TXX-5044, Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Log # TXX-5044 File # 10010 908.1     .
{{#Wiki_filter:Log # TXX-5044 File # 10010 908.1 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 ggQl@f "NN?A?E?5
TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 "NN?A?E?5 Mr. Eric H. Johnson, Director
!T Mr. Eric H. Johnson, Director p
                                                                                    !T ggQl@f p
Division of Reactor Safety and Projects W
Division of Reactor Safety and Projects                                         W U. S. Nuclear Regulatory Commission                                                   S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000                                                                   b, Arlington, TX' 76012                                                           --
U. S. Nuclear Regulatory Commission S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000 b,
Arlington, TX' 76012


==SUBJECT:==
==SUBJECT:==
Line 26: Line 27:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774).
On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986.
This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986.
The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987. The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date.
The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987.
The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date.
We anticipate submitting our next report by March 27, 1987.
We anticipate submitting our next report by March 27, 1987.
Very truly yours, f               ($
Very truly yours, f
($
W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)
W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies) j           U. S. Nuclear Regulatory Commission 4            Washington, D. C. 20555 8610090011 860926                                                                                         i PDR   ADOCK 05000445 g                   PDR A snvisson or rexas vritsries etecrurse courans}}
Director, Inspection and Enforcement (15 copies) j U. S. Nuclear Regulatory Commission Washington, D. C.
20555 4
8610090011 860926 i
PDR ADOCK 05000445 g
PDR A snvisson or rexas vritsries etecrurse courans
-}}

Latest revision as of 22:04, 7 December 2024

Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427
ML20203N424
Person / Time
Site: Comanche Peak  
Issue date: 09/26/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-10, TXX-5044, NUDOCS 8610090011
Download: ML20203N424 (1)


Text

Log # TXX-5044 File # 10010 908.1 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 ggQl@f "NN?A?E?5

!T Mr. Eric H. Johnson, Director p

Division of Reactor Safety and Projects W

U. S. Nuclear Regulatory Commission S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000 b,

Arlington, TX' 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-1.0 (INTERIM REPORT)

Dear Mr. Johnson:

On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774).

This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986.

The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987.

The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date.

We anticipate submitting our next report by March 27, 1987.

Very truly yours, f

($

W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection and Enforcement (15 copies) j U. S. Nuclear Regulatory Commission Washington, D. C.

20555 4

8610090011 860926 i

PDR ADOCK 05000445 g

PDR A snvisson or rexas vritsries etecrurse courans

-