                                                           We 4 are substantially on track and on schedule for the bulk of                                                                       '
2 those issues, i
5 them, as you will hear today.                                             So we look forward to this 6 briefing and we're glad for the opportunity to update the                                                                       ;
i 3
7 Commission.
I am encouraged by the progress we are making.
8                 At the table with me today are Roy Zimmerman, 9 Deputy Director of the Office of Nuclear Reactor Regulation.                                                                     ;
We 4
10 We also have Chris Grimes, Director of the License Renewal                                                                       ,
are substantially on track and on schedule for the bulk of 5
11 Project Directorate in NRR; Dave Matthews, who is the 12 Director of the Division of Reactor Program Management; and                                                                     i 13 Bob Wood, who is a Senior Financial Policy Advisor in the                                                                       ,
them, as you will hear today.
14 Office of Nuclear Reactor Regulation.
So we look forward to this 6
15                 Without further ado, let me turn it over to Roy to 16 begin the briefing.
briefing and we're glad for the opportunity to update the 7
17                 MR. ZIMMERMAN:                           Our plans this morning, the 18 majority of our presentation will be on the four areas of 19 license renewal, license transfer, 50.59 rule-making, and 20 FSAR update.               Chris Grimes will lead the discussion on 21 license renewal.               Bob Wood will take us through license i
Commission.
22 transfer and Dave Matthews will discuss the status of the                                                                         l 23 rule-making on 50.59 and the FSAR updates.
8 At the table with me today are Roy Zimmerman, 9
24                 As time permits, we would also like to be able to                                                                 l 25 discuss several of the other initiatives that are addressed i
Deputy Director of the Office of Nuclear Reactor Regulation.
10 We also have Chris Grimes, Director of the License Renewal 11 Project Directorate in NRR; Dave Matthews, who is the 12 Director of the Division of Reactor Program Management; and i
13 Bob Wood, who is a Senior Financial Policy Advisor in the 14 Office of Nuclear Reactor Regulation.
15 Without further ado, let me turn it over to Roy to 16 begin the briefing.
17 MR. ZIMMERMAN:
Our plans this morning, the 18 majority of our presentation will be on the four areas of 19 license renewal, license transfer, 50.59 rule-making, and 20 FSAR update.
Chris Grimes will lead the discussion on 21 license renewal.
Bob Wood will take us through license i
22 transfer and Dave Matthews will discuss the status of the 23 rule-making on 50.59 and the FSAR updates.
24 As time permits, we would also like to be able to 25 discuss several of the other initiatives that are addressed i
i ANN RILEY & ASSOCIATES, LTD.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


1 7
1 7
i 1    in the reactor licensing oversight area in our tasking memo                                     '
i in the reactor licensing oversight area in our tasking memo 1
2     and Dave Matthews and myself will walk the Commission f
2 and Dave Matthews and myself will walk the Commission f
l             3     through those items.             The Chairman has mentioned many of the i
l 3
4     items that we'd like to provide an overview of.
through those items.
5                     As you know, many of these items were discussed at 6     the Senate subcommittee hearing in the summer time-frame and l             7     have been the subject of discussion between the Commission l
The Chairman has mentioned many of the i
l 8     and the stakeholders on two occasions thus far.                                     A number of l             9     the initiatives that we're going to talk about today were 10     underway prior to last summer time-frame, but as a result of 11     the stakeholder interest, we have expedited a number of                                         l 12     items and we will bring those to light today, and there is 13     increased management in light of the concerns that we l             14     received.
4 items that we'd like to provide an overview of.
15                     There is a common thread that will come through in 16     our discussions as we discuss reducing unnecessary 17     regulatory burden in a number of these areas.                                     But I need to l
5 As you know, many of these items were discussed at 6
18     say at the outset that maintaining public safety is our 19     first and foremost effort and before we look for those areas 20     where we can reduce burden, we are particularly careful to 1
the Senate subcommittee hearing in the summer time-frame and l
21     make sure that we are not undermining the necessary safety                                     '
7 have been the subject of discussion between the Commission l
22     infrastructure.                                                                                 ;
l 8
23                     So with that, let me ask Chris Grimes to lead a 24     discussion on license renewal.
and the stakeholders on two occasions thus far.
25                     MR. GRIMES:       Thank you, Roy.                         Good morning. May I
A number of l
9 the initiatives that we're going to talk about today were 10 underway prior to last summer time-frame, but as a result of 11 the stakeholder interest, we have expedited a number of 12 items and we will bring those to light today, and there is 13 increased management in light of the concerns that we l
14 received.
15 There is a common thread that will come through in 16 our discussions as we discuss reducing unnecessary 17 regulatory burden in a number of these areas.
But I need to l
18 say at the outset that maintaining public safety is our 19 first and foremost effort and before we look for those areas 20 where we can reduce burden, we are particularly careful to 21 make sure that we are not undermining the necessary safety 22 infrastructure.
23 So with that, let me ask Chris Grimes to lead a 24 discussion on license renewal.
25 MR. GRIMES:
Thank you, Roy.
Good morning.
May I
(
(
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


8 1   have slide three, please?                       The regulatory requirements the
8 1
: 2. Commission established in Part 54 to Title 10 provides a 3   means to ensure safe plant operations during a 20-year 4   period of extended plant operation through a systematic 5   review of the programs that demonstrably manage aging 6   effects applicable to passive, long-lived structures and 7   components that perform safety-related functions.
have slide three, please?
8                   The requirements in Part 51 provide an appropriate 9   scope of environmental impacts to be evaluated in 10     conjunction with such a licensing action.                                 Given those 11       accomplishments, the present objective of the license 12     renewal program is to establish a review process that is 13     effective, efficient, timely, and predictable.
The regulatory requirements the 2.
14                       May I have slide four, please?                           With that 15     objective in mind, the NRC staff developed a review process, 16     as set forth in NRR Office Letter 805.                               The staff's 17     environmental impact review is conducted in parallel in 18     accordance with NRR's Office Letter 906.
Commission established in Part 54 to Title 10 provides a 3
19                     These procedures are applied through an aggressive 20     review schedule which will provide a complete safety 21     evaluation and final environmental impact statement in 585 22     days following receipt of a license renewal application.
means to ensure safe plant operations during a 20-year 4
23                     The new procedure also provides for a formal 24     feedback mechanism to identify generic renewal technical and 25     process issues and lessons learned during the review of the                                                   i ANN RILEY & ASSOCIATES, LTD.
period of extended plant operation through a systematic 5
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
review of the programs that demonstrably manage aging 6
effects applicable to passive, long-lived structures and 7
components that perform safety-related functions.
8 The requirements in Part 51 provide an appropriate 9
scope of environmental impacts to be evaluated in 10 conjunction with such a licensing action.
Given those 11 accomplishments, the present objective of the license 12 renewal program is to establish a review process that is 13 effective, efficient, timely, and predictable.
14 May I have slide four, please?
With that 15 objective in mind, the NRC staff developed a review process, 16 as set forth in NRR Office Letter 805.
The staff's 17 environmental impact review is conducted in parallel in 18 accordance with NRR's Office Letter 906.
19 These procedures are applied through an aggressive 20 review schedule which will provide a complete safety 21 evaluation and final environmental impact statement in 585 22 days following receipt of a license renewal application.
23 The new procedure also provides for a formal 24 feedback mechanism to identify generic renewal technical and 25 process issues and lessons learned during the review of the i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


    .                                                                          _.I 1
1 1
1 9     i 1 initial applications. This provision ensures that issues           ,
9 1
l 2 are promptly identified and addressed and the resolution of l       3 these issues are captured in improvements to the                       i 4 implementation guidance.                                               l i
initial applications.
5            Monthly management meetings are held to monitor 6 the_ progress of the renewal reviews against the milestone
This provision ensures that issues 2
!      7 schedules. Success measures are established each month to             l 8 demonstrate continued progress toward the future milestones.
are promptly identified and addressed and the resolution of l
9 We hold public meetings as often as possible, including 10 public meetings that are held in the vicinity of the plant 11 site when site visits are conducted to gather information 12 concerning aging management programs and we are exploring               !
3 these issues are captured in improvements to the i
i 13 ways to expand the license renewal information, including               i 14 the status of generic renewal issues and progress towards 15 improvement in the guidance on NRC's web site.
4 implementation guidance.
l 16           The License Renewal Steering Committee was i
i 5
17 established in April 1998 to monitor the progress of the               I f     18 staff's review of the initial renewal application.         Review 19 implementation of the license renewal program and to advise l     20 responsible line management, the Steering Committee meets 21 bimonthly with the NEI License Renewal Working Group.
Monthly management meetings are held to monitor 6
22           On alternating months, the Steering Committee
the_ progress of the renewal reviews against the milestone 7
!      23 meets internally with the NRC staff to review the progress 24 of the staff's efforts.
schedules.
25           In addition, in accordance with the March 6, 1998 h
Success measures are established each month to l
n                      ANN RILEY & ASSOCIATES, LTD.
8 demonstrate continued progress toward the future milestones.
4                              Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
9 We hold public meetings as often as possible, including 10 public meetings that are held in the vicinity of the plant 11 site when site visits are conducted to gather information 12 concerning aging management programs and we are exploring i
Washington, D.C. 20036
13 ways to expand the license renewal information, including i
!                                (202) 842-0034
14 the status of generic renewal issues and progress towards 15 improvement in the guidance on NRC's web site.
l 16 The License Renewal Steering Committee was i
17 established in April 1998 to monitor the progress of the f
18 staff's review of the initial renewal application.
Review 19 implementation of the license renewal program and to advise l
20 responsible line management, the Steering Committee meets 21 bimonthly with the NEI License Renewal Working Group.
22 On alternating months, the Steering Committee 23 meets internally with the NRC staff to review the progress 24 of the staff's efforts.
25 In addition, in accordance with the March 6, 1998 h
ANN RILEY & ASSOCIATES, LTD.
n Court Reporters 4
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 (202) 842-0034
(
(
                                                            - - ~ -
- - ~ -
* 1
 
                                                                                                          ,  1 10 1   memorandum from the EDO, the Executive Council monitors the 2     progress of license renewal to ensure oversight, 3     coordination and strategic implementation of the renewal                                       l l
1 10 1
4    program.     The EC meets about monthly on license renewal.                                   I 1
memorandum from the EDO, the Executive Council monitors the 2
5     It's periodically scheduled.                                                                 -
progress of license renewal to ensure oversight, 3
6                   The next meeting with the EC will be held on 7     January 19.             The next meeting of the Steering Committee, in 8   conjunction with a monthly management meeting, will be held 9     tomorrow.
coordination and strategic implementation of the renewal 4
10                   The next slide --
program.
11                   CHAIRMAN JACKSON:                 Before you go, let me ask you 12     two quick questions.             Has the staff identified any potential 13     policy issues that require direction or guidance from the 14     Commission with respect to license renewal?
The EC meets about monthly on license renewal.
15                   MR. GRIMES:         No.         The staff has not identified any 16     policy issues at this point.                     We are continuing to monitor a 17     series of generic renewal technical and process issued and 18-   at that point, we're continuing to dialogue with the 19     industry and we believe that these can be -- these generic                                     )
5 It's periodically scheduled.
20     renewal issues can be resolved with implementation guidance.
6 The next meeting with the EC will be held on 7
21                   CHAIRMAN JACKSON:               And can you speak a bit to what               l 22     public outreach' initiatives you have ongoing?
January 19.
23                   MR. GRIMES:         Our public outreach consists 24     primarily of holding as many public meetings as we can, both 25     in conjunction with the license renewal applications and 1
The next meeting of the Steering Committee, in 8
l ANN RILEY & ASSOCIATES, LTD.
conjunction with a monthly management meeting, will be held 9
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034                                               j
tomorrow.
10 The next slide --
11 CHAIRMAN JACKSON:
Before you go, let me ask you 12 two quick questions.
Has the staff identified any potential 13 policy issues that require direction or guidance from the 14 Commission with respect to license renewal?
15 MR. GRIMES:
No.
The staff has not identified any 16 policy issues at this point.
We are continuing to monitor a 17 series of generic renewal technical and process issued and 18-at that point, we're continuing to dialogue with the 19 industry and we believe that these can be -- these generic 20 renewal issues can be resolved with implementation guidance.
21 CHAIRMAN JACKSON:
And can you speak a bit to what 22 public outreach' initiatives you have ongoing?
23 MR. GRIMES:
Our public outreach consists 24 primarily of holding as many public meetings as we can, both 25 in conjunction with the license renewal applications and 1
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 j


1
11 1
    .                                                                                                                                            l 11 1      generic license renewal meetings with NEI and NEI's working 1
generic license renewal meetings with NEI and NEI's working 2
2      group and task force on license renewal.                                                                               l 3                     CHAIRMAN JACKSON:                                   When was the last public l               4     meeting you had?
group and task force on license renewal.
I                                                                                                                                                 l 5                     MR. GRIMES:                           It was in the middle of December.                             As 6       I mentioned, our next public meeting is tomorrow.
3 CHAIRMAN JACKSON:
7                     CHAIRMAN JACKSON:                                   When I talk about public 8       meeting, I'm not speaking of meetings with NEI in the                                                                   i 1
When was the last public l
i                9       public. Rather, I mean meetings with the public in the 10       vicinity of the --
4 meeting you had?
11                     MR. GRIMES:                           The last fully public meeting in that 12       sense was the environmental scoping meeting at the Oconee                                                               .
I 5
                                                                                                                                                )
MR. GRIMES:
13       site.                                                                                                                   l 14                     CHAIRMAN JACKSON:                                   You can tell me later.           I'll 15       let you go on.
It was in the middle of December.
l 16                     COMMISSIONER McGAFFIGAN:                                   Madam Chairman, could I 17       follow up on your question and give the staff a chance to 18       answer now.
As 6
l               19                     NEI, in its last viewgraph,.later in the meeting, l               20       raises a policy question.                                       I don't know if it's a policy i               21       issue. Is the intent of the rule to re-verify the existing i
I mentioned, our next public meeting is tomorrow.
22       CLB programs and activities?                                       And I don't know whether 23       that's a rhetorical question, but since you're on it right                                                             ;
7 CHAIRMAN JACKSON:
24       now, is there an issue arising as you go through the first 25       two applications that NEI perceives, where you're going                                                                 l ANN RILEY & ASSOCIATES, LTD.
When I talk about public 8
?                                                                     Court Reporters f                                 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
meeting, I'm not speaking of meetings with NEI in the i
9 public.
Rather, I mean meetings with the public in the 10 vicinity of the --
11 MR. GRIMES:
The last fully public meeting in that 12 sense was the environmental scoping meeting at the Oconee
)
13 site.
l 14 CHAIRMAN JACKSON:
You can tell me later.
I'll 15 let you go on.
l 16 COMMISSIONER McGAFFIGAN:
Madam Chairman, could I 17 follow up on your question and give the staff a chance to 18 answer now.
l 19 NEI, in its last viewgraph,.later in the meeting, l
20 raises a policy question.
I don't know if it's a policy i
21 issue.
Is the intent of the rule to re-verify the existing i
22 CLB programs and activities?
And I don't know whether 23 that's a rhetorical question, but since you're on it right 24 now, is there an issue arising as you go through the first 25 two applications that NEI perceives, where you're going ANN RILEY & ASSOCIATES, LTD.
?
Court Reporters f
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


12 1   outside the scope of the license renewal rule?
12 1
l
outside the scope of the license renewal rule?
  ,        2                  MR. MATTHEWS:   There are discussions underway with 3   NEI with regard to -- they characterize it as a policy 4   issue. It may be an implementation and review issue.                                                   But 5   regardless of its title, it has to do with the level of 6   detail and the information that needs to be provided to meet 7   the demonstration requirement in Part 54 in several areas.
l 2
8                 The one that's getting the most attention is the 9   one related to the EQ program.       It's the staff view that 10   compliance with the applicable sections of Part 54 depend on 11   a description of the programs that are relied upon to manage 12   aging effects, submitted on the docket to support the staff 13   findings in the safety evaluation.
MR. MATTHEWS:
14                 A simple commitment, which I believe is NEI's 15   position, of continued compliance or implementation of 16   particular programs in accordance with the regulations, 17   without any supporting program description, we don't believe l           18   provides an adequate basis for that purpose.
There are discussions underway with 3
19                 We've expressed that position in individual 20   conference calls with the two applicants involved and a 21   letter has been recently forwarded to EG&E with that 22   position and I believe they are preparing to provide such a                                                       l 23   description.
NEI with regard to -- they characterize it as a policy 4
24                 COMMISSIONER McGAFFIGAN:         There is an existing EQ 25   program and there is an existing description in the IJRJ RILEY & ASSOCIATES, LTD.
issue.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
It may be an implementation and review issue.
But 5
regardless of its title, it has to do with the level of 6
detail and the information that needs to be provided to meet 7
the demonstration requirement in Part 54 in several areas.
8 The one that's getting the most attention is the 9
one related to the EQ program.
It's the staff view that 10 compliance with the applicable sections of Part 54 depend on 11 a description of the programs that are relied upon to manage 12 aging effects, submitted on the docket to support the staff 13 findings in the safety evaluation.
14 A simple commitment, which I believe is NEI's 15 position, of continued compliance or implementation of 16 particular programs in accordance with the regulations, 17 without any supporting program description, we don't believe l
18 provides an adequate basis for that purpose.
19 We've expressed that position in individual 20 conference calls with the two applicants involved and a 21 letter has been recently forwarded to EG&E with that 22 position and I believe they are preparing to provide such a l
23 description.
24 COMMISSIONER McGAFFIGAN:
There is an existing EQ 25 program and there is an existing description in the IJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


13 l     1 licensing basis as to what they have to do to meet our 2 regulations.
13 l
3           MR. MATTHEWS:   There is an existing requirement 4 for EQ in the regulations.                                       I l                                                                        l 5           COMMISSIONER McGAFFIGAN:     And there is something   j j
1 licensing basis as to what they have to do to meet our 2
6 in the current licensing basis with regard to how they meet 7 that current requirement.
regulations.
[     8           MR. MATTHEWS:   If you deduce that the current 9 licensing basis extends to what they have on site, certainly l
3 MR. MATTHEWS:
10 there is a portion of their licensing basis that addresses l   11 how they have implemented a program to meet that 12 requirement. That doesn't necessarily mean that it's within 13 the hands of the NRC.
There is an existing requirement 4
l   14           MR. ZIMMERMAN:     Much of that information is not 15 docketed.
for EQ in the regulations.
16           COMMISSIONER McGAFFIGAN:     I see. So the issue is 17 --
l 5
is this also somehow connected with the notion that we're 18 really doing a new license, that this is --
COMMISSIONER McGAFFIGAN:
19           MR. MATTHEWS:   No, I don't think it's that broad 20 and it's less of an issue of a perception than it is one of 21 the regulatory language in Part 54 that addresses the need I
And there is something j
22 for the licensee to demonstrate to the satisfaction -- these I
j 6
23 are,my words -- the satisfaction of the NRC in accordance
in the current licensing basis with regard to how they meet 7
!    24 with their review criteria, that they are going to have a 25 program in place to manage the effects of aging through the A
that current requirement.
[
8 MR. MATTHEWS:
If you deduce that the current 9
licensing basis extends to what they have on site, certainly l
10 there is a portion of their licensing basis that addresses l
11 how they have implemented a program to meet that 12 requirement.
That doesn't necessarily mean that it's within 13 the hands of the NRC.
l 14 MR. ZIMMERMAN:
Much of that information is not 15 docketed.
16 COMMISSIONER McGAFFIGAN:
I see.
So the issue is is this also somehow connected with the notion that we're 17 18 really doing a new license, that this is --
19 MR. MATTHEWS:
No, I don't think it's that broad 20 and it's less of an issue of a perception than it is one of 21 the regulatory language in Part 54 that addresses the need 22 for the licensee to demonstrate to the satisfaction -- these I
23 are,my words -- the satisfaction of the NRC in accordance 24 with their review criteria, that they are going to have a 25 program in place to manage the effects of aging through the A
b JJRJ RILEY & ASSOCIATES, LTD.
b JJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
;                          Washington, D.C. 20036 (202) 842-0034
20036 (202) 842-0034


14 1 renewed term.
14 1
2           CHAIRMAN JACKSON:   Is it a question of NRC being 3 able to have access to the information that allows it to                                                         ;
renewed term.
l 4 make that judgment?
2 CHAIRMAN JACKSON:
5           MR. MATTHEWS:   It's more important, I think, to 6 phrase it as -- I think we might have access in that we can I
Is it a question of NRC being 3
7 go on site and do an examination of that program, but it's                                                       l 8 more an issue of them representing, as part of their i
able to have access to the information that allows it to l
9 application for renewal, on the docket, the description of 10 the programs they intend to rely on and it then becomes, of 11 course, a basis for the decision we make in granting the                                                         i 12 renewed license, and that's the issue.
4 make that judgment?
13           MR. ZIMMERMAN:   I think this is a relatively new 14 issue and it's a matter of trying to talk it through to see 15 if there is common ground here. In a discussion recently 16 that went on last month, there were questions from the 17 applicants, do we want to see all their programs, all their 18 procedures, do we want to see everything get boxed up and 19 sent in, are we going to pour over all that level of detail.
5 MR. MATTHEWS:
                                                                                                                      ]
It's more important, I think, to 6
20           And through the dialogue, we were discussing that 21 what we need is a summary that explains it at a higher 22 level. So you can see that there was some agreement and 23 focus coming together. We're not there yet, I'm not sure 24 that we will get there, but it was moving in that direction.
phrase it as -- I think we might have access in that we can I
25           CHAIRMAN JACKSON:   Narrowing it down.
7 go on site and do an examination of that program, but it's l
8 more an issue of them representing, as part of their i
9 application for renewal, on the docket, the description of 10 the programs they intend to rely on and it then becomes, of 11 course, a basis for the decision we make in granting the i
12 renewed license, and that's the issue.
13 MR. ZIMMERMAN:
I think this is a relatively new 14 issue and it's a matter of trying to talk it through to see 15 if there is common ground here.
In a discussion recently 16 that went on last month, there were questions from the 17 applicants, do we want to see all their programs, all their 18 procedures, do we want to see everything get boxed up and 19 sent in, are we going to pour over all that level of detail.
]
20 And through the dialogue, we were discussing that 21 what we need is a summary that explains it at a higher 22 level.
So you can see that there was some agreement and 23 focus coming together.
We're not there yet, I'm not sure 24 that we will get there, but it was moving in that direction.
25 CHAIRMAN JACKSON:
Narrowing it down.
i JJUJ RILEY & ASSOCIATES, LTD.
i JJUJ RILEY & ASSOCIATES, LTD.
Court Reporters j
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 j
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 i
i Washington, D.C.
(202) 842-0034
20036 (202) 842-0034


e' 15 1                 MR. ZIMMERMAN:                                                 Narrowing it-down.
e' 15 1
2                 COMMISSIONER McGAFFIGAN:                                                         Could I ask a follow-up?
MR. ZIMMERMAN:
3 Is.this something, when you've suspended working on the 4 standard review plan, because we wanted to get these first 5 couple done, it was sort of embedded in the standard review i
Narrowing it-down.
!            6 plan at the point that the standard review plan was 7 suspended?
2 COMMISSIONER McGAFFIGAN:
8               MR. MATTHEWS:                                               I will let Chris respond to that.
Could I ask a follow-up?
i i           9               MR. GRIMES:                                         Yes.                   I will explain in the following         I i
3 Is.this something, when you've suspended working on the 4
10 process.       We originally came in and said we had a variety of 11 these generic implementation issues.                                                               One of them is credit         I 12 for existing programs.                                                 We said that there is certain 13 guidance in the standard review plan or certain guidance in l
standard review plan, because we wanted to get these first 5
14 the content of a renewal application that gets to how this 15 information is conveyed and an explanation of how aging 16 effects are managed and how time managed aging analysis will 17 be managed in the future.
couple done, it was sort of embedded in the standard review i
1;B               We know have a database of some 98 issues where                                                                     ,
6 plan at the point that the standard review plan was 7
19 we've broken them down individually.                                                               Environmental                 l l
suspended?
20 qualification is one, credit for other existing programs are i
8 MR. MATTHEWS:
21 others, and it really gets to what level of detail is going                                                                       i 22 to be described in the application and then what level of 23 detail will the staff put in its safety evaluation that 24 provides the basis of how much we're going to inspect these 25 programs for the new license in the future.
I will let Chris respond to that.
l                                         JJUJ RILEY & ASSOCIATES, LTD.
i i
Court Reporters l                       1025 Connecticut Avenue, NW, Suite 1014                                                                                   1 l                                                     Washington, D.C. 20036                                                                     l l                                                                      (202) 842-0034 i
9 MR. GRIMES:
Yes.
I will explain in the following i
10 process.
We originally came in and said we had a variety of 11 these generic implementation issues.
One of them is credit 12 for existing programs.
We said that there is certain 13 guidance in the standard review plan or certain guidance in l
14 the content of a renewal application that gets to how this 15 information is conveyed and an explanation of how aging 16 effects are managed and how time managed aging analysis will 17 be managed in the future.
1;B We know have a database of some 98 issues where 19 we've broken them down individually.
Environmental l
20 qualification is one, credit for other existing programs are i
21 others, and it really gets to what level of detail is going i
22 to be described in the application and then what level of 23 detail will the staff put in its safety evaluation that 24 provides the basis of how much we're going to inspect these 25 programs for the new license in the future.
l JJUJ RILEY & ASSOCIATES, LTD.
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 1
l Washington, D.C.
20036 l
(202) 842-0034 i


1 1
16 1
i 16 1              We're trying to find optimum description of these i
We're trying to find optimum description of these i
2 programs.       We're not trying to challenge the current 3 licensing basis, but as is usual, whenever we start poking 4 at the current licensing basis and try to understand how it 5 operates, there's a natural nervousness.
2 programs.
6               Similarly, the ASME is naturally nervous about 7 what we say about how in-service inspection manages aging 8 effects. Those are all, in my view, implementation issues 9 in terms of what level of detail will the safety evaluation 10   basis for the granting of this new license rely upon.
We're not trying to challenge the current 3
* 11                 CHAIRMAN JACKSON:                         Okay. Why don't you go on?
licensing basis, but as is usual, whenever we start poking 4
12                 MR. GRIMES:                         If I could have slide five, please.
at the current licensing basis and try to understand how it 5
13   The staff's view of the Calvert Cliff's and Oconee license 14   renewal applications are on schedule.                           Upon receipt of the 15   responses to the staff's requests for additional information 16   from Baltimore Gas and Electric in December 1998, the staff 17   began preparation of the safety evaluation report and draft 18   environnental impact statement for Calvert Cliffs, both of                                       '
operates, there's a natural nervousness.
19     which are scheduled to be completed in March 1999.
6 Similarly, the ASME is naturally nervous about 7
20                 The staff's request for additional information 21     from Duke Energy on the Oconee license renewal application 22     were issued as scheduled in December 1998.                           Actually, the 23     requests for additional information for the environmental 24     review beat the scheduled January 3 date.                           They were issued 25     on December 29.
what we say about how in-service inspection manages aging 8
effects.
Those are all, in my view, implementation issues 9
in terms of what level of detail will the safety evaluation 10 basis for the granting of this new license rely upon.
11 CHAIRMAN JACKSON:
Okay.
Why don't you go on?
12 MR. GRIMES:
If I could have slide five, please.
13 The staff's view of the Calvert Cliff's and Oconee license 14 renewal applications are on schedule.
Upon receipt of the 15 responses to the staff's requests for additional information 16 from Baltimore Gas and Electric in December 1998, the staff 17 began preparation of the safety evaluation report and draft 18 environnental impact statement for Calvert Cliffs, both of 19 which are scheduled to be completed in March 1999.
20 The staff's request for additional information 21 from Duke Energy on the Oconee license renewal application 22 were issued as scheduled in December 1998.
Actually, the 23 requests for additional information for the environmental 24 review beat the scheduled January 3 date.
They were issued 25 on December 29.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


17 1             The responses to those requests from Duke have 2 already begun and are scheduled to be completed by March 3 1999. The staff is continuing to work with the NEI license 4 renewal group to focus and resolve generic renewal issues.
17 1
5             NEI has provided issue descriptions and contacts 6 to facilitate communications as well as NEI has'provided 7 commitments to provide supplementary information to help 8 clarify the issues the staff will address.
The responses to those requests from Duke have 2
t 9            The resolution of generic renewal technical and
already begun and are scheduled to be completed by March 3
1999.
The staff is continuing to work with the NEI license 4
renewal group to focus and resolve generic renewal issues.
5 NEI has provided issue descriptions and contacts 6
to facilitate communications as well as NEI has'provided 7
commitments to provide supplementary information to help 8
clarify the issues the staff will address.
t
[
[
:    10 process issues are expected to improve the efficiency of the 11 review process by providing clarity in the guidance for the l
9 The resolution of generic renewal technical and 10 process issues are expected to improve the efficiency of the 11 review process by providing clarity in the guidance for the 12 content of. future renewal applications and the conduct of l
12 content of. future renewal applications and the conduct of 1
1 13 renewal reviews.
13 renewal reviews.
14 Similar benefits are expected from the review of l
14             Similar benefits are expected from the review of l
15 generic technical reports submitted by owners' groups.
15 generic technical reports submitted by owners' groups. Two 16 of the B&W reports have been completed and two more are 17 being reviewed on schedules that are consistent with the 18 Oconee review, because Duke references those reports.
Two 16 of the B&W reports have been completed and two more are 17 being reviewed on schedules that are consistent with the 18 Oconee review, because Duke references those reports.
19 Progress is also being made on the review of the generic 20 technical reports submitted by the BWR owners in 21 anticipation that we will receive an application from Hatch l     22 in early calendar year 2000, and the Westinghouse Owners l
19 Progress is also being made on the review of the generic 20 technical reports submitted by the BWR owners in 21 anticipation that we will receive an application from Hatch l
23 Group, in anticipation that we will receive an application l
22 in early calendar year 2000, and the Westinghouse Owners l
24 from Turkey Point.
l 23 Group, in anticipation that we will receive an application 24 from Turkey Point.
. 25             Finally, we are aware of other parties interested ANN RILEY & ASSOCIATES, LTD.
25 Finally, we are aware of other parties interested ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


18 1         in license renewal; in particular, the Southern Company has i
18 1
2         described their methodology for submitting an application 3         for plant Hatch.       That includes information sharing with 4         Northern States Power and Philadelphia Electric Company,                                             t 5                     Florida Power and Light and Virginia Power have                                         !
in license renewal; in particular, the Southern Company has i
6        also expressed an interest in license renewal and sharing                                           l l
2 described their methodology for submitting an application 3
7        information in order to facilitate communicating with the r
for plant Hatch.
                                                                                                                        +
That includes information sharing with 4
8         staff. Any of these generic activities obviously will 9         benefit the staff by being able to address issues in a more 10           efficient way,                                                                                       f 11                       The NRC staff has also tried to be responsive to 12           other utility companies and even foreign groups working on I
Northern States Power and Philadelphia Electric Company, t
13           aging management programs or life extension who have                                                 !
5 Florida Power and Light and Virginia Power have 6
14           contacted the staff about various aspects about how the NRC 15           is implementing its license renewal program.
also expressed an interest in license renewal and sharing l
16                       That concludes it.
l 7
17                       COMMISSIONER MERRIFIELD:                       I've got two questions 18           for Mr. Grimes.       The first one is, you discussed a variety 19           of plants that may be interested in pursuing license renewal 20           in a relatively -- a time period of relative -- a relatively 21           short time. Is that -- are the requirements to address                                           i 22           those dealt with in your budget assumptions; i.e., do you                                           !
information in order to facilitate communicating with the r
l 23           have sufficient budgetary resources programmed and 24           anticipated in order to deal with that level of interest in i
+
25           license renewals?
8 staff.
Any of these generic activities obviously will 9
benefit the staff by being able to address issues in a more 10 efficient way, f
11 The NRC staff has also tried to be responsive to 12 other utility companies and even foreign groups working on I
13 aging management programs or life extension who have 14 contacted the staff about various aspects about how the NRC 15 is implementing its license renewal program.
16 That concludes it.
17 COMMISSIONER MERRIFIELD:
I've got two questions 18 for Mr. Grimes.
The first one is, you discussed a variety 19 of plants that may be interested in pursuing license renewal 20 in a relatively -- a time period of relative -- a relatively 21 short time.
Is that -- are the requirements to address i
22 those dealt with in your budget assumptions; i.e.,
do you l
23 have sufficient budgetary resources programmed and 24 anticipated in order to deal with that level of interest in i
25 license renewals?
f
f
                                                                                                                        ?
?
ANN RILEY & ASSOCIATES, LTD.                                                         ;
ANN RILEY & ASSOCIATES, LTD.
Court Reporters                                                             !
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
1025 Connecticut Avenue, NW, Suite 1014                                                   -
20036 I
Washington, D.C. 20036                                                         I (202) 842-0034
(202) 842-0034


_          ._ _          ~. _
~.
l 19 l 1             MR. GRIMES:       The answer to that today, at this 2 point in time, the answer is yes.           In fact, we have to go 3 back and review the projected number of renewal applications         1 1
19 1
4 for fiscal year                                                       l 99 and 2000, because as yet we have not         i 5 identified an applicant that would submit an application in 6 fiscal   99, although we have planned on receiving two more 7 applications.
MR. GRIMES:
8             But we also recognize that success in this program 9 could result in a couple of more years, say, beginning in 10 year 2000, with a flood of applications that might overwhelm 11 our resources.
The answer to that today, at this 2
12               So we have identified it as a dialogue, that we 13 want to continue with the industry a way to try to meet our 14 license renewal applications in such a way that we can have l
point in time, the answer is yes.
15 as much predictability in our budgeting assumptions as the 16 industry would like predictability in the review process 17 itself.
In fact, we have to go 3
18               COMMISSIONER MERRIFIELD:       To the degree that I
back and review the projected number of renewal applications 1
19 you're doing that kind of pacing, are you working with NEI           l l
4 for fiscal year 99 and 2000, because as yet we have not i
to try to identify facilities that may fit into that 1999 21 time period?
5 identified an applicant that would submit an application in 6
22               MR. GRIMES:       Yes, with NEI and with their working 23 group and with the task group and at this point licensees 24 have expressed interest, but many of them are not at a point 25 where they can make any firm commitments about particular ANN RILEY & ASSOCIATES, LTD.
fiscal 99, although we have planned on receiving two more 7
l                                     Court Reporters i                 1025 Connecticut Avenue, NW, Suite 1014 l                             Washington, D.C. 20036 (202) 842-0034
applications.
8 But we also recognize that success in this program 9
could result in a couple of more years, say, beginning in 10 year 2000, with a flood of applications that might overwhelm 11 our resources.
12 So we have identified it as a dialogue, that we 13 want to continue with the industry a way to try to meet our l
14 license renewal applications in such a way that we can have 15 as much predictability in our budgeting assumptions as the 16 industry would like predictability in the review process 17 itself.
18 COMMISSIONER MERRIFIELD:
To the degree that 19 you're doing that kind of pacing, are you working with NEI 7
to try to identify facilities that may fit into that 1999 21 time period?
22 MR. GRIMES:
Yes, with NEI and with their working 23 group and with the task group and at this point licensees 24 have expressed interest, but many of them are not at a point 25 where they can make any firm commitments about particular ANN RILEY & ASSOCIATES, LTD.
l Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 (202) 842-0034


20 1 submittal schedules.
20 1
2                     CHAIRMAN JACKSON: .There are some fairly detailed                                                             ,
submittal schedules.
discussions-that licensees have with you when they are                                                                           ,
2 CHAIRMAN JACKSON:.There are some fairly detailed 3
seriously on the path to come in as of a certain date, is                                                                       ;
discussions-that licensees have with you when they are 4
that not correct?                                                                                                               $
seriously on the path to come in as of a certain date, is 5
6                     MR. GRIMES:                     That's correct. As a matter of fact, 1
that not correct?
7 we were asked to meet with Arkansas Nuclear on January 22 8 and they want to describe their plans to us.                               As I                                                 ,
6 MR. GRIMES:
9 mentioned, we just recently received a submittal from plant 10 Hatch and they're working conscientiously toward their plan                                                                     !
That's correct.
11 to submit a license renewal application in 2000.
As a matter of fact, 1
12                     COMMISSIONER MERRIFIELD:                     The last question I had i                 13 for you is -- and this is a question I asked on Monday in 14 our meeting.                 What would a revision of the scope of the                                                         (
7 we were asked to meet with Arkansas Nuclear on January 22 8
l
and they want to describe their plans to us.
!                15 maintenance rule mean to the license renewal process and 16 'would such a change impact the milestones you've set for 17   Oconee and Calvert Cliffs?                                                                                                     [
As I 9
t                                                                                                                                                     .
mentioned, we just recently received a submittal from plant 10 Hatch and they're working conscientiously toward their plan 11 to submit a license renewal application in 2000.
18                       MR. GRIMES:                   I do not see a change in the scope of                                       ,
12 COMMISSIONER MERRIFIELD:
!                19   the maintenance rule affecting Calvert Cliffs or Oconee, 20   because they have already established a scope of passive                                                                       l o
The last question I had i
I
13 for you is -- and this is a question I asked on Monday in 14 our meeting.
!                  21 long-lived systems, structures and components for which 22 they're demonstrating aging management programs.
What would a revision of the scope of the
23                       I do see that a change in the scope of the 24 maintenance rule, because of the nature of the way that i
(
!                  25 licensees try to use that scoping process to scope license i
l 15 maintenance rule mean to the license renewal process and 16
'would such a change impact the milestones you've set for 17 Oconee and Calvert Cliffs?
[
t 18 MR. GRIMES:
I do not see a change in the scope of 19 the maintenance rule affecting Calvert Cliffs or Oconee, 20 because they have already established a scope of passive l
o I
21 long-lived systems, structures and components for which 22 they're demonstrating aging management programs.
23 I do see that a change in the scope of the 24 maintenance rule, because of the nature of the way that i
25 licensees try to use that scoping process to scope license i
a l
a l
1
1 ANN RILEY & ASSOCIATES, LTD.
'                                                  ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
:                                                                Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l                                                      Washington, D.C. 20036 l
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 l
(202) 842-0034
(202) 842-0034


e 21 1           renewal, it potentially could have a destabilizing effect on l
e 21 1
license renewal as we go through a change in what is 2
renewal, it potentially could have a destabilizing effect on l
3            safety-related, what systems, structures and components are                                                     I 4           relied upon for design basis transients and events.
2 license renewal as we go through a change in what is 3
5                                     But in the long run, I see license renewal could                                       '
safety-related, what systems, structures and components are 4
6            eventually come back and blend right in.                             It's the question
relied upon for design basis transients and events.
!                  7            about during the transition period, as the industry and the 8           staff are trying to change the scope of safety-related 9           systems, structures and components, how do you prevent that
5 But in the long run, I see license renewal could 6
,                10             change from destabilizing the predictability of the scope of l
eventually come back and blend right in.
l                 11             the license renewal review.
It's the question 7
!                12                                     At this point, we've only looked at it                                                 >
about during the transition period, as the industry and the 8
13             conceptually.                         I think it's a workable problem.     The                                 ;
staff are trying to change the scope of safety-related 9
14             question is whether or not it can be worked in such a way as                                                   i j                                                                                                                                               t 1                 15             to not impact long-term planning.                                                                               j 16                                     COMMISSIONER DICUS:             Let me follow up on that, if
systems, structures and components, how do you prevent that 10 change from destabilizing the predictability of the scope of l
!                17             I may.             Of the licensees that are talking to you about l
l 11 the license renewal review.
l                 18           -coming in with applications in FY-2000, are they talking to 19             you about this issue, as well?                             Are they concerned about did 20             some changes in scope in the maintenance rule, that that 21             might delay them or they're concerned about it or are they 22             talking to you about that at all?                             If so, could we have some
12 At this point, we've only looked at it l
!                23             feedback on that?                                                                                               I l                 24                                     MR. GRIMES:             Our dialogue thus far has primarily l
13 conceptually.
25             been with the practitioners of license renewal who have i
I think it's a workable problem.
ANN RILEY & ASSOCIATES, LTD.                                                 '
The 14 question is whether or not it can be worked in such a way as i
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
j t
1 15 to not impact long-term planning.
j 16 COMMISSIONER DICUS:
Let me follow up on that, if 17 I may.
Of the licensees that are talking to you about l
l 18
-coming in with applications in FY-2000, are they talking to 19 you about this issue, as well?
Are they concerned about did 20 some changes in scope in the maintenance rule, that that 21 might delay them or they're concerned about it or are they 22 talking to you about that at all?
If so, could we have some 23 feedback on that?
l 24 MR. GRIMES:
Our dialogue thus far has primarily l
25 been with the practitioners of license renewal who have i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


  . _ _ _ _ _ _ _ - . _          ._    .._.m._._.-       - _ _    - _ _ . _ _ _ _ _ _ _ . _ . _ _ . _ . . . _ _ . - -    - . . ._
.._.m._._.-
22 1                 taken as given a scope of systems, structures and 2                 components. At the higher levels, when the steering 3                 committee and the NEI executives meet, they have talked l
22 1
l     4                 about it in a conceptual way, but no one has identified it l
taken as given a scope of systems, structures and 2
!      5                 as a particular concern.
components.
6                             CHAIRMAN JACKSON:             Is it true, Mr. Travers, that i
At the higher levels, when the steering 3
7                 this issue of metering of the license applications, license 8               renewal applications and discussions with the industry, 9               nuclear power industry about that, is it your intent for 10                 that to play into the planning and budgeting process in a l
committee and the NEI executives meet, they have talked l
11                 way that you have a coherent approach?                                                                       !
l 4
12                               DR. TRAVERS:             It is.         It's a very important 13                 element because of the resources that would be required to                                                   ;
about it in a conceptual way, but no one has identified it l
i 14                 evaluate any given application.                           So we're certainly                                 l 15                 encouraging, to the extent we can and they can respond, to 16                 get information from the industry on their plans, to give 17                 them information on our planning assumptions, so that they 18                 know some of the limitations we face at least today in our 19                   current thinking and how we would budget for license renewal 20                   and give them an idea of sort of how long the queue is, how                                                 !
5 as a particular concern.
21                   long the review is certainly in terms of the predictability 22                   element.
6 CHAIRMAN JACKSON:
23                             But as much as we can, share and get information 24                 from them on their plans.
Is it true, Mr. Travers, that i
25                               CHAIRMAN JACKSON:               I take it that good feedback i
7 this issue of metering of the license applications, license 8
ANN RILEY & ASSOCIATES, LTD.                                                               I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l                                                         (202) 842-0034
renewal applications and discussions with the industry, 9
nuclear power industry about that, is it your intent for 10 that to play into the planning and budgeting process in a l
11 way that you have a coherent approach?
12 DR. TRAVERS:
It is.
It's a very important 13 element because of the resources that would be required to i
14 evaluate any given application.
So we're certainly l
15 encouraging, to the extent we can and they can respond, to 16 get information from the industry on their plans, to give 17 them information on our planning assumptions, so that they 18 know some of the limitations we face at least today in our 19 current thinking and how we would budget for license renewal 20 and give them an idea of sort of how long the queue is, how 21 long the review is certainly in terms of the predictability 22 element.
23 But as much as we can, share and get information 24 from them on their plans.
25 CHAIRMAN JACKSON:
I take it that good feedback i
I ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 l
(202) 842-0034


  ~ ~ - . . . ,     -    -      .    . . - .      - - .      _ ..- - _ -          .-.    ..- _ . .- . - . _ . - .
~ ~ -...,
23 i
23 1
has been received from the license applicants to this point 2   in terms of how the process has been going.
has been received from the license applicants to this point i
l l                   3               DR. TRAVERS:             At my level, yes.       I think in my 4   discussions with.the two plants thus far at least, in my i
2 in terms of how the process has been going.
5   relatively new capacity, I have been encouraged by what the l                   6   staff and licensee interaction has been to date. Our 7   ability to move forward on the issues, to identify them and 8   to work to closure and resolution on some of them to make l                   9   the processes efficient and predictable, but mostly to                                           i 10   achieve our fundamental goal of ensuring safety in the                                           l l
l l
11   renewal period.
3 DR. TRAVERS:
12               MR. GRIMES:             At my level, the feedback is more I
At my level, yes.
i                 13   than sufficient.
I think in my 4
i                 14               CHAIRMAN JACKSON:               Well, let me give you some l
discussions with.the two plants thus far at least, in my i
l                 15   feedback. I think you're doing a sterling job and you laid 16   out a plan and you're working the plan, but you're seeing to I
5 relatively new capacity, I have been encouraged by what the l
17   the issues, as far as I can tell.                     The Commission doesn't 18   get directly involved at this point, but I have my sources.                                       l 19               So I just want to encourage you to keep it up and                                   I 20   you have a big task.
6 staff and licensee interaction has been to date.
l                 21               DR. TRAVERS:             Thank you.
Our 7
l 22               CHAIRMAN JACKSON:               You seem to be doing a great 23   job.
ability to move forward on the issues, to identify them and 8
24               COMMISSIONER McGAFFIGAN:                   Madam Chairman, I will 25   second everything you just said.                     I just want to ask the i
to work to closure and resolution on some of them to make l
I
9 the processes efficient and predictable, but mostly to i
:                                        ANN RILEY & ASSOCIATES, LTD.
10 achieve our fundamental goal of ensuring safety in the l
Court Reporters l                                1025 Connecticut Avenue, NW, Suite 1014 i
11 renewal period.
l                                                Washington, D.C. 20036 (202) 842-0034
12 MR. GRIMES:
At my level, the feedback is more I
i 13 than sufficient.
i 14 CHAIRMAN JACKSON:
Well, let me give you some l
l 15 feedback.
I think you're doing a sterling job and you laid 16 out a plan and you're working the plan, but you're seeing to I
17 the issues, as far as I can tell.
The Commission doesn't 18 get directly involved at this point, but I have my sources.
19 So I just want to encourage you to keep it up and 20 you have a big task.
l 21 DR. TRAVERS:
Thank you.
l 22 CHAIRMAN JACKSON:
You seem to be doing a great 23 job.
24 COMMISSIONER McGAFFIGAN:
Madam Chairman, I will 25 second everything you just said.
I just want to ask the i
I ANN RILEY & ASSOCIATES, LTD.
l Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 (202) 842-0034


7 i
7 i
24 1           staff.             We have committed to a plan here.                     You've got very
24 1
;-    2            specific dates, in the updates to the tasking memo, as 3           you've had in previous updates.                     We're headed towards ACRS l     4           review early next year and presumably Commission review in 5           the March / April time-frame for the first application, a 6           couple months later for the second application, of the SER
staff.
                                                                                                                    ]
We have committed to a plan here.
7           and environmental impact statement.                                                             !
You've got very 2
8                                   I can't resist making a comment about something I 9           saw in the Trade Press sort of challenging us to get this 10           done by June, and I think that was disservice to try to --
specific dates, in the updates to the tasking memo, as 3
11           that would have been a destabilization of a process.
you've had in previous updates.
12                                   There is no way, having laid this out, having 13           assigned resources,-licensees assigned resources, on a                                         j 14           schedule, to --
We're headed towards ACRS l
l     15                                   CHAIRMAN JACKSON:       I'm content to let Chris handle i                                                                                                                   i 16             it.         That's my point of view.                                                           ;
4 review early next year and presumably Commission review in 5
17                                   COMMISSIONER McGAFFIGAN:       Right.                                   j 18                                   CHAIRMAN JACKSON:       And if he meets or beats the l
the March / April time-frame for the first application, a 6
l     19             milestones, all to the good.                   What we want is for him to I
couple months later for the second application, of the SER
20             meet the milestones, but if he beats them, all to the good.
]
l 21             We should let him -- it's his job to manage it and I think 22             he's been doing'a great job.
7 and environmental impact statement.
l 23                                   COMMISSIONER McGAFFIGAN:       But on the issue of 24             public meetings, it seems, to me, that in the March 25             time-frame, there will be an opportunity -- in the ANN RILEY & ASSOCIATES, LTD.                                         '
8 I can't resist making a comment about something I 9
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014                                   l Washington, D.C. 20036                                           !
saw in the Trade Press sort of challenging us to get this 10 done by June, and I think that was disservice to try to --
(202) 842-0034 1
11 that would have been a destabilization of a process.
12 There is no way, having laid this out, having j
13 assigned resources,-licensees assigned resources, on a 14 schedule, to --
l 15 CHAIRMAN JACKSON:
I'm content to let Chris handle i
i 16 it.
That's my point of view.
17 COMMISSIONER McGAFFIGAN:
Right.
j 18 CHAIRMAN JACKSON:
And if he meets or beats the l
l 19 milestones, all to the good.
What we want is for him to 20 meet the milestones, but if he beats them, all to the good.
l 21 We should let him -- it's his job to manage it and I think 22 he's been doing'a great job.
l 23 COMMISSIONER McGAFFIGAN:
But on the issue of 24 public meetings, it seems, to me, that in the March 25 time-frame, there will be an opportunity -- in the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 1


_._    ._ . .  .____ _._.- _. _......_._                _ _ _ . _ . .    .m___._ _..___..m____.
.m___._
25 {
_..___..m____.
1 environmental impact statement process, there is a public 2- meeting again when the draft EIS goes out, is my 3 recollection.               And when the initial safety evaluation report 4 goes out, there will be these periodic meetings, but that l
25
will be a pretty important document.
{
1 6             So any member of the public who wants to pay                                       l 7 particular attention to the safety evaluation will have a                                       i 8 real chance when the initial safety evaluation report comes i
1 environmental impact statement process, there is a public 2-meeting again when the draft EIS goes out, is my 3
9 out.                                                                                           l 10                 MR. GRIMES:                   We were talking about the plans for i     11     the public meeting for the Calvert Cliffs environmental j
recollection.
12     impact draft just within the last two days and I have begun 13     talking about a way to hold a public session that would also                                   '
And when the initial safety evaluation report 4
14     discuss the safety evaluation report that will be available 15     at that time, without interfering with the logistical things 16     that we have to do for the purpose of satisfying NEPA.                                         ;
goes out, there will be these periodic meetings, but that 5
17'                 So we will be pursuing that.                         And to the extent           :
will be a pretty important document.
18     that we can try and hold more public meetings in the                                           !
6 So any member of the public who wants to pay 7
i 19     vicinity of the plant site, at this point, we're simply 20     taking advantage of site visits because trying to make 21     public meetings, like the scoping meeting or the 22     environmental impact meeting, those are -- those are very 23   demanding, too, and I don't want to distract the resources                                     j 24   from meeting these milestones.
particular attention to the safety evaluation will have a i
25                 I will also add that I think I was quoted in that i
8 real chance when the initial safety evaluation report comes i
9 out.
10 MR. GRIMES:
We were talking about the plans for i
11 the public meeting for the Calvert Cliffs environmental j
12 impact draft just within the last two days and I have begun 13 talking about a way to hold a public session that would also 14 discuss the safety evaluation report that will be available 15 at that time, without interfering with the logistical things 16 that we have to do for the purpose of satisfying NEPA.
17' So we will be pursuing that.
And to the extent 18 that we can try and hold more public meetings in the i
19 vicinity of the plant site, at this point, we're simply 20 taking advantage of site visits because trying to make 21 public meetings, like the scoping meeting or the 22 environmental impact meeting, those are -- those are very 23 demanding, too, and I don't want to distract the resources j
24 from meeting these milestones.
25 I will also add that I think I was quoted in that i
J ANN RILEY & ASSOCIATES, LTD.
J ANN RILEY & ASSOCIATES, LTD.
t                                                  Court Reporters i                     1025 Connecticut Avenue, NW, Suite 1014                                                 ;
Court Reporters t
!                                              Washington, D.C. 20036 l
i 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 l
(202) 842-0034
(202) 842-0034


26 1   same article as saying we'll work milestone to milestone.
26 1
2   And in our meeting tomorrow, we're reviewing the milestones 3   and we will speak to the reconsidering the milestones after 4   the staff evaluation and the draft environmental impact 5   statement have been published. We'll have a much better                     ,
same article as saying we'll work milestone to milestone.
6    idea at that point about what the workload will look like.
2 And in our meeting tomorrow, we're reviewing the milestones 3
7             It will be appropriate to reconsider the 8   milestones at that point, but we're not going to change any 9   milestones and jeopardize not being able to meet them.
and we will speak to the reconsidering the milestones after 4
10             COMMISSIONER MERRIFIELD:     Madam Chairman.
the staff evaluation and the draft environmental impact 5
11             CHAIRMAN JACKSON:   Please.
statement have been published.
12             COMMISSIONER MERRIFIELD:     I didn't want to let the 13   moment go by and I want to associate myself with your                           ,
We'll have a much better 6
14   compliments to Chris Grimes and all of his staff in terms of                   ,
idea at that point about what the workload will look like.
15   the superb work that they've been doing. Keep it up.
7 It will be appropriate to reconsider the 8
16             MR. GRIMES:   Thank you.
milestones at that point, but we're not going to change any 9
: 17.             CHAIRMAN JACKSON:   Okay. Let's move forward.
milestones and jeopardize not being able to meet them.
18             MR. GRIMES:   We'll turn to Bob Wood now.
10 COMMISSIONER MERRIFIELD:
19             MR. WOOD:   Chairman and Commissioners, happy to be 20   here today.
Madam Chairman.
21             CHAIRMAN JACKSON:   Happy New Year.                                   ,
11 CHAIRMAN JACKSON:
22             MR. WOOD:   Happy New Year. Before I get into 23   slide six, I'd like to just go through the goal of the 24   license transfer initiative and some of the background that 25   might be helpful to you and putting it in perspective.
Please.
12 COMMISSIONER MERRIFIELD:
I didn't want to let the 13 moment go by and I want to associate myself with your 14 compliments to Chris Grimes and all of his staff in terms of 15 the superb work that they've been doing.
Keep it up.
16 MR. GRIMES:
Thank you.
17.
CHAIRMAN JACKSON:
Okay.
Let's move forward.
18 MR. GRIMES:
We'll turn to Bob Wood now.
19 MR. WOOD:
Chairman and Commissioners, happy to be 20 here today.
21 CHAIRMAN JACKSON:
Happy New Year.
22 MR. WOOD:
Happy New Year.
Before I get into 23 slide six, I'd like to just go through the goal of the 24 license transfer initiative and some of the background that 25 might be helpful to you and putting it in perspective.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
________a
20036 (202) 842-0034 a


4 27 1                                     The goal is similar to the goals of a lot of the
4 27 1
    .            2            licensing initiatives that we have; in other words, we want 3           to enhance the predictability, timeliness and efficiency of 4           the license transfer process, while, at the same time,
The goal is similar to the goals of a lot of the 2
                  '5           maintaining protection of public health and safety.
licensing initiatives that we have; in other words, we want 3
l                 6                                     The license transfer requirements are statutory.                           ;
to enhance the predictability, timeliness and efficiency of 4
the license transfer process, while, at the same time,
'5 maintaining protection of public health and safety.
l 6
The license transfer requirements are statutory.
i L
i L
i 7           They are in Section 184 of the Atomic Energy Act, and that 8           requirement is spelled out in some more detail in Section 9           50.80 of the Code of Federal Regulations.
7 They are in Section 184 of the Atomic Energy Act, and that i
10                                     The NRC has to approve in writing any transfer 11             that comes before it and it has to look at both the                                                 1 12             technical and the financial qualifications associated with 13             the transferee.                             It includes both direct and indirect 14             transfers.                   A direct transfer is a straightforward sale or                       !
8 requirement is spelled out in some more detail in Section 9
l                                                                                                                                  l
50.80 of the Code of Federal Regulations.
!              15             the license itself is transferred to a different entity.                                         An l
10 The NRC has to approve in writing any transfer 11 that comes before it and it has to look at both the 1
16             indirect transfer, we've seen several of those in the past, l
12 technical and the financial qualifications associated with 13 the transferee.
l               17             and they're in the nature of, for example, a holding company 18             being formed above an existing licensee and the control of l               19             the licensee, and thus the license being transferred 20             indirectly in that capacity.
It includes both direct and indirect 14 transfers.
21                                       When we look at license transfer applications, 22             there are several factors we can look at, depending on the 23             specifics of the application.                                       We look at financial 24             qualifications for operations.                                       We look at decommissioning l-25             funding assurance, antitrust, which is a statutory 2
A direct transfer is a straightforward sale or l
l
15 the license itself is transferred to a different entity.
;                                                                ANN RILEY & ASSOCIATES, LTD.
An l
16 indirect transfer, we've seen several of those in the past, l
l 17 and they're in the nature of, for example, a holding company 18 being formed above an existing licensee and the control of l
19 the licensee, and thus the license being transferred 20 indirectly in that capacity.
21 When we look at license transfer applications, 22 there are several factors we can look at, depending on the 23 specifics of the application.
We look at financial 24 qualifications for operations.
We look at decommissioning l-25 funding assurance, antitrust, which is a statutory 2
l ANN RILEY & ASSOCIATES, LTD.
[
[
Court Reporters l
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 i                                                                       Washington, D.C. 20036 l                                                                                   (202) 842-0034
1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 l
(202) 842-0034


28 1 requirement, the foreign ownership considerations, foreign 2 ownership control and domination issues, technical 3 qualifications in terms of management's ability and 4 experience in operating a plant, and then finally there are                                             ,
28 1
5 Price Andersen and on-site insurance issues that sometimes 6 arise in the context of a transfer application.
requirement, the foreign ownership considerations, foreign 2
7                   We've looked at about 50 license transfers over
ownership control and domination issues, technical 3
qualifications in terms of management's ability and 4
experience in operating a plant, and then finally there are 5
Price Andersen and on-site insurance issues that sometimes 6
arise in the context of a transfer application.
7 We've looked at about 50 license transfers over 8
the past four years or so and 20 just in 98.
Those are in
~
~
8 the past four years or so and 20 just in                      98. Those are in t
t 9
9 the nature of acquisitions, where one license -- a licensee 10 might acquire another entity, either a licensee or a                                                   l 11 non-licensee, mergers between two essentially co-equal 12 companies that are licensees, holding company formations 13 that I mentioned before, non-owner-operating companies that 14 are formed by existing owners to operate the plant, and 15 then, finally, outright sales, and we've seen that, of 16 course, with TMI-1 and Pilgrim most recently, those being 17 the first examples we've had of sales of entire plants.                                                 l 18                     Now, with respect to slide six, I will briefly --
the nature of acquisitions, where one license -- a licensee 10 might acquire another entity, either a licensee or a l
19 could we have slide six, please?                     Thank you. I'll briefly 20 go through some of the completed actions that we've done so 21 far. As you're all, of course, aware of, UC has completed a 22 final rule on streamlining the licensing transfer hearing 23 process.           The rule, final rule was published December 3 in 24 the Federal Register.                 It was immediately effective.
11 non-licensee, mergers between two essentially co-equal 12 companies that are licensees, holding company formations 13 that I mentioned before, non-owner-operating companies that 14 are formed by existing owners to operate the plant, and 15 then, finally, outright sales, and we've seen that, of 16 course, with TMI-1 and Pilgrim most recently, those being 17 the first examples we've had of sales of entire plants.
25                     It establishes a new subpart M to Part 2 of our JJM RILEY & ASSOCIATES , LTD.
18 Now, with respect to slide six, I will briefly --
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036                                                   j I
19 could we have slide six, please?
Thank you.
I'll briefly 20 go through some of the completed actions that we've done so 21 far.
As you're all, of course, aware of, UC has completed a 22 final rule on streamlining the licensing transfer hearing 23 process.
The rule, final rule was published December 3 in 24 the Federal Register.
It was immediately effective.
25 It establishes a new subpart M to Part 2 of our JJM RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 j
(202) 842-0034
(202) 842-0034


