TXX-5044, Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Log # TXX-5044 File # 10010 908.1 | {{#Wiki_filter:Log # TXX-5044 File # 10010 908.1 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 ggQl@f "NN?A?E?5 | ||
TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 "NN?A?E?5 Mr. Eric H. Johnson, Director | !T Mr. Eric H. Johnson, Director p | ||
Division of Reactor Safety and Projects W | |||
Division of Reactor Safety and Projects | U. S. Nuclear Regulatory Commission S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000 b, | ||
Arlington, TX' 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 26: | Line 27: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). | |||
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986. | This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986. | ||
The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987. The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date. | The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987. | ||
The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date. | |||
We anticipate submitting our next report by March 27, 1987. | We anticipate submitting our next report by March 27, 1987. | ||
Very truly yours, f | Very truly yours, f | ||
($ | |||
W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy) | W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection and Enforcement (15 copies) j | Director, Inspection and Enforcement (15 copies) j U. S. Nuclear Regulatory Commission Washington, D. C. | ||
20555 4 | |||
8610090011 860926 i | |||
PDR ADOCK 05000445 g | |||
PDR A snvisson or rexas vritsries etecrurse courans | |||
-}} | |||
Latest revision as of 22:04, 7 December 2024
| ML20203N424 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/26/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-10, TXX-5044, NUDOCS 8610090011 | |
| Download: ML20203N424 (1) | |
Text
Log # TXX-5044 File # 10010 908.1 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 ggQl@f "NN?A?E?5
!T Mr. Eric H. Johnson, Director p
Division of Reactor Safety and Projects W
U. S. Nuclear Regulatory Commission S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000 b,
Arlington, TX' 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-1.0 (INTERIM REPORT)
Dear Mr. Johnson:
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774).
This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986.
The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987.
The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date.
We anticipate submitting our next report by March 27, 1987.
Very truly yours, f
($
W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies) j U. S. Nuclear Regulatory Commission Washington, D. C.
20555 4
8610090011 860926 i
PDR ADOCK 05000445 g
PDR A snvisson or rexas vritsries etecrurse courans
-