o ENCLOSURE 1 l
ENCLOSURE 1                                   ;
NOTICE OF VIOLATION System Energy Resources, Inc.
l NOTICE OF VIOLATION l
Docket No. 50-416 I
System Energy Resources, Inc.                                       Docket No. 50-416   I Grand Gulf                                                           License No. NPF 29 l                                                                                                                       i During the Nuclear Regulatory Commission (NRC) inspection conducted on                   I 1988                                                    !
Grand Gulf License No. NPF 29 i
!                                August     20 - September In accordance        with the      23,"Gener,al Statement of Policy and Procedure for NR ;
l During the Nuclear Regulatory Commission (NRC) inspection conducted on I
Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:
August 20 - September 23,"Gener,al Statement of Policy and Procedure for N 1988 In accordance with the Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:
,                                      Technical Specification (TS) 6.8.1.a requires that procedures shall be             :
Technical Specification (TS) 6.8.1.a requires that procedures shall be established,i lesented and maintained covering the applicable procedures recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i
established,i       lesented and maintained covering the applicable procedures   !
Februa 1978.
:                                      recocaended             ndix "A" of Regulatory Guide 1.33 Revision 2, dated       i Februa       1978.                                                       Protec- !
inistrative Procedure 01-5 06-1, Revision 21, dent to Protec-tive T ing System states for tha shift supervisor /superinten evalua the tagging, out of breakera and determine the effect on plart i
tive T        ing System inistrative Procedure states for            01-5 06-1, /superinten tha shift supervisor  Revision 21, dent to !
;i operation by all affected components.
,                                    evalua       the tagging, out of breakera and determine the effect on plart       i operation by all affected components.                                               >
i Contary to the above, the licensee failed to follow Ahinistrative Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I
;i i                                    Contary to the above, the licensee failed to follow Ahinistrative                   ;
affect on other equipment and plant operation.
Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any           I affect on other equipment and plant operation. This resulted in a loss of           .
This resulted in a loss of instrument air inside containment and a reactor scram on September 5, 1988.
!                                      instrument air inside containment and a reactor scram on September 5,             !
i I
!                                    1988.                                                                               !
This is a Severity Level IV violation (SupplementI),
i                                                                                                                         I This is a Severity Level IV violation (SupplementI),                               !
i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc.
i                               Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc.             is I
is I
!                              hereby required to submit a written statement or explanation to the Nucle,ar             !
hereby required to submit a written statement or explanation to the Nucle,ar Regulatory Commission ATTN:
:                              Regulatory Commission         ATTN:   Document Control Desk                             i j                               with a copy to the Re,flional Administrator Region If, Washington, DC 20555and a co!
Document Control Desk Region If, Washington, DC 20555and a co!
Resident Jnspector wit tin 30 days of the date of the letter transmitting this           l Notice. This reply should be clearly marked as a "Reply to a Notice of                   l 1
i j
Violation" and should include (for each violation): (1)admissionordenialof
with a copy to the Re,flional Administrator Resident Jnspector wit tin 30 days of the date of the letter transmitting this l
;                              the violation, (2) the reason for the violation if admitted, (3) the corrective           i
Notice.
!                              steps which have been taken and the results at.hieved, (4) the corrective steps           l
This reply should be clearly marked as a "Reply to a Notice of l
!                              which will be taken to avoid further violations, and (5) the date when full               l l                               compliance will be achieved. Where good cause is shown, consideration will be             !
1 Violation" and should include (for each violation):
given to extending the response time. If an adequate reply is not received               l l                               within the time specified in this Notice, an order may be issued to show cause           i j                               why the Ifcense should not be modified suspended, or revokec8 or why such other           i
(1)admissionordenialof the violation, (2) the reason for the violation if admitted, (3) the corrective i
;                              actionasmaybepropershouldnotbef,aken,                                                     j FOR THE NUCL   REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l
steps which have been taken and the results at.hieved, (4) the corrective steps l
ReactorProjectsiranch1                       -
which will be taken to avoid further violations, and (5) the date when full l
:;                                                                          DivisionofReactorProjects                     f i
l compliance will be achieved.
l                              Dated at Atlanta Georgia                                                                 ;
Where good cause is shown, consideration will be given to extending the response time.
j                              this 6th day of October 1988                                                             ;
If an adequate reply is not received l
SS10210484 881006 DR        ADOCKO'500g6
l within the time specified in this Notice, an order may be issued to show cause i
j why the Ifcense should not be modified suspended, or revokec8 or why such other i
actionasmaybepropershouldnotbef,aken, j
FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l
ReactorProjectsiranch1 DivisionofReactorProjects f
i l
Dated at Atlanta Georgia j
this 6th day of October 1988 SS10210484 881006 ADOCKO'500g6 DR
,}}
,}}

Latest revision as of 20:18, 7 December 2024

Notice of Violation from Insp on 880820-0923.Violation Noted:Failure to Follow Administrative Procedure 01-5-06-1 to Evaluate Whether Opening Breaker Had Any Effect on Other Equipment & Plant Operation
ML20204E981
Person / Time
Site: Grand Gulf 
Issue date: 10/06/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20204E979 List:
References
50-416-88-19, NUDOCS 8810210484
Download: ML20204E981 (1)


Text

.

1 f

o ENCLOSURE 1 l

NOTICE OF VIOLATION System Energy Resources, Inc.

Docket No. 50-416 I

Grand Gulf License No. NPF 29 i

l During the Nuclear Regulatory Commission (NRC) inspection conducted on I

August 20 - September 23,"Gener,al Statement of Policy and Procedure for N 1988 In accordance with the Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Technical Specification (TS) 6.8.1.a requires that procedures shall be established,i lesented and maintained covering the applicable procedures recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i

Februa 1978.

inistrative Procedure 01-5 06-1, Revision 21, dent to Protec-tive T ing System states for tha shift supervisor /superinten evalua the tagging, out of breakera and determine the effect on plart i

i operation by all affected components.

i Contary to the above, the licensee failed to follow Ahinistrative Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I

affect on other equipment and plant operation.

This resulted in a loss of instrument air inside containment and a reactor scram on September 5, 1988.

i I

This is a Severity Level IV violation (SupplementI),

i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc.

is I

hereby required to submit a written statement or explanation to the Nucle,ar Regulatory Commission ATTN:

Document Control Desk Region If, Washington, DC 20555and a co!

i j

with a copy to the Re,flional Administrator Resident Jnspector wit tin 30 days of the date of the letter transmitting this l

Notice.

This reply should be clearly marked as a "Reply to a Notice of l

1 Violation" and should include (for each violation):

(1)admissionordenialof the violation, (2) the reason for the violation if admitted, (3) the corrective i

steps which have been taken and the results at.hieved, (4) the corrective steps l

which will be taken to avoid further violations, and (5) the date when full l

l compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

If an adequate reply is not received l

l within the time specified in this Notice, an order may be issued to show cause i

j why the Ifcense should not be modified suspended, or revokec8 or why such other i

actionasmaybepropershouldnotbef,aken, j

FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l

ReactorProjectsiranch1 DivisionofReactorProjects f

i l

Dated at Atlanta Georgia j

this 6th day of October 1988 SS10210484 881006 ADOCKO'500g6 DR

,