)
)
29 1 regulations.                       It basically establishes a more informal 2 hearing process.
29 1
3                               Another important aspect of the rule change was 4 that there are categorical exclusions for and eliminates the 5 need to prepare site-specific environmental assessments and 6 no significant hazards determinations.
regulations.
7                               We've also issued final standard review plans on 8 financial qualifications and decommissioning funding 9 assurance and antitrust.                       As you're well aware, of course, 10 there is one in process now, a draft standard review plan on 11 the foreign ownership issues.
It basically establishes a more informal 2
12                               CHAIRMAN JACKSON:   You should probably give 13 yourself credit for the decommissioning funding assurance 14 rule, because the standard review plan plays off of that.
hearing process.
15                               MR. WOOD:   Impending actions, in light of the time 16 we've got here and covering all these issues, I wasn't going 17 to go into any detail on slide seven, but, of course, the 18 major one on our plate now is the TMI-1 transfer and looking 19 at that, and also Pilgrim had come in towards the end of 20 December and we're also looking at that at the same time.
3 Another important aspect of the rule change was 4
21                               These other issues I think are fairly 22 self-explanatory and I'll be happy to answer any more 23 detailed questions on them, but that really concludes my 24 prepared remarks on this area.
that there are categorical exclusions for and eliminates the 5
25                               CHAIRMAN JACKSON:   Okay. Any comments, questions?
need to prepare site-specific environmental assessments and 6
no significant hazards determinations.
7 We've also issued final standard review plans on 8
financial qualifications and decommissioning funding 9
assurance and antitrust.
As you're well aware, of course, 10 there is one in process now, a draft standard review plan on 11 the foreign ownership issues.
12 CHAIRMAN JACKSON:
You should probably give 13 yourself credit for the decommissioning funding assurance 14 rule, because the standard review plan plays off of that.
15 MR. WOOD:
Impending actions, in light of the time 16 we've got here and covering all these issues, I wasn't going 17 to go into any detail on slide seven, but, of course, the 18 major one on our plate now is the TMI-1 transfer and looking 19 at that, and also Pilgrim had come in towards the end of 20 December and we're also looking at that at the same time.
21 These other issues I think are fairly 22 self-explanatory and I'll be happy to answer any more 23 detailed questions on them, but that really concludes my 24 prepared remarks on this area.
25 CHAIRMAN JACKSON:
Okay.
Any comments, questions?
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


30 1           COMMISSIONER MERRIFIELD:     What is your time line                                                 ;
30 1
2 for the TMI review?
COMMISSIONER MERRIFIELD:
3           MR. WOOD:     We should have it completed in early 4 March in terms of the staff analysis and the safety 5 evaluation. We've given ourselves three months.             The 6 application came in on December 4,     I believe, so we're going 7 to try to complete it within that three month time-frame.
What is your time line 2
8           Now, that does not include consideration, if there                                                   ,
for the TMI review?
9 is a hearing. We understand that there were some expressed 10   interests on the part of an intervenor to intervene, but we                                                     l 11- understand that that may be going away.
3 MR. WOOD:
          '12               CHAIRMAN JACKSON:     You suggested, I think, at the                                               [,
We should have it completed in early 4
13   beginning, that if there were the license transfer rule in                                                     :
March in terms of the staff analysis and the safety 5
14   place., a time line on the order of eight months, six to                                                       i 15 eight months.                                                                                                   l t
evaluation.
16             MR. WOOD:     That's correct.                                                                       i 17             CHAIRMAN JACKSON:     So far, are you meeting your                                                 !
We've given ourselves three months.
18 milestone?
The 6
19             MR. WOOD:     Yes.                                                                                  .
application came in on December 4, I believe, so we're going 7
20             CHAIRMAN JACKSON:     Okay.
to try to complete it within that three month time-frame.
r 21             COMMISSIONER McGAFFIGAN:     I again just want to                                                   !
8 Now, that does not include consideration, if there 9
22 commend the staff.     I think this is another success area and L
is a hearing.
23 we've got some reviews to do, but the rule, getting that                                                       :
We understand that there were some expressed 10 interests on the part of an intervenor to intervene, but we l
24 done as promptly as it was done was very --
11-understand that that may be going away.
;              25           CHAIRMAN JACKSON:     I think the rule is one part of 4                                                                                                                                 ,
'12 CHAIRMAN JACKSON:
f                                                                                                                               !
You suggested, I think, at the
}
[
l                               ANN RILEY & ASSOCIATES, LTD.                                                                   :
13 beginning, that if there were the license transfer rule in 14 place., a time line on the order of eight months, six to i
Court Reporters 1025-Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
15 eight months.
_. . - ~ -     ..        -.      ~                         .~   . . _ . _ _ _ _ _ _ _ _ _ _ _ - . _ . . _ _ - -
l t
16 MR. WOOD:
That's correct.
i 17 CHAIRMAN JACKSON:
So far, are you meeting your 18 milestone?
19 MR. WOOD:
Yes.
20 CHAIRMAN JACKSON:
Okay.
r 21 COMMISSIONER McGAFFIGAN:
I again just want to 22 commend the staff.
I think this is another success area and L
23 we've got some reviews to do, but the rule, getting that 24 done as promptly as it was done was very --
25 CHAIRMAN JACKSON:
I think the rule is one part of 4
f
}
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025-Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i
. - ~ -
~
.~


31 1   it. I think what we need to compliment them on is the whole 2   --
31 1
3             COMMISSIONER McGAFFIGAN:   Right.
it.
1 4             CRAIRMAN JACKSON:   -- infrastructure they've put 5   into place, the rule, the standard review plans, the 6   schedules, and the actual review process.
I think what we need to compliment them on is the whole 2
7             MR. WOOD:   Thank you.
3 COMMISSIONER McGAFFIGAN:
8             COMMISSIONER MERRIFIELD:     I second the Chairman, 9   and keep it up.
Right.
10             MR. WOOD:   Thank you.                                   I 1
4 CRAIRMAN JACKSON:
11             CHAIRMAN JACKSONi   Now to the point that's most 12   interesting in the sense of more difficult.
-- infrastructure they've put 5
13             MR. MATTHEWS:   Gee, I was hoping to proceed 14   through my portion of the presentation as rapidly and               I 15   smoothly as Mr. Wood did. Is there any expectation?
into place, the rule, the standard review plans, the 6
16             CHAIRMAN JACKSON:   Well, I'll put it this way.
schedules, and the actual review process.
17   You have one thing going for you, Mr. Matthews.       That is, l
7 MR. WOOD:
18   yesterday, we had a three hour and 45 minute Commission 19   meeting. At least I do not intend that.
Thank you.
20             MR. MATTHEWS:   Good. With that, I'll begin.     I'd 21   like to address two areas. They're interrelated. They also 22   are connected to a third and one of the other licensing 23   initiatives that are contained in our set of viewgraphs that 24   have been provided.
8 COMMISSIONER MERRIFIELD:
25             The first one I'd like to discuss is the 10 CFR
I second the Chairman, 9
                            ;JRJ RILEY & ASSOCIATES, LTD.
and keep it up.
Court Reporters
10 MR. WOOD:
!                      1025 Connecticut Avenue, NW, Suite 1014 i                               Washington, D.C. 20036 l                                   (202) 842-0034 i
Thank you.
11 CHAIRMAN JACKSONi Now to the point that's most 12 interesting in the sense of more difficult.
13 MR. MATTHEWS:
Gee, I was hoping to proceed 14 through my portion of the presentation as rapidly and 15 smoothly as Mr. Wood did.
Is there any expectation?
16 CHAIRMAN JACKSON:
Well, I'll put it this way.
17 You have one thing going for you, Mr. Matthews.
That is, l
18 yesterday, we had a three hour and 45 minute Commission 19 meeting.
At least I do not intend that.
20 MR. MATTHEWS:
Good.
With that, I'll begin.
I'd 21 like to address two areas.
They're interrelated.
They also 22 are connected to a third and one of the other licensing 23 initiatives that are contained in our set of viewgraphs that 24 have been provided.
25 The first one I'd like to discuss is the 10 CFR
;JRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 l
(202) 842-0034 i


32 1 50.59 rule-making activity.     By way of background, and I am 2 on slide eight at this point.     By way of background, and 3 this will be brief, Madam Chairman, you already gave an 4 introduction with regard to the fact that this effort had 5 been undertaken at your request some time ago.
32 1
6           It has proceeded through-the 1996-1997 time-frame 7 and now one more year has passed and we are still addressing 8 these issues in that reevaluation.       But it is coming to 9 closure, in my view.
50.59 rule-making activity.
10           We have responded to a Commission SRM in March of 11 98 to prepare a proposed rule.     You reviewed that proposed 12 rule and authorized us to issue it for public comment, but 13 suggested that we solicit comment in some additional areas 14 beyond the content of the proposed rule that was offered by 15 the staff.                                                             ,
By way of background, and I am 2
16           Those additional areas related to a wide range of 17 options on margin of safety and to seek comment on several 18 other topics, such as minimal increases and definitions and 19 the need for definition of accidents.
on slide eight at this point.
20           That rule was published for public comment.       That 21 occurred on October 21 and you had asked us in that SRM to 22 provide you a final rule, back to the Commission for your 23 consideration, on February 19 of 1999, which is close to a 24 month from now.
By way of background, and 3
25           With regard to the current status, we got IJRJ RILEY & ASSOCIATES, LTD.
this will be brief, Madam Chairman, you already gave an 4
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
introduction with regard to the fact that this effort had 5
been undertaken at your request some time ago.
6 It has proceeded through-the 1996-1997 time-frame 7
and now one more year has passed and we are still addressing 8
these issues in that reevaluation.
But it is coming to 9
closure, in my view.
10 We have responded to a Commission SRM in March of 11 98 to prepare a proposed rule.
You reviewed that proposed 12 rule and authorized us to issue it for public comment, but 13 suggested that we solicit comment in some additional areas 14 beyond the content of the proposed rule that was offered by 15 the staff.
16 Those additional areas related to a wide range of 17 options on margin of safety and to seek comment on several 18 other topics, such as minimal increases and definitions and 19 the need for definition of accidents.
20 That rule was published for public comment.
That 21 occurred on October 21 and you had asked us in that SRM to 22 provide you a final rule, back to the Commission for your 23 consideration, on February 19 of 1999, which is close to a 24 month from now.
25 With regard to the current status, we got IJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


_ __ _ --._.._._ _                m-   -._ _ _ _ . _ _--_ _ _ - _.__ _._ _ .. _ _ _ . _                      .._._.--__-..... - .._ __ _ _
m-o 33 1
o 33 1     extensive public comment, 57 comment letters have been 2     received, totaling in number about 300 pages.                               We did get 3     comments from NEI, as were expected.
extensive public comment, 57 comment letters have been 2
4               In addition, we got comments from 35 power reactor 5     licensees and two non-power reactor licensees.                                 I'd like to
received, totaling in number about 300 pages.
                      .6     remind -"erybody that this rule has wide applicability.                                                 It 7     addresses issues at power reactors that are operating, power 8     reactors that are in the process of decommissioning, 9     non-power reactors, and also addresses -- and I probably 10       won't have an all-inclusive list -- but changes relative to 11       people who have licenses under Part 72.                                                                         ;
We did get 3
12                 So it is an important rule and one that affects a                                                   l 13       lot of the operations that are overseen by the NRC.
comments from NEI, as were expected.
14                   We did not get any comments from any public 1
4 In addition, we got comments from 35 power reactor 5
15       interest group on this rule.                               We did have some comments from 16       members of the public and interested parties, but no 17       combined public interest group offered views on this rule.
licensees and two non-power reactor licensees.
18                 Most commenters supported the objectives of the 19       rule-making and I will summarize the more significant groups 20       of comments, without belaboring the details, other than to 21       the extent that we need to go into them, at your discretion.
I'd like to
22       I will take them only in order of what I view to be t
.6 remind -"erybody that this rule has wide applicability.
23       significance and the ones that are going to be most 24       difficult for the staff, first, and then the Commission, 25       secondly, to wrestle with.
It 7
i l                                                 ANN RILEY & ASSOCIATES, LTD.
addresses issues at power reactors that are operating, power 8
l                                                                 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
reactors that are in the process of decommissioning, 9
non-power reactors, and also addresses -- and I probably 10 won't have an all-inclusive list -- but changes relative to 11 people who have licenses under Part 72.
12 So it is an important rule and one that affects a 13 lot of the operations that are overseen by the NRC.
14 We did not get any comments from any public 15 interest group on this rule.
We did have some comments from 16 members of the public and interested parties, but no 17 combined public interest group offered views on this rule.
18 Most commenters supported the objectives of the 19 rule-making and I will summarize the more significant groups 20 of comments, without belaboring the details, other than to 21 the extent that we need to go into them, at your discretion.
22 I will take them only in order of what I view to be t
23 significance and the ones that are going to be most 24 difficult for the staff, first, and then the Commission, 25 secondly, to wrestle with.
i l
ANN RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034


34 1           Margin of safety drew many comments.     NEI offered 2 an approach that would substitute a group of criteria in 3 place of the existing margin of safety criterion.         In fact, 4 they didn't even label it.       They refer to it as criterion 5 seven. The reason being that their approach would not be to 6 address that issue with a concept of margins, but to 7 establish and focus on parameters that need to be addressed 8 to control the integrity of fission product barriers, and 9 they would argue that prior approval would be required if 10 they were to alter or exceed any of that set of parameters.
34 1
11           They would call these parameters for this group of 12 issues related to fission barrier product integrity as 13 design basis limits that would be agreed upon.       They exist 14 in the FSARs at this tirce.
Margin of safety drew many comments.
i 15           CHAIRMAN JACKSON:     In all of the FSARs.                             j
NEI offered 2
!                                                                                        i 16           MR. MATTHEWS:     I believe all of the FSARs address                   I l
an approach that would substitute a group of criteria in 3
17 those limits.
place of the existing margin of safety criterion.
18           CHAIRMAN JACKSON:     Does the staff have a position 19 on this?
In fact, 4
20           MR. MATTHEWS:     We are probing their proposal at 21 this point in time and that's the best way I can say it, 22 because there is an issue of concern over completeness and
they didn't even label it.
! 23 we don't think we've got a bottom line on whether it may be l
They refer to it as criterion 5
seven.
The reason being that their approach would not be to 6
address that issue with a concept of margins, but to 7
establish and focus on parameters that need to be addressed 8
to control the integrity of fission product barriers, and 9
they would argue that prior approval would be required if 10 they were to alter or exceed any of that set of parameters.
11 They would call these parameters for this group of 12 issues related to fission barrier product integrity as 13 design basis limits that would be agreed upon.
They exist 14 in the FSARs at this tirce.
i 15 CHAIRMAN JACKSON:
In all of the FSARs.
j i
16 MR. MATTHEWS:
I believe all of the FSARs address 17 those limits.
18 CHAIRMAN JACKSON:
Does the staff have a position 19 on this?
20 MR. MATTHEWS:
We are probing their proposal at 21 this point in time and that's the best way I can say it, 22 because there is an issue of concern over completeness and 23 we don't think we've got a bottom line on whether it may be l
24 sufficiently complete to exercise the degree of oversight 25 necessary.
24 sufficiently complete to exercise the degree of oversight 25 necessary.
IJUJ RILEY & ASSOCIATES, LTD.
IJUJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l                             (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 l
(202) 842-0034


35 1             We had an extensive public meeting with them last l
35 l
2 Friday, extended well beyond the snow release time, and we 3 had a few individuals from Chicago there and I think maybe 4 it was because they probably preferred being here.
1 We had an extensive public meeting with them last 2
1 5             CHAIRMAN JACKSON:   They couldn't go home anyway.
Friday, extended well beyond the snow release time, and we 3
6             MR. MATTHEWS:   I thought they preferred being here 7 rather than there. And we have another meeting scheduled to 8 further explore their proposal.       They're certainly here and 9 are well equipped to describe it.       I think I got it, in a 10 nutshell.
had a few individuals from Chicago there and I think maybe 4
11             With respect to probability and the relationship 12 of the phrase " minimal" to changes in probability, some 13 commenters noted that minimal increases in probability may 14 be difficult to justify without more definitive guidance 15 concerning the use of and quality of the PRAs.       I think this 16 is an issue that was discussed at some length on Monday.
it was because they probably preferred being here.
17             My understanding of NEI's comments in this area, 18 they aren't very eager to step off into a definitional               )
1 5
19 discussion on what means min'imal and they are very 20 comfortable with continued use, as they had in 96-07 and             )
CHAIRMAN JACKSON:
21 NSAC-125 that preceded it, with the concept of negligible as 22 applied to discussions relating to probability in that 23 existing criterion on Part 50.59.                                   j 24             CHAIRMAN JACKSON:   Wasn't negligible the original 25 staff recommendation?
They couldn't go home anyway.
                        ;dHJ RILEY & ASSOCIATES, LTD.
6 MR. MATTHEWS:
I                               Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I thought they preferred being here 7
rather than there.
And we have another meeting scheduled to 8
further explore their proposal.
They're certainly here and 9
are well equipped to describe it.
I think I got it, in a 10 nutshell.
11 With respect to probability and the relationship 12 of the phrase " minimal" to changes in probability, some 13 commenters noted that minimal increases in probability may 14 be difficult to justify without more definitive guidance 15 concerning the use of and quality of the PRAs.
I think this 16 is an issue that was discussed at some length on Monday.
17 My understanding of NEI's comments in this area, 18 they aren't very eager to step off into a definitional 19 discussion on what means min'imal and they are very 20 comfortable with continued use, as they had in 96-07 and 21 NSAC-125 that preceded it, with the concept of negligible as 22 applied to discussions relating to probability in that 23 existing criterion on Part 50.59.
j 24 CHAIRMAN JACKSON:
Wasn't negligible the original 25 staff recommendation?
;dHJ RILEY & ASSOCIATES, LTD.
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


____ ._ _ _ _ . . _ _ _ _ _            _ _ _ . _ . = _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . . . _ _ . _ . . _ . . _ _ _ . . . . - . . . _ . _ .-
_ _ _. _. = _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _.... _ _. _.. _.. _ _ _.... -... _. _.-
36 1                   MR. MATTHEWS:                                   Yes.                 The last item that I wanted
36 1
,                2        to speak to directly was with respect to the treatment on 3         consequences and the relationship of the word " minimal" 4         increases of consequences and that corresponding criterion 5         in 50.59.
MR. MATTHEWS:
6                   There is a bit of dual treatment that I think NEI 7         would like us to consider.                                           You may recall that the staff 8         proposed in the proposed rule as one of the primary options P
Yes.
9         for dealing with consequences that we adopt a view of 10         minimal relative to the percentage of change that would be 11         permitted based upon a sliding scale, dependent on how far 12         you were away from an acceptance criteria that may have been 13         established by either regulation or some other form.
The last item that I wanted 2
14                     And where no acceptance criteria could be                                                                               ,
to speak to directly was with respect to the treatment on 3
15         inferred, that in the areas that you may recall the staff 16         sometimes would view that it was -- the acceptance criteria 17         was not numerical, but was some small fraction of 10 CFR                                                                           ;
consequences and the relationship of the word " minimal" 4
18         Part 100.
increases of consequences and that corresponding criterion 5
19                     In those instances, NEI would propose that they 20         have the flexibility to not be held to a small fraction of a 21         small fraction and that they be allowed to allow those 22         consequences to increase to the regulatory acceptance 23         criteria that most usually is found in the standard review 24         plan.
in 50.59.
25                     So I think there is a mixed story with regard to ANN RILEY & ASSOCIATES, LTD.
6 There is a bit of dual treatment that I think NEI 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
would like us to consider.
You may recall that the staff 8
proposed in the proposed rule as one of the primary options P
9 for dealing with consequences that we adopt a view of 10 minimal relative to the percentage of change that would be 11 permitted based upon a sliding scale, dependent on how far 12 you were away from an acceptance criteria that may have been 13 established by either regulation or some other form.
14 And where no acceptance criteria could be 15 inferred, that in the areas that you may recall the staff 16 sometimes would view that it was -- the acceptance criteria 17 was not numerical, but was some small fraction of 10 CFR 18 Part 100.
19 In those instances, NEI would propose that they 20 have the flexibility to not be held to a small fraction of a 21 small fraction and that they be allowed to allow those 22 consequences to increase to the regulatory acceptance 23 criteria that most usually is found in the standard review 24 plan.
25 So I think there is a mixed story with regard to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


,. - . - - - ~ . . - - . . _ . . -             - . . - -          - - . -  . -    . .  . _ - - . - . . -        . - . .
,. -. - - - ~.. - -.. _.. -
I 37 1         the degree of acceptance we saw in at least the industry 2         comments on minimal as applied to consequences.
I 37 1
!                  3                     CHAIRMAN JACKSON:           This prospective was suffused 4         in both the NEI and the actual power reactor licensing.
the degree of acceptance we saw in at least the industry 2
5                     MR. MATTHEWS:         I'll have to look to Eileen for l
comments on minimal as applied to consequences.
6         that. Eileen McKenna is the primary staff individual on l
3 CHAIRMAN JACKSON:
!                  7         50.59.
This prospective was suffused 4
8                     MS. McKENNA:       Eileen McKenna, NRR staff.                 I would i
in both the NEI and the actual power reactor licensing.
9         characterize the comments we got from across the spectrum of 10           saying there were those that agreed that limiting this l
5 MR. MATTHEWS:
l                 11         percent of difference with respect to the SRP values was 1
I'll have to look to Eileen for l
12         unduly restrictive.
6 that.
13                     I would also comment that we did get a set of l
Eileen McKenna is the primary staff individual on l
14           comments that still would go back to, if you will, that the l                 15           -- you would not -- you should not measure whether there's 16         been any increase in consequences, unless the limits 17           themselves, whether they are either the regulatory limits or 18           the standard review plan limits that are exceeded; that they l                 19         were rejecting, if you will, the minimal increase approach.
7 50.59.
l 20                     So I wouldn't say that there was a uniformity, but
8 MS. McKENNA:
!                21           I would say that there were those that did accept the idea l                 22           of having some limitation on the degree of change.                       They 23           also raised this question of the SRP limits and things like 1
Eileen McKenna, NRR staff.
(                 24           that, that those not be also applied in this percent change 25           action.
I would i
9 characterize the comments we got from across the spectrum of 10 saying there were those that agreed that limiting this l
l 11 percent of difference with respect to the SRP values was 1
12 unduly restrictive.
13 I would also comment that we did get a set of l
14 comments that still would go back to, if you will, that the l
15
-- you would not -- you should not measure whether there's 16 been any increase in consequences, unless the limits 17 themselves, whether they are either the regulatory limits or 18 the standard review plan limits that are exceeded; that they l
19 were rejecting, if you will, the minimal increase approach.
l 20 So I wouldn't say that there was a uniformity, but 21 I would say that there were those that did accept the idea l
22 of having some limitation on the degree of change.
They 23 also raised this question of the SRP limits and things like 1
(
24 that, that those not be also applied in this percent change 25 action.
l i
l i
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters f
f Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 t
20036 (202) 842-0034 t
i
i


38 1               CHAIRMAN JACKSON:                     I see.                   So that they should be 2   able to go all the way to the limits without having NRC.
38 1
3               MS. McKENNA:                     These subsidiary limits, if you 4 will.
CHAIRMAN JACKSON:
5                 CHAIRMAN JACKSON:                   Without having any NRC review.
I see.
6                 MS. McKENNA:                   Correct, yes.
So that they should be 2
7                 CHAIRMAN JACKSON:                   Does the staff have a position 8   at this point, a preliminary position?
able to go all the way to the limits without having NRC.
9                 MS. McKENNA:                   Again, we're looking at that and 10     seeing whether there are any reasons why that would not be 11     acceptable, but I don't think we're prepared to say today 12     that we're accepting or rejecting.
3 MS. McKENNA:
13                   MR. MATTHEWS:                   Turning now to slide nine, I just 14     wanted to very quickly talk about the approach which I think 15     we've already discussed.
These subsidiary limits, if you 4
16                   CHAIRMAN JACKSON:                   Let me just ask you one other 17     question.         Well, two really.               One is specific and one is 18   more generic.             I note that NEI has a slide on the importance 19     of definition of change, which would redefine when 50.59 20     evaluations are received.
will.
21                     Now, is this -- have you had a chance to examine 22     this?
5 CHAIRMAN JACKSON:
23                     MR. MATTHEWS:                 I have not examined that slide or 24     that definition.               I don't know whether Eileen has had an f
Without having any NRC review.
l           25     opportunity to.
6 MS. McKENNA:
Correct, yes.
7 CHAIRMAN JACKSON:
Does the staff have a position 8
at this point, a preliminary position?
9 MS. McKENNA:
Again, we're looking at that and 10 seeing whether there are any reasons why that would not be 11 acceptable, but I don't think we're prepared to say today 12 that we're accepting or rejecting.
13 MR. MATTHEWS:
Turning now to slide nine, I just 14 wanted to very quickly talk about the approach which I think 15 we've already discussed.
16 CHAIRMAN JACKSON:
Let me just ask you one other 17 question.
Well, two really.
One is specific and one is 18 more generic.
I note that NEI has a slide on the importance 19 of definition of change, which would redefine when 50.59 20 evaluations are received.
21 Now, is this -- have you had a chance to examine 22 this?
23 MR. MATTHEWS:
I have not examined that slide or 24 that definition.
I don't know whether Eileen has had an f
l 25 opportunity to.
M34 RILEY & ASSOCIATES, LTD.
M34 RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


39 1                               MS. McKENNA:                 As you notice on our slide, our 2         third bullet is the issue of screening of changes.                                                       So it is 3         one that we are aware of and we did seek comments from a t
39 1
4         number of sources.
MS. McKENNA:
5                               I think, in essence, it's asking for a way that 6         within the definitions to limit, shall we say, those cases 7         where an evaluation is needed for changes that would affect 8         functions or design information as opposed to changed 9         anything that's described in the FSAR as requiring 50.59                                                               !
As you notice on our slide, our 2
10           evaluation.
third bullet is the issue of screening of changes.
11                               CHAIRMAN JACKSON:                       And is this a de facto change                           l 12           of scope?                                                                                                             '
So it is 3
13                               MS. McKENNA:                 Perhaps, I mean, in terms of what 14           requires a full evaluation, it could be a way of getting at                                                           i l
one that we are aware of and we did seek comments from a t
15           the scope question, yes. 'But if you agreed that certain                                                             j i
4 number of sources.
16           kinds of changes did not' require evaluations, they are l             17           essentially not part of the scope of the evaluation against 18           the criteria.
5 I think, in essence, it's asking for a way that 6
19                                 CHAIRMAN JACKSON:                       Now, was this something that 20           NEI and the staff said it wanted to do as a second step; 21           that is, scope?
within the definitions to limit, shall we say, those cases 7
22                                 MS. McKENNA:                 I think what we're talking about is 23           definitional within what facility and procedures described l             24           in the SAR, which was really what this -- the definitions we
where an evaluation is needed for changes that would affect 8
',            25           had now and the scope that we're working on.                                                       So I don't j                                                       ANN RILEY & ASSOCIATES, LTD.
functions or design information as opposed to changed 9
;                                                                    Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 1                                                             Washington, D.C. 20036 (202) 842-0034
anything that's described in the FSAR as requiring 50.59 10 evaluation.
11 CHAIRMAN JACKSON:
And is this a de facto change 12 of scope?
13 MS. McKENNA:
Perhaps, I mean, in terms of what 14 requires a full evaluation, it could be a way of getting at i
15 the scope question, yes. 'But if you agreed that certain j
i 16 kinds of changes did not' require evaluations, they are l
17 essentially not part of the scope of the evaluation against 18 the criteria.
19 CHAIRMAN JACKSON:
Now, was this something that 20 NEI and the staff said it wanted to do as a second step; 21 that is, scope?
22 MS. McKENNA:
I think what we're talking about is 23 definitional within what facility and procedures described l
24 in the SAR, which was really what this -- the definitions we 25 had now and the scope that we're working on.
So I don't j
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 1
Washington, D.C.
20036 (202) 842-0034


1 40 l
1 40 1
think we were trying to make a change there.                                                                     ;
think we were trying to make a change there.
2                         CHAIRMAN JACKSON:                 But it's scope within the 3   existing --
2 CHAIRMAN JACKSON:
4                       MS. McKENNA:                   Scope within the existing FSAR, yes.                         i 5                         CHAIRMAN JACKSON:                 So you're talking about                                 ,
But it's scope within the 3
narrowing that scope.
existing --
7                         MS. McKENNA:                 Narrowing the cases for which you 8   r-+           to do an evaluation, yes.
4 MS. McKENNA:
9                         COMMISSIONER McGAFFIGAN:                   Madam Chairman.                               l 10                         CHAIRMAN JACKSON:                 What is a scope change?
Scope within the existing FSAR, yes.
11                         COMMISSIONER McGAFFIGAN:                   Madam Chairman, the                           ;
i 5
12   change -- I'm looking at the NEI document.                                     It's still a 13   pretty broad definition.                             I think --
CHAIRMAN JACKSON:
14                         CHAIRMAN JACKSON:                 No , no. I'm not dealing with 15   broadness or narrowness.                             I'm just asking a more generic                             ,
So you're talking about 6
16   question as to whether, in fact, it affects the scope.
narrowing that scope.
17                         MR. MATTHEWS:                 I think it is a -- it does affect 18   scope.           It primarily affects it with regard to the screening                                           l 19   process that the utilities or the licensees undertake.                                                           ,
7 MS. McKENNA:
20                           COMMISSIONER McGAFFIGAN:                 To screen out the change                       !
Narrowing the cases for which you 8
21   in the vice president or something like that.
r-+
22                           MR. MATTHEWS:               That's correct.
to do an evaluation, yes.
23                           COMMISSIONER McGAFFIGAN:                 Right.       That may not be                 ;
9 COMMISSIONER McGAFFIGAN:
24   bad.                                                                                                           j 25                           CHAIRMAN JACKSON:                 It doesn't matter.         I'm just l
Madam Chairman.
ANN RILEY & ASSOCIATES, LTD.                                                 j Court Reporters                                                   !
l 10 CHAIRMAN JACKSON:
1025 Connecticut Avenue, NW, Suite 1014                                                       >
What is a scope change?
Washington, D.C. 20036 (202) 842-0034                                                   .
11 COMMISSIONER McGAFFIGAN:
I 1
Madam Chairman, the 12 change -- I'm looking at the NEI document.
It's still a 13 pretty broad definition.
I think --
14 CHAIRMAN JACKSON:
No, no.
I'm not dealing with 15 broadness or narrowness.
I'm just asking a more generic 16 question as to whether, in fact, it affects the scope.
17 MR. MATTHEWS:
I think it is a -- it does affect 18 scope.
It primarily affects it with regard to the screening l
19 process that the utilities or the licensees undertake.
20 COMMISSIONER McGAFFIGAN:
To screen out the change 21 in the vice president or something like that.
22 MR. MATTHEWS:
That's correct.
23 COMMISSIONER McGAFFIGAN:
Right.
That may not be 24 bad.
j 25 CHAIRMAN JACKSON:
It doesn't matter.
I'm just l
ANN RILEY & ASSOCIATES, LTD.
j Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 1


l -
l l-l 41 1
l-                                                                                     :
trying to clarify to what extent it is a scope change.
l                                                                                 41   l 1 trying to clarify to what extent it is a scope change.
l 2
l 2 Thank you.                 And let me ask the generic question; not to you, i
Thank you.
i     3 no, no , no.               You --
And let me ask the generic question; not to you, i
l     4               MS. McKENNA:             I'll wait here just in case.
i 3
5                 CHAIRMAN JACKSON:             Are we coming to a point -- how 6 much more iteration do we need to allow or are we coming to 7 a point that the Commission just needs to try to make a 8 decision?
no, no, no.
9               MR. MATTHEWS:             I think we're at the point, once 10 you receive the staff's proposal, my personal view is that 11 we're going to be able to make a proposal to you of a 1
You --
12 reasonable course of action, recognizing it's for this                         '
l 4
13 period before we reach a more broader change to our                             1 14 regulatory framework, that iteration at this point would 15 only delay the inevitable.                   We need to get on with this.
MS. McKENNA:
16                 So I think the staff is in a position -- we're 17 going to make a recommendation in February associated with 18 our response to these recommendations and comments of our 19 external stakeholders.                                                           l 20                 CHAIRMAN JACKSON:           Okay. That's fair.
I'll wait here just in case.
21                 MR. MATTHEWS:           As I indicated through a memo that 22 Bill forwarded to you earlier, I think in December, our 23 expectation is that the important work to be done is to                         '
5 CHAIRMAN JACKSON:
24 focus on the resolution.                   We felt it might be, frankly, a 25 waste of staff resources to galvanize one of these l
Are we coming to a point -- how 6
ANN RILEY & ASSOCIATES, LTD.
much more iteration do we need to allow or are we coming to 7
l I                                           Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
a point that the Commission just needs to try to make a 8
decision?
9 MR. MATTHEWS:
I think we're at the point, once 10 you receive the staff's proposal, my personal view is that 11 we're going to be able to make a proposal to you of a 12 reasonable course of action, recognizing it's for this 13 period before we reach a more broader change to our 1
14 regulatory framework, that iteration at this point would 15 only delay the inevitable.
We need to get on with this.
16 So I think the staff is in a position -- we're 17 going to make a recommendation in February associated with 18 our response to these recommendations and comments of our 19 external stakeholders.
20 CHAIRMAN JACKSON:
Okay.
That's fair.
21 MR. MATTHEWS:
As I indicated through a memo that 22 Bill forwarded to you earlier, I think in December, our 23 expectation is that the important work to be done is to 24 focus on the resolution.
We felt it might be, frankly, a 25 waste of staff resources to galvanize one of these l
l ANN RILEY & ASSOCIATES, LTD.
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


O 42 1   approaches into the complete final rule-making package and 2   all its attendant pieces prior to our getting your 3   reflection on it.
O 42 1
4                           CHAIRMAN JACKSON:                           And so it's time for the 5   Commission to bite the bullet.
approaches into the complete final rule-making package and 2
6                           MR. MATTHEWS:                     And then we will proceed to hand 7   you back very soon after that a final rule that will have 8   the -- as I say, the I's dotted and the T's crossed.
all its attendant pieces prior to our getting your 3
9                           CHAIRMAN JACKSON:                           Right.         I understand. But the 10   Commission needs to bite the bullet.                                               You can sit down, 11   Eileen.             Thank you.
reflection on it.
12                           MR. MATTHEWS:                     I haven't relinquished my ability 13   to call her back.
4 CHAIRMAN JACKSON:
14                           CHAIRMAN JACKSON:                           He reserves the right.                       j 15                           MR. MATTHEWS:                     I reserve the right, right, and the 16     reason for that is that the subsequent issue has 17     implications related to the 50.59 rule-making.                                                 The degree 18     of that interface is in the eye of the beholder sometimes.
And so it's time for the 5
19                           But I want to now turn to slide ten, and this 20     relates to the guidance for updating FSARs.                                                 This is one 21     that       --
Commission to bite the bullet.
22                           CHAIRMAN JACKSON:                           You skipped a slide, you 23     skipped nine.                     You think you've covered pretty much those 24     issues.
6 MR. MATTHEWS:
25                           MR. MATTHEWS:                     I think I covered nine with regard ANN RILEY & ASSOCIATES, LTD.
And then we will proceed to hand 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
you back very soon after that a final rule that will have 8
the -- as I say, the I's dotted and the T's crossed.
9 CHAIRMAN JACKSON:
Right.
I understand.
But the 10 Commission needs to bite the bullet.
You can sit down, 11 Eileen.
Thank you.
12 MR. MATTHEWS:
I haven't relinquished my ability 13 to call her back.
14 CHAIRMAN JACKSON:
He reserves the right.
j 15 MR. MATTHEWS:
I reserve the right, right, and the 16 reason for that is that the subsequent issue has 17 implications related to the 50.59 rule-making.
The degree 18 of that interface is in the eye of the beholder sometimes.
19 But I want to now turn to slide ten, and this 20 relates to the guidance for updating FSARs.
This is one 21 that 22 CHAIRMAN JACKSON:
You skipped a slide, you 23 skipped nine.
You think you've covered pretty much those 24 issues.
25 MR. MATTHEWS:
I think I covered nine with regard ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


l l*
l l*
43 1 to the fact that it addressed schedule and upcoming 2 activities.
43 1
3             CRAIRMAN JACKSON:     Fine, that's good. Okay. I 4 understand. Right.
to the fact that it addressed schedule and upcoming 2
5             MR. MATTHEWS:   Right. Let me go back to nine for   l 6 a moment, though.     I think it does deserve discussion, that   i 7 last bullet. Okay. We are working with the staff primarily 8 involved in the discussion on Monday.       We all were 1
activities.
9 participants in the discussion of those options offered to 10 the Commission with regard to risk informing Part 50,             )
3 CRAIRMAN JACKSON:
Fine, that's good.
Okay.
I 4
understand.
Right.
5 MR. MATTHEWS:
Right.
Let me go back to nine for 6
a moment, though.
I think it does deserve discussion, that 7
last bullet.
Okay.
We are working with the staff primarily 8
involved in the discussion on Monday.
We all were 9
participants in the discussion of those options offered to 10 the Commission with regard to risk informing Part 50,
)
11 because of the interrelationship between the change process 12 that is being suggested for adoption and the future need for 1
11 because of the interrelationship between the change process 12 that is being suggested for adoption and the future need for 1
13 a collateral change process to be developed, whether you 14 deal with option one or option two or both at the same time.
13 a collateral change process to be developed, whether you 14 deal with option one or option two or both at the same time.
l 15             So we've been involved in that and I just wanted 16 to reassure you that those activities are interleaved, so 17 that we don't make, to the extent that we can prevent it,         ;
l 15 So we've been involved in that and I just wanted 16 to reassure you that those activities are interleaved, so 17 that we don't make, to the extent that we can prevent it, I
I 18 one step forward and then have to take two back with regard 19 to this issue.                                                   ,
18 one step forward and then have to take two back with regard 19 to this issue.
i 20             So we have those continuing discussions with         '
i 20 So we have those continuing discussions with 21 regard to the relationship between 50.59, a potential 22 revised broad scope of 50.59, and how that relates to 23 risk-informed options and the scope of certain portions of 24 Part 50.
I 21 regard to the relationship between 50.59, a potential             l l
25 CHAIRFmR JACKSON:
22 revised broad scope of 50.59, and how that relates to 23 risk-informed options and the scope of certain portions of         ,
Let me ask you this quick I
l 24 Part 50.                                                           l 25             CHAIRFmR JACKSON:     Let me ask you this quick I                       ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
l                               Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


                            =.
=.
44 1 question. How is the staff coming to terms with acceptance 2 limits or even any de facto scope discussions without a 3 mutual understanding of design basis definition?
44 1
4           I mean, I note that NEI's slide talks about attain 5 a common understanding of what information is captured by 6 50.2 definition and must resolve this issue.
question.
7           Are they connected at all?
How is the staff coming to terms with acceptance 2
8           MR. MATTHEWS:   They are connected, but let me deal 9 with it this way. The concept of acceptance limits, and I'm 10 using that literal term, is really not a term or a concept 11 with much regulatory standing. We are moving away from it.
limits or even any de facto scope discussions without a 3
12           CHAIRMAN JACKSON:   So that will be part of what 13 comes to the Commission.
mutual understanding of design basis definition?
14           MR. MATTHEWS:   Right. This is consistent, I 15 believe, with NEI's comments on the proposed rule.     You will 16 hear the phrase acceptance criteria as we establish it in 17 standard review plans.
4 I mean, I note that NEI's slide talks about attain 5
t 18           CHAIRMAN JACKSON:   Is that at all related to the 19 issue of design basis definition?
a common understanding of what information is captured by 6
20           MR. MATTHEWS:   No , not directly.
50.2 definition and must resolve this issue.
21           CHAIRMAN JACKSON:   So you think one can make a 22 clean decision in the absence of having come to some meeting i
7 Are they connected at all?
8 MR. MATTHEWS:
They are connected, but let me deal 9
with it this way.
The concept of acceptance limits, and I'm 10 using that literal term, is really not a term or a concept 11 with much regulatory standing.
We are moving away from it.
12 CHAIRMAN JACKSON:
So that will be part of what 13 comes to the Commission.
14 MR. MATTHEWS:
Right.
This is consistent, I 15 believe, with NEI's comments on the proposed rule.
You will 16 hear the phrase acceptance criteria as we establish it in 17 standard review plans.
t 18 CHAIRMAN JACKSON:
Is that at all related to the 19 issue of design basis definition?
20 MR. MATTHEWS:
No, not directly.
21 CHAIRMAN JACKSON:
So you think one can make a 22 clean decision in the absence of having come to some meeting i
23 of the minds on design basis definition.
23 of the minds on design basis definition.
24           MR. MATTHEWS:   I believe we can, but I have to i 25 caveat that in that NEI's proposal with regard to a JJRJ RILEY & ASSOCIATES, LTD.
24 MR. MATTHEWS:
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I believe we can, but I have to i
25 caveat that in that NEI's proposal with regard to a JJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


    -  . . . _ . . . _ _ . . _ _ ._ . -. _ _ ._ _ ._._ _ _ - ._ __ _ __ _ _ _ . .___.._ _ _ . __                                  . . - ~ __
.. - ~
45 1         replacement criteria for margin of safety does not rely on 2         establishing acceptance limits.                                                   Had we been in a previous             i 1
45 1
3         era where we were struggling with margin of safety and how 4         it's defined in terms of the difference between some                                                                     I j             5         operating level and a, quote, acceptance limit that might l
replacement criteria for margin of safety does not rely on 2
l             6         have been established in the FSAR, I think it would have a 7         direct relationship.
establishing acceptance limits.
l             8                                 So there is some caveat to my statement that I 9         don't think resolution of the issue is an impediment to                                                                 l
Had we been in a previous i
                                                                                                                                                  )
3 era where we were struggling with margin of safety and how 4
10         moving forward on 50.59.
it's defined in terms of the difference between some j
l l
5 operating level and a, quote, acceptance limit that might l
11                               CHAIRMAN JACKSON:                                       Okay.                                     l l
l 6
12                               MR. MATTHEWS:                                       I've lost my place. On slide ten,           l l
have been established in the FSAR, I think it would have a 7
l            13         and I only have one slide on this subject.                                                     As you can see,           ;
direct relationship.
14         we have moved from the provision by NEI of a guidance l             15         document for our information in November 1997 to a generic 1
l 8
16         letter that the staff proposed to address issues that we                                                                 ;
So there is some caveat to my statement that I 9
17         didn't feel we could resolve in terms of the differences 18         that existed between our view and that that was provided to                                                           j 19         us for information.
don't think resolution of the issue is an impediment to
20                                 The Commission suggested that we work with NEI to                                               .
)
I 21         bring these two documents together, so to speak, and have us                                                           i 22         release that proposed generic letter for NEI's use in making 23         possible revisions to their NEI 98-03 document.
10 moving forward on 50.59.
24                                 We've reached agreement on that document and we                                                 r i
l 11 CHAIRMAN JACKSON:
25         have proposed to the Commission, as you remarked, l
Okay.
l
12 MR. MATTHEWS:
'                                                            ANN RILEY & ASSOCIATES, LTD.
I've lost my place.
[                                                                                     Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036
On slide ten, l
;                                                                                        (202) 842-0034
13 and I only have one slide on this subject.
As you can see, 14 we have moved from the provision by NEI of a guidance l
15 document for our information in November 1997 to a generic 1
16 letter that the staff proposed to address issues that we 17 didn't feel we could resolve in terms of the differences 18 that existed between our view and that that was provided to j
19 us for information.
20 The Commission suggested that we work with NEI to I
21 bring these two documents together, so to speak, and have us i
22 release that proposed generic letter for NEI's use in making 23 possible revisions to their NEI 98-03 document.
24 We've reached agreement on that document and we r
i 25 have proposed to the Commission, as you remarked, l
l ANN RILEY & ASSOCIATES, LTD.
[
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


-. - - .    . . . . . - _ . - . . - - -          . - . . . . _ - - - . - . _ - = -                     _ . - - - -          .
. -.... _ - - -. -. _ - = -
46 1 SECY-99-001, a reg guide,that would be issued for public                                                             ,
46 1
2 comment that would endorse NEI's guidance document 98-03 for 3 use by licensees in guiding their updating of FSARs 4 consistent with the existing regulations, 50.2, 50.34, and 5 50.71(e).
SECY-99-001, a reg guide,that would be issued for public 2
6                             We believe this is a success story.                         The next 7 milestone will be to reach your agreement and issue that for                                                         '
comment that would endorse NEI's guidance document 98-03 for 3
8 public comment, resolve those comments, and bring back to 9 the Commission a proposed final reg guide and thereby, in                                                           i i
use by licensees in guiding their updating of FSARs 4
10   our view, bring forward guidance through our combined                                                               i 11   efforts that has been long overdue with regard to the need 12   to clarify just what should be within the FSAR, what should i
consistent with the existing regulations, 50.2, 50.34, and 5
13   be within its updates, and bring conformance between that 14   guidance and the existing rules, which primarily are 50.34 15   and 50.71(e).
50.71(e).
16                               CHAIRMAN JACKSON:                         Let me ask you a question.         Is 17   there a level of risk significa:1t SSCs that should be 18   retained in the updated FSAR that somehow doesn't reach the 19   level of adequate protection or is that an oxymoron?
6 We believe this is a success story.
20                               MR. MATTHEWS:               Or a non-sequiter.           I'm having 21   trouble -- let me rephrase it in another way and see if you 22   agree that that's the appropriate question.
The next 7
23                                 Is there information that might not otherwise be 24   required by our regulations explicitly?
milestone will be to reach your agreement and issue that for 8
25                               CHAIRMAN JACKSON:                         Right.
public comment, resolve those comments, and bring back to 9
the Commission a proposed final reg guide and thereby, in i
i 10 our view, bring forward guidance through our combined i
11 efforts that has been long overdue with regard to the need 12 to clarify just what should be within the FSAR, what should i
13 be within its updates, and bring conformance between that 14 guidance and the existing rules, which primarily are 50.34 15 and 50.71(e).
16 CHAIRMAN JACKSON:
Let me ask you a question.
Is 17 there a level of risk significa:1t SSCs that should be 18 retained in the updated FSAR that somehow doesn't reach the 19 level of adequate protection or is that an oxymoron?
20 MR. MATTHEWS:
Or a non-sequiter.
I'm having 21 trouble -- let me rephrase it in another way and see if you 22 agree that that's the appropriate question.
23 Is there information that might not otherwise be 24 required by our regulations explicitly?
25 CHAIRMAN JACKSON:
Right.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


1 I*
I*
l l                                                                    47 i 1           MR. MATTHEWS:   Although you could argue that it 2 was provided as part of the application in response to our 3 need for information. But I'll just put it that way; that       l 4 would not otherwise be required through that process.       It is 5 there, it has risk significance; that if it were to be 6 removed, would threaten the concept of adequate protection.
l 47 i
7           CHAIRMAN JACKSON:   That's a good way to put it, 8 thank you.
1 MR. MATTHEWS:
9           MR. MATTHEWS:   And my view is that there is not 10 information that rises to that.
Although you could argue that it 2
11           CHAIRMAN JACKSON:   To that level. Okay.
was provided as part of the application in response to our 3
12           MR. MATTHEWS:   But this is an ongoing point of 13 discussion and the reason I'm able to say that is I believe 14 our whole regulatory fabric establishes, current 15 regulations, a level of adequate protection and we have 16 demonstrated through our licensing review process that that 17 has been met.
need for information.
But I'll just put it that way; that 4
would not otherwise be required through that process.
It is 5
there, it has risk significance; that if it were to be 6
removed, would threaten the concept of adequate protection.
7 CHAIRMAN JACKSON:
That's a good way to put it, 8
thank you.
9 MR. MATTHEWS:
And my view is that there is not 10 information that rises to that.
11 CHAIRMAN JACKSON:
To that level.
Okay.
12 MR. MATTHEWS:
But this is an ongoing point of 13 discussion and the reason I'm able to say that is I believe 14 our whole regulatory fabric establishes, current 15 regulations, a level of adequate protection and we have 16 demonstrated through our licensing review process that that 17 has been met.
l l
l l
18           The question relates to what is -- if we miss 19 something in terms of what the regulation requires, even 20 though it happens to be there, it raises a question with 1
18 The question relates to what is -- if we miss 19 something in terms of what the regulation requires, even 20 though it happens to be there, it raises a question with 1
21 regard to sufficiency of our regulatory process.       I don't 22 believe that --
21 regard to sufficiency of our regulatory process.
23           CHAIRMAN JACKSON:   Well, should make -- should you 24 not ensure or should the Commission not ensure, since the l
I don't 22 believe that --
25 SECY is here, that the Commission always reserves to itself ANN RILEY & ASSOCIATES, LTD.
23 CHAIRMAN JACKSON:
Court Reporters
Well, should make -- should you l
;            1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
24 not ensure or should the Commission not ensure, since the 25 SECY is here, that the Commission always reserves to itself ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l


I 48 1 the right to revisit the issue vis-a-vis adequate 2 protection.                                                                     ;
I 48 1
3           MR. MATTHEWS:   I'll tell you, I think we're always                 l 4 on -- in terms of our processes, always on the lookout for 5 that kind of information, if you will.                                         i 6           CHAIRMAN JACKSON:   I know, but I'm talking about 7 making it clear.
the right to revisit the issue vis-a-vis adequate 2
8           MR.'MATTHEWS:   As you said, reserve the right.         If           !
protection.
such a removal were to take place, that there are regulatory                   ,
3 MR. MATTHEWS:
10 mechanisms to assess it, address it, and if it did threaten                     l 11 adequate protection, that we have mechanisms to ensure that 12 that not happen.                                                               j 13           I believe that that is something we've given you                     !
I'll tell you, I think we're always l
14 an opportunity for in the way that we presented that issue
4 on -- in terms of our processes, always on the lookout for 5
  '15 in the Commission paper.                                                       !
that kind of information, if you will.
16           CHAIRMAN JACKSON:   Right.                                           !
i 6
17           MR. MATTHEWS:   And we did it in such a way that I                   {
CHAIRMAN JACKSON:
E 18 think is reflective, because we had discussions with NEI on                     !
I know, but I'm talking about 7
19 this point. It was not their intent in developing this                       l 20 guidance to support the removal of such information were it 21 to be there.
making it clear.
22           CHAIRMAN JACKSON:   Right. I'm just saying it's a 23 -point of clarity that I think -- I don't know, Karen, if you                   {
8 MR.'MATTHEWS:
24 have any comment you want to make about it, but you could 25 argue that the power exists for the Commission to do it ANN RILEY & ASSOCIATES, LTD.
As you said, reserve the right.
Court Reporters                                           ;
If 9
1025 Connecticut Avenue, NW, Suite 1014                                 :
such a removal were to take place, that there are regulatory 10 mechanisms to assess it, address it, and if it did threaten l
Washington, D.C. 20036 (202) 842-0034                                           .
11 adequate protection, that we have mechanisms to ensure that 12 that not happen.
j 13 I believe that that is something we've given you 14 an opportunity for in the way that we presented that issue
'15 in the Commission paper.
16 CHAIRMAN JACKSON:
Right.
17 MR. MATTHEWS:
And we did it in such a way that I
{
E 18 think is reflective, because we had discussions with NEI on 19 this point.
It was not their intent in developing this l
20 guidance to support the removal of such information were it 21 to be there.
22 CHAIRMAN JACKSON:
Right.
I'm just saying it's a 23
-point of clarity that I think -- I don't know, Karen, if you
{
24 have any comment you want to make about it, but you could 25 argue that the power exists for the Commission to do it ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


49 1 anyway if it relates to adequate protection.     But in terms 2 of truth in advertising, I think it's perhaps worthwhile to 3 --
49 1
4             MS. CYR:   There's always value in re-clarifying 5 that, but I agree the Commission has the power to.
anyway if it relates to adequate protection.
6             CHAIRMAN JACKSON:   So I think maybe I'll certainly 7 make that point. Let me ask you one other question. It 8 really relates to the use of the FSAR in the emergency 9 operations center.
But in terms 2
10             The NRC maintains the updated FSARs in the ops 11 center to aid in the assessment of the plant events.     So the 12 question is, how did the staff factor in the potential use 13 of the updated FSAR for assessing plant events in 14 determining what information could be deleted from the FSAR?
of truth in advertising, I think it's perhaps worthwhile to 3
15             MR. MATTHEWS:   We factored it in by consulting 16 with and working with AEOD, who participated in reviewing 17 the proposed generic letter that offered the opportunity for 18 removal. But more importantly, I think that what's germane 19 to this discussion is the opportunity to go to simplified 20 schematics as opposed to the more detailed P& ids.
4 MS. CYR:
21             The feedback we got was that -- and I think maybe 22 you used this word in your question -- that that information 23 existing in the ops center is an aid to our response.     It l     24 certainly isn't critically relied upon in our response,
There's always value in re-clarifying 5
!    25 given that the immediate response and, of course, the ANN RILEY & ASSOCIATES, LTD.
that, but I agree the Commission has the power to.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
6 CHAIRMAN JACKSON:
So I think maybe I'll certainly 7
make that point.
Let me ask you one other question.
It 8
really relates to the use of the FSAR in the emergency 9
operations center.
10 The NRC maintains the updated FSARs in the ops 11 center to aid in the assessment of the plant events.
So the 12 question is, how did the staff factor in the potential use 13 of the updated FSAR for assessing plant events in 14 determining what information could be deleted from the FSAR?
15 MR. MATTHEWS:
We factored it in by consulting 16 with and working with AEOD, who participated in reviewing 17 the proposed generic letter that offered the opportunity for 18 removal.
But more importantly, I think that what's germane 19 to this discussion is the opportunity to go to simplified 20 schematics as opposed to the more detailed P& ids.
21 The feedback we got was that -- and I think maybe 22 you used this word in your question -- that that information 23 existing in the ops center is an aid to our response.
It l
24 certainly isn't critically relied upon in our response, 25 given that the immediate response and, of course, the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l


1 50            !
50 1
1 dealing with the casualties is the licensee's 1
dealing with the casualties is the licensee's 2
2 responsibility.                                                                         l l
responsibility.
3           There also are plant information books that exist 4 in the ops center that contain information of this type.                 So 5 we assessed it, given that its retention was not something                             <
3 There also are plant information books that exist 4
l 6 we could support by the current regulatory requirements and 7 given that the ops center plays a support role to the 8 licensee, we determined that the removal of it insofar as it i
in the ops center that contain information of this type.
l 9 may allow for the elimination of some detail that, for                                 I 10 example, the reactor safety team may wish they had would not 11 be a serious shortcoming.                                                               J 12           Furthermore, there are FSARs, many of which, in 13 later era, have simplified schematics in them.
So 5
l 14           CHAIRMAN JACKSON:       Let me ask you.           With respect 15 to last summer's break in the fire protection system at 16 WNP-2, which resulted in the flooding of the ECCS rooms, 17 what value would the detailed P& ids have provided in 18 evaluating and understanding the event?
we assessed it, given that its retention was not something l
19           MR. MATTHEWS:       I don't know whether the P& ids were 20 available to the team at that time.                 So this is 21 hypothetical. In my view, it would be of value to aid them, 22 but certainly if they felt they needed details associated 23 with that information, could have gotten that information 24 very promptly, because I think they could have gotten P& ids or that portion of them transmitted electronically without                             I 25 ANN RILEY & ASSOCIATES, LTD.
6 we could support by the current regulatory requirements and 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
given that the ops center plays a support role to the 8
licensee, we determined that the removal of it insofar as it l
9 may allow for the elimination of some detail that, for 10 example, the reactor safety team may wish they had would not 11 be a serious shortcoming.
J 12 Furthermore, there are FSARs, many of which, in 13 later era, have simplified schematics in them.
14 CHAIRMAN JACKSON:
Let me ask you.
With respect 15 to last summer's break in the fire protection system at 16 WNP-2, which resulted in the flooding of the ECCS rooms, 17 what value would the detailed P& ids have provided in 18 evaluating and understanding the event?
19 MR. MATTHEWS:
I don't know whether the P& ids were 20 available to the team at that time.
So this is 21 hypothetical.
In my view, it would be of value to aid them, 22 but certainly if they felt they needed details associated 23 with that information, could have gotten that information 24 very promptly, because I think they could have gotten P& ids 25 or that portion of them transmitted electronically without ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


51         ,
51 1
1 delay.
delay.
2                   So I don't believe we're -- I don't believe                                           :
2 So I don't believe we're -- I don't believe 3
3 personally that we're frustrating efforts to gain required 4 information and I think we have the authority to get it when
personally that we're frustrating efforts to gain required 4
!                  5 we need it.
information and I think we have the authority to get it when 5
6                   Roy, I'd like to turn it back to you.
we need it.
7                   CHAIRMAN JACKSON:             So are you done?
6 Roy, I'd like to turn it back to you.
8                   MR. MATTHEWS:           I am.
7 CHAIRMAN JACKSON:
9                   CHAIRMAN JACKSON:             Well, if you're done, I just 10   want to issue my kudos to you.                             This one -- your buddies
So are you done?
              - 11   here at the table can say I've done this, this, this and 12   this, and this is done, I did this rule.                             You've been 13   working on something that's a very complex set of issues.                                   I 14   think that we've gotten to this point, I think, is amazing l                 15 and I think it's due to work that you've done and people who 16 have been working with you,                                                                             i 17                     So I compliment you, because the Commission, in 18 earlier times, has thought about -- let's call it opening 19 50.59 and looking at some of these other things and has 20 never really gotten to do it, and we're doing it.
8 MR. MATTHEWS:
l                 21                     So I want to not only compliment you, but to thank 22 you.
I am.
23                     MR. MATTHEWS:         Thank you very much.                 I'd like to 24 offer that this is probably -- these topics, interrelated 25 topics have probably occasioned more interaction with the T
9 CHAIRMAN JACKSON:
Well, if you're done, I just 10 want to issue my kudos to you.
This one -- your buddies
- 11 here at the table can say I've done this, this, this and 12 this, and this is done, I did this rule.
You've been 13 working on something that's a very complex set of issues.
I 14 think that we've gotten to this point, I think, is amazing l
15 and I think it's due to work that you've done and people who 16 have been working with you, i
17 So I compliment you, because the Commission, in 18 earlier times, has thought about -- let's call it opening 19 50.59 and looking at some of these other things and has 20 never really gotten to do it, and we're doing it.
l 21 So I want to not only compliment you, but to thank 22 you.
23 MR. MATTHEWS:
Thank you very much.
I'd like to 24 offer that this is probably -- these topics, interrelated 25 topics have probably occasioned more interaction with the T
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


52 1 Commission-than many that I've seen in my 20 years or more 2 here. I think we collectively view that as having been very 3 beneficial whenever it occurred.
52 1
4             COMMISSIONER McGAFFIGAN:                   Madam Chairman, I'll 5 second, but I also think, in this case, it took NEI doing 6 Rev. O to 98-03 to -- and the staff discussions with them, 7 it took two to tango and it's a joint success of both the 8 staff and the industry effort.
Commission-than many that I've seen in my 20 years or more 2
9             CHAIRMAN JACKSON:                 But I would say that it was the 10 Commission that decided that 50.59 needed to be opened up 11 .for review, but I don't disagree with you in terms of having                                     ,
here.
12 gotten to this point.       It took a joint effort.
I think we collectively view that as having been very 3
13             MR. MATTHEKS:         Thank you.
beneficial whenever it occurred.
14             COMMISSIONER MERRIFIELD:                   I'd add mine to 15 Commissioner McGaffigan and the Chairman.                                                         l 1
4 COMMISSIONER McGAFFIGAN:
16             MR. ZIMMERMAN:           If we can move to slide 11, 17 please. Now we're moving to other licensing initiatives 18 that are included in the tasking memo under this grouping of 19 reactor licensing and oversight.                     The way we have this laid 20 out, the first three items are ones that Dave Matthews will 21 address and the remaining five are ones that I will address.
Madam Chairman, I'll 5
l         22             We can take them from the top and work down or we l
second, but I also think, in this case, it took NEI doing 6
23 can.give Dave a rest and we can start on some others.
Rev. O to 98-03 to -- and the staff discussions with them, 7
l         24             CHAIRMAN JACKSON:                   It's time to give Dave a rest l
it took two to tango and it's a joint success of both the 8
25 and work from the bottom.
staff and the industry effort.
l i                                                                                                                i ANN RILEY & ASSOCIATES, LTD.
9 CHAIRMAN JACKSON:
But I would say that it was the 10 Commission that decided that 50.59 needed to be opened up 11
.for review, but I don't disagree with you in terms of having 12 gotten to this point.
It took a joint effort.
13 MR. MATTHEKS:
Thank you.
14 COMMISSIONER MERRIFIELD:
I'd add mine to 15 Commissioner McGaffigan and the Chairman.
16 MR. ZIMMERMAN:
If we can move to slide 11, 17 please.
Now we're moving to other licensing initiatives 18 that are included in the tasking memo under this grouping of 19 reactor licensing and oversight.
The way we have this laid 20 out, the first three items are ones that Dave Matthews will 21 address and the remaining five are ones that I will address.
l 22 We can take them from the top and work down or we l
23 can.give Dave a rest and we can start on some others.
l 24 CHAIRMAN JACKSON:
It's time to give Dave a rest l
l 25 and work from the bottom.
i ANN RILEY & ASSOCIATES, LTD.
i Court Reporters l
i Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 l                                 Washington, D.C. 20036 (202) 842-0034 i
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 (202) 842-0034 i


