{{#Wiki_filter:- _ . . _ _ _ _     -_ . - - .
{{#Wiki_filter:- _.. _ _ _ _
c..               s I
c..
                                                                                                                      <h FE Log # IXX-887E7 Fi1e 8 10110             ;
s I
                                                                                  =                 909.2     .
<h FE Log # IXX-887E7 Fi1e 8 10110
M# ELECTRIC Ref. # 10CFR50.SS(e)
=
October 28, 1988
909.2 Ref. # 10CFR50.SS(e)
                                % Nuese G. Ceemeu                                                                     .
M# ELECTRIC October 28, 1988
nm ,. n, n,m l
% Nuese G. Ceemeu l
1 U. S. Nuclear Regulatory Commission                                                   l Attn Document Control Desk                                                             -
nm,. n, n,m 1
Washington, D. C. 20555                                                               !
U. S. Nuclear Regulatory Commission l
St%1ECT: COMANCHE PEAK STEAM ELECTRIL STATION (CPSES)                                 !
Attn Document Control Desk Washington, D. C.
DOCKET NOS. 50-445 AND 50-446                                           ;
20555 St%1ECT: COMANCHE PEAK STEAM ELECTRIL STATION (CPSES)
STATION SERVICE WATER SYSTEM LEAKAGE                                   l SDAR: CP-86-07 (SUPPLEMENTAL REPORT)                                   j Gentle.wn:                                                                             !
DOCKET NOS. 50-445 AND 50-446 STATION SERVICE WATER SYSTEM LEAKAGE l
t On Ap'il 11, 1986, wie notified you by our letter logged TXX-4762 of a                 "
SDAR: CP-86-07 (SUPPLEMENTAL REPORT) j Gentle.wn:
deficiency involving weld failure and coating degradation in the Station               ~
t On Ap'il 11, 1986, wie notified you by our letter logged TXX-4762 of a deficiency involving weld failure and coating degradation in the Station
Serv \ce Water (SSW) System. Our last report, logged TXX-88476, was submitted on Ju.se 22, 1988. The purpose of thit, report is to update the status of the     .
~
corrective actions implemented to date.                                               '
Serv \\ce Water (SSW) System. Our last report, logged TXX-88476, was submitted on Ju.se 22, 1988.
In TXX-88476, we listed several Unit I corrective actions which we anticipated         >
The purpose of thit, report is to update the status of the corrective actions implemented to date.
would be completed by October 28, 1988. The following corrective actions have         ,
In TXX-88476, we listed several Unit I corrective actions which we anticipated would be completed by October 28, 1988.
been completed. The documents associated with this work are in the process of         I administrative review and will be completed by Dece+ber 1, 1988,
The following corrective actions have been completed. The documents associated with this work are in the process of I
: 1. The plasite 7122 has been removed from the safety related carbon steel           !
administrative review and will be completed by Dece+ber 1, 1988, 1.
piping in the SSW System.
The plasite 7122 has been removed from the safety related carbon steel piping in the SSW System.
l
l 2.
: 2. The section of pipe in the Unit 1 Train "B" dist.harge piping between the       :
The section of pipe in the Unit 1 Train "B" dist.harge piping between the reducing orifice and the flow orifice has been replaced.
    ..                              reducing orifice and the flow orifice has been replaced.                         l
l 3.
: 3. The installation of flange insulation kits or the replacement of carbon steel bolts with stainless steel bolts at all himetallic connections has been ccmpleted,                                                                 p i
The installation of flange insulation kits or the replacement of carbon steel bolts with stainless steel bolts at all himetallic connections has been ccmpleted, p
r i
i r
es1101053o esto2s                                                                           [
i es1101053o esto2s
[
gDR ADOCK0500g5 i
gDR ADOCK0500g5 i
M North Obw 5s art LB 8I Denes Texas 13Ml                   ;
M North Obw 5s art LB 8I Denes Texas 13Ml
                                                                                                                    .N
.N


