IR 05000087/1987001: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:v | {{#Wiki_filter:v | ||
. | |||
N APR 011988 Docket No. 50-87 Westinghouse Electric Corporation ATTN: Mr. G. W. Scholand, Manager Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 Gentlemen: | N APR 011988 Docket No. 50-87 Westinghouse Electric Corporation ATTN: | ||
This refers to the routine physical security and Material Control and Accountability inspection conducted by Mr. G. L. Pirtle of this office on March 18-19, 1987, of activities at the Westinghouse Nuclear Training Reactor authorized by NRC License No. R-119 and to the discussion of our findings with Mr. K. Hamrick and other members of your staff at the conclusion of | Mr. G. W. Scholand, Manager Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 Gentlemen: | ||
This refers to the routine physical security and Material Control and Accountability inspection conducted by Mr. G. L. Pirtle of this office on March 18-19, 1987, of activities at the Westinghouse Nuclear Training Reactor authorized by NRC License No. R-119 and to the discussion of our findings with Mr. K. Hamrick and other members of your staff at the conclusion of the inspection. | |||
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. | |||
No violations of NRC requirements were identified during the course of this inspection. | |||
Sections 2.f, 2.g, 5 and 6 of the Report Details identify commitments to resolve previous inspection findings or concerns noted during this inspection. | |||
Please advise in writing, within 30 days, if our understanding of your commitments is incorrect. | |||
Areas examined during the inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice," | |||
Part 2, Title 10, Code of Federal Regulations. | |||
Consequently, our report of this inspection will not be placed in the NRC Public Document Room. | |||
ATTACHE::: conyggy;57\\ | |||
87040 hS INNSTm? | |||
- | |||
p PDR w9 | |||
. | |||
FN 0 1 1987 Westinghouse Electric Corporation | |||
We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely, | Sincerely, | ||
W. L. Axelso , Chief Nuclear Materials Safety and Safeguards Branch Enclosure: Inspection Report No. 50-087/87001(DRSS) | W. L. Axelso, Chief Nuclear Materials Safety and Safeguards Branch Enclosure: | ||
==Inspection Report== | |||
No. 50-087/87001(DRSS) | |||
(PART 2.790(d) INFORMATION) | |||
cc w/ enclosure: | cc w/ enclosure: | ||
Ms. K. Rueter, Manager, WNTP, A. T. Sabo, Director, Licensing Safeguards & Safety A. Joseph Nardi, Manager NES License Administration DCS/R$B (RIDS) | Ms. K. Rueter, Manager, WNTP, | ||
A. T. Sabo, Director, Licensing | |||
Safeguards & Safety | |||
A. Joseph Nardi, Manager | |||
NES License Administration | |||
DCS/R$B (RIDS) | |||
cc w/ enclosure, w/o PART 2.790(d) | cc w/ enclosure, w/o PART 2.790(d) | ||
INFORMATION: | INFORMATION: | ||
Licensing Fee Management Branch II | Licensing Fee Management Branch | ||
II | |||
tle/ib | RIII | ||
M | |||
RII | |||
# | |||
h | |||
{ | |||
tle/ib | |||
. reed | |||
. | |||
Ax | Ax | ||
on | on | ||
, | |||
{ | { | ||
ATTAC WENT CONTAINS N | |||
10 CFR 2.790 zygogyggyng | |||
}} | }} | ||
Latest revision as of 14:30, 7 December 2024
| ML20205R836 | |
| Person / Time | |
|---|---|
| Site: | 05000087 |
| Issue date: | 04/01/1987 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Scholand G WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| References | |
| NUDOCS 8704060459 | |
| Download: ML20205R836 (2) | |
Text
v
.
N APR 011988 Docket No. 50-87 Westinghouse Electric Corporation ATTN:
Mr. G. W. Scholand, Manager Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 Gentlemen:
This refers to the routine physical security and Material Control and Accountability inspection conducted by Mr. G. L. Pirtle of this office on March 18-19, 1987, of activities at the Westinghouse Nuclear Training Reactor authorized by NRC License No. R-119 and to the discussion of our findings with Mr. K. Hamrick and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No violations of NRC requirements were identified during the course of this inspection.
Sections 2.f, 2.g, 5 and 6 of the Report Details identify commitments to resolve previous inspection findings or concerns noted during this inspection.
Please advise in writing, within 30 days, if our understanding of your commitments is incorrect.
Areas examined during the inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Consequently, our report of this inspection will not be placed in the NRC Public Document Room.
ATTACHE::: conyggy;57\\
87040 hS INNSTm?
-
p PDR w9
.
FN 0 1 1987 Westinghouse Electric Corporation
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W. L. Axelso, Chief Nuclear Materials Safety and Safeguards Branch Enclosure:
Inspection Report
No. 50-087/87001(DRSS)
(PART 2.790(d) INFORMATION)
cc w/ enclosure:
Ms. K. Rueter, Manager, WNTP,
A. T. Sabo, Director, Licensing
Safeguards & Safety
A. Joseph Nardi, Manager
NES License Administration
DCS/R$B (RIDS)
cc w/ enclosure, w/o PART 2.790(d)
INFORMATION:
Licensing Fee Management Branch
II
RIII
M
RII
h
{
tle/ib
. reed
.
Ax
on
,
{
ATTAC WENT CONTAINS N
10 CFR 2.790 zygogyggyng