53 1                                 MR. ZIMMERMAN:                           Okay.                                         l 2                                 MR. MATTHEWS:                           Or at least till we can find his 3       place.                                                                                                           '
53 1
l 4                                 MR. ZIMMERMAN:                           Why don't we start on licensing 5       actions and I'll get a page number.                                           It looks like it's 14.
MR. ZIMMERMAN:
;            6                                 What I'm going to describe are some broad l
Okay.
7       initiatives in the licensing action process area, status of 8       where we are with the timeliness and inventory on our l
l 2
9      licensing actions, and then focus specifically on some 10       initiatives we've had on the requests for additional 11       information or RAI area.
MR. MATTHEWS:
12                                 We have established recently an internal steering 13       group that is headed by Bill Dean that is interfacing with i
Or at least till we can find his 3
i 14       an industry steering group that is headed by Jim Fisacaro 15       and supported through the efforts of NEI.
place.
16                                 This has the potential to be a powerful tool for 17       us.     They have met, I believe, twice thus far and they have 18       a third meeting set for this afternoon.                                           The purpose of this 19       steering committee is to share the areas of what do we think 20       is going well in the area of licensing actions and the 21       process and what are the areas we need to focus on to 22       improve it further.
l 4
23                                 They've spent time talking about the RAI process 24       and dialoging what some of the next steps will be.                                           They're 25       currently working in the box, looking at things that may be i
MR. ZIMMERMAN:
Why don't we start on licensing 5
actions and I'll get a page number.
It looks like it's 14.
6 What I'm going to describe are some broad l
7 initiatives in the licensing action process area, status of l
8 where we are with the timeliness and inventory on our 9
licensing actions, and then focus specifically on some 10 initiatives we've had on the requests for additional 11 information or RAI area.
12 We have established recently an internal steering 13 group that is headed by Bill Dean that is interfacing with i
14 an industry steering group that is headed by Jim Fisacaro i
15 and supported through the efforts of NEI.
16 This has the potential to be a powerful tool for 17 us.
They have met, I believe, twice thus far and they have 18 a third meeting set for this afternoon.
The purpose of this 19 steering committee is to share the areas of what do we think 20 is going well in the area of licensing actions and the 21 process and what are the areas we need to focus on to 22 improve it further.
23 They've spent time talking about the RAI process 24 and dialoging what some of the next steps will be.
They're 25 currently working in the box, looking at things that may be i
)
)
i                                                         ANN RILEY & ASSOCIATES, LTD.
i ANN RILEY & ASSOCIATES, LTD.
l                                                                               Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


_ _ _ _ _ . . _ _ _ . _ _ _ _ . . _ . _ _ _ _ _ . _ _ . _ _ .                              _ . - _    _ _ _ _ _ . _ .      m..    .__ . _ .
m..
54 1               short-term type of deliverables, but they also have 2               recognized that there will come a time that they would like                                                                 !
54 1
3                to be able to bring forward ways of doing business outside f
short-term type of deliverables, but they also have 2
4               the box, ways that licensing matters may be able to be done
recognized that there will come a time that they would like 3
to be able to bring forward ways of doing business outside f
4 the box, ways that licensing matters may be able to be done
[
[
L 5               in a different fashion, less cumbersome, more done by the                                                                   ;
5 in a different fashion, less cumbersome, more done by the L
!        6               utility, with opportunity for oversight by the NRC.
6 utility, with opportunity for oversight by the NRC.
l 7                                                 So there's a plan here that these groups have, 8               both short and long term.                                                                                                   !
l 7
u        9                                               Another benefit of this group is it currently can                                         I l
So there's a plan here that these groups have, 8
(     10                 serve as a lightning rod for us, that if there are issues                                                                   {
both short and long term.
11                 within the industry, concerns on the way we're doing                                                                       ,
9 Another benefit of this group is it currently can u
12                 business, we want that feedback from the industry.                                               We need                   l 13                 to know where the concerns are so we have the opportunity to t
l
14                 address it, and we have asked the industry counterpart of 15                 this licensing action, the process group, to ferret out, l
(
L                                                                                                                                                     I 16                 identify, come forward, get people in contact with us so we 17                 can get that feedback, which is very important for us to see                                                               ,
10 serve as a lightning rod for us, that if there are issues
18                 if we're making the gains and strides that we believe we've                                                                 l 19                 started to do.
{
20                                                   CHAIRMAN JACKSON:       Roy,.can you step back for a 21                 moment and say up front what have been your desired 22                 outcomes?                           What is it that we were trying to get to with 23                 respect to licensing action?
11 within the industry, concerns on the way we're doing 12 business, we want that feedback from the industry.
24                                                   MR. ZIMMERMAN:       Desired outcomes, above all else l
We need l
25                 is that when we issue our safety evaluation, if we approve a i
13 to know where the concerns are so we have the opportunity to t
14 address it, and we have asked the industry counterpart of 15 this licensing action, the process group, to ferret out, l
L I
16 identify, come forward, get people in contact with us so we 17 can get that feedback, which is very important for us to see 18 if we're making the gains and strides that we believe we've l
19 started to do.
20 CHAIRMAN JACKSON:
Roy,.can you step back for a 21 moment and say up front what have been your desired 22 outcomes?
What is it that we were trying to get to with 23 respect to licensing action?
24 MR. ZIMMERMAN:
Desired outcomes, above all else l
25 is that when we issue our safety evaluation, if we approve a i
t f
t f
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
2 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 i                                                                         (202) 842-0034
2 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
                                                                                                        --e -                        - y   sw
20036 i
(202) 842-0034
--e y
sw


i
i
                                                                                                \
\\
55 1                     licensing action, that it is done in a quality way, that we 2                     are maintaining safety, and when we sign it out, we feel we 3                     can stand behind it, that it was appropriate to issue this 4                     licensing action, whether it be for a tech spec amendment, 5                     change to an individual portion of the license, an exemption 6                     or a relief.
55 1
7                                 And in that area, we think overall we've been 8                     quite successful. However, the timeliness of our actions 9                     has not been -- that we have not met the goals that we have 10                     established for ourselves in past years and we recognize 11                     that we need to look at making some fundamental changes to 12                     the way we do business, so that we can improve our 13                     timeliness, but not at the expense of the quality of the 14                     safety review.
licensing action, that it is done in a quality way, that we 2
15                                 And it's important for us as we try to work on 16                     that timeliness that we continue to reinforce to the staff 17                     that quality comes first and if we need to ask questions in 18                     an RAI, we're going to ask those questions. We're going to 19                     maintain that gatekeeper role.
are maintaining safety, and when we sign it out, we feel we 3
20                                 But we want to look for other ways of being able 21                     to gain the information, perhaps using the telephone more 22                     often, having management meetings, by sending letters back 23                     and.forth. We're looking for ways of gaining efficiency; 24                     not to give up on the safety side, but to be able to reduce 25                     unnecessary regulatory burden due to the length of time that ANN RILEY & ASSOCIATES, LTD.
can stand behind it, that it was appropriate to issue this 4
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 f
licensing action, whether it be for a tech spec amendment, 5
b - -       _ _ _ _ . _ _ _ _ _
change to an individual portion of the license, an exemption 6
or a relief.
7 And in that area, we think overall we've been 8
quite successful.
However, the timeliness of our actions 9
has not been -- that we have not met the goals that we have 10 established for ourselves in past years and we recognize 11 that we need to look at making some fundamental changes to 12 the way we do business, so that we can improve our 13 timeliness, but not at the expense of the quality of the 14 safety review.
15 And it's important for us as we try to work on 16 that timeliness that we continue to reinforce to the staff 17 that quality comes first and if we need to ask questions in 18 an RAI, we're going to ask those questions.
We're going to 19 maintain that gatekeeper role.
20 But we want to look for other ways of being able 21 to gain the information, perhaps using the telephone more 22 often, having management meetings, by sending letters back 23 and.forth.
We're looking for ways of gaining efficiency; 24 not to give up on the safety side, but to be able to reduce 25 unnecessary regulatory burden due to the length of time that ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 f
b - -


l
l 56 l
!                                                                                                        56 l
l 1
l           1   it takes us to be able to issue the actions.
it takes us to be able to issue the actions.
l           2                 It was with that backdrop that led to the
l 2
!                                                                                                                        i 3   development of this steering group, because, again, as we i
It was with that backdrop that led to the i
4   think we're making progress, we need stakeholder feedback 5   and this is an opportunity to gain it.                               If this group is 6   used as a focal point for the industry and they meet on, 7   ballpark, a monthly basis, then we can find out from this
3 development of this steering group, because, again, as we i
!          8  group whether, in fact, they're seeing a reduction in RAIs, 9   are the RAIs on point, are we asking appropriate questions, 10   does the NRC really need that information, issues associated 11   with timeliness and so forth.
4 think we're making progress, we need stakeholder feedback 5
12                  So I see this group doing -- as multi-faceted.
and this is an opportunity to gain it.
l 13   It's serving that mouthpiece role for us, but they're also 14   helping bring in inventive, creative ideas that we need to                                               ,
If this group is 6
15   stay open-minded to, to look for ways that we could possibly
used as a focal point for the industry and they meet on, 7
,        16   do business different.
ballpark, a monthly basis, then we can find out from this 8
l i                                                                                                                       ,
group whether, in fact, they're seeing a reduction in RAIs, 9
l         17                 CHAIRMAN JACKSON:                     So you would say the l
are the RAIs on point, are we asking appropriate questions, 10 does the NRC really need that information, issues associated 11 with timeliness and so forth.
18   overarching goals then are quality and timeliness.                                                       l 19                 MR. ZIMMERMAN:                 Yes.
l So I see this group doing -- as multi-faceted.
20                 CHAIRMAN JACKSON:                     Improving timeliness.
12 13 It's serving that mouthpiece role for us, but they're also 14 helping bring in inventive, creative ideas that we need to 15 stay open-minded to, to look for ways that we could possibly 16 do business different.
21                 MR. ZIMMERMAN:                 Yes.                                                       ;
l i
'                                                                                                                        l 22                 CHAIRMAN JACKSON:                     Okay.                                               l 23                 COMMISSIONER McGAFFIGAN:                     Madam Chairman, one of 24   the things that I found most interesting and hasn't really 25
l 17 CHAIRMAN JACKSON:
:    been highlighted by the staff in the briefings that I've I
So you would say the l
ANN RILEY & ASSOCIATES, LTD.
18 overarching goals then are quality and timeliness.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
l 19 MR. ZIMMERMAN:
Yes.
20 CHAIRMAN JACKSON:
Improving timeliness.
21 MR. ZIMMERMAN:
Yes.
t 22 CHAIRMAN JACKSON:
Okay.
23 COMMISSIONER McGAFFIGAN:
Madam Chairman, one of 24 the things that I found most interesting and hasn't really been highlighted by the staff in the briefings that I've 25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


0 57 1 heard is this new NRR guide on processing licensing actions, 2 for the first time risk-informs it, to some extent, in the 3 sense that the resources that are agreed to up front depend 4 on the risk significance of the licensing action, and I --               l 5           CHAIRMAN JACKSON:             Right. That's the point.
0 57 1
6           COMMISSIONER McGAFFIGAN:             I thought that was one   I 7 of the more interesting things in the draft guide.               I don't 8 know whether you've gotten any comments from industry about 9 that notion embedded, that there will be more resources, if 10 it's a more complicated risk significant license amendment.               l l
heard is this new NRR guide on processing licensing actions, 2
11           MR. ZIMMERMAN:             The increase in priority on the 12 risk-informed licensing actions.                                         !
for the first time risk-informs it, to some extent, in the 3
13           COMMISSIONER McGAFFIGAN:             It isn't just that.
sense that the resources that are agreed to up front depend 4
on the risk significance of the licensing action, and I --
5 CHAIRMAN JACKSON:
Right.
That's the point.
6 COMMISSIONER McGAFFIGAN:
I thought that was one 7
of the more interesting things in the draft guide.
I don't 8
know whether you've gotten any comments from industry about 9
that notion embedded, that there will be more resources, if 10 it's a more complicated risk significant license amendment.
11 MR. ZIMMERMAN:
The increase in priority on the 12 risk-informed licensing actions.
13 COMMISSIONER McGAFFIGAN:
It isn't just that.
14 It's that the relative risk significance of the amendment 15 request will impact the amount of resources the staff 16 devotes to the review in this treaty that gets negotiated up 17 front as to how -- you know, what is the staff expectation 18 as to resources required to process the amendment.
14 It's that the relative risk significance of the amendment 15 request will impact the amount of resources the staff 16 devotes to the review in this treaty that gets negotiated up 17 front as to how -- you know, what is the staff expectation 18 as to resources required to process the amendment.
19           You have embedded in your resources a risk 20 significance, I think.           That's what plain English seems to 21 say.
19 You have embedded in your resources a risk 20 significance, I think.
22           11R . ZIMMERMAN:           There is a cross-cut issue here 23 that we're sensitive to.             We have the Bill Dean steering 24 committee on licensing action process.             We have the Gary 25 Holahan risk-informed licensing panel.             What we're doing is ANN RILEY & ASSOCIATES, LTD.
That's what plain English seems to 21 say.
22 11R. ZIMMERMAN:
There is a cross-cut issue here 23 that we're sensitive to.
We have the Bill Dean steering 24 committee on licensing action process.
We have the Gary 25 Holahan risk-informed licensing panel.
What we're doing is ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 I
1025 Connecticut Avenue, NW, Suite 1014 I
Washington, D.C. 20036 (202) 842-0034
Washington, D.C.
20036 (202) 842-0034


0 58 1 making sure those organizations talk to each other, so that 2 we stay closely coupled between the efforts within Gary's 3 panel and the efforts within Bill's, so that we try to avoid 4 miscommunications, left-hand /right-hand problems, by i
0 58 1
5 maintaining that dialogue, by members of each group talking 6 to each other, by members of each group sitting in on the 7 other's panels.                                                     ;
making sure those organizations talk to each other, so that 2
8           So we think that's -- we have -- the bottom line 9 is we have high hopes on what we can gain from this group, t
we stay closely coupled between the efforts within Gary's 3
10           One of the first -- I sat in on the very first 11 meeting where they were -- the development meeting, and it           t 12 was interesting because we're not sure exactly what kind of 13 issues are we going to hear about. And the first issue that i
panel and the efforts within Bill's, so that we try to avoid 4
14 came across is industry would like to have an opportunity to 15 talk to us more, to be able to feel comfortable that they 16 can pick up the phone and talk with us and that we have a           j 17 willingness and that we'll demonstrate that coming through           ;
miscommunications, left-hand /right-hand problems, by i
t 18 the phone lines, to be able to talk with us, and without a           !
5 maintaining that dialogue, by members of each group talking 6
19 concern or fear that their questions will be considered t
to each other, by members of each group sitting in on the 7
other's panels.
8 So we think that's -- we have -- the bottom line 9
is we have high hopes on what we can gain from this group, t
10 One of the first -- I sat in on the very first 11 meeting where they were -- the development meeting, and it t
12 was interesting because we're not sure exactly what kind of 13 issues are we going to hear about.
And the first issue that i
14 came across is industry would like to have an opportunity to 15 talk to us more, to be able to feel comfortable that they 16 can pick up the phone and talk with us and that we have a j
17 willingness and that we'll demonstrate that coming through t
18 the phone lines, to be able to talk with us, and without a 19 concern or fear that their questions will be considered t
20 inappropriate.
20 inappropriate.
21           That sounds pretty easy to do. That's not one of 22 the more complex issues for us. So it's a matter of just         -
21 That sounds pretty easy to do.
23 dialoging with the staff, making the staff sensitive to the l
That's not one of 22 the more complex issues for us.
24 fact that we've got -- the first words that came forward 25 were that, just the discussion on early and frequent                 ;
So it's a matter of just 23 dialoging with the staff, making the staff sensitive to the l
ANN RILEY & ASSOCIATES, LTD.
24 fact that we've got -- the first words that came forward 25 were that, just the discussion on early and frequent ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 4


59 1 dialogue, and we feel that we've communicated that through 2 our training and our staff meetings.
59 1
3             The aspect of establishing schedules is an area 4 that we definitely need to improve upon and there's also 5 room for improvement within the industry, and the steering 6 group can help us here, as well.                           We have efforts underway 7 to try to have more realistic due dates for when we're going 8 to complete our activities.                           Licensing actions is just a 9 piece of that.                         You could apply it to other tasks that NRR 10 does and we recognize that that's not one of our strengths 11 right now.
dialogue, and we feel that we've communicated that through 2
12             The ability to change the due date does not have 13 the rigor to it that it needs.                           So we're improving our 14 processes to bring that forward, building the infrastructure 15 so we can come up with realistic due dates.
our training and our staff meetings.
16             The industry, likewise, we need to have a dialogue 17 with the industry to know that if we send out an RAI, what's 18 their time-frame for responding.                           Sometimes they may elect 19 to put it on hold because they're getting ready to go into 20 an outage or whatever and being able to see down the road 21 the success path or ultimate conclusion and a schedule is 22 important to us.
3 The aspect of establishing schedules is an area 4
23             So we're working in identifying what I will call 24 firm dates agreed upon for how the process will follow in 25 licensing actions.
that we definitely need to improve upon and there's also 5
room for improvement within the industry, and the steering 6
group can help us here, as well.
We have efforts underway 7
to try to have more realistic due dates for when we're going 8
to complete our activities.
Licensing actions is just a 9
piece of that.
You could apply it to other tasks that NRR 10 does and we recognize that that's not one of our strengths 11 right now.
12 The ability to change the due date does not have 13 the rigor to it that it needs.
So we're improving our 14 processes to bring that forward, building the infrastructure 15 so we can come up with realistic due dates.
16 The industry, likewise, we need to have a dialogue 17 with the industry to know that if we send out an RAI, what's 18 their time-frame for responding.
Sometimes they may elect 19 to put it on hold because they're getting ready to go into 20 an outage or whatever and being able to see down the road 21 the success path or ultimate conclusion and a schedule is 22 important to us.
23 So we're working in identifying what I will call 24 firm dates agreed upon for how the process will follow in 25 licensing actions.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


4 o
4 o
60 1                                 One of the initiatives that we've begun now is 2             ' initial. acceptance reviews.                                         Because of the inventory that 3               we have, a review can come in and it can get prioritized                                                                     j
60 1
                      .4               perhaps at a lower priority.                                               It may not get looked at for 5               several months and then if we look at it, we may find that
One of the initiatives that we've begun now is 2
' initial. acceptance reviews.
Because of the inventory that 3
we have, a review can come in and it can get prioritized j
.4 perhaps at a lower priority.
It may not get looked at for 5
several months and then if we look at it, we may find that
(
(
l 6               it has serious flaws that don't allow us to do anything with 7               it because there's some information that's missing that's                                                                   ,
6 it has serious flaws that don't allow us to do anything with l
l                       8                fundamental to the' review.
7 it because there's some information that's missing that's l
8 fundamental to the' review.
i 1
l 9
We lost a period of time, when we send that news 1
10 back to the utility.
So initial acceptance reviews are 11 beginning to be conducted by the project manager.
I'll call 12 it a quick look.
It's something to be done within a 13 one-week period upon arrival.
There is guidance that has i
14 been provided to the project managers in our in-office i
l 15 procedure 803.
There's training that's ongoing to train the 16 staff in what to look for.
17 It's aimed at trying to identify missing 18 information that is sufficiently glaring, that we can send 19 it back to the utility, make them aware of it, and they can 20 improve upon their submittal.
And hopefully, by the time 21 that information comes in, our staff, the tech staff will be 22 ready to perform their review and we are able to cut out a 23-chunk of time that otherwise could have been lost.
24 Another important piece is lessons learned.
If, 25 in fact, we have cases where we believe there are these i
ANN RILEY & ASSOCIATES, LTD.
[
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i
i 1
i 1
l                      9                                We lost a period of time, when we send that news 1
10                back to the utility.                                So initial acceptance reviews are 11                beginning to be conducted by the project manager.                                                              I'll call 12                it a quick look.                      It's something to be done within a 13                one-week period upon arrival.                                              There is guidance that has i
14                been provided to the project managers in our in-office                                                                        i l
15                procedure 803.                  There's training that's ongoing to train the 16                staff in what to look for.
17                                  It's aimed at trying to identify missing 18                information that is sufficiently glaring, that we can send                                                                    l 19                it back to the utility, make them aware of it, and they can 20                improve upon their submittal.                                              And hopefully, by the time 21                that information comes in, our staff, the tech staff will be 22                ready to perform their review and we are able to cut out a 23-                chunk of time that otherwise could have been lost.
24                                  Another important piece is lessons learned.                                                      If, 25                  in fact, we have cases where we believe there are these l
i                                                                ANN RILEY & ASSOCIATES, LTD.                                                                        l
[                                                                                    Court Reporters                                                                  !
1025 Connecticut Avenue, NW, Suite 1014                                                                            l Washington, D.C. 20036 (202) 842-0034                                                                i i
l 1


    = _ . _ _       ___ . _ . _ _ _ . ~ . _ _ _ _ _ _ _ . - . _ . _ _ _ _ _ . . _ . _ . . _ _ , , _ . _ .
= _. _ _
61 l 1 glaring issues, we want to get this information back not 2 only to the utility so that they can improve upon it next
___. _. _ _ _. ~. _ _ _ _ _ _ _. -. _. _ _ _ _ _.. _. _.. _ _,, _. _.
61 l
1 glaring issues, we want to get this information back not 2
only to the utility so that they can improve upon it next
{
{
3 time, but we also want to get it back to the steering                                                                     I 4 committee.                                   Maybe in generic terms, specific, not to create                             .
3 time, but we also want to get it back to the steering I
5 those types of issues,.but to try to get the word spread                                                                 ;
4 committee.
6 that a utility fell short of the mark in this manner and try l
Maybe in generic terms, specific, not to create 5
7 to elicit and leverage the industry group to help spread the                                                             ;
those types of issues,.but to try to get the word spread 6
8 word.
that a utility fell short of the mark in this manner and try l
l               9                                       We can do it through generic communications, but 10 there's a role for the industry here that's been expressed 11 to them, as well.
7 to elicit and leverage the industry group to help spread the 8
12                                         Increasing staff accountability is really l               13 reflecting on those words, not really what I want to say.
word.
14 It's really increasing management and staff accountability.                                                               i 15 The staff will do what we ask them to do, that makes sense                                                               !
l 9
16 and there's a logic behind it and it's laid out in an 17 orderly way.
We can do it through generic communications, but 10 there's a role for the industry here that's been expressed 11 to them, as well.
18                                       The first thing that has to happen is management 19 has to lay out expectations.                                                               We have to say that the past, 20 the ability to change due dates without rigor is not 21 appropriate.                                         Management expects to set realistic due dates.
12 Increasing staff accountability is really l
13 reflecting on those words, not really what I want to say.
14 It's really increasing management and staff accountability.
i 15 The staff will do what we ask them to do, that makes sense 16 and there's a logic behind it and it's laid out in an 17 orderly way.
18 The first thing that has to happen is management 19 has to lay out expectations.
We have to say that the past, 20 the ability to change due dates without rigor is not 21 appropriate.
Management expects to set realistic due dates.
22 The way we come up with the date will be based on a process.
22 The way we come up with the date will be based on a process.
23 So we arrived at a date that is meaningful and we think 24 we're going to meet that date and we expect that we're going 25 to meet that date.
23 So we arrived at a date that is meaningful and we think 24 we're going to meet that date and we expect that we're going 25 to meet that date.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


62 1             And then if something happens in the future and 2 there is a reasonable reason why we didn't, we'll look at 3 extending it, if it's appropriate.                                   We have to start with a                       '
62 1
4 premise that these dates are to be met and that's                                                                   I 5 management's job to make that expectation known and that's 6 not something that we have done as well in NRR as we need to 7 do. So the expectation on' timeliness.
And then if something happens in the future and 2
8             The expectation on the threshold for asking 9 questions, done carefully so that we don't turn off 10 questions, but that we make sure that we're within bounds, 11 that have discipline to the process.                                   And then in order for 12 this to work, on a personal level, it has to make its way 13 into the performance appraisal process.                                   People need to be 14 rewarded when they perform along the lines of what 15 management's expectations are and there needs to be 16 accountability after management's expectation has been made 17 known, if we aren't completing things on time.
there is a reasonable reason why we didn't, we'll look at 3
18               So it has to follow through the process entirely.
extending it, if it's appropriate.
19 So there's work to be done on the infrastructure of our 20 performance appraisal process that I don't want to minimize,                                                         '
We have to start with a 4
21 because there's effort that's involved in going r.hrough and l               22 doing this right and that's what we're going to do.
premise that these dates are to be met and that's I
l l               23             Arthur Andersen has been working with us from our 24 tasking order.                       One of the areas that we asked them to help l
5 management's job to make that expectation known and that's 6
l               25 us with was centralizing work load management.                                                     It was an       i i
not something that we have done as well in NRR as we need to 7
l ANN RILEY & ASSOCIATES, LTD.
do.
Court Reporters l                           1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
So the expectation on' timeliness.
8 The expectation on the threshold for asking 9
questions, done carefully so that we don't turn off 10 questions, but that we make sure that we're within bounds, 11 that have discipline to the process.
And then in order for 12 this to work, on a personal level, it has to make its way 13 into the performance appraisal process.
People need to be 14 rewarded when they perform along the lines of what 15 management's expectations are and there needs to be 16 accountability after management's expectation has been made 17 known, if we aren't completing things on time.
18 So it has to follow through the process entirely.
19 So there's work to be done on the infrastructure of our 20 performance appraisal process that I don't want to minimize, 21 because there's effort that's involved in going r.hrough and l
22 doing this right and that's what we're going to do.
l l
23 Arthur Andersen has been working with us from our 24 tasking order.
One of the areas that we asked them to help l
l 25 us with was centralizing work load management.
It was an i
i l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


_    ...__.m_     _ _. - . _ _ .        ___ _ _ _ _ _ - . . _ . _ _ . . . . . . . - _ _ _ _ . _ _ _ _ . _ . . _ . . . _ _ . . _ _ _
...__.m_
t 63 1   area that we felt needed work, particularly for the reason                                                                                 j 2   that I had indicated about our due dates. So they have                                                                                     !
t 63 1
l 3  helped us in this area and we have been briefed on their 4   thoughts.
area that we felt needed work, particularly for the reason j
5                       They worked with our focus groups, so really what 6   they've been doing is facilitating our staff in discussions.                                                                                 I 7 But what we envision is moving to a central clearinghouse, 8 where all tasks coming into NRR are going to go through a 9   central clearinghouse, a group of individuals, not sure of 10   the number yet, it's still conceptual, whether it's in the 11   range of three to five, something like that, that are going                                                                                 ;
2 that I had indicated about our due dates.
I 12   to broker assignment of work and we'll have information 13   available in order to be able to accomplish that.                                                                                           '
So they have 3
14                         They will have the ability in this vision to be 15   able to have on-line capability to look at the individual 16   work load through, say, a year, so that work can be                                                                                         i 17   levelized across the office, factor in leave, factor in a 18   certain amount of sick leave, put in educated assumptions 19   for a number of green tickets, number of SRMs, load this l
helped us in this area and we have been briefed on their 4
20   document, and then work to manage it, to equalize the work 21   load.
thoughts.
22                         We may find that we have cases where we have 23   fungibility issues.                           We may find that we have some lightly 24   loaded areas and we need to do some cross training in order I         25   to put the resources where they need to go, l
5 They worked with our focus groups, so really what 6
1 l
they've been doing is facilitating our staff in discussions.
[                                         IJRJ RILEY & ASSOCIATES, LTD.
7 But what we envision is moving to a central clearinghouse, 8
l                                                         Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
where all tasks coming into NRR are going to go through a 9
            -    __                    _          .        _              .                                            _          ~-- _ _.-- - - -    ,.
central clearinghouse, a group of individuals, not sure of 10 the number yet, it's still conceptual, whether it's in the 11 range of three to five, something like that, that are going I
12 to broker assignment of work and we'll have information 13 available in order to be able to accomplish that.
14 They will have the ability in this vision to be 15 able to have on-line capability to look at the individual 16 work load through, say, a year, so that work can be i
17 levelized across the office, factor in leave, factor in a 18 certain amount of sick leave, put in educated assumptions 19 for a number of green tickets, number of SRMs, load this l
20 document, and then work to manage it, to equalize the work 21 load.
22 We may find that we have cases where we have 23 fungibility issues.
We may find that we have some lightly 24 loaded areas and we need to do some cross training in order I
25 to put the resources where they need to go, l
l
[
IJRJ RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
~-- _


l i                                                                      ,
i l
4 64 l
4 64 l
1             This will remove -- it will bring it to a central 2   place and I think that that objectivity and standard way of 3   doing business, although quite challenging, I think, will l
1 This will remove -- it will bring it to a central 2
pay us dividends.
place and I think that that objectivity and standard way of l
5             CHAIRMAN JACKSON:   How does that play off of your 6   use of your operating plan?                                         l 7             MR. ZIMMERMAN:   The direction that we're currently 8   headed with our operating plan is to reshape it, to a 9   degree, to take the significant new initiatives that we have 10   to work on -- there's a lot of work to make this vision come 1
3 doing business, although quite challenging, I think, will 4
11   to light -- and incorporate this into our operating plan, 12   such that the milestones in order to do this, the scoping 13   effort to figure out what is this going to cost in hardware 14   and software and people and to look at what it's going to 15   take to actually make this work, we've got to go through it 16   by the numbers in the operating plan with milestones.
pay us dividends.
i 17             One last concept on this is the concept of what         !
5 CHAIRMAN JACKSON:
I 18   was called a knowledge-based operation, where lessons 19   learned are factored back in, perhaps through an electronic 20   note system, to inform the next one in line that I just did 21   a review in this area and there were a couple of pitfalls.
How does that play off of your 6
22   I went to this SRP for review, because I really wasn't sure 23   if that was the right one or not, and I spent a day looking         .
use of your operating plan?
l 24   at it before I realized I really want to go to this other 25   one.
7 MR. ZIMMERMAN:
The direction that we're currently 8
headed with our operating plan is to reshape it, to a 9
degree, to take the significant new initiatives that we have 10 to work on -- there's a lot of work to make this vision come 1
11 to light -- and incorporate this into our operating plan, 12 such that the milestones in order to do this, the scoping 13 effort to figure out what is this going to cost in hardware 14 and software and people and to look at what it's going to 15 take to actually make this work, we've got to go through it 16 by the numbers in the operating plan with milestones.
i 17 One last concept on this is the concept of what 18 was called a knowledge-based operation, where lessons 19 learned are factored back in, perhaps through an electronic 20 note system, to inform the next one in line that I just did 21 a review in this area and there were a couple of pitfalls.
22 I went to this SRP for review, because I really wasn't sure 23 if that was the right one or not, and I spent a day looking 24 at it before I realized I really want to go to this other 25 one.
i t
i t
!                    ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
!                            Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


i i
i i
                                    ,                                                                    65 1                       Whatever the lessons learned are, trying to 2       capture them so that we can improve our efficiency by 3       sharing our knowledge within the review.                     So it's sort of a l             4       post-mortem at the completion of the task, when appropriate.
65 1
5                       Each one of these issues has a cost associated i             6     with it.         So we need to proceed in a careful, methodical l
Whatever the lessons learned are, trying to 2
l             7       way. We need to bring this to the executive council and 8       discuss what we're considering doing.                     This, if it does 9       work, could very well have implications of potential for 10       other offices as well.
capture them so that we can improve our efficiency by 3
1 f
sharing our knowledge within the review.
11                         The last bullet on this page is moving toward a                               l
So it's sort of a l
\
4 post-mortem at the completion of the task, when appropriate.
l 12       more function-based organization.                     Our new reorganization is 13       less matrixed and should assist us by having the projects 14       and a good portion of our technical staff under one I
5 Each one of these issues has a cost associated i
l           15       associate.
6 with it.
l
So we need to proceed in a careful, methodical l
!            16                         With those resources located under one manager, 1
l 7
l           17       the brokering of priority challenges is easier done than l
way.
18       what's being done in two separate organizations.                     So we feel 19       that the new organization is going to help knock down some 20       of the challenges that we've had in conflicting priorities.
We need to bring this to the executive council and 8
21                         The decision will not need to bubble up to the 22       office director for resolution.                   It could be dealt with at 23       the associate level.
discuss what we're considering doing.
24                         Trend charts for licensing actions.             I will go 25       through this quickly and try to pick the pace up.                     Fiscal i
This, if it does 9
a l                                         ANN RILEY & ASSOCIATES, LTD.
work, could very well have implications of potential for 10 other offices as well.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
f 11 The last bullet on this page is moving toward a
\\
12 more function-based organization.
Our new reorganization is 13 less matrixed and should assist us by having the projects 14 and a good portion of our technical staff under one I
l 15 associate.
l 16 With those resources located under one manager, 1
l 17 the brokering of priority challenges is easier done than l
18 what's being done in two separate organizations.
So we feel 19 that the new organization is going to help knock down some 20 of the challenges that we've had in conflicting priorities.
21 The decision will not need to bubble up to the 22 office director for resolution.
It could be dealt with at 23 the associate level.
24 Trend charts for licensing actions.
I will go 25 through this quickly and try to pick the pace up.
Fiscal i'
a l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


1 66   i l
1 66 i
1 year   99 first quarter results are in.       It was quite a good   .
1 year 99 first quarter results are in.
I 2  quarter for us. The total inventory of licensing actions 3 was reduced by 16 percent.       The items greater than three 4 years old was reduced by 41 percent and the items greater 5 than two to three years old, in that window, were reduced 52 6 percent.
It was quite a good 2
7             Now, I must also bring out that as we went after 8 this effort, we had an initiative to look at our oldest 9 licensing actions and we went back to licensees and asked 10 them that, we've had this for three years, it hasn't been 11 attached on it, you haven't called us, we haven't called 12 you, do you really still need this.       As a result of that 13 effort, 68 licensing actions were withdrawn.
quarter for us.
14             If you take that 68 away, which is really, we 15   expect, a one-time effort, we don't expect to be seeing that 16   in future quarters. If you take that away from the total 17   number that we did, which was 545, the number that we 18   completed is still almost 60 licensing actions greater than 19   we had budgeted in our operating plan.
The total inventory of licensing actions 3
20             This is new information.     The news is good, but 21 now we have to understand it.     We need to analyze it to 22 understand what is it telling us, what is the labor rate; if 23 this got done to this extent, did something else not get 24 done. So we need to go through all our planned 25 accomplishments and make that comparison to be able to ANN RILEY & ASSOCIATES, LTD.
was reduced by 16 percent.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
The items greater than three 4
years old was reduced by 41 percent and the items greater 5
than two to three years old, in that window, were reduced 52 6
percent.
7 Now, I must also bring out that as we went after 8
this effort, we had an initiative to look at our oldest 9
licensing actions and we went back to licensees and asked 10 them that, we've had this for three years, it hasn't been 11 attached on it, you haven't called us, we haven't called 12 you, do you really still need this.
As a result of that 13 effort, 68 licensing actions were withdrawn.
14 If you take that 68 away, which is really, we 15 expect, a one-time effort, we don't expect to be seeing that 16 in future quarters.
If you take that away from the total 17 number that we did, which was 545, the number that we 18 completed is still almost 60 licensing actions greater than 19 we had budgeted in our operating plan.
20 This is new information.
The news is good, but 21 now we have to understand it.
We need to analyze it to 22 understand what is it telling us, what is the labor rate; if 23 this got done to this extent, did something else not get 24 done.
So we need to go through all our planned 25 accomplishments and make that comparison to be able to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i


G7 1     understand what this is telling us.
G7 1
2                         So this is raw data at this standpoint.                                             I tried 3     to do some quick off-the-top-of-the-head thinking in 4     preparation for this meeting, not having that information.
understand what this is telling us.
5     We went through a period of non-reactive time from a plant 6     performance scandpoint.                                   In comparison to other times, it i
2 So this is raw data at this standpoint.
7     was generally good performance by utilities that created                                                               1 8     less reactive issues for us, more project manager time 9     available.
I tried 3
10                           We've been working on that initiative, to be able 11     to have PMs spend more time working on licensing action and 12     less on the PM focus area.                                       But we need to pull the string 13     and see what the reasons are for the accomplishments.
to do some quick off-the-top-of-the-head thinking in 4
14                           CHAIRMAN JACKSON:                               Yes, because I was going to ask 15     a question.                 I noted this run-up between the August and l                   16     December time-frame in the percent of your inventory that is l
preparation for this meeting, not having that information.
17     less than a year old.                                 So the question is, you know, but 18     that's also the time-frame over which you've been able to l
5 We went through a period of non-reactive time from a plant 6
19     work down the greater than three year old inventory.
performance scandpoint.
20                             So what you say, I think, will allow you to get at 21     that question.
In comparison to other times, it i
22                             MR. ZIMMERMAN:                         Requests for additional 23      inf o rmation.                 As I mentioned, RAIs are an important role for 24     us. They're an important tool that we need to maintain.                                                             j 25     But what we need to do is ensure that we have appropriate i
7 was generally good performance by utilities that created 8
less reactive issues for us, more project manager time 9
available.
10 We've been working on that initiative, to be able 11 to have PMs spend more time working on licensing action and 12 less on the PM focus area.
But we need to pull the string 13 and see what the reasons are for the accomplishments.
14 CHAIRMAN JACKSON:
Yes, because I was going to ask 15 a question.
I noted this run-up between the August and l
16 December time-frame in the percent of your inventory that is 17 less than a year old.
So the question is, you know, but 18 that's also the time-frame over which you've been able to l
19 work down the greater than three year old inventory.
20 So what you say, I think, will allow you to get at 21 that question.
22 MR. ZIMMERMAN:
Requests for additional inf rmation.
As I mentioned, RAIs are an important role for 23 o
24 us.
They're an important tool that we need to maintain.
j 25 But what we need to do is ensure that we have appropriate i
i i
i i
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
'                                                                          Court Reporters 1025 Connecticut Avenue, NW, Suite 1014                                                               ]
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014
Washington, D.C. 20036                                                           j i                                                                            (202) 842-0034                                                       '
]
Washington, D.C.
20036 j
(202) 842-0034 i
l
l


                                                                                                                                              <    l 68 i
68 i
1       discipline in the process.                                           We need not be asking for 2       additional information if that information is not germane 3       and absolutely needed for us to be able to make our 4       decision.                     We have to have that rigor in our process.                       We 1                                                                                                                                               ,
1 discipline in the process.
l               5       have to be able to trace our questions back to regulatory 6       bases.                                                                                                                 !
We need not be asking for 2
7                                     We want to limit the number of RAIs.                       If there is                   !
additional information if that information is not germane 3
8        a reason to go greater than one round of RAIs, then we will.
and absolutely needed for us to be able to make our 4
9       It's not a carte blanch that we won't exceed it.
decision.
10                                     What we're trying to drive toward is getting out                                         E 11         of letter-writing campaigns.                                           We want to try to facilitate                   l l             12         resolution of the issues.                                           We want to communicate with the                   .
We have to have that rigor in our process.
13         utility involved to make sure they understand our point of                                                             s i
We 1
i 14         view and we understand theirs.                                                                                         !
l 5
I             15                                     So the use of meetings and use of telephones, it's l
have to be able to trace our questions back to regulatory 6
16         important that ultimately we have docketed information to be                                                           !
bases.
17         able to support.                                     So if there's meetings and telephone                             ;
7 We want to limit the number of RAIs.
              '18         calls, we want to make sure we get that information on the i
If there is 8
19         docket, but we want to use these other tools more than we 20         have in the past, even though we have used them in the past.                                                           i 21         We want to increase their use and be very sensitive to the 22         length of time that gets lost with letter-writing going back                                                           L 23         and forth.
a reason to go greater than one round of RAIs, then we will.
24                                       COMMISSIONER McGAFFIGAN:                       Madam Chairman, could I                   ;
9 It's not a carte blanch that we won't exceed it.
25         ask?                                                                                                                     l P
10 What we're trying to drive toward is getting out E
11 of letter-writing campaigns.
We want to try to facilitate l
l 12 resolution of the issues.
We want to communicate with the 13 utility involved to make sure they understand our point of s
i i
14 view and we understand theirs.
I 15 So the use of meetings and use of telephones, it's l
16 important that ultimately we have docketed information to be 17 able to support.
So if there's meetings and telephone
'18 calls, we want to make sure we get that information on the i
19 docket, but we want to use these other tools more than we 20 have in the past, even though we have used them in the past.
i 21 We want to increase their use and be very sensitive to the 22 length of time that gets lost with letter-writing going back L
23 and forth.
24 COMMISSIONER McGAFFIGAN:
Madam Chairman, could I 25 ask?
l P
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
f
f Court Reporters i.
: i.                                                                                 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036                                                 J (202) 842-0034
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 J
(202) 842-0034


69             l 1                         CHAIRMAN JACKSON:                 Please.
69 l
2                         COMMISSIONER McGAFFIGAN:                   This issue may go away, 3 but as you know, one of the complaints that we have received 4 over the years is when they take two or three years to 5 review our changes and the new reviewer brings a different 6 perspective perhaps and asks new RAIs, which the licensee 7 may have thought they already had put to bed with the 8 previous reviewer.
1 CHAIRMAN JACKSON:
9                         Is that something -- if you shorten the                                                           I l-l         10 time-frames, that won't happen as much.                                       But is there 11 anything in that area that you have done?
Please.
12                         MR. ZIMMERMAN:                 I thank you for bringing it up, l
2 COMMISSIONER McGAFFIGAN:
l         13 because I neglected to bring it up.                               That is an issue.                   It's l
This issue may go away, 3
l         14 a valid issue that we have had cases where that has occurred
but as you know, one of the complaints that we have received 4
!        15 and one of the efforts that we have underway is to minimize                                                             !
over the years is when they take two or three years to 5
l L         16' those opportunities for occurrence.                               Again, as we shorten                                 ,
review our changes and the new reviewer brings a different 6
l        17 it, that in itself-minimizes it, but we want to be very i
perspective perhaps and asks new RAIs, which the licensee 7
18 sensitive to not be changing reviewers in mid-stream and we f
may have thought they already had put to bed with the 8
19 want to make sure that's a very conscious decision, 20 understand the impact of doing it, and we want to minimize 21 it.
previous reviewer.
l         22                         CHAIRMAN JACKSON:                 I have a question to ask you on 23 behalf of Commissioner Dicus..                             She noted that in the past, 24 the Commission has received feedback from licensees 25 regarding the resources needed to respond to RAIs i
9 Is that something -- if you shorten the l-l 10 time-frames, that won't happen as much.
But is there 11 anything in that area that you have done?
12 MR. ZIMMERMAN:
I thank you for bringing it up, l
l 13 because I neglected to bring it up.
That is an issue.
It's l
l 14 a valid issue that we have had cases where that has occurred 15 and one of the efforts that we have underway is to minimize l
L 16' those opportunities for occurrence.
Again, as we shorten l
17 it, that in itself-minimizes it, but we want to be very i
18 sensitive to not be changing reviewers in mid-stream and we f
19 want to make sure that's a very conscious decision, 20 understand the impact of doing it, and we want to minimize 21 it.
l 22 CHAIRMAN JACKSON:
I have a question to ask you on 23 behalf of Commissioner Dicus..
She noted that in the past, 24 the Commission has received feedback from licensees 25 regarding the resources needed to respond to RAIs i
t ANN RILEY & ASSOCIATES, LTD.
t ANN RILEY & ASSOCIATES, LTD.
[
[
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
!                                                          (202) 842-0034 l
20036 (202) 842-0034 l


l 70 1 specifically on conversions to improved tech specs.
l 70 1
2             So the question is, have the changes to the RAI
specifically on conversions to improved tech specs.
!  3 process resulted in any impacts on the improved tech spec 4 conversion reviews?
2 So the question is, have the changes to the RAI 3
5             MR. ZIMMERMAN:     If you're willing to just defer 6 till I get to the ISTS, I will address it at that point.
process resulted in any impacts on the improved tech spec 4
7             CHAIRMAN JACKSON:     Sure. You're going to -- it's 8 part of that.
conversion reviews?
9             MR. ZIMMERMAN:     It's part of that discussion.
5 MR. ZIMMERMAN:
10             CHAIRMAN JACKSON:     That's great.
If you're willing to just defer 6
11             MR. ZIMMERMAN:   Okay. We're moving to slide 17 on 12 confirmatory action letters.       The concern that we have heard 13 from our stakeholders is that the confirmatory action 14 letters, or CALs, can bypass formal procedures and impose 15 new requirements. In the past, CALs have typically been 16 associated with extended plant shutdowns and recapturing 17 design basis information.
till I get to the ISTS, I will address it at that point.
18             Currently, there are four confirmatory action 19 letters still open. The number of CALs in use, if trended, 20 has gone down significnntly over the last ten years.       What 21 we've done in this area is a couple of actions that we think 22 shore up our performance in this area and they have been 23 placed into the enforcement manual guidance and training is 24 taking place to ensure that it's understood.
7 CHAIRMAN JACKSON:
l 25             In fact, today, the Regional Division of Reactor l
Sure.
You're going to -- it's 8
part of that.
9 MR. ZIMMERMAN:
It's part of that discussion.
10 CHAIRMAN JACKSON:
That's great.
11 MR. ZIMMERMAN:
Okay.
We're moving to slide 17 on 12 confirmatory action letters.
The concern that we have heard 13 from our stakeholders is that the confirmatory action 14 letters, or CALs, can bypass formal procedures and impose 15 new requirements.
In the past, CALs have typically been 16 associated with extended plant shutdowns and recapturing 17 design basis information.
18 Currently, there are four confirmatory action 19 letters still open.
The number of CALs in use, if trended, 20 has gone down significnntly over the last ten years.
What 21 we've done in this area is a couple of actions that we think 22 shore up our performance in this area and they have been 23 placed into the enforcement manual guidance and training is 24 taking place to ensure that it's understood.
l 25 In fact, today, the Regional Division of Reactor l
l l
l l
l
l ANN RILEY & ASSOCIATES, LTD.
;                    ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l                       Washington, D.C. 20036 l                           (202) 842-0034
Washington, D.C.
20036 l
(202) 842-0034


l l                                                                       1
l l
!t 71 j     1 Projects are having a counterpart meeting here in 2 headquarterc and this topic is one that will be discussed       l l
!t 71 j
3 there.                                                         l 4           One of our changes is that the confirmatory action 5 lettera, in the future, need the concurrence of the NRR 6 Office Director and we think this is going to aid in gaining 7 regional consistency.
1 Projects are having a counterpart meeting here in 2
8           We also have clarified the guidance to make it 9 clear that the concern -- in order to issue a CAL, the         !
headquarterc and this topic is one that will be discussed l
l 10 concern has to be of significant concern of health and         j l
3 there.
11 safety. We have to be able to get to that threshold before   1 12 we issue a confirmatory action letter. And in the past, we 13 had cases where we may have been issuing a CAL on 14 commitments that have already been made on the docket by the   l 15 licensee or were of a lower threshold than what's currently 16 in the guidance now.
4 One of our changes is that the confirmatory action 5
17           So those two efforts are viewed as being 18 appropriate action in this area and we intend on continuing 19 to monitor it and ensure that we don't impose new 20 requirements, bypass the back-fit rule, or prolong plant 21 shutdowns.
lettera, in the future, need the concurrence of the NRR 6
22             COMMISSIONER McGAFFIGAN: Could I ask, just for 23 the. record?   You mentioned in passing that the number of 24 CALs has trended down over the last ten years. If you could 25 just provide that to us, because at the stakeholder i
Office Director and we think this is going to aid in gaining 7
regional consistency.
8 We also have clarified the guidance to make it 9
clear that the concern -- in order to issue a CAL, the 10 concern has to be of significant concern of health and j
11 safety.
We have to be able to get to that threshold before 1
12 we issue a confirmatory action letter.
And in the past, we 13 had cases where we may have been issuing a CAL on 14 commitments that have already been made on the docket by the 15 licensee or were of a lower threshold than what's currently 16 in the guidance now.
17 So those two efforts are viewed as being 18 appropriate action in this area and we intend on continuing 19 to monitor it and ensure that we don't impose new 20 requirements, bypass the back-fit rule, or prolong plant 21 shutdowns.
22 COMMISSIONER McGAFFIGAN:
Could I ask, just for 23 the. record?
You mentioned in passing that the number of 24 CALs has trended down over the last ten years.
If you could 25 just provide that to us, because at the stakeholder i
l l
l l
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
I                             Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 342-0034
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 342-0034


  . . _ _ _. _ _ . _ _ _ . _ _ _ _ .                  _ _ . ~ . _ _ . _ _ _ _ _ _ _ _ _ .                 _ _ . _ _ _ . . _ _ . _ . _ _ _
_ _. ~. _ _. _ _ _ _ _ _ _ _ _.
l                                                                                                                                           '
l 72 1
72         -
meetings, former Commissioner Remmick has raised this issue 2
1          meetings, former Commissioner Remmick has raised this issue                                                 !
several timas and it's possible, if there's only four out at 3
2          several timas and it's possible, if there's only four out at 3           the moment, that he may be working on old data or at least l                     4         we should provide him that data.                                                                           j 5                     MR. ZIMMERMAN:                 I chatted with Commissioner 6         Remmick after the last stakeholder meeting and I think the                                                 ,
the moment, that he may be working on old data or at least l
l l                    7           plants, the CALs that Mr. Remmick was addressing, the                                                       '
4 we should provide him that data.
l t
j 5
8         information was somewhat dated.                         It wasn't one of the plants i
MR. ZIMMERMAN:
'                                                                                                                                              1 9           that we're currently dealing with, but not.to take away from i                                                                                                                                             t 10           the issue, it's important that we stay on the lookout to                                                   i l
I chatted with Commissioner 6
11           ensure that we're avoiding not only inappropriate CALs, but 12           finding other vehicles and arm-twisting utilities into l
Remmick after the last stakeholder meeting and I think the l
13           taking action and sending letters back and forth and not 14           calling them CALs.
l 7
l l                   15                       So we don't want the issue to live under another 16           name and we're pursuing the issues that Mr. Remmick had 17           brought to us.
plants, the CALs that Mr. Remmick was addressing, the l
18                       COMMISSIONER MERRIFIELD:                       Madam Chairman, I have 19           -- in previous meetings, I have heard the Chairman use the l                   20           term managing message as it pertains to enforcement.
8 information was somewhat dated.
21           Obviously, you have gone ahead and you have revisited the 22           issue of how CALs have been issued.
It wasn't one of the plants t
23                       How have you managed the message regarding CALs?
i 1
24           Specifically, have you made it clear to the staff that what L                   25           you're saying is issue CALs when appropriate and not don't 1
9 that we're currently dealing with, but not.to take away from i
1 l                                               ANN RILEY & ASSOCIATES, LTD.
t 10 the issue, it's important that we stay on the lookout to i
I                                                         Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i                                                   Washington, D.C. 20036 (202) 842-0034 l
l 11 ensure that we're avoiding not only inappropriate CALs, but 12 finding other vehicles and arm-twisting utilities into l
13 taking action and sending letters back and forth and not 14 calling them CALs.
l l
15 So we don't want the issue to live under another 16 name and we're pursuing the issues that Mr. Remmick had 17 brought to us.
18 COMMISSIONER MERRIFIELD:
Madam Chairman, I have 19
-- in previous meetings, I have heard the Chairman use the l
20 term managing message as it pertains to enforcement.
21 Obviously, you have gone ahead and you have revisited the 22 issue of how CALs have been issued.
23 How have you managed the message regarding CALs?
24 Specifically, have you made it clear to the staff that what L
25 you're saying is issue CALs when appropriate and not don't 1
1 l
ANN RILEY & ASSOCIATES, LTD.
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 (202) 842-0034 l


I 73 1 issue CALs?
73 1
2           MR. ZIMMERMAN:   I believe we did the former to 1
issue CALs?
3 indicate there is a role for CALs. We've added a couple       of 4 additional measures, process, steps to ensure that we do 5 them correctly, but the message to the staff is not to not 6 issue CALs. CALs serve a -- we see that CALs serve a 7 benefit to ensure clear communication. What we want to 8 avoid is an issue where the NRC and the utility both agree 9 that there are shortcomings, perhaps of a programmatic 10 nature, things that need to be taken care of, perhaps again 11 before a plant starts up.
2 MR. ZIMMERMAN:
12           And we think we're communicating.     The utility 13 thinks that they're hearing what we're saying. Everybody 14 thinks they're agreeing, but now the plant     --
I believe we did the former to 3
now time 15 passes by and we find out that we weren't there and now 16 you're on the eve of a startup and you didn't have that 17 meeting of the minds you thought you had a month ago.
indicate there is a role for CALs.
18           So the CAL, putting it down in writing is another     i 19 step to make sure that we're all talking here, because the 20 stakes go up as the startup gets closer or the restart or 21 whatever the issue is.
We've added a couple of 4
22           So I think the CAL can be an informative tool.     So 23 we don't want to take it out of our toolbox.       We want to 24 maintain it, but we want to use it with care.
additional measures, process, steps to ensure that we do 5
25           COMMISSIONER MERRIFIELD:   That's positive to hear.
them correctly, but the message to the staff is not to not 6
                        ;JRJ RILEY & ASSOCIATES, LTD.
issue CALs.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 j                               (202) 842-0034
CALs serve a -- we see that CALs serve a 7
benefit to ensure clear communication.
What we want to 8
avoid is an issue where the NRC and the utility both agree 9
that there are shortcomings, perhaps of a programmatic 10 nature, things that need to be taken care of, perhaps again 11 before a plant starts up.
12 And we think we're communicating.
The utility 13 thinks that they're hearing what we're saying.
Everybody 14 thinks they're agreeing, but now the plant now time 15 passes by and we find out that we weren't there and now 16 you're on the eve of a startup and you didn't have that 17 meeting of the minds you thought you had a month ago.
18 So the CAL, putting it down in writing is another i
19 step to make sure that we're all talking here, because the 20 stakes go up as the startup gets closer or the restart or 21 whatever the issue is.
22 So I think the CAL can be an informative tool.
So 23 we don't want to take it out of our toolbox.
We want to 24 maintain it, but we want to use it with care.
25 COMMISSIONER MERRIFIELD:
That's positive to hear.
;JRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 j
(202) 842-0034


l 74 1                           The thing that we're always subject to is when we start to 2                           get criticism, we don't swing too far one way or the other 3                           and I think keeping too far from the swings is important.
l 74 1
4                                       MR. TRAVERS:     I agree. In the broader context, if 5                           you just look at the number of initiatives that we have 6                           underway and the kind of change we're pursuing, the issue of 7                           communications within the staff and with our external 8                           stakeholders continues to loom large.         We need to reinforce, 9                           in our own minds, and redouble our efforts just about at 10                             every turn to make sure that we're communicating and 11                             avoiding unintended consequences of the sort that I think 12                             you're referring to.
The thing that we're always subject to is when we start to 2
13                                         MR. ZIMMERMAN:     Perfect opportunity today with the 14                             DRP Regional Directors all being here.         We'll go'back and 15                             assure that we make sure this message is clear.
get criticism, we don't swing too far one way or the other 3
16                                         Improved standard technical specifications.       The 17                           program began with the issuance of the first improved 18                             standard tech spec in 1992.       Currently, there are 89 units 19                             that are pursuing conversions.       This table on this slide can 20                           be a little confusing in that the Y axis is based on 21                             submittals by site, and I'm talking in terms of units.         So 22                           they won't match up on the Y axis.
and I think keeping too far from the swings is important.
23                                         But, again, 89 units are pursuing conversions thus 24                           far. We are hoping that there are others that will see the 25                         merit in converting.         To date, 43 units have been approved.
4 MR. TRAVERS:
I agree.
In the broader context, if 5
you just look at the number of initiatives that we have 6
underway and the kind of change we're pursuing, the issue of 7
communications within the staff and with our external 8
stakeholders continues to loom large.
We need to reinforce, 9
in our own minds, and redouble our efforts just about at 10 every turn to make sure that we're communicating and 11 avoiding unintended consequences of the sort that I think 12 you're referring to.
13 MR. ZIMMERMAN:
Perfect opportunity today with the 14 DRP Regional Directors all being here.
We'll go'back and 15 assure that we make sure this message is clear.
16 Improved standard technical specifications.
The 17 program began with the issuance of the first improved 18 standard tech spec in 1992.
Currently, there are 89 units 19 that are pursuing conversions.
This table on this slide can 20 be a little confusing in that the Y axis is based on 21 submittals by site, and I'm talking in terms of units.
So 22 they won't match up on the Y axis.
23 But, again, 89 units are pursuing conversions thus 24 far.
We are hoping that there are others that will see the 25 merit in converting.
To date, 43 units have been approved.
AlRJ RILEY & ASSOCIATES, LTD.
AlRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


