TXX-6385, Advises That on 870326,util Transmitted Rev 3 to S&W Facility Procedure CPPP-7, Design Criteria for Pipe Stress & Pipe Supports. Project Memo Used to Identify Sections of Rev 3 to CPPP-7 Which Require Confirmation for Usage Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.   - - _ -
{{#Wiki_filter:_.
M                                 Log # TXX-6385
M Log # TXX-6385
                                                =M                                 File # 10068 r
=M File # 10068 2
2
10010 clo r
                                                          =
=
10010 clo RIELECTRIC
RIELECTRIC
[*gyg',                                                                     April 1, 1987 e U.tS.nNuclearaRegulatory.Commissioni Attn: Document Control Desk Washington, D.C. 20555
[*gyg',
April 1, 1987 e U.tS.nNuclearaRegulatory.Commissioni Attn: Document Control Desk Washington, D.C.
20555


==SUBJECT:==
==SUBJECT:==
Line 31: Line 33:
Very truly yours,
Very truly yours,
[
[
* td W. G. Counsil By: ,        ,  _,
* td W. G. Counsil By:,
G. S. Keeley     -    's Manager,NuclearLl/nsing JCH/gj Attachment                                                                                                     l c - Mr. E. H. Johnson - Region IV                                                                             j Hr. D. L. Kelley, RI - Region IV                                                                         l Mr. H. S. Phillips, RI - Region IV                                                                       !
G. S. Keeley
8704070146 070401 PDR A
's Manager,NuclearLl/nsing JCH/gj Attachment c - Mr. E. H. Johnson - Region IV j
ADOCK 05000445 PDR     ,                                                  6[
Hr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV 8704070146 070401 6[
400 North Olne Mreet   1.11. M l Dalla, lese 75201                         l
PDR ADOCK 05000445 A
                                                                                                                  .]
PDR 400 North Olne Mreet 1.11. M l Dalla, lese 75201 l
.]


Attachment to TXX-6385 April.1, 1987 CTONE O WEesTER ENCINEERING CORPOZATION - CHERRY HILL OPERATION 3 CENTER PM- 135 INTEROFFICE MEMORANDUM                                 k125 15616/15454 PROJECT MEMORANDUM NO.
Attachment to TXX-6385 April.1, 1987 CTONE O WEesTER ENCINEERING CORPOZATION - CHERRY HILL OPERATION 3 CENTER PM-135 INTEROFFICE MEMORANDUM k125 15616/15454 PROJECT MEMORANDUM NO.
SUBJECT     COMANCllE PEAK STEAM ELECTRIC STATION     DATE 2-23-87 UNITS 1 AND 2 SECTIONS OF CPPP-7, REVISION 3,           FROM   RPKlause:ACD Wi!ICl! REQUIRE CONFIRMATION All CPPP Manual lloiders                          2145-1545405-IIC4WPC Job Book H3.1 Job Book M3.2.7 The purpose of this memorandum is to identify sections of CPPP-7, Revi-sion 3, which require confirmation for their usage, where this is not specified in the text.     Calculations which use any of the following sec-tions shall be marked " Confirmation Required."
SUBJECT COMANCllE PEAK STEAM ELECTRIC STATION DATE 2-23-87 UNITS 1 AND 2 SECTIONS OF CPPP-7, REVISION 3, FROM RPKlause:ACD Wi!ICl! REQUIRE CONFIRMATION 2145-1545405-IIC4WPC All CPPP Manual lloiders Job Book H3.1 Job Book M3.2.7 The purpose of this memorandum is to identify sections of CPPP-7, Revi-sion 3, which require confirmation for their usage, where this is not specified in the text.
NOTE:     The sections listed below are in addition to others noted in CPPP-7, Revision 3, as requiring confirmation.
Calculations which use any of the following sec-tions shall be marked " Confirmation Required."
: 1. Attachment 3-8, Section 3.0, the factor of 2.0 for seismic ac-celerations and the factor of 5.0 for fluid transient acceleration
NOTE:
: 2. Section 4.6.4.1, the 25 percent increase in thermal expansion loads
The sections listed below are in addition to others noted in CPPP-7, Revision 3, as requiring confirmation.
: 3. Attachment 4-6A, Section 5.1.1, the multiplier factor of 3.0 for thermal and OBEA Loadings
: 1. -8, Section 3.0, the factor of 2.0 for seismic ac-celerations and the factor of 5.0 for fluid transient acceleration 2.
: 4. Section 4.7.2.1, the application of 42 kai for A500, Grade B, material minimum yield strength This memorandum will be revised as above factors are confirmed.
Section 4.6.4.1, the 25 percent increase in thermal expansion loads
R. P. Klause Project Manager w _ _ _ _ - _ _ .                                                                                      ^'}}
: 3. -6A, Section 5.1.1, the multiplier factor of 3.0 for thermal and OBEA Loadings 4.
Section 4.7.2.1, the application of 42 kai for A500, Grade B, material minimum yield strength This memorandum will be revised as above factors are confirmed.
R. P. Klause Project Manager w
^'}}

