TXX-6328, Interim Deficiency Rept CP-86-69 Re Failure to Incorporate Restraining/Support Requirements Into Project Procedures & Specs.Initially Reported on 861002.Documents Supporting Util Position in Final Review Stages.Next Rept by 870427: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
F- | F-Log # TXX-6328 | ||
-9 File # 10110 L | |||
C 909.1 r | |||
C Ref #10CFR50.55(e) 1UELECTRIC | |||
%illiam G. Coumil cmwi, r,<, er,,tsen, March 27, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 30: | ||
Preliminary evaluations indicate that in the event these conditions had remained uncorrected no condition adverse to the safety of plant operations would exist. Documentation supporting our position is currently in the final stages of review. | Preliminary evaluations indicate that in the event these conditions had remained uncorrected no condition adverse to the safety of plant operations would exist. Documentation supporting our position is currently in the final stages of review. | ||
Our next report will be submitted no later than April 27, 1987. | Our next report will be submitted no later than April 27, 1987. | ||
Very truly yours, | Very truly yours, N[ | ||
N[ | / | ||
l W. G. Counsil l | I l | ||
8704010111 870327 PDR | W. G. Counsil l | ||
ADDCK 05000445 | 8704010111 870327 | ||
/ | |||
PDR | PDR ADDCK 05000445 By: | ||
g, 3, geejey Manager,NuclearLylensing DAR:ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV | ,7 S | ||
PDR g, 3, geejey n / | |||
Manager,NuclearLylensing DAR:ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV 9 | |||
S,o | |||
.-}} | |||
Latest revision as of 16:57, 7 December 2024
| ML20205H605 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/27/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CP-86-69, TXX-6328, NUDOCS 8704010111 | |
| Download: ML20205H605 (1) | |
Text
-
F-Log # TXX-6328
-9 File # 10110 L
C 909.1 r
C Ref #10CFR50.55(e) 1UELECTRIC
%illiam G. Coumil cmwi, r,<, er,,tsen, March 27, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SUPPORT OF CLASS 1E WIRING SDAR: CP-86-69 (INTERIM REPORT)
Gentlemen:
On October 2,1986, we verbally notified your Mr. I. Barnes of a deficiency regarding the failure to incorporate specific restraining / support requirements defined by IEEE Standard 420-1973, " Class IE Control Switchboards," into project specifications and procedures. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e) Our most recent interim report was logged TXX-6225, dated January 21, 1987. We requested and received a two week extension until March 27, 1987 in providing a response to this deficiency during the March 13, 1987, telephone conversation with Mr. I. Barnes.
Preliminary evaluations indicate that in the event these conditions had remained uncorrected no condition adverse to the safety of plant operations would exist. Documentation supporting our position is currently in the final stages of review.
Our next report will be submitted no later than April 27, 1987.
Very truly yours, N[
/
I l
W. G. Counsil l
8704010111 870327
/
PDR ADDCK 05000445 By:
,7 S
PDR g, 3, geejey n /
Manager,NuclearLylensing DAR:ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV 9
S,o
.-