75 i
75 1
We have 14 units currently in-house that we're reviewing and 2   we anticipate an additional ten being approved during the 3   remainder of this fiscal year.
We have 14 units currently in-house that we're reviewing and i
I 4                         We have seen current data is that for the plants 5   that have converted, if you look at the license amendments 6   that those plants are submitting and compare those to the 7   license amendments that are being submitted by plants that 8   have not converted, there are one-third less license 9   amendments being submitted by the plants that have 10   converted.                                                                                                       1 11                         Now, to your point, Chairman --
2 we anticipate an additional ten being approved during the 3
12                         CHAIRMAN JACKSON:                       Commissioner Dicus' point.
remainder of this fiscal year.
13                         MR. ZIMMERMAN:               We are contacting licensees to l           14   gain feedback on the ISTS process.                                   We recognize that we are i
4 We have seen current data is that for the plants I
15   issuing a large number of RAIs and we did that with a recent 16   utility, being Duke, and on the Oconee, the McGuire and the l
5 that have converted, if you look at the license amendments 6
17   Catawba facilities, there were a very substantive number of 4
that those plants are submitting and compare those to the 7
18   RAIs.                                                                                                             l 19                         As a result of that, we've requested that Duke l           20   meet with us and the meeting is on January 20 and we will l
license amendments that are being submitted by plants that 8
21   try to get feedback not just on the RAI issue, but in large, 22   if they can talk to us about areas that they think we need                                                       ,
have not converted, there are one-third less license 9
                                                                                                                                    )
amendments being submitted by the plants that have 10 converted.
23   to 1.cok at trying to improve, we'll be very interested in 24   areas that we can continue to improve,                                                                           l 25                         Our labor rate and number of RAIs is one that ANN RILEY & ASSOCIATES, LTD.
1 11 Now, to your point, Chairman --
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
12 CHAIRMAN JACKSON:
Commissioner Dicus' point.
13 MR. ZIMMERMAN:
We are contacting licensees to l
14 gain feedback on the ISTS process.
We recognize that we are i
15 issuing a large number of RAIs and we did that with a recent 16 utility, being Duke, and on the Oconee, the McGuire and the 17 Catawba facilities, there were a very substantive number of 4
18 RAIs.
19 As a result of that, we've requested that Duke l
20 meet with us and the meeting is on January 20 and we will l
21 try to get feedback not just on the RAI issue, but in large, 22 if they can talk to us about areas that they think we need
)
23 to 1.cok at trying to improve, we'll be very interested in 24 areas that we can continue to improve, l
25 Our labor rate and number of RAIs is one that ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


l 76 1 we're not fully satisfied with, so we want to continue 2 paying attention to try to improve this process.
l 76 1
3           The last thing I'll point out on this slide --
we're not fully satisfied with, so we want to continue 2
4           COMMISSIONER McGAFFIGAN:         Madam Chairman, one 5 other. I've had some conversations with staff and my sense 6 is Joe Callum, the former EDO, raised the same issue with 7 regard to the four-loop group RAIs.         He was surprised at the 8 extent of them and I know the staff is working on it and 9 intends to, in a lull this summer, perhaps revise the 10 guidance.
paying attention to try to improve this process.
11           Isn't that what I heard?
3 The last thing I'll point out on this slide --
12           MR. ZIMMERMAN-   Right.       This.is not the only 13 meeting that we're planning on holding.           We're going to talk 14 to other utilities to gain their feedback.           Once we have 15 captured it, then we'll look at where we ought to put our 16 resources to work to improve.       But we're just starting with 17 Duke, as they more recently had a very high number of RAIs.
4 COMMISSIONER McGAFFIGAN:
Madam Chairman, one 5
other.
I've had some conversations with staff and my sense 6
is Joe Callum, the former EDO, raised the same issue with 7
regard to the four-loop group RAIs.
He was surprised at the 8
extent of them and I know the staff is working on it and 9
intends to, in a lull this summer, perhaps revise the 10 guidance.
11 Isn't that what I heard?
12 MR. ZIMMERMAN-Right.
This.is not the only 13 meeting that we're planning on holding.
We're going to talk 14 to other utilities to gain their feedback.
Once we have 15 captured it, then we'll look at where we ought to put our 16 resources to work to improve.
But we're just starting with 17 Duke, as they more recently had a very high number of RAIs.
18 Again, the four-loop group follows closely behind.
18 Again, the four-loop group follows closely behind.
19           The only other thing I'd point out is in the upper 20 right-hand portion of the graph, we can see that near the               j l
19 The only other thing I'd point out is in the upper 20 right-hand portion of the graph, we can see that near the j
21 end of this fiscal year, we can start seeing that the 22 slippages that have been occurring during FY-98 are going to           i 23 start picking up, if this holds to form.
l 21 end of this fiscal year, we can start seeing that the 22 slippages that have been occurring during FY-98 are going to 23 start picking up, if this holds to form.
24           So the challenges associated with completing our 25 conversions in one year, which we want to improve upon, i
24 So the challenges associated with completing our 25 conversions in one year, which we want to improve upon, i
l i                   IdH1 RILEY & ASSOCIATES, LTD.
l i
!                          Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
IdH1 RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


b.
b.
77 1   we're not satisfied with that, but the bad wave that we may                   :
77 1
see is going to create some challenges for us.
we're not satisfied with that, but the bad wave that we may 2
3               So if we're going to make some improvements to our 4   process, this is the time to be doing it, before this bad                     ,
see is going to create some challenges for us.
r l           5   wave: comes in.
3 So if we're going to make some improvements to our 4
l           6               CHAIRMAN JACKSON:         What is your goal in terms of 7   turnaround time?                                                             '
process, this is the time to be doing it, before this bad r
8               MR. ZIMMERMAN:       We are trying to turn around the t
l 5
l           9   improved standard tech specs in less than a year.                             ;
wave: comes in.
l 10               COMMISSIONER McGAFFIGAN:         Madam Chairman, again, I i
l 6
11   think this is an area where the staff deserves commendation.
CHAIRMAN JACKSON:
12   You can see the slope of the curve changed by a factor of 13   two and I know a lot of effort went into that.           But the 14-   nature of my question is have you used the license group 15   that you talked about, the interface group, to talk to the i           16   industry?
What is your goal in terms of 7
17               There's been -- at the stakeholder meetings, there 18   has been some talk about meeting us halfway and if all these 19   submittals that are going to come in later, some of them 20   could come in earlier, we could smooth out our resources and 21   make more effective use of our resources and this strikes me 22   -- it follows on a question that Commissioner Merrifield 23   asked about license renewal.
turnaround time?
i 24               But these are very complex amendments.         They do l         - 25   take a lot of effort to go through and it strikes me that l
8 MR. ZIMMERMAN:
We are trying to turn around the t
l 9
improved standard tech specs in less than a year.
10 COMMISSIONER McGAFFIGAN:
Madam Chairman, again, I i
11 think this is an area where the staff deserves commendation.
12 You can see the slope of the curve changed by a factor of 13 two and I know a lot of effort went into that.
But the 14-nature of my question is have you used the license group 15 that you talked about, the interface group, to talk to the i
16 industry?
17 There's been -- at the stakeholder meetings, there 18 has been some talk about meeting us halfway and if all these 19 submittals that are going to come in later, some of them 20 could come in earlier, we could smooth out our resources and 21 make more effective use of our resources and this strikes me 22
-- it follows on a question that Commissioner Merrifield 23 asked about license renewal.
i 24 But these are very complex amendments.
They do l
- 25 take a lot of effort to go through and it strikes me that l
l l
l l
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
!                                          Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034


i l                                                                                                                                     .
i l
78 1 you guys may want to jawbone the industry, and I'm doing it l           2 right here, to get some of the 2,000 applications that are                                                               I 3 going to come in on a bow wave moved forward, so that you                                                                 ;
78 1
4 can more effectively utilize your resources.
you guys may want to jawbone the industry, and I'm doing it l
l l           5                             MR. ZIMMERMAN:                                       I fully agree and we have had that     1 6 discussion with the licensing action steering group and with                                                             ;
2 right here, to get some of the 2,000 applications that are 3
7 NEI and we will continue to do that.
going to come in on a bow wave moved forward, so that you 4
l           8                             CHAIRMAN JACKSON:                                       Let me ask you this question.
can more effectively utilize your resources.
l l
5 MR. ZIMMERMAN:
I fully agree and we have had that 1
6 discussion with the licensing action steering group and with 7
NEI and we will continue to do that.
l 8
CHAIRMAN JACKSON:
Let me ask you this question.
9 Has the staff considered incorporation of the recently 10 approved risk-informed technical specification changes into 11 the improved standard tech specs or do you believe those 12 risk-informed tech spec changes to be too plant specific?
9 Has the staff considered incorporation of the recently 10 approved risk-informed technical specification changes into 11 the improved standard tech specs or do you believe those 12 risk-informed tech spec changes to be too plant specific?
13                             I guess I'm asking is there an opportunity there 14 to at least take what may be generic pieces and move it 15 forward.                     Chris, you had a comment.                                                                    .
13 I guess I'm asking is there an opportunity there 14 to at least take what may be generic pieces and move it 15 forward.
l                                                                                                                                       I 16                             MR. ZIMMERMAN:                                     A reaction.                             l l                                                                                                                                      i j         17                             MR. GRIMES:                               I can't help it.         I'm pleased to see l
Chris, you had a comment.
l 16 MR. ZIMMERMAN:
A reaction.
l i
j 17 MR. GRIMES:
I can't help it.
I'm pleased to see l
18 that Mr. Beckner, as my successor and as Chief of the Tech 19 Spec Branch, has kept up the process, the vision that we 20 started with.
18 that Mr. Beckner, as my successor and as Chief of the Tech 19 Spec Branch, has kept up the process, the vision that we 20 started with.
l         21                             But I can tell you that even when I was the Chief 22 of the Tech Spec Branch, we put the options in for the 23 risk-informed alternatives and we used the industry working l
l 21 But I can tell you that even when I was the Chief 22 of the Tech Spec Branch, we put the options in for the 23 risk-informed alternatives and we used the industry working 24 group on tech specs in order to develop this style and the j
24 group on tech specs in order to develop this style and the                                                               j 1         25 form.
1 25 form.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
l Court Reporters l
l Washington, D.C. 20036 l                                                                             (202) 842-0034 i
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 l
(202) 842-0034 i
1
1


79 1                 So if Bill has kept up that practice, then --
79 1
2                 CHAIRMAN JACKSON:                     I guess I'm asking more                                 ;
So if Bill has kept up that practice, then --
3 specifically.             We've done some things with allowed outage 4 times.       We've done some things with graded QA and I'm sort 5 of both speaking to the staff and those who are sitting                                                         '
2 CHAIRMAN JACKSON:
6 behind the staff, in terms of whether there is an 7 opportunity to see if there is an ability to genericize and 8 to propagate these things into the improved tech specs.
I guess I'm asking more 3
9                 MR. ZIMMERMAN:               There may be an. opportunity to do 10 that.       We are not doing it now, it has not been done.                                     I             '
specifically.
11 think that Chris' point that the standard can have a bracket 12 that can be filled in by the utility with the allowed outage                                                   !
We've done some things with allowed outage 4
13 time that they choose to put in.                                   If they choose to --
times.
l 14                 CHAIRMAN JACKSON:                     I got your point.
We've done some things with graded QA and I'm sort 5
L           15                 MR. ZIMMERMAN:               If they choose not to go with the 1
of both speaking to the staff and those who are sitting 6
16 value in the standard or their old number and want to                                                           l 1
behind the staff, in terms of whether there is an 7
17 risk-inform it, we would currently consider that to be out l                                                                                                                               l 18 of scope.       It would take us longer to do it and we have not 19 been advocating that.                                                                                           )
opportunity to see if there is an ability to genericize and 8
;            20                 There is a separate initiative to risk-inform the                                               l l
to propagate these things into the improved tech specs.
9 MR. ZIMMERMAN:
There may be an. opportunity to do 10 that.
We are not doing it now, it has not been done.
I 11 think that Chris' point that the standard can have a bracket 12 that can be filled in by the utility with the allowed outage l
13 time that they choose to put in.
If they choose to --
14 CHAIRMAN JACKSON:
I got your point.
L 15 MR. ZIMMERMAN:
If they choose not to go with the 16 value in the standard or their old number and want to 1
17 risk-inform it, we would currently consider that to be out l
18 of scope.
It would take us longer to do it and we have not 19 been advocating that.
)
20 There is a separate initiative to risk-inform the l
21 tech specs and there is a task force that works under the 22 PRA implementation plan, under Gary Holahan, and includes 23 staff from our Tech Spec Branch that are working on doing 24 that.
21 tech specs and there is a task force that works under the 22 PRA implementation plan, under Gary Holahan, and includes 23 staff from our Tech Spec Branch that are working on doing 24 that.
25                 That is really the next evolutionary phase of our l-ANN RILEY & ASSOCIATES, LTD.
25 That is really the next evolutionary phase of our l-ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


                                                                                                          . 1 l                                                                                                           ,
1 l
l 80 1       improved standard tech specs is to risk-inform them.                           We 2       need to find the most efficient way of accomplishing that.
80 1
3       Right now it's on a case by case basis.                         If a licensee 4       elects to try to risk-inform when they come in, and to this                             !
improved standard tech specs is to risk-inform them.
l                                                                                                              l They have kept it separate.          I 5       point, none have done that.
We 2
l 6                       But sooner or later, we want to bring them l
need to find the most efficient way of accomplishing that.
l 7       together.         We just want to make sure we do it in an
3 Right now it's on a case by case basis.
;          8        intelligent way and in an efficient way.
If a licensee 4
l I           9                       So once we get a little smarter from what the task 10         force, under the PRA plan recommends, then we can look at 11         how best to merge.
elects to try to risk-inform when they come in, and to this l
l       12                           CHAIRMAN JACKSON:                 Okay.
5 point, none have done that.
l l       13                           MR. ZIMMERMAN:                 2.206 petitions, this is where any 14         member of the public can petition the Commission for the 15         agency to take enforcement action against a licensee, to be 16         issuing a notice of violation, it could be an immediate 17         shutdown of the plant and it requires office director
They have kept it separate.
!        18         involvement in the process.
l 6
19                           We have a goal of issuing these petitions 120 days                     ;
But sooner or later, we want to bring them l
20         after our acknowledgment lett,er goes out and this is an area 21         where we have not been meeting our goal.                         We have tried a 22         few things.                                                                             ,
l 7
23                         We have put in place a petition review board to 24         look at these early when they come in, just like we do on i
together.
25         allegations, to try to set the path of here's what we're                               j i.
We just want to make sure we do it in an 8
intelligent way and in an efficient way.
l I
9 So once we get a little smarter from what the task 10 force, under the PRA plan recommends, then we can look at 11 how best to merge.
l 12 CHAIRMAN JACKSON:
Okay.
l l
13 MR. ZIMMERMAN:
2.206 petitions, this is where any 14 member of the public can petition the Commission for the 15 agency to take enforcement action against a licensee, to be 16 issuing a notice of violation, it could be an immediate 17 shutdown of the plant and it requires office director 18 involvement in the process.
19 We have a goal of issuing these petitions 120 days 20 after our acknowledgment lett,er goes out and this is an area 21 where we have not been meeting our goal.
We have tried a 22 few things.
23 We have put in place a petition review board to 24 look at these early when they come in, just like we do on i
25 allegations, to try to set the path of here's what we're j
i.
I ANN RILEY & ASSOCIATES, LTD.
I ANN RILEY & ASSOCIATES, LTD.
-                                                      Court Reporters j
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 j
1025 Connecticut Avenue, NW, Suite 1014                                   l l
l Washington, D.C.
Washington, D.C. 20036 (202) 842-0034
20036 l
(202) 842-0034


    .. _ ._      - ._ _ _ _ _ _ . _ . _ _ _ .                          _ _ _ _    _ - . .__ _. _ . . _ . . . . ~   _ ._._ .
_ -..__ _. _.. _.... ~
81 1       going to do, here's accountability, here's the due dates in 2       order to be able to get to where we need to go.
81 1
3                               Although we have gained value from this review 4       board, we have not yet reaped the benefits that we want in 5       being able to show demonstrative improvement in our 6         timeliness.               But we want to keep the board, but we need to 7       do more than that.
going to do, here's accountability, here's the due dates in 2
8                               An area where we have done well, better, is in the 9       public responsiveness or petitioner responsiveness area.                                   In 10         the past, we held very few, if any, informal public hearings 11         to involve the petitioner in the process.                       Now, about 20 12       percent of our petitions involve an informal public hearing i             13         to be able to hear from the petitioner, with the ].icensee 14         there, and to talk about the different points of view and 15         engage the petitioner.                                                                               j 16                               So that's working quite well.
order to be able to get to where we need to go.
17                               CHAIRMAN JACKSON:     Would they agree?                                       i 18                               MR. ZIMMERMAN:     I won't defer again, but I'll                             ;
3 Although we have gained value from this review 4
19         answer it now.                 Because of the fact that we're not achieving 20         the time limits goal here is one of the primary reasons and 21         to get overall feedback, we're working to go out to the last 22         year or so's worth of petitioners.
board, we have not yet reaped the benefits that we want in 5
;            23                               We have nine petitioners that we're in the process 24         of doing telephone interviews of to ask the question that 25         you just asked, Madam Chairman, as well as half a dozen i
being able to show demonstrative improvement in our 6
!                                                  JJUJ RILEY & ASSOCIATES, LTD.
timeliness.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
But we want to keep the board, but we need to 7
do more than that.
8 An area where we have done well, better, is in the 9
public responsiveness or petitioner responsiveness area.
In 10 the past, we held very few, if any, informal public hearings 11 to involve the petitioner in the process.
Now, about 20 12 percent of our petitions involve an informal public hearing i
13 to be able to hear from the petitioner, with the ].icensee 14 there, and to talk about the different points of view and 15 engage the petitioner.
j 16 So that's working quite well.
17 CHAIRMAN JACKSON:
Would they agree?
i 18 MR. ZIMMERMAN:
I won't defer again, but I'll 19 answer it now.
Because of the fact that we're not achieving 20 the time limits goal here is one of the primary reasons and 21 to get overall feedback, we're working to go out to the last 22 year or so's worth of petitioners.
23 We have nine petitioners that we're in the process 24 of doing telephone interviews of to ask the question that 25 you just asked, Madam Chairman, as well as half a dozen i
JJUJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


82 1   other questions through this survey to gain that information 2   and we expect to have that complete by the end of January.
82 1
3                 Then we need to assimilate that information and 4   just like we spoke on improved standard tech specs, factor             l l
other questions through this survey to gain that information 2
that back into how we can improve our process.                         I 6                 CHAIRMAN JACKSON:   What other improvements do you 7   think need to be made in the 2.206 process?
and we expect to have that complete by the end of January.
8                 MR. ZIMMERMAN:   We need some good old-fashioned i
3 Then we need to assimilate that information and 4
9   management attention is what we need here.         We've talked at 10   the table about a number of successes that have gone well.
just like we spoke on improved standard tech specs, factor 5
11   We're not ready to take our finger off the posts of those 12   areas that are going well, but we need to recognize that we 13   need to shift additional attention by management to hold 14   ourselves accountable in the 2.206 area.                               !
that back into how we can improve our process.
15                 CHAIRMAN JACKSON:   When are you going to do that?
I 6
16                 MR. ZIMMERMAN:   Now.
CHAIRMAN JACKSON:
17                 COMMISSIONER McGAFFIGAN:   Madam Chairman, at 18   times, I think one of the complaints we also get is the tone 19   of the 2.206 letters.       There may be some -- there may be a 20   problem there, as well.       David Lochbaum has said publicly 21   that the letter oftentimes reads, sort of begrudgingly, we 22   agree with you and we deny your petition, you know, because 23   we've already done it.       And if we're actually agreeing with 24   them, maybe we could say it somewhat less grudgingly and say 25   we're denying it only because we -- only because we've ANN RILEY & ASSOCIATES, LTD.
What other improvements do you 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
think need to be made in the 2.206 process?
8 MR. ZIMMERMAN:
We need some good old-fashioned i
9 management attention is what we need here.
We've talked at 10 the table about a number of successes that have gone well.
11 We're not ready to take our finger off the posts of those 12 areas that are going well, but we need to recognize that we 13 need to shift additional attention by management to hold 14 ourselves accountable in the 2.206 area.
15 CHAIRMAN JACKSON:
When are you going to do that?
16 MR. ZIMMERMAN:
Now.
17 COMMISSIONER McGAFFIGAN:
Madam Chairman, at 18 times, I think one of the complaints we also get is the tone 19 of the 2.206 letters.
There may be some -- there may be a 20 problem there, as well.
David Lochbaum has said publicly 21 that the letter oftentimes reads, sort of begrudgingly, we 22 agree with you and we deny your petition, you know, because 23 we've already done it.
And if we're actually agreeing with 24 them, maybe we could say it somewhat less grudgingly and say 25 we're denying it only because we -- only because we've ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


  ^ ~     '
^ ~
      ,                                                                      i i
i i
83 1   already done it.                                               ;
83 1
2             There's tonal things that you may want to think 3   about.
already done it.
4             MR. ZIMMERMAN:   We agree. Wherever Sam is         i 5   sitting, I think he's -- this is an issue that Sam likewise 6   feels very strongly about, that the tone and the manner in       l 7   which we interact with the petitioners ought to be as polite     l l        8   and courteous as possible and if there is a way of moving l
2 There's tonal things that you may want to think 3
9   away from denial type terminology, we want to explore a 10   couple of things, i
about.
11             We want to explore the manner by which we write       )
4 MR. ZIMMERMAN:
12   back. We also want to explore whether this is really the 13   right process for the petitions that are coming in. The     l l                                                                            \
We agree.
l       14   petitioners may be using this process because it's the only     )
Wherever Sam is i
!                                                                            l 15   one that they really know to be able to accomplish this, but     ;
5 sitting, I think he's -- this is an issue that Sam likewise 6
I 16   working with OGC, it's possible there may be another 17   mechanism out there to address some of these items.
feels very strongly about, that the tone and the manner in 7
18             So we also want to explore the benefit perhaps of 19   having a spin-off type process that may be more appropriate.
which we interact with the petitioners ought to be as polite l
20              CHAIRMAN JACKSON:   We've also been accused of l       21   dragging out the response to the petition until we've made 22   the change and then we say we deny your petition, that it's i
8 and courteous as possible and if there is a way of moving l
i       23   a most deliberate process. So that all of these things flow 24   together, but this is an area that I do think needs more       I l       25   focused attention, not just in terms of the typical             ;
9 away from denial type terminology, we want to explore a 10 couple of things, i
I 1
11 We want to explore the manner by which we write
ANN RILEY & ASSOCIATES, LTD.
)
12 back.
We also want to explore whether this is really the 13 right process for the petitions that are coming in.
The l
\\
l 14 petitioners may be using this process because it's the only
)
l 15 one that they really know to be able to accomplish this, but I
16 working with OGC, it's possible there may be another 17 mechanism out there to address some of these items.
18 So we also want to explore the benefit perhaps of 19 having a spin-off type process that may be more appropriate.
CHAIRMAN JACKSON:
We've also been accused of 20 l
21 dragging out the response to the petition until we've made 22 the change and then we say we deny your petition, that it's i
i 23 a most deliberate process.
So that all of these things flow 24 together, but this is an area that I do think needs more l
25 focused attention, not just in terms of the typical I
1 ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036                       ]
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036
]
(202) 842-0034
(202) 842-0034


l l
l l
l                                                                                                                   84 1 management oversight, but a more_ fundamental reexamination
l 84 1
;  2 of just what the process is meant to accomplish and how we                                                             l l 3 can go about doing that, and that clearly then does                                                                   [
management oversight, but a more_ fundamental reexamination 2
4 necessitate having OGC's involvement.                                                                                 1 r
of just what the process is meant to accomplish and how we l
5           MR. ZIMMERMAN:   We agree.                                                                                 '
l 3
6           CHAIRMAN JACKSON:   You're done.                                 So that means 7 that Mr. Matthews -- we don't want to let you think that 8 we've forgotten you.
can go about doing that, and that clearly then does
9           MR. MATTHEWS:   I do appreciate the breather.
[
l 10 Let's turn to slide 12. Just as an introduction, I'm going                                                         f i                                                                                                                           i 11 to talk about the issue with regard to adding increased                                                               j l 12 definition to the term design basis and then speak for a few                                                           i l
4 necessitate having OGC's involvement.
13 moments on the back-fit initiatives in terms of our focusing                                                           ,
1 r
i 14 on that process. These are not related.                                                                             l 15           Define design basis has oeen an undertaking that,                                                           j 16 again, became important and was brought into greater focus                                                             i l
5 MR. ZIMMERMAN:
17 by NEI bringing to us a proposed guidance document to                                                                 ,
We agree.
i L 18 attempt to bring clarity to this issue.
6 CHAIRMAN JACKSON:
19           I want to clarify a possible misstatement I made a 20 little earlier with -- and it has to do with the confusion 21 among these numbers and the fact that both of the documents 22 that we've been talking about today, the design basis 23 document guidance and the document relative to FSAR update 24 guidance, came in November of     97.                                                                                   l 25           One of them, the design basis guidance, was f
You're done.
So that means 7
that Mr. Matthews -- we don't want to let you think that 8
we've forgotten you.
9 MR. MATTHEWS:
I do appreciate the breather.
l 10 Let's turn to slide 12.
Just as an introduction, I'm going f
i i
11 to talk about the issue with regard to adding increased j
l 12 definition to the term design basis and then speak for a few i
l 13 moments on the back-fit initiatives in terms of our focusing i
14 on that process.
These are not related.
l 15 Define design basis has oeen an undertaking that, j
16 again, became important and was brought into greater focus i
l 17 by NEI bringing to us a proposed guidance document to i
L 18 attempt to bring clarity to this issue.
19 I want to clarify a possible misstatement I made a 20 little earlier with -- and it has to do with the confusion 21 among these numbers and the fact that both of the documents 22 that we've been talking about today, the design basis 23 document guidance and the document relative to FSAR update 24 guidance, came in November of 97.
25 One of them, the design basis guidance, was f
e ANN RILEY & ASSOCIATES, LTD.
e ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 o                      Washington, D.C. 20036 l                           (202) 842-0034 l
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 o
l (202) 842-0034 l
l
l


    .                                                                                                                      r 85 1 voluntarily submitted to us by NEI for our information.                                 The               ;
r 85 1
2 other, 98-03, was submitted for staff review and 3 endorsement.         If I didn't make that clarification, I think 4 Tony probably would have.
voluntarily submitted to us by NEI for our information.
5               Now, back to the design basis guidance with regard 6 to NEI 97-04.           We have reviewed this document and we have 7 most recently communicated back to NEI in December with the 8 proposal that the attachment reflect a set of criteria that 9 we believe is appropriate for determining whether something
The 2
                                                                                                                          ]
other, 98-03, was submitted for staff review and 3
10 is or isn't design basis information for the purposes of                                                 l 11 interpreting and giving guidance to the definition in the                                                 I 12 regulations of 50.2.
endorsement.
l 13               I would like to say that I believe this issue 14 probably relates less to what is or isn't included in FSARs,                                             !
If I didn't make that clarification, I think 4
15 but more to how you treat that information; in other words, 16 what bin you put it in.                               And it comes down to an issue of                   ,
Tony probably would have.
17 discussion over level of detail of what constitutes design l
5 Now, back to the design basis guidance with regard 6
to NEI 97-04.
We have reviewed this document and we have 7
most recently communicated back to NEI in December with the 8
proposal that the attachment reflect a set of criteria that 9
we believe is appropriate for determining whether something
]
10 is or isn't design basis information for the purposes of l
11 interpreting and giving guidance to the definition in the 12 regulations of 50.2.
l 13 I would like to say that I believe this issue 14 probably relates less to what is or isn't included in FSARs, 15 but more to how you treat that information; in other words, 16 what bin you put it in.
And it comes down to an issue of 17 discussion over level of detail of what constitutes design l
18 basis information under the definition of 50.2, as l
18 basis information under the definition of 50.2, as l
19 distinguished from design input information, design values, l             20 insofar as there is a need to determine what is design basis
19 distinguished from design input information, design values, l
!            21 information that needs to be accorded the treatment that the 22 regulations require of it.
20 insofar as there is a need to determine what is design basis 21 information that needs to be accorded the treatment that the 22 regulations require of it.
!            23               I don't believe there is an issue or at least a                                             ;
23 I don't believe there is an issue or at least a l
l l
24 significant issue with regard to whether or not we have been 25 appropriately and the licensees have been appropriately 4
24 significant issue with regard to whether or not we have been 25 appropriately and the licensees have been appropriately 4
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014                                                         !
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington., D.C. 20036 (202) 842-0034 1
Washington., D.C. 20036                                                       l (202) 842-0034                                                   l 1


86 1 including this kind of information in the FSARs.                                         It's how 2 it's to be treated.
86 1
3           We haven't reached the degree of conformance or 4 closure on this issue with NEI as we have in the area of the 5 updating the FSAR guidance document.                                       They are considering 6 our comments. They have an objective of providing us a                                                   ;
including this kind of information in the FSARs.
7 revised document at the end of January.                                         I don't believe 8 they've decided yet whether or not that document will be one 9 that would continue to be offered for our information and 10 their potential use, but not asked for our endorsement.
It's how 2
11           In the event that they do ask for our endorsement, 12 we then have to make a decision with regard to the degree 13 that the guidance appropriately reflects our regulatory 14 requirements.
it's to be treated.
15           If it doesn't, then I think we're faced with, 16 again, developing guidance along the lines of our regulatory 17 requirements and proposing it in some form for the
3 We haven't reached the degree of conformance or 4
                                                                                              ~
closure on this issue with NEI as we have in the area of the 5
18 Commission's consideration, whether it be a generic letter 19 or a reg guide. So we're really faced with a two-track 20 process.
updating the FSAR guidance document.
21             If closure looks like it's a potential after our 22 receipt of this revision of NEI's document, then we'll 23 probably follow a process very similar to the one we 24 followed on the FSAR update guidance.
They are considering 6
25           COMMISSIONER MERRIFIELD:                                   I did have a question, ANN RILEY & ASSOCIATES, LTD.
our comments.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
They have an objective of providing us a 7
revised document at the end of January.
I don't believe 8
they've decided yet whether or not that document will be one 9
that would continue to be offered for our information and 10 their potential use, but not asked for our endorsement.
11 In the event that they do ask for our endorsement, 12 we then have to make a decision with regard to the degree 13 that the guidance appropriately reflects our regulatory 14 requirements.
15 If it doesn't, then I think we're faced with, 16 again, developing guidance along the lines of our regulatory 17 requirements and proposing it in some form for the
~
18 Commission's consideration, whether it be a generic letter 19 or a reg guide.
So we're really faced with a two-track 20 process.
21 If closure looks like it's a potential after our 22 receipt of this revision of NEI's document, then we'll 23 probably follow a process very similar to the one we 24 followed on the FSAR update guidance.
25 COMMISSIONER MERRIFIELD:
I did have a question, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


l
l
                                                                                    )
)
87 1 Madam Chairman. I was reviewing the January 11, 1999 staff         ,
87 1
[                                                                                   !
Madam Chairman.
;          2 update to the tasking memo and I noted that most of the 3 milestones, the dates associated with the milestones for               !
I was reviewing the January 11, 1999 staff
l 4 this portion were, this says, to be decided, l
[
5            I'm wondering what progress you've made in                 l i
2 update to the tasking memo and I noted that most of the 3
6 grappling with this issue and I'm wondering if you can give           l 7 us some sense of what your scheduling goals are for this 8 portion.
milestones, the dates associated with the milestones for 4
!          9           MR. MATTHEWS:       I think probably the "to be 10   decideds" emanate from the uncertainty associated with the 11   NEI position with regard to whether they want to seek our i
this portion were, this says, to be decided, 5
12   endorsement of this document or, in the alternative, provide l       13   it for our use and information, in which case we're faced 14   with establishing a reparate milestone schedule.         So that l       15   isn't a very direct answer, but it is the answer.
I'm wondering what progress you've made in l
16             I think at the end of January, we'll be prepared l
i 6
17   at that point to establish a milestone schedule for each of 18   those courses of action, because it does depend upon degree 19   of divergence on the two positions.
grappling with this issue and I'm wondering if you can give 7
20             COMMISSIONER MERRIFIELD:       Will that before or 21   after January 28?
us some sense of what your scheduling goals are for this 8
22             CHAIRMAN JACKSON:       January 27 at 5:00, right?         l 23             MR. MATTHEWS:     Before January 28.
portion.
24             COMMISSIONER McGAFFIGAN:       Madam Chairman, are 25   there policy issues embedded in -- there may be none if 1
9 MR. MATTHEWS:
I think probably the "to be 10 decideds" emanate from the uncertainty associated with the 11 NEI position with regard to whether they want to seek our 12 endorsement of this document or, in the alternative, provide i
l 13 it for our use and information, in which case we're faced 14 with establishing a reparate milestone schedule.
So that l
15 isn't a very direct answer, but it is the answer.
16 I think at the end of January, we'll be prepared l
17 at that point to establish a milestone schedule for each of 18 those courses of action, because it does depend upon degree 19 of divergence on the two positions.
20 COMMISSIONER MERRIFIELD:
Will that before or 21 after January 28?
22 CHAIRMAN JACKSON:
January 27 at 5:00, right?
l 23 MR. MATTHEWS:
Before January 28.
24 COMMISSIONER McGAFFIGAN:
Madam Chairman, are 25 there policy issues embedded in -- there may be none if 1
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters                                 1 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i


4 88 1 97-04 comes in and you guys are going to endorse it as you 2 did 98-03. But after you see 97-04, if there are policy 3 issues, will you try to follow some sort of process like you 4 did on the FSAR update and get them to us before -- maybe 5 that would help.
4 88 1
6           MR. MATTHEWS:   Yes. And if I didn't say that, I 7 should have indicated that.     That course of action, I 8 believe, will necessitate -- it will be a policy decision on 9 which direction to go.
97-04 comes in and you guys are going to endorse it as you 2
10           COMMISSIONER McGAFFIGAN:     Right.
did 98-03.
11           MR. MATTHEWS:   So my view is that will involve a 12 Commission consideration.
But after you see 97-04, if there are policy 3
13           CHAIRMAN JACKSON:     Okay.
issues, will you try to follow some sort of process like you 4
14           MR. MATTHEWS:   With regard to the tasking memo 15 items, which, at an earlier meeting we had on progress of 16 tasking memo issues, we brought some coherence in our 17 presentation on the tasking memo in that we had back-fitted           ;
did on the FSAR update and get them to us before -- maybe 5
18 in several different locations.
that would help.
19           For the purposes of my remarks, I will separate 20 two general areas associated with back-fit, but I will say 21 that the overall objective, which, as I'm now on slide 13, 22 is to ensure that the staff closely adheres to the back-fit 23 rule as it's written in evaluating all additional l
6 MR. MATTHEWS:
1 24 requirements, expansion in scope, potentially, or unique 25 interpretations pertaining to both operating or ANN RILEY & ASSOCIATES, LTD.
Yes.
Court Reporters                                 i 1025 Connecticut Avenue, NW, Suite 1014                     i Washington, D.C. 20036 (202) 842-0034
And if I didn't say that, I 7
should have indicated that.
That course of action, I 8
believe, will necessitate -- it will be a policy decision on 9
which direction to go.
10 COMMISSIONER McGAFFIGAN:
Right.
11 MR. MATTHEWS:
So my view is that will involve a 12 Commission consideration.
13 CHAIRMAN JACKSON:
Okay.
14 MR. MATTHEWS:
With regard to the tasking memo 15 items, which, at an earlier meeting we had on progress of 16 tasking memo issues, we brought some coherence in our 17 presentation on the tasking memo in that we had back-fitted 18 in several different locations.
19 For the purposes of my remarks, I will separate 20 two general areas associated with back-fit, but I will say 21 that the overall objective, which, as I'm now on slide 13, 22 is to ensure that the staff closely adheres to the back-fit l
23 rule as it's written in evaluating all additional 1
24 requirements, expansion in scope, potentially, or unique 25 interpretations pertaining to both operating or ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 (202) 842-0034


m-   . . _ . - _ - _ ._. _ _ _ _ _ _ . _ . -                _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _
m-89 1
89 1           decommissioning plans against the actual impact on public                                 f 2           health and safety.                                                                       !
decommissioning plans against the actual impact on public f
i 3                         So this takes the form, though, in terms of our l                     4           primary focus, in two places.                       One relates to our                   ;
2 health and safety.
i                                                                                                                             '
i 3
5           interaction with the industry through not only our 6           activities associated with licensing amendments and 7           licensing actions, but also through our process for                                       f l
So this takes the form, though, in terms of our l
l                    8           developing and coordinating the need for information and 9           generic activities that we promulgate through either                                     :
4 primary focus, in two places.
10             bulletins or generic letters.
One relates to our i
l                                                                                                                           i 11                           That particular issue has been put at a high point
5 interaction with the industry through not only our 6
[                   12             on our screen by NEI by virtue of their concerns and we met t
activities associated with licensing amendments and 7
l l                  13             with them last November, I believe, that we appear to be too                               !
licensing actions, but also through our process for f
14             willing to revert to the use of the compliance exception i
l l
15             with regard to our generic communications, insofar as our l
8 developing and coordinating the need for information and 9
l                 16             need for information in order to determine whether or not l                 17             compliance is being achieved.
generic activities that we promulgate through either 10 bulletins or generic letters.
I 18                           We've taken upon a task to consider how we treat 19             the compliance exemption in this context.                               We do propose to l
l i
20             conduct, in effect, a simplified cost-benefit analysis l                 21             associated with cases where the compliance exception is                                     !
11 That particular issue has been put at a high point
l                                                                                                                              I 22             being cited in bulletins or generic letters to determine, as                                 1 23             an additional facet of whether there is sufficient support                                   l 24             for the proposed activity.                                                                   ;
[
!                  25                           I did want to mention another one that NEI has I
12 on our screen by NEI by virtue of their concerns and we met l
t l
13 with them last November, I believe, that we appear to be too 14 willing to revert to the use of the compliance exception i
15 with regard to our generic communications, insofar as our l
l 16 need for information in order to determine whether or not l
17 compliance is being achieved.
I 18 We've taken upon a task to consider how we treat 19 the compliance exemption in this context.
We do propose to l
20 conduct, in effect, a simplified cost-benefit analysis l
21 associated with cases where the compliance exception is l
22 being cited in bulletins or generic letters to determine, as 1
23 an additional facet of whether there is sufficient support 24 for the proposed activity.
25 I did want to mention another one that NEI has I
i f
i f
l f                                                   JJU4 RILEY & ASSOCIATES, LTD.
l f
l Court Reporters
JJU4 RILEY & ASSOCIATES, LTD.
!                                              1025 Connecticut Avenue, NW, Suite 1014
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014
(                                                     Washington, D.C. 20036 (202) 842-0034 I
(
Washington, D.C. 20036 (202) 842-0034 I


4 _.          ..._._____..___..___m.._                 _ _ . _ . . _ . _ _ . _ . . _ . . . . - . _ . _ . _ _ . _ _ _ . - - . _ _ _ . _ _ _ ,
4
..._._____..___..___m.._
i I
i I
90 i
90 i
1           raised to our attention very recently, and this is the issue                                                             ;
1 raised to our attention very recently, and this is the issue 2
2            of averted on-site costs and the way we deal with averted 3           on-site costs in the context of doing cost-benefit analysis                                                               f i
of averted on-site costs and the way we deal with averted 3
4            for safety purposes, but it has also come up in the context 5           of our treatment of severe accident management alternatives 6           with regard to the environmental review that's been                                                       -
on-site costs in the context of doing cost-benefit analysis f
7            conducted and being conducted for our license renewal 8           applicants.                                                                                                              .
i 4
9                         You may recall that severe accident management 10           alternatives need to be addressed in environmental space 11           with regard to a cost-benefit analysis and then the staff 12           and ultimately the Commission's consideration of those                                                                   i
for safety purposes, but it has also come up in the context 5
          ' 13           cost-beneficial severe accident alternatives and our 14           treatment of an overall environmental finding in the license                                                             ,
of our treatment of severe accident management alternatives 6
15           renewal arena.                                                                                                           l 16                         There is an existing policy of the Commission that                                                         1 17           averted on-site costs will be considered in those 18           evaluations.       The Commission indicated that we.ought to                                                             i 19           consider as beneficial doing the calculation in the absence 20           of averted on-site costs, for what that may offer us, but 21           there is a Commission policy that those, as a minimum, those 22           evaluations of cost-benefit -- and this is expressed in our 23           regulatory analysis guidelines -- that as a minimum, those 24           costs be included and we are proceeding to include those 25             costs as we review the license application for Calvert ANN RILEY & ASSOCIATES, LTD.
with regard to the environmental review that's been 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
conducted and being conducted for our license renewal 8
applicants.
9 You may recall that severe accident management 10 alternatives need to be addressed in environmental space 11 with regard to a cost-benefit analysis and then the staff 12 and ultimately the Commission's consideration of those i
' 13 cost-beneficial severe accident alternatives and our 14 treatment of an overall environmental finding in the license 15 renewal arena.
l 16 There is an existing policy of the Commission that 1
17 averted on-site costs will be considered in those 18 evaluations.
The Commission indicated that we.ought to i
19 consider as beneficial doing the calculation in the absence 20 of averted on-site costs, for what that may offer us, but 21 there is a Commission policy that those, as a minimum, those 22 evaluations of cost-benefit -- and this is expressed in our 23 regulatory analysis guidelines -- that as a minimum, those 24 costs be included and we are proceeding to include those 25 costs as we review the license application for Calvert ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


1   .
1 b
b 91 1 Cliffs., which is the one that has progressed to the point 2 that it has and has involved that kind of decision.
91 1
3             CHAIRMAN JACKSON:   Mr. Grimes is chomping here.                     ,
Cliffs., which is the one that has progressed to the point 2
4             MR. MATTHEWS:   Chomping?   Hopefully, nodding his 5 head vociferously in agreement.
that it has and has involved that kind of decision.
6             MR. GRIMES:   I'm in total agreement.             But I do         t 7 want to correct the record, because Mr. Matthews referred to                     i 8 them as severe accident management alternatives.                   They're 9 mitigation alternatives.                                                         ;
3 CHAIRMAN JACKSON:
l 10             MR. MATTHEWS:   Excuse me. I knew I was struggling                 i 11                                                                                 I with that term for some reason.
Mr. Grimes is chomping here.
4 MR. MATTHEWS:
Chomping?
Hopefully, nodding his 5
head vociferously in agreement.
6 MR. GRIMES:
I'm in total agreement.
But I do t
7 want to correct the record, because Mr. Matthews referred to i
8 them as severe accident management alternatives.
They're 9
mitigation alternatives.
l 10 MR. MATTHEWS:
Excuse me.
I knew I was struggling i
I 11 with that term for some reason.
l 12 CHAIRMAN JACKSON:
Thank you.
i r
13 MR. MATTHEWS:
I didn't have it right.
That's why 14 it wasn't coming off my tongue.
l l
l l
12            CHAIRMAN JACKSON:   Thank you.                                        I r                                                                                        i
15 CHAIRMAN JACKSON:
!    13            MR. MATTHEWS:  I didn't have it right.                That's why    I 14 it wasn't coming off my tongue.                                                  ,
Karen probably would have come 1
l l
15            CHAIRMAN JACKSON:  Karen probably would have come 1                                                                                         ,
16 out of her seat at some point.
16 out of her seat at some point.
17             MR. TRAVERS:   Chairman, I just want to close our I
17 MR. TRAVERS:
Chairman, I just want to close our I
18 presentation by saying that I am glad to report and I think 19 you've heard from the staff today that we are making 20 significant progress on a number of fronts, in this case, in 21 particular, in the Office of Nuclear Reactor Regulation.
18 presentation by saying that I am glad to report and I think 19 you've heard from the staff today that we are making 20 significant progress on a number of fronts, in this case, in 21 particular, in the Office of Nuclear Reactor Regulation.
22             We've had one meeting on risk-informed initiatives 23 in Part 50, again, largely supported by the Office of                           l 24 Nuclear Reactor Regulation, and we have next week our final 25 meeting to discuss the oversight initiatives and the status 1
22 We've had one meeting on risk-informed initiatives 23 in Part 50, again, largely supported by the Office of 24 Nuclear Reactor Regulation, and we have next week our final 25 meeting to discuss the oversight initiatives and the status 1
JJai RILEY & ASSOCIATES, LTD.
JJai RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
(
(


s 92 1       of progress in that regard.
s 92 1
2                         So that finishes our presentation.
of progress in that regard.
3                         CHAIRMAN JACKSON:                       Right.             Let me read a comment 4       on behalf of Commissioner Diaz.                                     He notes, he says "I am 5       pleased that as the staff states on slide number three, that 6       it has proceeded to improve the effectiveness, efficiency, 7       timeliness and predictability of the license renewal 8       process, I am looking forward to these objectives to 9       permeate all the other issues discussed in this briefing so 10       that we can achieve closure.                                 In this regard, I urge the 11       staff to have frequent interactions with the Commission."
2 So that finishes our presentation.
12                         Then as a final comment, I didn't say it, but this 13       is directed to Mr. Zimmerman, in the end, you and Sam-,
3 CHAIRMAN JACKSON:
14       within the Office of Nuclear Reactor Regulation, have the i
Right.
15       overall responsibility for ensuring that all of these things 16       come together and I know that in particular, that you have 17       been focused on a number of process improvements and 18       improving overall how NRR does its work and with Sam and 19       Sam's support and leadership in aligning the organization in 20       a way to make that happen and to make how you do this the 21       way you do business.                                                                                         ;
Let me read a comment 4
22                         So once again, I want both to congratulate you, 23       even though your work -- you have a lot of work still in 24       front of you, and to thank you and I know all of you have a 25       lot on your plates.                   I tell Mr. Matthews I probably see him ANN RILEY & ASSOCIATES, LTD.
on behalf of Commissioner Diaz.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
He notes, he says "I am 5
pleased that as the staff states on slide number three, that 6
it has proceeded to improve the effectiveness, efficiency, 7
timeliness and predictability of the license renewal 8
process, I am looking forward to these objectives to 9
permeate all the other issues discussed in this briefing so 10 that we can achieve closure.
In this regard, I urge the 11 staff to have frequent interactions with the Commission."
12 Then as a final comment, I didn't say it, but this 13 is directed to Mr. Zimmerman, in the end, you and Sam-,
14 within the Office of Nuclear Reactor Regulation, have the i
15 overall responsibility for ensuring that all of these things 16 come together and I know that in particular, that you have 17 been focused on a number of process improvements and 18 improving overall how NRR does its work and with Sam and 19 Sam's support and leadership in aligning the organization in 20 a way to make that happen and to make how you do this the 21 way you do business.
22 So once again, I want both to congratulate you, 23 even though your work -- you have a lot of work still in 24 front of you, and to thank you and I know all of you have a 25 lot on your plates.
I tell Mr. Matthews I probably see him ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


93 1
93 1
more than I see Bill Travers, because we always see you, 2
more than I see Bill Travers, because we always see you, 2
Dave, because every rule in the world seems to run through 3           your door.
Dave, because every rule in the world seems to run through 3
4                           So with that, I want to thank the staff, and 5             invite NEI to come forward.
your door.
6                           COMMISSIONER MERRIFIELD:             Actually, I did have one 7             final question I was going to ask Mr. Matthews.
4 So with that, I want to thank the staff, and 5
I 8                           CHAIRMAN JACKSON:             Okay.                                               !
invite NEI to come forward.
9                                                                                                             I COMMISSIONER MERRIFIELD:             One of the things that                       j 10           you didn't focus on was the issue of decommissioning as it 11           relates to the back-fit rule.                   It's the staff's impression 12           that indeed the current back-fit rule does not apply to 13           decommissioning.
6 COMMISSIONER MERRIFIELD:
i l                 14                           It's further my understanding that the staff                                       i l                                                                                                                                  l 15           believes it should apply the decommissioning and that I
Actually, I did have one 7
16           currently underway you're attempting to apply it to the 17           extent practical to decommission facilities.
final question I was going to ask Mr. Matthews.
18                         I was just wondering if you could very briefly 19           explain how you're focusing your efforts on a day-to-day
8 CHAIRMAN JACKSON:
!'                20           basis with inspection and licensing to make sure that that
Okay.
: j.                 21           happens.
9 COMMISSIONER MERRIFIELD:
22                         MR. MATTHEWS:               I am prepared to comment on that.
One of the things that j
23           In fact, I just needed to turn the page, but didn't get to 24           it.
10 you didn't focus on was the issue of decommissioning as it 11 relates to the back-fit rule.
25                         There is an issue associated with the b
It's the staff's impression 12 that indeed the current back-fit rule does not apply to 13 decommissioning.
l 14 It's further my understanding that the staff l
15 believes it should apply the decommissioning and that 16 currently underway you're attempting to apply it to the I
17 extent practical to decommission facilities.
18 I was just wondering if you could very briefly 19 explain how you're focusing your efforts on a day-to-day 20 basis with inspection and licensing to make sure that that j.
21 happens.
22 MR. MATTHEWS:
I am prepared to comment on that.
23 In fact, I just needed to turn the page, but didn't get to 24 it.
25 There is an issue associated with the b
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
l                                                           Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 g                                                              (202) 842-0034 i
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
l I
20036 (202) 842-0034 g
i l
I


  ..____._._____.__.__.___.._.__.___..__..._.__m.           _
..____._._____.__.__.___.._.__.___..__..._.__m.
4 94 1               applicability of the back-fit rule to decommissioning that i
4 94 1
2               we raised in a Commission paper.       We did offer to utilize 3               the existing rule without proposing to revise it, as I think             l 4               we_said, to the extent practical.                                       l 5                         The use in that regard would be as we address the
applicability of the back-fit rule to decommissioning that i
:                            6              need for cost-benefit analysis, for NRC imposed changes in 7               license requirement applicable to a decommissioning reactor.           ;
2 we raised in a Commission paper.
8               So we intend to use the principals of the back-fit rule and 9               conduct such analysis where warranted in license requirement 10                 application, and this primarily relates to license                     .
We did offer to utilize 3
11                 amendments that are submitted as a plant moves through the             .
the existing rule without proposing to revise it, as I think 4
12                 decommissioning process.
we_said, to the extent practical.
13                             It probably has a greater role in the near-term 14                 until we get several rule-makings under our belt that will l
5 The use in that regard would be as we address the 6
15                 address new requirements and, of course, we'll impose 51.09
need for cost-benefit analysis, for NRC imposed changes in 7
(                                                                                                                     !
license requirement applicable to a decommissioning reactor.
(                         16                 in that rule-making process.     But before we get there, we 17                 have to be sensitive to back-fit considerations in l
8 So we intend to use the principals of the back-fit rule and 9
18                 establishing new requirements.
conduct such analysis where warranted in license requirement 10 application, and this primarily relates to license 11 amendments that are submitted as a plant moves through the 12 decommissioning process.
l                                                                                                                     i l                         19                           We hope a lot of this will be addressed by several l
13 It probably has a greater role in the near-term 14 until we get several rule-makings under our belt that will l
20                 rule-makings that I think you're aware of and we have                   I 21                 submitted or are in the process of submitting rule-making i
15 address new requirements and, of course, we'll impose 51.09
l                       - 22                 plans to address this issue in decommissioning space and, in l
(
l                         23                 effect, get us out of what I would call the unique set of 24                 license conditions that seem to emanate from each                       l I
(
l 25                 decommissioning action.
16 in that rule-making process.
But before we get there, we 17 have to be sensitive to back-fit considerations in l
18 establishing new requirements.
l l
19 We hope a lot of this will be addressed by several l
20 rule-makings that I think you're aware of and we have 21 submitted or are in the process of submitting rule-making i
l
- 22 plans to address this issue in decommissioning space and, in l
l 23 effect, get us out of what I would call the unique set of 24 license conditions that seem to emanate from each l
I 25 decommissioning action.
l l
l l
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


b 95 1             However, I want to make one more comment and I 2 think it's worth clarifying.       There is an issue that's been 3 raised with regard to the applicability of the back-fit rule 4 in the exemption process, which is used at times in a 5 decommissioning reactor's life to eliminate requirements.
b 95 1
6             In that context, the back-fit rule does not have a     !
However, I want to make one more comment and I 2
7 direct role and it's because when you grant an exemption, 8 it's contingent upon meeting new expectations and the 9 constraints, though, that we're going to impose on the 1
think it's worth clarifying.
10 process, that are hopefully sensitive to back-fit 11 considerations, is that those new expectations, that there 12 be a rational basis for them and that there is a reasonable 13 nexus between the new circumstances and the subject matter 14 of the exemption and that's the way by which we're going to 15 look hard in that exemption space.
There is an issue that's been 3
16             But the back-fit rule 51.90 would not be applied.
raised with regard to the applicability of the back-fit rule 4
17             MR. TRAVERS:   Just for completeness. There is an 18 appeal ongoing in one case where the licensee has taken 19 issue with this view and the appeal is to the Executive 20 Director for Operations level.       So that's an ongoing process 21 and I've had a chance to just today talk to Mr. Meisner 22 about what we're doing to follow up on that.
in the exemption process, which is used at times in a 5
23             COMMISSIONER McGAFFIGAN:     I was just going to 24 comment that I thought that was still an open -- that's the 25 staff position.     But at some point, that may even get 4
decommissioning reactor's life to eliminate requirements.
6 In that context, the back-fit rule does not have a 7
direct role and it's because when you grant an exemption, 8
it's contingent upon meeting new expectations and the 9
constraints, though, that we're going to impose on the 10 process, that are hopefully sensitive to back-fit 11 considerations, is that those new expectations, that there 12 be a rational basis for them and that there is a reasonable 13 nexus between the new circumstances and the subject matter 14 of the exemption and that's the way by which we're going to 15 look hard in that exemption space.
16 But the back-fit rule 51.90 would not be applied.
17 MR. TRAVERS:
Just for completeness.
There is an 18 appeal ongoing in one case where the licensee has taken 19 issue with this view and the appeal is to the Executive 20 Director for Operations level.
So that's an ongoing process 21 and I've had a chance to just today talk to Mr. Meisner 22 about what we're doing to follow up on that.
23 COMMISSIONER McGAFFIGAN:
I was just going to 24 comment that I thought that was still an open -- that's the 25 staff position.
But at some point, that may even get 4
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


  .        - - - . - . ~ . . - . . . -.                 -- - -                ._~ - -.- - - _ _                           .
- - -. -. ~.. -... -.
._~ - -.- - - _ _
96 l
96 l
1         appealed to the Commission itself.                                                                           ,
1 appealed to the Commission itself.
    <                          2                   CHAIRMAN JACKSON:                           But we'll let it work its way l                               3         through.the process.         Thank you very much.
2 CHAIRMAN JACKSON:
4                   MR. MATTHEWS:                 Thank you, Chairman.
But we'll let it work its way l
5                   CHAIRMAN JACKSON:                           Thank you. Mr. Beedle, Mr.
3 through.the process.
6         Pietrangelo, .and invited guests.                           Good afternoon.                                 i l                                                                                                                                                       :
Thank you very much.
l                               7                   MR. BEEDLE:       Good afternoon, Chairman.
4 MR. MATTHEWS:
!                                                                                                                                                      i 8                   COMMISSIONER McGAFFIGAN:                             You said you were trying 9-       to avoid three hours and 45 minutes.                                                                          .
Thank you, Chairman.
l 10                     CHAIRMAN JACKSON:                           This will not be three hours                         j
5 CHAIRMAN JACKSON:
!                            11           and 45 minutes.       You hear that, Mr. Beedle?
Thank you.
12                     MR. BEEDLE:       The staff covered some 12 topics this                                           ;
Mr. Beedle, Mr.
13           morning and we'd like to address four of those.                               But before                     i 14           I turn it over to Tony to talk about some details, I would                                                   '
6 Pietrangelo,.and invited guests.
15           comment on an observation made by Roy Zimmerman about the                                                     [
Good afternoon.
;                            16           use and facility and discussion of NEI task forces.
i l
t                           17                     We've got members of our task force on the RAI                                                     !
l 7
18           here in the audience, Jim Visacaro and that group have done                                                   !
MR. BEEDLE:
i 19           a lot of good work and I think that that does give us the                                                     f 20           ability ar. an industry to communicate with the NRC staff                                                     I 21         'without particular concern for issues associated with a l
Good afternoon, Chairman.
22           specific licensee.         So I think that's facilitated good                                                 r l                           23           communication.       We hope to continue that.                                                               ,
i 8
l 24                     I would also echo the fact that your observations
COMMISSIONER McGAFFIGAN:
!                            25         about the staff's effort to come to conclusion.                               Some of                       :
You said you were trying 9-to avoid three hours and 45 minutes.
I I
l 10 CHAIRMAN JACKSON:
This will not be three hours j
11 and 45 minutes.
You hear that, Mr. Beedle?
12 MR. BEEDLE:
The staff covered some 12 topics this 13 morning and we'd like to address four of those.
But before i
14 I turn it over to Tony to talk about some details, I would 15 comment on an observation made by Roy Zimmerman about the
[
16 use and facility and discussion of NEI task forces.
t 17 We've got members of our task force on the RAI 18 here in the audience, Jim Visacaro and that group have done i
19 a lot of good work and I think that that does give us the f
20 ability ar. an industry to communicate with the NRC staff I
21
'without particular concern for issues associated with a l
22 specific licensee.
So I think that's facilitated good r
l 23 communication.
We hope to continue that.
l 24 I would also echo the fact that your observations 25 about the staff's effort to come to conclusion.
Some of I
I
! ~.
! ~.
i                                                       ANN RILEY & ASSOCIATES, LTD.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


97       !
97 1
1        these are really difficult problems.                                                 I'd like to solve the 2
these are really difficult problems.
problem by this Friday, but many of them are very complex 3       and the 50.59 is a good example. You and I have personally 4       had conversations on this and it's --
I'd like to solve the 2
5                               CHAIRMAN JACKSON:                   We've come a long way down the 6       road.
problem by this Friday, but many of them are very complex 3
l                 7                               MR. BEEDLE:         But it takes time, I think, as you                                     '
and the 50.59 is a good example.
8      .get a lot of different opinions on it.
You and I have personally 4
I 9                               With that, I'd like to ask Tony to provide some                                             j 10           observations on four of those topics we discussed this 11           morning.
had conversations on this and it's --
12                                   MR. PIETRANGELO:                 Before I move to the first 13           slide, I just want to say a lot of the things that Roy went 14           over in terms of improvements in that whole licensing 15           process with respect to RAIs and process things do pertain 16           to license renewal.
5 CHAIRMAN JACKSON:
We've come a long way down the 6
road.
l 7
MR. BEEDLE:
But it takes time, I think, as you 8
.get a lot of different opinions on it.
9 With that, I'd like to ask Tony to provide some j
10 observations on four of those topics we discussed this 11 morning.
12 MR. PIETRANGELO:
Before I move to the first 13 slide, I just want to say a lot of the things that Roy went 14 over in terms of improvements in that whole licensing 15 process with respect to RAIs and process things do pertain 16 to license renewal.
i
i
                                                                                                                                              )
)
17                                   We're going to get to that at the end of this, but                                         !
17 We're going to get to that at the end of this, but 18 that's not affecting that either.
18           that's not affecting that either.
19 CHAIRMAN JACKSON:
19                                     CHAIRMAN JACKSON:                   Okay.                                                 ,
Okay.
20                                     MR. PIETRANGELO:                 Next slide, please.                     Let me just.
20 MR. PIETRANGELO:
,            21           start off by saying that -- and I know you want us to go l                                                                                                                                             i 22             into some detail on 50.59, Chairman.                                                                               !
Next slide, please.
l L           23                                     CHAIRMAN JACKSON:                   To whatever extent you can.                           '
Let me just.
21 start off by saying that -- and I know you want us to go l
i l
22 into some detail on 50.59, Chairman.
L 23 CHAIRMAN JACKSON:
To whatever extent you can.
i i
i i
24                                     MR. PIETRANGELO:                 But I'm going to resist that 25           because it will not do it justice here.                                                   I think we need a
24 MR. PIETRANGELO:
.                                                      ANN RILEY & ASSOCIATES, LTD.
But I'm going to resist that 25 because it will not do it justice here.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D..C. 20036 (202) 842-0034
I think we need a ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D..C.
20036 (202) 842-0034


98 1 --
98 1
2             CHAIRMAN JACKSON:   A separate --
2 CHAIRMAN JACKSON:
3             MR. PIETRANGELO:   We would respectfully request a 4 separate briefing on this.
A separate --
5             CHAIRMAN JACKSON:   To come and talk about it.
3 MR. PIETRANGELO:
6             MR. PIETRANGELO:   As Dave noted earlier, we met 7 with the staff for well over three hours on last Friday and 8 I think we're going to do it again with a broader cross 9 section of NRC and over tw. of those hours were devoted to 10 the margin of safety proposal that we put into our comments.
We would respectfully request a 4
11             I would just hate to gloss over that here.
separate briefing on this.
12             CHAIRMAN JACKSON:   I think that's fair. So why 13 don't we move on.
5 CHAIRMAN JACKSON:
14             MR. PIETRANGELO:   Let me do say, though, that the           1 15 rule-making package that the staff put out for comment was 16 -- and I said this in the EDO meetings we had, that it 17 should set a standard for how rule-makings are done by the               l 18 agency.                                                                   !
To come and talk about it.
19             It was a comprehensive detailed proposal, there 20 were proposed definitions on it, there were options proposed 1
6 MR. PIETRANGELO:
21 in it, and it gave the industry and the stakeholders an                   '
As Dave noted earlier, we met 7
22 opportunity to really offer, I think, substantive comments 23 in terms of what the impact would be.       We think that's the 24 way it should be done.
with the staff for well over three hours on last Friday and 8
25             I know you asked me on Monday about minimal and ANN RILEY & ASSOCIATES, LTD.
I think we're going to do it again with a broader cross 9
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
section of NRC and over tw. of those hours were devoted to 10 the margin of safety proposal that we put into our comments.
11 I would just hate to gloss over that here.
12 CHAIRMAN JACKSON:
I think that's fair.
So why 13 don't we move on.
14 MR. PIETRANGELO:
Let me do say, though, that the 15 rule-making package that the staff put out for comment was 16
-- and I said this in the EDO meetings we had, that it 17 should set a standard for how rule-makings are done by the 18 agency.
19 It was a comprehensive detailed proposal, there 20 were proposed definitions on it, there were options proposed 1
21 in it, and it gave the industry and the stakeholders an 22 opportunity to really offer, I think, substantive comments 23 in terms of what the impact would be.
We think that's the 24 way it should be done.
25 I know you asked me on Monday about minimal and ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