TXX-88757 October 28, 1988 Page 2 of 2 The following is the status of the remaining corrective actions being implemented to resolve this deficiency:
TXX-88757 October 28, 1988 Page 2 of 2 The following is the status of the remaining corrective actions being implemented to resolve this deficiency:
1 The revised estimated completion date for development of the corrosion monitoring plan to monitor SSW System corrosion rates is December 1, 1988.
1 The revised estimated completion date for development of the corrosion monitoring plan to monitor SSW System corrosion rates is December 1, 1988.
: 2. Draft operating procedures (as described in item 5 of the corrective actions contained in TXX-88476) are in review. The estimated approval date for issuance of these procedures has been revised to December 1, 1988.
2.
: 3. As previously stated in TXX-88476, the replacement of water absorbing gaskets with non-water absorbing gaskets is being done on a case-by-case basis as the flanges are opened for maintenance or other reasons.
Draft operating procedures (as described in item 5 of the corrective actions contained in TXX-88476) are in review.
Additionally, it was previously comitted in TXX-4762 to eliminate a flow induced vibration problem at 1-SW-026 via use of a longer pipe nipple. This problem was actually eliminated by utilizing a shorter, thicker pipe nipple.
The estimated approval date for issuance of these procedures has been revised to December 1, 1988.
3.
As previously stated in TXX-88476, the replacement of water absorbing gaskets with non-water absorbing gaskets is being done on a case-by-case basis as the flanges are opened for maintenance or other reasons.
Additionally, it was previously comitted in TXX-4762 to eliminate a flow induced vibration problem at 1-SW-026 via use of a longer pipe nipple.
This problem was actually eliminated by utilizing a shorter, thicker pipe nipple.
Our next rcoort, which will be submitted no later than July 29, 1989, will detail our corrective actions for Unit 2 installations.
Our next rcoort, which will be submitted no later than July 29, 1989, will detail our corrective actions for Unit 2 installations.
Very truly yours, W2 i%)L
Very truly yours, W2
                                                            /d /.
/.
W. G. Counsil MCP/gj c - Mr. R. D. Martin, Region IV Resident inspectors, CPSE! (3)
i%)L
                          -}}
/d W. G. Counsil MCP/gj c - Mr. R. D. Martin, Region IV Resident inspectors, CPSE! (3)
-}}

Latest revision as of 16:31, 7 December 2024

Supplemental Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Station Svc Water Sys.Initially Reported on 860411.Plasite 7122 Removed from safety-related Carbon Steel Piping in Svc Water Sys.Next Rept by 890729
ML20205L232
Person / Time
Site: Comanche Peak  
Issue date: 10/28/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-07, CP-86-7, TXX-88757, NUDOCS 8811010530
Download: ML20205L232 (2)


Text

- _.. _ _ _ _

c..

s I

<h FE Log # IXX-887E7 Fi1e 8 10110

=

909.2 Ref. # 10CFR50.SS(e)

M# ELECTRIC October 28, 1988

% Nuese G. Ceemeu l

nm,. n, n,m 1

U. S. Nuclear Regulatory Commission l

Attn Document Control Desk Washington, D. C.

20555 St%1ECT: COMANCHE PEAK STEAM ELECTRIL STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 STATION SERVICE WATER SYSTEM LEAKAGE l

SDAR: CP-86-07 (SUPPLEMENTAL REPORT) j Gentle.wn:

t On Ap'il 11, 1986, wie notified you by our letter logged TXX-4762 of a deficiency involving weld failure and coating degradation in the Station

~

Serv \\ce Water (SSW) System. Our last report, logged TXX-88476, was submitted on Ju.se 22, 1988.

The purpose of thit, report is to update the status of the corrective actions implemented to date.

In TXX-88476, we listed several Unit I corrective actions which we anticipated would be completed by October 28, 1988.

The following corrective actions have been completed. The documents associated with this work are in the process of I

administrative review and will be completed by Dece+ber 1, 1988, 1.

The plasite 7122 has been removed from the safety related carbon steel piping in the SSW System.

l 2.

The section of pipe in the Unit 1 Train "B" dist.harge piping between the reducing orifice and the flow orifice has been replaced.

l 3.

The installation of flange insulation kits or the replacement of carbon steel bolts with stainless steel bolts at all himetallic connections has been ccmpleted, p

i r

i es1101053o esto2s

[

gDR ADOCK0500g5 i

M North Obw 5s art LB 8I Denes Texas 13Ml

.N

TXX-88757 October 28, 1988 Page 2 of 2 The following is the status of the remaining corrective actions being implemented to resolve this deficiency:

1 The revised estimated completion date for development of the corrosion monitoring plan to monitor SSW System corrosion rates is December 1, 1988.

2.

Draft operating procedures (as described in item 5 of the corrective actions contained in TXX-88476) are in review.

The estimated approval date for issuance of these procedures has been revised to December 1, 1988.

3.

As previously stated in TXX-88476, the replacement of water absorbing gaskets with non-water absorbing gaskets is being done on a case-by-case basis as the flanges are opened for maintenance or other reasons.

Additionally, it was previously comitted in TXX-4762 to eliminate a flow induced vibration problem at 1-SW-026 via use of a longer pipe nipple.

This problem was actually eliminated by utilizing a shorter, thicker pipe nipple.

Our next rcoort, which will be submitted no later than July 29, 1989, will detail our corrective actions for Unit 2 installations.

Very truly yours, W2

/.

i%)L

/d W. G. Counsil MCP/gj c - Mr. R. D. Martin, Region IV Resident inspectors, CPSE! (3)

-