Latest revision as of 03:50, 7 December 2024

Advises That on 870326,util Transmitted Rev 3 to S&W Facility Procedure CPPP-7, Design Criteria for Pipe Stress & Pipe Supports. Project Memo Used to Identify Sections of Rev 3 to CPPP-7 Which Require Confirmation for Usage Encl
ML20205S863
Person / Time
Site: Comanche Peak  
Issue date: 04/01/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-6385, NUDOCS 8704070146
Download: ML20205S863 (2)


Text

_.

M Log # TXX-6385

=M File # 10068 2

10010 clo r

=

RIELECTRIC

[*gyg',

April 1, 1987 e U.tS.nNuclearaRegulatory.Commissioni Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF STONE & WEBSTER ENGINEERING CORPORATION PROJECT MEMORANDUM CONCERNING PROCEDURE CPPP-7, REVISION 3 Gentlemen:

On March 26, 1987, we transmitted Revision 3 to Stone & Webster Engineering Corporation's Comanche Peak Project Procedure CPPP-7, " Design Criteria for Pipe Stress and Pipe Supports" (see TXX-6345). Attached is a project memorandum used to identify sections of CPPP-7, Revision 3, which require confirmation for their usage, where this is not specified in the text.

The Atomic Safety and Licensing Board will be notified of this transmittal by separate letter from our attorney.

Very truly yours,

[

  • td W. G. Counsil By:,

G. S. Keeley

's Manager,NuclearLl/nsing JCH/gj Attachment c - Mr. E. H. Johnson - Region IV j

Hr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV 8704070146 070401 6[

PDR ADOCK 05000445 A

PDR 400 North Olne Mreet 1.11. M l Dalla, lese 75201 l

.]

Attachment to TXX-6385 April.1, 1987 CTONE O WEesTER ENCINEERING CORPOZATION - CHERRY HILL OPERATION 3 CENTER PM-135 INTEROFFICE MEMORANDUM k125 15616/15454 PROJECT MEMORANDUM NO.

SUBJECT COMANCllE PEAK STEAM ELECTRIC STATION DATE 2-23-87 UNITS 1 AND 2 SECTIONS OF CPPP-7, REVISION 3, FROM RPKlause:ACD Wi!ICl! REQUIRE CONFIRMATION 2145-1545405-IIC4WPC All CPPP Manual lloiders Job Book H3.1 Job Book M3.2.7 The purpose of this memorandum is to identify sections of CPPP-7, Revi-sion 3, which require confirmation for their usage, where this is not specified in the text.

Calculations which use any of the following sec-tions shall be marked " Confirmation Required."

NOTE:

The sections listed below are in addition to others noted in CPPP-7, Revision 3, as requiring confirmation.

1. -8, Section 3.0, the factor of 2.0 for seismic ac-celerations and the factor of 5.0 for fluid transient acceleration 2.

Section 4.6.4.1, the 25 percent increase in thermal expansion loads

3. -6A, Section 5.1.1, the multiplier factor of 3.0 for thermal and OBEA Loadings 4.

Section 4.7.2.1, the application of 42 kai for A500, Grade B, material minimum yield strength This memorandum will be revised as above factors are confirmed.

R. P. Klause Project Manager w

^'