                      -              .    --              . - .  . _ - - =         . . _  . - - . . _.-..-    . -.
. _ - - =
99 1       all that stuff and there's quite a lot of discussion in this
99 1
    ,            2        package with regard to that and I think on behalf of the 3       industry, we would like to see that kind of detail in future i
all that stuff and there's quite a lot of discussion in this 2
4       rule-making proposals, because then we can provide, I think, 5       some value-added into the process by offering more 6       meaningful comments.
package with regard to that and I think on behalf of the 3
7                     Even though our comment package was quite long, 8       most of it dealt with things where we agreed with many of
industry, we would like to see that kind of detail in future i
!                9        the staff proposals, as well as offered some tweaks or 10       clarifications to some of the parts of the rule-making 11       package, and then another large portion was devoted to the 12       margin of safety discussion.
4 rule-making proposals, because then we can provide, I think, 5
.                13                     And those are the two issues I just want to                                   ,
some value-added into the process by offering more 6
\
meaningful comments.
                                                                                                                        \
7 Even though our comment package was quite long, 8
14       briefly discuss this morning, margin of safety and this one j               15       you talked about earlier, about definition of change.
most of it dealt with things where we agreed with many of 9
16                     Next slide, please.                 When we went through all the i
the staff proposals, as well as offered some tweaks or 10 clarifications to some of the parts of the rule-making 11 package, and then another large portion was devoted to the 12 margin of safety discussion.
17       Commissioners' proposal -- and we ought to give credit to                                     !
13 And those are the two issues I just want to
18       the Commission here, too, because part of the rule-making                                     l t
\\
i               19       package was your -- included your notation votes on options l
\\
l               20       for margin of safety                 So the Commission had direct l
14 briefly discuss this morning, margin of safety and this one j
21       participation in putting out what was for comment and when 22       we went through all the permutations between what the scope l               23       of t.he margin of safety evaluation should be, as well as i
15 you talked about earlier, about definition of change.
24       what criteria should be used to decide whether prior NRC 25       review and approval was needed, we came up with 14 different AJUI RILEY & ASSOCIATES, LTD.
16 Next slide, please.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
When we went through all the i
17 Commissioners' proposal -- and we ought to give credit to 18 the Commission here, too, because part of the rule-making t
i 19 package was your -- included your notation votes on options l
l 20 for margin of safety So the Commission had direct l
21 participation in putting out what was for comment and when 22 we went through all the permutations between what the scope l
23 of t.he margin of safety evaluation should be, as well as i
24 what criteria should be used to decide whether prior NRC 25 review and approval was needed, we came up with 14 different AJUI RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


n i                                                                 100     l 1 permutations.
n i
l 2           And part of the long discussion in our comment 3 package walks through all of those about the pros and the 4 cons and what attributes they have.
100 l
5           The proposal we did finally agree on with our task 6 force, and this also went through our reg process working 7 group, is really a hybrid of the options that were in the 8 package.                                                               )
1 permutations.
9           Dave went through this in some detail, but in               I 10 terms of the scope of what criterion seven should be, we 11 came down on a focus on fission product barriers, and that's           !
l 2
l 12 really tied to the statement of considerations when the rule 13 was revised in 1968 and the associated design basis limits.           l 1
And part of the long discussion in our comment 3
14           Those are required to be in the SAR. We're not 15 looking for things that are in SERs or where it has 16 questionable legal standing and we don't want to get into a 17 discussion of that here. But to avoid the problem I think 18 Commissioner McGaffigan raised before about -- and we're 19 going to get to design basis in a second -- our intent at 20 this point is to be very prescriptive in our revision of 21 96-07 that would deal with these design basis limits, so 22 that there is no confusion about what we're talking about.
package walks through all of those about the pros and the 4
23           Hopefully, if that document is ultimately endorsed 24 by the NRC as a way to implement 50.59, then the design 25 basis piece that could potentially confuse what those limits
cons and what attributes they have.
5 The proposal we did finally agree on with our task 6
force, and this also went through our reg process working 7
group, is really a hybrid of the options that were in the 8
package.
)
9 Dave went through this in some detail, but in 10 terms of the scope of what criterion seven should be, we 11 came down on a focus on fission product barriers, and that's 12 really tied to the statement of considerations when the rule 13 was revised in 1968 and the associated design basis limits.
14 Those are required to be in the SAR.
We're not 15 looking for things that are in SERs or where it has 16 questionable legal standing and we don't want to get into a 17 discussion of that here.
But to avoid the problem I think 18 Commissioner McGaffigan raised before about -- and we're 19 going to get to design basis in a second -- our intent at 20 this point is to be very prescriptive in our revision of 21 96-07 that would deal with these design basis limits, so 22 that there is no confusion about what we're talking about.
23 Hopefully, if that document is ultimately endorsed 24 by the NRC as a way to implement 50.59, then the design 25 basis piece that could potentially confuse what those limits
(
(
                    ;JM RILEY & ASSOCIATES, LTD.
;JM RILEY & ASSOCIATES, LTD.
I                         Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


i E
i E
;                                                                                                  101 1    are would be eliminated.
101
{
{
l 1
1 are would be eliminated.
2                     Our intent at this point is to be very, very i               3   prescriptive about that in our guidance.
l 2
4                                                                                                 l CHAIRMAN JACKSON:           Let me ask you this question.
Our intent at this point is to be very, very 1
l l                5   In looking at this focus that you've come down on on fission 1
i 3
6   product barrier parameter and what you call associated 7   design basis limits, will support systems, like instrument 8   air, get margin reviews in your approach?
prescriptive about that in our guidance.
9                     MR. PIETRANGELO:           The thing that went over with 10       the staff is kind of five criteria and then you'd have to 11       answer yes to each one of those in order to go the next step 12       forward and go under this evaluation that we propose, and 13       that has to do with whether -- and I'm not sure I'm going to 14       remember all five, off the top of my head.
4 CHAIRMAN JACKSON:
15                       CHAIRMAN JACKSON:           That's okay. So the basic                     l 16     point is that anything that would satisfy an agreed upon 17     criteria would be in.
Let me ask you this question.
18                     .MR. PIETRANGELO:           That's right. And to be fair, 19     and this was some of the questions that we got on Friday, 20     our task force took a cut at that and we came up with 21     certain things that would not be covered if, let's say, we 22     eliminated the current margin of safety criteria.
l 5
23                       So we were trying to fill a gap with this what we 24     call criterion seven.               There may be other gaps that we 25     haven't identified yet, but if we get it down to an approach ANN RILEY & ASSOCIATES, LTD.
In looking at this focus that you've come down on on fission 1
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
6 product barrier parameter and what you call associated 7
design basis limits, will support systems, like instrument 8
air, get margin reviews in your approach?
9 MR. PIETRANGELO:
The thing that went over with 10 the staff is kind of five criteria and then you'd have to 11 answer yes to each one of those in order to go the next step 12 forward and go under this evaluation that we propose, and 13 that has to do with whether -- and I'm not sure I'm going to 14 remember all five, off the top of my head.
15 CHAIRMAN JACKSON:
That's okay.
So the basic 16 point is that anything that would satisfy an agreed upon 17 criteria would be in.
18
.MR.
PIETRANGELO:
That's right.
And to be fair, 19 and this was some of the questions that we got on Friday, 20 our task force took a cut at that and we came up with 21 certain things that would not be covered if, let's say, we 22 eliminated the current margin of safety criteria.
23 So we were trying to fill a gap with this what we 24 call criterion seven.
There may be other gaps that we 25 haven't identified yet, but if we get it down to an approach ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


e l
e l
l                                                                         4 l                                                                   102 l 1 with these five steps, I think that would address that 2 concern.
l 4
3           Let's move to the next slide.     You talked before a 4 little bit about definition of change.       It is not our intent 5 with the definition we put in our comments to get at the 6 scope issue. It's to get at the screening issue. We firmly 7 believe that we need to deal with scope on 50.59.       I think 8 we talked a little bit about that on Monday.
l 102 l
9           We think it should be integrated with the overall 10 scope discussion in order to ensure coherence in how you do 11 this across Part 50. But this does not take the place of 12 dealing with scope directly in 50.59.       Screening can't be 13 underestimated, though. I think we've learned through the 14 last couple of years that a lot of the burden associated 15 with this regulation is the confusion with regard to 16 screening.
1 with these five steps, I think that would address that 2
17           So we think this is a really good opportunity to 18 clarify the rule consistent with the Commission's objectives 19 and utilize both NRC and licensee resources more 20 effectively, because we can't --
concern.
l 21           CHAIRMAN JACKSON:   I'm not trying to needle you, 22 but it does sound like it's scope of what you screen.       So it 23 is scope. I mean, this is a screening rule.
3 Let's move to the next slide.
24           MR. PIETRANGELO:   Yes, but let me try to                 l l
You talked before a 4
25 distinguish it a little bit. What we're trying to screen           l l
little bit about definition of change.
It is not our intent 5
with the definition we put in our comments to get at the 6
scope issue.
It's to get at the screening issue.
We firmly 7
believe that we need to deal with scope on 50.59.
I think 8
we talked a little bit about that on Monday.
9 We think it should be integrated with the overall 10 scope discussion in order to ensure coherence in how you do 11 this across Part 50.
But this does not take the place of 12 dealing with scope directly in 50.59.
Screening can't be 13 underestimated, though.
I think we've learned through the 14 last couple of years that a lot of the burden associated 15 with this regulation is the confusion with regard to 16 screening.
17 So we think this is a really good opportunity to 18 clarify the rule consistent with the Commission's objectives 19 and utilize both NRC and licensee resources more 20 effectively, because we can't --
l 21 CHAIRMAN JACKSON:
I'm not trying to needle you, 22 but it does sound like it's scope of what you screen.
So it 23 is scope.
I mean, this is a screening rule.
24 MR. PIETRANGELO:
Yes, but let me try to l
25 distinguish it a little bit.
What we're trying to screen l
I l
I l
                    ;JRJ RILEY & ASSOCIATES, LTD.
;JRJ RILEY & ASSOCIATES, LTD.
Court Reporters                                 l 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034                                 ;
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


103 1 1 out of what's already the big scope are things that can't 2 possibly result in an affirmative answer to one of the l
103 1
3 questions in the next section, like VP names and other 4 design details, and the staff questioned us on this on 5 Friday, too.
out of what's already the big scope are things that can't l
6           I think we've got to go to some --
2 possibly result in an affirmative answer to one of the 3
7           CHAIRMAN JACKSON:     Right. See, I don't want you l
questions in the next section, like VP names and other 4
8 to confuse -- I'm not coming down with a bias one way or the       !
design details, and the staff questioned us on this on 5
l 9 other as to what is screened in or what is screened out, but 10 to kind of get a confession that we are talking about the 11 scope of what is screened and not necessarily a judgment as 12 to whether what gets screened out or remains in is the right 13 thing to do.
Friday, too.
14           MR. PIETRANGELO:     I don't think we're there yet, 15 Chairman. I think that's the next step.
6 I think we've got to go to some --
16           CHAIRMAN JACKSON:     I guess all I'm trying to say 17 is a screening rule.     So when you start to talk about what 18 will or will not be screened, you are de facto talking about 19 the scope of the rule.       So that's all I'm really saying. I 20 don't know if the lawyers --
7 CHAIRMAN JACKSON:
21           COMMISSIONER McGAFFIGAN:     Tony, I would advise you 22 to confess and still --
Right.
23             [ Laughter.)
See, I don't want you 8
24           COMMISSIONER McGAFFIGAN:     -- hold your position.
to confuse -- I'm not coming down with a bias one way or the l
l
9 other as to what is screened in or what is screened out, but 10 to kind of get a confession that we are talking about the 11 scope of what is screened and not necessarily a judgment as 12 to whether what gets screened out or remains in is the right 13 thing to do.
!    25           MR. BEEDLE:     Well, do you confess?
14 MR. PIETRANGELO:
I don't think we're there yet, 15 Chairman.
I think that's the next step.
16 CHAIRMAN JACKSON:
I guess all I'm trying to say 17 is a screening rule.
So when you start to talk about what 18 will or will not be screened, you are de facto talking about 19 the scope of the rule.
So that's all I'm really saying.
I 20 don't know if the lawyers --
21 COMMISSIONER McGAFFIGAN:
Tony, I would advise you 22 to confess and still --
23
[ Laughter.)
24 COMMISSIONER McGAFFIGAN:
-- hold your position.
l 25 MR. BEEDLE:
Well, do you confess?
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


104                   ,
104 1
1                        MR. PIETRANGELO:                 Yeah, I'll confess.
MR. PIETRANGELO:
2                         CHAIRMAN JACKSON:                 Just pass.
Yeah, I'll confess.
3                         MR. BEEDLE:       He said yes.
2 CHAIRMAN JACKSON:
4                         CHAIRMAN JACKSON:                   Okay.                 Then we can go on.
Just pass.
1 5                         COMMISSIONER MERRIFIELD:                                   Discussion is good.
3 MR. BEEDLE:
6                         MR. PIETRANGELO:                 And just finish this slide off, 7     our --
He said yes.
l l         8                         MR. BEEDLE:       But he wants an opportunity to 1
4 CHAIRMAN JACKSON:
9     appeal.                                                                                                                     ,
Okay.
l       10                         CHAIRMAN JACKSON:                 They could say that you 11     confessed with prejudice, that you can bring it back up l       12     again.
Then we can go on.
l 13                         MR. PIETRANGELO:                 If we thought this was dealing 14     with scope, then we wouldn't feel so strongly about needing 15     the next step.
1 5
16                         CHAIRMAN JACKSON:                   I understand, but I just want 17     to point out there is some subtlety there and it's not -- it 18     does relate to, I think, the scope.                                               Okay. Let's go on.                       ,
COMMISSIONER MERRIFIELD:
i 19                         MR. PIETRANGELO:               That's all I had on 50.59.
Discussion is good.
l       20                           [ Laughter.]
6 MR. PIETRANGELO:
21                         MR. PIETRANGELO:               Unless there's any further                                               ]
And just finish this slide off, 7
22     questions on this.                 Again, I think we need a separate 23     briefing.             We were going to bring Mr. Ray out for today's 24     discussion, but given that we only had limited time, we 25     really couldn't justify his trip out here.
our --
l l
8 MR. BEEDLE:
But he wants an opportunity to 1
9 appeal.
l 10 CHAIRMAN JACKSON:
They could say that you 11 confessed with prejudice, that you can bring it back up l
12 again.
l 13 MR. PIETRANGELO:
If we thought this was dealing 14 with scope, then we wouldn't feel so strongly about needing 15 the next step.
16 CHAIRMAN JACKSON:
I understand, but I just want 17 to point out there is some subtlety there and it's not -- it 18 does relate to, I think, the scope.
Okay.
Let's go on.
i 19 MR. PIETRANGELO:
That's all I had on 50.59.
l 20
[ Laughter.]
21 MR. PIETRANGELO:
Unless there's any further
]
22 questions on this.
Again, I think we need a separate 23 briefing.
We were going to bring Mr. Ray out for today's 24 discussion, but given that we only had limited time, we 25 really couldn't justify his trip out here.
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


105 1                     But I think we would look forward to the 2         opportunity to further discuss in detail what the problems 3         are.
105 1
4                       CHAIRMAN JACKSON:                                 I think we'll give the staff 5         time to digest and so on and you all to work some more, but 6         I think it is appropriate to have a separate meeting.
But I think we would look forward to the 2
7                       MR. PIETRANGELO:                             Okay.                 If we could move to the I
opportunity to further discuss in detail what the problems 3
8          next slide, please.                 FSAR updates, I think Dave said most of what had to be said here.
are.
1 9                                                                Again, we think this is probably 10         our best example yet of how we get together early on these 11         things and talk about them, that it can be of benefit.
4 CHAIRMAN JACKSON:
12                       In this case, we haven't seen 99-001 yet, but our 13         expectation is that it should be a relatively clean I
I think we'll give the staff 5
14         endorsement of the guideline, based on the discussions we                                                   ;
time to digest and so on and you all to work some more, but 6
15         had in putting the guideline together.                                                                     I 16                     As soon as we get a little bit further on where i
I think it is appropriate to have a separate meeting.
i 17         the Commission is going with 50.59, we're going to schedule                                                 '
7 MR. PIETRANGELO:
18         our next licensing workshop.                                     One of our objectives at that 19         workshop is to start getting some feedback on the 20         implementation of that guideline.                                               When we sent it to the
Okay.
,.          21         Commission, we also sent it-out across the industry for use.
If we could move to the 8
l-         22                     CHAIRMAN JACKSON:                               Let me just make sure I L                                                                                                                                   I 23-       understand.     Has the task force that developed the 98-03                                                 j 24         agreed to add clarification to those guidelines to stipulate 25         that risk significant SSCs should not be removed from the i
next slide, please.
FSAR updates, I think Dave said most of 1
9 what had to be said here.
Again, we think this is probably 10 our best example yet of how we get together early on these 11 things and talk about them, that it can be of benefit.
12 In this case, we haven't seen 99-001 yet, but our 13 expectation is that it should be a relatively clean 14 endorsement of the guideline, based on the discussions we 15 had in putting the guideline together.
I 16 As soon as we get a little bit further on where i
i 17 the Commission is going with 50.59, we're going to schedule 18 our next licensing workshop.
One of our objectives at that 19 workshop is to start getting some feedback on the 20 implementation of that guideline.
When we sent it to the l
21 Commission, we also sent it-out across the industry for use.
l-22 CHAIRMAN JACKSON:
Let me just make sure I L
I 23-understand.
Has the task force that developed the 98-03 j
24 agreed to add clarification to those guidelines to stipulate 25 that risk significant SSCs should not be removed from the i
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l                       .                                                                                            -
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l


, - . _ .  . . . -- . ~ . - .         . . . .  . . - - -    - . . - - . . . - .        . . - - - - - - . - ~ .                  _ - -                        .
... -. ~. -.
.. - - - - - -. - ~.
l 8
l 8
!-                                                                                                                                                      106 l             1               FSARs?
106 l
1 2                                 MR. PIETRANGELO:                   Yes.             We had a discussion with                                           l 3               the staff last week with regard to that.                                             That was never the L             4               intent of the update guidance at all.
1 FSARs?
5                                 CHAIRMAN JACKSON:                     And you'll add -- it's going to 6               be clarified to that effect.
1 2
l             7                                 MR. PIETRANGELO:                   What we talked to the staff                                                       ;
MR. PIETRANGELO:
Yes.
We had a discussion with 3
the staff last week with regard to that.
That was never the L
4 intent of the update guidance at all.
5 CHAIRMAN JACKSON:
And you'll add -- it's going to 6
be clarified to that effect.
l 7
MR. PIETRANGELO:
What we talked to the staff l
1 8
about is if there's any -- there is probably some other l
\\
9 little areas where --
10 CHAIRMAN JACKSON:
That's not a little area, but I i
11 understand.
But you mean little in the sense of word 12 changes.
i i
13 MR. PIETRANGELO:
Right, and we'd like.to do them i
14 all at once.
We'll issue Rev.
1, but we've agreed to j
i l
- 15 already add that provision in the annex of the document.
l 1
l 1
8              about is if there's any -- there is probably some other                                                                                ;
l 16 However, let me -- and I was scribbling this down t
                                                                                                                                                                      \
17 before, about I understand the concern there, but -- and i
l 9              little areas where --
i 18 that's why -- and I think ".r.
10                                  CHAIRMAN JACKSON:                      That's not a little area, but I                                              i 11                  understand.            But you mean little in the sense of word 12                  changes.                                                                                                                              i i
Ray would say this if he was
13                                  MR. PIETRANGELO:                  Right, and we'd like.to do them
)
                                                                  .                                                                                                  i 14                  all at once.              We'll issue Rev.                  1,      but we've agreed to                                              j i
19 here, we need to get on with this next step, because there's f
l         - 15                already add that provision in the annex of the document.                                                                              !
20 a notion that if I put it in the SAR, I've got regulatory i
l                                                                                                                                                                    1 l          16                                   However, let me -- and I was scribbling this down                                                                     ;
o 21 control and if it's not in the SAR, I don't have regulatory I
t 17                 before, about I understand the concern there, but -- and                                                                               i i
22 control, and it puts all this pressure on level of detail 23 that's in the SAR and all that.
18                 that's why -- and I think ".r. Ray would say this if he was                                                                           !
24 That's why we want to move to the next step.
                                                                                                                                                                      )
We i
19                 here, we need to get on with this next step, because there's                                                                           f 20                 a notion that if I put it in the SAR, I've got regulatory                                                                             i o
1 25 don't think that's appropriate.
21                 control and if it's not in the SAR, I don't have regulatory                                                                           I
There are certain key ANN RILEY & ASSOCIATES, LTD.
-          22                 control, and it puts all this pressure on level of detail 23                 that's in the SAR and all that.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
24                                 That's why we want to move to the next step.                                                         We i
Washington, D.C.
25                 don't think that's appropriate.                                   There are certain key                                             1 ANN RILEY & ASSOCIATES, LTD.                                                                                   '
20036 (202) 842-0034 j
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014                                                                                   i Washington, D.C. 20036                                                                                   !
i m
(202) 842-0034                                                                                       j i


  .    .- .    -  _ . . - _ _ -          - - .    . - - - . - . _ _ .          . - .-.__ ~ . _-        - -- - -.-
. -.-.__ ~. _-
1 107 1 things in the SAR that are tied to the licensing basis of 2 the plant. There's a lot of other information that really 3 kind of mucks up this process, and that's why we need to go 4 to the next step.
107 1
5                   And this notion about don't remove risk l
things in the SAR that are tied to the licensing basis of 2
6 significant information and maybe later how to move more 7 risk significant information that's in there seems to be                                               j i
the plant.
l
There's a lot of other information that really 3
;              8 premised on the notion that if it's not in the SAR, we're                                               '
kind of mucks up this process, and that's why we need to go 4
l
to the next step.
[             9 going to lose it.               We need to get over that.
5 And this notion about don't remove risk l
10                   CHAIRMAN JACKSON:                   See, let's not go down that 11 path, because if we had addressed the scope issue --
6 significant information and maybe later how to move more 7
l             12                   MR. PIETRANGELO:                   That's water under the bridge, 13 Chairman.
risk significant information that's in there seems to be j
14                   CHAIRMAN JACKSON:                   -- in a broad-based way, we 15 wouldn't be having to deal with what should be in the SAR or i
i 8
16 what should not be in the SAR.                             That's the point, that 17 because of a lot of discussion back and forth and where we 18 ended up, we are ending up dealing with the SAR in this --                                             l 19 having to deal with it and how it should be updated, what 20 should be in it.
premised on the notion that if it's not in the SAR, we're l
21                   But if one were dealing in a broad scope with what 22 should come under the regulatory umbrella and how we deal l
[
9 going to lose it.
We need to get over that.
10 CHAIRMAN JACKSON:
See, let's not go down that 11 path, because if we had addressed the scope issue --
l 12 MR. PIETRANGELO:
That's water under the bridge, 13 Chairman.
14 CHAIRMAN JACKSON:
-- in a broad-based way, we 15 wouldn't be having to deal with what should be in the SAR or i
16 what should not be in the SAR.
That's the point, that 17 because of a lot of discussion back and forth and where we 18 ended up, we are ending up dealing with the SAR in this --
19 having to deal with it and how it should be updated, what 20 should be in it.
21 But if one were dealing in a broad scope with what 22 should come under the regulatory umbrella and how we deal l
23 with that in a risk-informed way, then we wouldn't have 24 surrogates for that in this form.
23 with that in a risk-informed way, then we wouldn't have 24 surrogates for that in this form.
25                     So that's all I have to say about it.                         But let me i
25 So that's all I have to say about it.
But let me i
i 1
i 1
JJRJ RILEY & ASSOCIATES, LTD.
JJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


l 108     '
l 108 1
1 ask you this.       Assuming that 98-03 becomes the selected 2 approach for doing the updates and for assuring compliance 3 with 50.71(e), how much time do you think it would take for 4 all the licensees to meet this guidance?
ask you this.
5           MR. PIETRANGELO:       They've been using it since 6 November when we distributed it.         That's one of the things I 7 think we want to find out at this workshop.           I don't think I 8 can answer your question today.         And there may be other 9 things beyond the point you raised that we'd want to tweak 10 the guidelines, given the feedback we get from licensees.
Assuming that 98-03 becomes the selected 2
11             So I think the schedule the Commission laid out, I             .
approach for doing the updates and for assuring compliance 3
12 think that can be beat in terms of finalizing the thing by 13 September, given that this is so straightforward that 14 there's no reason why it should take that long.
with 50.71(e), how much time do you think it would take for 4
15             COMMISSIONER McGAFFIGAN:         I just want to 16 understand the process.         The intent would be that while this 17 is out for comment, you would do this Rev.         1.
all the licensees to meet this guidance?
18             MR. PIETRANGELO:       No.
5 MR. PIETRANGELO:
19             COMMISSIONER McGAFFIGAN:         And that we would 20 endorse in the final guide Rev. 1 rather than Rev.         O, or is 21 the intent --
They've been using it since 6
22             MR. PIETRANGELO:       I haven't worked through all 23 that, logic, in my head, yet, but I think we want to get 24 feedback plus any things that come up in terms of the 25 regulatory endorsement, consider them, incorporate them
November when we distributed it.
                              ;JRJ RILEY & ASSOCIATES, LTD.
That's one of the things I 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
think we want to find out at this workshop.
I don't think I 8
can answer your question today.
And there may be other 9
things beyond the point you raised that we'd want to tweak 10 the guidelines, given the feedback we get from licensees.
11 So I think the schedule the Commission laid out, I 12 think that can be beat in terms of finalizing the thing by 13 September, given that this is so straightforward that 14 there's no reason why it should take that long.
15 COMMISSIONER McGAFFIGAN:
I just want to 16 understand the process.
The intent would be that while this 17 is out for comment, you would do this Rev.
1.
18 MR. PIETRANGELO:
No.
19 COMMISSIONER McGAFFIGAN:
And that we would 20 endorse in the final guide Rev. 1 rather than Rev.
O, or is 21 the intent 22 MR. PIETRANGELO:
I haven't worked through all 23 that, logic, in my head, yet, but I think we want to get 24 feedback plus any things that come up in terms of the 25 regulatory endorsement, consider them, incorporate them
;JRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


t 3
t 3
109 1     ~ where appropriate, and I think the point you raised we've                                                           l i
109 1
2      already agreed to incorporate, and that would be the one l
~ where appropriate, and I think the point you raised we've l
3     that would be endorsed.
i 2
4                         So prior to -- maybe as part of the -- when 98-03                                               I l
already agreed to incorporate, and that would be the one l
5     Rev. O goes out for comment, in our comments back, we would l
3 that would be endorsed.
6      say how we would change --                                                                                         '
4 So prior to -- maybe as part of the -- when 98-03 l
7                         COMMISSIONER McGAFFIGAN:                                             So you would say how you 8     would change to incorporate the staff -- any tweaks that the 1
5 Rev. O goes out for comment, in our comments back, we would 6
9     staff suggests or others, perhaps, and then we would be in a                                                         '
say how we would change --
(       10     position to endorse effectively Rev.                                                     1. We would say we     ,
7 COMMISSIONER McGAFFIGAN:
11     endorse Rev. O with these changes, which turns out to be                                                           '
So you would say how you 8
l      12     Rev. 1.
would change to incorporate the staff -- any tweaks that the 1
l 13                         MR. PIETRANGELO:                                         Yes.     We need to figure out the   i l
9 staff suggests or others, perhaps, and then we would be in a
14    .right, proper way to do that, but that would be --
(
l                                                                                                                                   t 15-                         COMMISSIONER McGAFFIGAN:                                             Is that the way that       '
10 position to endorse effectively Rev.
16     would work?                                                                                                         '
1.
17                         MR. PIETRANGELO:                                         Yes.
We would say we 11 endorse Rev. O with these changes, which turns out to be l
!      18                         COMMISSIONER McGAFFIGAN:                                             Okay. I sort of regard, J
12 Rev.
i 19     Madam Chairman, in response to your comment, this clause L       20     that the staff is proposing to us is sort of a savings 21     clause for the later scope discussion.                                                       In fact, it's the       i l
1.
22     first place for -- I'll read you it, I may be violating some 23     rule, but the words they want you to say in Section A-2 are, 24     is the intent of this guideline to help-licensees remove 25     unimportant information from new FSARs, such as excessive ANN RILEY & ASSOCIATES, LTD.
l 13 MR. PIETRANGELO:
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l                                                                                                                     ..
Yes.
We need to figure out the i
l 14
.right, proper way to do that, but that would be --
l t
15-COMMISSIONER McGAFFIGAN:
Is that the way that 16 would work?
17 MR. PIETRANGELO:
Yes.
18 COMMISSIONER McGAFFIGAN:
Okay.
I sort of regard, J
19 Madam Chairman, in response to your comment, this clause i
L 20 that the staff is proposing to us is sort of a savings 21 clause for the later scope discussion.
In fact, it's the i
22 first place for -- I'll read you it, I may be violating some 23 rule, but the words they want you to say in Section A-2 are, 24 is the intent of this guideline to help-licensees remove 25 unimportant information from new FSARs, such as excessive ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l


d 110       j 1   detail, obsolete or redundant information.                       The guideline is 2   not intended to be used to remove information from new FSARs 4
d 110 j
3   regarding SSCs, the insights from operating experience, or 4   probabilistic risk assessments we'd indicate are risk 5   significant.
1 detail, obsolete or redundant information.
6                   Your normal mantra is operating experience, 7   engineering analyses or probabilistic risk assessment.                                     So I 8   suspect the staff would accept that, but that is what I 9   remember the mantra from the rule changes to be.                                     But this 10   is, in a sense, a savings clause for that later scope 11   discussion.
The guideline is 2
12                   MR. PIETRANGELO:     Yes. In fact, it may even be a 13   little narrower than our current mantra, because the risk 14   information, insights from PRA pick up that stuff.
not intended to be used to remove information from new FSARs 4
15                   The deterministic engineering things already 16   should be in there.
3 regarding SSCs, the insights from operating experience, or 4
17                   COMMISSIONER McGAFFIGAN:           Right.
probabilistic risk assessments we'd indicate are risk 5
18                   MR. PIETRANGELO:     The important ones.                           Operating 19   experience is pretty broad and I think our comment back to 20   the staff was we would probably strike the operating 21   experience part, because that should be incorporated in the 22   PRA and come out in the risk insights.                     But we're not --
significant.
23   we're on the same page.
6 Your normal mantra is operating experience, 7
24                   CHAIRMAN JACKSON:       When is your workshop or your 25   --
engineering analyses or probabilistic risk assessment.
ANN RILEY & ASSOCIATES, LTD.
So I 8
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
suspect the staff would accept that, but that is what I 9
remember the mantra from the rule changes to be.
But this 10 is, in a sense, a savings clause for that later scope 11 discussion.
12 MR. PIETRANGELO:
Yes.
In fact, it may even be a 13 little narrower than our current mantra, because the risk 14 information, insights from PRA pick up that stuff.
15 The deterministic engineering things already 16 should be in there.
17 COMMISSIONER McGAFFIGAN:
Right.
18 MR. PIETRANGELO:
The important ones.
Operating 19 experience is pretty broad and I think our comment back to 20 the staff was we would probably strike the operating 21 experience part, because that should be incorporated in the 22 PRA and come out in the risk insights.
But we're not --
23 we're on the same page.
24 CHAIRMAN JACKSON:
When is your workshop or your 25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


  . _ . - .        . - . - -        -  ._~ . . - .         . - - - -          . - . . . - - .  . . _ - . . - - -
._~.. -.
111 1                         MR. PIETRANGELO:           We haven't scheduled it yet,
111 1
            . 2          Chairman.         It somewhat depends on what happens -- you're 3           going to get a paper on it, I guess, February 19.
MR. PIETRANGELO:
[               4                         CHAIRMAN JACKSON:           Okay.
We haven't scheduled it yet, 2
5                         MR. PIETRANGELO:           That hopefully would be released l
Chairman.
6           fairly soon thereafter.
It somewhat depends on what happens -- you're 3
i 7                         CHAIRMAN JACKSON:           So it would be sometime after 8           that.
going to get a paper on it, I guess, February 19.
I 9                         MR. PIETRANGELO:           Yes.                                           I 10                         CHAIRMAN JACKSON:           I see. Okay.
[
11                         MR. PIETRANGELO:           Okay. Next slide, please. Dave           t 12           went through this a little bit and we are still in the early 13           stages of discussion with the staff on what the 14           interpretation should be.
4 CHAIRMAN JACKSON:
15                         I'm not going to sugarcoat it and say we're really 16           close. We're not.
Okay.
17                         CHAIRMAN JACKSON:           Can~you say where some of the 18           big differences are, from your point of view?
5 MR. PIETRANGELO:
19                         MR. PIETRANGELO:           Yes. I think there's design 20           basis for 50.2 that we would consider to be those design                                 j 21           functions that are necessary to place the plant in a safe 22           condition following a postulated design basis accident.                                   )
That hopefully would be released l
23           There.are other design functions and these have been termed, 24           and I think the staff coined this phrase in a NUREG several l               25           years ago, engineering decign basis, that don't have to do I
6 fairly soon thereafter.
i 7
CHAIRMAN JACKSON:
So it would be sometime after 8
that.
I 9
MR. PIETRANGELO:
Yes.
I 10 CHAIRMAN JACKSON:
I see.
Okay.
11 MR. PIETRANGELO:
Okay.
Next slide, please.
Dave t
12 went through this a little bit and we are still in the early 13 stages of discussion with the staff on what the 14 interpretation should be.
15 I'm not going to sugarcoat it and say we're really 16 close.
We're not.
17 CHAIRMAN JACKSON:
Can~you say where some of the 18 big differences are, from your point of view?
19 MR. PIETRANGELO:
Yes.
I think there's design 20 basis for 50.2 that we would consider to be those design j
21 functions that are necessary to place the plant in a safe 22 condition following a postulated design basis accident.
)
23 There.are other design functions and these have been termed, 24 and I think the staff coined this phrase in a NUREG several l
25 years ago, engineering decign basis, that don't have to do I
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 1


1 l
1 112 1
112 1 with a safety function or placing the plant in a safe               l
with a safety function or placing the plant in a safe
                                                                        )
)
2 condition.                                                           '
2 condition.
3             There are other attributes that the equipment have       l 4 that probably aren't safety related.     And I think the 5 confusion has been this level of detail and I think the 6 rule-making on reporting will address some of the concern, 7 but it doesn't eddress all of it, when you get into license 8 renewal, when you get into what information you put in the 9 SAR.
3 There are other attributes that the equipment have 4
10             I would disagree with Dave a little bit in terms 11 of I think what was put in the SAR does define, to some 12 extent, what the 50.2 design basis information is, because i
that probably aren't safety related.
13 that hasn't changed since 1960-something.                            .
And I think the 5
I 14             CHAIRMAN JACKSON:   But then if that's true, how do     I 15 we complete this endorsement of guidance for the update, if 16 there isn't clarity on design basis definition?
confusion has been this level of detail and I think the 6
17             MR. PIETRANGELO:   First, let me state, with regard 18 to our design basis program guidelines, that is a revision 19 to an old NUMARC document from 1990 and what was added in 20 the revision was just more examples on what we think are 21 design basis information examples.
rule-making on reporting will address some of the concern, 7
22             We are not requesting endorsement of all of 97-04 23 because there are things in there with regard to good 24 practices on how to structure a design reconstitution 25 program that we don't need regulatory endorsement for.     What ANN RILEY & ASSOCIATES, LTD.
but it doesn't eddress all of it, when you get into license 8
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
renewal, when you get into what information you put in the 9
SAR.
10 I would disagree with Dave a little bit in terms 11 of I think what was put in the SAR does define, to some 12 extent, what the 50.2 design basis information is, because i
13 that hasn't changed since 1960-something.
14 CHAIRMAN JACKSON:
But then if that's true, how do 15 we complete this endorsement of guidance for the update, if 16 there isn't clarity on design basis definition?
17 MR. PIETRANGELO:
First, let me state, with regard 18 to our design basis program guidelines, that is a revision 19 to an old NUMARC document from 1990 and what was added in 20 the revision was just more examples on what we think are 21 design basis information examples.
22 We are not requesting endorsement of all of 97-04 23 because there are things in there with regard to good 24 practices on how to structure a design reconstitution 25 program that we don't need regulatory endorsement for.
What ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


l
i.
: i. -
's 113 i
's 113       I i
I we do need is in the second bullet, and that is to really 2
!      I we do need is in the second bullet, and that is to really                         ,
finally get a common understanding of what the 50.2 3
finally get a common understanding of what the 50.2                               l 3 definition entails.
definition entails.
l 4                 And the staff sent us a letter.         I think there is 5 some movement from where we were maybe in the fall, but l
4 And the staff sent us a letter.
l 6 we've got a ways to go on this.
I think there is 5
7                 CHAIRMAN JACKSON:         I guess what I'm interested in l     8 is can you speak to what impact, if any, you see on the 9 updating of the FSAR?                                                           !
some movement from where we were maybe in the fall, but l
10                 MR. PIETRANGELO:         Given the way that the guidance l
l 6
11' is structured, unless there was a change to the facility                         l 12 that affected design basis information, then you wouldn't 13 have to add anything to the SAR.                                                 l 14                 We think that's at a fairly high level and there's               ;
we've got a ways to go on this.
15 other criteria within the guidance document that speaks to 16 that.     Beyond that, there is guidance with regard to                         i I
7 CHAIRMAN JACKSON:
17 providing a sufficient level of understanding of the design 18 basis when you make a change, but changes are very few that                       j
I guess what I'm interested in l
    .19 would affect design basis and so the update guidance doesn't 20 address what was originally required to be in the SAR and 21 what is the current information that's in there.
8 is can you speak to what impact, if any, you see on the 9
22                 It's only going to be the result of a change to 23 the; plant and there's certainly not going to be enough of 24 those to go back and if the intent is to redo what 50.34                         .
updating of the FSAR?
J 25 required whenever, that's not going to happen through the i
10 MR. PIETRANGELO:
Given the way that the guidance 11' is structured, unless there was a change to the facility 12 that affected design basis information, then you wouldn't 13 have to add anything to the SAR.
l 14 We think that's at a fairly high level and there's 15 other criteria within the guidance document that speaks to 16 that.
Beyond that, there is guidance with regard to i
I 17 providing a sufficient level of understanding of the design 18 basis when you make a change, but changes are very few that j
.19 would affect design basis and so the update guidance doesn't 20 address what was originally required to be in the SAR and 21 what is the current information that's in there.
22 It's only going to be the result of a change to 23 the; plant and there's certainly not going to be enough of 24 those to go back and if the intent is to redo what 50.34 J
25 required whenever, that's not going to happen through the i
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW ., Suite 1014 Washington, D.C. 20036 (202) 842-0034                                         l l
Court Reporters 1025 Connecticut Avenue, NW., Suite 1014 Washington, D.C.
20036 l
(202) 842-0034 l


114 1 update process.
114 1
2           CHAIRMAN JACKSON:   But, again, that's why I have 3 some level of discomfort, because if you talk about changes 4 to the plant that can change the design envelope in some way 5 that's substantial, then I guess I don't understand how, in 6 the absence of clarity on definition of design basis -- I'm 7 worried.
update process.
8           Nobody wants to finish off the FSAR update and the 9 50.59 rule-making more than I do, but I just want to be sure 10 we're not stepping off of a cliff here.
2 CHAIRMAN JACKSON:
11           MR. PIETRANGELO:   And I don't think I disagree 12 with you, Chairman. I think this activity, and that's the 13 last bullet, we have to get there.     Just one other point, 14 and this has to do with some of the plants that underwent 15 these architect engineering inspections and some plants have 16 been down for quite some time.
But, again, that's why I have 3
17           I think this problem about what the design basis 18 information is clouded some of those issues with regard to 19 those plants and what is and what's not and what's inside 20 and outside the design basis.
some level of discomfort, because if you talk about changes 4
21           The other part of that is that when the staff -- I 22 think it was the old AEOD -- reviewed some of the design 23 basi.s discrepancies that were reported by licensees that had 24 either ongoing programs or were subject to the inspections, 25 there's not a lot of risk significance that comes out of ANN RILEY & ASSOCIATES, LTD.
to the plant that can change the design envelope in some way 5
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
that's substantial, then I guess I don't understand how, in 6
the absence of clarity on definition of design basis -- I'm 7
worried.
8 Nobody wants to finish off the FSAR update and the 9
50.59 rule-making more than I do, but I just want to be sure 10 we're not stepping off of a cliff here.
11 MR. PIETRANGELO:
And I don't think I disagree 12 with you, Chairman.
I think this activity, and that's the 13 last bullet, we have to get there.
Just one other point, 14 and this has to do with some of the plants that underwent 15 these architect engineering inspections and some plants have 16 been down for quite some time.
17 I think this problem about what the design basis 18 information is clouded some of those issues with regard to 19 those plants and what is and what's not and what's inside 20 and outside the design basis.
21 The other part of that is that when the staff -- I 22 think it was the old AEOD -- reviewed some of the design 23 basi.s discrepancies that were reported by licensees that had 24 either ongoing programs or were subject to the inspections, 25 there's not a lot of risk significance that comes out of ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


I' 115 1 those reports, and this is fairly an area that -- and I 2 think we knew that from the late 80s and early 90s,       that 3 when you do these, you don't get a lot of --
I' 115 1
4             CHAIRMAN JACKSON:   Are you -- is your basic issue 5 --
those reports, and this is fairly an area that -- and I 2
does your basic issue have to do with the risk 6 significance of what constitutes design basis information or does it have to do with -- because my understanding is that 8 the staff historical definition of this position hasn't 9 changed.
think we knew that from the late 80s and early 90s, that 3
10             MR. PIETRANGELO:   I think it's a perception. I 11 really think it's a perception issue and I think to some 12 degree --
when you do these, you don't get a lot of --
13             CHAIRMAN JACKSON:   I mean, one could argue this.
4 CHAIRMAN JACKSON:
14 Let me just say this. One could argue that design basis 15 information is design basis information as we historically l
Are you -- is your basic issue 5
16 have understood it, assuming we've historically understood       l 17 it. But where we're talking about in terms of risk 18 informing various things has to do with, given that, what 19 happens in certain circumstances and how do we risk-inform 20 rules appropriately.                                             1 21             That's a separate -- that's one path. Another 22 path has to do with somehow changing the fundamental 23 definition of what constitutes design basis information to 24 say that now the new definition of what constitutes design l
does your basic issue have to do with the risk 6
l   25 basis information is some risk-informed list or i
significance of what constitutes design basis information or does it have to do with -- because my understanding is that 7
8 the staff historical definition of this position hasn't 9
changed.
10 MR. PIETRANGELO:
I think it's a perception.
I 11 really think it's a perception issue and I think to some 12 degree --
13 CHAIRMAN JACKSON:
I mean, one could argue this.
14 Let me just say this.
One could argue that design basis 15 information is design basis information as we historically 16 have understood it, assuming we've historically understood 17 it.
But where we're talking about in terms of risk 18 informing various things has to do with, given that, what 19 happens in certain circumstances and how do we risk-inform 20 rules appropriately.
1 21 That's a separate -- that's one path.
Another 22 path has to do with somehow changing the fundamental 23 definition of what constitutes design basis information to 24 say that now the new definition of what constitutes design l
l 25 basis information is some risk-informed list or i
ANN RILEY & ASSOCIATES, LTD.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


4 116 1 risk-informed definition and those are -- one path has more 2 stability associated with it and one path allows us to 3 complete the 50.59 rule-making and the FSAR update and the 4 other path has a lot more instability associated with it.
4 116 1
5           Namely, if you're talking about coming up with 6 some new fundamental definition of what constitutes design 7 basis information, that is some risk-informed definition, as 8 opposed to risk-informing rules within a given definition of 9 design basis, those are very different paths.
risk-informed definition and those are -- one path has more 2
10           What is your position here?                             l 11           MR. PIETRANGELO:   I don't think we are 12 contemplating any radical change or any change to the 50.2         '
stability associated with it and one path allows us to 3
13 definition, but I think as part of the defining what safety 14 significant means with regard to SSCs, at some point, and 15 hopefully this discussion will happen very early this year, 16 you've got to define what accident analyses and credible 17 events that you're going to use to define what is important 18 to safety in the hardware of the plant.
complete the 50.59 rule-making and the FSAR update and the 4
19           Right now, it's these events that have been 20 postulated 35 years ago, and some of them are credible, some 21 of them are not credible. There's others that aren't in 22 that set that we know are credible. We need to risk-inform 23 that and I think from -- once you get your handle on those i
other path has a lot more instability associated with it.
24 analyses, then you can back out what equipment you need to         l 25 defend against those events and the design -- that's why the       I i
5 Namely, if you're talking about coming up with 6
ANN RILEY & ASSOCIATES, LTD.                         '
some new fundamental definition of what constitutes design 7
Court Reporters                               l 1025 Connecticut Avenue, NW, Suite 1014                     ,
basis information, that is some risk-informed definition, as 8
Washington, D.C. 20036                             l (202) 842-0034                               l l
opposed to risk-informing rules within a given definition of 9
design basis, those are very different paths.
10 What is your position here?
l 11 MR. PIETRANGELO:
I don't think we are 12 contemplating any radical change or any change to the 50.2 13 definition, but I think as part of the defining what safety 14 significant means with regard to SSCs, at some point, and 15 hopefully this discussion will happen very early this year, 16 you've got to define what accident analyses and credible 17 events that you're going to use to define what is important 18 to safety in the hardware of the plant.
19 Right now, it's these events that have been 20 postulated 35 years ago, and some of them are credible, some 21 of them are not credible.
There's others that aren't in 22 that set that we know are credible.
We need to risk-inform 23 that and I think from -- once you get your handle on those i
24 analyses, then you can back out what equipment you need to 25 defend against those events and the design -- that's why the i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


__ _. _ - _ . . . __                . . - . . _ _ . _ . _ _ . _ . _ . . _ _ . . . _ - - - ~ _ _ _ _ _ . _ _ . _ . _ _ _ _ _ _ _ _
.. -.. _ _. _. _ _. _. _.. _ _... _ - - - ~ _ _ _ _ _. _ _. _. _ _ _ _ _ _ _ _
M l
M l
l 117 1   definition doesn't need to change. It's still the                                                                 intended 2     functions to place the plant in a safe condition.
117 l
1 definition doesn't need to change.
It's still the intended 2
functions to place the plant in a safe condition.
3 You would apply it to that set that you define as i.
3 You would apply it to that set that you define as i.
4   what you need to protect against.
4 what you need to protect against.
5                 CHAIRMAN JACKSON:                                         I just want to say this.
5 CHAIRMAN JACKSON:
l 6   Obviously, this is a complex area, but be very careful 7   because you may be treading on something that really has to l
I just want to say this.
8   do with creating a fundamental instability in the overall l                     9   regulatory basis that we're operating on in Part 50 and I                                                                       .
l 6
l 10     think we have to go down that path very carefully.
Obviously, this is a complex area, but be very careful 7
11                   MR. PIETRANGELO:                                       Okay.                 Next slide, please.
because you may be treading on something that really has to l
I 1
8 do with creating a fundamental instability in the overall l
12     License renewal.                   I had a feeling you were going to jump to 13     that, Commissioner McGaffigan, early on, but let me just say                                                                   ,
9 regulatory basis that we're operating on in Part 50 and I l
l 14     that I want to jump on the Chris Grimes bandwagon first here 15     with respect to on behalf of the industry, the j ob he's 16     doing in terms of managing that effect, the feedback we've 1
10 think we have to go down that path very carefully.
17     gotten from --
11 MR. PIETRANGELO:
18                 CHAIRMAN JACKSON:                                         He and his people.                       It's a 19     bunch of folks working on it.
Okay.
20                 MR. PIETRANGELO:                                       That's correct.                         But the point I l                 21                                                                                                                                     l made before, though, is that it's not Chris and his people.
Next slide, please.
l 22     -It's the agency, that there are other branches in NRR that 23     are heavily involved in license renewal review and to put                                                                       l 24     all that on Chris I think is inappropriate.
I 12 License renewal.
25                   There has to be, I think, a more holistic effort i
I had a feeling you were going to jump to 1
i                                                                                                                                                         l ANN RILEY & ASSOCIATES, LTD.
13 that, Commissioner McGaffigan, early on, but let me just say l
,                                                                  Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
14 that I want to jump on the Chris Grimes bandwagon first here 15 with respect to on behalf of the industry, the j ob he's 16 doing in terms of managing that effect, the feedback we've 1
17 gotten from --
18 CHAIRMAN JACKSON:
He and his people.
It's a 19 bunch of folks working on it.
20 MR. PIETRANGELO:
That's correct.
But the point I l
21 made before, though, is that it's not Chris and his people.
22
-It's the agency, that there are other branches in NRR that 23 are heavily involved in license renewal review and to put 24 all that on Chris I think is inappropriate.
25 There has to be, I think, a more holistic effort i
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


i
+
+
                                                                                                                                                  , i 118     I 1   to ensure the Commission's intent is carried out in the --
I 118 1
2                 CHAIRMAN JACKSON:                                         I think we have a holistic                         :
to ensure the Commission's intent is carried out in the --
i 3   effort.
2 CHAIRMAN JACKSON:
4               MR. PIETRANGELO:                                       Okay.                                                   ;
I think we have a holistic i
I                   5                 CHAIRMAN JACKSON:                                       We have to just maintain it,                         '
3 effort.
I i
4 MR. PIETRANGELO:
.                    6  but we have it.                                                                                                             ;
Okay.
;                    7                 MR. PIETRANGELO:                                     Right.                     I think the feedback we i
I 5
8   have from the lead applicants is that they're cautiously
CHAIRMAN JACKSON:
:                    9  optimistic about what's occurred.                                                           I think the discipline         '
We have to just maintain it, I
10 that the Commission has given to the hearing processes is 11   welcome and the staff sticking to the schedule is welcome.                                                                 ,
i 6
12                 I think the way Mr. Tekman would put it is the 13   water is fine, come on in, to the other applicants that we 14   expect in the --                                                                                                           t 15                 CHAIRMAN JACKSON:                                       Do you have some sense for the 16   numbers in terms of in the                                         99 to 2001 time-frame?                                 '
but we have it.
17                 MR. PIETRANGELO:                                     A handful.
7 MR. PIETRANGELO:
18                 MR. BEEDLE:                         We've got about six plants that have                                   ,
Right.
19   indicated an interest in doing that.
I think the feedback we i
20                 CHAIRMAN JACKSON:                                       Okay.                                               ,
8 have from the lead applicants is that they're cautiously 9
21                 MR. BEEDLE:                         And much of what we're going to see I 22   think is based on our experience with these first two 23   plants.
optimistic about what's occurred.
24                 CHAIRMAN JACKSON:                                       What are you -- what is your 25   reaction to what the staff said about this metering of the
I think the discipline 10 that the Commission has given to the hearing processes is 11 welcome and the staff sticking to the schedule is welcome.
                                            ;JU1 RILEY & ASSOCIATES, LTD.                                                                           i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D-C. 20036                     .
12 I think the way Mr. Tekman would put it is the 13 water is fine, come on in, to the other applicants that we 14 expect in the --
(202) 842-0034                                                                 ,
t 15 CHAIRMAN JACKSON:
Do you have some sense for the 16 numbers in terms of in the 99 to 2001 time-frame?
17 MR. PIETRANGELO:
A handful.
18 MR. BEEDLE:
We've got about six plants that have 19 indicated an interest in doing that.
20 CHAIRMAN JACKSON:
Okay.
21 MR. BEEDLE:
And much of what we're going to see I 22 think is based on our experience with these first two 23 plants.
24 CHAIRMAN JACKSON:
What are you -- what is your 25 reaction to what the staff said about this metering of the
;JU1 RILEY & ASSOCIATES, LTD.
i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D-C.
20036 (202) 842-0034


s 119 1     applications, if there is?
s 119 l
l 2                                       MR. BEEDLE:             I think what you're going to have is 3
1 applications, if there is?
a challenge of trying to balance your resources against the 4
2 MR. BEEDLE:
industry's desire and I think many of these plants have got 5       a time line that they can, in fact, adjust their submissions 6                                                                                                                     !
I think what you're going to have is 3
to accommodate the work load considerations that you're                                                     !
a challenge of trying to balance your resources against the industry's desire and I think many of these plants have got 4
7        going to have here in the agency.
5 a time line that they can, in fact, adjust their submissions 6
8 But I think there is clearly an opportunity to l           9       manage that.
to accommodate the work load considerations that you're 7
I 10                                           COMMISSIONER MERRIFIELD:               Do you think we'll have 11         some lucky volunteers for 1999 to fill that void?                                                           '
going to have here in the agency.
12                                           MR. BEEDLE:             I think Calvert Cliffs is going to 13         be.
8 But I think there is clearly an opportunity to l
14                                           CHAIRMAN JACKSON:               If we get it done.
9 manage that.
15                                           MR. BEEDLE:             If we see a continuation of the i
I 10 COMMISSIONER MERRIFIELD:
16-         progress that we've had to date, then I think that's going l       17         to encourage some utilities to maybe consider moving their 18         license submittals up.                                     But if we get bogged down and it's               I 19         going-to have a similar effect and it's going to cause them 20         delay.
Do you think we'll have 11 some lucky volunteers for 1999 to fill that void?
21                                           CHAIRMAN JACKSON:               Okay.
12 MR. BEEDLE:
* 22                                           MR. PIETRANGELO:               Before we leave this slide, I 23         want:to address a question Commissioner Merrifield had                                                       !
I think Calvert Cliffs is going to 13 be.
24         before about potential impact of the maintenance rule change 25         on license renewal.
14 CHAIRMAN JACKSON:
JJUJ RILEY & ASSOCIATES, LTD.                                     i' Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 I
If we get it done.
15 MR. BEEDLE:
If we see a continuation of the i
16-progress that we've had to date, then I think that's going l
17 to encourage some utilities to maybe consider moving their 18 license submittals up.
But if we get bogged down and it's I
19 going-to have a similar effect and it's going to cause them 20 delay.
21 CHAIRMAN JACKSON:
Okay.
22 MR. PIETRANGELO:
Before we leave this slide, I 23 want:to address a question Commissioner Merrifield had 24 before about potential impact of the maintenance rule change 25 on license renewal.
JJUJ RILEY & ASSOCIATES, LTD.
i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 I
(202) 842-0034
(202) 842-0034


  .._._ _ ._      . . _ . _ _ . _ _ . _ _ . . _ - .                    _ ..      _.___..m..    . _ . _ _ _ _ . _ _ . _ _ _ _ _ .
_.___..m..
e       l 120                 ;
l e
;              1                                      Before we finalized our comments on a proposed                                 *
120 1
          ,    2            revision of the maintenance rule, we briefed the license 3           renewal working group, that's comprised of the lead 4           applicants, as well as everybody else in the industry who is                                             '
Before we finalized our comments on a proposed 2
5            interested in this, and we did a full briefing of that and                                               ,
revision of the maintenance rule, we briefed the license 3
6            then utnez -- beyond that, I think the individual plants 7           were reviewing our position on that and had no problem with 8           what we proposed to do on a maintenance rule.
renewal working group, that's comprised of the lead 4
9                                     The last slide -- now, I brought with me a copy of 10           the statement of considerations for the 1995 rule and I also                                             '
applicants, as well as everybody else in the industry who is 5
11           brought with me a NUREG from the 1991 rule, called 12           foundation for the adequacy of the licensing basis.                                                       ,
interested in this, and we did a full briefing of that and 6
i 13                                     There's been a lot of work in terms of 14           establishing these principals for license renewal and 15           they're captured in this first bullet here on -- it's                                                     ;
then utnez -- beyond that, I think the individual plants 7
16           adequate and then it carries forward.
were reviewing our position on that and had no problem with 8
17                                     And there's other words that I've highlighted                                   l 18           here, but I'm not going to go through this, that this should 19           not be about a re-verification of the adequacy of the 20-           existing CLB programs.
what we proposed to do on a maintenance rule.
21                                     An observation we have based on what's transpired 22           thus far is that a lot of this appears to be a 23           re-verification of the adequacy of the CLB programs that 24           carry forward into the renewal term.
9 The last slide -- now, I brought with me a copy of 10 the statement of considerations for the 1995 rule and I also 11 brought with me a NUREG from the 1991 rule, called 12 foundation for the adequacy of the licensing basis.
25                                     We believe that the focus of the review, and, ANN RILEY & ASSOCIATES, LTD.
i 13 There's been a lot of work in terms of 14 establishing these principals for license renewal and 15 they're captured in this first bullet here on -- it's 16 adequate and then it carries forward.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
17 And there's other words that I've highlighted l
18 here, but I'm not going to go through this, that this should 19 not be about a re-verification of the adequacy of the 20-existing CLB programs.
21 An observation we have based on what's transpired 22 thus far is that a lot of this appears to be a 23 re-verification of the adequacy of the CLB programs that 24 carry forward into the renewal term.
25 We believe that the focus of the review, and, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


121 1 again, there's words to suggest that in here, that we're 2 trying to find areas where the current programs would not 3 address known aging mechanisms and that should be the real 4 focus of the review.
121 1
5             And given the resource question we just had 6 before, as well as Mr. McNeal's statement about trying to 7 get down to six months, that doesn't appear to be that much 8 of a stretch goal if these principals are upheld through the 9 review. And it's not just what Chris and his staff does.
again, there's words to suggest that in here, that we're 2
10 Again, that's an agency thing about -- these are all -- a 11 lot of these are old existing programs that the agency has a 12 lot of experience dealing with.
trying to find areas where the current programs would not 3
13             So they know what it takes in the current -- for 14 the current plants to meet those requirements. There should 15 not be a need -- and I want to clarify something David said 16 before. Our position -- and this was with regard to the       I l
address known aging mechanisms and that should be the real 4
17 environmental qualification rule -- is not just to check the     (
focus of the review.
l 18 box and say we continue to meet 50.49. That's not our 19 position.
5 And given the resource question we just had 6
20             We believe there should be a summary description 21 in the renewal application of the aging effects that your 22 environmental qualification program addressed. And that's 23 no d.ifferent in year 25 versus year 45.
before, as well as Mr. McNeal's statement about trying to 7
24             If there's additional aging mechanisms that -- and 25 for equipment that EQ pertains to that aren't addressed in ANN RILEY & ASSOCIATES, LTD.
get down to six months, that doesn't appear to be that much 8
Court Reporters 1025 Connecticut. Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
of a stretch goal if these principals are upheld through the 9
review.
And it's not just what Chris and his staff does.
10 Again, that's an agency thing about -- these are all -- a 11 lot of these are old existing programs that the agency has a 12 lot of experience dealing with.
13 So they know what it takes in the current -- for 14 the current plants to meet those requirements.
There should 15 not be a need -- and I want to clarify something David said 16 before.
Our position -- and this was with regard to the l
17 environmental qualification rule -- is not just to check the
(
l 18 box and say we continue to meet 50.49.
That's not our 19 position.
20 We believe there should be a summary description 21 in the renewal application of the aging effects that your 22 environmental qualification program addressed.
And that's 23 no d.ifferent in year 25 versus year 45.
24 If there's additional aging mechanisms that -- and 25 for equipment that EQ pertains to that aren't addressed in ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut. Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


                                                                        )
)
i 122 1 the current program, then there should be more in the 2 application. But that's what shodld be the focus of the 3 review, not a re-verification of what people currently do to 4 meet the current rule.
i 122 1
5           So that's the question we'd like to leave on the           l l
the current program, then there should be more in the 2
6 table for you and we're going to talk to the steering group 7 tomorrow about this. But if these principals hold up, at 8 least as we interpret them in the statement of 9 considerations, then I think the resource questions and how 10 fast you can do it are kind of in a new paradigm.                     1 1
application.
11           CHAIRMAN JACKSON:   Any comments?
But that's what shodld be the focus of the 3
l l
review, not a re-verification of what people currently do to 4
12           COMMISSIONER McGAFFIGAN:   It sounds like they need       l 1
meet the current rule.
5 So that's the question we'd like to leave on the l
l 6
table for you and we're going to talk to the steering group 7
tomorrow about this.
But if these principals hold up, at 8
least as we interpret them in the statement of 9
considerations, then I think the resource questions and how 10 fast you can do it are kind of in a new paradigm.
1 11 CHAIRMAN JACKSON:
Any comments?
12 COMMISSIONER McGAFFIGAN:
It sounds like they need 1
13 to do some discussing.
13 to do some discussing.
14           MR. BEEDLE:   Chairman, that completes our remarks.       l i
14 MR. BEEDLE:
15 We thank you for the opportunity to make some observations.
Chairman, that completes our remarks.
16           CHAIRMAN JACKSON:   Thank you. Commissioner?
i 15 We thank you for the opportunity to make some observations.
17           COMMISSIONER MERRIFIELD:   The only thing I'd 18 mention is we did have a lot of compliments on staff and I 19 do want to make known and repeat that the work the NEI did           ,
16 CHAIRMAN JACKSON:
20 on the FSAR was very helpful in a mutual effort to make that 21 a success.
Thank you.
22           CHAIRMAN JACKSON:   I want to thank you, and thank 23 you.for continuing to work with the staff and work in good i
Commissioner?
24 faith. Appreciate it.                                               !
17 COMMISSIONER MERRIFIELD:
l 25           I'd like to thank, in fact, the staff and the 1
The only thing I'd 18 mention is we did have a lot of compliments on staff and I 19 do want to make known and repeat that the work the NEI did 20 on the FSAR was very helpful in a mutual effort to make that 21 a success.
I JJRJ RILEY & ASSOCIATES, LTD.
22 CHAIRMAN JACKSON:
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
I want to thank you, and thank 23 you.for continuing to work with the staff and work in good i
24 faith.
Appreciate it.
l 25 I'd like to thank, in fact, the staff and the JJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


t                                                                         ,
t 123 j
123 j 1
1 Nuclear Energy Institute for an informative briefing.
Nuclear Energy Institute for an informative briefing.     As     I 2 we've heard and said repeatedly, some significant 3
As 2
accomplishments and progress have been made with respect     to 1
we've heard and said repeatedly, some significant 3
4 various reactor initiatives.
accomplishments and progress have been made with respect to 4
5             However, as evident and as evident in the 6 discussion, some significant work remains and important 7 decisions. Now, the Commission recognizes that there is, in 8 fact, a lot on the staff's plate and, at the same time, on 9 the nuclear industry's plate. And so the Commission is 10 appreciative of all efforts of tackling the -- aimed at 11 tackling the hard issues and asking tough questions, but 12 coupled with that, working in a solutions mind set and 13 maintaining cognizance of schedules.
various reactor initiatives.
14             Because not only are we challenged in the l     15 individual tasks, but -- and I repeat, we do have to remain 16 vigilant of the impact on other agency tasks and programs to 17 ensure that the decisions we make and the approaches we 18 pursue are consistent and focused on safety in a coherent i     19 and a risk-informed manner.
1 5
20             The Commission looks forward in particular to the 21 staff's recommendation on the final wcrding for the draft 22 rule on 10 CFR 50.59, including where we have to bite the 23 bullet.
However, as evident and as evident in the 6
24             And I would urge the staff to continue your 25 healthy interactions with the various stakeholders and to ANN RILEY & ASSOCIATES, LTD.
discussion, some significant work remains and important 7
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
decisions.
Now, the Commission recognizes that there is, in 8
fact, a lot on the staff's plate and, at the same time, on 9
the nuclear industry's plate.
And so the Commission is 10 appreciative of all efforts of tackling the -- aimed at 11 tackling the hard issues and asking tough questions, but 12 coupled with that, working in a solutions mind set and 13 maintaining cognizance of schedules.
14 Because not only are we challenged in the l
15 individual tasks, but -- and I repeat, we do have to remain 16 vigilant of the impact on other agency tasks and programs to 17 ensure that the decisions we make and the approaches we 18 pursue are consistent and focused on safety in a coherent i
19 and a risk-informed manner.
20 The Commission looks forward in particular to the 21 staff's recommendation on the final wcrding for the draft 22 rule on 10 CFR 50.59, including where we have to bite the 23 bullet.
24 And I would urge the staff to continue your 25 healthy interactions with the various stakeholders and to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l


4 124 1 bring to the Commission recommendations that the staff 2 believes pertain to policy issues and are the right thing to 3 do.
4 124 1
4           So unless my colleagues have any further questions 5 or comraents, we' re adj ourned. Thank you.
bring to the Commission recommendations that the staff 2
6             (Whereupon, at 12:55 p.m., the briefing was 7 concluded.]
believes pertain to policy issues and are the right thing to 3
do.
4 So unless my colleagues have any further questions 5
or comraents, we' re adj ourned.
Thank you.
6 (Whereupon, at 12:55 p.m.,
the briefing was 7
concluded.]
8 9
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 4
10 11 12 13 14 15 16 17 18 19 20 21 22 23 4
24                                                                     l 25                                                                     I AdRJ RILEY & ASSOCIATES, LTD.
24 25 AdRJ RILEY & ASSOCIATES, LTD.
Ccurt Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
Ccurt Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034


6 i
6 i
CERTIFICATE                                                           '
CERTIFICATE 1
1 e
e This is to certify that the attached description of a meeting of the U.S. Nuclear Regulatory Commission entitled:
This is to certify that the attached description of a meeting of the U.S. Nuclear Regulatory Commission entitled:                                                                         I TITLE OF MEETING:                   BRIEFING ON REACTOR LICENSING                                                 i INITIATIVES PUBLIC MEETING                                                               ;
I TITLE OF MEETING:
PLACE.OF MEETING:                   Rockville, Maryland DATE OF MEETING:                     Wednesday, January 13, 1999 i
BRIEFING ON REACTOR LICENSING i
INITIATIVES PUBLIC MEETING PLACE.OF MEETING:
Rockville, Maryland DATE OF MEETING:
Wednesday, January 13, 1999 i
was held as herein appears, is a true and accurate record of the meeting, and that this is the original transcript thereof taken stenographically by me, thereafter reduced to typewriting.by me or under the direction of the court
was held as herein appears, is a true and accurate record of the meeting, and that this is the original transcript thereof taken stenographically by me, thereafter reduced to typewriting.by me or under the direction of the court
                -reporting company i
-reporting company i
l Transcriber:                             Natalie Renner i
Transcriber:
l 1
Natalie Renner i
Reporter:                                 Mike Paulus                         l I
1 Reporter:
i
Mike Paulus i
                                                                                                                                                )
)
l l
l 4
    ,                                                                                                                                          4
3-
                                      -r--
-r--
r 3- - --


  , _u.w f. .A a .a a 4 m a mm - 4e. e 4.4 - -.mAm4u as#         m.m u s.omuw ussame++ s.r+..wa wuwm..a,,. 4_....--w a... . ,_..m-4 4
, _u.w f.
l                                                                                                                                     4   !
.A a.a a 4 m a mm - 4e. e 4.4
l l'                                                                                                                                       :
- -.mAm4u as#
m.m u s.omuw ussame++
s.r+..wa wuwm..a,,.
4_....--w a....
,_..m-4 4
l 4
l l'
i R
i R
I-1, 1
I-1, 1
L' f
L' f
a 3
a 3
d                                                                                                                                         '
d 4
4 8
8 4
4 I
I 4
4                                                                                                                                          6 i
6 i
4 1                                                                                                                                         ,
4 1
I b
I b
h a
h a
Line 1,946: Line 3,824:
t i
t i
1
1
                                                          - ,-- +,
-n++
-,-- +,


i
i
    , ;< . 3 ' ' ' e . a . .,. a ,. p: eg.:
, ;<. 3 ' ' ' e. a..,. a,. p: eg.:
a                                               S j
j a
i i
S i
NRC Briefing on Reactor Licensing Initiatives 1
i NRC Briefing on Reactor Licensing Initiatives 1
l                                                     January 13,1999 i
l January 13,1999 i
l                                                       Ralph Beedle c m m.a L. n , ,c. . ,
l Ralph Beedle c m m.a L. n,,c..,
  .          .                                      Tony Pietrangelo NEI k
Tony Pietrangelo NEI k


i m anaw. w r 10 CFR 50.59 Rulemaking
i m anaw. w r 10 CFR 50.59 Rulemaking Compreaensive, c etailed proposal
  = Compreaensive, c etailed proposal c eveloped by staff facilitated substantive comment by industry
=
  = Most comments agreed with staff proposals or provided clarifications
c eveloped by staff facilitated substantive comment by industry Most comments agreed with staff
  - Margin of safety and definition of change are key remaining issues                 l NEI h+
=
proposals or provided clarifications Margin of safety and definition of change are key remaining issues l
NEI h+
__[_o
__[_o


                        '                                                                          I   ^'
I,
I ,
I
^'
T l
T l
i Margin of Safety
Margin of Safety i
;                                          =                14 options identified in proposed
14 options identified in proposed
:                                                          rulemaking l                                         =                Proposec industry approach is a
=
!                                                          hybrid of several options l
rulemaking l
                                          =                Focus is on fission product barrier l                                                         parameters and associated design bases limits
Proposec industry approach is a
!                                                                                                                                                          NEI so-i
=
  . . . _ . , _ _ - , , . . , _ . . _ _ , . - . _ _ , _ - . - _ - _ _ . . ~ . _ , . . , . _ - - , _           _ _ _ _ . . - . _ , - . . - _ _ _ _ , . ___
hybrid of several options Focus is on fission product barrier l
=
l parameters and associated design bases limits NEI so-i
... _., _ _ -,,.., _.. _ _,. -. _ _, _ -. - _ - _ _.. ~. _,..,. _ - -, _


                                                                              ..f.-
f 9..igejw.ye p:;n p,3c.:,.q.
f          9..igejw.ye p:;n p ,3c.:,.q.                             ,.     ,
..f.-
                                                                !      ~f .,
~f I
I 1
1 l
l                                        Definition of " Change" L
Definition of " Change" L
Important impact on determining i
l m Important impact on determining i
m l
I when 50.59 evaluations are required j
i when 50.59 evaluations are required 4
i 4
                                          =             Opportunity to c arify rule and utilize l
= Opportunity to c arify rule and utilize l
resources more effectively 1
resources more effectively 1
l                                           =             Incustry proposal assures impacts on intenc ed c esign functions receive fu eva .uation NEI l                                                                                                                        u j                                                                                                                                       .
l
                                                                                                                      ._ _ _ _,-._ _ .u -
= Incustry proposal assures impacts on intenc ed c esign functions receive fu eva.uation l
NEI u
j
._ _ _ _,-._ _.u -


4
4
                                                                                            ^
^
;     _=.-, c .,we -                                                                         .
; _=.-, c.,we -
j l
j l
l FSAR Updates l
l FSAR Updates l
                    =             Gooc example of the benefits of early anc frequent communication
= Gooc example of the benefits of early anc frequent communication
                    =             Strong consensus on intent and content of guidance
= Strong consensus on intent and content of guidance
                    =             Future industry workshop will gather fee'dback on implementation experience NEI i                                                                                         k i
= Future industry workshop will gather fee'dback on implementation experience NEI i
k i


l Design Bases Activities l
l Design Bases Activities l
I
I
!                                          =                   Still in early stages of discussion with NRC staff l
= Still in early stages of discussion with NRC staff l
4
= Industry objective: Attain common 4
                                            =                 Industry objective: Attain common
understanding of what information is l
;                                                              understanding of what information is l                                                             captured by 50.2 definition i
captured by 50.2 definition i
i                                           =                     VIust resolve this issue to improve
i
!                                                              c arity and consistency l
= VIust resolve this issue to improve c arity and consistency l
NEI
NEI


w w.s z a                                                                                                               .
w w.s z a License Renewal i
l
= Lead application reviews proceecing on schedule i
l l
= Expect additional applications in 1999-2001 1
l
= Incustry observing process closely l
1 NEI 4+
4 1,_..___..___._,_,.,_.
 
, mv +.4w l
l l
License Renewal i
License Renewal i
l              =    Lead application reviews proceecing
!                  on schedule i
l                                                                                                      ..                            .
l              =    Expect additional applications in
!                    1999-2001 1
l              =    Incustry observing process closely l
1
:                                                                                                                                      NEI
;                                                                                                                                        4+
4 1,_..___..___._,_,.,_. _ , . _ _ _ _ _ . . . . . . _ _ _ _ _ . . . _ _ _ . _ . _ _ _ _ _ . - , . - - _ _ . , . _ _ _ , _ _ _ _ _ _ .
mv +.4w l
l l    License Renewal i
i
i
!    = Foundation Principles
= Foundation Principles
        . Current licensing basis is adequal:e
. Current licensing basis is adequal:e
        . Current licensing basis carries forward
. Current licensing basis carries forward
      = Policy Question
= Policy Question
        . Is the intent of the rule to reverify existing CLB programs and activities?
. Is the intent of the rule to reverify existing CLB programs and activities?
NEI k
NEI k
                                                                                    .l
.l


ggREGy l       %,
ggREGy l
l l
l l}I r
l}I r
i e
                      %,ws>+++++}
l
ie COMMISSION BRIEFING Licensing initiatives
%,ws>+++++}
  =c.o u m         January 13,1999 7 L1 (;) 8: i4
COMMISSION BRIEFING Licensing initiatives January 13,1999
=c.o u m 7 L1 (;) 8: i4


I INTRODUCTION l
I INTRODUCTION l
* License Renewal e   License Transfer
License Renewal e
    . 10 CFR 50.59 Rulemaking
License Transfer 10 CFR 50.59 Rulemaking FSAR Updates Other Licensing Initiatives e
* FSAR Updates Other Licensing Initiatives 2
2 9
9


i l
i l
l LICENSE RENEWAL
LICENSE RENEWAL l
)                                           e implement 10 CFR 54 and 51 which provide 4                                            safe plant operation and assessment of environmental impacts for renewal e Establish a review process that is effective, efficient, timely and predictable i
)
implement 10 CFR 54 and 51 which provide e
safe plant operation and assessment of 4
environmental impacts for renewal Establish a review process that is effective, e
efficient, timely and predictable i
1 j
1 j
1
1
    . _ _ - , , , , , , ~ , . _ , - - - - -
,,,,, ~,. _, - - - - -


LICENSE RENEWAL PROCESS 1
LICENSE RENEWAL PROCESS 1
* Establish reliable review schedules
Establish reliable review schedules Promptly identify and address issues Improve implementation guidance e
* Promptly identify and address issues e    Improve implementation guidance e   Public outreach e    Program oversight 1
e Public outreach Program oversight e
4 m
1 4
    --3,             , <.- c , _ , . , . , . . , , _ . , . . . , , , . . . , , , . , , , , , , , , , , . . , _ , , , , . , _ _  , , . . _ , , , _, , . __,
m
--3, c


LICENSE RENEWAL STATUS I
LICENSE RENEWAL STATUS I
i
i e
;                  e Calvert Cliffs e Oconee e NEl generic activities i
Calvert Cliffs e
i
Oconee NEl generic activities e
.
i i
* Owners groups generic technical reports I                  e Other interested plants
Owners groups generic technical reports Other interested plants I
e
.b 1
.b 1
i
i


i NRC LICENSE TRANSFERS i
i NRC LICENSE TRANSFERS i
i e Completed Actions l
Completed Actions i
Final rule to streamline the license transfer hearing j           process published (December 3,1998)
e l
Final rule to streamline the license transfer hearing j
process published (December 3,1998)
Final SRPs on:
Final SRPs on:
i
i Financial Qualifications and Decommissioning i
            -  Financial Qualifications and Decommissioning i             Funding Assurance l
Funding Assurance l
* Antitrust Draft SRP on Foreign Ownership, Control, and Domination i
Antitrust Draft SRP on Foreign Ownership, Control, and Domination i
I
I


NRC LICENSE TRANSFERS { cont.)
NRC LICENSE TRANSFERS { cont.)
* Pending Actions Timely license transfer reviews (TMI-1 and Pilgrim)
Pending Actions Timely license transfer reviews (TMI-1 and Pilgrim)
Complete Final SRP on Foreign Ownership Develop policy options on non-owner operators Issue lessons learned from recent license transfers Develop SRP to document current practice in review of technical qualifications Develop integrated SRP on license transfers 7
Complete Final SRP on Foreign Ownership Develop policy options on non-owner operators Issue lessons learned from recent license transfers Develop SRP to document current practice in review of technical qualifications Develop integrated SRP on license transfers 7
:                      10 CFR 50.59 RULEMAKING
 
* Background
10 CFR 50.59 RULEMAKING
* Issues from comment letters:
 
===Background===
Issues from comment letters:
Margin of safety proposals Guidance on minimal increases in probability and consequences, including cumulative effects Screening of changes Clarifications on definitions Pads 71,72, and 76 Enforcement policy Guidance development 8
Margin of safety proposals Guidance on minimal increases in probability and consequences, including cumulative effects Screening of changes Clarifications on definitions Pads 71,72, and 76 Enforcement policy Guidance development 8


10 CFR 50.59 RULEMAKING (cont.}
10 CFR 50.59 RULEMAKING (cont.}
l
l Approach and Schedule Staff analyzing comments to identify policy issues for Commission consideration and propose revisions to rule Staff requested alternative approach to allow Commission direction on certain key issues before completion of final rule package Potential future changes to 50.59 (revised scope and risk-informed options) l 9
;
* Approach and Schedule Staff analyzing comments to identify policy issues for Commission consideration and propose revisions to rule Staff requested alternative approach to allow Commission direction on certain key issues before completion of final rule package Potential future changes to 50.59 (revised scope and risk-informed options) l 9


FSAR UPDATE GUIDANCE i
FSAR UPDATE GUIDANCE i
e          Provide clear guidance for the required content of Updated FSARs
Provide clear guidance for the required content of e
* Publish draft guide (DG-1083) for public comment
Updated FSARs Publish draft guide (DG-1083) for public comment DG-1083 endorses industry guideline, NEl 98-03 issue final regulatory guide in September 1999 e
* DG-1083 endorses industry guideline, NEl 98-03 e          issue final regulatory guide in September 1999
)
)
i 10 t
i 10 t
  , , - - ,-,,--...n,--     --  .,,.,.,-,.,,,...,,.,,,,.,..,,,,,..,_..,n..,-.,.,,.-r,   -
,-,,--...n,--
.,,.,.,-,.,,,...,,.,,,,.,..,,,,,..,_..,n..,-.,.,,.-r,


1 i
1 i
o i
i o
!l                                                     OTHER LICENSING l.NITIATIVES i
!l OTHER LICENSING l.NITIATIVES i
e              Define Design Basis
Define Design Basis e
* Application of Backfit Rule e            Applicability of Backfit Rule to Decommissioning Activities
Application of Backfit Rule Applicability of Backfit Rule to Decommissioning e
;                e              Licensing Actions e             Requests for Additional Information (RAls) e             Confirmatory Action Letters (CALs) j                e             Improved Standard Technical Specifications e             2.206 Petitions 11
Activities Licensing Actions e
Requests for Additional Information (RAls) e Confirmatory Action Letters (CALs) e Improved Standard Technical Specifications j
e e
2.206 Petitions 11


)
)
DEFINE DESIGN BASIS
DEFINE DESIGN BASIS Provide a clear definition of what constitutes design bases information (10 CFR 50.2)
* Provide a clear definition of what constitutes design bases information (10 CFR 50.2)
NEl submittal of revised guidance document (NEl 97-04) by the end of January 1999 Options for meeting the objective include:
* NEl submittal of revised guidance document (NEl 97-04) by the end of January 1999
* Options for meeting the objective include:
Endorsing NEl guidance via regulatory guide Issuing staff guidance via regulatory guide or other means 12 i
Endorsing NEl guidance via regulatory guide Issuing staff guidance via regulatory guide or other means 12 i


                                                    ^
^
i APPLICATION OF BACKFIT RULE l                   Ob,iective i
i APPLICATION OF BACKFIT RULE l
i Ensure that the staff closely adheres to the
Ob,iective i
backfit rule (10 CFR 50.109) in evaluating all
i Ensure that the staff closely adheres to the backfit rule (10 CFR 50.109) in evaluating all additional requirements, expansion in scope, or unique interpretations (pertaining i
additional requirements, expansion in
to operating or decommissioning plants) l against actual impact on public health and safety 1
scope, or unique interpretations (pertaining i
i j
to operating or decommissioning plants) l against actual impact on public health and
13 2
safety 1
i j                         13 2


i i                         PLANNED IMPROVEMENTS TO THE
i i
  ,                                LICENSING ACTION PROCESS
PLANNED IMPROVEMENTS TO THE LICENSING ACTION PROCESS Maintain internal steering group to interface with industry
!
]
* Maintain internal steering group to interface with industry
steering group and obtain industry feedback Conduct early and frequent communications with licensees e
]                       steering group and obtain industry feedback e            Conduct early and frequent communications with licensees and establish " firm" schedules i
and establish " firm" schedules i
e            Conduct initial acceptance review e             Increase staff accountability e            Centralize workload management i
Conduct initial acceptance review e
e            Move toward a more function-based organization 14 9
e Increase staff accountability Centralize workload management e
Move toward a more function-based organization i
e 14 9


i l
i l
Nuclear Reactor Safety - Reactor Licensing FY 1999 Goal: 80% s 1 year,95% s 2 years,100% s 3 years s 1 YEAR OLD                                                                                           s 2 YEARS OLD 100                                                                                             1M g .        .                  .____-            . _ . - . _ _                ___-.
Nuclear Reactor Safety - Reactor Licensing FY 1999 Goal: 80% s 1 year,95% s 2 years,100% s 3 years s 1 YEAR OLD s 2 YEARS OLD 100 1M g.
: g.         _
g.
5 3                                                                                               3 Y n     -
5 3
                                                                                                  % n       -
3 Y n
0 e
% n 0
l G-r/                               E ma
l G-r/
                                    .  ^'*"'.
e E
mv
^ ' * " '.
                                                                                                        ,              .      .      .                                  M.                    .            .
_ mn 4 mow an= 4 ma. ". ~.
an.
M.
_ mn                                                         eE, 4 mow                           an= 4 ma . ".                   my
ma mv an.
                                                                                                                                                                ~.an ] eE, 4 nov s 3 YEARS OLD                                                                                           > 3 YEARS OLD in,     -
eE, my an ] eE, 4 nov s 3 YEARS OLD
a p:~                                         100
> 3 YEARS OLD in, a
                                          ^ +- .                 . M                                               -
p:~
e.sa rtu N       -
100
4   -                                                                                 -
^ +-.
80 j
. M e.sa rtu N
5 n       -
4 j
E   -
- 80 5 n E
so           z E
i E
i                                                                                                                                                                -
- so z
8 y ,,                                                                                           ~,                                                                         -
8 X.
X.
y,,
a           -
~,
2                                                                                              a.
a 2
a.
20
20
        =          ; ,, i ,, i 7 i A I,,,
;,, i,, i 7 i A I,,,
ase i A           *-t.i.titAt1.t.itAt-0 DEC             M         AMt         am         M         M             N DEC              Re        AMt                        AUS                OCT    DEC 15
i A
*-t.i.titAt1.t.itAt-0
=
DEC Re AMt ase AUS OCT DEC DEC M
AMt am M
M N
15


l REQUESTS FOR ADDITIONAL INFORMATION (RAls) i                                          e                    Determine relevancy of RAI to regulatory finding e                     Limit staff to one round of RAls; if licensee does not l                                                               fully answer RAI, consider management meeting with licensee (typically)
l REQUESTS FOR ADDITIONAL INFORMATION (RAls)
                                          .                      Revised office letter on license amendment review
Determine relevancy of RAI to regulatory finding i
.                                                                procedures to address RAI concerns e                    Conducting training sessions with staff regarding expectations and revised guidance l
e e
'I g                                                                                                                                           16 7
Limit staff to one round of RAls; if licensee does not l
fully answer RAI, consider management meeting with licensee (typically)
Revised office letter on license amendment review procedures to address RAI concerns Conducting training sessions with staff regarding e
l expectations and revised guidance
'I g
16 7


!                                                        CONFIRMATORY ACTION LEI iERS 1
CONFIRMATORY ACTION LEI iERS Stakeholder concern that CALs may bypass formal 1
* Stakeholder concern that CALs may bypass formal procedures - Imposing new requirements e                        CALs are typically associated with extended plant shutdowns and recapturing design basis j                   e                        Enforcement Manual Guidance revised (11/98)
procedures - Imposing new requirements CALs are typically associated with extended plant e
I
shutdowns and recapturing design basis j
!                  e                         Management expectations reinforced CALs must meet threshold of enforcement policy CALs should not:
Enforcement Manual Guidance revised (11/98) e I
;
e Management expectations reinforced CALs must meet threshold of enforcement policy CALs should not:
* Impose new requirements j                                                                    -              Bypass the Backfit Rule
Impose new requirements Bypass the Backfit Rule j
* Prolong plant shutdowns 1
Prolong plant shutdowns 1
17
17
  .._-,.---.-m.. _._ .._.-. - ,...._ __.___,,,.. . _,. - .- _ ... _ .- _._. , , _ ..
.._-,.---.-m..


i l
i l
l i
l STANDARD TECHNICAL SPECIFICATIONS i
STANDARD TECHNICAL SPECIFICATIONS
60 -
!    60 -                                                       '
j i
j i                                                         '
50 -
50 -                                               /
/
:                                                      /
/
:                                                    /
/
                                                    /
/
m 40                                       '-
m 40 i
i 3
2 E 30
,/
1
.os
* 20 -
10 g
i i
i i
i i
3 2                                              .
i 1
E 30
0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 l
  .o                                          ,/
Submitted Approved i
1 s
18 4
* 20 -
 
10                  g i      i      i 0                                     i        i        1
e l
;      1993 1994 1995 1996 1997 1998 1999 2000 2001             2002 l
10 CFR 2.206 PETITION l
:                    Submitted           Approved i
REVIEW AND PROCESS CHANGES l
18
2.206 Petition Review 130ard established for review of e
* 4
j new petitions Effort to achieve timely closure of new petitions Greater emphasis on management involvement at an early stage Obtaining stakeholder feedback 19}}
:                                                          e l               10 CFR 2.206 PETITION l       REVIEW AND PROCESS CHANGES l 2.206 Petition Review 130ard established for review of j     new petitions
* Effort to achieve timely closure of new petitions Greater emphasis on management involvement at an early stage Obtaining stakeholder feedback 19}}

Latest revision as of 07:52, 10 December 2024

Transcript of Public Meeting Re Briefing on Reactor Licensing Initiatives in Rockville,Md on 990113.Pp 1-124. Supporting Documentation Encl
ML20199E881
Person / Time
Issue date: 01/13/1999
From:
NRC
To:
References
REF-10CFR9.7 NUDOCS 9901210110
Download: ML20199E881 (154)


Text

._.

o OR G NA.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

Title:

BRIEFING ON REACTOR LICENSING INITIATIVES PUBLIC MEETING Location:

Rockville, Maryland Date:

Wednesday, January 13,1999 i

i Pages:

1 - 124 o

l l

s ggt 2}ggg"on PDR PT9.7 ANN RILEY & ASSOCIATES, LTD.

1025 Connecticut Avenue,NW, Suite 1014 gb e

Washington, D.C.20036

[V y

g,%

(202) 842 4034

s DISCLAIMER This is an unofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on January 13, 1999, in the Commission's office at One White Flint North, Rockville, Maryland.

The meeting was open to public attendance and observation.

This transcript has not been reviewed, corrected or edited, and it may contain inaccuracies.

The transcript is intended solely for general informational purposes.

As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed.

Expressions of opinion in this transcript do not necessarily reflect final determination or beliefs.

No pleading or other paper may be filed with the Commission in any proceeding as the result of, or addressed to, any statement or argument contained herein, except as the Commission may authorize.

- ~. -

4-1 1

UNITED STATES OF AMERICA i

2 NUCLEAR REGULATORY COMMISSION 3

4 BRIEFING ON l

5 REACTOR LICENSING INITIATIVES 6

7 PUBLIC MEETING 8

l 9

Nuclear Regulatory Commission 10 One White Flint North 11 Rockville, Maryland 12 Wednesday, January 13, 1999 13 14 The Commission met in open session, pursuant to 15 notice, at 10:10 a.m.,

Shirley A. Jackson, Chairman, 16 presiding.

17 18 COMMISSIONERS PRESENT:

19 SHIRLEY A.

JACKSON, Chairman of the Commission 20 GRETA J. DICUS, Commissioner 21 EDWARD McGAFFIGAN, JR., Commissioner 22 JEFFREY S. MERRIFIELD, Commissioner 23 STAFF PRESENT:

)

24 ANNETTE L. VIETTI-COOK, Secretary of the Commission 25 KAREN D.

CYR, General Counsel f

7dRJ RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

=

v 2

l 1

PRESENTERS:

2 WILLIAM TRAVERS, EDO i

3 ROY ZIMMERMAN, Deputy Director, NRR 4

DAVE MATTHEWS, Director, Division of Regulatory 5

Improvement Programs, NRR l

l 6

CHRIS GRIMES, Project Director, License Renewal 7

PD, NRR 8

ROBERT WOOD, Generic Issues & Environmental f

9 Projects Branch, NRR i

t 10 l

11 RALPH BEEDLE, Senior Vice President, Nuclear l

12 Generation and Chief Nuclear Officer, NEI l

13 TONY PIETRANGELO, Director, Licensing, Nuclear l

14 Generation, NEI 3

i l

15 j

l t

16 j

l 17 l

l 18 l

i 19 i

i 20 21 22 23 i

i 24 25 t

i i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 i

i 3

1 PROCEEDINGS 2

[10:10 a.m.]

3 CHAIRMAN JACKSON:

Good morning.

I'm pleased to 4

welcome members of the NRC staff and the Nuclear Energy 5

Institute here today to brief the Commission on the status 6

of reactor licensing initiatives, recent accomplishments in 7

this area, and any areas where difficulties, challenges or 8

limitations have arisen.

9 A representative from the Union of Concerned 10 Scientists was not able to join us for this briefing this 11 morning.

12 Today's briefing is the second of three Commission 13 briefings scheduled to address major topics identified in 14 the staff's response to the August 7, 1998 tasking 15 memorandum.

This past Monday, the Commission was briefed on 16 risk-informed initiatives and next week, on Wednesday, 17 January 20, the Commission is scheduled to be briefed on 1

l 18 reactor inspection, enforcement and assessment initiatives.

19 The agency has many important activities underway 20 relating to reactor licensing, including the 50.59 i

21 rule-making, license renewal, FSAR update guidance, design l

22 basis definition, improved technical specifications, 23 confirmatory action letters, requests for additional 24 information, known as RAIs, 2.206 petitions, application of l

25 the back-fit rule, and license transfers.

JRJ RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 l

(202) 842-0034 i

4 1

Over the past several months, the staff has made 2

quite significant progress in these areas, working with 3

various stakeholders, as appropriate, but I'll mention -- I 4

will highlight a few.

One is completion of the scheduled 5

license renewal milestones for Calvert Cliffs and Oconee; 6

issuance of a final rule to streamline the license transfer 7

hearing process; issuance for public comment of a proposed 8

rule to provide flexibility and clarity to 10 CFR 50.59; 9

and, issuance of a Commission paper, SECY-99-001, proposing 10 revisions to guidance on the information required to be 11 included in the updated final safety analysis reports or 12 FSARs.

13 Although numerous issues will be discussed today, 14 I would, in particular, and you will hear this from me, like 15 to delve a little deeper into a few of the issues 16 surrounding the next major rule change that will be 17 forwarded for Commission deliberation of 10 CFR 50.59, 18 changes, tests and experiments.

19 As you know, in the fall of 1995, I directed the 20 staff to perform a systematic reconsideration and 21 reevaluation of the regulatory framework that authorizes 22 licensees to make changes to their facilities without prior 23 NRC. approval.

10 CFR 50.59, issued in 1962, is a l

i 24 fundamental regulation, the application of which has l

25 expanded over the years.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

+

\\

i l

5 1

Given the importance of this rule to both the l

l 2

staff and the licensee and the fact that we have a slightly l

3 modified Commission at this time that will be reviewing 4

recommendations on the final rule language next month, I 5

would request that both the NRC staff and NEI provide l

6 sufficient coverage of what they believe to be on this topic 7

in today's briefing, highlighting any differences of 8

position on wording or concepts between the staff and the 9

nuclear power industry.

I think it's important that the 10 Commission understand.

11 I understand the copies of the viewgraphs are 12 available at entrances to this room.

I also would like to 13 note that many of the agencies' reactor licensing t

14 initiatives and milestones are included in what is termed l

15 the staff's update to the tasking memorandum response, which 16 is issued monthly and is available on the NRC's home site.

17 Unless my colleagues have any opening comments, 18 Dr. Travers, please proceed.

19 DR. TRAVERS:

Good morning, Chairman.

You've 20 already highlighted he focus of today's meeting.

I would l

21 point out that each one of the initiatives that you've I

22 mentioned are, in fact, included in our response to the 23 Chairman's tasking memorandum.

There are some 11 under the 24 category of reactor licensing initiatives and just 25 yesterday, for those who are interested, I signed out the ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 (202) 842-0034 i

l

6 1

most recent status report on our progress in addressing i

2 those issues, i

i 3

I am encouraged by the progress we are making.

We 4

are substantially on track and on schedule for the bulk of 5

them, as you will hear today.

So we look forward to this 6

briefing and we're glad for the opportunity to update the 7

Commission.

8 At the table with me today are Roy Zimmerman, 9

Deputy Director of the Office of Nuclear Reactor Regulation.

10 We also have Chris Grimes, Director of the License Renewal 11 Project Directorate in NRR; Dave Matthews, who is the 12 Director of the Division of Reactor Program Management; and i

13 Bob Wood, who is a Senior Financial Policy Advisor in the 14 Office of Nuclear Reactor Regulation.

15 Without further ado, let me turn it over to Roy to 16 begin the briefing.

17 MR. ZIMMERMAN:

Our plans this morning, the 18 majority of our presentation will be on the four areas of 19 license renewal, license transfer, 50.59 rule-making, and 20 FSAR update.

Chris Grimes will lead the discussion on 21 license renewal.

Bob Wood will take us through license i

22 transfer and Dave Matthews will discuss the status of the 23 rule-making on 50.59 and the FSAR updates.

24 As time permits, we would also like to be able to 25 discuss several of the other initiatives that are addressed i

i ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

1 7

i in the reactor licensing oversight area in our tasking memo 1

2 and Dave Matthews and myself will walk the Commission f

l 3

through those items.

The Chairman has mentioned many of the i

4 items that we'd like to provide an overview of.

5 As you know, many of these items were discussed at 6

the Senate subcommittee hearing in the summer time-frame and l

7 have been the subject of discussion between the Commission l

l 8

and the stakeholders on two occasions thus far.

A number of l

9 the initiatives that we're going to talk about today were 10 underway prior to last summer time-frame, but as a result of 11 the stakeholder interest, we have expedited a number of 12 items and we will bring those to light today, and there is 13 increased management in light of the concerns that we l

14 received.

15 There is a common thread that will come through in 16 our discussions as we discuss reducing unnecessary 17 regulatory burden in a number of these areas.

But I need to l

18 say at the outset that maintaining public safety is our 19 first and foremost effort and before we look for those areas 20 where we can reduce burden, we are particularly careful to 21 make sure that we are not undermining the necessary safety 22 infrastructure.

23 So with that, let me ask Chris Grimes to lead a 24 discussion on license renewal.

25 MR. GRIMES:

Thank you, Roy.

Good morning.

May I

(

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

8 1

have slide three, please?

The regulatory requirements the 2.

Commission established in Part 54 to Title 10 provides a 3

means to ensure safe plant operations during a 20-year 4

period of extended plant operation through a systematic 5

review of the programs that demonstrably manage aging 6

effects applicable to passive, long-lived structures and 7

components that perform safety-related functions.

8 The requirements in Part 51 provide an appropriate 9

scope of environmental impacts to be evaluated in 10 conjunction with such a licensing action.

Given those 11 accomplishments, the present objective of the license 12 renewal program is to establish a review process that is 13 effective, efficient, timely, and predictable.

14 May I have slide four, please?

With that 15 objective in mind, the NRC staff developed a review process, 16 as set forth in NRR Office Letter 805.

The staff's 17 environmental impact review is conducted in parallel in 18 accordance with NRR's Office Letter 906.

19 These procedures are applied through an aggressive 20 review schedule which will provide a complete safety 21 evaluation and final environmental impact statement in 585 22 days following receipt of a license renewal application.

23 The new procedure also provides for a formal 24 feedback mechanism to identify generic renewal technical and 25 process issues and lessons learned during the review of the i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

1 1

9 1

initial applications.

This provision ensures that issues 2

are promptly identified and addressed and the resolution of l

3 these issues are captured in improvements to the i

4 implementation guidance.

i 5

Monthly management meetings are held to monitor 6

the_ progress of the renewal reviews against the milestone 7

schedules.

Success measures are established each month to l

8 demonstrate continued progress toward the future milestones.

9 We hold public meetings as often as possible, including 10 public meetings that are held in the vicinity of the plant 11 site when site visits are conducted to gather information 12 concerning aging management programs and we are exploring i

13 ways to expand the license renewal information, including i

14 the status of generic renewal issues and progress towards 15 improvement in the guidance on NRC's web site.

l 16 The License Renewal Steering Committee was i

17 established in April 1998 to monitor the progress of the f

18 staff's review of the initial renewal application.

Review 19 implementation of the license renewal program and to advise l

20 responsible line management, the Steering Committee meets 21 bimonthly with the NEI License Renewal Working Group.

22 On alternating months, the Steering Committee 23 meets internally with the NRC staff to review the progress 24 of the staff's efforts.

25 In addition, in accordance with the March 6, 1998 h

ANN RILEY & ASSOCIATES, LTD.

n Court Reporters 4

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 (202) 842-0034

(

- - ~ -

1 10 1

memorandum from the EDO, the Executive Council monitors the 2

progress of license renewal to ensure oversight, 3

coordination and strategic implementation of the renewal 4

program.

The EC meets about monthly on license renewal.

5 It's periodically scheduled.

6 The next meeting with the EC will be held on 7

January 19.

The next meeting of the Steering Committee, in 8

conjunction with a monthly management meeting, will be held 9

tomorrow.

10 The next slide --

11 CHAIRMAN JACKSON:

Before you go, let me ask you 12 two quick questions.

Has the staff identified any potential 13 policy issues that require direction or guidance from the 14 Commission with respect to license renewal?

15 MR. GRIMES:

No.

The staff has not identified any 16 policy issues at this point.

We are continuing to monitor a 17 series of generic renewal technical and process issued and 18-at that point, we're continuing to dialogue with the 19 industry and we believe that these can be -- these generic 20 renewal issues can be resolved with implementation guidance.

21 CHAIRMAN JACKSON:

And can you speak a bit to what 22 public outreach' initiatives you have ongoing?

23 MR. GRIMES:

Our public outreach consists 24 primarily of holding as many public meetings as we can, both 25 in conjunction with the license renewal applications and 1

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 j

11 1

generic license renewal meetings with NEI and NEI's working 2

group and task force on license renewal.

3 CHAIRMAN JACKSON:

When was the last public l

4 meeting you had?

I 5

MR. GRIMES:

It was in the middle of December.

As 6

I mentioned, our next public meeting is tomorrow.

7 CHAIRMAN JACKSON:

When I talk about public 8

meeting, I'm not speaking of meetings with NEI in the i

9 public.

Rather, I mean meetings with the public in the 10 vicinity of the --

11 MR. GRIMES:

The last fully public meeting in that 12 sense was the environmental scoping meeting at the Oconee

)

13 site.

l 14 CHAIRMAN JACKSON:

You can tell me later.

I'll 15 let you go on.

l 16 COMMISSIONER McGAFFIGAN:

Madam Chairman, could I 17 follow up on your question and give the staff a chance to 18 answer now.

l 19 NEI, in its last viewgraph,.later in the meeting, l

20 raises a policy question.

I don't know if it's a policy i

21 issue.

Is the intent of the rule to re-verify the existing i

22 CLB programs and activities?

And I don't know whether 23 that's a rhetorical question, but since you're on it right 24 now, is there an issue arising as you go through the first 25 two applications that NEI perceives, where you're going ANN RILEY & ASSOCIATES, LTD.

?

Court Reporters f

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

12 1

outside the scope of the license renewal rule?

l 2

MR. MATTHEWS:

There are discussions underway with 3

NEI with regard to -- they characterize it as a policy 4

issue.

It may be an implementation and review issue.

But 5

regardless of its title, it has to do with the level of 6

detail and the information that needs to be provided to meet 7

the demonstration requirement in Part 54 in several areas.

8 The one that's getting the most attention is the 9

one related to the EQ program.

It's the staff view that 10 compliance with the applicable sections of Part 54 depend on 11 a description of the programs that are relied upon to manage 12 aging effects, submitted on the docket to support the staff 13 findings in the safety evaluation.

14 A simple commitment, which I believe is NEI's 15 position, of continued compliance or implementation of 16 particular programs in accordance with the regulations, 17 without any supporting program description, we don't believe l

18 provides an adequate basis for that purpose.

19 We've expressed that position in individual 20 conference calls with the two applicants involved and a 21 letter has been recently forwarded to EG&E with that 22 position and I believe they are preparing to provide such a l

23 description.

24 COMMISSIONER McGAFFIGAN:

There is an existing EQ 25 program and there is an existing description in the IJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

13 l

1 licensing basis as to what they have to do to meet our 2

regulations.

3 MR. MATTHEWS:

There is an existing requirement 4

for EQ in the regulations.

l 5

COMMISSIONER McGAFFIGAN:

And there is something j

j 6

in the current licensing basis with regard to how they meet 7

that current requirement.

[

8 MR. MATTHEWS:

If you deduce that the current 9

licensing basis extends to what they have on site, certainly l

10 there is a portion of their licensing basis that addresses l

11 how they have implemented a program to meet that 12 requirement.

That doesn't necessarily mean that it's within 13 the hands of the NRC.

l 14 MR. ZIMMERMAN:

Much of that information is not 15 docketed.

16 COMMISSIONER McGAFFIGAN:

I see.

So the issue is is this also somehow connected with the notion that we're 17 18 really doing a new license, that this is --

19 MR. MATTHEWS:

No, I don't think it's that broad 20 and it's less of an issue of a perception than it is one of 21 the regulatory language in Part 54 that addresses the need 22 for the licensee to demonstrate to the satisfaction -- these I

23 are,my words -- the satisfaction of the NRC in accordance 24 with their review criteria, that they are going to have a 25 program in place to manage the effects of aging through the A

b JJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

14 1

renewed term.

2 CHAIRMAN JACKSON:

Is it a question of NRC being 3

able to have access to the information that allows it to l

4 make that judgment?

5 MR. MATTHEWS:

It's more important, I think, to 6

phrase it as -- I think we might have access in that we can I

7 go on site and do an examination of that program, but it's l

8 more an issue of them representing, as part of their i

9 application for renewal, on the docket, the description of 10 the programs they intend to rely on and it then becomes, of 11 course, a basis for the decision we make in granting the i

12 renewed license, and that's the issue.

13 MR. ZIMMERMAN:

I think this is a relatively new 14 issue and it's a matter of trying to talk it through to see 15 if there is common ground here.

In a discussion recently 16 that went on last month, there were questions from the 17 applicants, do we want to see all their programs, all their 18 procedures, do we want to see everything get boxed up and 19 sent in, are we going to pour over all that level of detail.

]

20 And through the dialogue, we were discussing that 21 what we need is a summary that explains it at a higher 22 level.

So you can see that there was some agreement and 23 focus coming together.

We're not there yet, I'm not sure 24 that we will get there, but it was moving in that direction.

25 CHAIRMAN JACKSON:

Narrowing it down.

i JJUJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 j

i Washington, D.C.

20036 (202) 842-0034

e' 15 1

MR. ZIMMERMAN:

Narrowing it-down.

2 COMMISSIONER McGAFFIGAN:

Could I ask a follow-up?

3 Is.this something, when you've suspended working on the 4

standard review plan, because we wanted to get these first 5

couple done, it was sort of embedded in the standard review i

6 plan at the point that the standard review plan was 7

suspended?

8 MR. MATTHEWS:

I will let Chris respond to that.

i i

9 MR. GRIMES:

Yes.

I will explain in the following i

10 process.

We originally came in and said we had a variety of 11 these generic implementation issues.

One of them is credit 12 for existing programs.

We said that there is certain 13 guidance in the standard review plan or certain guidance in l

14 the content of a renewal application that gets to how this 15 information is conveyed and an explanation of how aging 16 effects are managed and how time managed aging analysis will 17 be managed in the future.

1;B We know have a database of some 98 issues where 19 we've broken them down individually.

Environmental l

20 qualification is one, credit for other existing programs are i

21 others, and it really gets to what level of detail is going i

22 to be described in the application and then what level of 23 detail will the staff put in its safety evaluation that 24 provides the basis of how much we're going to inspect these 25 programs for the new license in the future.

l JJUJ RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 1

l Washington, D.C.

20036 l

(202) 842-0034 i

16 1

We're trying to find optimum description of these i

2 programs.

We're not trying to challenge the current 3

licensing basis, but as is usual, whenever we start poking 4

at the current licensing basis and try to understand how it 5

operates, there's a natural nervousness.

6 Similarly, the ASME is naturally nervous about 7

what we say about how in-service inspection manages aging 8

effects.

Those are all, in my view, implementation issues 9

in terms of what level of detail will the safety evaluation 10 basis for the granting of this new license rely upon.

11 CHAIRMAN JACKSON:

Okay.

Why don't you go on?

12 MR. GRIMES:

If I could have slide five, please.

13 The staff's view of the Calvert Cliff's and Oconee license 14 renewal applications are on schedule.

Upon receipt of the 15 responses to the staff's requests for additional information 16 from Baltimore Gas and Electric in December 1998, the staff 17 began preparation of the safety evaluation report and draft 18 environnental impact statement for Calvert Cliffs, both of 19 which are scheduled to be completed in March 1999.

20 The staff's request for additional information 21 from Duke Energy on the Oconee license renewal application 22 were issued as scheduled in December 1998.

Actually, the 23 requests for additional information for the environmental 24 review beat the scheduled January 3 date.

They were issued 25 on December 29.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

17 1

The responses to those requests from Duke have 2

already begun and are scheduled to be completed by March 3

1999.

The staff is continuing to work with the NEI license 4

renewal group to focus and resolve generic renewal issues.

5 NEI has provided issue descriptions and contacts 6

to facilitate communications as well as NEI has'provided 7

commitments to provide supplementary information to help 8

clarify the issues the staff will address.

t

[

9 The resolution of generic renewal technical and 10 process issues are expected to improve the efficiency of the 11 review process by providing clarity in the guidance for the 12 content of. future renewal applications and the conduct of l

1 13 renewal reviews.

14 Similar benefits are expected from the review of l

15 generic technical reports submitted by owners' groups.

Two 16 of the B&W reports have been completed and two more are 17 being reviewed on schedules that are consistent with the 18 Oconee review, because Duke references those reports.

19 Progress is also being made on the review of the generic 20 technical reports submitted by the BWR owners in 21 anticipation that we will receive an application from Hatch l

22 in early calendar year 2000, and the Westinghouse Owners l

l 23 Group, in anticipation that we will receive an application 24 from Turkey Point.

25 Finally, we are aware of other parties interested ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

18 1

in license renewal; in particular, the Southern Company has i

2 described their methodology for submitting an application 3

for plant Hatch.

That includes information sharing with 4

Northern States Power and Philadelphia Electric Company, t

5 Florida Power and Light and Virginia Power have 6

also expressed an interest in license renewal and sharing l

l 7

information in order to facilitate communicating with the r

+

8 staff.

Any of these generic activities obviously will 9

benefit the staff by being able to address issues in a more 10 efficient way, f

11 The NRC staff has also tried to be responsive to 12 other utility companies and even foreign groups working on I

13 aging management programs or life extension who have 14 contacted the staff about various aspects about how the NRC 15 is implementing its license renewal program.

16 That concludes it.

17 COMMISSIONER MERRIFIELD:

I've got two questions 18 for Mr. Grimes.

The first one is, you discussed a variety 19 of plants that may be interested in pursuing license renewal 20 in a relatively -- a time period of relative -- a relatively 21 short time.

Is that -- are the requirements to address i

22 those dealt with in your budget assumptions; i.e.,

do you l

23 have sufficient budgetary resources programmed and 24 anticipated in order to deal with that level of interest in i

25 license renewals?

f

?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 I

(202) 842-0034

~.

19 1

MR. GRIMES:

The answer to that today, at this 2

point in time, the answer is yes.

In fact, we have to go 3

back and review the projected number of renewal applications 1

4 for fiscal year 99 and 2000, because as yet we have not i

5 identified an applicant that would submit an application in 6

fiscal 99, although we have planned on receiving two more 7

applications.

8 But we also recognize that success in this program 9

could result in a couple of more years, say, beginning in 10 year 2000, with a flood of applications that might overwhelm 11 our resources.

12 So we have identified it as a dialogue, that we 13 want to continue with the industry a way to try to meet our l

14 license renewal applications in such a way that we can have 15 as much predictability in our budgeting assumptions as the 16 industry would like predictability in the review process 17 itself.

18 COMMISSIONER MERRIFIELD:

To the degree that 19 you're doing that kind of pacing, are you working with NEI 7

to try to identify facilities that may fit into that 1999 21 time period?

22 MR. GRIMES:

Yes, with NEI and with their working 23 group and with the task group and at this point licensees 24 have expressed interest, but many of them are not at a point 25 where they can make any firm commitments about particular ANN RILEY & ASSOCIATES, LTD.

l Court Reporters i

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 (202) 842-0034

20 1

submittal schedules.

2 CHAIRMAN JACKSON:.There are some fairly detailed 3

discussions-that licensees have with you when they are 4

seriously on the path to come in as of a certain date, is 5

that not correct?

6 MR. GRIMES:

That's correct.

As a matter of fact, 1

7 we were asked to meet with Arkansas Nuclear on January 22 8

and they want to describe their plans to us.

As I 9

mentioned, we just recently received a submittal from plant 10 Hatch and they're working conscientiously toward their plan 11 to submit a license renewal application in 2000.

12 COMMISSIONER MERRIFIELD:

The last question I had i

13 for you is -- and this is a question I asked on Monday in 14 our meeting.

What would a revision of the scope of the

(

l 15 maintenance rule mean to the license renewal process and 16

'would such a change impact the milestones you've set for 17 Oconee and Calvert Cliffs?

[

t 18 MR. GRIMES:

I do not see a change in the scope of 19 the maintenance rule affecting Calvert Cliffs or Oconee, 20 because they have already established a scope of passive l

o I

21 long-lived systems, structures and components for which 22 they're demonstrating aging management programs.

23 I do see that a change in the scope of the 24 maintenance rule, because of the nature of the way that i

25 licensees try to use that scoping process to scope license i

a l

1 ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 l

(202) 842-0034

e 21 1

renewal, it potentially could have a destabilizing effect on l

2 license renewal as we go through a change in what is 3

safety-related, what systems, structures and components are 4

relied upon for design basis transients and events.

5 But in the long run, I see license renewal could 6

eventually come back and blend right in.

It's the question 7

about during the transition period, as the industry and the 8

staff are trying to change the scope of safety-related 9

systems, structures and components, how do you prevent that 10 change from destabilizing the predictability of the scope of l

l 11 the license renewal review.

12 At this point, we've only looked at it l

13 conceptually.

I think it's a workable problem.

The 14 question is whether or not it can be worked in such a way as i

j t

1 15 to not impact long-term planning.

j 16 COMMISSIONER DICUS:

Let me follow up on that, if 17 I may.

Of the licensees that are talking to you about l

l 18

-coming in with applications in FY-2000, are they talking to 19 you about this issue, as well?

Are they concerned about did 20 some changes in scope in the maintenance rule, that that 21 might delay them or they're concerned about it or are they 22 talking to you about that at all?

If so, could we have some 23 feedback on that?

l 24 MR. GRIMES:

Our dialogue thus far has primarily l

25 been with the practitioners of license renewal who have i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

.._.m._._.-

22 1

taken as given a scope of systems, structures and 2

components.

At the higher levels, when the steering 3

committee and the NEI executives meet, they have talked l

l 4

about it in a conceptual way, but no one has identified it l

5 as a particular concern.

6 CHAIRMAN JACKSON:

Is it true, Mr. Travers, that i

7 this issue of metering of the license applications, license 8

renewal applications and discussions with the industry, 9

nuclear power industry about that, is it your intent for 10 that to play into the planning and budgeting process in a l

11 way that you have a coherent approach?

12 DR. TRAVERS:

It is.

It's a very important 13 element because of the resources that would be required to i

14 evaluate any given application.

So we're certainly l

15 encouraging, to the extent we can and they can respond, to 16 get information from the industry on their plans, to give 17 them information on our planning assumptions, so that they 18 know some of the limitations we face at least today in our 19 current thinking and how we would budget for license renewal 20 and give them an idea of sort of how long the queue is, how 21 long the review is certainly in terms of the predictability 22 element.

23 But as much as we can, share and get information 24 from them on their plans.

25 CHAIRMAN JACKSON:

I take it that good feedback i

I ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 l

(202) 842-0034

~ ~ -...,

23 1

has been received from the license applicants to this point i

2 in terms of how the process has been going.

l l

3 DR. TRAVERS:

At my level, yes.

I think in my 4

discussions with.the two plants thus far at least, in my i

5 relatively new capacity, I have been encouraged by what the l

6 staff and licensee interaction has been to date.

Our 7

ability to move forward on the issues, to identify them and 8

to work to closure and resolution on some of them to make l

9 the processes efficient and predictable, but mostly to i

10 achieve our fundamental goal of ensuring safety in the l

11 renewal period.

12 MR. GRIMES:

At my level, the feedback is more I

i 13 than sufficient.

i 14 CHAIRMAN JACKSON:

Well, let me give you some l

l 15 feedback.

I think you're doing a sterling job and you laid 16 out a plan and you're working the plan, but you're seeing to I

17 the issues, as far as I can tell.

The Commission doesn't 18 get directly involved at this point, but I have my sources.

19 So I just want to encourage you to keep it up and 20 you have a big task.

l 21 DR. TRAVERS:

Thank you.

l 22 CHAIRMAN JACKSON:

You seem to be doing a great 23 job.

24 COMMISSIONER McGAFFIGAN:

Madam Chairman, I will 25 second everything you just said.

I just want to ask the i

I ANN RILEY & ASSOCIATES, LTD.

l Court Reporters i

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 (202) 842-0034

7 i

24 1

staff.

We have committed to a plan here.

You've got very 2

specific dates, in the updates to the tasking memo, as 3

you've had in previous updates.

We're headed towards ACRS l

4 review early next year and presumably Commission review in 5

the March / April time-frame for the first application, a 6

couple months later for the second application, of the SER

]

7 and environmental impact statement.

8 I can't resist making a comment about something I 9

saw in the Trade Press sort of challenging us to get this 10 done by June, and I think that was disservice to try to --

11 that would have been a destabilization of a process.

12 There is no way, having laid this out, having j

13 assigned resources,-licensees assigned resources, on a 14 schedule, to --

l 15 CHAIRMAN JACKSON:

I'm content to let Chris handle i

i 16 it.

That's my point of view.

17 COMMISSIONER McGAFFIGAN:

Right.

j 18 CHAIRMAN JACKSON:

And if he meets or beats the l

l 19 milestones, all to the good.

What we want is for him to 20 meet the milestones, but if he beats them, all to the good.

l 21 We should let him -- it's his job to manage it and I think 22 he's been doing'a great job.

l 23 COMMISSIONER McGAFFIGAN:

But on the issue of 24 public meetings, it seems, to me, that in the March 25 time-frame, there will be an opportunity -- in the ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 1

.m___._

_..___..m____.

25

{

1 environmental impact statement process, there is a public 2-meeting again when the draft EIS goes out, is my 3

recollection.

And when the initial safety evaluation report 4

goes out, there will be these periodic meetings, but that 5

will be a pretty important document.

6 So any member of the public who wants to pay 7

particular attention to the safety evaluation will have a i

8 real chance when the initial safety evaluation report comes i

9 out.

10 MR. GRIMES:

We were talking about the plans for i

11 the public meeting for the Calvert Cliffs environmental j

12 impact draft just within the last two days and I have begun 13 talking about a way to hold a public session that would also 14 discuss the safety evaluation report that will be available 15 at that time, without interfering with the logistical things 16 that we have to do for the purpose of satisfying NEPA.

17' So we will be pursuing that.

And to the extent 18 that we can try and hold more public meetings in the i

19 vicinity of the plant site, at this point, we're simply 20 taking advantage of site visits because trying to make 21 public meetings, like the scoping meeting or the 22 environmental impact meeting, those are -- those are very 23 demanding, too, and I don't want to distract the resources j

24 from meeting these milestones.

25 I will also add that I think I was quoted in that i

J ANN RILEY & ASSOCIATES, LTD.

Court Reporters t

i 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 l

(202) 842-0034

26 1

same article as saying we'll work milestone to milestone.

2 And in our meeting tomorrow, we're reviewing the milestones 3

and we will speak to the reconsidering the milestones after 4

the staff evaluation and the draft environmental impact 5

statement have been published.

We'll have a much better 6

idea at that point about what the workload will look like.

7 It will be appropriate to reconsider the 8

milestones at that point, but we're not going to change any 9

milestones and jeopardize not being able to meet them.

10 COMMISSIONER MERRIFIELD:

Madam Chairman.

11 CHAIRMAN JACKSON:

Please.

12 COMMISSIONER MERRIFIELD:

I didn't want to let the 13 moment go by and I want to associate myself with your 14 compliments to Chris Grimes and all of his staff in terms of 15 the superb work that they've been doing.

Keep it up.

16 MR. GRIMES:

Thank you.

17.

CHAIRMAN JACKSON:

Okay.

Let's move forward.

18 MR. GRIMES:

We'll turn to Bob Wood now.

19 MR. WOOD:

Chairman and Commissioners, happy to be 20 here today.

21 CHAIRMAN JACKSON:

Happy New Year.

22 MR. WOOD:

Happy New Year.

Before I get into 23 slide six, I'd like to just go through the goal of the 24 license transfer initiative and some of the background that 25 might be helpful to you and putting it in perspective.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 a

4 27 1

The goal is similar to the goals of a lot of the 2

licensing initiatives that we have; in other words, we want 3

to enhance the predictability, timeliness and efficiency of 4

the license transfer process, while, at the same time,

'5 maintaining protection of public health and safety.

l 6

The license transfer requirements are statutory.

i L

7 They are in Section 184 of the Atomic Energy Act, and that i

8 requirement is spelled out in some more detail in Section 9

50.80 of the Code of Federal Regulations.

10 The NRC has to approve in writing any transfer 11 that comes before it and it has to look at both the 1

12 technical and the financial qualifications associated with 13 the transferee.

It includes both direct and indirect 14 transfers.

A direct transfer is a straightforward sale or l

15 the license itself is transferred to a different entity.

An l

16 indirect transfer, we've seen several of those in the past, l

l 17 and they're in the nature of, for example, a holding company 18 being formed above an existing licensee and the control of l

19 the licensee, and thus the license being transferred 20 indirectly in that capacity.

21 When we look at license transfer applications, 22 there are several factors we can look at, depending on the 23 specifics of the application.

We look at financial 24 qualifications for operations.

We look at decommissioning l-25 funding assurance, antitrust, which is a statutory 2

l ANN RILEY & ASSOCIATES, LTD.

[

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 l

(202) 842-0034

28 1

requirement, the foreign ownership considerations, foreign 2

ownership control and domination issues, technical 3

qualifications in terms of management's ability and 4

experience in operating a plant, and then finally there are 5

Price Andersen and on-site insurance issues that sometimes 6

arise in the context of a transfer application.

7 We've looked at about 50 license transfers over 8

the past four years or so and 20 just in 98.

Those are in

~

t 9

the nature of acquisitions, where one license -- a licensee 10 might acquire another entity, either a licensee or a l

11 non-licensee, mergers between two essentially co-equal 12 companies that are licensees, holding company formations 13 that I mentioned before, non-owner-operating companies that 14 are formed by existing owners to operate the plant, and 15 then, finally, outright sales, and we've seen that, of 16 course, with TMI-1 and Pilgrim most recently, those being 17 the first examples we've had of sales of entire plants.

18 Now, with respect to slide six, I will briefly --

19 could we have slide six, please?

Thank you.

I'll briefly 20 go through some of the completed actions that we've done so 21 far.

As you're all, of course, aware of, UC has completed a 22 final rule on streamlining the licensing transfer hearing 23 process.

The rule, final rule was published December 3 in 24 the Federal Register.

It was immediately effective.

25 It establishes a new subpart M to Part 2 of our JJM RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 j

(202) 842-0034

)

29 1

regulations.

It basically establishes a more informal 2

hearing process.

3 Another important aspect of the rule change was 4

that there are categorical exclusions for and eliminates the 5

need to prepare site-specific environmental assessments and 6

no significant hazards determinations.

7 We've also issued final standard review plans on 8

financial qualifications and decommissioning funding 9

assurance and antitrust.

As you're well aware, of course, 10 there is one in process now, a draft standard review plan on 11 the foreign ownership issues.

12 CHAIRMAN JACKSON:

You should probably give 13 yourself credit for the decommissioning funding assurance 14 rule, because the standard review plan plays off of that.

15 MR. WOOD:

Impending actions, in light of the time 16 we've got here and covering all these issues, I wasn't going 17 to go into any detail on slide seven, but, of course, the 18 major one on our plate now is the TMI-1 transfer and looking 19 at that, and also Pilgrim had come in towards the end of 20 December and we're also looking at that at the same time.

21 These other issues I think are fairly 22 self-explanatory and I'll be happy to answer any more 23 detailed questions on them, but that really concludes my 24 prepared remarks on this area.

25 CHAIRMAN JACKSON:

Okay.

Any comments, questions?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

30 1

COMMISSIONER MERRIFIELD:

What is your time line 2

for the TMI review?

3 MR. WOOD:

We should have it completed in early 4

March in terms of the staff analysis and the safety 5

evaluation.

We've given ourselves three months.

The 6

application came in on December 4, I believe, so we're going 7

to try to complete it within that three month time-frame.

8 Now, that does not include consideration, if there 9

is a hearing.

We understand that there were some expressed 10 interests on the part of an intervenor to intervene, but we l

11-understand that that may be going away.

'12 CHAIRMAN JACKSON:

You suggested, I think, at the

[

13 beginning, that if there were the license transfer rule in 14 place., a time line on the order of eight months, six to i

15 eight months.

l t

16 MR. WOOD:

That's correct.

i 17 CHAIRMAN JACKSON:

So far, are you meeting your 18 milestone?

19 MR. WOOD:

Yes.

20 CHAIRMAN JACKSON:

Okay.

r 21 COMMISSIONER McGAFFIGAN:

I again just want to 22 commend the staff.

I think this is another success area and L

23 we've got some reviews to do, but the rule, getting that 24 done as promptly as it was done was very --

25 CHAIRMAN JACKSON:

I think the rule is one part of 4

f

}

l ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025-Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 i

. - ~ -

~

.~

31 1

it.

I think what we need to compliment them on is the whole 2

3 COMMISSIONER McGAFFIGAN:

Right.

4 CRAIRMAN JACKSON:

-- infrastructure they've put 5

into place, the rule, the standard review plans, the 6

schedules, and the actual review process.

7 MR. WOOD:

Thank you.

8 COMMISSIONER MERRIFIELD:

I second the Chairman, 9

and keep it up.

10 MR. WOOD:

Thank you.

11 CHAIRMAN JACKSONi Now to the point that's most 12 interesting in the sense of more difficult.

13 MR. MATTHEWS:

Gee, I was hoping to proceed 14 through my portion of the presentation as rapidly and 15 smoothly as Mr. Wood did.

Is there any expectation?

16 CHAIRMAN JACKSON:

Well, I'll put it this way.

17 You have one thing going for you, Mr. Matthews.

That is, l

18 yesterday, we had a three hour and 45 minute Commission 19 meeting.

At least I do not intend that.

20 MR. MATTHEWS:

Good.

With that, I'll begin.

I'd 21 like to address two areas.

They're interrelated.

They also 22 are connected to a third and one of the other licensing 23 initiatives that are contained in our set of viewgraphs that 24 have been provided.

25 The first one I'd like to discuss is the 10 CFR

JRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 l

(202) 842-0034 i

32 1

50.59 rule-making activity.

By way of background, and I am 2

on slide eight at this point.

By way of background, and 3

this will be brief, Madam Chairman, you already gave an 4

introduction with regard to the fact that this effort had 5

been undertaken at your request some time ago.

6 It has proceeded through-the 1996-1997 time-frame 7

and now one more year has passed and we are still addressing 8

these issues in that reevaluation.

But it is coming to 9

closure, in my view.

10 We have responded to a Commission SRM in March of 11 98 to prepare a proposed rule.

You reviewed that proposed 12 rule and authorized us to issue it for public comment, but 13 suggested that we solicit comment in some additional areas 14 beyond the content of the proposed rule that was offered by 15 the staff.

16 Those additional areas related to a wide range of 17 options on margin of safety and to seek comment on several 18 other topics, such as minimal increases and definitions and 19 the need for definition of accidents.

20 That rule was published for public comment.

That 21 occurred on October 21 and you had asked us in that SRM to 22 provide you a final rule, back to the Commission for your 23 consideration, on February 19 of 1999, which is close to a 24 month from now.

25 With regard to the current status, we got IJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

m-o 33 1

extensive public comment, 57 comment letters have been 2

received, totaling in number about 300 pages.

We did get 3

comments from NEI, as were expected.

4 In addition, we got comments from 35 power reactor 5

licensees and two non-power reactor licensees.

I'd like to

.6 remind -"erybody that this rule has wide applicability.

It 7

addresses issues at power reactors that are operating, power 8

reactors that are in the process of decommissioning, 9

non-power reactors, and also addresses -- and I probably 10 won't have an all-inclusive list -- but changes relative to 11 people who have licenses under Part 72.

12 So it is an important rule and one that affects a 13 lot of the operations that are overseen by the NRC.

14 We did not get any comments from any public 15 interest group on this rule.

We did have some comments from 16 members of the public and interested parties, but no 17 combined public interest group offered views on this rule.

18 Most commenters supported the objectives of the 19 rule-making and I will summarize the more significant groups 20 of comments, without belaboring the details, other than to 21 the extent that we need to go into them, at your discretion.

22 I will take them only in order of what I view to be t

23 significance and the ones that are going to be most 24 difficult for the staff, first, and then the Commission, 25 secondly, to wrestle with.

i l

ANN RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034

34 1

Margin of safety drew many comments.

NEI offered 2

an approach that would substitute a group of criteria in 3

place of the existing margin of safety criterion.

In fact, 4

they didn't even label it.

They refer to it as criterion 5

seven.

The reason being that their approach would not be to 6

address that issue with a concept of margins, but to 7

establish and focus on parameters that need to be addressed 8

to control the integrity of fission product barriers, and 9

they would argue that prior approval would be required if 10 they were to alter or exceed any of that set of parameters.

11 They would call these parameters for this group of 12 issues related to fission barrier product integrity as 13 design basis limits that would be agreed upon.

They exist 14 in the FSARs at this tirce.

i 15 CHAIRMAN JACKSON:

In all of the FSARs.

j i

16 MR. MATTHEWS:

I believe all of the FSARs address 17 those limits.

18 CHAIRMAN JACKSON:

Does the staff have a position 19 on this?

20 MR. MATTHEWS:

We are probing their proposal at 21 this point in time and that's the best way I can say it, 22 because there is an issue of concern over completeness and 23 we don't think we've got a bottom line on whether it may be l

24 sufficiently complete to exercise the degree of oversight 25 necessary.

IJUJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 l

(202) 842-0034

35 l

1 We had an extensive public meeting with them last 2

Friday, extended well beyond the snow release time, and we 3

had a few individuals from Chicago there and I think maybe 4

it was because they probably preferred being here.

1 5

CHAIRMAN JACKSON:

They couldn't go home anyway.

6 MR. MATTHEWS:

I thought they preferred being here 7

rather than there.

And we have another meeting scheduled to 8

further explore their proposal.

They're certainly here and 9

are well equipped to describe it.

I think I got it, in a 10 nutshell.

11 With respect to probability and the relationship 12 of the phrase " minimal" to changes in probability, some 13 commenters noted that minimal increases in probability may 14 be difficult to justify without more definitive guidance 15 concerning the use of and quality of the PRAs.

I think this 16 is an issue that was discussed at some length on Monday.

17 My understanding of NEI's comments in this area, 18 they aren't very eager to step off into a definitional 19 discussion on what means min'imal and they are very 20 comfortable with continued use, as they had in 96-07 and 21 NSAC-125 that preceded it, with the concept of negligible as 22 applied to discussions relating to probability in that 23 existing criterion on Part 50.59.

j 24 CHAIRMAN JACKSON:

Wasn't negligible the original 25 staff recommendation?

dHJ RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

_ _ _. _. = _. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _.... _ _. _.. _.. _ _ _.... -... _. _.-

36 1

MR. MATTHEWS:

Yes.

The last item that I wanted 2

to speak to directly was with respect to the treatment on 3

consequences and the relationship of the word " minimal" 4

increases of consequences and that corresponding criterion 5

in 50.59.

6 There is a bit of dual treatment that I think NEI 7

would like us to consider.

You may recall that the staff 8

proposed in the proposed rule as one of the primary options P

9 for dealing with consequences that we adopt a view of 10 minimal relative to the percentage of change that would be 11 permitted based upon a sliding scale, dependent on how far 12 you were away from an acceptance criteria that may have been 13 established by either regulation or some other form.

14 And where no acceptance criteria could be 15 inferred, that in the areas that you may recall the staff 16 sometimes would view that it was -- the acceptance criteria 17 was not numerical, but was some small fraction of 10 CFR 18 Part 100.

19 In those instances, NEI would propose that they 20 have the flexibility to not be held to a small fraction of a 21 small fraction and that they be allowed to allow those 22 consequences to increase to the regulatory acceptance 23 criteria that most usually is found in the standard review 24 plan.

25 So I think there is a mixed story with regard to ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

,. -. - - - ~.. - -.. _.. -

I 37 1

the degree of acceptance we saw in at least the industry 2

comments on minimal as applied to consequences.

3 CHAIRMAN JACKSON:

This prospective was suffused 4

in both the NEI and the actual power reactor licensing.

5 MR. MATTHEWS:

I'll have to look to Eileen for l

6 that.

Eileen McKenna is the primary staff individual on l

7 50.59.

8 MS. McKENNA:

Eileen McKenna, NRR staff.

I would i

9 characterize the comments we got from across the spectrum of 10 saying there were those that agreed that limiting this l

l 11 percent of difference with respect to the SRP values was 1

12 unduly restrictive.

13 I would also comment that we did get a set of l

14 comments that still would go back to, if you will, that the l

15

-- you would not -- you should not measure whether there's 16 been any increase in consequences, unless the limits 17 themselves, whether they are either the regulatory limits or 18 the standard review plan limits that are exceeded; that they l

19 were rejecting, if you will, the minimal increase approach.

l 20 So I wouldn't say that there was a uniformity, but 21 I would say that there were those that did accept the idea l

22 of having some limitation on the degree of change.

They 23 also raised this question of the SRP limits and things like 1

(

24 that, that those not be also applied in this percent change 25 action.

l i

ANN RILEY & ASSOCIATES, LTD.

f Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 t

i

38 1

CHAIRMAN JACKSON:

I see.

So that they should be 2

able to go all the way to the limits without having NRC.

3 MS. McKENNA:

These subsidiary limits, if you 4

will.

5 CHAIRMAN JACKSON:

Without having any NRC review.

6 MS. McKENNA:

Correct, yes.

7 CHAIRMAN JACKSON:

Does the staff have a position 8

at this point, a preliminary position?

9 MS. McKENNA:

Again, we're looking at that and 10 seeing whether there are any reasons why that would not be 11 acceptable, but I don't think we're prepared to say today 12 that we're accepting or rejecting.

13 MR. MATTHEWS:

Turning now to slide nine, I just 14 wanted to very quickly talk about the approach which I think 15 we've already discussed.

16 CHAIRMAN JACKSON:

Let me just ask you one other 17 question.

Well, two really.

One is specific and one is 18 more generic.

I note that NEI has a slide on the importance 19 of definition of change, which would redefine when 50.59 20 evaluations are received.

21 Now, is this -- have you had a chance to examine 22 this?

23 MR. MATTHEWS:

I have not examined that slide or 24 that definition.

I don't know whether Eileen has had an f

l 25 opportunity to.

M34 RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

39 1

MS. McKENNA:

As you notice on our slide, our 2

third bullet is the issue of screening of changes.

So it is 3

one that we are aware of and we did seek comments from a t

4 number of sources.

5 I think, in essence, it's asking for a way that 6

within the definitions to limit, shall we say, those cases 7

where an evaluation is needed for changes that would affect 8

functions or design information as opposed to changed 9

anything that's described in the FSAR as requiring 50.59 10 evaluation.

11 CHAIRMAN JACKSON:

And is this a de facto change 12 of scope?

13 MS. McKENNA:

Perhaps, I mean, in terms of what 14 requires a full evaluation, it could be a way of getting at i

15 the scope question, yes. 'But if you agreed that certain j

i 16 kinds of changes did not' require evaluations, they are l

17 essentially not part of the scope of the evaluation against 18 the criteria.

19 CHAIRMAN JACKSON:

Now, was this something that 20 NEI and the staff said it wanted to do as a second step; 21 that is, scope?

22 MS. McKENNA:

I think what we're talking about is 23 definitional within what facility and procedures described l

24 in the SAR, which was really what this -- the definitions we 25 had now and the scope that we're working on.

So I don't j

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 1

Washington, D.C.

20036 (202) 842-0034

1 40 1

think we were trying to make a change there.

2 CHAIRMAN JACKSON:

But it's scope within the 3

existing --

4 MS. McKENNA:

Scope within the existing FSAR, yes.

i 5

CHAIRMAN JACKSON:

So you're talking about 6

narrowing that scope.

7 MS. McKENNA:

Narrowing the cases for which you 8

r-+

to do an evaluation, yes.

9 COMMISSIONER McGAFFIGAN:

Madam Chairman.

l 10 CHAIRMAN JACKSON:

What is a scope change?

11 COMMISSIONER McGAFFIGAN:

Madam Chairman, the 12 change -- I'm looking at the NEI document.

It's still a 13 pretty broad definition.

I think --

14 CHAIRMAN JACKSON:

No, no.

I'm not dealing with 15 broadness or narrowness.

I'm just asking a more generic 16 question as to whether, in fact, it affects the scope.

17 MR. MATTHEWS:

I think it is a -- it does affect 18 scope.

It primarily affects it with regard to the screening l

19 process that the utilities or the licensees undertake.

20 COMMISSIONER McGAFFIGAN:

To screen out the change 21 in the vice president or something like that.

22 MR. MATTHEWS:

That's correct.

23 COMMISSIONER McGAFFIGAN:

Right.

That may not be 24 bad.

j 25 CHAIRMAN JACKSON:

It doesn't matter.

I'm just l

ANN RILEY & ASSOCIATES, LTD.

j Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 1

l l-l 41 1

trying to clarify to what extent it is a scope change.

l 2

Thank you.

And let me ask the generic question; not to you, i

i 3

no, no, no.

You --

l 4

MS. McKENNA:

I'll wait here just in case.

5 CHAIRMAN JACKSON:

Are we coming to a point -- how 6

much more iteration do we need to allow or are we coming to 7

a point that the Commission just needs to try to make a 8

decision?

9 MR. MATTHEWS:

I think we're at the point, once 10 you receive the staff's proposal, my personal view is that 11 we're going to be able to make a proposal to you of a 12 reasonable course of action, recognizing it's for this 13 period before we reach a more broader change to our 1

14 regulatory framework, that iteration at this point would 15 only delay the inevitable.

We need to get on with this.

16 So I think the staff is in a position -- we're 17 going to make a recommendation in February associated with 18 our response to these recommendations and comments of our 19 external stakeholders.

20 CHAIRMAN JACKSON:

Okay.

That's fair.

21 MR. MATTHEWS:

As I indicated through a memo that 22 Bill forwarded to you earlier, I think in December, our 23 expectation is that the important work to be done is to 24 focus on the resolution.

We felt it might be, frankly, a 25 waste of staff resources to galvanize one of these l

l ANN RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

O 42 1

approaches into the complete final rule-making package and 2

all its attendant pieces prior to our getting your 3

reflection on it.

4 CHAIRMAN JACKSON:

And so it's time for the 5

Commission to bite the bullet.

6 MR. MATTHEWS:

And then we will proceed to hand 7

you back very soon after that a final rule that will have 8

the -- as I say, the I's dotted and the T's crossed.

9 CHAIRMAN JACKSON:

Right.

I understand.

But the 10 Commission needs to bite the bullet.

You can sit down, 11 Eileen.

Thank you.

12 MR. MATTHEWS:

I haven't relinquished my ability 13 to call her back.

14 CHAIRMAN JACKSON:

He reserves the right.

j 15 MR. MATTHEWS:

I reserve the right, right, and the 16 reason for that is that the subsequent issue has 17 implications related to the 50.59 rule-making.

The degree 18 of that interface is in the eye of the beholder sometimes.

19 But I want to now turn to slide ten, and this 20 relates to the guidance for updating FSARs.

This is one 21 that 22 CHAIRMAN JACKSON:

You skipped a slide, you 23 skipped nine.

You think you've covered pretty much those 24 issues.

25 MR. MATTHEWS:

I think I covered nine with regard ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

l l*

43 1

to the fact that it addressed schedule and upcoming 2

activities.

3 CRAIRMAN JACKSON:

Fine, that's good.

Okay.

I 4

understand.

Right.

5 MR. MATTHEWS:

Right.

Let me go back to nine for 6

a moment, though.

I think it does deserve discussion, that 7

last bullet.

Okay.

We are working with the staff primarily 8

involved in the discussion on Monday.

We all were 9

participants in the discussion of those options offered to 10 the Commission with regard to risk informing Part 50,

)

11 because of the interrelationship between the change process 12 that is being suggested for adoption and the future need for 1

13 a collateral change process to be developed, whether you 14 deal with option one or option two or both at the same time.

l 15 So we've been involved in that and I just wanted 16 to reassure you that those activities are interleaved, so 17 that we don't make, to the extent that we can prevent it, I

18 one step forward and then have to take two back with regard 19 to this issue.

i 20 So we have those continuing discussions with 21 regard to the relationship between 50.59, a potential 22 revised broad scope of 50.59, and how that relates to 23 risk-informed options and the scope of certain portions of 24 Part 50.

25 CHAIRFmR JACKSON:

Let me ask you this quick I

ANN RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

=.

44 1

question.

How is the staff coming to terms with acceptance 2

limits or even any de facto scope discussions without a 3

mutual understanding of design basis definition?

4 I mean, I note that NEI's slide talks about attain 5

a common understanding of what information is captured by 6

50.2 definition and must resolve this issue.

7 Are they connected at all?

8 MR. MATTHEWS:

They are connected, but let me deal 9

with it this way.

The concept of acceptance limits, and I'm 10 using that literal term, is really not a term or a concept 11 with much regulatory standing.

We are moving away from it.

12 CHAIRMAN JACKSON:

So that will be part of what 13 comes to the Commission.

14 MR. MATTHEWS:

Right.

This is consistent, I 15 believe, with NEI's comments on the proposed rule.

You will 16 hear the phrase acceptance criteria as we establish it in 17 standard review plans.

t 18 CHAIRMAN JACKSON:

Is that at all related to the 19 issue of design basis definition?

20 MR. MATTHEWS:

No, not directly.

21 CHAIRMAN JACKSON:

So you think one can make a 22 clean decision in the absence of having come to some meeting i

23 of the minds on design basis definition.

24 MR. MATTHEWS:

I believe we can, but I have to i

25 caveat that in that NEI's proposal with regard to a JJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

.. - ~

45 1

replacement criteria for margin of safety does not rely on 2

establishing acceptance limits.

Had we been in a previous i

3 era where we were struggling with margin of safety and how 4

it's defined in terms of the difference between some j

5 operating level and a, quote, acceptance limit that might l

l 6

have been established in the FSAR, I think it would have a 7

direct relationship.

l 8

So there is some caveat to my statement that I 9

don't think resolution of the issue is an impediment to

)

10 moving forward on 50.59.

l 11 CHAIRMAN JACKSON:

Okay.

12 MR. MATTHEWS:

I've lost my place.

On slide ten, l

13 and I only have one slide on this subject.

As you can see, 14 we have moved from the provision by NEI of a guidance l

15 document for our information in November 1997 to a generic 1

16 letter that the staff proposed to address issues that we 17 didn't feel we could resolve in terms of the differences 18 that existed between our view and that that was provided to j

19 us for information.

20 The Commission suggested that we work with NEI to I

21 bring these two documents together, so to speak, and have us i

22 release that proposed generic letter for NEI's use in making 23 possible revisions to their NEI 98-03 document.

24 We've reached agreement on that document and we r

i 25 have proposed to the Commission, as you remarked, l

l ANN RILEY & ASSOCIATES, LTD.

[

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

. -.... _ - - -. -. _ - = -

46 1

SECY-99-001, a reg guide,that would be issued for public 2

comment that would endorse NEI's guidance document 98-03 for 3

use by licensees in guiding their updating of FSARs 4

consistent with the existing regulations, 50.2, 50.34, and 5

50.71(e).

6 We believe this is a success story.

The next 7

milestone will be to reach your agreement and issue that for 8

public comment, resolve those comments, and bring back to 9

the Commission a proposed final reg guide and thereby, in i

i 10 our view, bring forward guidance through our combined i

11 efforts that has been long overdue with regard to the need 12 to clarify just what should be within the FSAR, what should i

13 be within its updates, and bring conformance between that 14 guidance and the existing rules, which primarily are 50.34 15 and 50.71(e).

16 CHAIRMAN JACKSON:

Let me ask you a question.

Is 17 there a level of risk significa:1t SSCs that should be 18 retained in the updated FSAR that somehow doesn't reach the 19 level of adequate protection or is that an oxymoron?

20 MR. MATTHEWS:

Or a non-sequiter.

I'm having 21 trouble -- let me rephrase it in another way and see if you 22 agree that that's the appropriate question.

23 Is there information that might not otherwise be 24 required by our regulations explicitly?

25 CHAIRMAN JACKSON:

Right.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

I*

l 47 i

1 MR. MATTHEWS:

Although you could argue that it 2

was provided as part of the application in response to our 3

need for information.

But I'll just put it that way; that 4

would not otherwise be required through that process.

It is 5

there, it has risk significance; that if it were to be 6

removed, would threaten the concept of adequate protection.

7 CHAIRMAN JACKSON:

That's a good way to put it, 8

thank you.

9 MR. MATTHEWS:

And my view is that there is not 10 information that rises to that.

11 CHAIRMAN JACKSON:

To that level.

Okay.

12 MR. MATTHEWS:

But this is an ongoing point of 13 discussion and the reason I'm able to say that is I believe 14 our whole regulatory fabric establishes, current 15 regulations, a level of adequate protection and we have 16 demonstrated through our licensing review process that that 17 has been met.

l l

18 The question relates to what is -- if we miss 19 something in terms of what the regulation requires, even 20 though it happens to be there, it raises a question with 1

21 regard to sufficiency of our regulatory process.

I don't 22 believe that --

23 CHAIRMAN JACKSON:

Well, should make -- should you l

24 not ensure or should the Commission not ensure, since the 25 SECY is here, that the Commission always reserves to itself ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

I 48 1

the right to revisit the issue vis-a-vis adequate 2

protection.

3 MR. MATTHEWS:

I'll tell you, I think we're always l

4 on -- in terms of our processes, always on the lookout for 5

that kind of information, if you will.

i 6

CHAIRMAN JACKSON:

I know, but I'm talking about 7

making it clear.

8 MR.'MATTHEWS:

As you said, reserve the right.

If 9

such a removal were to take place, that there are regulatory 10 mechanisms to assess it, address it, and if it did threaten l

11 adequate protection, that we have mechanisms to ensure that 12 that not happen.

j 13 I believe that that is something we've given you 14 an opportunity for in the way that we presented that issue

'15 in the Commission paper.

16 CHAIRMAN JACKSON:

Right.

17 MR. MATTHEWS:

And we did it in such a way that I

{

E 18 think is reflective, because we had discussions with NEI on 19 this point.

It was not their intent in developing this l

20 guidance to support the removal of such information were it 21 to be there.

22 CHAIRMAN JACKSON:

Right.

I'm just saying it's a 23

-point of clarity that I think -- I don't know, Karen, if you

{

24 have any comment you want to make about it, but you could 25 argue that the power exists for the Commission to do it ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

49 1

anyway if it relates to adequate protection.

But in terms 2

of truth in advertising, I think it's perhaps worthwhile to 3

4 MS. CYR:

There's always value in re-clarifying 5

that, but I agree the Commission has the power to.

6 CHAIRMAN JACKSON:

So I think maybe I'll certainly 7

make that point.

Let me ask you one other question.

It 8

really relates to the use of the FSAR in the emergency 9

operations center.

10 The NRC maintains the updated FSARs in the ops 11 center to aid in the assessment of the plant events.

So the 12 question is, how did the staff factor in the potential use 13 of the updated FSAR for assessing plant events in 14 determining what information could be deleted from the FSAR?

15 MR. MATTHEWS:

We factored it in by consulting 16 with and working with AEOD, who participated in reviewing 17 the proposed generic letter that offered the opportunity for 18 removal.

But more importantly, I think that what's germane 19 to this discussion is the opportunity to go to simplified 20 schematics as opposed to the more detailed P& ids.

21 The feedback we got was that -- and I think maybe 22 you used this word in your question -- that that information 23 existing in the ops center is an aid to our response.

It l

24 certainly isn't critically relied upon in our response, 25 given that the immediate response and, of course, the ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

50 1

dealing with the casualties is the licensee's 2

responsibility.

3 There also are plant information books that exist 4

in the ops center that contain information of this type.

So 5

we assessed it, given that its retention was not something l

6 we could support by the current regulatory requirements and 7

given that the ops center plays a support role to the 8

licensee, we determined that the removal of it insofar as it l

9 may allow for the elimination of some detail that, for 10 example, the reactor safety team may wish they had would not 11 be a serious shortcoming.

J 12 Furthermore, there are FSARs, many of which, in 13 later era, have simplified schematics in them.

14 CHAIRMAN JACKSON:

Let me ask you.

With respect 15 to last summer's break in the fire protection system at 16 WNP-2, which resulted in the flooding of the ECCS rooms, 17 what value would the detailed P& ids have provided in 18 evaluating and understanding the event?

19 MR. MATTHEWS:

I don't know whether the P& ids were 20 available to the team at that time.

So this is 21 hypothetical.

In my view, it would be of value to aid them, 22 but certainly if they felt they needed details associated 23 with that information, could have gotten that information 24 very promptly, because I think they could have gotten P& ids 25 or that portion of them transmitted electronically without ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

51 1

delay.

2 So I don't believe we're -- I don't believe 3

personally that we're frustrating efforts to gain required 4

information and I think we have the authority to get it when 5

we need it.

6 Roy, I'd like to turn it back to you.

7 CHAIRMAN JACKSON:

So are you done?

8 MR. MATTHEWS:

I am.

9 CHAIRMAN JACKSON:

Well, if you're done, I just 10 want to issue my kudos to you.

This one -- your buddies

- 11 here at the table can say I've done this, this, this and 12 this, and this is done, I did this rule.

You've been 13 working on something that's a very complex set of issues.

I 14 think that we've gotten to this point, I think, is amazing l

15 and I think it's due to work that you've done and people who 16 have been working with you, i

17 So I compliment you, because the Commission, in 18 earlier times, has thought about -- let's call it opening 19 50.59 and looking at some of these other things and has 20 never really gotten to do it, and we're doing it.

l 21 So I want to not only compliment you, but to thank 22 you.

23 MR. MATTHEWS:

Thank you very much.

I'd like to 24 offer that this is probably -- these topics, interrelated 25 topics have probably occasioned more interaction with the T

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

52 1

Commission-than many that I've seen in my 20 years or more 2

here.

I think we collectively view that as having been very 3

beneficial whenever it occurred.

4 COMMISSIONER McGAFFIGAN:

Madam Chairman, I'll 5

second, but I also think, in this case, it took NEI doing 6

Rev. O to 98-03 to -- and the staff discussions with them, 7

it took two to tango and it's a joint success of both the 8

staff and the industry effort.

9 CHAIRMAN JACKSON:

But I would say that it was the 10 Commission that decided that 50.59 needed to be opened up 11

.for review, but I don't disagree with you in terms of having 12 gotten to this point.

It took a joint effort.

13 MR. MATTHEKS:

Thank you.

14 COMMISSIONER MERRIFIELD:

I'd add mine to 15 Commissioner McGaffigan and the Chairman.

16 MR. ZIMMERMAN:

If we can move to slide 11, 17 please.

Now we're moving to other licensing initiatives 18 that are included in the tasking memo under this grouping of 19 reactor licensing and oversight.

The way we have this laid 20 out, the first three items are ones that Dave Matthews will 21 address and the remaining five are ones that I will address.

l 22 We can take them from the top and work down or we l

23 can.give Dave a rest and we can start on some others.

l 24 CHAIRMAN JACKSON:

It's time to give Dave a rest l

l 25 and work from the bottom.

i ANN RILEY & ASSOCIATES, LTD.

i Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 (202) 842-0034 i

53 1

MR. ZIMMERMAN:

Okay.

l 2

MR. MATTHEWS:

Or at least till we can find his 3

place.

l 4

MR. ZIMMERMAN:

Why don't we start on licensing 5

actions and I'll get a page number.

It looks like it's 14.

6 What I'm going to describe are some broad l

7 initiatives in the licensing action process area, status of l

8 where we are with the timeliness and inventory on our 9

licensing actions, and then focus specifically on some 10 initiatives we've had on the requests for additional 11 information or RAI area.

12 We have established recently an internal steering 13 group that is headed by Bill Dean that is interfacing with i

14 an industry steering group that is headed by Jim Fisacaro i

15 and supported through the efforts of NEI.

16 This has the potential to be a powerful tool for 17 us.

They have met, I believe, twice thus far and they have 18 a third meeting set for this afternoon.

The purpose of this 19 steering committee is to share the areas of what do we think 20 is going well in the area of licensing actions and the 21 process and what are the areas we need to focus on to 22 improve it further.

23 They've spent time talking about the RAI process 24 and dialoging what some of the next steps will be.

They're 25 currently working in the box, looking at things that may be i

)

i ANN RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

m..

54 1

short-term type of deliverables, but they also have 2

recognized that there will come a time that they would like 3

to be able to bring forward ways of doing business outside f

4 the box, ways that licensing matters may be able to be done

[

5 in a different fashion, less cumbersome, more done by the L

6 utility, with opportunity for oversight by the NRC.

l 7

So there's a plan here that these groups have, 8

both short and long term.

9 Another benefit of this group is it currently can u

l

(

10 serve as a lightning rod for us, that if there are issues

{

11 within the industry, concerns on the way we're doing 12 business, we want that feedback from the industry.

We need l

13 to know where the concerns are so we have the opportunity to t

14 address it, and we have asked the industry counterpart of 15 this licensing action, the process group, to ferret out, l

L I

16 identify, come forward, get people in contact with us so we 17 can get that feedback, which is very important for us to see 18 if we're making the gains and strides that we believe we've l

19 started to do.

20 CHAIRMAN JACKSON:

Roy,.can you step back for a 21 moment and say up front what have been your desired 22 outcomes?

What is it that we were trying to get to with 23 respect to licensing action?

24 MR. ZIMMERMAN:

Desired outcomes, above all else l

25 is that when we issue our safety evaluation, if we approve a i

t f

ANN RILEY & ASSOCIATES, LTD.

2 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 i

(202) 842-0034

--e y

sw

i

\\

55 1

licensing action, that it is done in a quality way, that we 2

are maintaining safety, and when we sign it out, we feel we 3

can stand behind it, that it was appropriate to issue this 4

licensing action, whether it be for a tech spec amendment, 5

change to an individual portion of the license, an exemption 6

or a relief.

7 And in that area, we think overall we've been 8

quite successful.

However, the timeliness of our actions 9

has not been -- that we have not met the goals that we have 10 established for ourselves in past years and we recognize 11 that we need to look at making some fundamental changes to 12 the way we do business, so that we can improve our 13 timeliness, but not at the expense of the quality of the 14 safety review.

15 And it's important for us as we try to work on 16 that timeliness that we continue to reinforce to the staff 17 that quality comes first and if we need to ask questions in 18 an RAI, we're going to ask those questions.

We're going to 19 maintain that gatekeeper role.

20 But we want to look for other ways of being able 21 to gain the information, perhaps using the telephone more 22 often, having management meetings, by sending letters back 23 and.forth.

We're looking for ways of gaining efficiency; 24 not to give up on the safety side, but to be able to reduce 25 unnecessary regulatory burden due to the length of time that ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 f

b - -

l 56 l

l 1

it takes us to be able to issue the actions.

l 2

It was with that backdrop that led to the i

3 development of this steering group, because, again, as we i

4 think we're making progress, we need stakeholder feedback 5

and this is an opportunity to gain it.

If this group is 6

used as a focal point for the industry and they meet on, 7

ballpark, a monthly basis, then we can find out from this 8

group whether, in fact, they're seeing a reduction in RAIs, 9

are the RAIs on point, are we asking appropriate questions, 10 does the NRC really need that information, issues associated 11 with timeliness and so forth.

l So I see this group doing -- as multi-faceted.

12 13 It's serving that mouthpiece role for us, but they're also 14 helping bring in inventive, creative ideas that we need to 15 stay open-minded to, to look for ways that we could possibly 16 do business different.

l i

l 17 CHAIRMAN JACKSON:

So you would say the l

18 overarching goals then are quality and timeliness.

l 19 MR. ZIMMERMAN:

Yes.

20 CHAIRMAN JACKSON:

Improving timeliness.

21 MR. ZIMMERMAN:

Yes.

t 22 CHAIRMAN JACKSON:

Okay.

23 COMMISSIONER McGAFFIGAN:

Madam Chairman, one of 24 the things that I found most interesting and hasn't really been highlighted by the staff in the briefings that I've 25 ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

0 57 1

heard is this new NRR guide on processing licensing actions, 2

for the first time risk-informs it, to some extent, in the 3

sense that the resources that are agreed to up front depend 4

on the risk significance of the licensing action, and I --

5 CHAIRMAN JACKSON:

Right.

That's the point.

6 COMMISSIONER McGAFFIGAN:

I thought that was one 7

of the more interesting things in the draft guide.

I don't 8

know whether you've gotten any comments from industry about 9

that notion embedded, that there will be more resources, if 10 it's a more complicated risk significant license amendment.

11 MR. ZIMMERMAN:

The increase in priority on the 12 risk-informed licensing actions.

13 COMMISSIONER McGAFFIGAN:

It isn't just that.

14 It's that the relative risk significance of the amendment 15 request will impact the amount of resources the staff 16 devotes to the review in this treaty that gets negotiated up 17 front as to how -- you know, what is the staff expectation 18 as to resources required to process the amendment.

19 You have embedded in your resources a risk 20 significance, I think.

That's what plain English seems to 21 say.

22 11R. ZIMMERMAN:

There is a cross-cut issue here 23 that we're sensitive to.

We have the Bill Dean steering 24 committee on licensing action process.

We have the Gary 25 Holahan risk-informed licensing panel.

What we're doing is ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 I

Washington, D.C.

20036 (202) 842-0034

0 58 1

making sure those organizations talk to each other, so that 2

we stay closely coupled between the efforts within Gary's 3

panel and the efforts within Bill's, so that we try to avoid 4

miscommunications, left-hand /right-hand problems, by i

5 maintaining that dialogue, by members of each group talking 6

to each other, by members of each group sitting in on the 7

other's panels.

8 So we think that's -- we have -- the bottom line 9

is we have high hopes on what we can gain from this group, t

10 One of the first -- I sat in on the very first 11 meeting where they were -- the development meeting, and it t

12 was interesting because we're not sure exactly what kind of 13 issues are we going to hear about.

And the first issue that i

14 came across is industry would like to have an opportunity to 15 talk to us more, to be able to feel comfortable that they 16 can pick up the phone and talk with us and that we have a j

17 willingness and that we'll demonstrate that coming through t

18 the phone lines, to be able to talk with us, and without a 19 concern or fear that their questions will be considered t

20 inappropriate.

21 That sounds pretty easy to do.

That's not one of 22 the more complex issues for us.

So it's a matter of just 23 dialoging with the staff, making the staff sensitive to the l

24 fact that we've got -- the first words that came forward 25 were that, just the discussion on early and frequent ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 4

59 1

dialogue, and we feel that we've communicated that through 2

our training and our staff meetings.

3 The aspect of establishing schedules is an area 4

that we definitely need to improve upon and there's also 5

room for improvement within the industry, and the steering 6

group can help us here, as well.

We have efforts underway 7

to try to have more realistic due dates for when we're going 8

to complete our activities.

Licensing actions is just a 9

piece of that.

You could apply it to other tasks that NRR 10 does and we recognize that that's not one of our strengths 11 right now.

12 The ability to change the due date does not have 13 the rigor to it that it needs.

So we're improving our 14 processes to bring that forward, building the infrastructure 15 so we can come up with realistic due dates.

16 The industry, likewise, we need to have a dialogue 17 with the industry to know that if we send out an RAI, what's 18 their time-frame for responding.

Sometimes they may elect 19 to put it on hold because they're getting ready to go into 20 an outage or whatever and being able to see down the road 21 the success path or ultimate conclusion and a schedule is 22 important to us.

23 So we're working in identifying what I will call 24 firm dates agreed upon for how the process will follow in 25 licensing actions.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

4 o

60 1

One of the initiatives that we've begun now is 2

' initial. acceptance reviews.

Because of the inventory that 3

we have, a review can come in and it can get prioritized j

.4 perhaps at a lower priority.

It may not get looked at for 5

several months and then if we look at it, we may find that

(

6 it has serious flaws that don't allow us to do anything with l

7 it because there's some information that's missing that's l

8 fundamental to the' review.

i 1

l 9

We lost a period of time, when we send that news 1

10 back to the utility.

So initial acceptance reviews are 11 beginning to be conducted by the project manager.

I'll call 12 it a quick look.

It's something to be done within a 13 one-week period upon arrival.

There is guidance that has i

14 been provided to the project managers in our in-office i

l 15 procedure 803.

There's training that's ongoing to train the 16 staff in what to look for.

17 It's aimed at trying to identify missing 18 information that is sufficiently glaring, that we can send 19 it back to the utility, make them aware of it, and they can 20 improve upon their submittal.

And hopefully, by the time 21 that information comes in, our staff, the tech staff will be 22 ready to perform their review and we are able to cut out a 23-chunk of time that otherwise could have been lost.

24 Another important piece is lessons learned.

If, 25 in fact, we have cases where we believe there are these i

ANN RILEY & ASSOCIATES, LTD.

[

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 i

i 1

= _. _ _

___. _. _ _ _. ~. _ _ _ _ _ _ _. -. _. _ _ _ _ _.. _. _.. _ _,, _. _.

61 l

1 glaring issues, we want to get this information back not 2

only to the utility so that they can improve upon it next

{

3 time, but we also want to get it back to the steering I

4 committee.

Maybe in generic terms, specific, not to create 5

those types of issues,.but to try to get the word spread 6

that a utility fell short of the mark in this manner and try l

7 to elicit and leverage the industry group to help spread the 8

word.

l 9

We can do it through generic communications, but 10 there's a role for the industry here that's been expressed 11 to them, as well.

12 Increasing staff accountability is really l

13 reflecting on those words, not really what I want to say.

14 It's really increasing management and staff accountability.

i 15 The staff will do what we ask them to do, that makes sense 16 and there's a logic behind it and it's laid out in an 17 orderly way.

18 The first thing that has to happen is management 19 has to lay out expectations.

We have to say that the past, 20 the ability to change due dates without rigor is not 21 appropriate.

Management expects to set realistic due dates.

22 The way we come up with the date will be based on a process.

23 So we arrived at a date that is meaningful and we think 24 we're going to meet that date and we expect that we're going 25 to meet that date.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

62 1

And then if something happens in the future and 2

there is a reasonable reason why we didn't, we'll look at 3

extending it, if it's appropriate.

We have to start with a 4

premise that these dates are to be met and that's I

5 management's job to make that expectation known and that's 6

not something that we have done as well in NRR as we need to 7

do.

So the expectation on' timeliness.

8 The expectation on the threshold for asking 9

questions, done carefully so that we don't turn off 10 questions, but that we make sure that we're within bounds, 11 that have discipline to the process.

And then in order for 12 this to work, on a personal level, it has to make its way 13 into the performance appraisal process.

People need to be 14 rewarded when they perform along the lines of what 15 management's expectations are and there needs to be 16 accountability after management's expectation has been made 17 known, if we aren't completing things on time.

18 So it has to follow through the process entirely.

19 So there's work to be done on the infrastructure of our 20 performance appraisal process that I don't want to minimize, 21 because there's effort that's involved in going r.hrough and l

22 doing this right and that's what we're going to do.

l l

23 Arthur Andersen has been working with us from our 24 tasking order.

One of the areas that we asked them to help l

l 25 us with was centralizing work load management.

It was an i

i l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

...__.m_

t 63 1

area that we felt needed work, particularly for the reason j

2 that I had indicated about our due dates.

So they have 3

helped us in this area and we have been briefed on their 4

thoughts.

5 They worked with our focus groups, so really what 6

they've been doing is facilitating our staff in discussions.

7 But what we envision is moving to a central clearinghouse, 8

where all tasks coming into NRR are going to go through a 9

central clearinghouse, a group of individuals, not sure of 10 the number yet, it's still conceptual, whether it's in the 11 range of three to five, something like that, that are going I

12 to broker assignment of work and we'll have information 13 available in order to be able to accomplish that.

14 They will have the ability in this vision to be 15 able to have on-line capability to look at the individual 16 work load through, say, a year, so that work can be i

17 levelized across the office, factor in leave, factor in a 18 certain amount of sick leave, put in educated assumptions 19 for a number of green tickets, number of SRMs, load this l

20 document, and then work to manage it, to equalize the work 21 load.

22 We may find that we have cases where we have 23 fungibility issues.

We may find that we have some lightly 24 loaded areas and we need to do some cross training in order I

25 to put the resources where they need to go, l

l

[

IJRJ RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

~-- _

i l

4 64 l

1 This will remove -- it will bring it to a central 2

place and I think that that objectivity and standard way of l

3 doing business, although quite challenging, I think, will 4

pay us dividends.

5 CHAIRMAN JACKSON:

How does that play off of your 6

use of your operating plan?

7 MR. ZIMMERMAN:

The direction that we're currently 8

headed with our operating plan is to reshape it, to a 9

degree, to take the significant new initiatives that we have 10 to work on -- there's a lot of work to make this vision come 1

11 to light -- and incorporate this into our operating plan, 12 such that the milestones in order to do this, the scoping 13 effort to figure out what is this going to cost in hardware 14 and software and people and to look at what it's going to 15 take to actually make this work, we've got to go through it 16 by the numbers in the operating plan with milestones.

i 17 One last concept on this is the concept of what 18 was called a knowledge-based operation, where lessons 19 learned are factored back in, perhaps through an electronic 20 note system, to inform the next one in line that I just did 21 a review in this area and there were a couple of pitfalls.

22 I went to this SRP for review, because I really wasn't sure 23 if that was the right one or not, and I spent a day looking 24 at it before I realized I really want to go to this other 25 one.

i t

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

i i

65 1

Whatever the lessons learned are, trying to 2

capture them so that we can improve our efficiency by 3

sharing our knowledge within the review.

So it's sort of a l

4 post-mortem at the completion of the task, when appropriate.

5 Each one of these issues has a cost associated i

6 with it.

So we need to proceed in a careful, methodical l

l 7

way.

We need to bring this to the executive council and 8

discuss what we're considering doing.

This, if it does 9

work, could very well have implications of potential for 10 other offices as well.

f 11 The last bullet on this page is moving toward a

\\

12 more function-based organization.

Our new reorganization is 13 less matrixed and should assist us by having the projects 14 and a good portion of our technical staff under one I

l 15 associate.

l 16 With those resources located under one manager, 1

l 17 the brokering of priority challenges is easier done than l

18 what's being done in two separate organizations.

So we feel 19 that the new organization is going to help knock down some 20 of the challenges that we've had in conflicting priorities.

21 The decision will not need to bubble up to the 22 office director for resolution.

It could be dealt with at 23 the associate level.

24 Trend charts for licensing actions.

I will go 25 through this quickly and try to pick the pace up.

Fiscal i'

a l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

1 66 i

1 year 99 first quarter results are in.

It was quite a good 2

quarter for us.

The total inventory of licensing actions 3

was reduced by 16 percent.

The items greater than three 4

years old was reduced by 41 percent and the items greater 5

than two to three years old, in that window, were reduced 52 6

percent.

7 Now, I must also bring out that as we went after 8

this effort, we had an initiative to look at our oldest 9

licensing actions and we went back to licensees and asked 10 them that, we've had this for three years, it hasn't been 11 attached on it, you haven't called us, we haven't called 12 you, do you really still need this.

As a result of that 13 effort, 68 licensing actions were withdrawn.

14 If you take that 68 away, which is really, we 15 expect, a one-time effort, we don't expect to be seeing that 16 in future quarters.

If you take that away from the total 17 number that we did, which was 545, the number that we 18 completed is still almost 60 licensing actions greater than 19 we had budgeted in our operating plan.

20 This is new information.

The news is good, but 21 now we have to understand it.

We need to analyze it to 22 understand what is it telling us, what is the labor rate; if 23 this got done to this extent, did something else not get 24 done.

So we need to go through all our planned 25 accomplishments and make that comparison to be able to ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 i

G7 1

understand what this is telling us.

2 So this is raw data at this standpoint.

I tried 3

to do some quick off-the-top-of-the-head thinking in 4

preparation for this meeting, not having that information.

5 We went through a period of non-reactive time from a plant 6

performance scandpoint.

In comparison to other times, it i

7 was generally good performance by utilities that created 8

less reactive issues for us, more project manager time 9

available.

10 We've been working on that initiative, to be able 11 to have PMs spend more time working on licensing action and 12 less on the PM focus area.

But we need to pull the string 13 and see what the reasons are for the accomplishments.

14 CHAIRMAN JACKSON:

Yes, because I was going to ask 15 a question.

I noted this run-up between the August and l

16 December time-frame in the percent of your inventory that is 17 less than a year old.

So the question is, you know, but 18 that's also the time-frame over which you've been able to l

19 work down the greater than three year old inventory.

20 So what you say, I think, will allow you to get at 21 that question.

22 MR. ZIMMERMAN:

Requests for additional inf rmation.

As I mentioned, RAIs are an important role for 23 o

24 us.

They're an important tool that we need to maintain.

j 25 But what we need to do is ensure that we have appropriate i

i i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014

]

Washington, D.C.

20036 j

(202) 842-0034 i

l

68 i

1 discipline in the process.

We need not be asking for 2

additional information if that information is not germane 3

and absolutely needed for us to be able to make our 4

decision.

We have to have that rigor in our process.

We 1

l 5

have to be able to trace our questions back to regulatory 6

bases.

7 We want to limit the number of RAIs.

If there is 8

a reason to go greater than one round of RAIs, then we will.

9 It's not a carte blanch that we won't exceed it.

10 What we're trying to drive toward is getting out E

11 of letter-writing campaigns.

We want to try to facilitate l

l 12 resolution of the issues.

We want to communicate with the 13 utility involved to make sure they understand our point of s

i i

14 view and we understand theirs.

I 15 So the use of meetings and use of telephones, it's l

16 important that ultimately we have docketed information to be 17 able to support.

So if there's meetings and telephone

'18 calls, we want to make sure we get that information on the i

19 docket, but we want to use these other tools more than we 20 have in the past, even though we have used them in the past.

i 21 We want to increase their use and be very sensitive to the 22 length of time that gets lost with letter-writing going back L

23 and forth.

24 COMMISSIONER McGAFFIGAN:

Madam Chairman, could I 25 ask?

l P

ANN RILEY & ASSOCIATES, LTD.

f Court Reporters i.

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 J

(202) 842-0034

69 l

1 CHAIRMAN JACKSON:

Please.

2 COMMISSIONER McGAFFIGAN:

This issue may go away, 3

but as you know, one of the complaints that we have received 4

over the years is when they take two or three years to 5

review our changes and the new reviewer brings a different 6

perspective perhaps and asks new RAIs, which the licensee 7

may have thought they already had put to bed with the 8

previous reviewer.

9 Is that something -- if you shorten the l-l 10 time-frames, that won't happen as much.

But is there 11 anything in that area that you have done?

12 MR. ZIMMERMAN:

I thank you for bringing it up, l

l 13 because I neglected to bring it up.

That is an issue.

It's l

l 14 a valid issue that we have had cases where that has occurred 15 and one of the efforts that we have underway is to minimize l

L 16' those opportunities for occurrence.

Again, as we shorten l

17 it, that in itself-minimizes it, but we want to be very i

18 sensitive to not be changing reviewers in mid-stream and we f

19 want to make sure that's a very conscious decision, 20 understand the impact of doing it, and we want to minimize 21 it.

l 22 CHAIRMAN JACKSON:

I have a question to ask you on 23 behalf of Commissioner Dicus..

She noted that in the past, 24 the Commission has received feedback from licensees 25 regarding the resources needed to respond to RAIs i

t ANN RILEY & ASSOCIATES, LTD.

[

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

l 70 1

specifically on conversions to improved tech specs.

2 So the question is, have the changes to the RAI 3

process resulted in any impacts on the improved tech spec 4

conversion reviews?

5 MR. ZIMMERMAN:

If you're willing to just defer 6

till I get to the ISTS, I will address it at that point.

7 CHAIRMAN JACKSON:

Sure.

You're going to -- it's 8

part of that.

9 MR. ZIMMERMAN:

It's part of that discussion.

10 CHAIRMAN JACKSON:

That's great.

11 MR. ZIMMERMAN:

Okay.

We're moving to slide 17 on 12 confirmatory action letters.

The concern that we have heard 13 from our stakeholders is that the confirmatory action 14 letters, or CALs, can bypass formal procedures and impose 15 new requirements.

In the past, CALs have typically been 16 associated with extended plant shutdowns and recapturing 17 design basis information.

18 Currently, there are four confirmatory action 19 letters still open.

The number of CALs in use, if trended, 20 has gone down significnntly over the last ten years.

What 21 we've done in this area is a couple of actions that we think 22 shore up our performance in this area and they have been 23 placed into the enforcement manual guidance and training is 24 taking place to ensure that it's understood.

l 25 In fact, today, the Regional Division of Reactor l

l l

l ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 l

(202) 842-0034

l l

!t 71 j

1 Projects are having a counterpart meeting here in 2

headquarterc and this topic is one that will be discussed l

3 there.

4 One of our changes is that the confirmatory action 5

lettera, in the future, need the concurrence of the NRR 6

Office Director and we think this is going to aid in gaining 7

regional consistency.

8 We also have clarified the guidance to make it 9

clear that the concern -- in order to issue a CAL, the 10 concern has to be of significant concern of health and j

11 safety.

We have to be able to get to that threshold before 1

12 we issue a confirmatory action letter.

And in the past, we 13 had cases where we may have been issuing a CAL on 14 commitments that have already been made on the docket by the 15 licensee or were of a lower threshold than what's currently 16 in the guidance now.

17 So those two efforts are viewed as being 18 appropriate action in this area and we intend on continuing 19 to monitor it and ensure that we don't impose new 20 requirements, bypass the back-fit rule, or prolong plant 21 shutdowns.

22 COMMISSIONER McGAFFIGAN:

Could I ask, just for 23 the. record?

You mentioned in passing that the number of 24 CALs has trended down over the last ten years.

If you could 25 just provide that to us, because at the stakeholder i

l l

ANN RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 342-0034

_ _. ~. _ _. _ _ _ _ _ _ _ _ _.

l 72 1

meetings, former Commissioner Remmick has raised this issue 2

several timas and it's possible, if there's only four out at 3

the moment, that he may be working on old data or at least l

4 we should provide him that data.

j 5

MR. ZIMMERMAN:

I chatted with Commissioner 6

Remmick after the last stakeholder meeting and I think the l

l 7

plants, the CALs that Mr. Remmick was addressing, the l

8 information was somewhat dated.

It wasn't one of the plants t

i 1

9 that we're currently dealing with, but not.to take away from i

t 10 the issue, it's important that we stay on the lookout to i

l 11 ensure that we're avoiding not only inappropriate CALs, but 12 finding other vehicles and arm-twisting utilities into l

13 taking action and sending letters back and forth and not 14 calling them CALs.

l l

15 So we don't want the issue to live under another 16 name and we're pursuing the issues that Mr. Remmick had 17 brought to us.

18 COMMISSIONER MERRIFIELD:

Madam Chairman, I have 19

-- in previous meetings, I have heard the Chairman use the l

20 term managing message as it pertains to enforcement.

21 Obviously, you have gone ahead and you have revisited the 22 issue of how CALs have been issued.

23 How have you managed the message regarding CALs?

24 Specifically, have you made it clear to the staff that what L

25 you're saying is issue CALs when appropriate and not don't 1

1 l

ANN RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 (202) 842-0034 l

73 1

issue CALs?

2 MR. ZIMMERMAN:

I believe we did the former to 3

indicate there is a role for CALs.

We've added a couple of 4

additional measures, process, steps to ensure that we do 5

them correctly, but the message to the staff is not to not 6

issue CALs.

CALs serve a -- we see that CALs serve a 7

benefit to ensure clear communication.

What we want to 8

avoid is an issue where the NRC and the utility both agree 9

that there are shortcomings, perhaps of a programmatic 10 nature, things that need to be taken care of, perhaps again 11 before a plant starts up.

12 And we think we're communicating.

The utility 13 thinks that they're hearing what we're saying.

Everybody 14 thinks they're agreeing, but now the plant now time 15 passes by and we find out that we weren't there and now 16 you're on the eve of a startup and you didn't have that 17 meeting of the minds you thought you had a month ago.

18 So the CAL, putting it down in writing is another i

19 step to make sure that we're all talking here, because the 20 stakes go up as the startup gets closer or the restart or 21 whatever the issue is.

22 So I think the CAL can be an informative tool.

So 23 we don't want to take it out of our toolbox.

We want to 24 maintain it, but we want to use it with care.

25 COMMISSIONER MERRIFIELD:

That's positive to hear.

JRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 j

(202) 842-0034

l 74 1

The thing that we're always subject to is when we start to 2

get criticism, we don't swing too far one way or the other 3

and I think keeping too far from the swings is important.

4 MR. TRAVERS:

I agree.

In the broader context, if 5

you just look at the number of initiatives that we have 6

underway and the kind of change we're pursuing, the issue of 7

communications within the staff and with our external 8

stakeholders continues to loom large.

We need to reinforce, 9

in our own minds, and redouble our efforts just about at 10 every turn to make sure that we're communicating and 11 avoiding unintended consequences of the sort that I think 12 you're referring to.

13 MR. ZIMMERMAN:

Perfect opportunity today with the 14 DRP Regional Directors all being here.

We'll go'back and 15 assure that we make sure this message is clear.

16 Improved standard technical specifications.

The 17 program began with the issuance of the first improved 18 standard tech spec in 1992.

Currently, there are 89 units 19 that are pursuing conversions.

This table on this slide can 20 be a little confusing in that the Y axis is based on 21 submittals by site, and I'm talking in terms of units.

So 22 they won't match up on the Y axis.

23 But, again, 89 units are pursuing conversions thus 24 far.

We are hoping that there are others that will see the 25 merit in converting.

To date, 43 units have been approved.

AlRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

75 1

We have 14 units currently in-house that we're reviewing and i

2 we anticipate an additional ten being approved during the 3

remainder of this fiscal year.

4 We have seen current data is that for the plants I

5 that have converted, if you look at the license amendments 6

that those plants are submitting and compare those to the 7

license amendments that are being submitted by plants that 8

have not converted, there are one-third less license 9

amendments being submitted by the plants that have 10 converted.

1 11 Now, to your point, Chairman --

12 CHAIRMAN JACKSON:

Commissioner Dicus' point.

13 MR. ZIMMERMAN:

We are contacting licensees to l

14 gain feedback on the ISTS process.

We recognize that we are i

15 issuing a large number of RAIs and we did that with a recent 16 utility, being Duke, and on the Oconee, the McGuire and the 17 Catawba facilities, there were a very substantive number of 4

18 RAIs.

19 As a result of that, we've requested that Duke l

20 meet with us and the meeting is on January 20 and we will l

21 try to get feedback not just on the RAI issue, but in large, 22 if they can talk to us about areas that they think we need

)

23 to 1.cok at trying to improve, we'll be very interested in 24 areas that we can continue to improve, l

25 Our labor rate and number of RAIs is one that ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

l 76 1

we're not fully satisfied with, so we want to continue 2

paying attention to try to improve this process.

3 The last thing I'll point out on this slide --

4 COMMISSIONER McGAFFIGAN:

Madam Chairman, one 5

other.

I've had some conversations with staff and my sense 6

is Joe Callum, the former EDO, raised the same issue with 7

regard to the four-loop group RAIs.

He was surprised at the 8

extent of them and I know the staff is working on it and 9

intends to, in a lull this summer, perhaps revise the 10 guidance.

11 Isn't that what I heard?

12 MR. ZIMMERMAN-Right.

This.is not the only 13 meeting that we're planning on holding.

We're going to talk 14 to other utilities to gain their feedback.

Once we have 15 captured it, then we'll look at where we ought to put our 16 resources to work to improve.

But we're just starting with 17 Duke, as they more recently had a very high number of RAIs.

18 Again, the four-loop group follows closely behind.

19 The only other thing I'd point out is in the upper 20 right-hand portion of the graph, we can see that near the j

l 21 end of this fiscal year, we can start seeing that the 22 slippages that have been occurring during FY-98 are going to 23 start picking up, if this holds to form.

24 So the challenges associated with completing our 25 conversions in one year, which we want to improve upon, i

l i

IdH1 RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

b.

77 1

we're not satisfied with that, but the bad wave that we may 2

see is going to create some challenges for us.

3 So if we're going to make some improvements to our 4

process, this is the time to be doing it, before this bad r

l 5

wave: comes in.

l 6

CHAIRMAN JACKSON:

What is your goal in terms of 7

turnaround time?

8 MR. ZIMMERMAN:

We are trying to turn around the t

l 9

improved standard tech specs in less than a year.

10 COMMISSIONER McGAFFIGAN:

Madam Chairman, again, I i

11 think this is an area where the staff deserves commendation.

12 You can see the slope of the curve changed by a factor of 13 two and I know a lot of effort went into that.

But the 14-nature of my question is have you used the license group 15 that you talked about, the interface group, to talk to the i

16 industry?

17 There's been -- at the stakeholder meetings, there 18 has been some talk about meeting us halfway and if all these 19 submittals that are going to come in later, some of them 20 could come in earlier, we could smooth out our resources and 21 make more effective use of our resources and this strikes me 22

-- it follows on a question that Commissioner Merrifield 23 asked about license renewal.

i 24 But these are very complex amendments.

They do l

- 25 take a lot of effort to go through and it strikes me that l

l l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034

i l

78 1

you guys may want to jawbone the industry, and I'm doing it l

2 right here, to get some of the 2,000 applications that are 3

going to come in on a bow wave moved forward, so that you 4

can more effectively utilize your resources.

l l

5 MR. ZIMMERMAN:

I fully agree and we have had that 1

6 discussion with the licensing action steering group and with 7

NEI and we will continue to do that.

l 8

CHAIRMAN JACKSON:

Let me ask you this question.

9 Has the staff considered incorporation of the recently 10 approved risk-informed technical specification changes into 11 the improved standard tech specs or do you believe those 12 risk-informed tech spec changes to be too plant specific?

13 I guess I'm asking is there an opportunity there 14 to at least take what may be generic pieces and move it 15 forward.

Chris, you had a comment.

l 16 MR. ZIMMERMAN:

A reaction.

l i

j 17 MR. GRIMES:

I can't help it.

I'm pleased to see l

18 that Mr. Beckner, as my successor and as Chief of the Tech 19 Spec Branch, has kept up the process, the vision that we 20 started with.

l 21 But I can tell you that even when I was the Chief 22 of the Tech Spec Branch, we put the options in for the 23 risk-informed alternatives and we used the industry working 24 group on tech specs in order to develop this style and the j

1 25 form.

ANN RILEY & ASSOCIATES, LTD.

l Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 l

Washington, D.C.

20036 l

(202) 842-0034 i

1

79 1

So if Bill has kept up that practice, then --

2 CHAIRMAN JACKSON:

I guess I'm asking more 3

specifically.

We've done some things with allowed outage 4

times.

We've done some things with graded QA and I'm sort 5

of both speaking to the staff and those who are sitting 6

behind the staff, in terms of whether there is an 7

opportunity to see if there is an ability to genericize and 8

to propagate these things into the improved tech specs.

9 MR. ZIMMERMAN:

There may be an. opportunity to do 10 that.

We are not doing it now, it has not been done.

I 11 think that Chris' point that the standard can have a bracket 12 that can be filled in by the utility with the allowed outage l

13 time that they choose to put in.

If they choose to --

14 CHAIRMAN JACKSON:

I got your point.

L 15 MR. ZIMMERMAN:

If they choose not to go with the 16 value in the standard or their old number and want to 1

17 risk-inform it, we would currently consider that to be out l

18 of scope.

It would take us longer to do it and we have not 19 been advocating that.

)

20 There is a separate initiative to risk-inform the l

21 tech specs and there is a task force that works under the 22 PRA implementation plan, under Gary Holahan, and includes 23 staff from our Tech Spec Branch that are working on doing 24 that.

25 That is really the next evolutionary phase of our l-ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

1 l

80 1

improved standard tech specs is to risk-inform them.

We 2

need to find the most efficient way of accomplishing that.

3 Right now it's on a case by case basis.

If a licensee 4

elects to try to risk-inform when they come in, and to this l

5 point, none have done that.

They have kept it separate.

l 6

But sooner or later, we want to bring them l

l 7

together.

We just want to make sure we do it in an 8

intelligent way and in an efficient way.

l I

9 So once we get a little smarter from what the task 10 force, under the PRA plan recommends, then we can look at 11 how best to merge.

l 12 CHAIRMAN JACKSON:

Okay.

l l

13 MR. ZIMMERMAN:

2.206 petitions, this is where any 14 member of the public can petition the Commission for the 15 agency to take enforcement action against a licensee, to be 16 issuing a notice of violation, it could be an immediate 17 shutdown of the plant and it requires office director 18 involvement in the process.

19 We have a goal of issuing these petitions 120 days 20 after our acknowledgment lett,er goes out and this is an area 21 where we have not been meeting our goal.

We have tried a 22 few things.

23 We have put in place a petition review board to 24 look at these early when they come in, just like we do on i

25 allegations, to try to set the path of here's what we're j

i.

I ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 j

l Washington, D.C.

20036 l

(202) 842-0034

_ -..__ _. _.. _.... ~

81 1

going to do, here's accountability, here's the due dates in 2

order to be able to get to where we need to go.

3 Although we have gained value from this review 4

board, we have not yet reaped the benefits that we want in 5

being able to show demonstrative improvement in our 6

timeliness.

But we want to keep the board, but we need to 7

do more than that.

8 An area where we have done well, better, is in the 9

public responsiveness or petitioner responsiveness area.

In 10 the past, we held very few, if any, informal public hearings 11 to involve the petitioner in the process.

Now, about 20 12 percent of our petitions involve an informal public hearing i

13 to be able to hear from the petitioner, with the ].icensee 14 there, and to talk about the different points of view and 15 engage the petitioner.

j 16 So that's working quite well.

17 CHAIRMAN JACKSON:

Would they agree?

i 18 MR. ZIMMERMAN:

I won't defer again, but I'll 19 answer it now.

Because of the fact that we're not achieving 20 the time limits goal here is one of the primary reasons and 21 to get overall feedback, we're working to go out to the last 22 year or so's worth of petitioners.

23 We have nine petitioners that we're in the process 24 of doing telephone interviews of to ask the question that 25 you just asked, Madam Chairman, as well as half a dozen i

JJUJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

82 1

other questions through this survey to gain that information 2

and we expect to have that complete by the end of January.

3 Then we need to assimilate that information and 4

just like we spoke on improved standard tech specs, factor 5

that back into how we can improve our process.

I 6

CHAIRMAN JACKSON:

What other improvements do you 7

think need to be made in the 2.206 process?

8 MR. ZIMMERMAN:

We need some good old-fashioned i

9 management attention is what we need here.

We've talked at 10 the table about a number of successes that have gone well.

11 We're not ready to take our finger off the posts of those 12 areas that are going well, but we need to recognize that we 13 need to shift additional attention by management to hold 14 ourselves accountable in the 2.206 area.

15 CHAIRMAN JACKSON:

When are you going to do that?

16 MR. ZIMMERMAN:

Now.

17 COMMISSIONER McGAFFIGAN:

Madam Chairman, at 18 times, I think one of the complaints we also get is the tone 19 of the 2.206 letters.

There may be some -- there may be a 20 problem there, as well.

David Lochbaum has said publicly 21 that the letter oftentimes reads, sort of begrudgingly, we 22 agree with you and we deny your petition, you know, because 23 we've already done it.

And if we're actually agreeing with 24 them, maybe we could say it somewhat less grudgingly and say 25 we're denying it only because we -- only because we've ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

^ ~

i i

83 1

already done it.

2 There's tonal things that you may want to think 3

about.

4 MR. ZIMMERMAN:

We agree.

Wherever Sam is i

5 sitting, I think he's -- this is an issue that Sam likewise 6

feels very strongly about, that the tone and the manner in 7

which we interact with the petitioners ought to be as polite l

8 and courteous as possible and if there is a way of moving l

9 away from denial type terminology, we want to explore a 10 couple of things, i

11 We want to explore the manner by which we write

)

12 back.

We also want to explore whether this is really the 13 right process for the petitions that are coming in.

The l

\\

l 14 petitioners may be using this process because it's the only

)

l 15 one that they really know to be able to accomplish this, but I

16 working with OGC, it's possible there may be another 17 mechanism out there to address some of these items.

18 So we also want to explore the benefit perhaps of 19 having a spin-off type process that may be more appropriate.

CHAIRMAN JACKSON:

We've also been accused of 20 l

21 dragging out the response to the petition until we've made 22 the change and then we say we deny your petition, that it's i

i 23 a most deliberate process.

So that all of these things flow 24 together, but this is an area that I do think needs more l

25 focused attention, not just in terms of the typical I

1 ANN RILEY & ASSOCIATES, LTD.

Court Reporters l

1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036

]

(202) 842-0034

l l

l 84 1

management oversight, but a more_ fundamental reexamination 2

of just what the process is meant to accomplish and how we l

l 3

can go about doing that, and that clearly then does

[

4 necessitate having OGC's involvement.

1 r

5 MR. ZIMMERMAN:

We agree.

6 CHAIRMAN JACKSON:

You're done.

So that means 7

that Mr. Matthews -- we don't want to let you think that 8

we've forgotten you.

9 MR. MATTHEWS:

I do appreciate the breather.

l 10 Let's turn to slide 12.

Just as an introduction, I'm going f

i i

11 to talk about the issue with regard to adding increased j

l 12 definition to the term design basis and then speak for a few i

l 13 moments on the back-fit initiatives in terms of our focusing i

14 on that process.

These are not related.

l 15 Define design basis has oeen an undertaking that, j

16 again, became important and was brought into greater focus i

l 17 by NEI bringing to us a proposed guidance document to i

L 18 attempt to bring clarity to this issue.

19 I want to clarify a possible misstatement I made a 20 little earlier with -- and it has to do with the confusion 21 among these numbers and the fact that both of the documents 22 that we've been talking about today, the design basis 23 document guidance and the document relative to FSAR update 24 guidance, came in November of 97.

25 One of them, the design basis guidance, was f

e ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 o

l (202) 842-0034 l

l

r 85 1

voluntarily submitted to us by NEI for our information.

The 2

other, 98-03, was submitted for staff review and 3

endorsement.

If I didn't make that clarification, I think 4

Tony probably would have.

5 Now, back to the design basis guidance with regard 6

to NEI 97-04.

We have reviewed this document and we have 7

most recently communicated back to NEI in December with the 8

proposal that the attachment reflect a set of criteria that 9

we believe is appropriate for determining whether something

]

10 is or isn't design basis information for the purposes of l

11 interpreting and giving guidance to the definition in the 12 regulations of 50.2.

l 13 I would like to say that I believe this issue 14 probably relates less to what is or isn't included in FSARs, 15 but more to how you treat that information; in other words, 16 what bin you put it in.

And it comes down to an issue of 17 discussion over level of detail of what constitutes design l

18 basis information under the definition of 50.2, as l

19 distinguished from design input information, design values, l

20 insofar as there is a need to determine what is design basis 21 information that needs to be accorded the treatment that the 22 regulations require of it.

23 I don't believe there is an issue or at least a l

24 significant issue with regard to whether or not we have been 25 appropriately and the licensees have been appropriately 4

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington., D.C. 20036 (202) 842-0034 1

86 1

including this kind of information in the FSARs.

It's how 2

it's to be treated.

3 We haven't reached the degree of conformance or 4

closure on this issue with NEI as we have in the area of the 5

updating the FSAR guidance document.

They are considering 6

our comments.

They have an objective of providing us a 7

revised document at the end of January.

I don't believe 8

they've decided yet whether or not that document will be one 9

that would continue to be offered for our information and 10 their potential use, but not asked for our endorsement.

11 In the event that they do ask for our endorsement, 12 we then have to make a decision with regard to the degree 13 that the guidance appropriately reflects our regulatory 14 requirements.

15 If it doesn't, then I think we're faced with, 16 again, developing guidance along the lines of our regulatory 17 requirements and proposing it in some form for the

~

18 Commission's consideration, whether it be a generic letter 19 or a reg guide.

So we're really faced with a two-track 20 process.

21 If closure looks like it's a potential after our 22 receipt of this revision of NEI's document, then we'll 23 probably follow a process very similar to the one we 24 followed on the FSAR update guidance.

25 COMMISSIONER MERRIFIELD:

I did have a question, ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

l

)

87 1

Madam Chairman.

I was reviewing the January 11, 1999 staff

[

2 update to the tasking memo and I noted that most of the 3

milestones, the dates associated with the milestones for 4

this portion were, this says, to be decided, 5

I'm wondering what progress you've made in l

i 6

grappling with this issue and I'm wondering if you can give 7

us some sense of what your scheduling goals are for this 8

portion.

9 MR. MATTHEWS:

I think probably the "to be 10 decideds" emanate from the uncertainty associated with the 11 NEI position with regard to whether they want to seek our 12 endorsement of this document or, in the alternative, provide i

l 13 it for our use and information, in which case we're faced 14 with establishing a reparate milestone schedule.

So that l

15 isn't a very direct answer, but it is the answer.

16 I think at the end of January, we'll be prepared l

17 at that point to establish a milestone schedule for each of 18 those courses of action, because it does depend upon degree 19 of divergence on the two positions.

20 COMMISSIONER MERRIFIELD:

Will that before or 21 after January 28?

22 CHAIRMAN JACKSON:

January 27 at 5:00, right?

l 23 MR. MATTHEWS:

Before January 28.

24 COMMISSIONER McGAFFIGAN:

Madam Chairman, are 25 there policy issues embedded in -- there may be none if 1

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 i

4 88 1

97-04 comes in and you guys are going to endorse it as you 2

did 98-03.

But after you see 97-04, if there are policy 3

issues, will you try to follow some sort of process like you 4

did on the FSAR update and get them to us before -- maybe 5

that would help.

6 MR. MATTHEWS:

Yes.

And if I didn't say that, I 7

should have indicated that.

That course of action, I 8

believe, will necessitate -- it will be a policy decision on 9

which direction to go.

10 COMMISSIONER McGAFFIGAN:

Right.

11 MR. MATTHEWS:

So my view is that will involve a 12 Commission consideration.

13 CHAIRMAN JACKSON:

Okay.

14 MR. MATTHEWS:

With regard to the tasking memo 15 items, which, at an earlier meeting we had on progress of 16 tasking memo issues, we brought some coherence in our 17 presentation on the tasking memo in that we had back-fitted 18 in several different locations.

19 For the purposes of my remarks, I will separate 20 two general areas associated with back-fit, but I will say 21 that the overall objective, which, as I'm now on slide 13, 22 is to ensure that the staff closely adheres to the back-fit l

23 rule as it's written in evaluating all additional 1

24 requirements, expansion in scope, potentially, or unique 25 interpretations pertaining to both operating or ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 (202) 842-0034

m-89 1

decommissioning plans against the actual impact on public f

2 health and safety.

i 3

So this takes the form, though, in terms of our l

4 primary focus, in two places.

One relates to our i

5 interaction with the industry through not only our 6

activities associated with licensing amendments and 7

licensing actions, but also through our process for f

l l

8 developing and coordinating the need for information and 9

generic activities that we promulgate through either 10 bulletins or generic letters.

l i

11 That particular issue has been put at a high point

[

12 on our screen by NEI by virtue of their concerns and we met l

t l

13 with them last November, I believe, that we appear to be too 14 willing to revert to the use of the compliance exception i

15 with regard to our generic communications, insofar as our l

l 16 need for information in order to determine whether or not l

17 compliance is being achieved.

I 18 We've taken upon a task to consider how we treat 19 the compliance exemption in this context.

We do propose to l

20 conduct, in effect, a simplified cost-benefit analysis l

21 associated with cases where the compliance exception is l

22 being cited in bulletins or generic letters to determine, as 1

23 an additional facet of whether there is sufficient support 24 for the proposed activity.

25 I did want to mention another one that NEI has I

i f

l f

JJU4 RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014

(

Washington, D.C. 20036 (202) 842-0034 I

4

..._._____..___..___m.._

i I

90 i

1 raised to our attention very recently, and this is the issue 2

of averted on-site costs and the way we deal with averted 3

on-site costs in the context of doing cost-benefit analysis f

i 4

for safety purposes, but it has also come up in the context 5

of our treatment of severe accident management alternatives 6

with regard to the environmental review that's been 7

conducted and being conducted for our license renewal 8

applicants.

9 You may recall that severe accident management 10 alternatives need to be addressed in environmental space 11 with regard to a cost-benefit analysis and then the staff 12 and ultimately the Commission's consideration of those i

' 13 cost-beneficial severe accident alternatives and our 14 treatment of an overall environmental finding in the license 15 renewal arena.

l 16 There is an existing policy of the Commission that 1

17 averted on-site costs will be considered in those 18 evaluations.

The Commission indicated that we.ought to i

19 consider as beneficial doing the calculation in the absence 20 of averted on-site costs, for what that may offer us, but 21 there is a Commission policy that those, as a minimum, those 22 evaluations of cost-benefit -- and this is expressed in our 23 regulatory analysis guidelines -- that as a minimum, those 24 costs be included and we are proceeding to include those 25 costs as we review the license application for Calvert ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

1 b

91 1

Cliffs., which is the one that has progressed to the point 2

that it has and has involved that kind of decision.

3 CHAIRMAN JACKSON:

Mr. Grimes is chomping here.

4 MR. MATTHEWS:

Chomping?

Hopefully, nodding his 5

head vociferously in agreement.

6 MR. GRIMES:

I'm in total agreement.

But I do t

7 want to correct the record, because Mr. Matthews referred to i

8 them as severe accident management alternatives.

They're 9

mitigation alternatives.

l 10 MR. MATTHEWS:

Excuse me.

I knew I was struggling i

I 11 with that term for some reason.

l 12 CHAIRMAN JACKSON:

Thank you.

i r

13 MR. MATTHEWS:

I didn't have it right.

That's why 14 it wasn't coming off my tongue.

l l

15 CHAIRMAN JACKSON:

Karen probably would have come 1

16 out of her seat at some point.

17 MR. TRAVERS:

Chairman, I just want to close our I

18 presentation by saying that I am glad to report and I think 19 you've heard from the staff today that we are making 20 significant progress on a number of fronts, in this case, in 21 particular, in the Office of Nuclear Reactor Regulation.

22 We've had one meeting on risk-informed initiatives 23 in Part 50, again, largely supported by the Office of 24 Nuclear Reactor Regulation, and we have next week our final 25 meeting to discuss the oversight initiatives and the status 1

JJai RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

(

s 92 1

of progress in that regard.

2 So that finishes our presentation.

3 CHAIRMAN JACKSON:

Right.

Let me read a comment 4

on behalf of Commissioner Diaz.

He notes, he says "I am 5

pleased that as the staff states on slide number three, that 6

it has proceeded to improve the effectiveness, efficiency, 7

timeliness and predictability of the license renewal 8

process, I am looking forward to these objectives to 9

permeate all the other issues discussed in this briefing so 10 that we can achieve closure.

In this regard, I urge the 11 staff to have frequent interactions with the Commission."

12 Then as a final comment, I didn't say it, but this 13 is directed to Mr. Zimmerman, in the end, you and Sam-,

14 within the Office of Nuclear Reactor Regulation, have the i

15 overall responsibility for ensuring that all of these things 16 come together and I know that in particular, that you have 17 been focused on a number of process improvements and 18 improving overall how NRR does its work and with Sam and 19 Sam's support and leadership in aligning the organization in 20 a way to make that happen and to make how you do this the 21 way you do business.

22 So once again, I want both to congratulate you, 23 even though your work -- you have a lot of work still in 24 front of you, and to thank you and I know all of you have a 25 lot on your plates.

I tell Mr. Matthews I probably see him ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

93 1

more than I see Bill Travers, because we always see you, 2

Dave, because every rule in the world seems to run through 3

your door.

4 So with that, I want to thank the staff, and 5

invite NEI to come forward.

6 COMMISSIONER MERRIFIELD:

Actually, I did have one 7

final question I was going to ask Mr. Matthews.

8 CHAIRMAN JACKSON:

Okay.

9 COMMISSIONER MERRIFIELD:

One of the things that j

10 you didn't focus on was the issue of decommissioning as it 11 relates to the back-fit rule.

It's the staff's impression 12 that indeed the current back-fit rule does not apply to 13 decommissioning.

l 14 It's further my understanding that the staff l

15 believes it should apply the decommissioning and that 16 currently underway you're attempting to apply it to the I

17 extent practical to decommission facilities.

18 I was just wondering if you could very briefly 19 explain how you're focusing your efforts on a day-to-day 20 basis with inspection and licensing to make sure that that j.

21 happens.

22 MR. MATTHEWS:

I am prepared to comment on that.

23 In fact, I just needed to turn the page, but didn't get to 24 it.

25 There is an issue associated with the b

ANN RILEY & ASSOCIATES, LTD.

l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 g

i l

I

..____._._____.__.__.___.._.__.___..__..._.__m.

4 94 1

applicability of the back-fit rule to decommissioning that i

2 we raised in a Commission paper.

We did offer to utilize 3

the existing rule without proposing to revise it, as I think 4

we_said, to the extent practical.

5 The use in that regard would be as we address the 6

need for cost-benefit analysis, for NRC imposed changes in 7

license requirement applicable to a decommissioning reactor.

8 So we intend to use the principals of the back-fit rule and 9

conduct such analysis where warranted in license requirement 10 application, and this primarily relates to license 11 amendments that are submitted as a plant moves through the 12 decommissioning process.

13 It probably has a greater role in the near-term 14 until we get several rule-makings under our belt that will l

15 address new requirements and, of course, we'll impose 51.09

(

(

16 in that rule-making process.

But before we get there, we 17 have to be sensitive to back-fit considerations in l

18 establishing new requirements.

l l

19 We hope a lot of this will be addressed by several l

20 rule-makings that I think you're aware of and we have 21 submitted or are in the process of submitting rule-making i

l

- 22 plans to address this issue in decommissioning space and, in l

l 23 effect, get us out of what I would call the unique set of 24 license conditions that seem to emanate from each l

I 25 decommissioning action.

l l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

b 95 1

However, I want to make one more comment and I 2

think it's worth clarifying.

There is an issue that's been 3

raised with regard to the applicability of the back-fit rule 4

in the exemption process, which is used at times in a 5

decommissioning reactor's life to eliminate requirements.

6 In that context, the back-fit rule does not have a 7

direct role and it's because when you grant an exemption, 8

it's contingent upon meeting new expectations and the 9

constraints, though, that we're going to impose on the 10 process, that are hopefully sensitive to back-fit 11 considerations, is that those new expectations, that there 12 be a rational basis for them and that there is a reasonable 13 nexus between the new circumstances and the subject matter 14 of the exemption and that's the way by which we're going to 15 look hard in that exemption space.

16 But the back-fit rule 51.90 would not be applied.

17 MR. TRAVERS:

Just for completeness.

There is an 18 appeal ongoing in one case where the licensee has taken 19 issue with this view and the appeal is to the Executive 20 Director for Operations level.

So that's an ongoing process 21 and I've had a chance to just today talk to Mr. Meisner 22 about what we're doing to follow up on that.

23 COMMISSIONER McGAFFIGAN:

I was just going to 24 comment that I thought that was still an open -- that's the 25 staff position.

But at some point, that may even get 4

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

- - -. -. ~.. -... -.

._~ - -.- - - _ _

96 l

1 appealed to the Commission itself.

2 CHAIRMAN JACKSON:

But we'll let it work its way l

3 through.the process.

Thank you very much.

4 MR. MATTHEWS:

Thank you, Chairman.

5 CHAIRMAN JACKSON:

Thank you.

Mr. Beedle, Mr.

6 Pietrangelo,.and invited guests.

Good afternoon.

i l

l 7

MR. BEEDLE:

Good afternoon, Chairman.

i 8

COMMISSIONER McGAFFIGAN:

You said you were trying 9-to avoid three hours and 45 minutes.

l 10 CHAIRMAN JACKSON:

This will not be three hours j

11 and 45 minutes.

You hear that, Mr. Beedle?

12 MR. BEEDLE:

The staff covered some 12 topics this 13 morning and we'd like to address four of those.

But before i

14 I turn it over to Tony to talk about some details, I would 15 comment on an observation made by Roy Zimmerman about the

[

16 use and facility and discussion of NEI task forces.

t 17 We've got members of our task force on the RAI 18 here in the audience, Jim Visacaro and that group have done i

19 a lot of good work and I think that that does give us the f

20 ability ar. an industry to communicate with the NRC staff I

21

'without particular concern for issues associated with a l

22 specific licensee.

So I think that's facilitated good r

l 23 communication.

We hope to continue that.

l 24 I would also echo the fact that your observations 25 about the staff's effort to come to conclusion.

Some of I

I

! ~.

i ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

97 1

these are really difficult problems.

I'd like to solve the 2

problem by this Friday, but many of them are very complex 3

and the 50.59 is a good example.

You and I have personally 4

had conversations on this and it's --

5 CHAIRMAN JACKSON:

We've come a long way down the 6

road.

l 7

MR. BEEDLE:

But it takes time, I think, as you 8

.get a lot of different opinions on it.

9 With that, I'd like to ask Tony to provide some j

10 observations on four of those topics we discussed this 11 morning.

12 MR. PIETRANGELO:

Before I move to the first 13 slide, I just want to say a lot of the things that Roy went 14 over in terms of improvements in that whole licensing 15 process with respect to RAIs and process things do pertain 16 to license renewal.

i

)

17 We're going to get to that at the end of this, but 18 that's not affecting that either.

19 CHAIRMAN JACKSON:

Okay.

20 MR. PIETRANGELO:

Next slide, please.

Let me just.

21 start off by saying that -- and I know you want us to go l

i l

22 into some detail on 50.59, Chairman.

L 23 CHAIRMAN JACKSON:

To whatever extent you can.

i i

24 MR. PIETRANGELO:

But I'm going to resist that 25 because it will not do it justice here.

I think we need a ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D..C.

20036 (202) 842-0034

98 1

2 CHAIRMAN JACKSON:

A separate --

3 MR. PIETRANGELO:

We would respectfully request a 4

separate briefing on this.

5 CHAIRMAN JACKSON:

To come and talk about it.

6 MR. PIETRANGELO:

As Dave noted earlier, we met 7

with the staff for well over three hours on last Friday and 8

I think we're going to do it again with a broader cross 9

section of NRC and over tw. of those hours were devoted to 10 the margin of safety proposal that we put into our comments.

11 I would just hate to gloss over that here.

12 CHAIRMAN JACKSON:

I think that's fair.

So why 13 don't we move on.

14 MR. PIETRANGELO:

Let me do say, though, that the 15 rule-making package that the staff put out for comment was 16

-- and I said this in the EDO meetings we had, that it 17 should set a standard for how rule-makings are done by the 18 agency.

19 It was a comprehensive detailed proposal, there 20 were proposed definitions on it, there were options proposed 1

21 in it, and it gave the industry and the stakeholders an 22 opportunity to really offer, I think, substantive comments 23 in terms of what the impact would be.

We think that's the 24 way it should be done.

25 I know you asked me on Monday about minimal and ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

. _ - - =

99 1

all that stuff and there's quite a lot of discussion in this 2

package with regard to that and I think on behalf of the 3

industry, we would like to see that kind of detail in future i

4 rule-making proposals, because then we can provide, I think, 5

some value-added into the process by offering more 6

meaningful comments.

7 Even though our comment package was quite long, 8

most of it dealt with things where we agreed with many of 9

the staff proposals, as well as offered some tweaks or 10 clarifications to some of the parts of the rule-making 11 package, and then another large portion was devoted to the 12 margin of safety discussion.

13 And those are the two issues I just want to

\\

\\

14 briefly discuss this morning, margin of safety and this one j

15 you talked about earlier, about definition of change.

16 Next slide, please.

When we went through all the i

17 Commissioners' proposal -- and we ought to give credit to 18 the Commission here, too, because part of the rule-making t

i 19 package was your -- included your notation votes on options l

l 20 for margin of safety So the Commission had direct l

21 participation in putting out what was for comment and when 22 we went through all the permutations between what the scope l

23 of t.he margin of safety evaluation should be, as well as i

24 what criteria should be used to decide whether prior NRC 25 review and approval was needed, we came up with 14 different AJUI RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

n i

100 l

1 permutations.

l 2

And part of the long discussion in our comment 3

package walks through all of those about the pros and the 4

cons and what attributes they have.

5 The proposal we did finally agree on with our task 6

force, and this also went through our reg process working 7

group, is really a hybrid of the options that were in the 8

package.

)

9 Dave went through this in some detail, but in 10 terms of the scope of what criterion seven should be, we 11 came down on a focus on fission product barriers, and that's 12 really tied to the statement of considerations when the rule 13 was revised in 1968 and the associated design basis limits.

14 Those are required to be in the SAR.

We're not 15 looking for things that are in SERs or where it has 16 questionable legal standing and we don't want to get into a 17 discussion of that here.

But to avoid the problem I think 18 Commissioner McGaffigan raised before about -- and we're 19 going to get to design basis in a second -- our intent at 20 this point is to be very prescriptive in our revision of 21 96-07 that would deal with these design basis limits, so 22 that there is no confusion about what we're talking about.

23 Hopefully, if that document is ultimately endorsed 24 by the NRC as a way to implement 50.59, then the design 25 basis piece that could potentially confuse what those limits

(

JM RILEY & ASSOCIATES, LTD.

I Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

i E

101

{

1 are would be eliminated.

l 2

Our intent at this point is to be very, very 1

i 3

prescriptive about that in our guidance.

4 CHAIRMAN JACKSON:

Let me ask you this question.

l 5

In looking at this focus that you've come down on on fission 1

6 product barrier parameter and what you call associated 7

design basis limits, will support systems, like instrument 8

air, get margin reviews in your approach?

9 MR. PIETRANGELO:

The thing that went over with 10 the staff is kind of five criteria and then you'd have to 11 answer yes to each one of those in order to go the next step 12 forward and go under this evaluation that we propose, and 13 that has to do with whether -- and I'm not sure I'm going to 14 remember all five, off the top of my head.

15 CHAIRMAN JACKSON:

That's okay.

So the basic 16 point is that anything that would satisfy an agreed upon 17 criteria would be in.

18

.MR.

PIETRANGELO:

That's right.

And to be fair, 19 and this was some of the questions that we got on Friday, 20 our task force took a cut at that and we came up with 21 certain things that would not be covered if, let's say, we 22 eliminated the current margin of safety criteria.

23 So we were trying to fill a gap with this what we 24 call criterion seven.

There may be other gaps that we 25 haven't identified yet, but if we get it down to an approach ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

e l

l 4

l 102 l

1 with these five steps, I think that would address that 2

concern.

3 Let's move to the next slide.

You talked before a 4

little bit about definition of change.

It is not our intent 5

with the definition we put in our comments to get at the 6

scope issue.

It's to get at the screening issue.

We firmly 7

believe that we need to deal with scope on 50.59.

I think 8

we talked a little bit about that on Monday.

9 We think it should be integrated with the overall 10 scope discussion in order to ensure coherence in how you do 11 this across Part 50.

But this does not take the place of 12 dealing with scope directly in 50.59.

Screening can't be 13 underestimated, though.

I think we've learned through the 14 last couple of years that a lot of the burden associated 15 with this regulation is the confusion with regard to 16 screening.

17 So we think this is a really good opportunity to 18 clarify the rule consistent with the Commission's objectives 19 and utilize both NRC and licensee resources more 20 effectively, because we can't --

l 21 CHAIRMAN JACKSON:

I'm not trying to needle you, 22 but it does sound like it's scope of what you screen.

So it 23 is scope.

I mean, this is a screening rule.

24 MR. PIETRANGELO:

Yes, but let me try to l

25 distinguish it a little bit.

What we're trying to screen l

I l

JRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

103 1

out of what's already the big scope are things that can't l

2 possibly result in an affirmative answer to one of the 3

questions in the next section, like VP names and other 4

design details, and the staff questioned us on this on 5

Friday, too.

6 I think we've got to go to some --

7 CHAIRMAN JACKSON:

Right.

See, I don't want you 8

to confuse -- I'm not coming down with a bias one way or the l

9 other as to what is screened in or what is screened out, but 10 to kind of get a confession that we are talking about the 11 scope of what is screened and not necessarily a judgment as 12 to whether what gets screened out or remains in is the right 13 thing to do.

14 MR. PIETRANGELO:

I don't think we're there yet, 15 Chairman.

I think that's the next step.

16 CHAIRMAN JACKSON:

I guess all I'm trying to say 17 is a screening rule.

So when you start to talk about what 18 will or will not be screened, you are de facto talking about 19 the scope of the rule.

So that's all I'm really saying.

I 20 don't know if the lawyers --

21 COMMISSIONER McGAFFIGAN:

Tony, I would advise you 22 to confess and still --

23

[ Laughter.)

24 COMMISSIONER McGAFFIGAN:

-- hold your position.

l 25 MR. BEEDLE:

Well, do you confess?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

104 1

MR. PIETRANGELO:

Yeah, I'll confess.

2 CHAIRMAN JACKSON:

Just pass.

3 MR. BEEDLE:

He said yes.

4 CHAIRMAN JACKSON:

Okay.

Then we can go on.

1 5

COMMISSIONER MERRIFIELD:

Discussion is good.

6 MR. PIETRANGELO:

And just finish this slide off, 7

our --

l l

8 MR. BEEDLE:

But he wants an opportunity to 1

9 appeal.

l 10 CHAIRMAN JACKSON:

They could say that you 11 confessed with prejudice, that you can bring it back up l

12 again.

l 13 MR. PIETRANGELO:

If we thought this was dealing 14 with scope, then we wouldn't feel so strongly about needing 15 the next step.

16 CHAIRMAN JACKSON:

I understand, but I just want 17 to point out there is some subtlety there and it's not -- it 18 does relate to, I think, the scope.

Okay.

Let's go on.

i 19 MR. PIETRANGELO:

That's all I had on 50.59.

l 20

[ Laughter.]

21 MR. PIETRANGELO:

Unless there's any further

]

22 questions on this.

Again, I think we need a separate 23 briefing.

We were going to bring Mr. Ray out for today's 24 discussion, but given that we only had limited time, we 25 really couldn't justify his trip out here.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

105 1

But I think we would look forward to the 2

opportunity to further discuss in detail what the problems 3

are.

4 CHAIRMAN JACKSON:

I think we'll give the staff 5

time to digest and so on and you all to work some more, but 6

I think it is appropriate to have a separate meeting.

7 MR. PIETRANGELO:

Okay.

If we could move to the 8

next slide, please.

FSAR updates, I think Dave said most of 1

9 what had to be said here.

Again, we think this is probably 10 our best example yet of how we get together early on these 11 things and talk about them, that it can be of benefit.

12 In this case, we haven't seen 99-001 yet, but our 13 expectation is that it should be a relatively clean 14 endorsement of the guideline, based on the discussions we 15 had in putting the guideline together.

I 16 As soon as we get a little bit further on where i

i 17 the Commission is going with 50.59, we're going to schedule 18 our next licensing workshop.

One of our objectives at that 19 workshop is to start getting some feedback on the 20 implementation of that guideline.

When we sent it to the l

21 Commission, we also sent it-out across the industry for use.

l-22 CHAIRMAN JACKSON:

Let me just make sure I L

I 23-understand.

Has the task force that developed the 98-03 j

24 agreed to add clarification to those guidelines to stipulate 25 that risk significant SSCs should not be removed from the i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

... -. ~. -.

.. - - - - - -. - ~.

l 8

106 l

1 FSARs?

1 2

MR. PIETRANGELO:

Yes.

We had a discussion with 3

the staff last week with regard to that.

That was never the L

4 intent of the update guidance at all.

5 CHAIRMAN JACKSON:

And you'll add -- it's going to 6

be clarified to that effect.

l 7

MR. PIETRANGELO:

What we talked to the staff l

1 8

about is if there's any -- there is probably some other l

\\

9 little areas where --

10 CHAIRMAN JACKSON:

That's not a little area, but I i

11 understand.

But you mean little in the sense of word 12 changes.

i i

13 MR. PIETRANGELO:

Right, and we'd like.to do them i

14 all at once.

We'll issue Rev.

1, but we've agreed to j

i l

- 15 already add that provision in the annex of the document.

l 1

l 16 However, let me -- and I was scribbling this down t

17 before, about I understand the concern there, but -- and i

i 18 that's why -- and I think ".r.

Ray would say this if he was

)

19 here, we need to get on with this next step, because there's f

20 a notion that if I put it in the SAR, I've got regulatory i

o 21 control and if it's not in the SAR, I don't have regulatory I

22 control, and it puts all this pressure on level of detail 23 that's in the SAR and all that.

24 That's why we want to move to the next step.

We i

1 25 don't think that's appropriate.

There are certain key ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i

Washington, D.C.

20036 (202) 842-0034 j

i m

. -.-.__ ~. _-

107 1

things in the SAR that are tied to the licensing basis of 2

the plant.

There's a lot of other information that really 3

kind of mucks up this process, and that's why we need to go 4

to the next step.

5 And this notion about don't remove risk l

6 significant information and maybe later how to move more 7

risk significant information that's in there seems to be j

i 8

premised on the notion that if it's not in the SAR, we're l

[

9 going to lose it.

We need to get over that.

10 CHAIRMAN JACKSON:

See, let's not go down that 11 path, because if we had addressed the scope issue --

l 12 MR. PIETRANGELO:

That's water under the bridge, 13 Chairman.

14 CHAIRMAN JACKSON:

-- in a broad-based way, we 15 wouldn't be having to deal with what should be in the SAR or i

16 what should not be in the SAR.

That's the point, that 17 because of a lot of discussion back and forth and where we 18 ended up, we are ending up dealing with the SAR in this --

19 having to deal with it and how it should be updated, what 20 should be in it.

21 But if one were dealing in a broad scope with what 22 should come under the regulatory umbrella and how we deal l

23 with that in a risk-informed way, then we wouldn't have 24 surrogates for that in this form.

25 So that's all I have to say about it.

But let me i

i 1

JJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

l 108 1

ask you this.

Assuming that 98-03 becomes the selected 2

approach for doing the updates and for assuring compliance 3

with 50.71(e), how much time do you think it would take for 4

all the licensees to meet this guidance?

5 MR. PIETRANGELO:

They've been using it since 6

November when we distributed it.

That's one of the things I 7

think we want to find out at this workshop.

I don't think I 8

can answer your question today.

And there may be other 9

things beyond the point you raised that we'd want to tweak 10 the guidelines, given the feedback we get from licensees.

11 So I think the schedule the Commission laid out, I 12 think that can be beat in terms of finalizing the thing by 13 September, given that this is so straightforward that 14 there's no reason why it should take that long.

15 COMMISSIONER McGAFFIGAN:

I just want to 16 understand the process.

The intent would be that while this 17 is out for comment, you would do this Rev.

1.

18 MR. PIETRANGELO:

No.

19 COMMISSIONER McGAFFIGAN:

And that we would 20 endorse in the final guide Rev. 1 rather than Rev.

O, or is 21 the intent 22 MR. PIETRANGELO:

I haven't worked through all 23 that, logic, in my head, yet, but I think we want to get 24 feedback plus any things that come up in terms of the 25 regulatory endorsement, consider them, incorporate them

JRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

t 3

109 1

~ where appropriate, and I think the point you raised we've l

i 2

already agreed to incorporate, and that would be the one l

3 that would be endorsed.

4 So prior to -- maybe as part of the -- when 98-03 l

5 Rev. O goes out for comment, in our comments back, we would 6

say how we would change --

7 COMMISSIONER McGAFFIGAN:

So you would say how you 8

would change to incorporate the staff -- any tweaks that the 1

9 staff suggests or others, perhaps, and then we would be in a

(

10 position to endorse effectively Rev.

1.

We would say we 11 endorse Rev. O with these changes, which turns out to be l

12 Rev.

1.

l 13 MR. PIETRANGELO:

Yes.

We need to figure out the i

l 14

.right, proper way to do that, but that would be --

l t

15-COMMISSIONER McGAFFIGAN:

Is that the way that 16 would work?

17 MR. PIETRANGELO:

Yes.

18 COMMISSIONER McGAFFIGAN:

Okay.

I sort of regard, J

19 Madam Chairman, in response to your comment, this clause i

L 20 that the staff is proposing to us is sort of a savings 21 clause for the later scope discussion.

In fact, it's the i

22 first place for -- I'll read you it, I may be violating some 23 rule, but the words they want you to say in Section A-2 are, 24 is the intent of this guideline to help-licensees remove 25 unimportant information from new FSARs, such as excessive ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

d 110 j

1 detail, obsolete or redundant information.

The guideline is 2

not intended to be used to remove information from new FSARs 4

3 regarding SSCs, the insights from operating experience, or 4

probabilistic risk assessments we'd indicate are risk 5

significant.

6 Your normal mantra is operating experience, 7

engineering analyses or probabilistic risk assessment.

So I 8

suspect the staff would accept that, but that is what I 9

remember the mantra from the rule changes to be.

But this 10 is, in a sense, a savings clause for that later scope 11 discussion.

12 MR. PIETRANGELO:

Yes.

In fact, it may even be a 13 little narrower than our current mantra, because the risk 14 information, insights from PRA pick up that stuff.

15 The deterministic engineering things already 16 should be in there.

17 COMMISSIONER McGAFFIGAN:

Right.

18 MR. PIETRANGELO:

The important ones.

Operating 19 experience is pretty broad and I think our comment back to 20 the staff was we would probably strike the operating 21 experience part, because that should be incorporated in the 22 PRA and come out in the risk insights.

But we're not --

23 we're on the same page.

24 CHAIRMAN JACKSON:

When is your workshop or your 25 ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

._~.. -.

111 1

MR. PIETRANGELO:

We haven't scheduled it yet, 2

Chairman.

It somewhat depends on what happens -- you're 3

going to get a paper on it, I guess, February 19.

[

4 CHAIRMAN JACKSON:

Okay.

5 MR. PIETRANGELO:

That hopefully would be released l

6 fairly soon thereafter.

i 7

CHAIRMAN JACKSON:

So it would be sometime after 8

that.

I 9

MR. PIETRANGELO:

Yes.

I 10 CHAIRMAN JACKSON:

I see.

Okay.

11 MR. PIETRANGELO:

Okay.

Next slide, please.

Dave t

12 went through this a little bit and we are still in the early 13 stages of discussion with the staff on what the 14 interpretation should be.

15 I'm not going to sugarcoat it and say we're really 16 close.

We're not.

17 CHAIRMAN JACKSON:

Can~you say where some of the 18 big differences are, from your point of view?

19 MR. PIETRANGELO:

Yes.

I think there's design 20 basis for 50.2 that we would consider to be those design j

21 functions that are necessary to place the plant in a safe 22 condition following a postulated design basis accident.

)

23 There.are other design functions and these have been termed, 24 and I think the staff coined this phrase in a NUREG several l

25 years ago, engineering decign basis, that don't have to do I

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 1

1 112 1

with a safety function or placing the plant in a safe

)

2 condition.

3 There are other attributes that the equipment have 4

that probably aren't safety related.

And I think the 5

confusion has been this level of detail and I think the 6

rule-making on reporting will address some of the concern, 7

but it doesn't eddress all of it, when you get into license 8

renewal, when you get into what information you put in the 9

SAR.

10 I would disagree with Dave a little bit in terms 11 of I think what was put in the SAR does define, to some 12 extent, what the 50.2 design basis information is, because i

13 that hasn't changed since 1960-something.

14 CHAIRMAN JACKSON:

But then if that's true, how do 15 we complete this endorsement of guidance for the update, if 16 there isn't clarity on design basis definition?

17 MR. PIETRANGELO:

First, let me state, with regard 18 to our design basis program guidelines, that is a revision 19 to an old NUMARC document from 1990 and what was added in 20 the revision was just more examples on what we think are 21 design basis information examples.

22 We are not requesting endorsement of all of 97-04 23 because there are things in there with regard to good 24 practices on how to structure a design reconstitution 25 program that we don't need regulatory endorsement for.

What ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

i.

's 113 i

I we do need is in the second bullet, and that is to really 2

finally get a common understanding of what the 50.2 3

definition entails.

4 And the staff sent us a letter.

I think there is 5

some movement from where we were maybe in the fall, but l

l 6

we've got a ways to go on this.

7 CHAIRMAN JACKSON:

I guess what I'm interested in l

8 is can you speak to what impact, if any, you see on the 9

updating of the FSAR?

10 MR. PIETRANGELO:

Given the way that the guidance 11' is structured, unless there was a change to the facility 12 that affected design basis information, then you wouldn't 13 have to add anything to the SAR.

l 14 We think that's at a fairly high level and there's 15 other criteria within the guidance document that speaks to 16 that.

Beyond that, there is guidance with regard to i

I 17 providing a sufficient level of understanding of the design 18 basis when you make a change, but changes are very few that j

.19 would affect design basis and so the update guidance doesn't 20 address what was originally required to be in the SAR and 21 what is the current information that's in there.

22 It's only going to be the result of a change to 23 the; plant and there's certainly not going to be enough of 24 those to go back and if the intent is to redo what 50.34 J

25 required whenever, that's not going to happen through the i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW., Suite 1014 Washington, D.C.

20036 l

(202) 842-0034 l

114 1

update process.

2 CHAIRMAN JACKSON:

But, again, that's why I have 3

some level of discomfort, because if you talk about changes 4

to the plant that can change the design envelope in some way 5

that's substantial, then I guess I don't understand how, in 6

the absence of clarity on definition of design basis -- I'm 7

worried.

8 Nobody wants to finish off the FSAR update and the 9

50.59 rule-making more than I do, but I just want to be sure 10 we're not stepping off of a cliff here.

11 MR. PIETRANGELO:

And I don't think I disagree 12 with you, Chairman.

I think this activity, and that's the 13 last bullet, we have to get there.

Just one other point, 14 and this has to do with some of the plants that underwent 15 these architect engineering inspections and some plants have 16 been down for quite some time.

17 I think this problem about what the design basis 18 information is clouded some of those issues with regard to 19 those plants and what is and what's not and what's inside 20 and outside the design basis.

21 The other part of that is that when the staff -- I 22 think it was the old AEOD -- reviewed some of the design 23 basi.s discrepancies that were reported by licensees that had 24 either ongoing programs or were subject to the inspections, 25 there's not a lot of risk significance that comes out of ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

I' 115 1

those reports, and this is fairly an area that -- and I 2

think we knew that from the late 80s and early 90s, that 3

when you do these, you don't get a lot of --

4 CHAIRMAN JACKSON:

Are you -- is your basic issue 5

does your basic issue have to do with the risk 6

significance of what constitutes design basis information or does it have to do with -- because my understanding is that 7

8 the staff historical definition of this position hasn't 9

changed.

10 MR. PIETRANGELO:

I think it's a perception.

I 11 really think it's a perception issue and I think to some 12 degree --

13 CHAIRMAN JACKSON:

I mean, one could argue this.

14 Let me just say this.

One could argue that design basis 15 information is design basis information as we historically 16 have understood it, assuming we've historically understood 17 it.

But where we're talking about in terms of risk 18 informing various things has to do with, given that, what 19 happens in certain circumstances and how do we risk-inform 20 rules appropriately.

1 21 That's a separate -- that's one path.

Another 22 path has to do with somehow changing the fundamental 23 definition of what constitutes design basis information to 24 say that now the new definition of what constitutes design l

l 25 basis information is some risk-informed list or i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

4 116 1

risk-informed definition and those are -- one path has more 2

stability associated with it and one path allows us to 3

complete the 50.59 rule-making and the FSAR update and the 4

other path has a lot more instability associated with it.

5 Namely, if you're talking about coming up with 6

some new fundamental definition of what constitutes design 7

basis information, that is some risk-informed definition, as 8

opposed to risk-informing rules within a given definition of 9

design basis, those are very different paths.

10 What is your position here?

l 11 MR. PIETRANGELO:

I don't think we are 12 contemplating any radical change or any change to the 50.2 13 definition, but I think as part of the defining what safety 14 significant means with regard to SSCs, at some point, and 15 hopefully this discussion will happen very early this year, 16 you've got to define what accident analyses and credible 17 events that you're going to use to define what is important 18 to safety in the hardware of the plant.

19 Right now, it's these events that have been 20 postulated 35 years ago, and some of them are credible, some 21 of them are not credible.

There's others that aren't in 22 that set that we know are credible.

We need to risk-inform 23 that and I think from -- once you get your handle on those i

24 analyses, then you can back out what equipment you need to 25 defend against those events and the design -- that's why the i

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

.. -.. _ _. _. _ _. _. _.. _ _... _ - - - ~ _ _ _ _ _. _ _. _. _ _ _ _ _ _ _ _

M l

117 l

1 definition doesn't need to change.

It's still the intended 2

functions to place the plant in a safe condition.

3 You would apply it to that set that you define as i.

4 what you need to protect against.

5 CHAIRMAN JACKSON:

I just want to say this.

l 6

Obviously, this is a complex area, but be very careful 7

because you may be treading on something that really has to l

8 do with creating a fundamental instability in the overall l

9 regulatory basis that we're operating on in Part 50 and I l

10 think we have to go down that path very carefully.

11 MR. PIETRANGELO:

Okay.

Next slide, please.

I 12 License renewal.

I had a feeling you were going to jump to 1

13 that, Commissioner McGaffigan, early on, but let me just say l

14 that I want to jump on the Chris Grimes bandwagon first here 15 with respect to on behalf of the industry, the j ob he's 16 doing in terms of managing that effect, the feedback we've 1

17 gotten from --

18 CHAIRMAN JACKSON:

He and his people.

It's a 19 bunch of folks working on it.

20 MR. PIETRANGELO:

That's correct.

But the point I l

21 made before, though, is that it's not Chris and his people.

22

-It's the agency, that there are other branches in NRR that 23 are heavily involved in license renewal review and to put 24 all that on Chris I think is inappropriate.

25 There has to be, I think, a more holistic effort i

i ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

i

+

I 118 1

to ensure the Commission's intent is carried out in the --

2 CHAIRMAN JACKSON:

I think we have a holistic i

3 effort.

4 MR. PIETRANGELO:

Okay.

I 5

CHAIRMAN JACKSON:

We have to just maintain it, I

i 6

but we have it.

7 MR. PIETRANGELO:

Right.

I think the feedback we i

8 have from the lead applicants is that they're cautiously 9

optimistic about what's occurred.

I think the discipline 10 that the Commission has given to the hearing processes is 11 welcome and the staff sticking to the schedule is welcome.

12 I think the way Mr. Tekman would put it is the 13 water is fine, come on in, to the other applicants that we 14 expect in the --

t 15 CHAIRMAN JACKSON:

Do you have some sense for the 16 numbers in terms of in the 99 to 2001 time-frame?

17 MR. PIETRANGELO:

A handful.

18 MR. BEEDLE:

We've got about six plants that have 19 indicated an interest in doing that.

20 CHAIRMAN JACKSON:

Okay.

21 MR. BEEDLE:

And much of what we're going to see I 22 think is based on our experience with these first two 23 plants.

24 CHAIRMAN JACKSON:

What are you -- what is your 25 reaction to what the staff said about this metering of the

JU1 RILEY & ASSOCIATES, LTD.

i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D-C.

20036 (202) 842-0034

s 119 l

1 applications, if there is?

2 MR. BEEDLE:

I think what you're going to have is 3

a challenge of trying to balance your resources against the industry's desire and I think many of these plants have got 4

5 a time line that they can, in fact, adjust their submissions 6

to accommodate the work load considerations that you're 7

going to have here in the agency.

8 But I think there is clearly an opportunity to l

9 manage that.

I 10 COMMISSIONER MERRIFIELD:

Do you think we'll have 11 some lucky volunteers for 1999 to fill that void?

12 MR. BEEDLE:

I think Calvert Cliffs is going to 13 be.

14 CHAIRMAN JACKSON:

If we get it done.

15 MR. BEEDLE:

If we see a continuation of the i

16-progress that we've had to date, then I think that's going l

17 to encourage some utilities to maybe consider moving their 18 license submittals up.

But if we get bogged down and it's I

19 going-to have a similar effect and it's going to cause them 20 delay.

21 CHAIRMAN JACKSON:

Okay.

22 MR. PIETRANGELO:

Before we leave this slide, I 23 want:to address a question Commissioner Merrifield had 24 before about potential impact of the maintenance rule change 25 on license renewal.

JJUJ RILEY & ASSOCIATES, LTD.

i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 I

(202) 842-0034

_.___..m..

l e

120 1

Before we finalized our comments on a proposed 2

revision of the maintenance rule, we briefed the license 3

renewal working group, that's comprised of the lead 4

applicants, as well as everybody else in the industry who is 5

interested in this, and we did a full briefing of that and 6

then utnez -- beyond that, I think the individual plants 7

were reviewing our position on that and had no problem with 8

what we proposed to do on a maintenance rule.

9 The last slide -- now, I brought with me a copy of 10 the statement of considerations for the 1995 rule and I also 11 brought with me a NUREG from the 1991 rule, called 12 foundation for the adequacy of the licensing basis.

i 13 There's been a lot of work in terms of 14 establishing these principals for license renewal and 15 they're captured in this first bullet here on -- it's 16 adequate and then it carries forward.

17 And there's other words that I've highlighted l

18 here, but I'm not going to go through this, that this should 19 not be about a re-verification of the adequacy of the 20-existing CLB programs.

21 An observation we have based on what's transpired 22 thus far is that a lot of this appears to be a 23 re-verification of the adequacy of the CLB programs that 24 carry forward into the renewal term.

25 We believe that the focus of the review, and, ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

121 1

again, there's words to suggest that in here, that we're 2

trying to find areas where the current programs would not 3

address known aging mechanisms and that should be the real 4

focus of the review.

5 And given the resource question we just had 6

before, as well as Mr. McNeal's statement about trying to 7

get down to six months, that doesn't appear to be that much 8

of a stretch goal if these principals are upheld through the 9

review.

And it's not just what Chris and his staff does.

10 Again, that's an agency thing about -- these are all -- a 11 lot of these are old existing programs that the agency has a 12 lot of experience dealing with.

13 So they know what it takes in the current -- for 14 the current plants to meet those requirements.

There should 15 not be a need -- and I want to clarify something David said 16 before.

Our position -- and this was with regard to the l

17 environmental qualification rule -- is not just to check the

(

l 18 box and say we continue to meet 50.49.

That's not our 19 position.

20 We believe there should be a summary description 21 in the renewal application of the aging effects that your 22 environmental qualification program addressed.

And that's 23 no d.ifferent in year 25 versus year 45.

24 If there's additional aging mechanisms that -- and 25 for equipment that EQ pertains to that aren't addressed in ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut. Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

)

i 122 1

the current program, then there should be more in the 2

application.

But that's what shodld be the focus of the 3

review, not a re-verification of what people currently do to 4

meet the current rule.

5 So that's the question we'd like to leave on the l

l 6

table for you and we're going to talk to the steering group 7

tomorrow about this.

But if these principals hold up, at 8

least as we interpret them in the statement of 9

considerations, then I think the resource questions and how 10 fast you can do it are kind of in a new paradigm.

1 11 CHAIRMAN JACKSON:

Any comments?

12 COMMISSIONER McGAFFIGAN:

It sounds like they need 1

13 to do some discussing.

14 MR. BEEDLE:

Chairman, that completes our remarks.

i 15 We thank you for the opportunity to make some observations.

16 CHAIRMAN JACKSON:

Thank you.

Commissioner?

17 COMMISSIONER MERRIFIELD:

The only thing I'd 18 mention is we did have a lot of compliments on staff and I 19 do want to make known and repeat that the work the NEI did 20 on the FSAR was very helpful in a mutual effort to make that 21 a success.

22 CHAIRMAN JACKSON:

I want to thank you, and thank 23 you.for continuing to work with the staff and work in good i

24 faith.

Appreciate it.

l 25 I'd like to thank, in fact, the staff and the JJRJ RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

t 123 j

1 Nuclear Energy Institute for an informative briefing.

As 2

we've heard and said repeatedly, some significant 3

accomplishments and progress have been made with respect to 4

various reactor initiatives.

1 5

However, as evident and as evident in the 6

discussion, some significant work remains and important 7

decisions.

Now, the Commission recognizes that there is, in 8

fact, a lot on the staff's plate and, at the same time, on 9

the nuclear industry's plate.

And so the Commission is 10 appreciative of all efforts of tackling the -- aimed at 11 tackling the hard issues and asking tough questions, but 12 coupled with that, working in a solutions mind set and 13 maintaining cognizance of schedules.

14 Because not only are we challenged in the l

15 individual tasks, but -- and I repeat, we do have to remain 16 vigilant of the impact on other agency tasks and programs to 17 ensure that the decisions we make and the approaches we 18 pursue are consistent and focused on safety in a coherent i

19 and a risk-informed manner.

20 The Commission looks forward in particular to the 21 staff's recommendation on the final wcrding for the draft 22 rule on 10 CFR 50.59, including where we have to bite the 23 bullet.

24 And I would urge the staff to continue your 25 healthy interactions with the various stakeholders and to ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034 l

4 124 1

bring to the Commission recommendations that the staff 2

believes pertain to policy issues and are the right thing to 3

do.

4 So unless my colleagues have any further questions 5

or comraents, we' re adj ourned.

Thank you.

6 (Whereupon, at 12:55 p.m.,

the briefing was 7

concluded.]

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 4

24 25 AdRJ RILEY & ASSOCIATES, LTD.

Ccurt Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.

20036 (202) 842-0034

6 i

CERTIFICATE 1

e This is to certify that the attached description of a meeting of the U.S. Nuclear Regulatory Commission entitled:

I TITLE OF MEETING:

BRIEFING ON REACTOR LICENSING i

INITIATIVES PUBLIC MEETING PLACE.OF MEETING:

Rockville, Maryland DATE OF MEETING:

Wednesday, January 13, 1999 i

was held as herein appears, is a true and accurate record of the meeting, and that this is the original transcript thereof taken stenographically by me, thereafter reduced to typewriting.by me or under the direction of the court

-reporting company i

Transcriber:

Natalie Renner i

1 Reporter:

Mike Paulus i

)

l 4

3-

-r--

r 3- - --

, _u.w f.

.A a.a a 4 m a mm - 4e. e 4.4

- -.mAm4u as#

m.m u s.omuw ussame++

s.r+..wa wuwm..a,,.

4_....--w a....

,_..m-4 4

l 4

l l'

i R

I-1, 1

L' f

a 3

d 4

8 4

I 4

6 i

4 1

I b

h a

a 5

l 6

t i

1

-n++

-,-- +,

i

, ;<. 3 ' ' ' e. a..,. a,. p: eg.:

j a

S i

i NRC Briefing on Reactor Licensing Initiatives 1

l January 13,1999 i

l Ralph Beedle c m m.a L. n,,c..,

Tony Pietrangelo NEI k

i m anaw. w r 10 CFR 50.59 Rulemaking Compreaensive, c etailed proposal

=

c eveloped by staff facilitated substantive comment by industry Most comments agreed with staff

=

proposals or provided clarifications Margin of safety and definition of change are key remaining issues l

NEI h+

__[_o

I,

I

^'

T l

Margin of Safety i

14 options identified in proposed

=

rulemaking l

Proposec industry approach is a

=

hybrid of several options Focus is on fission product barrier l

=

l parameters and associated design bases limits NEI so-i

... _., _ _ -,,.., _.. _ _,. -. _ _, _ -. - _ - _ _.. ~. _,..,. _ - -, _

f 9..igejw.ye p:;n p,3c.:,.q.

..f.-

~f I

1 l

Definition of " Change" L

l m Important impact on determining i

I when 50.59 evaluations are required j

i 4

= Opportunity to c arify rule and utilize l

resources more effectively 1

l

= Incustry proposal assures impacts on intenc ed c esign functions receive fu eva.uation l

NEI u

j

._ _ _ _,-._ _.u -

4

^

_=.-, c.,we -

j l

l FSAR Updates l

= Gooc example of the benefits of early anc frequent communication

= Strong consensus on intent and content of guidance

= Future industry workshop will gather fee'dback on implementation experience NEI i

k i

l Design Bases Activities l

I

= Still in early stages of discussion with NRC staff l

= Industry objective: Attain common 4

understanding of what information is l

captured by 50.2 definition i

i

= VIust resolve this issue to improve c arity and consistency l

NEI

w w.s z a License Renewal i

l

= Lead application reviews proceecing on schedule i

l l

= Expect additional applications in 1999-2001 1

l

= Incustry observing process closely l

1 NEI 4+

4 1,_..___..___._,_,.,_.

, mv +.4w l

l l

License Renewal i

i

= Foundation Principles

. Current licensing basis is adequal:e

. Current licensing basis carries forward

= Policy Question

. Is the intent of the rule to reverify existing CLB programs and activities?

NEI k

.l

ggREGy l

l l}I r

i e

l

%,ws>+++++}

COMMISSION BRIEFING Licensing initiatives January 13,1999

=c.o u m 7 L1 (;) 8: i4

I INTRODUCTION l

License Renewal e

License Transfer 10 CFR 50.59 Rulemaking FSAR Updates Other Licensing Initiatives e

2 9

i l

LICENSE RENEWAL l

)

implement 10 CFR 54 and 51 which provide e

safe plant operation and assessment of 4

environmental impacts for renewal Establish a review process that is effective, e

efficient, timely and predictable i

1 j

1

,,,,, ~,. _, - - - - -

LICENSE RENEWAL PROCESS 1

Establish reliable review schedules Promptly identify and address issues Improve implementation guidance e

e Public outreach Program oversight e

1 4

m

--3, c

LICENSE RENEWAL STATUS I

i e

Calvert Cliffs e

Oconee NEl generic activities e

i i

Owners groups generic technical reports Other interested plants I

e

.b 1

i

i NRC LICENSE TRANSFERS i

Completed Actions i

e l

Final rule to streamline the license transfer hearing j

process published (December 3,1998)

Final SRPs on:

i Financial Qualifications and Decommissioning i

Funding Assurance l

Antitrust Draft SRP on Foreign Ownership, Control, and Domination i

I

NRC LICENSE TRANSFERS { cont.)

Pending Actions Timely license transfer reviews (TMI-1 and Pilgrim)

Complete Final SRP on Foreign Ownership Develop policy options on non-owner operators Issue lessons learned from recent license transfers Develop SRP to document current practice in review of technical qualifications Develop integrated SRP on license transfers 7

10 CFR 50.59 RULEMAKING

Background

Issues from comment letters:

Margin of safety proposals Guidance on minimal increases in probability and consequences, including cumulative effects Screening of changes Clarifications on definitions Pads 71,72, and 76 Enforcement policy Guidance development 8

10 CFR 50.59 RULEMAKING (cont.}

l Approach and Schedule Staff analyzing comments to identify policy issues for Commission consideration and propose revisions to rule Staff requested alternative approach to allow Commission direction on certain key issues before completion of final rule package Potential future changes to 50.59 (revised scope and risk-informed options) l 9

FSAR UPDATE GUIDANCE i

Provide clear guidance for the required content of e

Updated FSARs Publish draft guide (DG-1083) for public comment DG-1083 endorses industry guideline, NEl 98-03 issue final regulatory guide in September 1999 e

)

i 10 t

,-,,--...n,--

.,,.,.,-,.,,,...,,.,,,,.,..,,,,,..,_..,n..,-.,.,,.-r,

1 i

i o

!l OTHER LICENSING l.NITIATIVES i

Define Design Basis e

Application of Backfit Rule Applicability of Backfit Rule to Decommissioning e

Activities Licensing Actions e

Requests for Additional Information (RAls) e Confirmatory Action Letters (CALs) e Improved Standard Technical Specifications j

e e

2.206 Petitions 11

)

DEFINE DESIGN BASIS Provide a clear definition of what constitutes design bases information (10 CFR 50.2)

NEl submittal of revised guidance document (NEl 97-04) by the end of January 1999 Options for meeting the objective include:

Endorsing NEl guidance via regulatory guide Issuing staff guidance via regulatory guide or other means 12 i

^

i APPLICATION OF BACKFIT RULE l

Ob,iective i

i Ensure that the staff closely adheres to the backfit rule (10 CFR 50.109) in evaluating all additional requirements, expansion in scope, or unique interpretations (pertaining i

to operating or decommissioning plants) l against actual impact on public health and safety 1

i j

13 2

i i

PLANNED IMPROVEMENTS TO THE LICENSING ACTION PROCESS Maintain internal steering group to interface with industry

]

steering group and obtain industry feedback Conduct early and frequent communications with licensees e

and establish " firm" schedules i

Conduct initial acceptance review e

e Increase staff accountability Centralize workload management e

Move toward a more function-based organization i

e 14 9

i l

Nuclear Reactor Safety - Reactor Licensing FY 1999 Goal: 80% s 1 year,95% s 2 years,100% s 3 years s 1 YEAR OLD s 2 YEARS OLD 100 1M g.

g.

5 3

3 Y n

% n 0

l G-r/

e E

^ ' * " '.

_ mn 4 mow an= 4 ma. ". ~.

M.

ma mv an.

eE, my an ] eE, 4 nov s 3 YEARS OLD

> 3 YEARS OLD in, a

p:~

100

^ +-.

. M e.sa rtu N

4 j

- 80 5 n E

i E

- so z

8 X.

y,,

~,

a 2

a.

20

,, i,, i 7 i A I,,,

i A

  • -t.i.titAt1.t.itAt-0

=

DEC Re AMt ase AUS OCT DEC DEC M

AMt am M

M N

15

l REQUESTS FOR ADDITIONAL INFORMATION (RAls)

Determine relevancy of RAI to regulatory finding i

e e

Limit staff to one round of RAls; if licensee does not l

fully answer RAI, consider management meeting with licensee (typically)

Revised office letter on license amendment review procedures to address RAI concerns Conducting training sessions with staff regarding e

l expectations and revised guidance

'I g

16 7

CONFIRMATORY ACTION LEI iERS Stakeholder concern that CALs may bypass formal 1

procedures - Imposing new requirements CALs are typically associated with extended plant e

shutdowns and recapturing design basis j

Enforcement Manual Guidance revised (11/98) e I

e Management expectations reinforced CALs must meet threshold of enforcement policy CALs should not:

Impose new requirements Bypass the Backfit Rule j

Prolong plant shutdowns 1

17

.._-,.---.-m..

i l

l STANDARD TECHNICAL SPECIFICATIONS i

60 -

j i

50 -

/

/

/

/

m 40 i

i 3

2 E 30

,/

1

.os

  • 20 -

10 g

i i

i i

i 1

0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 l

Submitted Approved i

18 4

e l

10 CFR 2.206 PETITION l

REVIEW AND PROCESS CHANGES l

2.206 Petition Review 130ard established for review of e

j new petitions Effort to achieve timely closure of new petitions Greater emphasis on management involvement at an early stage Obtaining stakeholder feedback 19